一种疏浚施工管道的泥浆浓度确定系统、方法及存储介质
By acquiring voltage and conductivity data of mud conveying and cooling equipment through signal acquisition and processing equipment, and combining them with the linear back projection formula, the radiation risk and accuracy problems of mud concentration monitoring in dredging construction pipelines in the existing technology are solved, and high-precision mud concentration monitoring is achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- NAT ENG RES CENT OF DREDGING TECH & EQUIP
- Filing Date
- 2025-08-26
- Publication Date
- 2026-07-17
AI Technical Summary
Existing technologies for determining the mud concentration in dredging pipelines using gamma-ray densitometers and ultrasonic testing suffer from radiation risks and accuracy issues due to air bubble interference, resulting in poor practicality.
The voltage, conductivity, and temperature data of the mud conveying equipment and mud pump cooling equipment are acquired using signal acquisition equipment. The data is then processed by signal processing equipment to determine the conductivity of the carrier fluid in the mud, and the mud concentration is calculated. By combining the linear back projection formula and flow control, real-time monitoring of the mud concentration is achieved.
It improves the practicality and accuracy of slurry concentration monitoring in dredging construction pipelines, enabling accurate monitoring of slurry concentration in construction environments with varying fluid conductivity. It is highly practical and accurate.