Pre-stressed pipe pile advance guide hole combined hammering type pile sinking construction method
The construction method of prestressed pipe pile pre-drilling combined with hammer driving pile construction has solved the construction problem under alternating soft and hard geological conditions, and has achieved precise construction and efficient pile driving of pipe piles under complex geological conditions, meeting the foundation bearing capacity requirements of heavy-load buildings.
Patent Information
- Application Number
- CN202511167255.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-20
- Publication Date
- 2025-12-02
AI Technical Summary
Traditional prestressed pipe pile construction technology cannot be carried out in complex geological conditions with alternating layers of soft and hard rock. It is impossible to determine the thickness of the underground rock layer and the depth of the bearing layer at the pile location, and it is impossible to estimate the pile length. The pipe pile cannot penetrate the rock layer. In addition, the construction of cast-in-place concrete piles is cumbersome, time-consuming, and difficult to control the quality, and cannot meet the foundation bearing capacity requirements of large-load buildings.
The construction method of prestressed pipe pile pre-drilling combined with hammer driving is adopted. Through precise pile position measurement, pneumatic down-the-hole hammer pre-drilling, accurate geological exploration, welding quality control, verticality observation and optimization of hammer driving method, the pipe pile is ensured to penetrate the rock strata and meet the design requirements.
It enables precise construction of pipe piles under complex geological conditions, improves construction quality and efficiency, reduces the number of piles and the foundation area, lowers project costs, and shortens the construction cycle.
Smart Images

Figure CN121047261A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction, and in particular to a construction method for prestressed pipe piles using a combination of pre-drilling and hammer driving. Background Technology
[0002] High-rise buildings and large column-grid structures have become the mainstream of modern urban construction, placing increasingly greater demands on the load-bearing capacity of structural foundations. Traditional prestressed concrete pipe pile construction methods are employed under favorable geological conditions using hammer driving or static pressure methods. However, for special geological conditions, such as the intermingling of strongly weathered, moderately weathered, medium sand, and silty clay layers, and the complex alternation of soft-hard-soft layers with significant undulations and uneven thickness in the strongly and moderately weathered areas, traditional geological survey reports have limited locations and significant regional variations. The geological structure changes considerably every 3-5 meters, rendering traditional prestressed concrete pipe pile construction methods unusable. Firstly, it is impossible to determine the thickness of the underground rock strata at each pile location, the depth of the bearing stratum, estimate the pile length, or determine the appropriate pile configuration. Secondly, the pipe piles cannot penetrate the rock strata, and forced construction leads to pile bursting and breakage. Finally, high-load buildings require high foundation bearing capacity, which ordinary PHC (high-strength prestressed concrete pipe piles) cannot meet. Concrete cast-in-place piles have disadvantages such as complicated construction processes, long construction periods, difficulty in quality control, and high costs. Therefore, this construction method is not suitable for complex geological conditions with alternating "soft-hard-soft" geological features.
[0003] Most domestic and international research on UHC (ultra-high strength prestressed concrete pipe pile) construction in complex geological conditions focuses on pipe pile construction in silty soft soil, primarily employing composite foundation treatment methods or UHC pile planting techniques. For pre-drilling and pile driving techniques, the majority of studies involve soil-based pre-drilling and static pressure pile construction. For instance, driving UHC pipe piles in gravel layers or residual gravelly silty clay layers is challenging, necessitating the use of long spiral pre-drilling and static pressure pile construction techniques. For foundation construction under alternating soft and hard geological conditions, most research focuses on other pile types such as PHC piles and bored piles, with very little research on UHC pipe piles.
[0004] Therefore, a prestressed pipe pile pre-drilling combined with hammer driving construction method is proposed to solve the construction problem of UHC pipe piles in complex geological conditions with alternating soft-hard layers. Summary of the Invention
[0005] This invention provides a prestressed pipe pile pre-drilling combined with hammer driving construction method, which solves the problems of limited geological survey points and large regional differences in complex geological conditions with alternating soft-hard layers, where UHC pipe piles cannot be matched with piles and cannot penetrate the rock strata.
[0006] This invention provides the following technical solution:
[0007] The construction method of prestressed pipe pile pre-drilling combined with hammer driving includes:
[0008] Step 1: Accurately survey and mark the pile locations, establish precise geological exploration for "one pile, one hole" using geological exploration machinery, determine the distribution of rock strata by drilling and core sampling, and compile advanced drilling columnar diagrams.
[0009] Step 2: Based on the depth and thickness of the rock strata shown in the advance drilling column, use a pneumatic down-the-hole hammer to guide the hole. After the pneumatic down-the-hole hammer is in place, lower the down-the-hole hammer drill bit and start the air compressor until the pilot hole penetrates the moderately weathered rock strata.
[0010] Step 3: After drilling, calculate the bearing layer location and pile length of each pile; after the pipe piles arrive on site, conduct quality acceptance; after the hammer pile driver arrives on site, check all components and instruments.
[0011] Step 4: After the pipe pile is lifted, place one end of the pile into the pile cap and adjust it by rotating and sliding the pile driver guide frame to ensure that the position and verticality of the pipe pile meet the requirements.
[0012] Step 5: Perform pile tip welding and check the quality of pile tip welding. The pile tip of the first section of pipe pile is completed and inserted into the ground. Gently place the pile hammer and observe the verticality at any time.
[0013] Step Six: During the pile driving process, the hammering construction adopts the "heavy hammer low impact" method; in the initial stage of pile driving, the hammer drop height is less than 0.5m; during the pile driving process, verticality should be observed at any time to ensure that the pile position error does not exceed 2cm and the verticality deviation does not exceed 0.5%.
[0014] Step 7: Weld the upper and lower sections of the pipe pile, ensuring that the deviation between the upper and lower sections does not exceed 2mm, the weld is continuous and full, and the natural cooling time is not less than 5 minutes;
[0015] Step 8: The final hammering standard is based primarily on hammer height and penetration, with pile length and number of hammer blows as secondary factors. During the last three rounds of hammering, the penetration of each round of 10 blows should not be less than 2cm, and the vertical height should not be greater than 70cm.
[0016] Step 9: When the designed pile top elevation is lower than the ground elevation, a special pile tube is used to drive the pile. The bottom end of the pile tube is aligned with the pile top, and then the pile top is hammered to reach the design value. The pile top elevation is controlled by measuring with a level. When there are excess pipe piles exposed on the ground or the pile top exceeds the designed pile top elevation, the pile needs to be cut. It is strictly forbidden to use a sledgehammer to strike the pile horizontally or to forcibly pull the pile to cut it.
[0017] Preferably, in step one, coordinate control points and leveling control points are set up on the construction site according to standard requirements. The coordinates of each pile position are accurately calculated according to the design drawings, and the pile positions are accurately measured and marked. After the pile position is marked, a 30cm long Ф8 steel bar or bamboo chopstick is inserted into the soil at the center to draw the outline of the pile skin. Geological exploration machinery is aligned with the pile position to drill and take core samples. The rock strata distribution is determined by the core samples and a pre-drilling columnar diagram is compiled. Pre-drilling is performed for each pile position.
[0018] Preferably, in step two, a pneumatic down-the-hole hammer is used for pilot drilling, and the pilot drilling depth is determined based on the pre-drilling columnar section. The bottom of the down-the-hole hammer drill bit has many high-hardness carbide alloy teeth, which transmit the huge impact to the rock, thereby breaking the entire rock. The diameter of the down-the-hole hammer pilot hole is the pile diameter + 200mm. During the pilot drilling process, it is necessary to avoid the pilot hole being too large, which would cause the pile body to be unstable, or the pilot hole being too small, which would cause the soil to wrap around the pile body, making it difficult to drive the pile.
[0019] Preferably, in step three, after drilling, the bearing layer position of each pile is calculated, the length of the pipe pile is calculated and the piles are matched; when the pipe piles arrive on site, the specifications and models, dimensional deviations and appearance quality, and geometric dimensions of the pile end plate are checked in a timely manner, and inspection records are made; after the hammer pile driver arrives on site, the sensitivity and effectiveness of each component and instrument are checked, and the pile driver is aligned, leveled and straightened.
[0020] Preferably, in step four, when a single pipe pile is horizontally lifted, a two-end hook lifting method is used, and when it is vertically lifted, a single-point method can be used; when the length of the pipe pile is no more than 15m, two-point lifting is used, and the distance between the lifting point and the end should be 0.21 times the length; after the pile body is in place, bidirectional verticality correction is performed, and the verticality of the pile driving frame does not exceed 1%; for short piles of 10m and below, bidirectional correction is performed using a plumb line; for piles of more than 10m or piles that need to be joined, a theodolite must be used for bidirectional correction.
[0021] Preferably, in step five, the UHC pipe pile foundation is equipped with a pile tip. The pile tip is a pointed-bottom cross-shaped sealing pile tip with an outer diameter d1 = 570 mm, a height of 150 mm, a cross-shaped pile tip steel plate thickness of 18 mm, and a sealing steel plate thickness of 12 mm. It is essential to ensure that the pile tip coincides with the centerline of the pipe pile, and the deviation should be controlled within a certain range, not exceeding 1% of the outer diameter of the pipe pile. Inspect the appearance quality of the pile tip, ensuring there are no cracks, sand holes, or porosity defects. Before welding, the welding area must be thoroughly cleaned; remove rust, oil, and dirt from the weld between the pipe pile and the pile tip until the metal luster is exposed. The interface between the pile tip and the pipe pile should be flat and tightly fitted, without misalignment or gaps. After welding, check the continuity and fullness of the weld, ensuring there are no cracks, porosity, slag inclusions, or undercut defects. For important projects or pile foundations with special requirements, perform non-destructive testing on the welded joints. If internal defects such as cracks, incomplete penetration, or lack of fusion are found through non-destructive testing, repairs should be carried out promptly. Once the first section of the pipe pile tip is in place and inserted into the ground, gently place the pile hammer and carefully check the pile position and verticality deviation. The pile position deviation should not exceed 20mm, and the verticality deviation should not exceed 0.5%.
[0022] Preferably, in step six, during the initial stage of pile driving, the hammer drop height can be appropriately increased, but the hammer return height should not exceed 70cm; during the hammering process, the "heavy hammer low impact" method should be used, and the piles should be driven from the center outwards; for piles in soft soil areas with a center-to-center distance of less than 4 times the pile diameter, or piles in a group foundation on the same pile cap, the construction methods of skip driving and diagonal driving should be used; during the construction of multi-pile pile caps, in order to ensure the accuracy of the pile position and the overall stability of the pile cap structure, the piles located at the edge of the pile cap should be constructed after the other piles inside the pile cap have been completed and repositioned before construction work is carried out;
[0023] Throughout the piling process, keep the pile hammer, pile cap, and pile body in a straight line. If necessary, adjust the guide rods of the pile hammer and pile frame according to the direction of the pile body; take care to avoid eccentric hammering of the pipe pile to prevent bending and torsional damage; when the piling difficulty increases, check whether the hammer is tilted or eccentric, especially check whether the pile pad and pile cap are suitable; if not, replace or add soft pads; each pile should be driven continuously in one go as much as possible to avoid interruption and affect subsequent piling operations; verticality should be observed at any time during the piling process to ensure that the verticality of the pile does not exceed 0.5% and control the deviation of the pile top to not exceed 2cm; during the pile driving process, a dedicated person is responsible for accurately measuring and recording the elevation and penetration.
[0024] Preferably, in step seven, when the pile needs to be extended, the pile head of the pile section in the ground should be 0.5m to 1.0m above the ground surface; when splicing the pile, the upper and lower pile sections should be kept straight, and the end faces of the upper and lower pile sections should be in close contact at the joint, with a misalignment deviation not exceeding 2mm; before splicing the pile, clean the soil and debris from the pile end, which can be done with a wire brush; during the welding process, carbon dioxide gas shielded welding should be used. First, spot welding should be performed at symmetrical positions near the bevel, with the number of spot welds controlled at 4-8 points. Two welders and two welding machines should perform welding evenly and symmetrically, using a double-layer welding method. The joint positions of the inner and outer layer welds should be staggered. During the welding process, the forming quality of the weld should be strictly controlled to ensure the fullness and continuity of the weld and avoid defects such as incomplete penetration, porosity, and slag inclusions; the welding time is 15-22 minutes, and the weld needs to be naturally cooled before continuing to apply pressure. The natural cooling time should not be less than 5 minutes, and forced cooling is strictly prohibited. The weld should be continuous and full, and there should be no construction defects.
[0025] Preferably, in step eight, the penetration depth of the last three rounds or the number of hammer blows for the last 1m pile driving is determined by test piles based on engineering geological conditions, pile type, characteristic value of single pile bearing capacity, pile specifications, and soil penetration depth. For UHC pipe piles under alternating soft and hard geological conditions, the total number of hammer blows and the number of hammer blows for the last 1m pile driving need to be tested and statistically analyzed. The total number of hammer blows for UHC piles shall not exceed 3000, and the number of hammer blows for the last 1m shall not exceed 350. During the last three rounds of hammering, the penetration depth of each round of 10 blows shall not be less than 2cm, and the vertical height shall not be greater than 70cm.
[0026] Preferably, in step nine, a cardboard or scrap plywood pad is placed inside the pile driver sleeve. The thickness of the pad after being hammered and compacted is not less than 60mm. The pile top elevation is controlled by measuring with a level instrument, and the pile driving depth does not exceed 6m. A pile saw is used for pile cutting. It is strictly forbidden to use a sledgehammer to strike the pile laterally or to forcibly pull the pile for cutting. Effective measures are taken to prevent the pile head from cracking before sawing the pile. If serious cracks appear during pile cutting, the pile should be moved down for cutting and the cracked section should be removed.
[0027] The beneficial effects of this invention are:
[0028] 1) Utilize advanced drilling to establish a precise geological exploration method of "one pile, one hole". By drilling and core sampling, compile advanced drilling columnar diagrams to accurately calculate the location, depth, and length of the bearing layer of the pipe pile in complex geological conditions.
[0029] 2) A pneumatic down-the-hole hammer is used to pre-break moderately weathered rock strata, allowing the pipe pile to penetrate the rock strata without damage to the pile body. The diameter of the down-the-hole hammer pilot hole is the pile diameter + 200mm, which avoids the instability of the pile body due to an excessively large pilot hole or the difficulty of pile driving caused by soil encroachment due to an excessively small pilot hole, thus meeting the foundation requirements of various complex geological heavy loads;
[0030] 3) It has high strength, high bearing capacity and good durability, which can reduce the number of piles and the foundation area, reduce project cost, shorten construction period and improve construction efficiency. Attached Figure Description
[0031] Figure 1 This is a flowchart of the prestressed pipe pile pre-drilling combined with hammer driving construction method of the present invention;
[0032] Figure 2 This is a flowchart of the pneumatic down-the-hole hammer drilling process of the present invention;
[0033] Figure 3 This is a schematic diagram of the advance drilling columnar diagram in this invention;
[0034] Figure 4 This is a schematic diagram of the pipe pile lifting process in this invention;
[0035] Figure 5 This is a schematic diagram of the pipe pile tip in this invention;
[0036] Figure 6 This is a schematic diagram of the pipe pile tip viewed from below in this invention;
[0037] Figure 7 This is a schematic diagram of the piling state in this invention. Detailed Implementation
[0038] The present invention will now be described in further detail with reference to the accompanying drawings, so that those skilled in the art can implement it based on the description.
[0039] like Figure 1 As shown, this embodiment of the invention provides a construction method for prestressed pipe piles using a combination of pre-drilling and hammer driving, comprising the following steps:
[0040] Step 1: Precisely mark the pile locations. Utilize geological exploration machinery to establish a precise "one pile, one hole" geological exploration system. Core sampling is used to determine the distribution of rock strata and compile a pre-drilling columnar section, addressing the limitations of traditional geological survey reports in terms of limited point locations and the inability to match pipe piles in complex geological conditions. Coordinate control points and leveling control points are set up on the construction site according to standard requirements. The coordinates of each pile location are accurately calculated based on the design drawings, and the pile locations are precisely marked. After marking the pile locations, a 30cm long Ф8 steel bar or bamboo chopstick is inserted into the soil at the center to draw the outer outline of the pile. The geological exploration machinery is then aligned with the pile location to drill cores. The rock strata distribution is determined using the core samples, and a pre-drilling columnar section is compiled. Pre-drilling is performed for each pile location. The pre-drilling columnar section is shown below. Figure 3 As shown.
[0041] Step 2: Based on the rock strata depth and thickness shown in the pre-drilling columnar section, use a pneumatic down-the-hole hammer to initiate the borehole. After the pneumatic down-the-hole hammer is in place, lower the drill bit and start the air compressor until the pilot hole penetrates the moderately weathered rock strata. For example... Figure 2 As shown, a pneumatic down-the-hole hammer is used for pilot drilling, and the pilot drilling depth is determined based on the pre-drilling columnar section. The bottom of the down-the-hole hammer drill bit has many high-hardness carbide alloy teeth. These alloy teeth transmit the enormous impact to the rock, thereby breaking up the entire rock mass. The pilot drilling diameter is the pile diameter + 200mm. During pilot drilling, it is important to avoid overly large pilot holes, which could lead to pile instability, or underly small pilot holes, which could cause soil to engulf the pile, making pile driving difficult. By incorporating pilot drilling technology, the challenges of pile foundation construction under complex geological conditions are effectively solved, improving construction quality and efficiency.
[0042] Step 3: After drilling, calculate the bearing layer location and pile length for each pile and match the piles. After the pipe piles arrive on site, conduct quality acceptance. After the hammer pile driver arrives on site, check all components and instruments, specifically checking whether each component and instrument is sensitive and effective. After ensuring the safe and normal operation of the equipment, move and adjust the pile driver according to the pile driving sequence to ensure safe operation. During the process, arrange the arrival of precast pipe piles according to the pile matching situation. After the pipe piles arrive on site, stack them neatly, and arrange the stacking position reasonably according to the pile matching situation and construction location. Use bottom pads and top covers, and arrange the pads reasonably to reduce the amount of secondary handling of pipe piles. After the pipe piles arrive at the construction site, they should be inspected and randomly sampled in a timely manner. First, check the factory certificate of conformity of the prestressed pipe piles, and then check the specifications and models, dimensional deviations and appearance quality, and geometric dimensions of the pile end plates. At the same time, check the inspection records. Both ends of the pipe piles should be cleaned. If there is paint or debris on the welding surface, it should be cleaned. The quantity and diameter of the prestressed steel bars or non-prestressed steel bars, the wall thickness of the steel pipe, the diameter and spacing of the spiral reinforcement, the length of the spiral reinforcement densification zone, and the thickness of the reinforced concrete protective layer of the pipe piles should be tested by randomly selecting two pile sections on the construction site and manually breaking them.
[0043] Step 4: After the pipe pile is lifted, place one end of the pile into the pile cap. Adjust the position and verticality of the pipe pile by rotating and sliding the pile driver guide frame. After lifting the pipe pile, place it into the pile driver's clamping box and straighten it in place, then slowly place one end of the pile into the pile cap. When lifting a single pipe pile horizontally, use the two-end hook lifting method; when lifting vertically, a single-point method can be used. For single pipe piles with a length not exceeding 15m, it is advisable to use two-point lifting, with the distance from the lifting point to the end preferably being 0.21 times the length of the pipe pile. See [link to relevant documentation]. Figure 4 During the lifting and transportation of pipe piles, they should be placed smoothly and gently to avoid vibration and impact. After the pile is in place, bidirectional verticality correction should be performed. The verticality of the pile driving frame should not exceed 1%. For short piles of 10m or less, bidirectional correction can be performed using a plumb line; for piles longer than 10m or piles requiring splicing, bidirectional correction should be performed using a plumb line or theodolite.
[0044] Step 5: Perform pile tip welding and inspect the welding quality. After the first section of the pipe pile tip is completed and inserted into the ground, gently place the pile hammer and continuously monitor its verticality. Ensure the pile tip coincides with the centerline of the pipe pile; the deviation should be controlled within a certain range, generally not exceeding 1% of the outer diameter of the pipe pile. The pile tip should be a pointed-bottom cross-shaped sealing pile tip with an outer diameter d1 = 570mm, a height of 150mm, a cross-shaped pile tip steel plate thickness of 18mm, and a sealing steel plate thickness of 12mm. Figure 5 , Figure 6 As shown. The appearance quality of the pile tip must be free of defects such as cracks, sand holes, and pores to ensure the strength and rigidity of the pile tip. Before welding, the welding area must be thoroughly cleaned. Remove rust, oil, dirt, and other impurities from the weld between the pipe pile and the pile tip until the metal luster is exposed. The interface between the pile tip and the pipe pile should be flat and tightly fitted, without misalignment or gaps. After welding, check the continuity and fullness of the weld, and ensure there are no defects such as cracks, pores, slag inclusions, or undercut. For important projects or pile foundations with special requirements, non-destructive testing should be performed on the weld joint. Commonly used non-destructive testing methods include ultrasonic testing and radiographic testing. Non-destructive testing can detect internal defects in the weld, such as cracks, incomplete penetration, and lack of fusion, allowing for timely repair. The first section of the pipe pile tip is positioned and inserted into the ground. The pile hammer is gently placed, and the pile position and verticality deviation are carefully checked. The pile position deviation must not exceed 20mm, and the verticality deviation must not exceed 0.5%.
[0045] Step Six: After the pile tip is in place, gently tap the top of the pile with the pile hammer to ensure that the pile tip falls into the soil layer evenly and slowly. Before officially starting the hammering operation, a series of low-energy, low-stroke operations must be performed, usually 3-5 times, as a preliminary penetration test to ensure that there are no abnormal obstacles in the direction of pile penetration, thus laying a solid foundation for subsequent continuous hammering. During the pile driving process, the settlement quality of the first pile section needs to be strictly monitored. In the initial stage of pile driving, a lower hammer drop height (less than 0.5m) should be used. Because the soil layer is relatively soft, the initial sinking amount may be large. As the pile driving depth increases, the sinking speed will slow down, and the hammer drop height can be appropriately increased, but the hammer return height should not exceed 70cm.
[0046] During the hammering process, the "heavy hammer low blow" method should be used, and the hammering should be carried out in the order from the center to the periphery. For piles in soft soil areas with a center-to-center distance of less than 4 times the pile diameter, or piles in a group foundation on the same pile cap, the construction methods of skip driving and diagonal driving can be used. In the construction of multi-pile pile caps, in order to ensure the accuracy of the pile position and the overall stability of the pile cap structure, the piles located at the edge of the pile cap should be constructed after the other piles inside the pile cap have been completed and repositioned before the construction work is carried out.
[0047] Throughout the piling process, the pile hammer, pile cap, and pile body should be kept in a straight line as much as possible. Length markings in meters (m) should be marked on the pile body for identification before placement. For example... Figure 7 As shown. If necessary, the guide rods of the pile hammer and pile frame should be adjusted according to the direction of the pile. Care should be taken to avoid eccentric hammering of the pipe pile to prevent bending and torsional damage. When the difficulty of pile driving increases, the hammer should be checked for tilting or eccentricity, especially the pile pad and pile cap. If they are not suitable, they need to be replaced or additional pads added. Each pile should be driven continuously in one go as much as possible to avoid interruption and affecting subsequent pile driving operations. Verticality should be observed at all times during pile driving to ensure that the verticality of the pile does not exceed 0.5% and the deviation of the pile top does not exceed 2cm. During pile driving, a designated person should be responsible for accurately measuring and recording the elevation and penetration. The condition of the pile should be observed at all times during pile driving. If there are drastic changes in penetration, sudden tilting, displacement, or severe rebound, or if the pile top or body shows bending, severe cracks, or breakage, pile driving should be stopped immediately. Remedial measures should be studied jointly with the supervisor, design unit, and construction unit. Construction can only continue after the situation has been resolved.
[0048] Step 7: Welding of upper and lower pipe pile sections. The pile head of the pile section driven into the ground should be 0.5m to 1.0m above the ground surface (platform). When splicing piles, the upper and lower pile sections should be kept straight, and the end faces of the upper and lower pile sections at the joint should be in close contact, with a misalignment deviation not exceeding 2mm. Before splicing, clean the soil and debris from the pile ends, which can be done with a wire brush. During the welding process, carbon dioxide gas shielded welding is used. First, spot welding should be performed at symmetrical positions near the bevel to fix the joint. The number of spot welds should be controlled to 4-8 points to ensure the stability and alignment of the upper and lower pile sections in the initial stage of welding. Two welders and two welding machines should perform welding evenly and symmetrically, using a double-layer welding method. The joint positions of the inner and outer layer welds should be staggered to avoid stress concentration. During the welding process, the forming quality of the weld must be strictly controlled to ensure the fullness and continuity of the weld and avoid defects such as incomplete penetration, porosity, and slag inclusions. Welding time should not be too short, generally 15-22 minutes. The weld needs to cool naturally before applying pressure again; otherwise, the weld will deform. The natural cooling time should be no less than 5 minutes. Forced cooling methods such as water cooling are strictly prohibited to prevent increased weld brittleness or structural deformation caused by rapid temperature changes. The weld should be continuous and full, and free from construction defects such as undercut, slag inclusions, and weld beads.
[0049] Step 8: The final hammering criteria are primarily based on hammer height and penetration depth, supplemented by pile length and number of blows. The penetration depth for the final three rounds or the number of blows for the final 1m of pile driving is determined through test piles based on factors such as engineering geological conditions, pile type, characteristic value of single pile bearing capacity, pile specifications, and depth of penetration. For UHC pipe piles in alternating soft and hard geological conditions, the total number of blows and the number of blows for the final 1m of pile driving need to be tested and statistically analyzed. The total number of blows for UHC piles should not exceed 3000, and the number of blows for the final 1m should not exceed 350. During the final three rounds of hammering, the penetration depth of each round of 10 blows should not be less than 2cm, and the vertical height should not exceed 70cm.
[0050] Step Nine: When the designed pile top elevation is lower than the ground elevation, a special pile driving device is used. The bottom end of the driving device is aligned with the pile top (the conical guide head is inside the hollow pile tube), and then the pile top is hammered to reach the design value. The pile top elevation is controlled by a level. A cardboard or scrap plywood pad should be placed inside the driving device sleeve. The thickness of the pad after hammering and compaction should not be less than 60mm. The pile top elevation is controlled by a level, and the driving depth should not exceed 6m. When the ultimate pressure of the pile tube is reached but the design elevation is not reached, and excess pile is exposed above the ground, driving should be stopped and pile cutting should begin. Pile cutting should be done using a pile saw; it is strictly forbidden to use a sledgehammer to strike the pile laterally or to forcibly pull the pile. Effective measures should be taken to prevent pile head cracking before sawing. If severe cracks appear during pile cutting, the pile should continue to be lowered for cutting, and the cracked section should be removed. After the pile driving is completed, the remaining pile pit is backfilled with slabs and boulders to prevent safety accidents. When the ultimate pressure of the pile pipe is reached but the design elevation is not reached, the pile driving is stopped, and the pile head is cut after the earthwork is excavated.
[0051] The above embodiments are for illustrative purposes only and are not intended to limit the invention. Those skilled in the art can make various changes or modifications without departing from the spirit and scope of the invention. Therefore, all equivalent technical solutions should also fall within the scope of the invention and should be defined by the claims.
Claims
1. A construction method for prestressed pipe piles using a combination of pre-drilling and hammer driving, characterized in that... include: Step 1: Accurately mark the pile location, establish a precise geological exploration of "one pile, one hole" using geological exploration machinery, determine the rock strata distribution by drilling and core sampling, and compile an advanced drilling columnar section. Step 2: Based on the depth and thickness of the rock strata shown in the advance drilling column, use a pneumatic down-the-hole hammer to guide the hole. After the pneumatic down-the-hole hammer is in place, lower the down-the-hole hammer drill bit and start the air compressor until the pilot hole penetrates the moderately weathered rock strata. Step 3: After drilling, calculate the bearing layer location and pile length of each pile; after the pipe piles arrive on site, conduct quality acceptance; after the hammer pile driver arrives on site, check all components and instruments. Step 4: After the pipe pile is lifted, place one end of the pile into the pile cap and adjust it by rotating and sliding the pile driver guide frame to ensure that the position and verticality of the pipe pile meet the requirements. Step 5: Perform pile tip welding and check the quality of pile tip welding. The pile tip of the first section of pipe pile is completed and inserted into the ground. Gently place the pile hammer and observe the verticality at any time. Step Six: During the pile driving process, the hammering construction adopts the "heavy hammer low impact" method; in the initial stage of pile driving, the hammer drop height is less than 0.5m; during the pile driving process, verticality should be observed at any time to ensure that the pile position error does not exceed 2cm and the verticality deviation does not exceed 0.5%. Step 7: Weld the upper and lower sections of the pipe pile, ensuring that the deviation between the upper and lower sections does not exceed 2mm, the weld is continuous and full, and the natural cooling time is not less than 5 minutes; Step 8: The final hammering standard is based primarily on hammer height and penetration, with pile length and number of hammer blows as secondary factors. During the last three rounds of hammering, the penetration of each round of 10 blows should not be less than 2cm, and the vertical height should not be greater than 70cm. Step 9: When the designed pile top elevation is lower than the ground elevation, a special pile tube is used to drive the pile. The bottom end of the pile tube is aligned with the pile top, and then the pile top is hammered to reach the design value. The pile top elevation is controlled by measuring with a level. When there are excess pipe piles exposed on the ground or the pile top exceeds the designed pile top elevation, the pile needs to be cut. It is strictly forbidden to use a sledgehammer to strike the pile horizontally or to forcibly pull the pile to cut it.
2. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step one, coordinate control points and leveling control points are set up on the construction site according to standard requirements. The coordinates of each pile position are accurately calculated based on the design drawings, and the pile positions are accurately measured and marked. After the pile positions are marked, a 30cm long Ф8 steel bar or bamboo chopsticks are inserted into the soil at the center to draw the outline of the pile skin. Geological exploration machinery is aligned with the pile position to drill and take core samples. The rock strata distribution is determined by the core samples, and a pre-drilling columnar diagram is compiled. Pre-drilling is performed for each pile position.
3. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step two, a pneumatic down-the-hole hammer is used for pilot drilling. The pilot drilling depth is determined based on the pre-drilling columnar section. The bottom of the down-the-hole hammer drill bit has many high-hardness carbide alloy teeth. The alloy teeth transmit the huge impact to the rock, thereby breaking the entire rock. The diameter of the down-the-hole hammer pilot hole is the pile diameter + 200mm. During the pilot drilling process, it is necessary to avoid the pilot hole being too large, which would cause the pile body to be unstable, or the pilot hole being too small, which would cause the soil to wrap around the pile body, making it difficult to drive the pile.
4. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step three, after drilling, the bearing layer position of each pile is calculated, the length of the pipe pile is calculated, and the piles are matched; when the pipe piles arrive on site, the specifications and models, dimensional deviations and appearance quality, and the geometric dimensions of the pile end plate are checked in a timely manner, and inspection records are made; after the hammer pile driver arrives on site, the sensitivity and effectiveness of each component and instrument are checked, and the pile driver is aligned, leveled and straightened.
5. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step four, when lifting a single pipe pile horizontally, the two-end hook lifting method is used, and when erecting it, the single-point method can be used; when the length of the pipe pile is no more than 15m, two-point lifting is used, and the distance between the lifting point and the end should be 0.21 times the length; after the pile body is in place, bidirectional verticality correction is carried out, and the verticality of the pile driving frame does not exceed 1%; for short piles of 10m and below, bidirectional correction is carried out by plumb line; for piles of more than 10m or piles that need to be joined, bidirectional correction must be carried out by theodolite.
6. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step five, the UHC pipe pile foundation is equipped with a pile tip. The pile tip is a pointed-bottom cross-shaped sealing pile tip with an outer diameter d1 = 570mm, a height of 150mm, a cross-shaped pile tip steel plate thickness of 18mm, and a sealing steel plate thickness of 12mm. It is essential to ensure that the centerline of the pile tip coincides with that of the pipe pile, and the deviation should be controlled within a certain range, not exceeding 1% of the outer diameter of the pipe pile. The appearance quality of the pile tip must be inspected; there should be no cracks, sand holes, or porosity defects. Before welding, the welding area must be thoroughly cleaned. Rust, oil, and dirt impurities at the weld joint between the pipe pile and the pile tip must be removed until the metal luster is exposed. The joint between the pile tip and the pipe pile should be flat and tightly fitted, without misalignment or gaps. After welding, check the continuity and fullness of the weld, and ensure there are no cracks, porosity, slag inclusions, or undercut defects. For important projects or pile foundations with special requirements, non-destructive testing should be performed on the welded joints. Defects inside the weld, such as cracks, incomplete penetration, or lack of fusion, should be identified through non-destructive testing and repaired promptly. The tip of the first section of pipe pile should be positioned and inserted into the ground. The pile hammer should be gently placed, and the pile position and verticality deviation should be carefully checked. The pile position deviation should not exceed 20mm, and the verticality deviation should not exceed 0.5%.
7. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step six, during the initial stage of pile driving, the hammer drop height can be appropriately increased, but the hammer return height should not exceed 70cm. During the hammering process, the "heavy hammer low impact" method should be used, and the piles should be driven from the center outwards. For piles in soft soil areas with a center-to-center distance of less than 4 times the pile diameter, or piles in a group foundation on the same pile cap, the construction methods of skip driving and diagonal driving should be used. During the construction of multi-pile pile caps, in order to ensure the accuracy of the pile positions and the overall stability of the pile cap structure, the piles located at the edge of the pile cap should be constructed after the other piles inside the pile cap have been completed and repositioned before construction work is carried out. Throughout the piling process, keep the pile hammer, pile cap, and pile body in a straight line. If necessary, adjust the guide rods of the pile hammer and pile frame according to the direction of the pile body. Take care to avoid eccentric hammering of the pipe pile to prevent bending and torsional damage. When the piling difficulty increases, check whether the hammer is tilted or eccentric, especially check whether the pile pad and pile cap are suitable. If not, replace or add soft pads. Each pile should be driven continuously in one go as much as possible to avoid interruption and affect subsequent piling operations. Verticality should be observed at any time during the piling process to ensure that the verticality of the pile does not exceed 0.5% and control the deviation of the pile top to not exceed 2cm. During the pile driving process, a designated person is responsible for accurately measuring and recording the elevation and penetration depth.
8. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step seven, when the pile needs to be extended, the pile head of the pile section should be 0.5m to 1.0m above the ground surface. When splicing the piles, the upper and lower pile sections should be kept straight, and the end faces of the upper and lower pile sections should be in close contact at the joint, with a misalignment deviation not exceeding 2mm. Before splicing, clean the soil and debris from the pile ends, which can be done with a wire brush. During the welding process, carbon dioxide gas shielded welding should be used. First, spot welding should be performed at symmetrical positions near the bevel, with the number of spot welds controlled at 4-8 points. Two welders and two welding machines should perform welding evenly and symmetrically, using a double-layer welding method. The joint positions of the inner and outer weld seams should be staggered. During the welding process, the forming quality of the weld seam should be strictly controlled to ensure the fullness and continuity of the weld seam and avoid defects such as incomplete penetration, porosity, and slag inclusion. The welding time is 15-22 minutes. The weld seam needs to cool naturally before continuing to apply pressure. The natural cooling time should not be less than 5 minutes. Forced cooling is strictly prohibited. The weld seam should be continuous and full, and there should be no construction defects.
9. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step eight, the penetration depth of the last three rounds or the number of hammer blows for the last 1m pile driving is determined based on engineering geological conditions, pile type, characteristic value of single pile bearing capacity, pile specifications, and soil penetration depth. For UHC pipe piles under alternating soft and hard geological conditions, the total number of hammer blows and the number of hammer blows for the last 1m pile driving need to be tested and statistically analyzed. The total number of hammer blows for UHC piles should not exceed 3000, and the number of hammer blows for the last 1m should not exceed 350. During the last three rounds of hammering, the penetration depth of each round of 10 blows should not be less than 2cm, and the vertical height should not be greater than 70cm.
10. The prestressed pipe pile pre-drilling combined with hammer driving construction method according to claim 1, characterized in that: In step nine, a cardboard or scrap plywood pad is placed inside the sleeve of the pile driver. The thickness of the pad after being hammered and compacted is not less than 60mm. The elevation of the pile top is controlled by measuring with a level instrument, and the pile driving depth does not exceed 6m. Piles should be cut using a pile saw. It is strictly forbidden to use a sledgehammer to strike the pile laterally or to forcibly pull the pile during cutting. Before cutting the pile, take effective measures to prevent the pile head from cracking. If serious cracks appear during pile cutting, continue to move the pile down to cut the cracked section.
Citation Information
Patent Citations
Application of prestressed concrete pipe pile planting technology in complex foundation
CN113152450A
Offshore rock-drilling redriving-type large-diameter pile structure and construction method
EP3406802A1