Rapid gas delivery system for semiconductor processes
By optimizing gas delivery through the training and inference modes of MFC, the problems of complex gas management and long process cycles in the ALE process system are solved, achieving efficient and low-cost etching results, which are particularly suitable for high aspect ratio structures.
Patent Information
- Application Number
- CN202510731197.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2024-06-04
- Filing Date
- 2025-06-03
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2045-06-03
AI Technical Summary
Existing ALE process systems are complex in terms of gas management, have high operational inconsistencies, and long process cycles, making it difficult to meet the etching requirements of high aspect ratio structures.
By adopting the training and inference mode of MFC and combining it with PID control loop, rapid gas delivery and switching can be achieved, simplifying gas management and shortening the process cycle.
It improves etching consistency and efficiency, reduces operational complexity and costs, and is suitable for etching high aspect ratio structures.
Smart Images

Figure CN121065642B_ABST
Abstract
Description
[0001] Cross-references to related applications
[0002] This invention claims priority to U.S. Patent Application No. 18 / 732,779, filed June 4, 2024. Technical Field
[0003] This invention relates to the field of semiconductor manufacturing, and more specifically, to a rapid gas delivery system for process systems. The invention aims to optimize gas delivery systems to reduce costs and improve the efficiency of atomic layer etching (ALE) process systems. Background Technology
[0004] Reactive ion etching (RIE) is a major etching technique in semiconductor manufacturing. During RIE, various substances, including neutral particles, free radicals, and ions, interact and influence the etching process. A key feature of RIE is the synergistic effect of ion and neutral particle fluxes, which significantly increases the etching rate. The concept of this synergistic effect first appeared in Coburn and Winters' paper "Ion-and electron-assisted gas-surface chemistry—an important effect in plasma etching" published in J. Appl. Phys. (Vol. 50, pp. 3189-3196, 1979). They found that the etching rate of silicon was significantly improved when using argon ion beams, XeF2 neutral particle beams, and combinations thereof. Efficient RIE etching requires both ion and neutral particle fluxes to maximize the synergistic effect. However, in modern etching processes, especially when etching dimensions are pushed down to the nanometer scale and structures have high aspect ratios (also known as high depth-to-width ratios), balancing these fluxes becomes increasingly complex. Furthermore, achieving uniformity on 300mm wafers and consistent repeatability in the manufacturing process also presents challenges.
[0005] The development of ALE technology aims to overcome the limitations of RIE. The ALE process system evolved from the RIE process system, which has less stringent requirements for achieving uniformity on 300mm wafers. However, ALE has unique requirements due to the characteristics of its process steps. Karanik et al. provided an overview of ALE technology in "Overview of atomic layer etching in the semiconductor industry" published in J.Vac.Sci.Technol. (A33, 020802 1-14, 2015), while Lill further explored ALE technology in "Atomic layer processing: semiconductor dry etching technology" (Wiley-VCH GmbH, 12 Boschstrasse, Weinheim, Germany, 69469, 2021). ALE enables atomically precise control of material layer removal and is an etching technique utilizing sequential self-limiting reactions. The ALE process typically involves two steps: surface modification and material removal. The surface modification step forms a thin reactive layer of a predetermined thickness, which is easier to remove than the unmodified material. The material removal step removes the formed thin reactive layer while preserving the underlying unmodified substrate material, thus resetting the surface for subsequent cycles. Material removal can be achieved using thermal energy obtained by increasing wafer temperature or by utilizing the kinetic energy provided by inert gas ions. U.S. Patent No. 10,208,383 to George et al. discloses an isotropic process for removing the modified layer (i.e., the thin reactive layer) using thermal energy. When using high-energy ions, the material removal step is achieved through a sputtering process. The anisotropic ALE process described in U.S. Patent No. 10,727,073 to Tan et al. demonstrates the versatility of this technology.
[0006] The standard practice in ALE (Alternating Electrode Etching) is to use mass flow controllers (MFCs) to regulate the flow rates of various gases. This regulation is typically dynamic and requires continuous adjustments to maintain optimal etching conditions, which undoubtedly increases operational complexity and potential inconsistencies in the etching process. Furthermore, switching between different etching steps, such as from surface modification to sputtering, often requires a complete gas replacement, further extending the overall process cycle.
[0007] Clearly, the ALE process urgently needs innovation to simplify gas management, accelerate gas replacement, shorten process cycles, and improve the consistency of etching results. To meet these needs, this invention proposes a novel system and method that innovatively utilizes MFC to rapidly deliver gas into the chamber. Summary of the Invention
[0008] This invention introduces an ALE process system including a gas delivery system, designed to improve operating speed and reduce costs. The anisotropic ALE process comprises two cyclically running, consecutive steps: a surface modification step consuming a first gas and a sputtering step consuming a second gas.
[0009] In some specific implementations, a novel MFC operation method is introduced. The MFC can include two operating modes: a training mode and an inference mode. In training mode, the MFC performs a training procedure involving two gases. During this process, the MFC tests the gases at the flow rates set for each process step. A proportional-integral-derivative (PID) control loop is used to regulate the current supplied to the MFC solenoid coil, causing the plunger to move and thus achieving the desired gas flow rate. These current values are recorded in a storage unit by the controller for later use. The training of the MFC can be completed before it is put into the ALE process.
[0010] After the ALE process starts, the MFC operates in inference mode. During the surface modification step, the MFC controller obtains the value of the first electromagnetic coil current from the storage cell. When this current is applied to the electromagnetic coil, the plunger shifts to the appropriate position to achieve the desired flow rate of the first gas. In inference mode, the PID control loop is inactive. Therefore, the MFC setpoint is determined based on the current applied to the electromagnetic coil, using magnetic force to position the plunger. Compared to conventional processes using PID control loops, this invention can reduce the setpoint time to a few milliseconds. The plasma generated in the chamber produces neutral particles, thereby achieving surface modification of the substrate.
[0011] When switching to the sputtering step, the first MFC is shut down by applying a preset current to the electromagnetic coil, causing the plunger to shift and block gas flow. The controller retrieves the value of the second electromagnetic coil current from the storage unit and applies a corresponding current to the electromagnetic coil of the second MFC. The second gas is then delivered into the chamber at the desired flow rate. Subsequently, plasma is generated in the chamber, and ion acceleration is achieved by applying a bias voltage to the substrate, thereby removing the modified layer. This process is repeated until the ALE process is complete.
[0012] In some embodiments, a brief delay can be set between shutting down the first MFC and starting the second MFC to ensure that the first gas has been completely removed from the chamber before the second gas is delivered, and vice versa. In some embodiments, the present invention achieves rapid gas switching through an improved gas delivery system using an innovative application of MFCs. This technical solution accelerates the ALE process without degrading its performance. Attached Figure Description
[0013] For clarity, the following explanation will refer to the accompanying diagram.
[0014] Figure 1 A conventional ALE process system is shown.
[0015] Figure 2 A flowchart illustrating the operating steps of a conventional ALE process system is shown.
[0016] Figure 3 An ALE process system with an improved gas delivery unit according to an embodiment of the present invention is shown.
[0017] Figure 4 A functional block diagram of MFC according to an embodiment of the present invention is illustrated schematically.
[0018] Figure 5 A flowchart illustrating the operation of MFC in training mode according to an embodiment of the present invention is shown.
[0019] Figure 6 A flowchart illustrating an ALE process using improved MFCs according to an embodiment of the present invention is shown schematically. Detailed Implementation
[0020] For thorough understanding, embodiments of the present invention are described in detail below. Although the embodiments have been described in detail for clarity, modifications and variations adapted to the principles of the present invention are within the scope of protection of the present invention. The present invention describes only some conventional methods and components to highlight its unique aspects.
[0021] This invention utilizes an ALE process system to illustrate an inventive method for rapidly delivering gas to a chamber suitable for vacuum plasma processes. The invention is also applicable to any other process chamber requiring rapid gas delivery and displacement. The use of the ALE process system is merely illustrative and is not intended to limit the scope of the invention. For example, wherever there is a need for rapid gas delivery and displacement, whether based on plasma or thermal processes, the principles of this invention can be applied to any type of etching or deposition process system.
[0022] Figure 1A conventional ALE process system 100 is shown. A chamber 101 is in a vacuum environment and is equipped with a plasma source 102. The plasma source 102 is powered by an associated radio frequency (RF) power generator 103. The plasma source 102 can employ various designs, including transformer-coupled plasma (TCP) and inductively coupled plasma (ICP). In some embodiments, the RF power generator 103 and the plasma source 102 can be directly connected, or they can be indirectly connected via a matching network (not shown).
[0023] like Figure 1 As shown, the gas delivery system includes a gas distribution unit 104, a gas tank 106, a gas manifold 105, and valves (112, 114, and 116). The gas distribution unit 104 draws gas from the gas tank 106 via the gas manifold 105. Depending on specific design requirements, the gas distribution unit 104 can be in the form of a spray head or an injector. The gas manifold 105 mixes multiple gases before they enter the chamber 101. Valves 112 and 114 are located between the gas tank 106 and the gas manifold 105 and are used to control the flow rates of the first gas 108 and the second gas 110, respectively. It should be noted that although only two gas lines are configured for clarity, the ALE process can also support the delivery of more gases. The first gas 108 and the second gas 110 can both be single gases or mixtures of multiple gases. Valve 116 is located between the gas manifold 105 and the gas distribution unit 104 and is used to control the flow rate of gas entering the chamber 101. The gas tank 106 is connected to a central gas supply unit 107.
[0024] Within chamber 101, a base 121 (typically an electrostatic chuck (ESC)) supports the substrate 120 and is specifically designed for the etching process. To ensure the desired ion energy (especially important for etching high aspect ratio structures), a bias unit 119 is activated to accelerate the ions once plasma is formed within chamber 101. Depending on the design parameters, the bias source can be an RF power generator connected to the base 121 via a blocking capacitor, or it can be a specific waveform generator.
[0025] The ALE process system 100 discharges gas and generated byproducts from chamber 101 via pump 124. A valve 122 is located adjacent to pump 124 to regulate the exhaust rate, thereby delivering the gas to exhaust port 126 via exhaust line 125. A constant pressure needs to be maintained within chamber 101, therefore the gas input and output flow rates need to be balanced. This balance is achieved through a PID control loop, which obtains real-time pressure data from pressure gauge 127.
[0026] In the ALE process, two distinct steps, such as surface modification and sputtering, typically require the use of different gases (108 and 110). These two steps are often referred to as two “half-cycles,” which are combined to form a complete ALE cycle.
[0027] Figure 2 A detailed operation flow chart of a conventional ALE process system 100, labeled Flow 200, is shown. In step 201, a first gas 108 is delivered from a gas tank 106 to a chamber 101 via a gas distribution unit 104. In step 202, the surface of the substrate 120 is chemically modified. For example, chlorine gas can be used to weaken silicon-chlorine bonds, unlike the inherent bonds between silicon atoms. Plasma generated by the combined excitation of an RF power generator 103 and a plasma source 102 can assist in this chemical modification operation. When using plasma during surface modification, the bias device needs to be turned off to prevent interference from high-energy ions. In step 204, the surface modification step is ended, the delivery of the first gas 108 is stopped, and the second gas 110 is delivered simultaneously.
[0028] In step 206, a sputtering etching step is performed. Specifically, the modified surface layer is removed by activating the bias unit 119 connected to the base 121. Since each ALE cycle can only etch a few single-atom layers of material, multiple cycles are necessary to achieve the desired etching depth. In some cases, the number of ALE cycles may exceed 100, especially when processing high aspect ratio structures. In step 208, the number of cycles is calculated and compared to a predetermined process formulation. If all required cycles have been performed, the ALE process ends. If not, in step 210, the second gas 110 is switched back to the first gas 108, starting a new ALE cycle.
[0029] Figure 3 An ALE process system 300 with an improved gas delivery unit according to an embodiment of the present invention is shown. The ALE process system 300 and... Figure 1 Several significant differences exist between the conventional ALE process systems 100 shown. One significant difference is the omission of the gas chamber, and since the gas chamber is typically a costly subsystem, this simplification enables a low-cost design.
[0030] Furthermore, the ALE process system 300 omits valves. One unique design feature of this invention is the dual functionality of the MFC, which can function as both a flow controller and a valve. In conventional methods, a PID control loop is typically used to adjust the MFC to a specific setpoint to achieve the desired flow rate, which usually takes tens to hundreds of milliseconds to reach a steady-state flow rate. This duration is undesirable for ALE process systems. This invention innovatively enables the MFC to operate in inference mode, eliminating the need to activate the PID control loop and reducing the MFC settling time to a few milliseconds or even less.
[0031] The ALE process system 300 includes a chamber 301 operating in a vacuum environment. A plasma source 302 is installed within the chamber 301, and the plasma source 302 is connected to an RF power generator 303. Furthermore, the ALE process system 300 includes a gas distribution unit 304, which can be a spray head or an injector. The gas distribution unit 304 can be directly connected to the gas supply device 310 of the ALE process system 300, without the need for a separate gas tank and valves. A first gas 312 enters the gas distribution unit 304 via an MFC 306. Although the MFC 306 can regulate the flow rate of the first gas 312, its inherent characteristics result in slow flow regulation, typically lasting tens to hundreds of milliseconds. In one embodiment, the flow rate of the first gas 312 delivered by the MFC 306 is preset, and this preset flow rate is related to a specific drive current specified for the electromagnetic coil. The preset current is achieved by putting the MFC 306 into a training mode before starting the ALE process. After the ALE process is started, the MFC306 enters inference mode. In this mode, a preset current is supplied to the solenoid coil via the solenoid valve actuator to position the solenoid valve plunger at a predetermined position, thereby achieving gas flow control. When the MFC306 is in inference mode, the PID control loop is inactive (i.e., disabled). The diverted airflow measured by the flow sensor is used to determine whether the flow rate has reached the set value.
[0032] Controller 307 coordinates and manages multiple operational steps of the ALE process system 300. Controller 307 reads the process recipe to determine parameter information, such as the flow rates of the first gas 312 and the second gas 314. Controller 307 is also capable of monitoring the operation of MFCs 306 and 308, enabling the start-up and termination of the ALE process. In some embodiments, MFCs 306 and 308 are equipped with local controllers (…). Figure 3 (Not shown), the local controller is capable of operating according to the instructions of controller 307.
[0033] A base 321 is disposed at the bottom region of chamber 301 to provide support for substrate 320 during the ALE process. In various etching operations, an electrostatic chuck (ESC) is preferred in this invention. Typically, ions generated by plasma do not possess the energy required to etch contemporary semiconductor structures, especially those with high aspect ratios. To enhance ion energy, base 321 is typically provided with a bias unit 319. The bias source can be an RF power generator connected to base 321 via a capacitor, or it can be a specific waveform generator.
[0034] The ALE process system 300 utilizes a pump 324 to discharge gases and reaction residues from chamber 301. The pump 324 is connected to the ALE process system 300 via a valve 322. The ALE process system 300 also includes a pressure gauge 327 for assessing chamber pressure. A controller 307 uses pressure data from the pressure gauge 327 to synchronize the input gas flow rate through the gas distribution unit 304 with the output gas flow rate through the valve 322, thereby ensuring that chamber 301 is at a stable pressure suitable for the ALE process.
[0035] Figure 4 This is a schematic diagram of the structure of an MFC400 according to an embodiment of the present invention. The MFC400 includes an inlet 402 and an outlet 404, both of which are connected to a gas flow channel 406. A proportional valve ( Figure 4 (Not shown) A portion of the gas is diverted to channel 408. Flow sensor 410 determines the flow rate of the diverted gas, typically using thermal sensing technology to measure the temperature difference between two specified locations along the flow path. This flow rate characterizes the total flow rate in gas diversion channel 406.
[0036] The MFC400 is equipped with a solenoid valve. The solenoid valve includes a spring 412 for fixing the position of a plunger 414. The position of the plunger 414 determines the degree of gas flow at the orifice 413. When the plunger 414 blocks the passage within the orifice 413, gas flow is completely blocked. An electromagnetic coil 415 controls the position of the plunger 414. When current flows through the electromagnetic coil 415, it generates a magnetic force, which, combined with the force applied by the spring 412, controls the position of the plunger 414.
[0037] The flow sensor 410 sends the read data to the MFC controller 418. The MFC controller 418 compares the received flow data with a reference value stored in its memory, which corresponds to the desired gas flow rate. If the measured flow rate (i.e., the received flow data) is inconsistent with the reference value, the MFC controller 418 instructs the valve actuator 416 to adjust the current to the solenoid coil 415 to change the position of the plunger 414. This calibration cycle is repeated until the measured flow rate matches the reference value. To speed up the adjustment, the MFC controller 418 uses a PID control loop for feedback regulation. However, the PID control loop can take tens to hundreds of milliseconds, a duration that is not ideal for ALE process efficiency.
[0038] In this invention, the MFC400 can be in either training or inference mode. In training mode, the MFC controller 418 executes a test program to determine the current value corresponding to the electromagnetic coil 415 when the first and second gases reach the desired flow rates. The desired flow rates of the first and second gases can be obtained from the ALE process recipe. The storage unit 422, connected to the MFC controller 418, is used to store the determined current value.
[0039] Upon startup of the ALE process, the MFC controller 418 immediately switches the MFCs to inference mode. Correspondingly, the PID control loop 420 is deactivated, significantly reducing the MFCs' runtime. Unlike the longer adjustment phase in training mode, MFCs in inference mode achieve the desired gas flow rate in just milliseconds or less. The MFC controller 418 retrieves the stored current value of the solenoid coil 415 from the storage unit 422. Applying the corresponding current to the solenoid coil 415 quickly adjusts the plunger 414 to the correct position. Although some gas is still diverted to channel 408 for monitoring by the flow sensor 410, the measured flow data is primarily used for verification to confirm whether the desired flow rate has been achieved. The measured flow data can be stored in the storage unit 422. The controller 307 can use this stored flow data to generate trend graphs. Statistical Process Control (SPC) techniques can be applied to monitor the stability of the MFCs. If an out-of-control event is detected according to the pre-defined APC (Advanced Process Control) rules, a retraining event is initiated.
[0040] Figure 5A flowchart illustrating the operation of MFCs in training mode according to an embodiment of the present invention is shown, labeled as process 500. Process 500 begins at step 502, in which the MFC controller 418 activates the PID control loop 420 and switches the MFCs to training mode. Subsequently, at step 504, a test program is executed to determine the current values of the electromagnetic coils corresponding to the first MFC and the second MFC (i.e., MFC306 and MFC308), respectively. The determined current values of the electromagnetic coils can be stored in the storage unit 422.
[0041] In some implementations, process 500 can be executed by controller 307. In other implementations, controller 307 and MFC controller 418 work together to execute process 500.
[0042] Figure 6 A flowchart of the operation of an ALE process system 300 according to another embodiment of the present invention is shown, labeled as process 600. Process 600 begins at step 602, in which, before starting the ALE process, the PID control loop of the MFCs is deactivated by controller 307. The MFCs are set to inference mode. Subsequently, the desired current value of the solenoid coil is obtained from storage unit 422. Proceeding to step 604, which includes two parallel operations: steps 604A and 604B. In step 604A, the first MFC controller instructs its corresponding valve actuator to adjust the current of the first solenoid coil so that the first gas can be delivered to chamber 301 at the desired flow rate. Simultaneously, in step 604B, the second MFC is shut down to prevent the delivery of the second gas to chamber 301.
[0043] In step 606, a surface modification step is performed. In the surface modification step, the plasma source 302 in chamber 301 receives radio frequency power from the RF power generator 303. Neutral particles generated in the plasma within chamber 301 diffuse to the surface of substrate 320 and react with surface atoms to form a modified layer with weakened bonding.
[0044] Next, proceed to step 608, which includes two parallel operations: step 608A and step 608B. In step 608A, the flow rate of the first gas is reduced to zero by the first MFC. Conversely, in step 608B, the second MFC controller instructs its corresponding valve actuator to adjust the current of the second solenoid coil so that the second gas can be delivered to chamber 301 at the desired flow rate.
[0045] These two parallel operations (steps 606A and 606B) can be initiated simultaneously, or in some embodiments, a brief delay can be set between the two operations to ensure that the first gas has been completely purged from chamber 301 before the second gas is delivered.
[0046] Then, proceed to step 610 to perform the sputtering step of the ALE process. At this point, the modified layer will be removed due to the action of high-energy ions generated by the plasma and bias unit. This completes one ALE process cycle.
[0047] Finally, in step 612, the controller 307 checks the number of completed ALE process cycles and determines whether to start the next ALE process cycle based on the requirements of the process recipe.
Claims
1. An ALE process system, comprising: A chamber designed for operation in a vacuum environment; A plasma source, which is connected to an RF power generator; The base is used to support the substrate; A bias unit connected to the base; characterized in that it further comprises: A gas delivery system includes a first MFC and a second MFC, wherein the first MFC is used to regulate a first gas, the second MFC is used to regulate a second gas, and both the first MFC and the second MFC include a solenoid valve composed of an electromagnetic coil. and A controller that controls the first MFC and / or the second MFC to be in training mode or inference mode, wherein, in training mode, the controller measures the current value of the electromagnetic coil corresponding to the expected flow rate of the first gas and the second gas, respectively, and stores the current value in a storage unit; Specifically, when the first MFC and / or the second MFC is in training mode, the PID control loop is activated; and In the inference mode, the controller acquires the current value and supplies the corresponding current to the electromagnetic coils of the first MFC and the second MFC respectively through the valve driver, so that the first gas and the second gas reach the desired flow rate. When the first MFC and / or the second MFC is in the inference mode, the PID control loop is inactive to shorten the MFC set-up time.
2. The ALE process system as described in claim 1, wherein, The first MFC and / or the second MFC are used as valves.
3. The ALE process system as described in claim 1, wherein, The ALE process system performs surface modification and sputtering steps sequentially during the ALE process.
4. The ALE process system as described in claim 3, wherein, The surface modification step consumes only the first gas whose flow rate is regulated by the first MFC.
5. The ALE process system as described in claim 3, wherein, The sputtering step consumes only the second gas whose flow rate is regulated by the second MFC.
6. The ALE process system as described in claim 1, wherein, The ALE process system directly supplies gas through a gas supply device, eliminating the need for a gas tank.
7. The ALE process system as described in claim 1, wherein, The gas delivery system also includes a gas distribution unit.
8. The ALE process system as described in claim 7, wherein, The gas distribution unit is a spray head or an injector.
9. A method for performing an ALE process within a chamber of an ALE process system according to claim 1, characterized in that, include: a) Disable the PID control loop and obtain the current values stored in the electromagnetic coils of the first MFC and the second MFC respectively; b) Apply the required current to the electromagnetic coil of the first MFC to deliver the first gas to the chamber at the desired flow rate, and shut down the second MFC; c) Perform the surface modification step of the ALE process; d) Apply the required current to the electromagnetic coil of the second MFC to deliver the second gas into the chamber at the desired flow rate, and shut down the first MFC; e) Perform the sputtering step of the ALE process; and f) Repeat steps a) through e) until the ALE process is complete.
10. The method of claim 9, wherein, The method further includes measuring the current value of the corresponding electromagnetic coil when the first MFC and the second MFC are in training mode, and starting the PID control loop.
11. The method of claim 10, wherein, The training mode is performed before the ALE process begins.
12. The method of claim 9, wherein, In step b), the operation of applying the corresponding current to the electromagnetic coil of the first MFC and turning off the second MFC are performed simultaneously.
13. The method of claim 9, wherein, In step d), the application of the corresponding current to the electromagnetic coil of the second MFC and the shutdown of the first MFC are performed simultaneously.
14. A gas delivery system for an ALE process system according to claim 1, characterized in that, include: A first MFC and a second MFC are configured such that their respective solenoid valves are applied with corresponding drive currents to achieve the desired flow rates of the first and second gases as specified in the process formulation. Before the start of the ALE process, the first MFC and / or the second MFC are put into training mode, and a test procedure is executed to determine the corresponding drive currents. The PID control loops associated with the first MFC and the second MFC are both inactive during the ALE process to shorten the MFC setup time.
15. The gas delivery system as claimed in claim 14, wherein, The first gas and the second gas are supplied directly by the gas supply device, without the need for a gas box.
16. The gas delivery system as claimed in claim 14, wherein, The first MFC and the second MFC achieve valve function by completely blocking the orifice in the gas flow channel by the plunger in their respective solenoid valves.
17. The gas delivery system of claim 14, wherein, The gas delivery system also includes a gas distribution unit.
Citation Information
Patent Citations
Atomic layer etching processes using sequential, self-limiting thermal reactions comprising oxidation and fluorination
US10208383B2
Atomic layer etching 3D structures: Si and SiGe and Ge smoothness on horizontal and vertical surfaces
US10727073B2
Sputtering pressure system of multi-target magnetron sputtering coating machine
CN203144508U
Atomic layer etching 3D structures: si and SIGE and GE smoothness on horizontal and vertical surfaces
US20170229314A1
