A PCCP pipe manufacturing equipment and forming method based on the fixed pedestal method

The PCCP pipe manufacturing equipment based on the fixed pedestal method has realized the assembly line operation of the PCCP pipe production process, solved the problems of large space occupation and complex structure in traditional manufacturing, improved production efficiency and ensured product quality.

CN121374838BActive Publication Date: 2026-11-10中铁十四局集团房桥有限公司 +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510978361.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-07-16
Publication Date
2026-11-10
Estimated Expiration
2045-07-16

AI Technical Summary

Technical Problem

Traditional PCCP pipe manufacturing requires a large area and has a complex structure. Although the existing assembly line production method has improved production efficiency, it still has the problems of large space occupation and complex structure.

Method used

The PCCP pipe manufacturing equipment based on the fixed pedestal method includes a working platform, transfer components, demolding components, casting components, and hoisting components. By setting up a foundation pit in the working area for mold assembly, casting, and curing, the construction of two sets of support frames is avoided, realizing the assembly line operation and independent curing of molds.

Benefits of technology

It reduced the requirements for site area, simplified the structure, improved production efficiency, ensured product quality, and reduced safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121374838B_ABST
    Figure CN121374838B_ABST
Patent Text Reader

Abstract

This invention discloses a PCCP pipe manufacturing equipment and forming method based on a fixed pedestal method, belonging to the technical field of PCCP pipe production equipment. The equipment includes a working platform, a first transfer component, a second transfer component, a third transfer component, a demolding component, a casting component, and a hoisting component. Several working platforms are set in a foundation pit within the working area. The first transfer component is located on one side of the top of the working area; the second and third transfer components are located on the other side of the top of the working area. The casting component is used to pour concrete into the mold body assembled in the operating holes to form PCCP pipes, which are then cured in the corresponding operating holes. The method includes work preparation, mold assembly, casting, curing, and demolding. This equipment avoids the problems of large space occupation and complex structure in traditional manufacturing, has relatively low requirements for factory height, and can cast PCCP core pipes with stable product quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of PCCP pipe production equipment technology, specifically to a PCCP pipe manufacturing equipment and forming method based on the fixed pedestal method. Background Technology

[0002] PCCP pipe, or prestressed concrete cylinder pipe, is made by pouring high-strength concrete on both the inner and outer sides of a steel cylinder. Currently, PCCP pipe production sites are mainly divided into a manufacturing area and a curing area. In the manufacturing area, molds are assembled and concrete is poured to form the PCCP pipe. It is then transported to the curing area in a twin-cart unit for curing. After curing, it is transported back to the manufacturing area in a twin-cart unit for demolding, and this process is repeated for mass production. However, this manufacturing method separates manufacturing and curing, requiring a large area. Support frames must be erected in both the manufacturing and curing areas for operators to perform tasks such as formwork erection, demolding, and leveling after pouring. Support frames are also needed in the curing area for operators to perform curing work. The two sets of support frames increase structural complexity.

[0003] For example, the invention patent with publication number CN106363796A discloses a streamlined vertical molding method for PCCP cores, which can realize the streamlined operation of PCCP cores and improve production efficiency. The method includes the following steps: 1) Designing a production line suitable for PCCP core molding according to capacity requirements; 2) Demolding the PCCP cores, cleaning the mold top cover and outer mold, and spraying a release agent; 3) Cleaning and spraying a release agent on the inner mold and base of the PCCP vertical mold; 4) Installing the steel cylinder and assembling the PCCP vertical mold; 5) Pouring concrete; 6) Finishing the concrete surface of the PCCP core insertion end; 7) Curing the PCCP cores while they are in place. This molding method uses a production line consisting of n production lines and x curing lines. While it has the advantage of high production efficiency, it still suffers from problems such as large footprint and complex structure. Summary of the Invention

[0004] The purpose of this invention is to provide a PCCP pipe manufacturing equipment and forming method based on the fixed pedestal method. This equipment can solve the problems of large space occupation and complex structure in the traditional production and manufacturing of PCCP pipes.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: A PCCP pipe manufacturing equipment based on the fixed pedestal method includes a working platform, a first transfer component, a second transfer component, a third transfer component, a demolding component, a casting component, and a hoisting component; Several of the aforementioned work platforms are set in a foundation pit located within the work area, with the top of the work platforms flush with the top of the work area; each work platform is provided with an operating hole; and a protective cylinder is installed outside the operating hole. The first transfer component is located on one side of the top of the work area and is used to transport the prepared base plate, inner mold assembly and outer mold assembly to the side of the corresponding operation hole; The demolding component is used to remove the base plate, inner mold assembly and outer mold assembly to obtain the finished PCCP core tube; The casting component is used to cast concrete into the mold body assembled in the operating hole to form a PCCP pipe, and the PCCP pipe is cured in the corresponding operating hole. The second transfer component and the third transfer component are located on the other side of the top of the work area. The second transfer component is used to transport the disassembled base plate, inner mold assembly and outer mold assembly to the set position; the third transfer component is used to transport the PCCP core tube finished product to the finished product storage area. The hoisting components include a first hoisting assembly, a second hoisting assembly, and a third hoisting assembly. The first hoisting assembly is used to hoist the cured PCCP pipe out of the operating hole to the work area. The second hoisting assembly is used to hoist the inner mold assembly and the outer mold assembly into the cleaning and spraying area for cleaning and spraying, and then hoist the cleaned and sprayed inner mold assembly and the outer mold assembly into the operating hole for assembly. The third hoisting assembly is used to adjust the position of the accessory assembly.

[0006] Preferably, several of the work platforms are arranged in two rows side by side, and each work platform is composed of multiple sets of support frames vertically spliced ​​together; one or two work platforms in the middle of one row are the inner mold cleaning and spraying area, and one or two work platforms in the middle of the other row are the outer mold cleaning and spraying area.

[0007] Preferably, an outer mold chuck is provided at the bottom of the outer mold cleaning and spraying area, and the outer mold assembly is mounted on the outer mold chuck; a first cleaning and spraying assembly is provided on the outer mold chuck, and the first cleaning and spraying assembly cleans or sprays the inner surface of the outer mold assembly.

[0008] Preferably, the first cleaning and spraying assembly includes a base, a rotating component, a vertical support component, a linear drive component, a horizontal drive component, a support plate, and a first nozzle. The base is mounted on the outer mold chuck; the rotating component is mounted on the base and is used to drive the vertical support component to rotate; the linear drive component is mounted on the vertical support component and is used to drive the horizontal drive component to move vertically along the vertical support component; the horizontal drive component is used to drive the support plate to move horizontally; the first nozzle is mounted on the support plate and can spray cleaning liquid or release agent outward.

[0009] Preferably, an inner mold chuck is provided at the bottom of the inner mold cleaning and spraying area, and the inner mold assembly is mounted on the inner mold chuck; a second cleaning and spraying assembly is mounted on the inner mold chuck, and the second cleaning and spraying assembly cleans or sprays the outer surface of the inner mold assembly.

[0010] Preferably, the second cleaning and spraying assembly includes a second bracket, an annular bracket slidably mounted on the second bracket, and a plurality of second nozzles mounted on the annular bracket. The annular bracket carries the plurality of second nozzles and moves vertically along the second bracket. The second nozzles spray cleaning liquid or release agent onto the outer surface of the inner mold assembly.

[0011] Preferably, the accessory assembly includes a top cover, a counterweight, and a distribution cone; the inner mold assembly, the thin-walled steel pipe, and the outer mold assembly are all mounted on the base plate; the top cover is mounted on top of the inner mold assembly; the counterweight is mounted above the top cover; the distribution cone is mounted above the top cover, and the distribution cone distributes the poured concrete between the inner mold assembly and the thin-walled steel pipe and between the thin-walled steel pipe and the outer mold assembly.

[0012] Preferably, the demolding component includes a fourth support frame and a lifting component slidably mounted on the fourth support frame. The lifting component is sequentially connected to the material distribution cone, counterweight, top cover, outer mold assembly, and inner mold assembly to perform demolding operations.

[0013] Preferably, the first transfer component, the second transfer component, and the third transfer component have the same structure, each including a track and a transport vehicle installed on the track.

[0014] A forming method, wherein the forming operation is performed using the PCCP pipe manufacturing equipment based on the fixed pedestal method as described in any one of claims 1 to 9, comprising the following steps: Step 1: Work preparation. Manually clean the base plate and spray a release agent on the top of the base plate. Use the second hoisting component to hoist the inner mold component and outer mold component to be assembled into the cleaning and spraying area for cleaning and spraying. Use the second transfer component to transport the thin-walled steel pipe to the side of the corresponding operating hole. Use the third hoisting component to hoist the accessory assembly to the side of the corresponding operating hole. Step two, mold assembly: First, install the base plate at the bottom of the corresponding operating hole; then, use the second lifting assembly to lift the inner mold assembly onto the corresponding working platform, lower the inner mold assembly, and install it onto the base plate; use the second lifting assembly to lift the thin-walled steel pipe onto the corresponding working platform, lower the thin-walled steel pipe, and install it onto the base plate, located outside the inner mold assembly; use the second lifting assembly to lift the outer mold assembly onto the corresponding working platform, lower the outer mold assembly, and install it onto the base plate, located outside the thin-walled steel pipe; use the third lifting assembly to sequentially install the top cover, counterweight, and material distribution cone to form the main body of the mold. Step 3, pouring operation: pour an appropriate amount of concrete into the main body of the mold through the pouring component. During the pouring operation, vibrate the inner mold component and the outer mold component to form the PCCP pipe; after the pouring is completed, smooth the top of the PCCP pipe. Step four, curing operation: wrap the outside of the operating hole with multiple protective cylinders, and then install a protective cover on the top of the work platform to form a curing kiln; each curing kiln is equipped with a set of steam pipes, and the steam pipes blow different amounts of steam into the curing kiln to perform wet curing of the PCCP pipes. Step 5: Demolding operation. After curing, the first hoisting component lifts the PCCP pipe out and transports it to the demolding component. The demolding component then disassembles the material distribution cone, counterweight, and top cover in sequence. Next, the outer mold assembly is disassembled and placed on the second transfer component. The inner mold assembly is then disassembled and placed on the second transfer component. The resulting PCCP core pipe is placed on the third transfer component and then transferred to the finished product storage area.

[0015] In this invention, a foundation pit is set up in the work area. The assembly of the inner mold components, outer mold components, base plate and accessory group, the cleaning and spraying of the inner mold components and outer mold components, and the maintenance of the PCCP pipe are all carried out in the foundation pit. This avoids the problem of erecting a large amount of scaffolding for support and protection, and reduces the height requirements of the factory building.

[0016] The lifting components include a first lifting assembly, a second lifting assembly, and a third lifting assembly arranged from high to low. These components are configured according to the height of the object to be lifted, avoiding safety hazards caused by swaying due to excessive lifting height. Furthermore, the vertically layered arrangement ensures that the components do not interfere with each other during movement. The lifting capacity is configured according to the weight of the object being lifted, avoiding the problem of high overall cost caused by using the same specification of overhead crane.

[0017] The use of protective cylinders and covers allows each work platform to form an independent curing kiln for wet curing of PCCP pipes. PCCP pipes produced at different times can be cured separately without affecting each other. Furthermore, the independence of each curing kiln facilitates temperature control during curing, ensuring product quality.

[0018] The overall method adopts a fixed platform method, which means that the mold assembly, concrete pouring and curing operations do not need to be moved, which greatly reduces the requirements for the work area area and eliminates the need to set up two sets of support frames for auxiliary and curing operations.

[0019] The counterweights firmly press the top cover onto the top of the inner mold assembly, stabilizing the positional relationship between the inner mold assembly, outer mold assembly, and thin-walled steel pipe, thus ensuring stability during pouring and guaranteeing product quality. The distribution cones disperse the poured concrete in all directions, diverting it to both the inner and outer sides of the thin-walled steel pipe.

[0020] The disassembled base plate, inner mold assembly, and outer mold assembly are transferred through the second transfer component, the finished PCCP core tube is transferred through the third transfer component, and the base plate, inner mold assembly, and outer mold assembly to be assembled are transferred through the first transfer component. The first and second transfer components are arranged on both sides of the foundation pit, so that the demolding and mold assembly operations do not interfere with each other, and also avoid the phenomenon of directly assembling the base plate, inner mold assembly, and outer mold assembly that have just been disassembled in an unwashed and uncoated state.

[0021] The equipment mainly uses the first, second, and third transfer components for ground transportation, reducing reliance on hoisting components and avoiding safety hazards caused by large-scale movement of hoisting components. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram illustrating the overall principle of the present invention; Figure 3 This is a schematic diagram of the component assembly structure of the present invention; Figure 4 This is a schematic diagram of the internal mold component structure of the present invention; Figure 5 This is a schematic diagram of the outer mold assembly structure of the present invention; Figure 6 This is a schematic diagram of the first cleaning and spraying assembly installed at the middle position of the bottom of the outer mold chuck according to the present invention; Figure 7 This is a schematic diagram of the second cleaning and spraying assembly installed on the outside of the inner mold chuck according to the present invention; Figure 8 This is a schematic diagram of the support frame structure of the present invention; Figure 9 This is a schematic diagram of the curing kiln structure formed by the operating platform of the present invention; Figure 10 This is a schematic diagram of the base plate structure of the present invention; In the diagram: 1. Working platform; 2. First transfer component; 3. Second transfer component; 4. Third transfer component; 5. Demolding component; 6. Casting component; 7. Lifting component; 8. Inner mold assembly; 9. Outer mold assembly; 10. Protective cylinder; 11. Support frame; 20. Track; 21. Transport vehicle; 30. Base plate; 31. Finished PCCP core tube; 32. Outer mold chuck; 33. First cleaning and spraying assembly; 34. Inner mold chuck; 35. Second cleaning and spraying assembly; 36. Accessory assembly; 37. Thin-walled steel pipe; 50. Fourth support frame; 51. Lifting component; 70. First lifting assembly; 71. Second lifting assembly; 72. Third lifting assembly. Components; 80. Inner cylinder; 81. Extruded component; 82. Inner vibration motor; 83. Inner support component; 84. Inner mold ladder; 90. Outer cylinder; 91. Outer mold fixing plate; 92. Fastener; 93. Outer vibration motor; 94. Outer support component; 110. Support top plate; 111. Support leg; 112. Protective fence; 330. Base; 331. Rotating component; 332. Vertical support component; 333. Linear drive component; 334. Horizontal drive component; 335. Support plate; 336. First nozzle; 350. Second bracket; 351. Circular bracket; 352. Second nozzle; 360. Top cover; 361. Counterweight; 362. Distributing cone. Detailed Implementation

[0023] The present invention will be further described below with reference to the accompanying drawings: like Figures 1 to 10 The illustrated PCCP pipe manufacturing equipment based on the fixed pedestal method includes a working platform 1, a first transfer component 2, a second transfer component 3, a third transfer component 4, a demolding component 5, a casting component 6, and a hoisting component 7. Several working platforms 1 are arranged in a pit within the working area, with the top of each working platform 1 flush with the top of the working area. The depth of the pit is slightly greater than or matched to the height of the mold body.

[0024] Several work platforms 1 are arranged in two rows side by side. Each work platform 1 is vertically spliced ​​together from multiple sets of support frames 11. In this embodiment, each work platform 1 is spliced ​​together from three support frames 11. Each support frame 11 consists of a support top plate 110, multiple support legs 111 fixedly installed at the bottom of the support top plate 110, and a protective railing 112 installed on the support top plate 110. One or two work platforms 1 in the middle of one row are designated as the inner mold cleaning and spraying area, while one or two work platforms 1 in the middle of the other row are designated as the outer mold cleaning and spraying area. Of course, depending on production capacity requirements, work platforms 1 can also be set in one row, three rows, or other quantities. Spraying is performed at an angle in the middle position, and then the platforms are hoisted and assembled to both sides, avoiding long-distance hoisting and improving construction efficiency.

[0025] An operating hole is provided within each working platform 1, located on the supporting top plate 110. The diameter of the operating hole is 1.1 to 1.4 times the maximum outer diameter of the outer mold assembly 9. A protective fence 112 is provided circumferentially around the operating hole. A protective cylinder 10 is installed outside the operating hole, located outside the protective fence 112. A door is provided on the protective cylinder 10, through which operators enter the protective cylinder 10 to perform operations. The door is closed during curing operations to prevent temperature loss from affecting product quality.

[0026] The inner mold assembly 8 includes an inner cylinder 80 with a vertical opening, an extruder 81 fixedly disposed on one side of the opening, and multiple internal vibration motors 82 arranged on the inner surface of the inner cylinder 80. Multiple internal support members 83 are provided on the inner side of the inner cylinder 80, providing attachment points for operators to move the inner mold assembly 8, facilitating operation. An inner mold ladder 84 is also provided on the inner side of the inner cylinder 80, facilitating operator access within the inner cylinder 80. The opening side of the inner cylinder 80 tapers inward, and the extruder 81 presses this inward-tapered side outward, causing the inner cylinder 80 to form a ring. When demolding, the extruder 81 is released, and demolding is achieved through the elastic deformation of the inner cylinder 80 itself, simplifying the demolding process.

[0027] The outer mold assembly 9 includes an outer cylinder 90 with a vertical opening, outer mold fixing plates 91 fixedly disposed on both sides of the opening, multiple fasteners 92 mounted on the two outer mold fixing plates 91, and multiple external vibration motors 93 arranged on the outer surface of the outer cylinder 90. The two outer mold fixing plates 91 are locked together by the fasteners 92, so that the outer cylinder 90 is closed into a ring. The external vibration motors 93 vibrate the outer cylinder 90, making the poured concrete more uniform and ensuring product quality. Multiple external support members 94 are provided on the outer side of the outer cylinder 90. The external support members 94 provide hook points for operators to move the outer mold assembly 9, facilitating operation. When dismantling the mold, the fasteners 92 are loosened, and demolding is achieved through the elastic deformation of the outer cylinder 90 itself, simplifying the demolding process.

[0028] An outer mold chuck 32 is provided at the bottom of the outer mold cleaning and spraying area, and the outer mold assembly 9 is installed on the outer mold chuck 32; a first cleaning and spraying assembly 33 is provided on the outer mold chuck 32, and the first cleaning and spraying assembly 33 cleans or sprays the inner surface of the outer mold assembly 9.

[0029] Specifically, the first cleaning and spraying assembly 33 includes a base 330, a rotating component 331, a vertical support component 332, a linear drive component 333, a horizontal drive component 334, a support plate 335, and a first spray head 336. The base 330 is fixedly mounted on the bottom center of the outer mold chuck 32 by fasteners. The rotating component 331 is mounted on the base 330 and is used to drive the vertical support component 332 to rotate. The rotating component 331 includes a rotary drive motor fixedly mounted on the base 330 by a motor bracket, a rotary drive gear fixedly mounted on the output end of the rotary drive motor, and a rotary driven gear rotatably mounted on the base. The rotary drive gear and the rotary driven gear are meshed together. The vertical support component 332 is fixedly mounted on the top of the rotary driven gear.

[0030] A linear drive unit 333 is mounted on a vertical support member 332 and drives a horizontal drive unit 334 to move vertically along the vertical support member 332. The linear drive unit 333 is a linear module, and the operator can control its vertical movement via a controller. The horizontal drive unit 334 drives a support plate 335 to move horizontally; the horizontal drive unit 334 is also a linear module, and the operator can control its horizontal movement via a controller. A first nozzle 336 is mounted on the support plate 335 and can spray cleaning fluid or release agent outwards. One end of the first nozzle 336 is connected to a conduit for supplying the cleaning fluid or release agent, which supplies pressurized cleaning fluid or release agent to the first nozzle 336 for outward spraying. Alternatively, a storage tank for holding the cleaning fluid and release agent can also be installed on the support plate 335, and the cleaning fluid or release agent in the storage tank can be supplied to the first nozzle 336 for outward spraying via a pressurized pump and conduit. The rotation of the rotary component 331 and the vertical movement of the linear drive component 333 can achieve uniform cleaning or spraying of the inner surface of the outer mold assembly 9. The horizontal drive component 334 can be adjusted according to the outer mold assembly 9 with different diameters.

[0031] An inner mold chuck 34 is provided at the bottom of the inner mold cleaning and spraying area, and the inner mold assembly 8 is installed on the inner mold chuck 34; a second cleaning and spraying assembly 35 is installed on the inner mold chuck 34, and the second cleaning and spraying assembly 35 cleans or sprays the outer surface of the inner mold assembly 8.

[0032] The second cleaning and spraying assembly 35 includes a second bracket 350, an annular bracket 351 slidably mounted on the second bracket 350, and a plurality of second nozzles 352 mounted on the annular bracket 351. The annular bracket 351 is slidably mounted on the second bracket 350 via a linear module. When the operator controls the linear module to move, the annular bracket 351 carries the plurality of second nozzles 352 and moves vertically along the second bracket 350. The second nozzles 352 uniformly spray cleaning fluid or release agent onto the outer surface of the inner mold assembly 8. One end of the second nozzle 352 is connected to a conduit for supplying the cleaning fluid or release agent. The conduit supplies pressurized cleaning fluid or release agent to the second nozzle 352 for outward spraying.

[0033] The first transfer component 2 is located on one side of the top of the work area and is used to transport the prepared base plate 30, inner mold assembly 8, and outer mold assembly 9 to the corresponding operating hole side, awaiting mold closing operation. The first transfer component 2 includes a track 20 and a transport vehicle 21 mounted on the track 20. The transport vehicle 21 has an independent drive device and can be selected as a mother vehicle or daughter vehicle under the control of the operator. Of course, two or more transport vehicles 21 can be set on the track 20 to improve work efficiency. The first transfer component 2 can share a set of track 20 with the casting component 6.

[0034] The first transfer component 2, the second transfer component 3, and the third transfer component 4 have the same structure, except that the arrangement of the track 20 is different. The structure of the second transfer component 3 and the third transfer component 4 will not be described again in this specification.

[0035] The second transfer component 3 and the third transfer component 4 are located on the other side of the top of the work area. The pit is located between the first transfer component 2 and the second transfer component 3. The second transfer component 3 is used to transport the disassembled base plate 30, inner mold assembly 8 and outer mold assembly 9 to the inner mold cleaning and spraying area or the outer mold cleaning and spraying area. The base plate 30 is manually cleaned and sprayed with release agent.

[0036] The third transfer component 4 is used to transport the PCCP core tube finished product 31 obtained after demolding to the finished product storage area, or directly load it onto a vehicle for transportation.

[0037] The demolding component 5 is used to remove the base plate 30, inner mold assembly 8, and outer mold assembly 9 to obtain the finished PCCP core tube 31. The demolding component 5 includes a fourth support frame 50 installed at the top of the work area and a lifting component 51 slidably installed on the fourth support frame 50. The lifting component 51 is sequentially connected to the distribution cone 362, counterweight 361, top cover 360, outer mold assembly 9, and inner mold assembly 8 for demolding operations. A sliding groove is provided at the top of the fourth support frame 50, and the lifting component 51 is slidably installed in this groove via a sliding trolley. The lifting component 51 uses a manual or electric hoist to lift and lower the distribution cone 362, counterweight 361, top cover 360, outer mold assembly 9, and inner mold assembly 8. The lifting component 51 can also lift the finished PCCP core tube 31 to the third transfer component 4.

[0038] The pouring component 6 is used to pour concrete into the mold body assembled in the operating hole to form a PCCP pipe, which is then cured in the corresponding operating hole. The pouring component 6 includes a horizontal slide, a storage box slidably mounted on the horizontal slide, and a conveying pipe installed on one side of the storage box. When concrete needs to be poured into the mold body, the storage box is first moved to the side of the mold body to be poured, and then concrete is fed into the storage box. The concrete is then poured onto the distribution cone 362 via the conveying pipe. Two outlets are provided on the conveying pipe; the corresponding outlet is opened according to the different positions of the mold bodies in the two rows during pouring.

[0039] The hoisting component 7 includes a first hoisting assembly 70, a second hoisting assembly 71, and a third hoisting assembly 72, which are overhead cranes of different specifications. The first hoisting assembly 70 is used to hoist the cured PCCP pipe out of the operating hole to the work area. The first hoisting assembly 70 has the largest span and the highest height, and has a large hoisting capacity, enabling it to hoist the PCCP pipe out of the operating hole to the demolding position for subsequent demolding operations.

[0040] The second lifting assembly 71 is used to lift the inner mold assembly 8 and the outer mold assembly 9 into the cleaning and spraying area for cleaning and spraying, and then lift the cleaned and sprayed inner mold assembly 8 and outer mold assembly 9 into the operating hole for assembly. The second lifting assembly 71 is also used to lift the thin-walled steel pipe 37 into the operating hole for assembly, and can also lift the base plate 30. The span, height and lifting capacity of the second lifting assembly 71 are smaller than those of the first lifting assembly 70.

[0041] The third lifting assembly 72 is used to adjust the position of the accessory assembly 36. The span, height, and lifting capacity of the third lifting assembly 72 are smaller than those of the second lifting assembly 71.

[0042] The accessory assembly 36 includes a top cover 360, a counterweight 361, and a distribution cone 362. The inner mold assembly 8, thin-walled steel pipe 37, and outer mold assembly 9 are all mounted on the base plate 30, arranged from the inside out. The top cover 360 is installed on top of the inner mold assembly 8, and it restricts the relative positions of the inner mold assembly 8, thin-walled steel pipe 37, and outer mold assembly 9. The counterweight 361 is installed above the top cover 360 to ensure the stability of the top cover 360 installation and improve the pouring quality. The distribution cone 362 is installed above the top cover 360, and it distributes the poured concrete between the inner mold assembly 8 and the thin-walled steel pipe 37, and between the thin-walled steel pipe 37 and the outer mold assembly 9. The concrete is poured onto the distribution cone 362, which allows the concrete to spread, improving the uniformity of the pouring.

[0043] like Figures 1 to 10 The molding method shown above uses the PCCP pipe manufacturing equipment based on the fixed pedestal method disclosed above for molding operations, and includes the following steps: Step 1: Work preparation. Manually clean the base plate 30 and spray a release agent onto the top of the base plate 30. The inner mold assembly 8 to be assembled is hoisted into the inner mold cleaning and spraying area using the second hoisting assembly 71. The inner mold assembly 8 is then cleaned and sprayed with release agent using the second cleaning and spraying assembly 35, and finally hoisted onto the first transfer component 2. The outer mold assembly 9 to be assembled is hoisted into the outer mold cleaning and spraying area using the second hoisting assembly 71. The inner surface of the outer mold assembly 9 is cleaned and sprayed with release agent using the first cleaning and spraying assembly 33, and finally hoisted onto the first transfer component 2. When the inner mold assembly 8 is disassembled from the demolding component 5, its outer surface must be cleaned before spraying.

[0044] The second transfer component 3 transports the thin-walled steel pipe 37 to the side of the corresponding operating hole; the third hoisting component 72 hoists the accessory group 36 to the side of the corresponding operating hole, waiting for assembly.

[0045] Step 2, mold closing operation: First, install the base plate 30 at the bottom of the corresponding operating hole using the third lifting component 72 or the second lifting component 71, and then manually adjust and fix the position of the base plate 30.

[0046] Then, the inner mold assembly 8 is hoisted to the position directly above the operating hole of the corresponding work platform 1 using the second hoisting component 71. The inner mold assembly 8 is then lowered and installed on the base plate 30, where its position is manually adjusted and secured. During the lowering process, operators use support rods or other tools to provide auxiliary support for the inner mold assembly 8 on the work platform 1, improving stability during installation. Alternatively, multiple centering support rods can be slidably installed on the work platform 1, with rotatable rubber rollers mounted at the ends of these rods. These rubber rollers contact the outer wall of the inner mold assembly 8, further enhancing stability during installation.

[0047] The thin-walled steel pipe 37 is hoisted to the position directly above the operating hole of the corresponding working platform 1 using the second hoisting assembly 71. The thin-walled steel pipe 37 is then lowered and installed on the base plate 30, located outside the inner mold assembly 8. During the lowering process, the operator uses support rods or other tools to provide auxiliary support for the thin-walled steel pipe 37 on the working platform 1, improving stability during installation. Alternatively, multiple centering support rods can be slidably installed on the working platform 1, with rotatable rubber rollers mounted at the ends of the centering support rods. These rubber rollers contact the outer wall of the thin-walled steel pipe 37, further enhancing stability during installation.

[0048] The outer mold assembly 9 is hoisted to a position directly above the operating hole of the corresponding working platform 1 using the second hoisting component 71. The outer mold assembly 9 is then lowered and installed on the base plate 30, located outside the thin-walled steel pipe 37. During the lowering process, operators use support rods or other tools to provide auxiliary support for the outer mold assembly 9 on the working platform 1, improving stability during installation. Alternatively, multiple centering support rods can be slidably installed on the working platform 1, with rotatable rubber rollers mounted at the ends of the centering support rods. These rubber rollers contact the outer wall of the outer mold assembly 9, further enhancing stability during installation.

[0049] The top cover 360, counterweight 361, and material distribution cone 362 are sequentially installed using the third hoisting assembly 72 to form the main body of the mold.

[0050] Step 3, pouring operation: A suitable amount of concrete is poured into the main body of the mold using pouring component 6. During pouring, the inner mold assembly 8 and the outer mold assembly 9 are vibrated to form the PCCP pipe. Specifically, the inner cylinder 80 and the outer cylinder 90 are vibrated by the inner vibration motor 82 and the outer vibration motor 93. After pouring, the top of the PCCP pipe is manually smoothed.

[0051] Step four, curing operation: wrap the outside of the operating hole with multiple protective cylinders 10, and then install a protective cover on the top of the working platform 1 to form a curing kiln; each curing kiln is equipped with a set of steam pipes, and the steam pipes blow different amounts of steam into the curing kiln to perform wet curing of the PCCP pipe.

[0052] Specifically, the steam pipeline connects to the main steam pipeline within the workshop, and then, via a control valve group (one electric ball valve), introduces steam into the steam pipeline of the curing kiln. Each curing kiln is equipped with one electric ball valve. The curing process is divided into three stages: heating, constant temperature, and cooling. A curing controller is installed within the curing area. Based on the different curing stages, the corresponding time and temperature are set through the controller. Two or three temperature measuring points (PT100 with transmitter, outputting 4-20mA signal) are set vertically within each curing kiln. The average value is taken to monitor and collect the temperature inside the curing kiln in real time. The collected temperature signal is transmitted to the curing controller via a signal line. The curing controller compares the average value of the real-time monitored temperature data with the set temperature data and outputs a control signal to control the opening and closing (on / off) of the electric ball valve, thereby controlling the steam supply and achieving temperature control within the curing kiln.

[0053] In one specific embodiment, the steam curing time is controlled at 8 hours, including 2 hours of heating time, 4 hours of constant temperature time, and 2 hours of cooling time.

[0054] Step 5: Demolding operation. After curing, the first hoisting component 70 lifts the PCCP pipe out and transports it to the demolding component 5. The demolding component 5 then sequentially disassembles the material distribution cone 362, the counterweight block 361, and the top cover 360. The disassembled material distribution cone 362, counterweight block 361, and top cover 360 are placed on the second transfer component 3 for transportation or attached to the third hoisting component 72 for repeated use.

[0055] Then, the outer mold assembly 9 is disassembled and placed on the second transfer component 3. It is then lifted by the second lifting component 71 for subsequent cleaning and painting. The inner mold assembly 8 is disassembled and placed on the second transfer component 3. It is then lifted by the second lifting component 71 for subsequent cleaning and painting. The resulting PCCP core tube product 31 is placed on the third transfer component 4 and then transferred to the finished product storage area.

[0056] The above embodiments are merely illustrative of the concept and implementation of the present invention and are not intended to limit it. Under the concept of the present invention, technical solutions without substantial changes are still within the scope of protection.

Claims

1. A PCCP pipe manufacturing equipment based on the fixed pedestal method, characterized in that: It includes a work platform (1), a first transfer component (2), a second transfer component (3), a third transfer component (4), a demolding component (5), a casting component (6), and a hoisting component (7); Several of the aforementioned work platforms (1) are set in the foundation pit located in the work area, with the top of the work platform (1) being flush with the top of the work area; each work platform (1) is provided with an operating hole; and a protective cylinder (10) is provided outside the operating hole. The first transfer component (2) is located on one side of the top of the work area and is used to transport the prepared base plate (30), inner mold assembly (8) and outer mold assembly (9) to the side of the corresponding operation hole; The demolding component (5) is used to remove the base plate (30), inner mold assembly (8) and outer mold assembly (9) to obtain the PCCP core tube finished product (31). The casting component (6) is used to cast concrete into the mold body assembled in the operating hole to form a PCCP pipe, and the PCCP pipe is cured in the corresponding operating hole. The second transfer component (3) and the third transfer component (4) are located on the other side of the top of the work area. The second transfer component (3) is used to transport the disassembled base plate (30), inner mold assembly (8) and outer mold assembly (9) to the set position; the third transfer component (4) is used to transport the PCCP core tube finished product (31) to the finished product storage area. The hoisting component (7) includes a first hoisting assembly (70), a second hoisting assembly (71), and a third hoisting assembly (72). The first hoisting assembly (70) is used to hoist the cured PCCP pipe out of the operating hole to the work area; the second hoisting assembly (71) is used to hoist the inner mold assembly (8) and the outer mold assembly (9) into the cleaning and spraying area for cleaning and spraying, and to hoist the cleaned and sprayed inner mold assembly (8) and the outer mold assembly (9) into the operating hole for assembly; the third hoisting assembly (72) is used to adjust the position of the accessory assembly (36). The accessory assembly (36) includes a top cover (360), a counterweight (361), and a distribution cone (362); the inner mold assembly (8), the thin-walled steel pipe (37), and the outer mold assembly (9) are all installed on the base plate (30); the top cover (360) is installed on top of the inner mold assembly (8); the counterweight (361) is installed above the top cover (360); the distribution cone (362) is installed above the top cover (360), and the distribution cone (362) distributes the poured concrete between the inner mold assembly (8) and the thin-walled steel pipe (37) and between the thin-walled steel pipe (37) and the outer mold assembly (9).

2. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 1, characterized in that: Several of the aforementioned work platforms (1) are arranged in two rows side by side. Each work platform (1) is vertically spliced ​​from multiple sets of support frames (11). One or two work platforms (1) in the middle of one row are the inner mold cleaning and spraying area, and one or two work platforms (1) in the middle of the other row are the outer mold cleaning and spraying area.

3. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 2, characterized in that: An outer mold chuck (32) is provided at the bottom of the outer mold cleaning and spraying area, and the outer mold assembly (9) is installed on the outer mold chuck (32); a first cleaning and spraying assembly (33) is provided on the outer mold chuck (32), and the first cleaning and spraying assembly (33) cleans or sprays the inner surface of the outer mold assembly (9).

4. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 3, characterized in that: The first cleaning and spraying assembly (33) includes a base (330), a rotating component (331), a vertical support component (332), a linear drive component (333), a horizontal drive component (334), a support plate (335), and a first nozzle (336). The base (330) is mounted on the outer mold chuck (32). The rotating component (331) is mounted on the base (330) and is used to drive the vertical support component (332) to rotate. The linear drive component (333) is mounted on the vertical support component (332) and is used to drive the horizontal drive component (334) to move vertically along the vertical support component (332). The horizontal drive component (334) is used to drive the support plate (335) to move horizontally. The first nozzle (336) is mounted on the support plate (335) and can spray cleaning liquid or release agent outward.

5. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 4, characterized in that: An inner mold chuck (34) is provided at the bottom of the inner mold cleaning and spraying area, and the inner mold assembly (8) is installed on the inner mold chuck (34); a second cleaning and spraying assembly (35) is installed on the inner mold chuck (34), and the second cleaning and spraying assembly (35) cleans or sprays the outer surface of the inner mold assembly (8).

6. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 5, characterized in that: The second cleaning and spraying assembly (35) includes a second bracket (350), an annular bracket (351) slidably mounted on the second bracket (350), and a plurality of second nozzles (352) mounted on the annular bracket (351). The annular bracket (351) carries the plurality of second nozzles (352) and moves vertically along the second bracket (350). The second nozzles (352) spray cleaning liquid or release agent onto the outer surface of the inner mold assembly (8).

7. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 6, characterized in that: The demolding component (5) includes a fourth support frame (50) and a lifting component (51) that is slidably mounted on the fourth support frame (50). The lifting component (51) is connected in sequence to the material distribution cone (362), the counterweight (361), the top cover (360), the outer mold assembly (9), and the inner mold assembly (8) to perform demolding operations.

8. The PCCP pipe manufacturing equipment based on the fixed pedestal method according to claim 7, characterized in that: The first transfer component (2), the second transfer component (3) and the third transfer component (4) have the same structure, each including a track (20) and a transport vehicle (21) installed on the track (20).

9. A molding method, characterized in that: The forming method uses the PCCP pipe manufacturing equipment based on the fixed pedestal method described in claim 8 to perform the forming operation, and includes the following steps: Step 1, work preparation: manually clean the base plate (30) and spray the top of the base plate (30) with release agent; use the second hoisting component (71) to hoist the inner mold component (8) and outer mold component (9) to be assembled into the cleaning and spraying area for cleaning and spraying; use the second transfer component (3) to transport the thin-walled steel pipe (37) to the side of the corresponding operating hole; use the third hoisting component (72) to hoist the accessory group (36) to the side of the corresponding operating hole; Step 2, mold assembly operation: First, install the base plate (30) at the bottom of the corresponding operating hole; then, use the second hoisting assembly (71) to hoist the inner mold assembly (8) onto the corresponding working platform (1), lower the inner mold assembly (8), and install the inner mold assembly (8) onto the base plate (30); use the second hoisting assembly (71) to hoist the thin-walled steel pipe (37) onto the corresponding working platform (1), lower the thin-walled steel pipe (37), and install the thin-walled steel pipe (37) onto the base plate (30), located outside the inner mold assembly (8); use the second hoisting assembly (71) to hoist the outer mold assembly (9) onto the corresponding working platform (1), lower the outer mold assembly (9), and install the outer mold assembly (9) onto the base plate (30), located outside the thin-walled steel pipe (37); use the third hoisting assembly (72) to install the top cover (360), counterweight (361), and material distribution cone (362) in sequence to form the mold body; Step 3, pouring operation: pour an appropriate amount of concrete into the main body of the mold through the pouring component (6). During the pouring operation, vibrate the inner mold component (8) and the outer mold component (9) to form the PCCP pipe. After the pouring is completed, smooth the top of the PCCP pipe. Step 4, curing operation: wrap the outside of the operating hole with multiple protective cylinders (10), and then install a protective cover on the top of the operating platform (1) to form a curing kiln; each curing kiln is equipped with a set of steam pipes, and the steam pipes blow different amounts of steam into the curing kiln to perform wet curing of the PCCP pipes. Step 5, demolding operation. After curing, the first hoisting component (70) lifts the PCCP pipe out and transports it to the demolding component (5). The demolding component (5) disassembles the material distribution cone (362), counterweight (361) and top cover (360) in sequence. Then, the outer mold component (9) is disassembled and placed on the second transfer component (3). The inner mold component (8) is disassembled and placed on the second transfer component (3). The obtained PCCP core tube finished product (31) is placed on the third transfer component (4) and transferred to the finished product storage area through the third transfer component (4).