Semiconductor gas path valve group system and thin film preparation method
By integrating a semiconductor gas valve system, the problems of complex piping and high maintenance difficulty in existing technologies are solved, achieving space saving, increased production capacity and reduced particulate contamination, and ensuring the consistency and reliability of thin film deposition.
Patent Information
- Application Number
- CN202511786475.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-28
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2045-11-28
AI Technical Summary
In existing semiconductor thin film deposition equipment, the piping layout for various precursors and purge gases is complex, occupies a large space, is difficult to maintain, and has a long purging time, which affects the equipment's production capacity and may lead to particulate contamination.
The system employs an integrated semiconductor gas path valve assembly system, including the valve body, valves, and gas path design with internal channels. Gas diversion and control are achieved through three-way blocks and two-way valves. Combined with the IGS structure and pneumatic connectors, it ensures high vacuum sealing and independent control.
It simplifies pipeline layout, reduces space occupation, shortens gas transmission path, increases equipment capacity, reduces particulate contamination risk, and ensures consistency of thin film deposition and equipment reliability.
Smart Images

Figure CN121576442B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the technical field of semiconductor manufacturing equipment, and more specifically to a gas path valve group system for atomic layer deposition (ALD) processes and a thin film preparation method based on the system. Background Technology
[0002] In semiconductor thin film deposition, especially in atomic layer deposition (ALD), multiple precursors are often sequentially introduced into the reaction chamber to achieve layer-by-layer film growth. ALD requires multiple precursors and purge gases because it is a technique for growing thin films layer-by-layer by sequentially introducing different reactive gases (precursors) and allowing them to undergo self-confined chemical reactions on the substrate surface. Each precursor participates in different chemical reaction steps, thus constructing the desired film composition or structure. Precursors are the reactive gases that participate in the film deposition reaction and are introduced into the reaction chamber sequentially. Between two precursors, a purge gas (such as N2, Ar, or other inert gases) must be introduced to thoroughly remove any residual precursors and reaction byproducts from the previous step from the chamber and piping. The purge gas prevents different precursors from directly mixing and reacting in the gas phase, thus avoiding particulate contamination and ensuring that each reaction occurs only on the substrate surface, maintaining the self-confined nature of the ALD process.
[0003] The precursor enters the cavity through a gas transmission system, which typically includes multiple valves, pipelines, and other components. The gas flow is controlled by the arrangement of the pipelines and the opening and closing of the valves.
[0004] Currently, coating equipment typically uses individual valves connected separately to control different precursors and purge gases. When the deposition process requires multiple precursors and purge gases, multiple sets of independent valves are often necessary. This structure leads to complex piping layouts, occupies a large space, and increases the difficulty of equipment maintenance. Furthermore, the longer piping increases the time required for the purging process, impacting equipment throughput. In addition, for processes requiring heating, the long and complex piping increases the design difficulty of the heating system and may create potential particle contamination risks due to dead zones or residual gases, affecting semiconductor device yield and reliability. Summary of the Invention
[0005] The following provides a brief overview of one or more aspects to offer a basic understanding of them. This overview is not an exhaustive summary of all conceived aspects, nor is it intended to identify key or decisive elements of all aspects, nor to define the scope of any or all aspects. Its sole purpose is to present some concepts of one or more aspects in a simplified form to prepare for the more detailed descriptions that follow.
[0006] The purpose of this invention is to solve the above-mentioned problems and provide a semiconductor gas path valve group system and a thin film preparation method. The system has a simple and compact overall structure, saves space and reduces maintenance difficulty, reduces purging time, increases equipment capacity, reduces the difference in thin film deposition parameters, prevents precursor backflow, and reduces the risk of particulate contamination.
[0007] The technical solution of this invention is as follows: This invention discloses a semiconductor gas circuit valve assembly system, the system including a valve body containing an internal channel, a valve, a three-way block, an inlet pipe, and an outlet pipe, wherein:
[0008] The three-way block is located inside the valve body and serves as a flow-diverting structure for the purging gas, delivering the purging gas to the left and right side channels respectively.
[0009] The valve includes a three-way valve and a two-way valve. The three-way valve is located on the outer side of the valve body and is used to control the precursor or reactant gas to enter different reaction chambers, and to switch the gas on / off or flow direction selection. The two-way valve is located on the inner side of the valve body and controls whether the precursor or reactant gas enters the corresponding channel by switching it on / off.
[0010] The intake pipe includes a precursor inlet and a purge gas inlet, and the exhaust pipe includes an exhaust port.
[0011] According to one embodiment of the semiconductor gas valve assembly system of the present invention, the components including the three-way block, the three-way valve, and the two-way valve are connected by a high-vacuum sealed connection through valves and gaskets.
[0012] According to one embodiment of the semiconductor pneumatic valve assembly system of the present invention, the structure of the valve and the gasket includes an IGS structure.
[0013] According to one embodiment of the semiconductor pneumatic valve assembly system of the present invention, the opening and closing operation of the valve is controlled by a pneumatic joint.
[0014] According to one embodiment of the semiconductor pneumatic valve assembly system of the present invention, the pneumatic connector drives the valve to operate by receiving a signal from an external control system, the external control system including a control system for a solenoid valve.
[0015] According to one embodiment of the semiconductor gas valve assembly system of the present invention, the precursor inlet is located below the corresponding three-way valve, and the purge gas inlet is located on the side of the valve body.
[0016] According to one embodiment of the semiconductor gas valve assembly system of the present invention, the system adopts a symmetrical design, which includes the symmetry of the physical structure and the symmetry of the geometric path of the gas flow channel.
[0017] This invention also discloses a thin film deposition preparation method, which is based on the semiconductor gas path valve group system described above, the method comprising:
[0018] Vacuuming of chambers and valves: Vacuuming is performed on the chambers and valve assemblies used for gas transmission;
[0019] The precursor enters the cavity and remains there for the required time before closing.
[0020] Purge gas is introduced into the cavity to remove residual gas from the precursor in the pipeline and cavity, and the process is continued for the required time before being shut off.
[0021] The reactive gas enters the cavity and reacts chemically with the adsorbed precursor to form a target film, which is then closed after the required time.
[0022] Purge gas is introduced into the cavity to purge the pipeline of the reaction gas, remove the reaction gas and its byproducts, and then the process is closed after the required time is completed.
[0023] After a complete cycle, the required valves are closed as needed for the process, and the process is repeated to achieve layer-by-layer growth of multilayer films.
[0024] According to one embodiment of the thin film deposition preparation method of the present invention, the method is for simultaneous processing of at least two cavities.
[0025] According to one embodiment of the thin film deposition preparation method of the present invention, the method is for the individual processing of a single cavity.
[0026] The present invention also discloses a thin film deposition preparation apparatus, comprising:
[0027] Memory; and
[0028] A processor, connected to the memory, is configured to implement the thin film deposition preparation method as described above.
[0029] The present invention also discloses a computer-readable storage medium storing computer instructions thereon, which, when executed by a processor, implement the thin film deposition preparation method as described above.
[0030] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention adopts a modular manifold valve assembly that can be used by dual-chamber or multi-chamber machines for various precursors or reaction gases. It integrates multiple valves, tees, inlet / outlet gas pipelines, etc. into one valve body, replacing the traditional method of connecting multiple independent single valves. This significantly simplifies the pipeline layout, makes the overall structure simple and compact, reduces the space occupied, and reduces the maintenance complexity. (2) The present invention features a pipeline design that is located inside the valve assembly and has the shortest length. Since the flow channels of the precursor and the purging gas are integrated inside the valve assembly, the traditional external long pipeline structure is avoided, the gas transmission path is greatly shortened, thereby reducing the residue in the gas transmission process, shortening the purging time, and improving the overall production capacity of the equipment. (3) The left and right sides of the valve assembly inside the present invention are symmetrically designed. The symmetrical structure ensures that the gas path length entering different chambers is consistent, so that different chambers obtain more consistent gas flow and reaction environment under the same process conditions, thereby reducing the parameter differences of the deposited thin film in different chambers. (4) The purge gas inlet of the present invention is located in the middle of the side of the valve body. After being divided into two by the three-way block, it merges with the precursor in the three-way valve channel and the purge gas is located upstream of the precursor. At the same time, each precursor channel can introduce a purge gas. By controlling the purge gas flow rate, it can prevent the precursor airflow from flowing back and use a large flow rate to purge the flow channel in the valve block without dead zone, thereby effectively reducing the risk of particulate pollution caused by gas phase reaction caused by residual gas. (5) Independent control: the passage of each precursor and purge gas is independent of each other. Each gas can be controlled to enter the A cavity or the B cavity separately, or it can enter the two cavities at the same time, so as to achieve precise control and compensation of different cavities. (6) Good sealing performance: the IGS interface is combined with the gasket to ensure the tight connection between each component, prevent gas leakage, and ensure the efficient operation of the system. Attached Figure Description
[0031] The above-described features and advantages of the present invention will be better understood after reading the following detailed description of embodiments of the present disclosure in conjunction with the accompanying drawings. In the drawings, components are not necessarily drawn to scale, and components having similar related properties or features may have the same or similar reference numerals.
[0032] Figure 1A , 1B A structural diagram of an embodiment of the semiconductor pneumatic valve assembly system of the present invention is shown.
[0033] Figures 2A to 2D They are shown respectively Figure 1A The diagram shows a front view, bottom view, rear view, and middle sectional view of an embodiment of a semiconductor gas valve assembly system.
[0034] Figure 3A , 3B It shows the basis Figure 1A This is a schematic diagram of an embodiment of the dual-cavity atomic thin film deposition method for a semiconductor gas path valve group system.
[0035] Figure 4 It shows Figure 3A , 3B The flowchart illustrates an example of a dual-cavity atomic thin film deposition method.
[0036] Figure 5A , 5B It shows the basis Figure 1A This is a schematic diagram of an embodiment of a single-cavity atomic thin film deposition method for a semiconductor gas path valve group system.
[0037] Figure 6 It shows Figure 5A , 5B The flowchart illustrates an example of a single-cavity atomic thin film deposition method.
[0038] Figures 7A to 7D The top view, cross-sectional view, bottom view, and rear view of the extended form of the semiconductor gas valve assembly system of the present invention are shown respectively. Detailed Implementation
[0039] The following specific embodiments illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. Although the description of the present invention is presented in conjunction with preferred embodiments, this does not mean that the features of the invention are limited to these embodiments. On the contrary, the purpose of describing the invention in conjunction with embodiments is to cover other options or modifications that may be derived based on the claims of the present invention. To provide a thorough understanding of the invention, many specific details will be included in the following description. The invention may also be implemented without using these details. Furthermore, to avoid confusion or obscuring the focus of the invention, some specific details will be omitted in the description.
[0040] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0041] Furthermore, the terms "upper," "lower," "left," "right," "top," "bottom," "horizontal," and "vertical" used in the following description should be understood as the orientations shown in the relevant paragraphs and accompanying drawings. These relative terms are for illustrative purposes only and do not imply that the described apparatus must be manufactured or operated in a specific orientation, and therefore should not be construed as limiting the invention.
[0042] It is understood that although terms such as "first," "second," and "third" may be used herein to describe various components, regions, layers, and / or parts, these components, regions, layers, and / or parts should not be limited by these terms, and these terms are only used to distinguish different components, regions, layers, and / or parts. Therefore, the first components, regions, layers, and / or parts discussed below may be referred to as second components, regions, layers, and / or parts without departing from some embodiments of the present invention.
[0043] Figure 1A , 1B The structure of an embodiment of the semiconductor gas valve assembly system of the present invention is shown. The semiconductor gas valve assembly system of this embodiment includes: a valve body containing an internal channel, a valve, a tee block, an inlet pipe, and an outlet pipe.
[0044] The three-way block is located in the center of the valve body and serves as a flow divider for the purging gas. It splits the purging gas from the middle inlet into two parts and delivers them to the left and right side channels respectively, thereby achieving the flow division of the purging gas within the valve body and purging the precursor pipeline.
[0045] Valves include three-way valves (also known as three-way ALD valves) and two-way valves (also known as two-way ALD valves). Three-way valves are located on the outer sides of the valve body on both sides and are used to control the entry of precursors (such as C1, B1) or reactant gases (A1) into different reaction chambers (e.g., chamber A or chamber B in the diagram). They can also be switched to allow for gas flow on / off or selection of flow direction. Two-way valves are located on the inner side of the valve body and are used to control the opening and closing of corresponding gas paths, i.e., whether precursors or reactant gases enter the corresponding channels. They are usually used in conjunction with three-way valves to achieve precise gas path control.
[0046] Components such as three-way blocks, three-way valves, and two-way valves are connected by high-vacuum seals using gaskets (e.g., IGS gaskets) to ensure the sealing between internal components of the valve body. This helps prevent gas leakage during transmission, meeting the stringent cleanliness and sealing requirements of semiconductor processes, ensuring efficient system operation, and reducing the risk of particulate contamination. The opening and closing of valves (including three-way and two-way valves) is controlled by pneumatic connectors. Specifically, these pneumatic connectors actuate the valves by receiving signals from an external control system. For example, when precursors or purge gases need to enter a specific path, the corresponding pneumatic connector receives a command to open or close the corresponding valve. This design allows for rapid system response and precise gas flow control, which is crucial for achieving efficient thin-film deposition processes.
[0047] Regarding the configuration of the system's external interfaces, the intake pipeline includes a precursor inlet and a purge gas inlet. For example, the valve group system has six precursor inlets, located below the corresponding three-way valves (L1 / L2 / L3 and Q1 / Q2 / Q3), used to introduce three types of precursors and supply them to chamber A and chamber B respectively; at the same time, it has three purge gas inlets, located in the middle of the side of the valve body, corresponding to purge gases 1, 2, and 3 respectively.
[0048] The exhaust piping includes exhaust ports. For example, the system provides 6 exhaust ports (3 on each side), allowing each precursor to be independently output to cavity A or cavity B, enabling parallel or independent processes in both cavities.
[0049] The valve assembly system employs a completely symmetrical design. This symmetry is reflected not only in the physical structure but also in the geometric path of the gas flow channel: the path length from the precursor inlet to chamber A is exactly the same as the path length to chamber B. This ensures that both chambers achieve the same gas flow rate, pressure response time, and purging efficiency under the same process conditions, thereby significantly reducing parameter differences between chambers A and B in terms of film thickness, composition, or uniformity, and improving the process consistency and product yield of the dual-chamber equipment.
[0050] In summary, the valve assembly system of this embodiment, through modular, symmetrical, and internal flow channel optimization design, supports multiple precursors and multiple purge gases while achieving multiple technical effects such as space saving, simplified maintenance, increased production capacity, and enhanced process precision.
[0051] Figures 2A to 2DThe structural layout of the valve assembly is shown, including front, bottom, rear, and center sectional views, clearly presenting its internal structure and gas flow path. The front view shows the arrangement of valves mounted on the upper part of the valve body, from left to right: three-way valve L1, two-way valve M1, three-way block N1, two-way valve P1, and three-way valve Q1. Each valve connects to the valve body via an IGS interface, forming an independent gas channel. The bottom view shows the distribution of air inlets at the bottom of the valve body, with multiple interfaces connecting to the air inlets of three-way valves L1, L2, L3, Q1, Q2, and Q3, for introducing different precursors or reactant gases. The rear view shows the valve arrangement on the rear side of the valve body, corresponding to the three-way ALD valves L3, M3, N3, P3, and Q3 on the other side, a symmetrical design with the front side, enabling synchronous control of the dual chambers A and B. The center sectional view reveals the gas flow path structure inside the valve body. The purge gas (carrier gas & purge gases a, b, c) enters from the middle of the valve body side and is split into two by a three-way block (N1, N2, N3), flowing to the left and right channels respectively. Each channel is equipped with an independent two-way valve (such as M1 / P1) to control whether the gas enters chamber A or B, ensuring that the gas path is controllable and there is no cross-contamination.
[0052] Taking the three gas passages shown in the diagram as an example, the semiconductor gas path valve group system in this embodiment adopts a symmetrical design and contains a total of 12 valves, specifically including: 6 three-way valves (L1, L2, L3, Q1, Q2, Q3) arranged on the outside of the valve body, and 6 two-way valves (M1, M2, M3, P1, P2, P3) arranged on the inside of the valve body. All valves are connected to the valve body through an IGS (Internal Ground Seal, a standard sealing interface for high vacuum or ultra-high vacuum semiconductor equipment) interface, and are sealed by an IGS gasket.
[0053] The illustrated system can simultaneously control three independent and unconnected precursor and purge gas passages. Each passage consists of five core components: for example, the first group is L1, M1, N1, P1, and Q1; the second group is L2, M2, N2, P2, and Q2; and the third group is L3, M3, N3, P3, and Q3. N1, N2, and N3 are three-way valves located in the middle of the valve body.
[0054] The gas passage layout is as follows:
[0055] The precursor inlet is located below the corresponding three-way valve (such as L1, L2, L3 or Q1, Q2, Q3), and the flow direction of each precursor can be independently controlled through its corresponding two-way three-way valves;
[0056] After passing through the three-way valve, the precursor is output through the outlet pipes on the left and right sides respectively, and enters chamber A and chamber B. The outlet pipe connector can be a VCR (Vacuum Coupling Reusable, metal-sealed quick connector for high vacuum and ultra-high vacuum systems) connector.
[0057] The purge gas inlet is uniformly located in the middle of the side of the valve body. The purge gas first enters the three-way block (N1, N2 or N3), where it is split into two and flows to the left and right sides respectively.
[0058] Each flow path is equipped with a corresponding two-way valve (such as M1 / P1, M2 / P2, M3 / P3) to achieve independent purging control of cavity A and cavity B;
[0059] The purging gas then merges with the precursor in the internal channel of the three-way valve, and its channel design ensures that the purging gas is located upstream of the precursor, so that it can be effectively purged before and after the precursor is introduced, ensuring that the precursor is completely removed and there is no residue in the pipeline.
[0060] The valve assembly in this embodiment supports up to three independent precursors (such as C1, B1, and A1) and corresponding purge gas passages, each containing a complete control unit (such as L1-M1-N1-P1-Q1). By precisely controlling the on / off state of each three-way and two-way valve, the gas flow direction can be flexibly configured.
[0061] When it is necessary to supply air to chamber A and chamber B at the same time, open the three-way valve and two-way valve on the corresponding sides.
[0062] When only one chamber needs to be supplied with air, close the valve on the other side;
[0063] More importantly, the flow rate of the precursor in cavities A and B can be independently fine-tuned by adjusting the opening degree or on / off time of the two-way valves on both sides (such as M1 and P1), which is called "compensation for the inflow". For example, in a dual-cavity system, if the film thickness in a certain cavity is thinner due to differences in the pipeline, it can be compensated by increasing the inflow time or flow rate of the precursor in that cavity, thereby ensuring the deposition consistency of the two cavities and improving the yield.
[0064] Therefore, it can be seen that the structure of the semiconductor gas valve group system and its corresponding gas passage layout in this embodiment not only achieves complete isolation and independent control of the three sets of precursors and purge gas, but also takes into account process cleanliness, control flexibility and equipment compactness through integration and symmetrical layout.
[0065] Figure 3A , 3B Based on Figure 1AThis is a schematic diagram of an embodiment of the dual-cavity atomic thin film deposition method for a semiconductor gas path valve group system. Figure 4 It shows Figure 3A , 3B The flowchart illustrates an embodiment of the dual-cavity atomic thin film deposition method. Simultaneous dual-cavity processing is merely an example; this embodiment can be extended to simultaneous processing of multiple cavities (e.g., three or more).
[0066] Start: Process initiation.
[0067] Vacuuming of chambers and valves: Vacuuming is performed on chamber A, chamber B, and the valve assembly used for gas transmission to ensure a clean initial environment and prevent impurity gases from interfering with the deposition process.
[0068] Precursor C1 enters chambers A and B, and is kept in place for the required time before being closed: Valve Z corresponding to precursor C1 is opened, and controlled by solenoid valves 5, 6, 7, and 8, precursor C1 enters chambers A and B under constant flow of carrier gas c. This process is continued for the set time before being closed, completing the first step of the precursor adsorption reaction. See details. Figure 3B As shown, the gas source is precursor C1, which enters the system through valve Z; controlled by solenoid valves 5, 6, 7, and 8, the gas enters the valve body; the corresponding ALD valves 50, 60, 70, and 80 are in the open state, allowing the gas to pass through; precursor C1 enters chamber A and chamber B respectively through the internal channel of the valve body; at the same time, CDA serves as the carrier gas c in constant flow, assisting in gas delivery; during this process, the reaction gas channel (X) is closed to prevent gas mixing.
[0069] Purge gas is introduced into chambers A and B and kept in place for the required time before being shut off. Purge gas c (such as N2 or Ar) is then introduced to remove residual gas from precursor C1 in the pipeline and chambers, preventing unintended reactions with subsequent gases and ensuring no dead zones remain in the pipeline. Utilizing the valve body's internal design, the purging gas enters from the central inlet, is diverted to both sides via a three-way valve, and performs a dead-zone-free purging of the precursor pipeline, removing residual precursors and preventing particle formation.
[0070] Reactant gas A1 is introduced into chambers A and B and kept there for the required time before being closed. Then, valve X corresponding to reactant gas A1 is opened, and controlled by solenoid valves 1, 2, 3, and 4, reactant gas A1 enters chambers A and B under constant flow conditions of carrier gas a, where it reacts chemically with the adsorbed precursor C1 to form the target thin film. See details. Figure 3AAs shown, the gas source is reactant gas A1, which enters the system through valve X; controlled by solenoid valves 1, 2, 3, and 4, the gas enters the valve body; the corresponding ALD valves 10, 20, 30, and 40 are in the open state, allowing the gas to pass through; reactant gas A1 enters chamber A and chamber B respectively through the internal channels of the valve body; at the same time, CDA (compressed dry air) serves as a constant flow of carrier gas a, assisting in gas delivery and improving stability; during this process, the precursor channel (Z) is closed to avoid cross-contamination.
[0071] Purge gas a is introduced into chambers A and B and kept for the required time before being shut off. Purge gas a is introduced and, similarly, flows through the internal flow channel of the valve body to purge the reaction gas pipeline, removing reaction gas A1 and its byproducts, ensuring the chambers are clean, and preparing for the next ALD cycle.
[0072] Close the required valves according to process requirements: After a complete ALD cycle, close the relevant valves according to process requirements to end the cycle.
[0073] End: Process terminated.
[0074] The above steps constitute a complete "ALD process cycle", which can be repeated to achieve layer-by-layer growth of multilayer films.
[0075] Figure 5A , 5B Based on Figure 1A This is a schematic diagram of an embodiment of a single-cavity atomic thin film deposition method for a semiconductor gas path valve group system. Figure 6 It shows Figure 5A , 5B The flowchart shows an example of a single-cavity (taking cavity A as an example, using only one side channel such as cavity A, while the other side cavity B is not involved) atomic thin film deposition preparation method.
[0076] Start: Process initiation.
[0077] Vacuuming of chambers and valves: Vacuuming is performed on chamber A and the valve components in the gas transmission system to ensure a clean initial environment and prevent impurity gases from interfering with the deposition process.
[0078] Precursor C1 enters cavity A and remains there for the required time before closing: Valve Z corresponding to precursor C1 is opened, controlled by solenoid valves 7 and 8 (soleoid valves 7 and 8 are open, solenoid valves 5 and 6 are closed), allowing precursor C1 to enter cavity A through the internal channel of the valve body under constant flow of carrier gas c. This process continues for the set time before closing, completing the first step of the precursor adsorption reaction. See details. Figure 5BThe gas source is precursor C1, which enters the system through valve Z; controlled by solenoid valves 7 and 8, the gas enters the valve body; the corresponding ALD valves 70 and 80 are in the open state, allowing the gas to pass through; precursor C1 enters cavity A through the internal channel of the valve body; at the same time, CDA serves as the carrier gas c in constant flow, assisting in gas delivery; during this process, the reaction gas channel X is closed to prevent gas mixing.
[0079] Purge gas c is introduced into cavity A and kept for the required time before being shut off: Purge gas c (such as N2 or Ar) is introduced. Utilizing the internal design of the valve body, the purging gas enters from the middle inlet and is diverted to both sides via the three-way block to purge the precursor pipeline without dead zones. This removes residual gas from the precursor C1 in the pipeline and cavity, preventing it from reacting unexpectedly with subsequent gases, while ensuring that there are no dead zones remaining in the pipeline.
[0080] Reactant gas A1 is introduced into chamber A and allowed to remain for the required time before being closed. Then, valve X corresponding to reactant gas A1 is opened, controlled by solenoid valves 3 and 4 (soleoid valves 3 and 4 are open, solenoid valves 1 and 2 are closed), allowing reactant gas A1 to enter chamber A under constant flow conditions of carrier gas a. There, it reacts chemically with the adsorbed precursor C1 to form the target thin film. See details. Figure 5A The gas source is reactant gas A1, which enters the system through valve X; controlled by solenoid valves 3 and 4, the gas enters the valve body; the corresponding ALD valves 30 and 40 are in the open state, allowing the gas to pass through; reactant gas A1 enters cavity A through the internal channel of the valve body; at the same time, CDA (compressed dry air) is used as carrier gas a in constant flow to assist gas delivery; during this process, the precursor channel Z is closed to avoid cross-contamination.
[0081] Purge gas a into chamber A and shut off after the required time: Purge gas a is introduced and, similarly, flows through the internal flow channel of the valve body to purge the reaction gas pipeline, removing reaction gas A1 and its byproducts, ensuring the chamber is clean, and preparing for the next ALD cycle.
[0082] Close the required valves according to process requirements: After a complete ALD cycle, close all relevant valves according to process requirements to end the cycle.
[0083] End: Process terminated.
[0084] The above steps constitute a complete "ALD process cycle", which can be repeated to achieve layer-by-layer growth of multilayer films.
[0085] Figures 7A to 7DThe diagrams show a top view, a cross-sectional view (XX), a bottom view, and a rear view of an extended form of the semiconductor gas valve assembly system of the present invention. This embodiment corresponds to a four-cavity structure and is an extended application of the first embodiment described above in a multi-cavity system. The four-cavity structure is merely an example, and the present invention can be extended to any number of cavity structures. Figure 7A The top view shows the overall layout of the valve body: it contains two rows of eight three-way valves and four three-way blocks, located in the center. The left and right sides are connected to chambers A, B, C, and D, with two chambers on each side. Figure 7C The bottom view shows the distribution of air inlets at the bottom of the valve body, with multiple ports for introducing precursors and purge gases. Figure 7D The rear view shows the valve arrangement on the rear side of the valve body, which is symmetrical to the front side, corresponding to the gas passages of each chamber. Figure 7B The XX cross-sectional view is a transverse section, showing the gas flow path from cavity B to cavity A. It can be seen that the three-way block diverts the purge gas to both sides, and then the flow direction is controlled by the three-way valve.
[0086] This structure supports simultaneous or separate ALD processes in four independent chambers (A, B, C, and D). Each chamber allows independent control of the introduction of precursors (e.g., B1, D1) and reactant gases (e.g., A1, C1). Purge gas enters through the central inlet, is split in two by multiple T-junctions, and directed to the left and right sides respectively, enabling independent purging control of each chamber. All valves are connected to the valve body via IGS interfaces and sealed with IGS gaskets to ensure reliable gas transmission in high-vacuum environments.
[0087] Furthermore, the present invention also discloses a thin film deposition preparation apparatus, including a memory and a processor, wherein the processor is connected to the memory and configured to implement the thin film deposition preparation method as described above.
[0088] The present invention also discloses a computer-readable storage medium storing computer instructions thereon, which, when executed by a processor, implement the thin film deposition preparation method as described above.
[0089] Although the methods described above are illustrated and depicted as a series of actions for the sake of simplicity, it should be understood and appreciated that these methods are not limited by the order of the actions, as some actions may occur in a different order and / or concurrently with other actions from the illustrations and descriptions herein or not illustrated and described herein but which may be understood by those skilled in the art, according to one or more embodiments.
[0090] The prior description of this disclosure is provided to enable any person skilled in the art to make or use this disclosure. Various modifications to this disclosure will be apparent to those skilled in the art, and the general principles defined herein may be applied to other variations without departing from the spirit or scope of this disclosure. Therefore, this disclosure is not intended to be limited to the examples and designs described herein, but should be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A semiconductor pneumatic valve assembly system, characterized in that, The system includes a valve body with internal channels, valves, tees, inlet pipes, and outlet pipes, wherein: The three-way block is located inside the valve body and serves as a flow-diverting structure for the purging gas, delivering the purging gas to the left and right side channels respectively. The valve includes a three-way valve and a two-way valve. The three-way valve is located on the outer side of the valve body and is used to control the precursor or reactant gas to enter different reaction chambers, and to switch the gas on / off or flow direction selection. The two-way valve is located on the inner side of the valve body and controls whether the precursor or reactant gas enters the corresponding channel by switching it on / off. The purge gas is located upstream of the precursor and the purge gas merges with the precursor in the internal channel of the three-way valve. The intake pipe includes a precursor inlet and a purge gas inlet, and the exhaust pipe includes an exhaust port.
2. The semiconductor pneumatic valve assembly system according to claim 1, characterized in that, The components, including the three-way block, the three-way valve, and the two-way valve, are connected by a high-vacuum seal using valves and gaskets.
3. The semiconductor pneumatic valve assembly system according to claim 2, characterized in that, The structure of the valve and the gasket includes an IGS structure.
4. The semiconductor pneumatic valve assembly system according to claim 1, characterized in that, The opening and closing of the valve is controlled by a pneumatic connector.
5. The semiconductor pneumatic valve assembly system according to claim 4, characterized in that, The pneumatic connector drives the valve by receiving signals from an external control system, which includes a control system for a solenoid valve.
6. The semiconductor pneumatic valve assembly system according to claim 1, characterized in that, The precursor inlet is located below the corresponding three-way valve, and the purge gas inlet is located on the side of the valve body.
7. The semiconductor pneumatic valve assembly system according to claim 1, characterized in that, The system adopts a symmetrical design, which includes the symmetry of the physical structure and the symmetry of the geometric path of the gas flow channel.
8. A method for preparing thin films by deposition, characterized in that, This method is implemented based on a semiconductor pneumatic valve assembly system as described in any one of claims 1 to 7, the method comprising: Vacuuming of chambers and valves: Vacuuming is performed on the chambers and valve assemblies used for gas transmission; The precursor enters the cavity and remains there for the required time before closing. Purge gas is introduced into the cavity to remove residual gas from the precursor in the pipeline and cavity, and the process is continued for the required time before being shut off. The reactive gas enters the cavity and reacts chemically with the adsorbed precursor to form a target film, which is then closed after the required time. Purge gas is introduced into the cavity to purge the pipeline of the reaction gas, remove the reaction gas and its byproducts, and then the process is closed after the required time is completed. After a complete cycle, the required valves are closed as needed for the process, and the process is repeated to achieve layer-by-layer growth of multilayer films.
9. The thin film deposition preparation method according to claim 8, characterized in that, The method is designed for simultaneous processing of at least two cavities.
10. The thin film deposition preparation method according to claim 8, characterized in that, The method is designed for individual processing of a single cavity.
11. A thin film deposition preparation apparatus, characterized in that, include: Memory; as well as A processor, connected to the memory, and configured to implement the thin film deposition preparation method as described in claim 8.
12. A computer-readable storage medium storing computer instructions thereon, characterized in that, When the computer instructions are executed by the processor, the thin film deposition preparation method as described in claim 8 is implemented.
Citation Information
Patent Citations
Modularized ALD reaction gas distributor, system and method for preparing coating
CN114959651A
Gas supply equipment, gas supply method and treatment device for deposition process
CN117448782A
Manifold valve group structure
CN118793812A
Air inlet pipeline module
CN219637339U
