An online test method, system, medium, and product for preventing over-level tripping.

By introducing substation and host computer-coordinated protection devices into the power monitoring system for online testing, the problem of not being able to verify the anti-over-tripping function without affecting power supply in the existing technology has been solved. This enables periodic or real-time verification under normal operating conditions, improving the reliability and safety of power supply.

CN121955574BActive Publication Date: 2026-11-10BEIJING GUANGDA TAIXIANG AUTOMATION TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202610253475.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-03-03
Publication Date
2026-11-10
Estimated Expiration
2046-03-03

AI Technical Summary

Technical Problem

Existing technologies make it difficult to periodically or in real-time verify the anti-over-tripping function in power monitoring systems without affecting normal power supply, resulting in safety hazards and insufficient reliability.

Method used

By introducing substations and host computers into the power monitoring system, the protector is coordinated to conduct online tests simulating fault current values, collect current values ​​in real time and block the trip output drive circuit, record the reception time and action events of the anti-over-level blocking signal, realize the anti-over-level trip logic operation, avoid false tripping, and evaluate the response speed and reliability of the anti-over-level trip function through the host computer.

Benefits of technology

It enables periodic or real-time verification of the anti-overlapping tripping function under normal operating conditions, timely detection and resolution of potential hazards, and improves the reliability and safety of power supply, avoiding the disadvantages of traditional methods that require power outages and extensive preparation work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121955574B_ABST
    Figure CN121955574B_ABST
Patent Text Reader

Abstract

This invention relates to an online testing method, system, medium, and product for anti-overlapping tripping functionality, relating to the field of power monitoring. Implementing this method, the substation responds to the test preparation and start commands from the host computer and coordinates the protector to conduct a simulated test, verifying the anti-overlapping tripping function without affecting normal power supply. The protector disables real-time current acquisition and retrieves simulated fault current values, while simultaneously blocking the tripping output drive circuit to execute the anti-overlapping tripping logic operation within the duration of the simulated fault, ensuring that the simulated test does not lead to false tripping. The substation records the moment the protector sends the anti-overlapping blocking signal and retrieves the action events generated when the protector executes the anti-overlapping tripping logic operation, allowing the host computer to comprehensively evaluate the response speed and reliability of the anti-overlapping tripping function. This method avoids the disadvantages of requiring power outages and extensive preparation work, and can periodically or in real-time verify the anti-overlapping tripping function under normal operating conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power monitoring, and in particular to an online test method, system, medium, and product for preventing over-level tripping. Background Technology

[0002] In industrial sectors such as coal mining, the stability and reliability of power supply are directly related to production safety and economic benefits. Most coal mines have adopted power monitoring systems for power supply management, and the anti-cascading tripping function in these systems is crucial for ensuring power supply. When faults such as short circuits, overcurrents, undervoltage, or grounding occur, the anti-cascading tripping function can effectively control the scope of the fault and prevent large-scale power outages.

[0003] Currently, the main methods for verifying the anti-overcurrent tripping function are to conduct underground three-phase or two-phase actual short-circuit tests, adjust the instantaneous overcurrent protection settings of the power supply line for testing, or simulate faults during the start-up of high-load terminal equipment.

[0004] Because the above verification methods require a lot of preparation work and production activities in the relevant areas must be stopped during the verification process, the verification frequency is low, making it difficult to verify the effectiveness and reliability of the anti-overlapping trip function regularly or in real time, which leads to potential safety hazards. Summary of the Invention

[0005] This application provides an online testing method, system, medium, and product for the anti-over-level tripping function, which is used to periodically or in real time verify the anti-over-level tripping function under normal operating conditions, promptly identify and resolve potential hazards, and improve the reliability and safety of power supply.

[0006] Firstly, this application provides an online testing method for anti-cascading tripping functionality, applied to a power monitoring system. The power monitoring system includes a host computer, substations, and several protectors. The host computer is connected to the substations, and the substations are connected to the protectors. The method includes: the substation responding to a test preparation command issued by the host computer by stopping preset port inspections and transmitting the test preparation command to the protector, so that the protector enters the test preparation state; the substation receiving a test start command sent by the host computer, the test start command including a simulated fault current value and a simulated fault duration; the substation broadcasting the test start command to the protector to trigger the protector to shield the real-time current value acquisition and call the simulated fault current value while simultaneously blocking the tripping output drive circuit, so as to execute the anti-cascading tripping logic operation within the simulated fault duration. The calculation involves real-time acquisition of current values, representing the actual operating current flowing through the primary circuit monitored by the protector. The interlocking trip output drive circuit refers to driving the switch associated with the protector from a closed state to an open state to cut off the primary circuit current. The anti-over-level trip logic operation refers to the logical judgment and control process to prevent the protector from over-level tripping when it detects a fault. The substation records the reception time of the anti-over-level interlocking signal sent by the protector and retrieves the action events generated when the protector executes the anti-over-level trip logic operation. The anti-over-level interlocking signal is a signal issued by the protector when it detects a fault, used to prohibit the substation or the host computer from over-level tripping. The substation uploads the anti-over-level interlocking signal, reception time, and action events to the host computer so that the host computer can determine whether the anti-over-level tripping function is normal.

[0007] By adopting the above technical solution, the substation responds to the test preparation and test start commands from the host computer and coordinates the protector to conduct simulation tests, thus verifying the anti-over-level tripping function without affecting normal power supply. The protector disables real-time current value acquisition and calls up simulated fault current values, while simultaneously blocking the trip output drive circuit to execute the anti-over-level tripping logic operation within the duration of the simulated fault, ensuring that the simulation test does not lead to false tripping. The substation records the time of receiving the anti-over-level blocking signal sent by the protector and retrieves the action events generated when the protector executes the anti-over-level tripping logic operation, allowing the host computer to comprehensively evaluate the response speed and reliability of the anti-over-level tripping function. This online testing method avoids the disadvantages of traditional methods that require power outages and extensive preparation work, and can periodically or in real-time verify the anti-over-level tripping function under normal operating conditions, promptly identifying and resolving potential problems, and improving the reliability and safety of power supply.

[0008] In conjunction with some embodiments of the first aspect, in some embodiments, the anti-overlap trip logic operation specifically includes: the protector determining whether the simulated fault current value is greater than a preset instantaneous trip setting; if the simulated fault current value is greater than the preset instantaneous trip setting, the protector generates a start event and detects whether an external blocking signal is received within a preset anti-overlap time limit, the start event including the start time; if not, the protector sends an anti-overlap blocking signal to the substation and generates an instantaneous trip event, the instantaneous trip event including the instantaneous trip time; if yes, the protector generates a blocking event, the blocking event including the blocking time.

[0009] By adopting the above technical solution, the protector, based on a preset instantaneous trip setting, achieves precise definition between fault conditions and normal conditions, avoiding false triggering or missed triggering during simulation tests. When the simulated fault current value exceeds the preset instantaneous trip setting, the protector generates a start event, indicating that the protector has detected a fault. The protector determines the fault scenario (an independent fault scenario without an external blocking signal and a coordinated fault scenario with an external blocking signal) based on the presence of an external blocking signal: when there is no external blocking signal, the protector sends an anti-level-crossing blocking signal to the substation and generates an instantaneous trip event, verifying the protector's ability to respond quickly and actively prevent level-crossing in independent fault scenarios, and also verifying the timeliness and accuracy of the anti-level-crossing blocking signal triggering; when there is an external blocking signal, the protector generates a blocking event, effectively verifying the protector's ability to receive and execute external coordinated commands, ensuring that the protector can be integrated into the hierarchical blocking system of the entire power monitoring system, and avoiding level-crossing tripping or fault expansion caused by abnormal response to external blocking signals.

[0010] In conjunction with some embodiments of the first aspect, in some embodiments, after the substation uploads the anti-overlapping blocking signal, the receiving time, and the action event to the host computer for the host computer to determine whether the anti-overlapping tripping function is normal, the method further includes: the host computer determining the start time of the protector based on the action event; the host computer calculating the time difference based on the start time and the receiving time; if the time difference is less than the lower limit of the preset standard response interval, the host computer determines that the protector has a risk of sending a false signal; if the time difference is greater than the upper limit of the preset standard response interval, the host computer determines that the protector's action is delayed; if the time difference is within the preset standard response interval, the host computer determines that the protector's anti-overlapping tripping function is normal.

[0011] By employing the above technical solution, the host computer calculates the time difference between the start-up time and the receiving time, and compares it with a preset standard response range, thus achieving a quantitative assessment of the protector's anti-over-tripping function. If the time difference is less than the lower limit, it indicates a risk of the protector sending a false signal; if the time difference is greater than the upper limit, it indicates a lag in the protector's action; if the time difference is within the preset standard response range, it indicates that the protector's anti-over-tripping function is normal. This time difference-based judgment method makes the assessment of the anti-over-tripping function more scientific and objective, enabling timely detection of various potential problems with the protector, such as the risk of false operation and action delay.

[0012] In conjunction with some embodiments of the first aspect, in some embodiments, after the step of the host computer calculating the time difference based on the startup time and the reception time, the method further includes: the host computer obtaining the pure logic processing time of the protector based on the time difference and a preset signal transmission delay; the host computer retrieving the historical pure logic processing time of the protector; the host computer calculating the time drift trend value based on the pure logic processing time and the historical pure logic processing time; the host computer determining whether the time drift trend value exceeds a preset degradation warning threshold; if so, the host computer generating a device performance degradation warning signal, which is used to indicate that the performance of the protector is in a downward trend.

[0013] By adopting the above technical solution, the host computer calculates the pure logic processing time of the protector and compares it with historical pure logic processing times, thus assessing the performance trend of the protector. This method can detect signs of protector performance degradation early, enabling predictive maintenance and preventing the failure of the anti-cascading tripping function due to performance deterioration, thereby improving the reliability and safety of the entire power supply system.

[0014] In some embodiments of the first aspect, the method further includes: when the duration of the simulated fault reaches a certain point, the substation resumes the preset port inspection and records the recovery time; when the duration of the simulated fault reaches a certain point, the protector releases the shielding of the real-time acquired current value and releases the lockout of the trip output drive circuit; and the substation uploads the recovery time to the host computer.

[0015] By adopting the above technical solution, after the simulated fault duration ends, the substation resumes the preset port inspection and records the recovery time. Simultaneously, the protector releases the shielding of the real-time current acquisition value and the blocking of the trip output drive circuit. This orderly recovery mechanism avoids potential system instability at the end of the simulation test, ensuring a smooth transition of the power monitoring system to normal operation.

[0016] In conjunction with some embodiments of the first aspect, in some embodiments, before the substation broadcasts the test start command to the protector, the method further includes: the substation determining whether the current time is within a preset prohibited test period; if the current time is within the preset prohibited test period, the substation refuses to broadcast the test start command and reports the test start failure information to the host computer.

[0017] By adopting the above technical solution, the substation determines whether the current time falls within a preset prohibited testing period to control the start of the simulation test, thus avoiding conducting the test during peak power load periods or other unsuitable special times. When the test start command is rejected, the substation will report the test start failure information to the host computer, ensuring that the host computer is promptly aware of the test status. This time control mechanism improves the safety of the simulation test, makes the online test more in line with actual operational needs, and also facilitates management personnel in rationally scheduling test times.

[0018] In conjunction with some embodiments of the first aspect, in some embodiments, the method further includes: the protector continuously monitors the rate of change of the real-time acquired current value; when the rate of change exceeds a preset sudden change threshold, the protector stops executing the anti-overlapping trip logic operation and generates a test forced interruption message to be sent to the substation; the protector performs conventional fault protection logic operation based on the real-time acquired current value.

[0019] By adopting the above technical solution, when the rate of change of the real-time acquired current value exceeds the preset sudden change threshold, the protector will immediately stop the simulation test and execute the conventional fault protection logic operation, ensuring timely response in the event of an actual fault. This dual protection mechanism ensures the safety of the simulation test without affecting the protector's ability to handle actual faults. The protector generates a test forced interruption message to notify the substation, enabling all parts of the power monitoring system to coordinately exit the test state, avoiding potential protection coordination problems during test interruption, and improving the reliability and security of the entire power monitoring system.

[0020] In a second aspect, embodiments of this application provide a power monitoring system, which includes: one or more processors and a memory; the memory is coupled to the one or more processors, and the memory is used to store computer program code, which includes computer instructions, and the one or more processors call the computer instructions to cause the power monitoring system to perform the methods described in the first aspect and any possible implementation thereof.

[0021] Thirdly, embodiments of this application provide a computer program product containing instructions that, when the computer program product is run on a power monitoring system, cause the power monitoring system to perform the method described in the first aspect and any possible implementation thereof.

[0022] Fourthly, embodiments of this application provide a computer-readable storage medium including instructions that, when executed on a power monitoring system, cause the power monitoring system to perform the method described in the first aspect and any possible implementation thereof.

[0023] Understandably, the power monitoring system provided in the second aspect, the computer program product provided in the third aspect, and the computer storage medium provided in the fourth aspect are all used to execute the methods provided in the embodiments of this application. Therefore, the beneficial effects they can achieve can be referred to the beneficial effects in the corresponding methods, and will not be repeated here.

[0024] One or more technical solutions provided in the embodiments of this application have at least the following technical effects or advantages: 1. By adopting the above technical solution, the substation responds to the test preparation and test start commands from the host computer and coordinates the protector to conduct simulated tests. This allows for the verification of the anti-over-level tripping function without affecting normal power supply. The protector disables real-time current value acquisition and calls up simulated fault current values, while simultaneously blocking the trip output drive circuit to execute the anti-over-level tripping logic operation within the duration of the simulated fault, ensuring that the simulated test does not lead to false tripping. The substation records the moment the protector sends the anti-over-level blocking signal and retrieves the action events generated when the protector executes the anti-over-level tripping logic operation. This allows the host computer to comprehensively evaluate the response speed and reliability of the anti-over-level tripping function. This online testing method avoids the disadvantages of traditional methods that require power outages and extensive preparation work. It allows for periodic or real-time verification of the anti-over-level tripping function under normal operating conditions, enabling timely detection and resolution of potential problems, and improving the reliability and safety of power supply.

[0025] 2. By adopting the above technical solution, the protector, based on a preset instantaneous trip setting, achieves precise definition between fault conditions and normal conditions, avoiding false triggering or missed triggering during simulation tests. When the simulated fault current value exceeds the preset instantaneous trip setting, the protector generates a start event, indicating that the protector has detected a fault. The protector determines the fault scenario (independent fault scenario without external blocking signals and coordinated fault scenario with external blocking signals) based on the presence of external blocking signals: When there are no external blocking signals, the protector sends an anti-level-crossing blocking signal to the substation and generates an instantaneous trip event, verifying the protector's ability to respond quickly and actively prevent level-crossing in independent fault scenarios, and also verifying the timeliness and accuracy of the anti-level-crossing blocking signal triggering; when there are external blocking signals, the protector generates a blocking event, effectively verifying the protector's ability to receive and execute external coordinated commands, ensuring that the protector can be integrated into the hierarchical blocking system of the entire power monitoring system, and avoiding level-crossing tripping or fault expansion caused by abnormal response to external blocking signals.

[0026] 3. By adopting the above technical solution, the host computer calculates the time difference between the start-up time and the receiving time, and compares it with the preset standard response range, thus realizing a quantitative evaluation of the protector's anti-over-level tripping function. If the time difference is less than the lower limit, it indicates that the protector has a risk of sending false signals; if the time difference is greater than the upper limit, it indicates that the protector's action is lagging; if the time difference is within the preset standard response range, it indicates that the protector's anti-over-level tripping function is normal. This judgment method based on time difference makes the evaluation of the anti-over-level tripping function more scientific and objective, and can promptly detect various potential problems of the protector, such as the risk of false operation and action delay. Attached Figure Description

[0027] Figure 1 This is a flowchart illustrating an online test method for the anti-over-level tripping function in an embodiment of this application; Figure 2 This is another flowchart illustrating the online test method for the anti-over-level tripping function in the embodiments of this application; Figure 3 This is a schematic diagram of the physical device structure of a power monitoring system in an embodiment of this application. Detailed Implementation

[0028] The terminology used in the following embodiments of this application is for the purpose of describing particular embodiments only and is not intended to be limiting of this application. As used in the specification of this application, the singular expressions “a,” “an,” “the,” “the,” and “this” are intended to include the plural expressions as well, unless the context clearly indicates otherwise. It should also be understood that the term “and / or” as used in this application refers to any or all possible combinations including one or more of the listed items.

[0029] Hereinafter, the terms "first" and "second" are used for descriptive purposes only and should not be construed as implying or suggesting relative importance or implicitly indicating the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature, and in the description of the embodiments of this application, unless otherwise stated, "multiple" means two or more.

[0030] In power monitoring systems, the host computer, substations, and protectors are the core equipment in a three-tiered collaborative system. They have clearly defined roles and work together through communication links to achieve power system monitoring, fault simulation testing, and protection control. The host computer, substations, and protectors are explained in detail below: (1) The host computer is the centralized control and data processing center of the power monitoring system. It is usually composed of industrial computers and its core functions include: Command issuance: Lead the entire process of the anti-overlapping trip simulation test, including issuing commands such as "test preparation", "test start" and "test end" to the substations, and sending commands to each protector through "transparent transmission"; Status monitoring: Receive feedback information from substations and protection stations (such as "preparation successful / failed", "startup successful / failed", etc.) and only proceed with the test process after confirming that all equipment has entered the specified status; Data reading and analysis: After the simulation test is completed, detailed data recorded by the substations and protectors are read to determine the effectiveness of the simulation test, generate a test report, and identify the risk of over-level tripping; Remote control: Supports remote control of test parameter adjustment and test start / stop operations without on-site intervention.

[0031] (2) The substation is the intermediate communication and control node between the host computer and the protector. It is usually deployed in a regional power supply unit (such as a power supply area in a coal mine). Its core functions include: Command forwarding: Receives commands from the host computer and broadcasts them to all protectors within the jurisdiction via the RS485 bus; at the same time, it transmits the feedback information from the protectors to the host computer. Local control: Execute commands from the host computer, such as stopping RS485 port inspection when entering the test preparation state and resuming port inspection after the simulation test ends; execute the anti-level tripping process according to the test parameters (consistent with the actual fault handling logic, but without tripping). Data logging: Detailed records of key events during the experiment; Communication adaptation: Solve the communication protocol adaptation problem between the host computer and the protector (e.g., the host computer communicates with the substation via CAN bus, and the substation communicates with the protector via RS485 bus).

[0032] (2) A protector (full name "integrated protector") is a terminal protection device directly connected to power equipment (such as transformers and power supply lines). It is the "last line of defense" to ensure the safety of power equipment. Its core functions include: Status Response: Receive commands from the substation, such as entering the test preparation state, and send feedback to the substation (which then transmits them to the host computer). Fault simulation and action execution: According to the test parameters (such as simulated current and duration), execute the overcurrent protection tripping, overcurrent stage II and overcurrent stage III handling process (completely consistent with the actual fault handling logic, but without actual output tripping). Data recording: Recording key information during the experiment; Actual fault protection (non-test state): When a real fault occurs in the power equipment (such as short circuit or overcurrent), the protection action such as tripping and blocking is quickly executed according to the preset setting value to prevent the fault from expanding and avoid cascading tripping.

[0033] The following describes the process of the method provided in this implementation. Please refer to [link / reference]. Figure 1 This is a flowchart illustrating an online test method for the anti-over-level tripping function in an embodiment of this application.

[0034] S101. The substation responds to the test preparation command issued by the host computer, stops the preset port inspection, and transmits the test preparation command to the protector so that the protector enters the test preparation state. Among them, the test preparation command refers to the control command issued by the host computer to put the power monitoring system into the test state; the preset port inspection means that the substation periodically polls each communication port to obtain the status information of the protector, for example, polling each communication port once every 100ms; the test preparation state refers to the working state in which the protector temporarily stops the conventional fault protection function and prepares to execute the simulation test; stopping the preset port inspection means pausing the conventional query initiated by the substation (as the master station), releasing bus resources, so that the substation is in the receiving mode that can respond to the sudden data reported by the protector (as the slave station) in real time (such as the event trigger mode based on CAN bus, or the high-frequency listening mode of RS485).

[0035] Specifically, the host computer sends a test preparation command to the substation. Upon receiving the command, the substation stops routine polling of all communication ports to ensure that communication resources are dedicated to test data transmission during the test. The substation forwards the test preparation command to all connected protectors, switching them from normal operation to test preparation mode. In test preparation mode, the protectors continue to monitor the operating status of the power equipment to ensure they can promptly exit the test mode in the event of an actual fault.

[0036] S102. The substation receives the test start command sent by the host computer. The test start command includes the simulated fault current value and the simulated fault duration. Among them, the test start command refers to the control command issued by the host computer to start the specific test process; the simulated fault current value refers to the current value used to simulate the fault state of the power system and to test the response characteristics of the protector; the simulated fault duration represents the time period for maintaining the simulated fault state, usually in milliseconds.

[0037] Specifically, the host computer will generate a test start command that includes the simulated fault current value and the simulated fault duration. The simulated fault current value is usually set to be greater than the protector's preset instantaneous trip setting to ensure that the protector's anti-overlap trip logic is triggered. The simulated fault duration needs to be long enough to ensure complete recording of the protector's response process, but it must also avoid affecting normal power supply; it is generally set within the range of 100-500 milliseconds. After receiving the test start command, the branch station will verify the format and parameters to ensure the integrity and validity of the data.

[0038] Before the test begins, the substation needs to synchronize with the protector at the microsecond or millisecond level using IEEE1588, NTP or other industrial time synchronization protocols to ensure that the comparison benchmark for the timestamps of subsequent action events is consistent.

[0039] S103. The substation broadcasts a test start command to the protector to trigger the protector to shield the real-time current value and call the simulated fault current value while blocking the trip output drive circuit. This is to execute the anti-over-level trip logic operation during the duration of the simulated fault. The real-time current value represents the actual operating current flowing through the primary circuit monitored by the protector. The blocking trip output drive circuit refers to driving the switch associated with the protector from the closed state to the open state to cut off the primary circuit current. The anti-over-level trip logic operation refers to the logic judgment and control process to prevent the protector from over-level tripping when it detects a fault. Among them, broadcasting means that the substation sends the same instruction information to all connected protectors at the same time; shielding the real-time current value acquisition means temporarily stopping the use of the current data actually collected by the protector; primary circuit means the main circuit that transmits electrical energy and carries the actual operating current; blocking the trip output drive circuit means temporarily prohibiting the protector from issuing trip commands to the circuit breaker; switching equipment refers to equipment such as circuit breakers used to connect or disconnect circuits.

[0040] Specifically, the substation simultaneously sends a test start command to all protectors. Upon receiving the command, the protectors temporarily stop using real-time current acquisition values ​​and switch to using simulated fault current values. Simultaneously, the protectors lock out their trip output drive circuits to ensure that the circuit breaker does not trip due to malfunction during the test. In this state, the protectors will execute complete anti-overlap tripping logic operations, including fault judgment, time delay judgment, and blocking signal processing, but will not actually perform a tripping operation. This mechanism verifies the protector's logic processing capabilities while avoiding disruption to normal power supply.

[0041] Optionally, the anti-overlap trip logic operation specifically includes: the protector determining whether the simulated fault current value is greater than the preset instantaneous trip setting; if the simulated fault current value is greater than the preset instantaneous trip setting, the protector generates a start event and checks whether an external blocking signal is received within the preset anti-overlap time limit, the start event including the start time; if not, the protector sends an anti-overlap blocking signal to the substation and generates an instantaneous trip event, the instantaneous trip event including the instantaneous trip time; if yes, the protector generates a blocking event, the blocking event including the blocking time.

[0042] Among them, the preset instantaneous trip setting value refers to the current threshold for judging faults, which is usually set to 5-10 times the rated current; the start event refers to the status record of the protector when it detects a fault; the preset anti-overrun time limit indicates the maximum time to wait for receiving an external blocking signal, which is usually set to 100-300 milliseconds; the external blocking signal refers to the control signal from other protectors that prohibits the local trip; the anti-overrun blocking signal indicates the control signal sent to the superior equipment that prohibits tripping; the instantaneous trip event indicates the action record of the protector performing instantaneous trip protection; the blocking event indicates the status record of the protector after receiving an external blocking signal; the start time, instantaneous trip time, and blocking time respectively indicate the precise time point of occurrence of the corresponding event.

[0043] Specifically, the protector compares the simulated fault current value with the preset instantaneous trip setting. When it is confirmed that the simulated fault current value exceeds the preset instantaneous trip setting, the protector generates a startup event including the startup time and records the startup status of the protection function. Next, the protector starts a timer to monitor whether an external blocking signal from other protectors is received within a preset overcurrent protection time limit. If no external blocking signal is received within the preset overcurrent protection time limit, it means the protector should handle the fault. In this case, it sends an overcurrent protection level blocking signal to the substation to prevent the upper-level protection from operating, and simultaneously generates an instantaneous trip event including the instantaneous trip time. If an external blocking signal is received within the preset overcurrent protection time limit, it means the fault point is within the range of the lower-level protection. In this case, the protector generates a blocking event including the blocking time and transfers control to the lower-level protector.

[0044] Optionally, the substation determines whether the current time is within a preset prohibited test period; if the current time is within a preset prohibited test period, the substation refuses to broadcast the test start command and reports the test start failure information to the host computer.

[0045] Among them, the current time indicates the actual time point at which the test is to be started; the preset prohibited test period indicates the time interval during which the test is not allowed to be carried out, such as the peak power load period (8:00-12:00, 18:00-22:00); the broadcast test start command refers to the control command sent by the substation to all connected protectors to start the test; the test start failure information indicates the status report data packet containing the reason why the test could not be started.

[0046] Specifically, the substation reads the system clock to obtain the precise current time, and then compares the current time with the configured preset prohibited test periods. These preset prohibited test periods typically include special periods such as peak power load periods, important production periods, and system maintenance times. If the current time is determined to fall within a preset prohibited test period, the substation will immediately terminate the test process and will no longer broadcast the test start command to the protector. At the same time, the substation will generate a test start failure report containing detailed information, including the current time and the reason for the failure, and send it to the host computer via the communication network.

[0047] S104. The substation records the time when the protector sends the anti-overpass blocking signal and retrieves the action event generated when the protector performs the anti-overpass trip logic operation. The anti-overpass blocking signal is a signal issued by the protector when it detects a fault and is used to prohibit the substation or host computer from overpassing. Among them, the receiving time indicates the precise time point at which the substation receives the anti-overpass blocking signal sent by the protector, accurate to the millisecond level; the action event refers to various status records generated when the protector executes the anti-overpass tripping logic operation, including start events, instantaneous overpass events, blocking events, etc.; the anti-overpass blocking signal indicates the control signal issued by the protector when it detects a fault, used to prevent the upstream equipment from performing a tripping operation; overpass tripping indicates the situation where the upstream equipment performs a tripping operation, bypassing the nearest protector.

[0048] Specifically, the substation monitors the communication port in real time. When it receives an anti-overpass blocking signal from the protector, it immediately records the reception time. Simultaneously, the substation uses a dedicated data retrieval command to request the protector to upload all action event records generated during this test. These action events include the complete process of the protector executing the anti-overpass trip logic, such as the moment the protector detects that the simulated fault current value exceeds the preset instantaneous trip setting, the moment it issues the anti-overpass blocking signal, and detailed information about the results of detecting external blocking signals.

[0049] S105. The substation uploads the anti-over-level blocking signal, the receiving time, and the action event to the host computer so that the host computer can determine whether the anti-over-level tripping function is normal.

[0050] Among them, the judgment refers to the process by which the host computer evaluates the test results according to preset rules; normal means that the anti-over-level tripping function meets the design requirements.

[0051] Specifically, the substation packages the recorded anti-overpass blocking signals, reception times, and all action events acquired from the protector into standard format data packets. These data packets are transmitted to the host computer via the communication network between the substation and the host computer. Upon receiving the data, the host computer analyzes it according to preset rules, including calculating whether the protector's response time is within a reasonable range, checking the correct timing of action events, and verifying whether the content of the anti-overpass blocking signals meets the requirements. Through these analyses, the host computer can comprehensively evaluate the normal operation of the protector's anti-overpass tripping function and generate a detailed test report.

[0052] Optionally, under normal circumstances, the host computer can determine whether the anti-overlapping tripping function is normal through the following methods, which are not limited here: The host computer determines the start time of the protector based on the action event; the host computer calculates the time difference based on the start time and the receiving time; if the time difference is less than the lower limit of the preset standard response range, the host computer determines that the protector has a risk of sending false signals; if the time difference is greater than the upper limit of the preset standard response range, the host computer determines that the protector's action is lagging; if the time difference is within the preset standard response range, the host computer determines that the protector's anti-overlapping tripping function is normal.

[0053] Optionally, after the host computer calculates the time difference based on the startup and reception times, the following steps can be performed, or not, and are not limited here: The host computer obtains the pure logic processing time of the protector based on the time difference and the preset signal transmission delay; the host computer retrieves the historical pure logic processing time of the protector; the host computer calculates the time drift trend value based on the pure logic processing time and the historical pure logic processing time; the host computer determines whether the time drift trend value exceeds the preset degradation warning threshold; if so, the host computer generates a device performance degradation warning signal, which is used to indicate that the performance of the protector is declining.

[0054] Among them, the preset signal transmission delay refers to the standard time required for the signal to be transmitted in the communication network; the pure logic processing time represents the processing time data required for the protector to perform logic operations, excluding communication delay; the historical pure logic processing time refers to the processing time data recorded in the protector's past tests; the time drift trend value represents the degree of change of the pure logic processing time relative to the historical pure logic processing time; the preset degradation warning threshold is the standard value for judging whether the equipment performance has significantly decreased; and the equipment performance degradation warning signal represents an alarm message indicating a decrease in equipment performance.

[0055] Specifically, the host computer subtracts the startup time from the reception time to obtain the total time difference, and then subtracts the preset signal transmission delay (usually 2-5ms) to obtain the pure logic processing time of the protector. Next, the host computer retrieves the historical pure logic processing time of the protector's recent tests (e.g., the last 10 tests) from the historical database. By comparing the pure logic processing time with the historical pure logic processing time, a time drift trend value reflecting the protector's performance changes is calculated. This calculation may use statistical methods such as moving average or weighted average. When the time drift trend value is found to exceed the preset degradation warning threshold (e.g., exceeding 20% ​​of the historical average), the host computer generates a device performance degradation warning signal (including specific performance degradation data and trend analysis results).

[0056] By adopting the above technical solution, the substation responds to the test preparation and test start commands from the host computer and coordinates the protector to conduct simulation tests, thus verifying the anti-over-level tripping function without affecting normal power supply. The protector disables real-time current value acquisition and calls up simulated fault current values, while simultaneously blocking the trip output drive circuit to execute the anti-over-level tripping logic operation within the duration of the simulated fault, ensuring that the simulation test does not lead to false tripping. The substation records the time of receiving the anti-over-level blocking signal sent by the protector and retrieves the action events generated when the protector executes the anti-over-level tripping logic operation, allowing the host computer to comprehensively evaluate the response speed and reliability of the anti-over-level tripping function. This online testing method avoids the disadvantages of traditional methods that require power outages and extensive preparation work, and can periodically or in real-time verify the anti-over-level tripping function under normal operating conditions, promptly identifying and resolving potential problems, and improving the reliability and safety of power supply.

[0057] The following provides a more detailed description of the process of the method provided in this implementation. Please refer to [link / reference]. Figure 2 This is another flowchart illustrating the online test method for the anti-over-level tripping function in this application embodiment.

[0058] After step S105, the following steps may or may not be performed; this is not limited here: S201. When the duration of the simulated fault is reached, the substation resumes the preset port inspection and records the recovery time.

[0059] Among them, the recovery time indicates the precise time point at which the power monitoring system exits the test state and returns to the normal working state, accurate to the millisecond level; the arrival time indicates the time point at which the simulated fault duration timer ends.

[0060] Specifically, the substation continuously times the simulated fault duration using an internal timer. When the timer reaches the set duration, the substation resumes its normal port inspection function, polling each communication port sequentially at preset time intervals (e.g., 100ms) to collect the protector's operating status information in real time. Simultaneously, the substation records the recovery time, which serves as the end marker for the test process.

[0061] S202. When the duration of the simulated fault is reached, the protector releases the shielding of the real-time current value and releases the lockout of the trip output drive circuit.

[0062] "Release" means to remove previously imposed functional restrictions.

[0063] Specifically, when the protector detects that the simulated fault duration has expired, or receives a test termination command from the substation, it will execute a series of recovery operations: it will remove the shielding from the real-time acquired current value, re-enable the actual current data from the sampling device, and stop using the simulated fault current value; it will also release the lockout on the trip output drive circuit, restoring the protector's ability to send trip commands to the circuit breaker. These operations are executed sequentially according to a preset order to ensure a smooth transition of the power monitoring system to normal operation. During the recovery process, if the protector detects a real fault, it will immediately execute the corresponding protection action.

[0064] The protector is equipped with a local countdown timer. When the duration of the simulated fault is reached, the protector will forcibly release the shielding of the real-time current value and the blocking of the trip output drive circuit, regardless of whether an external command is received.

[0065] S203, the substation will upload the recovery time to the host computer.

[0066] Specifically, the substation sends the recovery time recorded in step S201 to the host computer to report the end of the test to the host computer.

[0067] S204, the protector continuously monitors the rate of change of the real-time current value.

[0068] Among them, real-time current acquisition value refers to the actual operating current value of the current primary circuit obtained by the protector through the sampling device, and the sampling frequency is usually 80-128 points per cycle; the rate of change represents the change range of the actual operating current value per unit time, usually in amperes per millisecond (A / ms); continuous monitoring refers to the process by which the protector continuously calculates and evaluates the current change.

[0069] Specifically, while performing the test, the protector continuously calculates the rate of change of the real-time sampled current value through a dedicated monitoring program. This calculation process includes: acquiring the current values ​​at multiple consecutive sampling points, and then calculating the current rate of change based on the difference in current values ​​between adjacent sampling points and the sampling time interval. The protector typically maintains a sliding time window (e.g., 10ms), within which the rate of change is continuously calculated and updated to ensure timely detection of rapid changes in current.

[0070] S205. When the rate of change exceeds the preset mutation threshold, the protector stops executing the anti-overstepping trip logic operation and generates a test forced interruption message to be sent to the substation.

[0071] Among them, the preset mutation threshold is a standard value used to judge whether the current change is abnormal, which is usually set to 3-5 times the rated current per millisecond; abort means to immediately stop the currently executed operation; the test forced interruption message means to immediately terminate the communication data packet of the test.

[0072] Specifically, the protector compares the calculated rate of change with a preset mutation threshold. If the rate of change exceeds the preset mutation threshold, it indicates that an actual fault may have occurred, and the protector will immediately perform the following operations: First, stop the currently executing anti-overlapping trip logic operation and abandon the test state; then, generate a test forced interruption message containing information such as the interruption reason, current value, and rate of change, and urgently send it to the substation through the communication network.

[0073] S206. The protector performs routine fault protection logic operations based on the real-time acquired current value.

[0074] Among them, the conventional fault protection logic operation represents the fault detection and handling process executed by the protector under normal working conditions.

[0075] Specifically, the protector completely removes all restrictions under test conditions and resumes normal processing of real-time acquired current values. Then, the protector immediately initiates standard fault protection logic operations, including: calculating the effective current value, determining if the protection setting is exceeded, performing corresponding time-limit judgments, and handling protection coordination relationships—a series of standard protection functions. If an actual fault is confirmed, the protector will perform a trip operation according to the normal protection action procedure to isolate the fault. The entire switching process should be completed within 10ms to ensure that the protector's rapid response to actual faults is not affected.

[0076] The power monitoring system in the embodiments of this invention is described below from the perspective of hardware processing. Please refer to [link / reference]. Figure 3 This is a schematic diagram of the physical device structure of a power monitoring system in an embodiment of this application.

[0077] It should be noted that, Figure 3The structure of the power monitoring system shown is merely an example and should not impose any limitations on the functionality and scope of use of the embodiments of the present invention.

[0078] like Figure 3 As shown, the power monitoring system includes a CPU 301, which can perform various appropriate actions and processes based on a program stored in the read-only memory ROM 302 or a program loaded from the storage section 308 into the random access memory RAM 303, such as executing the methods described in the above embodiments. The RAM 303 also stores various programs and data required for system operation. The CPU 301, ROM 302, and RAM 303 are interconnected via a bus 304. An I / O interface 305 is also connected to the bus 304.

[0079] The following components are connected to I / O interface 305: input section 306 including audio input devices, push-button switches, etc.; output section 307 including a liquid crystal display (LCD) and audio output devices, indicator lights, etc.; storage section 308 including a hard disk, etc.; and communication section 309 including a network interface card such as a LAN (Local Area Network) card, modem, etc. Communication section 309 performs communication processing via a network such as the Internet. Drive 310 is also connected to I / O interface 305 as needed. Removable media 311, such as a disk, optical disk, magneto-optical disk, semiconductor memory, etc., are installed on drive 310 as needed so that computer programs read from them can be installed into storage section 308 as needed.

[0080] In particular, according to embodiments of the present invention, the processes described above with reference to the flowcharts can be implemented as computer software programs. For example, embodiments of the present invention include a computer program product comprising a computer program carried on a computer-readable medium, the computer program containing computer programs for performing the methods shown in the flowcharts. In such embodiments, the computer program can be downloaded and installed from a network via communication section 309, and / or installed from removable medium 311. When the computer program is executed by CPU 301, it performs the various functions defined in the present invention.

[0081] It should be noted that specific examples of computer-readable storage media may include, but are not limited to: electrical connections having one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM), flash memory, optical fiber, portable compact disc read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof. In this invention, a computer-readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device.

[0082] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present invention. Each block in a flowchart or block diagram may represent a module, program segment, or portion of code, which contains one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those shown in the drawings.

[0083] Specifically, the power monitoring system in this embodiment includes a processor and a memory. The memory stores a computer program. When the computer program is executed by the processor, it implements the online test method for the anti-over-level tripping function provided in the above embodiment.

[0084] In another aspect, the present invention also provides a computer-readable storage medium, which may be included in the power monitoring system described in the above embodiments; or it may exist independently and not be assembled into the power monitoring system. The storage medium carries one or more computer programs, which, when executed by a processor of the power monitoring system, enable the power monitoring system to implement the online test method for preventing cascading tripping provided in the above embodiments.

[0085] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit it. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.

[0086] As used in the above embodiments, depending on the context, the term "when..." can be interpreted as meaning "if...", "after...", "in response to determining...", or "in response to detecting...". Similarly, depending on the context, the phrase "when determining..." or "if (the stated condition or event) is interpreted as meaning "if determining...", "in response to determining...", "when (the stated condition or event) is detected", or "in response to detecting (the stated condition or event)".

[0087] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. This program can be stored in a computer-readable storage medium, and when executed, it can include the processes described in the above method embodiments. The aforementioned storage medium includes various media capable of storing program code, such as ROM or random access memory (RAM), magnetic disks, or optical disks.

Claims

1. An online test method for anti-over-tripping function, characterized in that, This method is applied to a power monitoring system, which includes a host computer, substations, and several protectors. The host computer is connected to the substations, and the substations are connected to the protectors. The method includes: the substation responding to a test preparation command issued by the host computer by stopping preset port inspections and transmitting the test preparation command to the protectors, so that the protectors enter a test preparation state; the substation receiving a test start command sent by the host computer, the test start command including a simulated fault current value and a simulated fault duration; the substation broadcasting the test start command to the protectors to trigger the protectors to simultaneously block the real-time current value acquisition and call the simulated fault current value while blocking the trip output drive circuit, so as to perform anti-overlapping trip logic operations within the simulated fault duration. The real-time acquired current value represents the actual operating current flowing through the primary circuit monitored by the protector. The interlocking trip output drive circuit indicates that the protector is temporarily prohibited from issuing a trip command to the circuit breaker. The anti-over-level trip logic operation refers to the logic judgment and control process to prevent the protector from over-level tripping when it detects a fault. The substation records the receiving time of the anti-over-level interlocking signal sent by the protector and retrieves the action event generated when the protector executes the anti-over-level trip logic operation. The anti-over-level interlocking signal is a signal issued by the protector when it detects a fault, used to prohibit the substation or the host computer from over-level tripping. The substation uploads the anti-over-level interlocking signal, the receiving time, and the action event to the host computer so that the host computer can determine whether the anti-over-level tripping function is normal.

2. The method according to claim 1, characterized in that, The anti-overlap trip logic operation specifically includes: the protector determining whether the simulated fault current value is greater than a preset instantaneous trip setting; if the simulated fault current value is greater than the preset instantaneous trip setting, the protector generates a start event and detects whether an external blocking signal is received within a preset anti-overlap time limit, the start event including the start time; if not, the protector sends the anti-overlap blocking signal to the substation and generates an instantaneous trip event, the instantaneous trip event including the instantaneous trip time; if yes, the protector generates a blocking event, the blocking event including the blocking time.

3. The method according to claim 2, characterized in that, After the substation uploads the anti-overpass blocking signal, the receiving time, and the action event to the host computer for the host computer to determine whether the anti-overpass tripping function is normal, the method further includes: the host computer determining the start time of the protector based on the action event; the host computer calculating the time difference based on the start time and the receiving time; if the time difference is less than the lower limit of a preset standard response interval, the host computer determines that the protector has a risk of false signal transmission; if the time difference is greater than the upper limit of the preset standard response interval, the host computer determines that the protector's action is delayed; if the time difference is within the preset standard response interval, the host computer determines that the anti-overpass tripping function of the protector is normal.

4. The method according to claim 3, characterized in that, After the step of the host computer calculating the time difference based on the startup time and the reception time, the method further includes: the host computer obtaining the pure logic processing time of the protector based on the time difference and a preset signal transmission delay; the host computer retrieving the historical pure logic processing time of the protector; the host computer calculating a time drift trend value based on the pure logic processing time and the historical pure logic processing time; the host computer determining whether the time drift trend value exceeds a preset degradation warning threshold; if so, the host computer generating a device performance degradation warning signal, which is used to indicate that the performance of the protector is in a downward trend.

5. The method according to claim 1, characterized in that, The method further includes: when the duration of the simulated fault reaches a certain point, the substation resumes the preset port inspection and records the recovery time; when the duration of the simulated fault reaches a certain point, the protector releases the shielding of the real-time acquired current value and releases the lockout of the trip output drive circuit; the substation uploads the recovery time to the host computer.

6. The method according to claim 1, characterized in that, Before the step of the substation broadcasting the test start command to the protector, the method further includes: the substation determining whether the current time is within a preset prohibited test period; if the current time is within the preset prohibited test period, the substation refuses to broadcast the test start command and sends test start failure information back to the host computer.

7. The method according to claim 1, characterized in that, The method further includes: the protector continuously monitoring the rate of change of the real-time acquired current value; when the rate of change exceeds a preset sudden change threshold, the protector stops executing the anti-over-level tripping logic operation and generates a test forced interruption message to be sent to the substation; the protector performs conventional fault protection logic operation based on the real-time acquired current value.

8. A power monitoring system, characterized in that, The power monitoring system includes: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code including computer instructions, and the one or more processors call the computer instructions to cause the power monitoring system to perform the method as described in any one of claims 1-7.

9. A computer-readable storage medium comprising instructions, characterized in that, When the instruction is executed on the power monitoring system, it causes the power monitoring system to perform the method as described in any one of claims 1-7.

10. A computer program product, characterized in that, When the computer program product is run on the power monitoring system, it causes the power monitoring system to perform the method as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Face protection method and system through higher-lower stage blocking

    CN103997024A

  • Underground coal mine override trip prevention system and method based on EtherCAT

    CN104242258A