High performance titanium alloy tube forming process and system
By inserting a prefabricated tubular self-supporting body before the hot drawing of titanium alloy tubes and reducing its strength after drawing, the problem of internal cavity support and removal in the prior art is solved, and the processing consistency and efficiency of titanium alloy tubes are improved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- SHAANXI XINDONGYING METAL PROD CO LTD
- Filing Date
- 2026-04-29
- Publication Date
- 2026-06-02
AI Technical Summary
Existing technologies struggle to simultaneously ensure stable internal cavity support during the multi-pass, low-temperature drawing process of titanium alloy tubes, while also facilitating rapid removal and cleaning after drawing, thus affecting processing consistency and efficiency.
Before each secondary temperature drawing, a prefabricated tubular removable self-supporting body is inserted into the tube, and the support state is formed to maintain continuous circumferential support capacity before drawing. After drawing, the strength attenuation triggering treatment makes it easy to remove, combined with intermediate heat treatment and surface cleaning.
It achieves continuous internal cavity support stability and easy-to-remove support during warm drawing, improving processing consistency and manufacturing efficiency, and is suitable for precision forming of high-performance titanium alloy tubes.
Smart Images

Figure CN122125076A_ABST