A support system and construction method for mainline bridge cap beams
By adopting a cap beam formwork support system in bridge construction, the problem of traditional full-span scaffolding occupying the river channel was solved, achieving efficient bridge construction and protection of the river channel function, and shortening the construction period.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CCCC TUNNEL ENG CO LTD
- Filing Date
- 2026-04-16
- Publication Date
- 2026-06-02
AI Technical Summary
Traditional mainline bridge cap beam construction uses a full-span scaffolding method, which occupies a large area of the river channel under the bridge, has a long cofferdam closure period, and construction is restricted during the flood season, leading to delays in progress.
A cap beam formwork support system is adopted, including a first cap beam formwork support and a second cap beam formwork support, which are erected above the bracket structure and the auxiliary road bridge to form an integrated support system, avoiding the occupation of the river channel under the bridge, and optimizing the stability of the support structure by adjusting the formwork height and load distribution.
It does not require occupying the river channel under the bridge, ensuring the river's flood control and navigation functions, is not affected by the flood season, shortens the construction period, and improves the stability and construction efficiency of the support system.
Smart Images

Figure CN122128972A_ABST