Methods and related devices for dynamic monitoring, evaluation and decision-making of the geological environment in mining areas throughout the entire process

By deploying GNSS deformation monitoring points in the mining area and combining D-InSAR and SBAS-InSAR technologies to conduct multi-source data fusion analysis, the closed-loop decision-making problem of geological environment monitoring and evaluation in the mining area was solved, realizing dynamic monitoring and governance management at the block level and improving the continuity and reliability of geological environment management in the mining area.

CN122491976BActive Publication Date: 2026-11-10SHAANXI ECOLOGICAL IND CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202610981724.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-07-02
Publication Date
2026-11-10
Estimated Expiration
2046-07-02

AI Technical Summary

Technical Problem

Existing mining area monitoring and evaluation technologies are insufficient to form a closed-loop decision-making process for continuous early warning at the plot level, identification of stable damage, temporary governance management, annual restoration deployment, and performance evaluation, resulting in deficiencies in refined, dynamic, and closed-loop ecological restoration management for mining enterprises.

Method used

By deploying GNSS deformation monitoring points, calculating monthly settlement data using D-InSAR technology, determining annual settlement using SBAS-InSAR technology, verifying with LiDAR, and performing multi-source data fusion analysis, combined with a finite state machine model and state transition rules, dynamic monitoring and governance decisions at the plot level are achieved.

Benefits of technology

It has improved the continuity, precision and traceability of geological environment management in mining areas, realized a closed-loop decision-making chain from continuous early warning at the block level to annual restoration and management, enhanced the continuity and spatial integrity of subsidence early warning, and improved the reliability of identifying annual stable areas and subsidence-damaged areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122491976B_ABST
    Figure CN122491976B_ABST
Patent Text Reader

Abstract

This application pertains to a comprehensive geological decision-making method. Addressing the technical challenge of existing mining area monitoring and evaluation technologies failing to establish a closed-loop decision-making process that integrates continuous early warning at the plot level, stability damage identification, temporary remediation management, annual restoration deployment, and performance evaluation, this method provides a dynamic monitoring and evaluation decision-making approach and related equipment for the entire geological environment of mining areas. It divides plots according to land use type, deploys GNSS deformation monitoring points and delineates monitoring and early warning zones, and combines GNSS, monthly D-InSAR, annual SBAS-InSAR, and LiDAR verification data to identify subsidence impacts, plot state transitions, and annual stability damage results. Based on fusion analysis, it conducts stability damage evaluations by land type, generates restoration and remediation engineering deployment plans for the following year, and evaluates the restoration effects and plot remediation effectiveness, thus achieving a closed loop of plot-level early warning, evaluation, remediation, and performance feedback.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application pertains to a comprehensive geological decision-making method, specifically involving a dynamic monitoring and evaluation decision-making method and related devices for the entire process of geological environment in mining areas. Background Technology

[0002] Coal mining activities easily trigger geological environmental problems such as surface subsidence, ground fissures, and sinkholes, resulting in damage to land use functions, decline in agricultural production conditions, destruction of forest and grassland habitats, and increased safety risks to roads and buildings. As mining enterprises shift from ecological restoration management to adaptive management, management needs to integrate short-term early warning, temporary remediation, annual restoration deployment, fund allocation, and performance evaluation into a closed loop.

[0003] Current mining area monitoring typically employs methods such as manual inspections, InSAR (Interferometric Synthetic Aperture Radar) remote sensing, GNSS (Global Navigation Satellite System) monitoring, and UAV lidar. Damage severity is often assessed using deformation thresholds or a limited number of on-site survey indicators. However, existing technologies largely focus on single deformation identification or damage effect evaluation. InSAR lacks stability in areas with strong gradient subsidence, GNSS has limited spatial coverage, and UAV lidar lacks continuous early warning capabilities. Furthermore, damage assessments fail to reflect differences in land types, the difficulty of remediation, and engineering implementation constraints. They lack site-level early warning, remediation records, and performance closed-loop mechanisms, making it difficult to support refined remediation decisions. Summary of the Invention

[0004] This application addresses the technical problem that existing mining area monitoring and evaluation technologies are unable to form a closed-loop decision-making process that takes into account continuous early warning at the block level, stable damage identification, temporary treatment management, annual restoration deployment, and performance evaluation. It provides a dynamic monitoring and evaluation decision-making method and related devices for the entire process of mining area geological environment.

[0005] To achieve the above objectives, this application adopts the following technical solution: Firstly, this application proposes a dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas, including: Determine the land use type of the monitoring area and divide the monitoring area into several plots according to the land use type; GNSS deformation monitoring points are set up at preset intervals along the centerline of the working face, and GNSS deformation monitoring points are deployed near preset key targets. A monitoring and early warning zone of fixed width is delineated according to the deployment method of the GNSS deformation monitoring points. Based on the GNSS monitoring data of the monitoring and early warning zone, determine whether a settlement signal has appeared in the monitoring and early warning zone and what stage of settlement it is in, and obtain the GNSS monitoring data determination result; Based on the monthly SAR images of the monitoring area, the monthly subsidence data of the monitoring area is calculated using D-InSAR technology, and the monthly temporary stable subsidence area and the monthly subsidence damage area are determined. Based on the GNSS monitoring data and monthly settlement data, the settlement impact range within and adjacent to the monitoring and early warning zone was determined. Combining monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each plot, the state transition of the plot is identified according to the preset finite state machine model and preset state transition rules for each plot. When the plot enters a temporary stable settlement state, temporary governance decision suggestions are output, and early warning events and temporary governance events are recorded. At the end of the year, the annual stable zone and the annual subsidence and damage zone are determined based on SBAS-InSAR technology; The annual subsidence and damage areas were reviewed by LiDAR, and a fusion analysis was conducted by combining the SBAS-InSAR technical assessment results, LiDAR review results, and GNSS monitoring data of the annual subsidence and damage areas. Based on the results of the fusion analysis, a stability damage assessment is conducted on the land parcels according to land type. Based on the stability damage assessment results, early warning events, and temporary remediation events, a remediation project deployment plan for the next year is generated. After implementing the next year's restoration and remediation project deployment plan, the restoration effect and the effectiveness of the site remediation will be evaluated.

[0006] Secondly, this application proposes a dynamic monitoring, evaluation, and decision-making system for the entire geological environment of a mining area, including: The land parcel division module is used to determine the land use type of the monitoring area and divide the monitoring area into several land parcels according to the land use type; The monitoring and early warning zone delineation module is used to deploy GNSS deformation monitoring points along the center line of the working face at preset intervals, and to deploy GNSS deformation monitoring points near preset key targets, and to delineate a monitoring and early warning zone of fixed width according to the deployment method of the GNSS deformation monitoring points; The settlement signal determination module is used to determine whether a settlement signal has appeared in the monitoring and early warning zone and what stage of settlement it is based on the GNSS monitoring data of the monitoring and early warning zone, and to obtain the GNSS monitoring data determination result. The monthly settlement monitoring module is used to acquire SAR images of the monitoring area on a monthly basis, calculate the monthly settlement data of the monitoring area using D-InSAR technology, and determine the monthly temporary stable settlement zone and the monthly subsidence damage zone. The settlement impact determination module is used to combine GNSS monitoring data and monthly settlement data to determine the settlement impact range within the monitoring and warning zone and adjacent areas; The temporary governance decision module is used to combine monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each plot. It identifies the state transition of the plot according to the preset finite state machine model and preset state transition rules of each plot, and outputs temporary governance decision suggestions when the plot enters a temporary stable settlement state, and records early warning events and temporary governance events. The annual settlement monitoring module is used to determine the annual stable zone and the annual subsidence and damage zone based on SBAS-InSAR technology at the end of the year; The analysis module is used to perform LiDAR verification of the annual subsidence and damage areas, and to conduct fusion analysis by combining the SBAS-InSAR technology judgment results, LiDAR verification results and GNSS monitoring data of the annual subsidence and damage areas. The repair and deployment module is used to conduct stability damage assessments of land parcels based on the results of the fusion analysis, and to generate a repair and treatment project deployment plan for the next year based on the stability damage assessment results, early warning events, and temporary remediation events. The assessment module is used to evaluate the restoration effect and the effectiveness of land management after the implementation of the next year's restoration and management project deployment plan.

[0007] Thirdly, this application proposes an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the steps of the above-mentioned dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas.

[0008] Fourthly, this application proposes a computer-readable storage medium storing a computer program that, when executed by a processor, implements the steps of the above-mentioned dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas.

[0009] Compared with the prior art, this application has the following beneficial effects: This application proposes a dynamic monitoring, evaluation, and decision-making method for the entire geological environment of mining areas. By dividing land into plots based on land use type and deploying GNSS deformation monitoring points along the centerline of the working face and near key targets, and defining a fixed-width monitoring and early warning zone, subsidence monitoring in mining areas can be implemented at the plot scale while also considering the risks to key targets. Subsidence signals and stages are determined using GNSS monitoring data, and monthly temporary stable subsidence zones, monthly subsidence damage zones, and subsidence impact ranges are identified by combining monthly D-InSAR subsidence data, improving the continuity and spatial integrity of subsidence early warning. By using monthly subsidence data, GNSS monitoring data, and the previous state of the plot over several consecutive months, a finite state machine model and state transition rules are used to identify the state transitions of the plot. When a plot enters a temporary stable subsidence state, temporary governance decision suggestions are output, and early warning events and temporary governance events are recorded, achieving dynamic early warning and temporary governance management. The reliability of identifying annual stable zones and annual subsidence damage zones is improved through annual SBAS-InSAR determination, LiDAR verification, and GNSS monitoring data fusion analysis. By conducting stability damage assessments by land type, deploying restoration and remediation projects for the following year, and evaluating the restoration effects and the effectiveness of land parcel remediation, the geological environment management of the mining area forms a closed-loop decision-making chain, from continuous monitoring and early warning at the parcel level, temporary remediation, annual stability damage assessment, restoration and remediation deployment to performance feedback, thereby improving the pertinence, continuity, and traceability of restoration and remediation deployment.

[0010] This application also proposes a dynamic monitoring, evaluation and decision-making system for the entire process of geological environment in mining areas, an electronic device, and a computer-readable storage medium, which have the advantages of the aforementioned dynamic monitoring, evaluation and decision-making method for the entire process of geological environment in mining areas. Attached Figure Description

[0011] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a flowchart illustrating a dynamic monitoring, evaluation, and decision-making method for the entire geological environment of the mining area as described in this application. Figure 2 This is a schematic diagram of another process for the dynamic monitoring, evaluation, and decision-making method of the geological environment of the mining area in this application; Figure 3 This is a schematic diagram of a monthly early warning determination process in an embodiment of this application; Figure 4 This is a schematic diagram of a process for determining and comprehensively evaluating annual stability / settlement in an embodiment of this application. Figure 5 This is a schematic diagram of a process for evaluating land stability damage by land category in an embodiment of this application; Figure 6 This is a schematic diagram of the dynamic monitoring, evaluation, and decision-making system for the entire geological environment of the mining area in this application. Detailed Implementation

[0013] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. The components of the embodiments of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0014] Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.

[0015] During coal mining, the excavation of underground coal seams causes the overlying rock structure to shift, bend, fracture, and rebalance, easily leading to geological environmental problems such as subsidence basins, ground fissures, collapse pits, and abrupt changes in local topography. These problems not only alter surface elevation and landforms but also further impact land use functions. For example, arable land may experience reduced cultivation conditions due to slope changes, water accumulation, and fissure cutting; forests and grasslands may suffer vegetation degradation due to soil structure damage and altered moisture conditions; and construction land, roads, pipelines, and buildings may pose safety hazards due to uneven settlement. Therefore, monitoring land damage in mining areas, assessing the degree of damage, and making ecological restoration decisions have become crucial aspects of geological environmental protection, land reclamation, and ecological restoration management in coal mining areas. As mining enterprises gradually shift from traditional engineering-based governance to adaptive management—that is, a management approach that continuously adjusts restoration plans based on monitoring results, damage changes, and governance effects—mining enterprises no longer need to focus on governance projects after mining begins. Instead, they need to keep track of surface deformation, land damage extent, damage level, and restoration effects throughout the entire process of mining impact occurrence, development, and stabilization. Based on this, they can dynamically optimize annual implementation plans, fund allocation, governance sequence, and performance evaluation results.

[0016] In practical applications, the damage in coal mining subsidence areas is characterized by rapid spatial and temporal changes, wide impact range, complex damage types, and dispersed management targets. Surface subsidence is often not a one-time event but a continuous development as mining progresses, with significant differences in the degree of impact on different plots. Within the same subsidence area, different land types such as cultivated land, forest land, grassland, and construction land have varying sensitivities to subsidence, cracks, water accumulation, and slope changes, and their production functions, ecological functions, and utilization value are also affected differently. Existing monitoring and evaluation methods, if focusing only on overall regional deformation, often struggle to identify the damage boundaries, damage extent, and remediation needs of specific plots in a timely manner. If investigations are only conducted during annual or phased acceptance inspections, it is easy to miss the rapid development stage of damage, leading to poor coordination between temporary remediation, emergency response, and annual restoration projects. Especially when it is necessary to carry out zonal control, time-series remediation, and funding arrangements, mining enterprises not only need to know where subsidence has occurred but also need to further assess the extent of damage, whether early warning and response are required, what remediation measures are suitable, whether it should be included in the annual project plan, and whether the post-remediation effects can be quantified and evaluated. Therefore, simple deformation monitoring or single damage level assessment is no longer sufficient to meet the needs of mining enterprises for refined, dynamic, and closed-loop ecological restoration management.

[0017] To address surface deformation and land damage in coal mining subsidence areas, existing technologies typically employ methods such as manual inspections, InSAR remote sensing monitoring, GNSS monitoring, and UAV lidar measurements for monitoring and evaluation. Manual inspections, relying primarily on on-site surveys, photographic documentation, and completed survey forms, can visually identify obvious damage phenomena such as cracks, subsidence pits, and water accumulation points; however, they are significantly affected by personnel experience, inspection frequency, and on-site access conditions. Existing technologies generally utilize InSAR for large-scale deformation identification, GNSS for precise monitoring of key locations, and UAV lidar for high-precision topographic mapping of key areas. These methods, combined with on-site survey results, evaluate the extent and severity of damage, thus providing data support for land reclamation, ecological restoration, and safety management in mining areas.

[0018] However, the aforementioned technologies still have shortcomings in supporting mining enterprises in carrying out site-level early warning, remediation, and annual restoration decisions. While InSAR has advantages such as wide coverage, relatively continuous monitoring periods, and sensitivity to minor deformations, it is prone to decoherence in areas with strong gradient subsidence, significant vegetation cover changes, or severe surface damage. This means that the phase correlation of radar images decreases between different periods, leading to unstable subsidence boundary identification and deformation inversion results. Although GNSS offers high monitoring accuracy, it primarily reflects the deformation of discrete monitoring points, with limited spatial coverage, making it difficult to fully represent the continuous damage characteristics of the entire subsidence area. UAV-LiDAR (Unmanned Aerial Vehicle Light Detection and Ranging) can acquire high-precision topographic data, but it is mostly used for phased mapping and cannot independently undertake continuous early warning and dynamic tracking tasks. Meanwhile, existing damage assessment methods often use a single deformation threshold or a few field survey indicators for classification, rarely considering the production function, ecological function, utilization value, remediation difficulty, restoration sequence, and engineering implementation conditions of different land types, resulting in insufficient connection between assessment results and remediation decisions. Especially during mining impacts, existing technologies generally lack mechanisms for site-level damage early warning, damage severity assessment, temporary response management, remediation record keeping, and restoration performance evaluation, making it difficult to form a closed-loop system covering the entire lifecycle. Therefore, existing mining area monitoring and evaluation technologies are still insufficient to fully support mining enterprises in conducting refined zoning management, annual dynamic engineering optimization, quantitative allocation of funds, and remediation performance evaluation. There is an urgent need to establish a site-level monitoring, evaluation, and remediation decision-making method that integrates multi-source data such as SBAS-InSAR (Small Baseline Subset Interferometric Synthetic Aperture Radar), UAV-LiDAR, and GNSS, taking into account continuous monitoring, damage identification, early warning response, remediation decision-making, and performance evaluation.

[0019] Based on the above, this application proposes a dynamic monitoring, evaluation, and decision-making method and related apparatus for the entire process of geological environment in mining areas. The following is a detailed description of this application in conjunction with embodiments and accompanying drawings.

[0020] This application presents a dynamic monitoring, evaluation, and decision-making method for the entire geological environment of mining areas. This method addresses the challenge of existing mining area monitoring and evaluation technologies failing to establish a closed-loop decision-making process that integrates continuous early warning at the plot level, stability and damage identification, temporary remediation management, annual restoration deployment, and performance evaluation. The method organizes monitoring, evaluation, and remediation decisions based on land use types within the monitoring area, ensuring continuous correlation between subsidence monitoring results, plot status changes, annual stability and damage assessment results, and remediation effectiveness at the same plot scale.

[0021] like Figure 1 The diagram shown is a flowchart of a dynamic monitoring and evaluation decision-making method for the entire geological environment of the mining area, which may include: S101, determine the land use type of the monitoring area, and divide the monitoring area into several plots according to the land use type.

[0022] Each plot serves as the basic object for subsequent monitoring data collection, status assessment, stability and damage evaluation, remediation deployment, and performance evaluation. By organizing monitoring areas on a plot-by-plot basis, a correlation can be established between the impact of mining subsidence, damage to land use functions, temporary remediation needs, and annual restoration arrangements, avoiding the problem that evaluations based solely on areal subsidence ranges or discrete monitoring points are insufficient to support plot-level decision-making.

[0023] S102, GNSS deformation monitoring points are set up at preset intervals along the center line of the working face, and GNSS deformation monitoring points are deployed near preset key targets. A monitoring and early warning zone of fixed width is delineated according to the deployment method of the GNSS deformation monitoring points.

[0024] It should be noted that the monitoring and early warning zone is used to receive early settlement responses during the working face advancement process and to transform the discrete monitoring information generated by GNSS deformation monitoring points into a strip-shaped spatial object that can be used for early warning management. Because this monitoring and early warning zone has a fixed width, continuous same-scale comparisons and event recordings can be performed within the zone and adjacent areas, thereby enhancing the continuity and traceability of early warning results.

[0025] S103, based on the GNSS monitoring data of the monitoring and early warning zone, determine whether a settlement signal has appeared in the monitoring and early warning zone and the settlement stage it is in, and obtain the GNSS monitoring data determination result.

[0026] The GNSS monitoring data results are used to characterize the trend and stage of subsidence activity within the monitoring and warning zone. When the GNSS monitoring data does not reflect subsidence signals, the original warning status of the monitoring and warning zone is maintained; when the GNSS monitoring data reflects subsidence signals, the subsidence stage is further identified, and this serves as an important basis for subsequently determining the subsidence impact range and the shift in land parcel status.

[0027] S104. Based on the monthly SAR images of the monitoring area, the monthly subsidence data of the monitoring area is calculated using D-InSAR (Differential Interferometric Synthetic Aperture Radar) technology, and the monthly temporary stable subsidence area and the monthly subsidence damage area are determined.

[0028] Monthly settlement data is used to reflect the areal settlement changes in the monitored area over a short period, which can compensate for the insufficient spatial coverage of GNSS deformation monitoring points. By identifying monthly temporary stable settlement zones and monthly subsidence damage zones, short-term settlement identification results can be generated before the annual assessment, providing a basis for temporary remediation and continuous early warning.

[0029] S105, combining GNSS monitoring data and monthly settlement data, determines the settlement impact range within and adjacent to the monitoring and early warning zone.

[0030] GNSS monitoring data provides trend information on whether settlement has occurred and its stage, while monthly settlement data provides information on the spatial distribution of settlement. Combining these two types of data allows for the linkage between the determination of warning zone attributes and the identification of specific settlement impact areas, enabling monitoring and early warning to move beyond point locations or strip-shaped objects and be implemented at the level of specific plots and their adjacent areas.

[0031] S106 combines monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each plot. It identifies the state transition of the plot according to the preset finite state machine model and preset state transition rules for each plot, and outputs temporary governance decision suggestions when the plot enters a temporary stable settlement state, and records early warning events and temporary governance events.

[0032] Therefore, during the period of mining impact, the site status is not a one-time determination, but is continuously updated based on monthly settlement data and GNSS monitoring data. Temporary remediation decision recommendations are also triggered as the site status changes, enabling temporary remediation management and monitoring and early warning to be linked.

[0033] S107, at the end of the year, the annual stable zone and the annual subsidence and damage zone are determined based on SBAS-InSAR technology.

[0034] The annual assessment results are used to form the basis for identifying stable damage on an annual scale.

[0035] S108. The annual subsidence and damage areas were reviewed by LiDAR, and a fusion analysis was carried out by combining the SBAS-InSAR technical judgment results, LiDAR review results and GNSS monitoring data of the annual subsidence and damage areas.

[0036] This application can comprehensively utilize the time-series deformation identification capability of SBAS-InSAR, the terrain change verification capability of LiDAR, and the high-precision location characteristics of GNSS monitoring data to reduce the judgment bias caused by a single data source under conditions of strong gradient subsidence, incoherence, or insufficient spatial coverage.

[0037] S109. Based on the results of the integrated analysis, a stability damage assessment is conducted on the land parcels according to land type. Based on the stability damage assessment results, early warning events, and temporary remediation events, a deployment plan for the restoration and remediation project for the next year is generated.

[0038] The stability damage assessment not only reflects the amount of subsidence itself, but also combines it with the land use type of the plot, so that different land types such as cultivated land, orchards, forest land, and grassland can be evaluated differently according to their production functions, ecological functions, and governance and management needs. The next year's restoration and governance project deployment plan combines the annual stability damage assessment results with early warning events and temporary governance events formed during the mining period, supporting the dynamic adjustment of project deployment, governance priorities, and restoration arrangements.

[0039] S110, after implementing the next year's restoration and remediation project deployment plan, evaluates the restoration effect and the effectiveness of the land remediation.

[0040] The assessment of restoration effectiveness is used to determine the improvement of the stable damage status of the land plot by the implemented project, while the assessment of land plot governance effectiveness is used to establish a correspondence between the changes in the state of the restored land plot, the improvement of production or ecological impact, and the governance investment.

[0041] Through the above process, this application can form a closed-loop decision-making chain of monitoring and early warning, temporary treatment, annual evaluation, engineering deployment, remediation assessment, and performance feedback, thereby improving the continuity, precision, and traceability of dynamic monitoring, evaluation, and treatment decisions of the geological environment in the mining area throughout the entire process.

[0042] The present application will be further described in detail below through some more detailed embodiments.

[0043] The dynamic monitoring, evaluation, and decision-making method for the entire geological environment of mining areas proposed in this application is applicable to the dynamic monitoring, damage assessment, and remediation management of areas affected by underground coal mining, subsidence areas, land reclamation areas, and ecological restoration areas. Coal mining activities may cause surface subsidence, ground fissures, and sinkholes, which in turn lead to damage to land use functions, a decline in agricultural production conditions, destruction of forest and grassland habitats, and increased safety risks to key targets such as roads, buildings, and slopes. To ensure the integration of short-term early warning, temporary remediation, annual restoration deployment, funding allocation, and performance evaluation, this embodiment takes the land parcel as the object of full-process management and forms a continuous data chain using GNSS, D-InSAR, SBAS-InSAR, UAV-LiDAR, multispectral remote sensing, and field surveys.

[0044] like Figure 2The diagram shown is another flowchart of the dynamic monitoring, evaluation and decision-making method for the entire geological environment of the mining area in this application. The overall process of this embodiment includes, in sequence, the construction of monitoring and evaluation units, the construction of short-cycle early warning monitoring and impact identification, the determination of land parcel status and temporary governance decision-making, the determination of annual stability and the fusion of multi-source deformation, the comprehensive evaluation of stability and damage by land category, the constraint-driven governance deployment, the observation of restoration and the evaluation of effect, and the performance evaluation of land parcels and the closed-loop management of governance. Figure 2 Each process node corresponds to the land parcel-level data preparation, monthly early warning, annual evaluation, governance deployment, and performance feedback stages, ensuring that the land parcels have traceable status records at different time scales.

[0045] During the monitoring area construction phase, the monitoring area is determined based on the boundary of the mining face, the impact zone of the mining face, and the restoration zone. Optionally, the boundary of the mining face can be the boundary of the mining face over the past 5 years, and the impact zone and restoration zone can also be the spatial range of the past 5 years, thus forming a monitoring area covering existing mining impacts, recent mining impacts, and restoration areas. Furthermore, the working face advancement relationship, surface impact range, and distribution of key targets can be determined by combining mining continuity data and surface-to-ground comparison maps.

[0046] In this embodiment, UAV-LiDAR point cloud data of the monitoring area is acquired and a baseline digital elevation model (DEM) is generated. Optionally, the baseline DEM serves as five-year baseline data for subsequent annual DEM differencing and land surface relief change evaluation. Simultaneously, high-resolution remote sensing images and multispectral remote sensing images of the monitoring area are acquired, and land use status data is generated. The baseline DEM, land use status data, and working face boundaries are overlaid, and the monitoring area is divided into several plots according to land use type. Each plot is assigned a unique number and basic attributes. Basic attributes may include land use type, planting type, landform type, whether it is located near key targets, the influence range of its working face, and whether it is located in a remediation area.

[0047] In some embodiments of this application, agricultural land can be divided into plots according to cadastral attributes or cadastral boundaries and in combination with agricultural planting types. Agricultural land may include arable land and orchards; forest land and grassland can be divided according to topographic and geomorphological units. Through the above division method, arable land, orchards, forest land, and grassland can be configured with different sets of indicators in subsequent stability damage assessments, avoiding the mismatch between assessment results and actual governance needs caused by directly evaluating different land types with a uniform settlement threshold.

[0048] During the GNSS deformation monitoring point deployment phase, GNSS deformation monitoring points are deployed along the centerline of the working face at predetermined intervals, and additional GNSS deformation monitoring points are deployed near key targets. Key targets may include residential areas, roads, buildings, slopes, and other facilities sensitive to settlement and deformation. The width of the monitoring and early warning zone is determined based on the deployment method of the GNSS deformation monitoring points along the centerline of the working face and on both sides. The deployment method may include one or more of the following: GNSS deformation monitoring point spacing, GNSS deformation monitoring point coverage density, GNSS deformation monitoring point control range, and connection relationships between adjacent GNSS deformation monitoring points. Optionally, GNSS deformation monitoring points are deployed along the centerline of the working face at 300m intervals, and additional GNSS deformation monitoring points are deployed near key targets such as residential areas, roads, buildings, and slopes. The spatial width of the monitoring and early warning zone is predetermined during the monitoring plan formulation and used as a fixed width, not arbitrarily changing with the monitoring month.

[0049] like Figure 3 The diagram illustrates a flowchart of a monthly early warning determination process in this application. During the monthly early warning determination process, GNSS monitoring data is first acquired, and it is determined whether the GNSS monitoring data shows a continuous deformation trend. If no continuous deformation trend is observed, the original monitoring and early warning zone status is maintained; if a continuous deformation trend is observed, it is determined that the monitoring and early warning zone has a subsidence signal, and further determination is made as to whether the GNSS monitoring data meets the criteria for determining the rapid subsidence period. When the GNSS monitoring data meets the criteria for determining the rapid subsidence period, the corresponding monitoring and early warning zone is determined to be a rapid subsidence period early warning zone. When the criteria for determining the rapid subsidence period are not met, the corresponding GNSS early warning result is still output to indicate that the monitoring and early warning zone has shown a subsidence signal but has not yet entered the rapid subsidence stage.

[0050] Optionally, when GNSS monitoring data within a monitoring and warning zone shows a continuous downward trend and the subsidence rate is less than 10 mm / d, the monitoring and warning zone is identified as an initial subsidence warning zone. When GNSS monitoring data within the monitoring and warning zone shows a subsidence rate exceeding 20 mm / d, the monitoring and warning zone is identified as a rapid subsidence warning zone. The aforementioned 10 mm / d and 20 mm / d are exemplary judgment values ​​and can be adjusted according to the geological conditions of the mining area, historical monitoring data, surface subsidence response characteristics, and the sensitivity of key targets. Further, optionally, the GNSS subsidence signal judgment threshold, GNSS subsidence activity judgment threshold, and / or D-InSAR influence area judgment threshold for blocks within the monitoring and warning zone can be lower than the corresponding thresholds outside the monitoring and warning zone, so that blocks within the monitoring and warning zone can trigger trend warnings or formal warnings under conditions of relatively small subsidence signals, subsidence amounts, or subsidence rates.

[0051] After GNSS early warning results are generated, monthly surface subsidence increments are retrieved using D-InSAR technology based on monthly SAR imagery of the monitoring area, and monthly subsidence data for the monitoring area is calculated. Monthly subsidence data includes monthly subsidence amount, monthly subsidence rate, and deformation gradient. When the monthly subsidence amount and monthly subsidence rate of a block or contiguous block are both below the D-InSAR temporary stability threshold, the block or contiguous block is identified as a monthly temporary stability zone. When the monthly subsidence amount or monthly subsidence rate of a block or contiguous block exceeds the D-InSAR monthly damage threshold, the block or contiguous block is identified as a monthly subsidence damage zone. The D-InSAR monthly determination results are used to identify the spatial distribution of short-period surface deformation and provide areal basis for the monthly subsidence damage range and the monthly temporary stability range.

[0052] When determining the subsidence impact range, GNSS monitoring data is used as the basis for determining the attributes of the monitoring and warning zone and the subsidence stage. Then, it is determined whether the monthly subsidence amount, monthly subsidence rate, and deformation gradient reach the D-InSAR impact zone determination threshold. If the corresponding plot reaches the D-InSAR impact zone determination threshold, it is included in the subsidence impact range of the monitoring and warning zone and adjacent areas; if not, monthly tracking continues based on its spatial relationship with the monitoring and warning zone, the working face boundary, and adjacent plots. Thus, GNSS is used to determine the subsidence signal and subsidence stage, while D-InSAR is used to characterize the subsidence impact range. The combination of the two avoids relying solely on discrete GNSS points or single-period area remote sensing results for early warning judgments.

[0053] During the site state machine identification phase, monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each site are combined to identify the state transitions of the sites according to the preset finite state machine models and preset state transition rules for each site. The finite state machine models can include multiple states such as unaffected state, settlement stage state, active settlement state, temporary stable settlement state, continuously damaged state, stable settlement awaiting assessment state, repair observation state, and repair completed state. Optionally, the settlement stage state can be further refined by combining it with the initial settlement period, and the active settlement state can be identified by combining it with the rapid settlement stage, to adapt to the needs of different mining areas for segmented management of the settlement process.

[0054] The state transition rules include: when the monthly settlement data of a plot for k consecutive periods all meet the temporary stability criteria, and the GNSS settlement rate determined by GNSS monitoring data is lower than the GNSS stability threshold, the plot transitions from an active settlement state to a temporary stable settlement state. If the monthly settlement data for any period within the k consecutive periods meets the monthly subsidence damage criteria, or the GNSS settlement rate determined by GNSS monitoring data is higher than the GNSS rapid settlement period threshold, the plot returns from the temporary stable settlement state to an active settlement state or a continuously damaged state. Here, k is the continuous period discrimination parameter. Optionally, the state transition rules may also include a hysteresis judgment parameter to reduce frequent switching of the plot's state around the critical threshold and improve the stability of the temporary stable settlement state determination.

[0055] When a plot of land enters a temporary stable settlement state, temporary remediation decision recommendations are generated, and early warning events and temporary remediation events are recorded. Temporary remediation decision recommendations may include one or more of the following: warning signs and risk notifications, drainage diversion, crack sealing or backfilling, localized backfilling and reshaping, or increased monitoring. Early warning events and temporary remediation events can be recorded for their occurrence time, triggering conditions, type of measures taken, and duration, forming an event-based ledger. This event-based ledger is linked to a unique plot number and is used for both monthly management and annual remediation project deployment and subsequent performance evaluation.

[0056] like Figure 4 The diagram illustrates a flowchart of the annual stability / subsidence determination and comprehensive evaluation process in this application. At the end of the year, SBAS-InSAR inversion is performed based on the annual SAR sequence to obtain the surface deformation time series, and the annual cumulative deformation and average annual subsidence rate of SBAS-InSAR are acquired. Subsequently, the SBAS-InSAR noise threshold is determined, and the annual cumulative deformation and / or average annual subsidence rate of SBAS-InSAR are compared with the SBAS-InSAR noise threshold. Areas that do not exceed the SBAS-InSAR noise threshold are determined as annual stable areas; areas that exceed the SBAS-InSAR noise threshold or whose determination reliability is insufficient are determined as annual subsidence and damage areas or areas with uncertain SBAS-InSAR determination. The SBAS-InSAR noise threshold can be determined by the SBAS-InSAR deformation statistics of stable control areas or historical stable periods. The SBAS-InSAR deformation statistics include one or more of the following: mean, standard deviation, quantiles, or confidence intervals.

[0057] Furthermore, in the annual settlement / subsidence determination, SBAS-InSAR leverages its high sensitivity to minute deformations to perform time-series identification of slow subsidence, residual subsidence, and low-amplitude continuous deformation at the annual scale. For plots identified by SBAS-InSAR as annual subsidence-damaged areas or areas with uncertain SBAS-InSAR determination, UAV-LiDAR differential deformation is used to verify surface elevation changes, and GNSS displacement is used to calibrate or constrain SBAS-InSAR deformation and LiDAR differential deformation, and participates in subsequent confidence-weighted fusion. Through these methods, while maintaining the large-scale continuous identification capability of SBAS-InSAR, the reliability of subsidence boundaries and annual deformation values ​​can be improved by utilizing UAV-LiDAR and GNSS.

[0058] LiDAR verification is performed on annual subsidence and damage areas. Furthermore, LiDAR verification is also performed on areas where SBAS-InSAR determination is uncertain. LiDAR verification may include: conducting UAV-LiDAR aerial surveys on annual subsidence and damage areas and areas where SBAS-InSAR determination is uncertain, generating an annual digital elevation model (DEM); differentiating the annual DEM with the previous year's baseline DEM to obtain LiDAR differential deformation, and using the LiDAR differential deformation as the LiDAR verification result. Triggering conditions for LiDAR verification include: the site being identified as an annual subsidence and damage area by SBAS-InSAR technology; SBAS-InSAR coherence being below the coherence determination threshold; annual deformation gradient being above the deformation gradient determination threshold; or the SBAS-InSAR and GNSS residuals being above the SBAS-GNSS residual determination threshold. Through this triggering mechanism, UAV-LiDAR does not need to perform simultaneous resurveying of the entire area, but rather focuses on verifying annual subsidence and damage areas and uncertain areas, improving the targeting of the verification work.

[0059] During the fusion analysis phase, the uncertainties of SBAS-InSAR deformation, LiDAR differential deformation, and GNSS displacement are estimated separately. These uncertainties include one or more of the following: InSAR coherence and unwrapping reliability factors, LiDAR point density and occlusion factors, and GNSS residual variance factors. Fusion weights are determined based on these uncertainties, with the weights proportional to the reciprocal or inverse square of the uncertainty, thus assigning higher weights to data sources with smaller uncertainties in the fusion analysis. Subsequently, the SBAS-InSAR deformation, LiDAR differential deformation, and GNSS displacement are fused using a confidence-weighted method according to the fusion weights to obtain the annual deformation value and its uncertainty for the land parcel, which serves as the fusion analysis result.

[0060] After fusing multi-source deformation confidence data, in addition to obtaining the annual deformation value and uncertainty of the land parcel, the confidence partition of the land parcel can also be output based on the uncertainty of each data source, the fusion weight, and the reliability of the fusion result. The confidence partition of the land parcel is used to identify the confidence level of the annual deformation results of different land parcels, and can serve as a reference for subsequent land-category stability damage assessment, LiDAR supplementary verification, and field survey deployment.

[0061] like Figure 5 The diagram illustrates a flowchart of a land-category stability damage assessment process used in this application. In this assessment, evaluation branches are first organized according to the land use type of each plot. Based on the annual deformation value and its uncertainty obtained from the fusion analysis, evaluation indicators for stability damage assessment are acquired. These indicators may include deformation indicators, crack network indicators, and field survey indicators. Deformation indicators include annual subsidence, subsidence gradient, and / or surface undulation changes; crack network indicators include ground crack intersection density and / or crack connectivity; and field survey indicators include one or more of the following: damage type, damage characteristics, damage severity level, ease of remediation level, agricultural productivity impact level, and ecological impact level. Differentiated indicator sets and grading rules are configured according to the land use type of each plot. Based on these evaluation indicators, a land-category stability damage assessment is conducted, outputting the plot's stability damage level and dominant damage factors.

[0062] For cultivated land, agricultural production impact sub-indicators and governance difficulty levels are configured based on deformation and crack network indicators. Agricultural production impact sub-indicators include one or more of the following: degree of restriction on mechanized farming, degree of topsoil damage, or degree of restriction on field accessibility. For orchards, fruit tree or economic forest production impact sub-indicators and governance difficulty levels are configured based on deformation and crack network indicators. Fruit tree or economic forest production impact sub-indicators include one or more of the following: degree of root disturbance or tree damage, degree of restriction on planting row spacing and passage, or degree of restriction on management operations. For forest and grassland, ecological impact sub-indicators and governance difficulty levels are configured based on deformation and crack network indicators. Ecological impact sub-indicators include one or more of the following: degree of ecological damage, degree of vegetation degradation, or difficulty of community restoration.

[0063] Furthermore, a set of veto indicators is established according to land use type, and the stability damage level of land parcels is classified and assessed using the maximum value method. For cultivated land parcels, at least one of the following veto indicators is used: agricultural production impact sub-indicator and difficulty of remediation level. The agricultural production impact sub-indicator can reflect one or more of the following: degree of restriction on mechanized farming, degree of damage to the topsoil, degree of restriction on field accessibility, or degree of impact on irrigation and drainage conditions. For orchard parcels, at least one of the following veto indicators is used: degree of tree damage or degree of restriction on management operations. For forest and grassland parcels, at least one of the following veto indicators is used: ecological impact level or degree of ecological damage. The stability damage level of a land parcel is determined by the maximum value of the corresponding level in the veto indicator set. Therefore, when the deformation index of a land parcel does not reach a higher level, but its agricultural production, orchard management, or ecological habitat index has reached a higher damage level, it can still be managed and remediated according to the higher level.

[0064] Optionally, indicator values ​​and uncertainties are determined for each plot. The indicator uncertainty is correlated with one or more of the following: the uncertainty of the fusion analysis results, crack extraction error, and the representativeness error of the field samples. The standardized plot indicator values ​​and uncertainties are converted into regional damage risk scores, and the maximum value of the corresponding level of the regional damage risk score is used to assess the regional stability damage level. The regional damage risk score can be formed by a weighted combination of standardized indicator values ​​and uncertainties, or by using conservative estimates, ensuring that areas with high uncertainty but significant risk response are fully reflected in the regional level assessment.

[0065] Alternatively, when the crack network connects across plots or adjacent plots form a continuous subsidence gradient zone, the isolated low-level plots can be adjusted upwards or corrected for consistency based on the spatial adjacency between the target plot and neighboring plots, the distribution of stability damage levels in neighboring plots, and crack connectivity. Spatial consistency correction can prevent the continuous subsidence gradient zone or connected crack network from being artificially severed by plot boundaries, making the regional stability damage level results more spatially continuous and better suited to the actual needs of remediation and construction organization.

[0066] When generating the next year's restoration and remediation project deployment plan, the list and priority ranking of restoration and remediation projects for the following year are generated through multi-objective optimization, taking into account the results of stable damage assessment, the level of difficulty of remediation, early warning events, temporary remediation events, and the exposure of sensitive targets. The objective function of multi-objective optimization includes one or more of the following: risk reduction, agricultural productivity improvement, and ecological improvement. The constraints include one or more of the following: annual budget ceiling, construction capacity ceiling, agricultural time sequence window, and constraint of not changing land use type. Therefore, the annual restoration and remediation project deployment plan is not simply ranked according to the damage level, but also considers the feasibility of the projects, agricultural arrangements, ecological restoration needs, and the requirement to maintain land use type.

[0067] During the implementation of the next year's restoration and remediation project deployment plan, the restoration process will be observed through multispectral remote sensing and field surveys, and the restoration effect will be evaluated at the end of the preset period. Multispectral remote sensing can be used to observe vegetation restoration, changes in land cover, and the ecological restoration process, while field surveys can be used to verify crack treatment, backfilling and reshaping, drainage, restoration of farming conditions, and changes in the risk of key targets. The restoration effect evaluation results at the end of the preset period will be compared with the stability damage level, agricultural productivity impact level, and ecological impact level before restoration to determine the contribution of the restoration and remediation project to the improvement of the site's condition.

[0068] During the land remediation effectiveness assessment phase, the temporary and final remediation investments for each land parcel are statistically analyzed. These are combined with improvements in stability and damage levels, agricultural productivity impact levels, and ecological impact levels to calculate land parcel performance indicators. The effectiveness of land remediation is then assessed based on these performance indicators. Optionally, the land parcel performance indicator KPIs can be expressed using the following formula: KPI=(α·ΔD+β·ΔP+γ·ΔEco) / Cost Wherein, ΔD represents the improvement in the stability damage level, ΔP represents the improvement in the agricultural productivity impact level, ΔEco represents the improvement in the ecological impact level, Cost is the sum of the temporary and final remediation costs for the site, and α, β, and γ are the weighting coefficients for the corresponding improvement amounts, whose values ​​can be set in conjunction with annual remediation targets and land use types. Furthermore, differential correction can be performed based on dynamic control sites or adjacent background sites to eliminate the impact of natural fluctuations. The site performance indicators and unit cost-effectiveness can also be fed back into the next year's remediation project deployment plan, enabling closed-loop management of fund allocation and project deployment.

[0069] In one optional embodiment of this application, a full-process management file is established for each plot of land, recording information such as monitoring, early warning, temporary remediation, annual evaluation, formal remediation, restoration observation, and performance evaluation. The full-process management file is associated with a unique plot number, and early warning events, temporary remediation events, stability damage evaluation results, the next year's restoration and remediation project deployment plan, and restoration effect evaluation results can all be written into this file. Through this file, the geological environment management of the mining area can be transformed from single monitoring and evaluation to a continuously updated closed-loop management system centered around each plot.

[0070] The following is an application example of this application: This study focuses on the operating face and its impact area in a mining area of ​​an underground coal mine, conducting dynamic monitoring, evaluation, and decision-making regarding the entire geological environment of the mining area. The basic data used in this application example includes mining continuity data, surface and underground comparison maps, mining face boundaries over the past five years, impact and restoration areas of mining faces over the past five years, distribution of residential areas, roads, buildings and structures, slope distribution, and existing restoration and remediation data. This data is used to determine the monitoring area, key targets, and subsequent land parcel-level management objects.

[0071] In this application example, a five-year baseline digital elevation model is generated using UAV-LiDAR point cloud data, and land use status data is generated by combining high-resolution remote sensing imagery and multispectral remote sensing imagery. Among them, agricultural land is divided into cultivated land plots and orchard plots according to cadastral boundaries and agricultural planting types, while forest land and grassland are divided according to topographic and geomorphological units. Each plot is assigned a unique number, and the land use type, proximity relationship of key targets, influence range of the work area, and restoration area attributes are recorded.

[0072] GNSS deformation monitoring points are deployed at 300m intervals along the centerline of the working face, and additional GNSS deformation monitoring points are deployed near residential areas, roads, buildings, and slopes. A fixed-width monitoring and early warning zone is delineated based on the spacing, coverage density, control range, and connectivity between adjacent GNSS deformation monitoring points. As an example, when GNSS monitoring data shows a continuous downward trend and the settlement rate is less than 2mm / d, the corresponding monitoring and early warning zone is designated as the initial settlement warning zone; when GNSS monitoring data shows a settlement rate exceeding 10mm / d, the corresponding monitoring and early warning zone is designated as the rapid settlement warning zone.

[0073] In monthly monitoring, one SAR image is acquired each month, and D-InSAR technology is used to obtain the monthly subsidence amount, monthly subsidence rate, and deformation gradient. Based on the D-InSAR temporary stable subsidence determination threshold, the D-InSAR monthly damage determination threshold, and the D-InSAR impact area determination threshold, the monthly temporary stable subsidence area, the monthly subsidence damage area, and the subsidence impact range within and adjacent to the monitoring and early warning zone are determined, and the corresponding results are associated with the plot number.

[0074] In determining the state transition of a land parcel, the D-InSAR settlement increment, GNSS settlement rate, and the previous state of the land parcel are used as inputs. When the land parcel meets the conditions for temporary stable settlement transition, temporary governance decision suggestions are output, and the event occurrence time, triggering conditions, type of measures taken, and duration are recorded. The type of measures includes one or more of the following: warning signs and risk notification, drainage diversion, crack sealing or backfilling, local backfilling and reshaping, and intensified monitoring.

[0075] In the annual evaluation, based on the SBAS-InSAR inversion results, the annual cumulative deformation, average annual subsidence rate, annual stable zone, annual subsidence and damage zone, and SBAS-InSAR uncertain area are output. UAV-LiDAR aerial survey is carried out to verify the annual subsidence and damage zone and the SBAS-InSAR uncertain area, and credibility weighted fusion is performed in combination with GNSS displacement to obtain the annual deformation value of the land parcel and its uncertainty.

[0076] In the land use category stability damage assessment, based on the annual deformation value and uncertainty of the plot, combined with the crack network index, field survey index and the differentiated index set corresponding to the land use type, the stability damage level and dominant damage factor of each plot are determined; for plots with low credibility, crack networks that are connected across plots or adjacent plots that form a continuous subsidence gradient zone, priority is given to supplementary verification or spatial consistency correction.

[0077] In the deployment of restoration and remediation projects for the following year, the following inputs are used: level of stable damage, level of difficulty of remediation, early warning events, temporary remediation events, and exposure of sensitive targets. A list of restoration and remediation projects for the following year and a priority ranking are generated. After the restoration is implemented, the restoration process is observed through multispectral remote sensing and on-site investigation. The restoration effect and the effectiveness of the land remediation are evaluated at the end of the preset period.

[0078] like Figure 6 The diagram shown is a schematic representation of a dynamic monitoring, evaluation, and decision-making system for the entire geological environment of the mining area, which may include: The land parcel division module is used to determine the land use type of the monitoring area and divide the monitoring area into several land parcels according to the land use type; The monitoring and early warning zone delineation module is used to deploy GNSS deformation monitoring points along the center line of the working face at preset intervals, and to deploy GNSS deformation monitoring points near preset key targets, and to delineate a monitoring and early warning zone of fixed width according to the deployment method of the GNSS deformation monitoring points; The settlement signal determination module is used to determine whether a settlement signal has appeared in the monitoring and early warning zone and what stage of settlement it is based on the GNSS monitoring data of the monitoring and early warning zone, and to obtain the GNSS monitoring data determination result. The monthly settlement monitoring module is used to acquire SAR images of the monitoring area on a monthly basis, calculate the monthly settlement data of the monitoring area using D-InSAR technology, and determine the monthly temporary stable settlement zone and the monthly subsidence damage zone. The settlement impact determination module is used to combine GNSS monitoring data and monthly settlement data to determine the settlement impact range within the monitoring and warning zone and adjacent areas; The temporary governance decision module is used to combine monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each plot. It identifies the state transition of the plot according to the preset finite state machine model and preset state transition rules of each plot, and outputs temporary governance decision suggestions when the plot enters a temporary stable settlement state, and records early warning events and temporary governance events. The annual settlement monitoring module is used to determine the annual stable zone and the annual subsidence and damage zone based on SBAS-InSAR technology at the end of the year; The analysis module is used to perform LiDAR verification of the annual subsidence and damage areas, and to conduct fusion analysis by combining the SBAS-InSAR technology judgment results, LiDAR verification results and GNSS monitoring data of the annual subsidence and damage areas. The repair and deployment module is used to conduct stability damage assessments of land parcels based on the results of the fusion analysis, and to generate a repair and treatment project deployment plan for the next year based on the stability damage assessment results, early warning events, and temporary remediation events. The assessment module is used to evaluate the restoration effect and the effectiveness of land management after the implementation of the next year's restoration and management project deployment plan.

[0079] It should be noted that, in the several embodiments provided in this application, it should be understood that the disclosed apparatus and methods can be implemented in other ways. For example, the system embodiments described above are merely illustrative. For instance, the division of each module is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple blocks may be combined or integrated into another device, or some features may be ignored or not executed. Modules described as separate components may or may not be physically separated. Components shown as modules may be one or more physical units, that is, they may be located in one place or distributed in multiple different places. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs.

[0080] Furthermore, the modules in the various embodiments of this application can be integrated into one processing unit, or each module can exist physically separately, or two or more modules can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.

[0081] This application also provides an electronic device, which may include one or more processors, memory and communication interfaces.

[0082] The memory, communication interface, and processor are coupled together. For example, the memory, communication interface, and processor can be coupled together via a bus.

[0083] The communication interface is used for data transmission with other devices. The memory stores computer program code. This computer program code includes computer instructions, which, when executed by the processor, cause the electronic equipment to perform the steps of the aforementioned dynamic monitoring, evaluation, and decision-making method for the entire geological environment of the mining area.

[0084] The processor can be a controller, a central processing unit (CPU), a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute the various exemplary logic blocks, modules, and circuits described in connection with this application. The processor can also be a combination that implements computational functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc. The processor can be used to support an electronic device in performing the method steps provided in the above embodiments.

[0085] The bus can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. These buses can be categorized as address buses, data buses, control buses, etc.

[0086] This application provides a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, it implements the steps of the above-mentioned dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas.

[0087] The computer-readable storage media involved in this application include random access memory (RAM), memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disks, removable disks, CD-ROMs, or any other form of storage media known in the art.

[0088] The above are merely preferred embodiments of this application and are not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas, characterized in that, include: Determine the land use type of the monitoring area and divide the monitoring area into several plots according to the land use type; GNSS deformation monitoring points are set up at preset intervals along the centerline of the working face, and GNSS deformation monitoring points are deployed near preset key targets. A monitoring and early warning zone of fixed width is delineated according to the deployment method of the GNSS deformation monitoring points. Based on the GNSS monitoring data of the monitoring and early warning zone, determine whether a settlement signal has appeared in the monitoring and early warning zone and what stage of settlement it is in, and obtain the GNSS monitoring data determination result; Based on monthly SAR images of the monitoring area, monthly subsidence data for the monitoring area is calculated using D-InSAR technology, and monthly temporary stable subsidence zones and monthly subsidence damage zones are determined. The monthly subsidence data includes monthly subsidence amount, monthly subsidence rate, and deformation gradient. The determination of monthly temporary stable subsidence zones and monthly subsidence damage zones includes: classifying plots or continuous plots with monthly subsidence amount and monthly subsidence rate both below the D-InSAR temporary stable subsidence determination threshold as monthly temporary stable subsidence zones; and classifying plots or continuous plots with monthly subsidence amount or monthly subsidence rate exceeding the D-InSAR monthly damage determination threshold as monthly subsidence damage zones. Based on the GNSS monitoring data and monthly settlement data, the settlement impact range within and adjacent to the monitoring and warning zone is determined: Based on the GNSS monitoring data, it is determined whether the monthly settlement amount, monthly settlement rate and deformation gradient reach the D-InSAR impact zone determination threshold. If the corresponding plot reaches the D-InSAR impact zone determination threshold, it is included in the settlement impact range within and adjacent to the monitoring and warning zone. Combining monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each plot, the state transition of the plot is identified according to the preset finite state machine model and preset state transition rules for each plot. When the plot enters a temporary stable settlement state, temporary governance decision suggestions are output, and early warning events and temporary governance events are recorded. At the end of the year, the annual stable area and the annual subsidence and damage area are determined based on SBAS-InSAR technology: the surface deformation time series is retrieved based on SBAS-InSAR technology, the annual cumulative deformation and / or average annual subsidence rate of SBAS-InSAR are compared with the SBAS-InSAR noise threshold, and the annual stable area and the annual subsidence and damage area are determined based on the comparison results; the SBAS-InSAR noise threshold is determined by the SBAS-InSAR deformation statistics of the stable control area or the historical stable period, and the SBAS-InSAR deformation statistics include one or more of the following: mean, standard deviation, quantile or confidence interval. The annual subsidence and damage areas were reviewed by LiDAR, and a fusion analysis was conducted by combining the SBAS-InSAR technical assessment results, LiDAR review results, and GNSS monitoring data of the annual subsidence and damage areas. Based on the results of the fusion analysis, a stability damage assessment is conducted on the land parcels according to land type. Based on the stability damage assessment results, early warning events, and temporary remediation events, a remediation project deployment plan for the next year is generated. After implementing the next year's restoration and remediation project deployment plan, the restoration effect and the effectiveness of the site remediation will be evaluated.

2. The dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas according to claim 1, characterized in that, The process of determining the land use type of the monitoring area and dividing the monitoring area into several plots based on the land use type includes: The monitoring area is determined based on the boundary of the mining face, the affected area of ​​the mining face, and the repair area. Acquire UAV-LiDAR point cloud data of the monitoring area and generate a benchmark digital elevation model; acquire high-resolution remote sensing images and multispectral remote sensing images of the monitoring area and generate land use status data; The benchmark digital elevation model and the current land use data are overlaid on the boundary of the mining face. The monitoring area is divided into several plots according to the land use type, and each plot is assigned a unique number and basic attributes.

3. The dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas according to claim 1, characterized in that, The width of the monitoring and early warning zone is determined according to the layout of GNSS deformation monitoring points along the center line of the working face and on both sides; the layout includes one or more of the following: GNSS deformation monitoring point spacing, GNSS deformation monitoring point coverage density, GNSS deformation monitoring point control range, and connection relationship between adjacent GNSS deformation monitoring points.

4. The dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas according to claim 1, characterized in that: The finite state machine model includes multiple states such as unaffected state, settlement stage state, active settlement state, temporary stable settlement state, continuous damage state, stable settlement pending evaluation state, repair observation state, and repair completed state. The state transition rules include: When the monthly settlement data for k consecutive periods all meet the temporary settlement determination conditions, and the GNSS settlement rate determined by GNSS monitoring data is lower than the GNSS settlement determination threshold, the plot changes from an active settlement state to a temporary settlement state. Where k is the continuous period discrimination parameter.

5. The dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas according to claim 4, characterized in that, The LiDAR review of the annual subsidence and damage area also includes: LiDAR review of the uncertain areas determined by SBAS-InSAR; LiDAR verification was performed on the annual subsidence and damage areas and the areas with uncertainties in SBAS-InSAR determination, including: UAV-LiDAR aerial surveys were conducted on the annual subsidence and damage areas and the areas with uncertainties determined by SBAS-InSAR to generate annual digital elevation models. The LiDAR differential deformation is obtained by subtracting the annual digital elevation model from the previous year's baseline digital elevation model. The differential deformation of LiDAR is used as the verification result of LiDAR; The triggering conditions for LiDAR verification include: The site was identified as an annual subsidence and damage area by SBAS-InSAR technology; Or the annual deformation gradient is higher than the deformation gradient determination threshold.

6. The dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas according to claim 1, characterized in that, The generation of the next year's restoration and remediation project deployment plan includes: By combining the results of stability damage assessment, early warning events, and temporary remediation events, a list of remediation projects for the following year and a priority ranking are generated through multi-objective optimization. The objective function of the multi-objective optimization includes one or more of the following: risk reduction, agricultural productivity improvement, and ecological improvement. The constraints include one or more of the following: annual budget ceiling, construction capacity ceiling, agricultural time sequence window, and no change in land use type.

7. The dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas according to claim 1, characterized in that, The assessment of the restoration and remediation effectiveness and the results of land remediation after the implementation of the next year's restoration and remediation project deployment plan includes: During the implementation of the next year's restoration and remediation project deployment plan, the restoration process will be observed through multispectral remote sensing and on-site surveys; The repair effect is evaluated at the end of the preset period; The temporary and final remediation investments for each plot are statistically analyzed. The plot performance indicators are calculated by combining the improvement in stability damage level, agricultural productivity impact level, and ecological impact level. The effectiveness of plot remediation is then evaluated based on these performance indicators.

8. A dynamic monitoring, evaluation, and decision-making system for the entire geological environment of a mining area, characterized in that, include: The land parcel division module is used to determine the land use type of the monitoring area and divide the monitoring area into several land parcels according to the land use type; The monitoring and early warning zone delineation module is used to deploy GNSS deformation monitoring points along the center line of the working face at preset intervals, and to deploy GNSS deformation monitoring points near preset key targets, and to delineate a monitoring and early warning zone of fixed width according to the deployment method of the GNSS deformation monitoring points; The settlement signal determination module is used to determine whether a settlement signal has appeared in the monitoring and early warning zone and what stage of settlement it is based on the GNSS monitoring data of the monitoring and early warning zone, and to obtain the GNSS monitoring data determination result. The monthly subsidence monitoring module is used to acquire SAR images of the monitoring area monthly, calculate monthly subsidence data of the monitoring area using D-InSAR technology, and determine monthly temporary stable subsidence zones and monthly subsidence damage zones. The monthly subsidence data includes monthly subsidence amount, monthly subsidence rate, and deformation gradient. The determination of monthly temporary stable subsidence zones and monthly subsidence damage zones includes: classifying plots or consecutive plots with monthly subsidence amount and monthly subsidence rate both below the D-InSAR temporary stable subsidence determination threshold as monthly temporary stable subsidence zones; and classifying plots or consecutive plots with monthly subsidence amount or monthly subsidence rate exceeding the D-InSAR monthly damage determination threshold as monthly subsidence damage zones. The subsidence impact determination module is used to combine GNSS monitoring data determination results and monthly subsidence data to determine the subsidence impact range within the monitoring and warning zone and adjacent areas: Based on the GNSS monitoring data determination results, it determines whether the monthly subsidence amount, monthly subsidence rate and deformation gradient reach the D-InSAR impact zone determination threshold. If the corresponding plot reaches the D-InSAR impact zone determination threshold, it is included in the subsidence impact range within the monitoring and warning zone and adjacent areas. The temporary governance decision module is used to combine monthly settlement data from multiple consecutive months, GNSS monitoring data from the monitoring and early warning zone, and the previous status of each plot. It identifies the state transition of the plot according to the preset finite state machine model and preset state transition rules of each plot, and outputs temporary governance decision suggestions when the plot enters a temporary stable settlement state, and records early warning events and temporary governance events. The annual subsidence monitoring module is used to determine the annual stable zone and the annual subsidence damage zone at the end of the year based on SBAS-InSAR technology. It retrieves the surface deformation time series based on SBAS-InSAR technology, compares the annual cumulative deformation and / or average annual subsidence rate with the SBAS-InSAR noise threshold, and determines the annual stable zone and the annual subsidence damage zone based on the comparison results. The SBAS-InSAR noise threshold is determined by the SBAS-InSAR deformation statistics of the stable control zone or historical stable periods. The SBAS-InSAR deformation statistics include one or more of the following: mean, standard deviation, quantiles, or confidence intervals. The analysis module is used to perform LiDAR verification of the annual subsidence and damage areas, and to conduct fusion analysis by combining the SBAS-InSAR technology judgment results, LiDAR verification results and GNSS monitoring data of the annual subsidence and damage areas. The repair and deployment module is used to conduct stability damage assessments of land parcels based on the results of the fusion analysis, and to generate a repair and treatment project deployment plan for the next year based on the stability damage assessment results, early warning events, and temporary remediation events. The assessment module is used to evaluate the restoration effect and the effectiveness of land management after the implementation of the next year's restoration and management project deployment plan.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the dynamic monitoring, evaluation, and decision-making method for the entire process of geological environment in mining areas as described in any one of claims 1-7.

10. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed by the processor, it implements the steps of the dynamic monitoring, evaluation and decision-making method for the entire process of geological environment in mining areas as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Mining area deformation monitoring and risk assessment method

    CN120252593A

  • Multi-dimensional monitoring system and method for ecological restoration of coal mining subsidence area

    CN121581413A