Highway bridge transition section settlement intelligent monitoring method

By identifying the time points of freeze-thaw interface crossings and calculating directional drop, a freeze-thaw activity distribution sequence is generated. Combined with earth pressure data, the freeze-thaw impact segment is determined, solving the inaccuracy problem of freeze-thaw settlement monitoring in existing technologies. This enables precise positioning of the freeze-thaw impact segment and judgment of the dominant factors, providing effective early warning information.

CN122566772BActive Publication Date: 2026-11-10CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202611074073.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-07-20
Publication Date
2026-11-10
Estimated Expiration
2046-07-20

AI Technical Summary

Technical Problem

Existing technologies fail to effectively distinguish the settlement components caused by freeze-thaw cycles, cannot identify the spatial extent of freeze-thaw effects, and cannot determine the dominant settlement state, resulting in early warning information failing to pinpoint specific spatial locations.

Method used

By identifying the time point of the freeze-thaw interface crossing, calculating the directional drop and the freeze-thaw correlation drop, generating a freeze-thaw activity distribution sequence, and combining it with earth pressure data to determine the spatial range and dominant factors of the freeze-thaw affected section, an alarm is executed.

Benefits of technology

It enables accurate differentiation of settlement components caused by freeze-thaw action, determines the spatial range and dominant factors of the freeze-thaw affected area, and provides targeted early warning information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122566772B_ABST
    Figure CN122566772B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of highway quality monitoring, and particularly relates to a highway bridge transition section settlement intelligent monitoring method. According to the temperature data of each temperature measuring point, the present application identifies the time point of the freeze-thaw interface crossing monitoring section, and takes the corresponding anisotropic difference as the freeze-thaw correlation difference. From all the anisotropic differences, the settlement difference caused by the freeze-thaw effect is screened out, so as to distinguish the settlement component caused by the freeze-thaw effect from the settlement component caused by non-freeze-thaw factors. According to the soil pressure data of each pressure measuring point, the present application extracts the cumulative values of positive and negative directions in the unit window and compares them. According to the comparison result, it is determined whether the dominant factor of the freeze-thaw influence section is settlement or uplift.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of highway quality monitoring technology, specifically to an intelligent monitoring method for settlement of highway bridge transition sections. Background Technology

[0002] Approach slab settlement is a common quality defect in road-bridge transition sections of highway engineering. This is caused by the stiffness difference between the bridge abutment and the adjacent roadbed. In island-like permafrost regions, the permafrost has poor thermal stability and is discontinuously distributed. Freeze-thaw cycles cause uncoordinated deformation between the roadbed thawing settlement and the stability of the bridge abutment pile foundation, resulting in differential settlement. This differential settlement and stiffness difference create abrupt changes in rigidity, further aggravating approach slab settlement and seriously endangering traffic safety.

[0003] In existing technologies, for example, Chinese invention patent CN119958494A discloses a method for detecting settlement in road and bridge transition sections based on machine vision and harmonic analysis. This method uses three-dimensional laser scanning to acquire point cloud data to construct a settlement displacement field. Simultaneously, it collects vibration signals using an accelerometer and extracts frequency domain features through Fourier transform. Then, it fuses the frequency domain features and the settlement displacement field using a Bayesian network to obtain settlement data. Another example is Chinese invention patent CN119309543A, which discloses an automated settlement monitoring method for railway subgrades in permafrost regions. This method uses a laser transmitter aligned with a steel ruler at the monitoring point to automatically monitor settlement at the measuring point, and transmits the monitoring data to a backend server via a wireless transmission system.

[0004] However, the existing technologies still have the following shortcomings: 1. They do not perform correlation analysis between settlement data and temperature data to identify differential settlement caused by freeze-thaw cycles. Therefore, they cannot distinguish the settlement component caused by freeze-thaw cycles from the settlement data, resulting in settlement monitoring results that cannot reflect the degree of impact of freeze-thaw cycles on differential settlement. 2. They do not perform correlation analysis between settlement data and earth pressure data, making it impossible to determine whether the freeze-thaw affected section is currently in a state dominated by settlement or uplift based on changes in earth pressure. 3. They do not use continuous segment marking to locate the spatial range of concentrated differential settlement in the spatial distribution of settlement activity, resulting in early warning information not being able to pinpoint specific spatial locations. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide an intelligent monitoring method for settlement of highway bridge transition sections.

[0006] The technical solution adopted by the present invention to solve its technical problem is: a method for intelligent monitoring of settlement of highway bridge transition section, including the following steps: generating settlement sequence and offset sequence in the driving direction based on the settlement and longitudinal offset data of displacement measuring points; identifying extreme measuring points based on the offset sequence.

[0007] The vertical drop is calculated by extracting extreme measurement points and the simultaneous settlement of adjacent measurement points from the settlement sequence, and marking the vertical drop with the offset direction of the extreme measurement points.

[0008] Based on temperature measurement data, the time point at which the freeze-thaw interface crosses the monitoring section is identified, and the directional drop corresponding to the time point is taken as the freeze-thaw correlation drop.

[0009] Based on the settlement data of displacement measuring points corresponding to the freeze-thaw correlation drop, the settlement change at adjacent time points is calculated, and the activity of the freeze-thaw interface settlement is obtained by combining the freeze-thaw correlation drop, and an activity distribution sequence is generated.

[0010] Based on the activity distribution sequence, continuous segments with activity greater than adjacent activity are denoted as freeze-thaw affected segments, and the start and end positions and spatial range of freeze-thaw affected segments are determined.

[0011] Within the freeze-thaw impact zone, the cumulative values ​​of positive and negative forces within the unit window are extracted based on the earth pressure data from the pressure measuring points and compared. Based on the comparison results, the dominant factors in the freeze-thaw impact zone are determined and an alarm is triggered.

[0012] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention identifies the time point when the freeze-thaw interface crosses the monitoring section based on the temperature data of each temperature measuring point, and uses the directional drop corresponding to the time point as the freeze-thaw related drop. It then selects the settlement drop caused by freeze-thaw action from all directional drops, thereby distinguishing the settlement component caused by freeze-thaw action from the settlement component caused by non-freeze-thaw factors.

[0013] 2. This invention extracts and compares the cumulative positive and negative values ​​within a unit window based on the soil pressure data from each pressure measuring point, and determines whether the dominant factor in the freeze-thaw influence section is settlement or uplift based on the comparison results.

[0014] 3. This invention calculates the settlement change at adjacent times and combines it with the freeze-thaw correlation drop to obtain the activity of the freeze-thaw interface settlement, generates an activity distribution sequence, and records the continuous segments with activity greater than the adjacent activity as freeze-thaw affected segments and determines the start and end positions and spatial range of the freeze-thaw affected segments, thereby solving the problem that the early warning information in the prior art cannot point to a specific spatial location. Attached Figure Description

[0015] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 This is a schematic diagram of the monitoring method of the present invention;

[0017] Figure 2 This is a schematic diagram of the process for obtaining the freeze-thaw correlation drop according to the present invention;

[0018] Figure 3 This is a flowchart illustrating the process of determining the start and end positions and spatial range of the freeze-thaw affected section in this invention.

[0019] Figure 4 This is a flowchart illustrating the process of determining the dominant factors affecting the freeze-thaw cycle in this invention. Detailed Implementation

[0020] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that, unless otherwise specifically stated, the relative arrangement, numerical expressions, and values ​​of the components and steps set forth in these embodiments do not limit the scope of the invention. Furthermore, it should be understood that, for ease of description, the dimensions of the various parts shown in the drawings are not drawn to actual scale.

[0021] The following description of at least one exemplary embodiment is merely illustrative and is in no way intended to limit the invention or its application or use. Techniques, methods, and apparatus known to those skilled in the art may not be discussed in detail, but where appropriate, such techniques, methods, and apparatus should be considered part of the specification.

[0022] In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not as limitations. Therefore, other examples of exemplary embodiments may have different values.

[0023] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.

[0024] The following description, in conjunction with the accompanying drawings, details the specific scheme of the intelligent monitoring method for settlement of highway bridge transition sections provided by the present invention.

[0025] Please see Figure 1 The diagram shows a flowchart of an intelligent monitoring method for settlement of highway bridge transition sections provided by the present invention, which specifically includes the following steps: Step S1, based on the settlement and longitudinal offset data of displacement measuring points, generate settlement sequence and offset sequence in the driving direction respectively; identify extreme measuring points based on the offset sequence.

[0026] In the transition section of highway bridges in island-like permafrost regions, there is a stiffness difference between the bridge abutment and the adjacent roadbed. The bridge abutment, with its pile foundation penetrating the soft soil layer, experiences minimal settlement, while the adjacent roadbed sits directly on the natural foundation, resulting in significant post-construction settlement and abrupt change in stiffness. Freeze-thaw cycles cause uncoordinated deformation between the roadbed thawing settlement and the stability of the bridge abutment pile foundation, leading to differential settlement. This manifests as uneven settlement distribution along the driving direction and concentrated longitudinal offset at various locations in the transition section. Therefore, this invention constructs settlement and offset sequences along the driving direction based on settlement and longitudinal offset data from displacement measurement points.

[0027] Specifically, along the driving direction, cross-sections perpendicular to the driving direction are set at the abutment back wall, the end of the approach slab, and the junction of adjacent graded fill transition sections in the highway bridge-road transition section. These cross-sections serve as monitoring sections. The graded fill transition sections are located between the abutment and the ordinary roadbed and are arranged sequentially along the driving direction. Each graded fill transition section uses a different fill type and cementitious material dosage. The approach slab refers to the reinforced concrete load-bearing slab connecting the abutment and the roadbed fill, with one end supported by the abutment back wall and the other end resting on the crushed stone drainage layer of the graded fill transition section.

[0028] Next, the width of the road surface where the monitoring section is located is read from the cross-sectional design drawings of the road-bridge transition section. In order to evenly distribute displacement measuring points throughout the entire width of the road surface, the value of the road surface width is rounded up to the nearest whole number as a fraction. The road surface width is then divided into equal parts to obtain the length of each segment and the division point. At each division point on the monitoring section, a displacement measuring point located below the top surface of the roadbed is buried. Similarly, a displacement measuring point is buried at each division point located at the edge of the road surface width.

[0029] Piezoelectric sensors and fiber optic strain sensors are installed at each displacement measuring point. After the piezoelectric sensor outputs its voltage value, the settlement displacement at each measuring point at each acquisition time is calculated using calibration coefficients (existing technology, not described in detail here). The data is then arranged in chronological order to form settlement displacement time series data, i.e., settlement data.

[0030] After the fiber optic strain sensor outputs a wavelength drift signal, the longitudinal offset of each displacement measurement point at each acquisition time is obtained through demodulation and calibration coefficient conversion (existing technology, not described in detail here). This longitudinal offset time-series data is then arranged in chronological order to form the longitudinal offset data. The gauge length is the actual distance between the two fixed ends of the fiber optic strain sensor.

[0031] To visually reflect the trend of settlement change from small settlement at the abutment end to large settlement at the roadbed end, the settlement values ​​of each displacement measuring point at the current acquisition time are initially sorted according to the order of arrangement from the abutment to the roadbed along the traffic direction, resulting in an initial settlement sequence. For the transition section with two-way traffic, the direction from the abutment to the roadbed is selected as the sorting direction to ensure that the sorting direction is consistent with the gradual change direction of structural stiffness in the road-bridge transition section.

[0032] Then, starting from the beginning of the initial settlement sequence, the initial settlement sequence is traversed along the driving direction. If the current settlement is greater than the previous settlement, the displacement measuring point corresponding to the current settlement is recorded as a Class I point; if the current settlement is equal to the previous settlement, the displacement measuring point corresponding to the current settlement is not marked, and the next settlement is determined; if the current settlement is less than the previous settlement, the displacement measuring point corresponding to the current settlement is recorded as a Class II point.

[0033] The segment consisting of all adjacent displacement measuring points marked as Class I points is classified as a Class I segment; the segment consisting of all adjacent displacement measuring points marked as Class II points is classified as a Class II segment. If there are displacement measuring points marked as Class I points but not adjacent, each of these Class I points is treated as a separate Class I segment. The same treatment applies to displacement measuring points marked as Class II points but not adjacent.

[0034] Next, the displacement measuring points within the first-class section are arranged in ascending order of settlement, resulting in a first-class subsequence. Similarly, the displacement measuring points within the second-class section are arranged in descending order of settlement, resulting in a second-class subsequence. When either the first-class or second-class section contains only one displacement measuring point, no sorting operation is required.

[0035] Subsequently, all Class I and Class II subsequences are concatenated in chronological order along the driving direction to generate the settlement sequence in the driving direction at the current acquisition time; thus, the settlement sequence corresponding to each acquisition time is obtained. If both Class I and Class II sections are empty, the displacement measuring points are directly arranged in the order from the abutment to the roadbed along the driving direction to obtain the settlement sequence in the driving direction at the current acquisition time.

[0036] While performing the operation to obtain the settlement sequence, the longitudinal offset of each displacement measuring point at the current acquisition time is initially sorted according to the arrangement order from the bridge abutment to the roadbed along the traffic direction to obtain the initial offset sequence.

[0037] The offset direction is extracted from the initial offset sequence. The offset direction is determined by the sign of the longitudinal offset: if the longitudinal offset is positive, the offset direction points towards the roadbed; if the longitudinal offset is negative, the offset direction points towards the bridge abutment. However, if the longitudinal offset is zero, it means that no longitudinal offset has occurred at the displacement measuring point. In this case, the offset direction is marked as no offset direction and will not participate in the subsequent classification of directional segments.

[0038] Based on this, segments formed by adjacent displacement measuring points with the same offset direction are grouped into segments of the same direction. If there are no displacement measuring points with the same offset direction, each displacement measuring point is treated as an independent directional segment; if there are displacement measuring points with the same offset direction but not adjacent, the displacement measuring points with the same offset direction are treated as independent directional segments respectively.

[0039] Next, the longitudinal offsets of each displacement measuring point within each directional segment are arranged sequentially from the abutment to the roadbed to generate a directional offset subsequence. When a directional segment contains only one displacement measuring point, the longitudinal offset of this displacement measuring point is directly used as the directional offset subsequence. All directional offset subsequences are then concatenated in chronological order along the driving direction to generate the offset sequence for the driving direction at the current acquisition time; thus, the offset sequence corresponding to each acquisition time is obtained.

[0040] Because the extreme values ​​of longitudinal offset along the driving direction correspond to areas of concentrated deformation in the road-bridge transition section, these areas are related to the locations of abrupt changes in stiffness between the abutment and the roadbed, and are key locations for differential settlement monitoring. Therefore, extreme measurement points are identified based on the offset sequence.

[0041] The specific identification process is as follows: traverse each offset sequence along the driving direction, select displacement measurement points with longitudinal offset greater than the previous longitudinal offset as initial measurement points; an increase in longitudinal offset along the driving direction means that the degree of deformation is gradually intensifying.

[0042] If no initial measurement point can be selected after traversing each offset sequence, it indicates that the longitudinal offset in the entire transition section does not increase along the driving direction. At this time, the displacement measurement point with the largest longitudinal offset in the offset sequence is directly taken as the extreme value measurement point and the identification process ends.

[0043] If only one initial measurement point is selected after traversing each offset sequence, then this initial measurement point is taken as the only extreme value measurement point, and there is no need to determine the subsequent positive and negative extreme value candidate points.

[0044] Then, first extract the initial measurement points whose longitudinal offset is greater than the longitudinal offset of the next adjacent initial measurement point, then select the initial measurement points with positive longitudinal offset from the extracted initial measurement points, record them as positive extreme value candidate points, and record the spatial position of the positive extreme value candidate points.

[0045] If no positive extreme value candidate point is obtained, the subsequent steps related to the positive extreme value candidate point are not executed; only the steps related to the negative extreme value candidate point are executed.

[0046] When positive extreme value candidate points are obtained, the system traverses backward along the driving direction starting from each positive extreme value candidate point, that is, traverses along the driving direction from the bridge abutment to the roadbed. The first displacement measurement point whose longitudinal offset is less than the longitudinal offset of the current positive extreme value candidate point is taken as the positive termination point. If there is no displacement measurement point whose longitudinal offset is less than the longitudinal offset of the current positive extreme value candidate point, the last displacement measurement point in the offset sequence along the driving direction is taken as the positive termination point.

[0047] After determining the positive termination point, the displacement measurement section between the positive extreme value candidate point and the positive termination point (including both the positive extreme value candidate point and the positive termination point) is denoted as the positive uplift section. The positive uplift section corresponds to the area where frost heave or compression deformation is concentrated.

[0048] In each positive uplift segment, the displacement measuring point with the largest longitudinal offset is located at the position of the largest deformation in the uplift segment. Therefore, the displacement measuring point with the largest longitudinal offset is regarded as the positive extreme value measuring point. If multiple displacement measuring points have the largest and equal longitudinal offsets, then these displacement measuring points are all regarded as positive extreme value measuring points. At the same time, the spatial position and offset direction of each positive extreme value measuring point are recorded.

[0049] Simultaneously, first extract initial measurement points whose longitudinal offset is less than the longitudinal offset of the next adjacent initial measurement point, then select initial measurement points with negative longitudinal offsets from the extracted initial measurement points, record them as negative extreme value candidate points, and record the spatial position of the negative extreme value candidate points.

[0050] If no negative extreme candidate point is obtained, subsequent steps related to the negative extreme candidate point are not executed; only subsequent steps related to the positive extreme candidate point are executed.

[0051] When a negative extreme value candidate point is obtained, the system traverses backward along the driving direction starting from each negative extreme value candidate point. The first displacement measurement point with a longitudinal offset greater than the longitudinal offset of the current negative extreme value candidate point is taken as the negative termination point. If there is no displacement measurement point with a longitudinal offset greater than the longitudinal offset of the current negative extreme value candidate point, the last displacement measurement point along the driving direction in the offset sequence is taken as the negative termination point.

[0052] After determining the negative termination point, the displacement measurement section between the negative extreme candidate point and the negative termination point (including both the negative extreme candidate point and the negative termination point) is denoted as the negative depression segment. The negative depression segment corresponds to the area where melting or tensile deformation is concentrated.

[0053] In each negative concave segment, the displacement measuring point with the smallest longitudinal offset is located at the position with the smallest deformation in the concave segment. Therefore, the displacement measuring point with the smallest longitudinal offset is regarded as the negative extreme value measuring point. If multiple displacement measuring points have the smallest and equal longitudinal offsets, then all of these displacement measuring points are regarded as negative extreme value measuring points. At the same time, the spatial position and offset direction of each negative extreme value measuring point are recorded.

[0054] If neither positive nor negative extreme candidate points can be obtained, the displacement measurement point with the largest absolute value of longitudinal offset in the offset sequence will be taken as the extreme measurement point.

[0055] Step S2: Extract extreme measurement points and the simultaneous settlement of adjacent measurement points from the settlement sequence to calculate the drop. Mark the drop with the offset direction of the extreme measurement points to obtain the directional drop.

[0056] In practice, within the settlement sequence at the current acquisition time, based on the spatial location of the extreme value measuring point, adjacent displacement measuring points are searched forward along the driving direction as the previous displacement measuring point, and adjacent displacement measuring points are searched backward along the driving direction as the next displacement measuring point. The previous displacement measuring point and the next displacement measuring point are respectively designated as the previous adjacent measuring point and the next adjacent measuring point.

[0057] Select the target measuring point from the adjacent measuring points (both the following and preceding points) whose offset direction is the same as that of the extreme measuring point. If none of the adjacent measuring points have the same offset direction as the extreme measuring point, then select the target measuring point with the smaller settlement between the preceding and following measuring points. Subtract the settlement of the target measuring point from the settlement of the extreme measuring point to obtain the settlement difference.

[0058] To distinguish whether differential settlement is caused by relative movement from the abutment side to the roadbed side or from the roadbed side to the abutment side, the directional drop is obtained by marking the offset direction of the extreme measurement points.

[0059] Specifically: when the offset direction of the extreme value measuring point points towards the roadbed, it indicates that the soil at the extreme value measuring point has shifted towards the roadbed relative to the adjacent displacement measuring point. The settlement at this point is relatively large compared to the adjacent displacement measuring points, so the settlement difference is marked as a positive directional drop. When the offset direction of the extreme value measuring point points towards the abutment, it indicates that the soil at the extreme value measuring point has shifted towards the abutment relative to the adjacent displacement measuring point. The settlement at this point is relatively small compared to the adjacent displacement measuring points, so the settlement difference is marked as a negative directional drop.

[0060] Please see Figure 2 Step S3: Identify the time point when the freeze-thaw interface crosses the monitoring section based on the temperature measurement data, and take the directional drop corresponding to the time point as the freeze-thaw correlation drop.

[0061] Due to the varying thickness and discontinuous distribution of the island-like permafrost, freeze-thaw cycles can cause sudden and significant subsidence in some sections after a period of slow, continuous settlement. Differential settlement is concentrated in the continuous sections where freeze-thaw action is most intense. The rise and fall of the permafrost upper limit reflects the movement of the freeze-thaw interface, which in turn causes changes in the soil's mechanical properties, leading to variations in settlement at each displacement measuring point along the monitoring section. Therefore, it is necessary to identify the time point at which the freeze-thaw interface crosses the monitoring section based on temperature measuring data, determine the freeze-thaw-related drop, and filter out the settlement drop caused by freeze-thaw action from all directional drops.

[0062] Based on the above considerations, while setting up each displacement measuring point, temperature measuring points were also installed at each depth layer of the monitoring section where each displacement measuring point was located, according to the depth layer location recorded in the geological survey report of the road-bridge transition section. PT100 platinum resistance temperature sensors were installed at the temperature measuring points to collect temperature values ​​and obtain temperature time series data.

[0063] In practice, the temperature values ​​of each temperature measuring point at each monitoring section are retrieved at the current acquisition time, and the depth position with the largest temperature change gradient is determined based on the temperature values ​​at different depths of the monitoring section.

[0064] The specific determination process is as follows: For each monitoring section, if multiple temperature measuring points are set up in the same depth layer, the arithmetic mean of the temperature values ​​of all temperature measuring points is taken as the temperature value of this depth layer; if only one temperature measuring point is set up in the same depth layer, the temperature value of the temperature measuring point is taken directly as the temperature value of this depth layer.

[0065] Then, subtract the depth value of the adjacent depth layer from the depth value of the lower depth layer to obtain the difference in depth values ​​between the two adjacent depth layers; calculate the temperature difference between adjacent depth layers sequentially along the depth direction, and divide the temperature difference by the difference in depth values ​​between the two adjacent depth layers to obtain the temperature change gradient value between adjacent depth layers.

[0066] By traversing all adjacent depth layers, the depth layer with the largest temperature gradient value is determined as the depth location with the largest temperature gradient. Since the freeze-thaw interface is the boundary between frozen and thawed soil, the rate of temperature change with depth is greatest at the freeze-thaw interface. Therefore, the depth location with the largest temperature gradient is selected as the freeze-thaw interface location for the corresponding monitoring section. The depth value of the freeze-thaw interface is recorded with the ground surface as the zero point and downward as the positive direction.

[0067] Next, when the current collection time is the first collection time, the freeze-thaw correlation drop at the first collection time is set to zero, and the determination of the freeze-thaw interface position movement is skipped.

[0068] When the current acquisition time is not the first acquisition time, perform the following operations: For a certain monitoring section, if the current freeze-thaw interface depth value is less than the previous freeze-thaw interface depth value, it indicates that the freeze-thaw interface position has risen, and it is determined that the freeze-thaw interface position has moved from the frozen soil layer to the thawed soil layer.

[0069] If the depth value of the freeze-thaw interface at the current acquisition time is greater than the depth value of the freeze-thaw interface at the previous acquisition time, it indicates that the position of the freeze-thaw interface has dropped. It is determined that the position of the freeze-thaw interface has moved from the thawed soil layer to the frozen soil layer. At this time, the freeze-thaw correlation drop remains unchanged with the previously acquired value. If the freeze-thaw correlation drop has not been acquired before, the next monitoring section is processed.

[0070] If the depth value of the freeze-thaw interface at the current acquisition time is equal to the depth value of the freeze-thaw interface at the previous acquisition time, it means that the position of the freeze-thaw interface has not moved, so no judgment is made and the next monitoring section is processed.

[0071] When the location of the freeze-thaw interface at a certain monitoring section is first determined to be moving from the frozen soil layer to the thawed soil layer, the moment when the location of the freeze-thaw interface begins to move is recorded as the time point when the freeze-thaw interface crosses the corresponding monitoring section.

[0072] Subsequently, among the directional drops at all sampling times, the directional drop obtained at the sampling time corresponding to the stated time point is selected as the freeze-thaw correlated drop. If there is no directional drop corresponding to the stated time point, the settlement drop at the sampling time of that time point is directly used as the freeze-thaw correlated drop.

[0073] Step S4: Based on the settlement data of the displacement measuring points corresponding to the freeze-thaw correlation drop, calculate the settlement change at adjacent time points, combine the freeze-thaw correlation drop to obtain the activity of the freeze-thaw interface settlement, and generate an activity distribution sequence.

[0074] In practice, after obtaining the freeze-thaw correlation drop, using the spatial location of the displacement measuring point corresponding to the freeze-thaw correlation drop as an index, starting from the second acquisition time, the current settlement and the previous settlement of the displacement measuring point corresponding to the freeze-thaw correlation drop are extracted from the settlement sequences of the current acquisition time and the previous acquisition time, respectively. Subtracting the previous settlement from the current settlement yields the settlement change at adjacent times.

[0075] Then, the settlement change is divided by the freeze-thaw correlation drop to obtain the activity of the freeze-thaw interface settlement. The activity of the freeze-thaw interface settlement reflects the intensity of settlement changes near the freeze-thaw interface; the higher the activity, the more intense the settlement changes and the greater the impact of freeze-thaw action. If the freeze-thaw correlation drop is zero, the activity is set to zero.

[0076] Then, all activity levels are arranged in chronological order along the direction of traffic to generate an activity level distribution sequence at the current collection time, thereby reflecting the variation pattern of settlement activity levels from the abutment to the roadbed.

[0077] Please see Figure 3 Step S5: Based on the activity distribution sequence, the continuous segments with activity greater than the adjacent activity are recorded as freeze-thaw affected segments, and the start and end positions and spatial range of the freeze-thaw affected segments are determined.

[0078] In order to spatially locate the continuous section where the effects of freeze-thaw action are most concentrated, so as to provide a clear spatial range for subsequent earth pressure analysis and alarms within this continuous section, the start and end points and spatial range of the freeze-thaw affected section are determined.

[0079] The specific process is as follows: Traverse each activity distribution sequence along the driving direction. If the current activity is greater than both the previous and next activity, mark the displacement measurement point corresponding to the current activity as the peak point; if the current activity is less than both the previous and next activity, mark the displacement measurement point corresponding to the current activity as the valley point.

[0080] If the current activity level does not simultaneously satisfy the condition of being greater than the previous activity level and the next activity level, or simultaneously less than the previous activity level and the next activity level, then no mark is made on the displacement measurement point corresponding to the current activity level, and the next activity level is determined.

[0081] If no peak point is found after traversing the current activity distribution sequence, the displacement measurement point corresponding to the highest activity in the current activity distribution sequence is marked as the peak point. If no valley point is found after traversing the current activity distribution sequence, the displacement measurement point corresponding to the lowest activity in the current activity distribution sequence is marked as the valley point.

[0082] Next, using each peak point as a reference, the system traverses forward along the driving direction to the adjacent previous valley point, that is, traversing along the driving direction from the roadbed towards the bridge abutment; and then traverses backward to the adjacent next valley point. The displacement measurement section between this peak point and the previous valley point (including both the peak point and the previous valley point) is recorded as the first influential half-segment. The displacement measurement section between this peak point and the next valley point (including both the peak point and the next valley point) is recorded as the second influential half-segment.

[0083] Then, the displacement measuring points in the first half of the affected section are connected to the displacement measuring points in the second half of the affected section in chronological order along the travel direction to form the entire affected section. The three-dimensional spatial position of each displacement measuring point in the entire affected section is projected onto a one-dimensional coordinate axis along the travel direction to obtain the coordinate values ​​in the travel direction; the displacement measuring point with the smallest coordinate value is designated as the front measuring point, and the displacement measuring point with the largest coordinate value is designated as the rear measuring point. The length of the entire affected section is obtained by subtracting the travel direction coordinate value of the front measuring point from the travel direction coordinate value of the rear measuring point.

[0084] Since a longer affected segment indicates a larger spatial range of freeze-thaw impact, and thus a greater impact on traffic safety within that segment, the longest affected segment is selected as the freeze-thaw impact segment at the current data collection time. If multiple affected segments are of the longest length and the same, then all of these segments are selected as the freeze-thaw impact segments at the current data collection time.

[0085] Then, the starting and ending displacement measuring points of the freeze-thaw affected section are taken as the starting and ending positions of the freeze-thaw affected section, and the spatial range of the freeze-thaw affected section is the length of the freeze-thaw affected section.

[0086] If all activity levels in the activity distribution sequence are equal, it is impossible to distinguish between peak points and valley points. In this case, the segment corresponding to the entire activity distribution sequence is directly taken as the freeze-thaw impact segment at the current acquisition time. The spatial range of the freeze-thaw impact segment is obtained in the same way as the process described above for obtaining the length of the entire impact segment.

[0087] Please see Figure 4 Step S6: Within the freeze-thaw affected section, extract the cumulative values ​​of positive and negative directions within the unit window based on the earth pressure data from the pressure measuring points and compare them. Determine the dominant factors of the freeze-thaw affected section based on the comparison results and execute an alarm.

[0088] In the transition section of road and bridge sections in island-like permafrost areas, the thawing and freezing of permafrost will cause changes in the mechanical properties of the soil, manifested as an increase or decrease in earth pressure. The freeze-thaw affected section is the section with the highest settlement activity. Comparing the positive and negative cumulative values ​​of earth pressure within the freeze-thaw affected section can determine the current dominant deformation trend of the freeze-thaw affected section, providing a basis for differentiated warnings.

[0089] Based on the above considerations, while setting up each displacement measuring point, pressure measuring points are also simultaneously buried in the roadbed fill layer of the monitoring section where each displacement measuring point is located. Earth pressure gauges are installed at the pressure measuring points to collect earth pressure values ​​and obtain earth pressure time series data, i.e., earth pressure data.

[0090] In practice, the current acquisition time is used as the end point of the window, and the number of acquisition times preceding the current acquisition time is used as the start point of the window. The time interval between the start and end points of the window is used as the unit window. To accumulate sufficient data points to smooth out instantaneous disturbances and reflect the changing trend of earth pressure in a timely manner, the preset number is obtained by multiplying the sampling frequency of the earth pressure gauge by the total number of hours corresponding to seven days. If the number of acquisition times before the current acquisition time is less than the preset number, the positive and negative cumulative values ​​of earth pressure are extracted and compared only after the number of acquisition times reaches the preset number.

[0091] Then, using the identifiers of each pressure measuring point within the freeze-thaw affected section as an index, the time sequence of earth pressure values ​​at each pressure measuring point within a unit window, as well as the initial earth pressure value at each pressure measuring point, are retrieved. The analysis is based on a unit window because the earth pressure value at a single moment is easily affected by instantaneous disturbances.

[0092] The process of obtaining the initial value of earth pressure is as follows: after the roadbed filling is completed and the earth pressure gauge is put into operation, based on the technical standards for monitoring of building foundation pit engineering, the arithmetic mean of the earth pressure values ​​collected at three consecutive sampling times according to the sampling frequency is taken as the initial value of earth pressure.

[0093] Then, select earth pressure values ​​in the time series of each earth pressure value that are greater than the corresponding initial earth pressure value. An increase in earth pressure value indicates that the soil at the corresponding pressure measuring point is compressed. If no earth pressure value greater than the corresponding initial earth pressure value is selected, the positive cumulative component of the corresponding pressure measuring point is set to zero. If only one earth pressure value greater than the corresponding initial earth pressure value is selected, the difference between the selected earth pressure value and the initial earth pressure value is directly used as the positive cumulative component of the corresponding pressure measuring point. If at least two earth pressure values ​​greater than the corresponding initial earth pressure value are selected, the difference between the selected earth pressure value and the initial earth pressure value is calculated and accumulated to obtain the positive cumulative component of the corresponding pressure measuring point.

[0094] Simultaneously, earth pressure values ​​less than the corresponding initial earth pressure value are selected from the time series of each earth pressure value. A decrease in earth pressure value indicates unloading of the soil at the corresponding pressure measuring point. If no earth pressure value less than the corresponding initial earth pressure value is selected, the negative cumulative component of the corresponding pressure measuring point is set to zero. If only one earth pressure value less than the corresponding initial earth pressure value is selected, the difference between the selected earth pressure value and the initial earth pressure value is directly used as the negative cumulative component of the corresponding pressure measuring point. If at least two earth pressure values ​​less than the corresponding initial earth pressure value are selected, the absolute value of the difference between the selected earth pressure value and the initial earth pressure value is calculated and accumulated to obtain the negative cumulative component of the corresponding pressure measuring point.

[0095] Next, sum all the positive cumulative components to obtain the positive cumulative value. The larger the positive cumulative value, the more significant the soil pressure and the stronger the settlement trend within the freeze-thaw affected section. Then, sum all the negative cumulative components to obtain the negative cumulative value. The larger the negative cumulative value, the more significant the soil unloading and the stronger the uplift trend within the freeze-thaw affected section.

[0096] Furthermore, by comparing the magnitudes of positive and negative cumulative values, the dominant factors affecting the freeze-thaw cycle are determined, so as to output targeted alarm information.

[0097] The specific determination rule is as follows: when the positive cumulative value is greater than the negative cumulative value, the dominant factor in the freeze-thaw affected section is determined to be the dominant settlement factor. Settlement dominance indicates that the cumulative effect of increased earth pressure in the freeze-thaw affected section is dominant, the soil is generally in a state of compressive settlement, and the corresponding differential settlement trend is settlement intensification.

[0098] When the negative cumulative value is greater than the positive cumulative value, the dominant factor in the freeze-thaw affected section is determined to be the uplift dominant factor. Uplift dominance indicates that the cumulative effect of reduced earth pressure in the freeze-thaw affected section is dominant, the soil is generally in a state of unloading and uplift, and the corresponding differential settlement trend is intensified uplift.

[0099] When the positive cumulative value is equal to the negative cumulative value, it indicates that the soil in the freeze-thaw affected section is under pressure and unloaded to a similar degree. Considering that settlement will cause bridge approach slab settlement, the direct impact on traffic safety is more obvious. Therefore, the dominant factor in the freeze-thaw affected section is determined as the dominant factor in settlement.

[0100] Subsequently, if the current data collection time is not the first data collection time, the spatial range of the freeze-thaw affected section is compared with the spatial range of the freeze-thaw affected section at the previous data collection time to determine the priority of the alarm. The specific comparison process is as follows: when the spatial range of the freeze-thaw affected section is greater than that of the freeze-thaw affected section at the previous data collection time, the alarm information is set to high priority, and maintenance personnel must be notified immediately to take measures (such as reinforcing the freeze-thaw affected section); when the spatial range of the freeze-thaw affected section is less than or equal to that of the freeze-thaw affected section at the previous data collection time, the alarm information is set to normal priority and processed as a routine monitoring record.

[0101] If the current acquisition time is the first acquisition time, then there is no spatial range of the freeze-thaw impact zone from the previous acquisition time, and the priority of the alarm information is directly set to the normal priority.

[0102] Next, the spatial range of the freeze-thaw affected area, the dominant factors, and the time identifier of the current collection time are used as data content. According to the alarm information data format predefined by the monitoring platform, the data content is filled into the corresponding fields in sequence to generate a complete alarm information data packet.

[0103] Afterwards, the complete alarm information data packet is sent to the alarm receiver of the monitoring platform via wired or wireless communication. The alarm receiver then executes the corresponding alarm action according to the priority of the alarm information, including but not limited to: displaying the alarm information on the monitoring platform interface, sending alarm notifications to maintenance personnel, and triggering on-site audible and visual alarm devices.

[0104] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented in software, the above embodiments can be implemented, in whole or in part, as a computer program product.

[0105] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.

[0106] In addition, the functional modules in the various embodiments of the present invention can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module.

[0107] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

[0108] Finally, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for intelligent monitoring of settlement in the transition section of a highway bridge, characterized in that, Includes the following steps: Based on the settlement and longitudinal offset data of displacement measuring points, settlement sequences and offset sequences in the driving direction are generated respectively; extreme measuring points are identified based on the offset sequences. The vertical drop is calculated by extracting extreme value measuring points and the simultaneous settlement of adjacent measuring points from the settlement sequence, and the vertical drop is obtained by marking the offset direction of the extreme value measuring points. Based on temperature measurement data, identify the time point when the freeze-thaw interface crosses the monitoring section, and use the directional drop corresponding to the time point as the freeze-thaw correlation drop. Based on the settlement data of displacement measuring points corresponding to the freeze-thaw correlation drop, the settlement change at adjacent time points is calculated, and the activity of the freeze-thaw interface settlement is obtained by combining the freeze-thaw correlation drop, and an activity distribution sequence is generated. Based on the activity distribution sequence, continuous segments with activity greater than adjacent activity are denoted as freeze-thaw affected segments, and the start and end positions and spatial range of freeze-thaw affected segments are determined. Within the freeze-thaw impact zone, the cumulative values ​​of positive and negative forces within the unit window are extracted based on the earth pressure data from the pressure measuring points and compared. Based on the comparison results, the dominant factors in the freeze-thaw impact zone are determined and an alarm is triggered.

2. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 1, characterized in that, The process of generating a sedimentation sequence is as follows: The settlement values ​​of each displacement measuring point at the current acquisition time are initially sorted according to the order of arrangement from the bridge abutment to the roadbed along the traffic direction to obtain the initial settlement sequence. Traverse the initial sequence of settlement along the direction of travel, and classify the continuous displacement measurement point section where the subsequent settlement is greater than the previous settlement as a Class I section, and the continuous displacement measurement point section where the subsequent settlement is less than the previous settlement as a Class II section. Arrange the displacement measuring points in the first category section in order of settlement from smallest to largest to obtain the first category subsequence; arrange the displacement measuring points in the second category section in order of settlement from largest to smallest to obtain the second category subsequence. All the first-class and second-class subsequences are spliced ​​together in chronological order along the driving direction to generate the settlement sequence in the driving direction at the current acquisition time.

3. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 1, characterized in that, The process of generating the offset sequence is as follows: The longitudinal offset of each displacement measuring point at the current acquisition time is initially sorted according to the arrangement order from the bridge abutment to the roadbed along the driving direction to obtain the initial offset sequence. Extract the offset direction from the initial offset sequence, and group the continuous displacement measurement point segments with the same offset direction into segments with the same direction. The longitudinal offset of each displacement measuring point in each directional segment is arranged in order from the bridge abutment to the roadbed to generate a directional offset subsequence. All directional offset subsequences are concatenated in chronological order along the driving direction to generate the offset sequence of the driving direction at the current acquisition time.

4. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 1, characterized in that, The process of identifying extreme measurement points is as follows: Traverse each offset sequence along the driving direction and select displacement measurement points with longitudinal offset greater than the previous longitudinal offset as initial measurement points; Initially selected measurement points whose longitudinal offset is greater than the next adjacent initial selection measurement point and whose longitudinal offset is positive are denoted as positive extreme value candidate points. Initially selected measurement points whose longitudinal offset is less than the next adjacent initial selection measurement point and whose longitudinal offset is negative are denoted as negative extreme value candidate points. Starting from each positive extreme value candidate point, traverse backward along the driving direction. Take the first displacement measurement point whose longitudinal offset is less than the longitudinal offset of the current positive extreme value candidate point as the positive termination point; take the displacement measurement point section between the positive extreme value candidate point and the positive termination point as the positive uplift section. Starting from each negative extreme value candidate point, traverse backward along the driving direction. Take the first displacement measurement point whose longitudinal offset is greater than the longitudinal offset of the current negative extreme value candidate point as the negative termination point. Take the displacement measurement point section between the negative extreme value candidate point and the negative termination point as the negative concave section. In each positively convex segment, the displacement measuring point with the largest longitudinal offset is taken as the positive extreme value measuring point; in each negatively concave segment, the displacement measuring point with the smallest longitudinal offset is taken as the negative extreme value measuring point.

5. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 1, characterized in that, The process of obtaining the directional drop is as follows: In the settlement sequence at the current acquisition time, the previous and next displacement measurement points along the driving direction are determined based on the spatial location of the extreme value measurement points, and are respectively used as the previous adjacent measurement point and the next adjacent measurement point. Select the target measuring point from the adjacent measuring points after the current point and the adjacent measuring points before the current point, whose offset direction is the same as that of the extreme value measuring point. Subtract the settlement of the target measuring point from the settlement of the extreme measuring point to obtain the settlement difference; When the offset direction of the extreme value measuring point is towards the roadbed, the settlement difference is marked as positive directional drop; when the offset direction of the extreme value measuring point is towards the abutment, the settlement difference is marked as negative directional drop.

6. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 1, characterized in that, The process of obtaining the freeze-thaw correlation drop is as follows: Retrieve the temperature values ​​of each temperature measuring point at each monitoring section at the current acquisition time, and determine the depth location with the largest temperature change gradient based on the temperature values ​​at different depths of the monitoring section, which is used as the location of the freeze-thaw interface. The positions of the freeze-thaw interface of each monitoring section at the current acquisition time are compared with those at the previous acquisition time. When the position of the freeze-thaw interface of a certain monitoring section moves from the frozen soil layer to the thawed soil layer, the time when the position of the freeze-thaw interface begins to move is recorded as the time point when the freeze-thaw interface crosses the corresponding monitoring section. Among all the directional drops at all collection times, the directional drop corresponding to the time point is selected as the freeze-thaw correlation drop.

7. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 6, characterized in that, The process of generating the activity distribution sequence is as follows: Extract the current settlement and the previous settlement of the displacement measuring point corresponding to the freeze-thaw correlation drop from the settlement sequence at the current acquisition time and the previous acquisition time, respectively. Subtracting the previous settlement from the current settlement amount yields the settlement change at adjacent time points; dividing the settlement change by the freeze-thaw correlation drop yields the activity of freeze-thaw interface settlement. Arrange all activity levels in chronological order along the direction of travel to generate an activity distribution sequence at the current data collection time.

8. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 7, characterized in that, The process of determining the start and end points and spatial range of the freeze-thaw affected section is as follows: Traverse each activity distribution sequence along the driving direction, and record the displacement measurement points whose activity is greater than both the previous and the next activity as peak points; record the displacement measurement points whose activity is less than both the previous and the next activity as valley points. Using each peak point as a reference, the system traverses forward along the driving direction to the adjacent previous valley point and backward to the adjacent next valley point. The displacement measurement point section between this peak point and the previous valley point is taken as the front influence half section, and the displacement measurement point section between this peak point and the next valley point is taken as the back influence half section. The front influence half section and the back influence half section are merged into the entire influence section. The longest influence segment is taken as the freeze-thaw influence segment at the current acquisition time. The starting and ending displacement measurement points of the freeze-thaw influence segment are taken as the starting and ending positions of the freeze-thaw influence segment. The spatial range of the freeze-thaw influence segment is the length of the freeze-thaw influence segment.

9. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 8, characterized in that, The process of obtaining the cumulative values ​​of positive and negative directions is as follows: Retrieve the earth pressure values ​​of each pressure measuring point within the freeze-thaw affected section in the time sequence of earth pressure values ​​within a unit window, as well as the initial earth pressure values ​​of each pressure measuring point; Select the earth pressure values ​​in the time series of each earth pressure value that are greater than the corresponding initial earth pressure value, calculate the difference between the selected earth pressure value and the initial earth pressure value, and sum them up to obtain the positive cumulative component of the corresponding pressure measuring point. Select the earth pressure values ​​in the time series of each earth pressure value that are less than the corresponding initial earth pressure value, calculate the absolute value of the difference between the selected earth pressure value and the initial earth pressure value, and sum them up to obtain the negative cumulative component of the corresponding pressure measuring point. The positive cumulative value is obtained by summing all positive cumulative components, and the negative cumulative value is obtained by summing all negative cumulative components.

10. The intelligent monitoring method for settlement of highway bridge transition sections according to claim 9, characterized in that, The process of identifying the dominant factors affecting the freeze-thaw cycle and issuing alarms is as follows: By comparing the magnitudes of positive and negative cumulative values, the dominant factors affecting the freeze-thaw cycle are determined; these dominant factors include subsidence and uplift. Based on the comparison results of the spatial range of the freeze-thaw affected section and the spatial range of the freeze-thaw affected section at the previous data collection time, as well as the dominant factors, alarm information containing the spatial range of the freeze-thaw affected section and the dominant factors is generated and the alarm is executed.

Citation Information

Patent Citations

  • Automatic settlement monitoring method for railroad bed in permafrost region

    CN119309543A

  • Road and bridge transition section settlement detection method based on machine vision and harmonic analysis

    CN119958494A

  • Intelligent monitoring and analyzing system for layered settlement of foundation

    CN114199191A

  • Method and system for measuring thaw collapse of highway subgrade in frozen earth region

    CN120739080A