A method and system for controlling PTA mixing and feeding

By using real-time data calculation and dynamic adjustment, the instability of raw material ratio and characteristic index during PTA mixing was solved, achieving mixing uniformity and precise control, and improving the stability and response speed of the mixing process.

CN122745786BActive Publication Date: 2026-11-17北京优义科技有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202610730217.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-05-26
Publication Date
2026-11-17
Estimated Expiration
2046-05-26

AI Technical Summary

Technical Problem

Traditional methods fail to adjust the raw material ratio and characteristic index in real time during PTA mixing, resulting in uneven mixing and poor control robustness. Furthermore, they cannot sensitively capture drastic fluctuations in a single parameter, affecting subsequent reaction control.

Method used

By acquiring raw material flow rate, temperature, and pressure data in real time, calculating material characteristic index and process disturbance index, dynamically adjusting mixing ratio and stirring speed, and combining preset mapping relationships and correction coefficient library, precise control is achieved.

Benefits of technology

It improves the stability and robustness of the PTA mixing process, ensures mixing uniformity, enhances the ability to capture fluctuations in single parameters, and improves control precision and response speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122745786B_ABST
    Figure CN122745786B_ABST
Patent Text Reader

Abstract

This invention relates to the field of control methods, specifically to a control method and system for PTA mixing and feeding. The method includes: determining an initial mixing ratio based on the real-time flow rates of a first raw material, a second raw material, and a preset mixing baseline ratio; determining a material characteristic index based on the real-time flow rates of the first and second raw materials and a preset raw material characteristic mapping relationship; determining a process disturbance index based on the real-time temperature and pressure of the reactor and the material characteristic index; determining a mixer operating mode based on the current production mode; and determining a feed correction coefficient based on the process disturbance index and the mixer operating mode. This invention obtains the material characteristic index by selecting different mapping paths based on the real-time flow ratio. Since the physicochemical properties of the mixture under different ratios often exhibit non-linear changes, this method can more accurately characterize the material properties corresponding to the current actual ratio.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of control method technology, specifically to a control method and system for PTA mixing and feeding. Background Technology

[0002] Currently, traditional methods typically only set a fixed mixing baseline ratio, without considering changes in the ratio of the two raw material flow rates in real time. When the incoming flow rates of the first or second raw material deviate significantly due to upstream fluctuations, traditional methods cannot compensate in advance, resulting in a serious deviation of the actual proportion entering the mixing chamber from the target. This leads to poor consistency of the mixed material and weak robustness to unstable supply. Furthermore, when obtaining material characteristic indices, traditional methods often use a single linear mapping relationship, ignoring the nonlinear changes in material viscosity, flowability, reactivity, and other characteristics under different ratios. This makes the characteristic indices inaccurate, which in turn affects all subsequent control decisions based on these indices.

[0003] Furthermore, when calculating the process disturbance index, traditional methods often simply add or average the reaction deviation level and the material deviation level. This approach can mask the risk of severe deviations in one dimension: for example, if the reaction temperature is severely exceeded but the material properties are normal, the summed or averaged value may still be at a moderate level, causing the control system to misjudge the degree of disturbance and fail to take strong compensation measures in time. Also, traditional methods usually do not evaluate temperature and pressure separately before taking the highest level, but instead use a comprehensive empirical formula or threshold to determine the level directly. This makes it difficult to sensitively capture scenarios where a single parameter, such as a sharp fluctuation in pressure but a normal temperature, is used, and it is easy to underestimate the actual reaction deviation level. Summary of the Invention

[0004] To achieve the above objectives, the present invention provides the following technical solution: a method for controlling PTA mixing and feeding, comprising: The real-time flow rates of the first raw material and the second raw material, as well as the real-time temperature and pressure of the reactor, are obtained. The preliminary mixing ratio is determined based on the real-time flow rates of the first raw material and the second raw material and a preset mixing reference ratio. The material characteristic index is determined based on the real-time flow rates of the first raw material and the second raw material and a preset raw material characteristic mapping relationship. The process disturbance index is determined based on the real-time temperature and pressure of the reactor and the material property index; the mixer operation mode is determined based on the current production mode; and the feed correction coefficient is determined based on the process disturbance index and the mixer operation mode. The target mixing ratio is determined based on the preliminary mixing ratio and the feed correction coefficient; the feed flow rates of the first and second raw materials into the target mixing chamber are controlled based on the target mixing ratio. After feeding is completed, the expected material level height in the target mixing chamber is determined based on the target mixing ratio, the total feed flow rate of the first and second raw materials, the structural parameters of the target mixing chamber, and the bulk density of the material in the target mixing chamber. The initial speed of the mixing motor is determined based on the expected material level, bulk density, preset target mixing uniformity, and the change in the rotational speed of the mixing blades per unit speed. The mixing motor is started and run at the initial speed to determine the real-time mixing uniformity of the PTA mixed raw materials in the target mixing chamber at the initial speed. The predicted feed concentration of the downstream reactor is determined based on the real-time mixing uniformity; the initial speed of the stirring motor is adjusted based on the predicted feed concentration and the preset concentration threshold to obtain the target speed, and the stirring motor is controlled to operate at the target speed.

[0005] Preferably, the preliminary mixing ratio is determined based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and a preset mixing baseline ratio, including: The real-time flow ratio is determined based on the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material. When the real-time traffic ratio is greater than or equal to the preset traffic ratio threshold, the initial mixing ratio is determined based on the mixing baseline ratio and the first ratio correction coefficient. When the real-time flow ratio is less than the preset flow ratio threshold, the initial mixing ratio is determined based on the mixing baseline ratio and the second ratio correction coefficient.

[0006] Preferably, the material characteristic index is determined based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and a preset raw material characteristic mapping relationship, including: The real-time flow ratio is determined based on the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material. When the real-time flow ratio is greater than or equal to the preset characteristic mapping threshold, the first material characteristic index is obtained by mapping the real-time flow of the first raw material and the real-time flow of the second raw material in the preset raw material characteristic mapping relationship. When the real-time flow ratio is less than the preset characteristic mapping threshold, the real-time flow of the first raw material and the real-time flow of the second raw material are mapped in the preset raw material characteristic mapping relationship to obtain the second material characteristic index.

[0007] Preferably, the process disturbance index is determined based on the real-time temperature of the reactor, the real-time pressure of the reactor, and the material property index, including: The reaction deviation level is determined based on the real-time temperature and pressure of the reactor, as well as the preset reaction parameter threshold range. The material deviation level is determined based on the material characteristic index and the preset material characteristic threshold range; The process disturbance index is determined based on the higher of the reaction deviation level and the material deviation level.

[0008] Preferably, the reaction parameter threshold range includes multiple temperature threshold ranges and multiple pressure threshold ranges; The reaction deviation level is determined based on the reactor's real-time temperature, real-time pressure, and preset reaction parameter threshold ranges, including: The first reaction deviation level is determined based on the reactor's real-time temperature and temperature threshold range; The second reaction deviation level is determined based on the real-time pressure and pressure threshold range of the reactor; The highest of the first and second reaction deviation grades is determined as the reaction deviation grade.

[0009] Preferably, the mixer operating mode is determined based on the current production mode, and the feed correction coefficient is determined based on the process disturbance index and the mixer operating mode, including: Obtain the current production mode and determine the corresponding mixer operation mode based on the current production mode; The feed correction coefficient is obtained by matching the process disturbance index and the mixer operating mode in a preset correction coefficient library. The construction of the correction coefficient library includes: Acquire test data of the test equipment under different process disturbance indices, different mixer operating modes, and different feed correction coefficients; Based on the test data, determine the target process disturbance index and the optimal feed correction coefficient under the target mixer operating mode, and use the target process disturbance index and the target mixer operating mode as keys and the optimal feed correction coefficient as values ​​to generate correction coefficient key-value pairs. Construct a correction coefficient library based on correction coefficient key-value pairs.

[0010] Preferably, the target mixing ratio is determined based on the preliminary mixing ratio and the feed correction factor, including: The first raw material correction weight and the second raw material correction weight are determined based on the feed correction coefficient. The initial mixing ratio is weighted and adjusted based on the first raw material adjustment weight and the second raw material adjustment weight to obtain the target mixing ratio.

[0011] Preferably, controlling the feed flow rates of the first and second raw materials into the target mixing chamber according to the target mixing ratio includes: Obtain the preset valve opening mapping table; The target opening of the first raw material regulating valve and the target opening of the second raw material regulating valve are obtained by querying the valve opening mapping table based on the target mixing ratio and total feed flow rate. The target opening degree of the first raw material regulating valve and the target opening degree of the second raw material regulating valve are respectively input into the corresponding regulating valves, so that the regulating valves control the feed flow rate into the target mixing chamber.

[0012] Preferably, determining the predicted feed concentration for the downstream reactor based on real-time mixing uniformity includes: Determine the real-time time point corresponding to the real-time mixing uniformity; Determine the transfer time between warehouses and vessels, and then determine the predicted time point based on the real-time time point and the transfer time between warehouses and vessels. The real-time predicted concentration at a given time point is determined based on the real-time mixing uniformity and the preset concentration mapping relationship. The real-time predicted concentration is used as the predicted feed concentration of the downstream reactor at the predicted time point; Determining the transfer time between warehouses includes: The vertical transmission distance between the target discharge port of the target mixing bin and the radar level gauge is determined by the radar level gauge. Determine the length of the PTA delivery pipeline between the target mixing chamber and the downstream reactor, as well as the corresponding delivery speed of the PTA delivery pipeline; The first time interval is determined based on the transmission distance and the initial rotation speed, and the second time interval is determined based on the pipeline length and the conveying speed. The transfer time between the silos and the vessels is determined based on the first time interval and the second time interval.

[0013] A control system for PTA mixing and feeding, applicable to the aforementioned control method for PTA mixing and feeding, includes: The data acquisition unit is used to acquire the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the real-time temperature and pressure of the reactor; determine the preliminary mixing ratio based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the preset mixing reference ratio; and determine the material characteristic index based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the preset raw material characteristic mapping relationship. The feed correction unit is used to determine the process disturbance index based on the real-time temperature and pressure of the reactor and the material characteristic index; determine the mixer operation mode based on the current production mode; and determine the feed correction coefficient based on the process disturbance index and the mixer operation mode. The feed ratio unit is used to determine the target mixing ratio based on the preliminary mixing ratio and the feed correction coefficient; and to control the feed flow rate of the first raw material and the second raw material into the target mixing chamber based on the target mixing ratio. The material level determination unit is used to determine the expected material level height in the target mixing chamber after the feeding is completed, based on the target mixing ratio, the total feeding flow rate of the first raw material and the second raw material, the structural parameters of the target mixing chamber, and the bulk density of the material in the target mixing chamber. The raw material mixing unit is used to determine the initial speed of the mixing motor based on the expected material level, bulk density, preset target mixing uniformity, and the change in the rotational speed of the mixing blades per unit speed; the mixing motor is started to run at the initial speed to determine the real-time mixing uniformity of the PTA mixed raw materials in the target mixing chamber at the initial speed; The speed adjustment unit is used to determine the predicted feed concentration of the downstream reactor based on the real-time mixing uniformity; adjust the initial speed of the stirring motor according to the predicted feed concentration and the preset concentration threshold to obtain the target speed, and control the operation of the stirring motor at the target speed.

[0014] Compared with the prior art, the beneficial effects of the present invention are: (1) This invention determines the initial mixing ratio by selecting different correction coefficients through real-time flow ratio; when there is a large deviation in the actual incoming flow of the two raw materials, targeted compensation can be made in advance to avoid the mixing ratio imbalance caused by the fluctuation of one-sided feeding, thereby enhancing the robustness of unstable feeding; and by selecting different mapping paths through real-time flow ratio to obtain material characteristic index, since the physicochemical properties of the mixture under different ratios often change nonlinearly, it can more accurately characterize the material characteristics corresponding to the current real ratio, providing a more reliable basis for subsequent disturbance assessment; (2) This invention determines the process disturbance index by comparing the higher of the reaction deviation level and the material deviation level, thus grasping the main contradiction and ensuring that any serious abnormality in any aspect can be identified in a timely manner and reflected in the disturbance index, avoiding the problem that averaging may cover up key risks; and by evaluating temperature abnormalities and pressure abnormalities independently, it can more sensitively capture the drastic fluctuations of a single parameter, preventing the overall level from being underestimated when one parameter is normal and another parameter is seriously out of control. (3) By solidifying and storing the optimal parameters obtained from offline testing, the present invention eliminates the need for repeated testing during subsequent production. The optimal feed correction coefficient can be quickly obtained directly based on the current process disturbance index and mixer operating mode, thereby improving the response speed and control accuracy. Attached Figure Description

[0015] Figure 1 This is a schematic flowchart of the overall method in one embodiment of the present invention; Figure 2 This is a schematic diagram of the overall system architecture in one embodiment of the present invention.

[0016] In the diagram: 1. Data acquisition unit; 2. Feed correction unit; 3. Feed ratio unit; 4. Material level determination unit; 5. Raw material mixing unit; 6. Rotation speed adjustment unit. Detailed Implementation

[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0018] Example 1, please refer to Figure 1 This invention provides a technical solution: a method for controlling PTA mixing and feeding, comprising: S1. Obtain the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the real-time temperature and pressure of the reactor; determine the preliminary mixing ratio based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the preset mixing reference ratio; determine the material characteristic index based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the preset raw material characteristic mapping relationship. S2. Determine the process disturbance index based on the real-time temperature and pressure of the reactor and the material characteristic index; determine the mixer operation mode based on the current production mode; and determine the feed correction coefficient based on the process disturbance index and the mixer operation mode. S3. Determine the target mixing ratio based on the preliminary mixing ratio and the feed correction coefficient; control the feed flow rate of the first and second raw materials into the target mixing chamber based on the target mixing ratio; S4. After feeding is completed, determine the expected material level height in the target mixing chamber based on the target mixing ratio, the total feed flow rate of the first and second raw materials, the structural parameters of the target mixing chamber, and the bulk density of the material in the target mixing chamber. S5. Determine the initial speed of the mixing motor based on the expected material level, bulk density, preset target mixing uniformity, and the change in the rotational speed of the mixing blades per unit speed; start the mixing motor and run it at the initial speed to determine the real-time mixing uniformity of the PTA mixed raw materials in the target mixing chamber at the initial speed. S6. Determine the predicted feed concentration of the downstream reactor based on the real-time mixing uniformity; adjust the initial speed of the stirring motor based on the predicted feed concentration and the preset concentration threshold to obtain the target speed, and control the operation of the stirring motor with the target speed.

[0019] It should be noted that four key data points are collected in real time: the instantaneous flow rate of the first raw material, the instantaneous flow rate of the second raw material, the current temperature of the reactor, and the current pressure of the reactor; these data are the basis for all subsequent calculations and controls. Once the flow data is available, two calculations need to be performed. The first is to obtain a preliminary mixing ratio based on the real-time flow of the first and second raw materials and a pre-set mixing baseline ratio. This baseline ratio can be understood as the target ratio under ideal conditions. The second is to calculate a material characteristic index based on the real-time flow rates of the two raw materials and the pre-established mapping relationship of raw material characteristics. This index reflects the properties of the raw materials themselves, such as viscosity, particle size or chemical activity, which will affect the mixing effect and subsequent reactions. By incorporating the real-time temperature and pressure of the reactor and combining it with the material property index obtained earlier, a process disturbance index is calculated. This index is used to measure the extent to which the current production environment deviates from the ideal state. For example, temperature fluctuations, pressure changes, or abnormal raw material properties can all lead to increased disturbance. The current production mode, such as continuous or batch production, high or low load, determines the mixer's operating mode; the mixer's operating mode affects the mixing intensity or mixing time; next, the process disturbance index and the mixer's operating mode are used together to determine a feed correction coefficient; if the disturbance is large or the mixing mode is aggressive, the correction coefficient will be adjusted to compensate for possible deviations; With the feed correction factor, apply it to the initial mixing ratio to obtain the final target mixing ratio; this ratio is the basis for actual feed control; according to the target mixing ratio, adjust the feed flow rate of the first raw material and the second raw material into the target mixing chamber respectively to ensure the accurate material ratio entering the mixing chamber; After all raw materials are fed into the mixing silo, the height of the material inside the silo needs to be estimated. The estimated material level is calculated based on the target mixing ratio, the total feed flow rate of the two raw materials, the geometry of the mixing silo, and the bulk density of the material inside the silo. Bulk density refers to the mass of loose material per unit volume, which determines the volume occupied by the same mass of material. With the expected material level, bulk density, target mixing uniformity, and the change in rotational speed of the mixing blades per unit rotational speed, the initial rotational speed of the mixing motor can be calculated. The target mixing uniformity is the mixing effect index required by the process, and the change in rotational speed reflects the mechanical characteristics of the mixing blades. Combining these parameters, an initial mixing speed can be determined. The stirring motor is started and runs at this initial speed, while the actual mixing uniformity of the PTA raw materials in the mixing chamber is monitored in real time; the mixing uniformity is usually obtained through sampling analysis or online sensors; For example: Suppose a chemical plant produces PTA mixed feedstock; the first feedstock is purified terephthalic acid powder, and the second feedstock is isophthalic acid powder; the target mixing ratio is 3:1, that is, 3 parts of the first feedstock are mixed with 1 part of the second feedstock; the total feed flow rate is 2400 kg; the target mixing silo is cylindrical with a flat bottom, an inner diameter of 2 meters, and a straight section height of 3 meters; the measured bulk density of the material is 0.8 tons per cubic meter, that is, 800 kg per cubic meter; After feeding, the total mass of the material in the silo is 2400 kg; the bulk density is 800 kg / m³, so the material volume is 2400 divided by 800 = 3 m³; the bottom area of ​​the cylindrical silo is the square of a radius of 1 m multiplied by 3.14 = 3.14 square meters; the expected material level height is the volume divided by the bottom area = 3 divided by 3.14 ≈ 0.96 meters; therefore, the expected material level height is approximately 0.96 meters. The preset target mixing uniformity is 98%, which means that the spatial distribution deviation of the two components in the material is required to be within 2%. The change value of the stirring blade speed per unit speed is defined as the rate of increase in mixing uniformity for every 1 revolution per minute. This equipment is calibrated to 0.2% per revolution per minute. At the same time, the material level affects the mixing difficulty, and higher material levels require higher speeds. Empirical coefficient setting: When the base rotation speed is 20 revolutions per minute, 98% uniformity can be achieved when the hopper is empty or the material level is low; however, the current material level is 0.96 meters, so additional compensation is required; the compensation value is calculated based on the bulk density and material level height. In this case, 2 revolutions per minute are required for every 0.1 meter of material level height; 0.96 meters requires approximately 19.2 revolutions per minute; therefore, the initial rotation speed = 20 + 19.2 ≈ 39.2 revolutions per minute, rounded to 39 revolutions per minute. The stirring motor was started and ran at 39 revolutions per minute. After running for 5 minutes, the concentration distribution of the two components in the material was detected in real time by a near-infrared spectral probe installed on the wall of the mixing chamber. The real-time mixing uniformity was calculated to be 95%. Since it did not reach the preset 98%, it means that the current speed is not enough to mix the materials thoroughly. This leads to the following steps: predict the feed concentration of the downstream reactor based on the 95% real-time mixing uniformity, compare it with the concentration threshold, and then adjust the rotation speed; finally, based on the actual deviation, gradually increase the rotation speed to, for example, 45 revolutions per minute, until the real-time mixing uniformity reaches more than 98%; After obtaining the real-time mixing uniformity, the predicted feed concentration of the downstream reactor is calculated, because the concentration of the material entering the reactor directly determines the reaction rate and product quality. Then, this predicted concentration is compared with the preset concentration threshold. If the predicted concentration is too high or too low, it means that the current stirring speed may not be sufficient to mix the material fully, or that over-mixing has caused stratification. Based on this, the initial stirring speed is finely adjusted to finally obtain the target stirring speed, and the stirring motor is controlled to run continuously with this target stirring speed to ensure the mixing quality and the stability of the subsequent reaction.

[0020] In an optional embodiment, determining the preliminary mixing ratio based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and a preset mixing reference ratio includes: The real-time flow ratio is determined based on the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material. When the real-time traffic ratio is greater than or equal to the preset traffic ratio threshold, the initial mixing ratio is determined based on the mixing baseline ratio and the first ratio correction coefficient. When the real-time flow ratio is less than the preset flow ratio threshold, the initial mixing ratio is determined based on the mixing baseline ratio and the second ratio correction coefficient.

[0021] It should be noted that the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material is called the real-time flow ratio. It reflects the actual quantitative comparison between the two raw materials currently entering the mixing chamber. For example, if the flow rate of the first raw material is 60 kg per minute and the flow rate of the second raw material is 30 kg per minute, then the real-time flow ratio is 2 to 1. The flow ratio threshold is the dividing line for judging whether the raw material supply is balanced. When the real-time flow ratio is greater than or equal to this threshold, it means that the flow of the first raw material is too high relative to the second raw material, that is, the first raw material is too much or the second raw material is too little. At this time, the first proportion correction coefficient is used to adjust the mixing baseline ratio. The first proportion correction coefficient is usually a parameter used to reduce the proportion of the first raw material or increase the proportion of the second raw material, so as to obtain a corrected preliminary mixing ratio to balance the actual flow deviation. Conversely, if the real-time flow ratio is less than the preset flow ratio threshold, it means that the flow of the first raw material is too low relative to the second raw material, i.e., the first raw material is too little or the second raw material is too much. In this case, the second proportion correction coefficient is used. The second proportion correction coefficient is generally the opposite of the first correction coefficient and is used to appropriately increase the proportion of the first raw material or decrease the proportion of the second raw material to obtain another preliminary mixing ratio. Therefore, before officially controlling the feed according to the target mixing ratio, a pre-adjustment is made based on the actual flow ratio of the incoming material in real time; if the incoming material itself has deviated from the ideal relative ratio, the preliminary mixing ratio is also compensated accordingly, so that the target mixing ratio calculated later is more accurate and control fluctuations are reduced.

[0022] In an optional embodiment, determining the material characteristic index based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and a preset raw material characteristic mapping relationship includes: The real-time flow ratio is determined based on the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material. When the real-time flow ratio is greater than or equal to the preset characteristic mapping threshold, the first material characteristic index is obtained by mapping the real-time flow of the first raw material and the real-time flow of the second raw material in the preset raw material characteristic mapping relationship. When the real-time flow ratio is less than the preset characteristic mapping threshold, the real-time flow of the first raw material and the real-time flow of the second raw material are mapped in the preset raw material characteristic mapping relationship to obtain the second material characteristic index.

[0023] It should be noted that the characteristic mapping threshold is a reference point used to determine the current flow ratio range. When the real-time flow ratio is greater than or equal to this threshold, it indicates that the first raw material is relatively sufficient and the second raw material is relatively insufficient. At this time, based on the real-time flow values ​​of the first and second raw materials, a query or calculation is performed in the pre-established raw material characteristic mapping relationship. The result is called the first material characteristic index. This index represents the comprehensive characteristics of the mixture when the current flow ratio is high, such as the fluidity, reactivity, or thermal stability of the mixture. Conversely, if the real-time flow ratio is less than this preset characteristic mapping threshold, it means that the first raw material is relatively insufficient and the second raw material is relatively sufficient. Then, using the same raw material characteristic mapping relationship, but inputting the same real-time flow value, the mapped result is the second material characteristic index. In other words, the same mapping table or mapping function may output different index values ​​due to different triggering conditions. This is because the raw material characteristic mapping relationship may be a non-linear relationship or a piecewise function containing multiple regions; when the flow ratio exceeds a certain critical value, the dominant characteristics of the material will change, so it is necessary to output the first or second index respectively to accurately describe the actual characteristics of the current material.

[0024] In an optional embodiment, the process disturbance index is determined based on the real-time temperature of the reactor, the real-time pressure of the reactor, and the material property index, including: The reaction deviation level is determined based on the real-time temperature and pressure of the reactor, as well as the preset reaction parameter threshold range. The material deviation level is determined based on the material characteristic index and the preset material characteristic threshold range; The process disturbance index is determined based on the higher of the reaction deviation level and the material deviation level.

[0025] It should be noted that the real-time temperature and pressure of the reactor are obtained and compared with the preset reaction parameter threshold range; this threshold range usually includes multiple intervals, such as normal range, slightly deviated range, moderately deviated range, and severely deviated range. Based on the current temperature and pressure range, a reaction deviation level is determined; for example, a normal temperature but high pressure may correspond to a slight deviation; both being significantly exceeded corresponds to a severe deviation; the level can be expressed as a number, such as level 0 normal, level 1 slight, level 2 moderate, and level 3 severe. Based on the previously calculated material characteristic index, compare it with the preset material characteristic threshold range. The material characteristic index itself is a numerical value that reflects the viscosity, activity, and other properties of the raw material. This threshold range is also divided into multiple intervals to determine whether the material characteristics deviate from the ideal state. Based on the interval in which the material characteristic index is located, a material deviation level is determined. For example, if the material characteristic index is within the ideal range, the level is 0, a slight deviation is 1, and a severe deviation is 2. Compare the reaction deviation level and the material deviation level, and select the higher level as the process disturbance index. The disturbance index represents the largest source of deviation that needs to be monitored in the production process. If the reaction conditions deviate significantly, the process disturbance index will be high even if the material is normal. Conversely, if the material characteristics deviate significantly, the disturbance index will also be high even if the reaction conditions are normal. The purpose of this is to allow the control system to prioritize the most serious abnormal situation and ensure that the subsequent feed correction coefficient can fully compensate for the largest disturbance factor.

[0026] In one alternative embodiment, the reaction parameter threshold range includes multiple temperature threshold ranges and multiple pressure threshold ranges; The reaction deviation level is determined based on the reactor's real-time temperature, real-time pressure, and preset reaction parameter threshold ranges, including: The first reaction deviation level is determined based on the reactor's real-time temperature and temperature threshold range; The second reaction deviation level is determined based on the real-time pressure and pressure threshold range of the reactor; The highest of the first and second reaction deviation grades is determined as the reaction deviation grade.

[0027] It should be noted that, based on the real-time temperature of the reactor and compared with the preset temperature threshold range, a deviation level is determined separately, which is called the first reaction deviation level. The temperature threshold range is usually divided into several intervals, such as the normal temperature range, the slightly high or low temperature range, the moderate deviation range, and the severe deviation range. The real-time temperature falls into whichever interval it falls into, which level it corresponds to. Based on the real-time pressure of the reactor, and in comparison with the preset pressure threshold range, the second reaction deviation level is calculated separately; the pressure threshold range is also divided into multiple intervals, from normal to severe deviation, and the corresponding level is assigned to the interval in which the real-time pressure falls. The higher of the first and second reaction deviation grades is taken as the final reaction deviation grade. For example, if temperature causes a slight deviation (grade 1) and pressure causes a moderate deviation (grade 2), then the reaction deviation grade is 2. If the temperature deviation is severe and reaches grade 3, while the pressure is normally 0, then the reaction deviation grade is 3. The goal is to enable the reaction deviation level to sensitively detect any significant deviations in temperature or pressure. If either condition worsens, the overall reaction deviation level will increase accordingly, thus ensuring that severe anomalies in a single parameter are not missed when calculating the perturbation index in the subsequent process.

[0028] In an optional embodiment, the mixer operating mode is determined based on the current production mode, and the feed correction coefficient is determined based on the process disturbance index and the mixer operating mode, including: Obtain the current production mode and determine the corresponding mixer operation mode based on the current production mode; The feed correction coefficient is obtained by matching the process disturbance index and the mixer operating mode in a preset correction coefficient library. The construction of the correction coefficient library includes: Acquire test data of the test equipment under different process disturbance indices, different mixer operating modes, and different feed correction coefficients; Based on the test data, determine the target process disturbance index and the optimal feed correction coefficient under the target mixer operating mode, and use the target process disturbance index and the target mixer operating mode as keys and the optimal feed correction coefficient as values ​​to generate correction coefficient key-value pairs. Construct a correction coefficient library based on correction coefficient key-value pairs.

[0029] It should be noted that the current production mode is obtained, such as continuous production, batch production, or high-load production; based on this production mode, the corresponding mixer operation mode is determined, such as high-speed mixing, low-speed energy saving, or pulse mixing; different production modes require different mixer operation modes to ensure mixing effect and efficiency. Using the previously calculated process disturbance index and the mixer operating mode as two key conditions, a matching query is performed in the pre-built correction coefficient library; after finding a match, the required feed correction coefficient is obtained. The process of building the correction coefficient library requires acquiring data generated by the test equipment. The test equipment will operate under various process disturbance indices and various mixer operating modes, and will try multiple different feed correction coefficients, recording the test results data for each combination, such as mixing uniformity, energy consumption, or downstream reaction effect. Based on these test data, the following analysis is conducted: for a specific target process disturbance index and a specific target mixer operating mode, the feed correction coefficient that optimizes the overall effect is identified, which is called the optimal feed correction coefficient. The target process disturbance index and the target mixer operating mode are combined as a key, and the corresponding optimal feed correction coefficient is used as the value to form a key-value pair. Key-value pairs are a data storage method in which the key uniquely corresponds to a value, which facilitates fast lookup. By collecting all the key-value pairs obtained from the tests, a complete correction coefficient library is constructed. During actual production operation, the optimal feed correction coefficient can be quickly obtained by simply using the current process disturbance index and mixer operating mode as keys to search the library, without the need for repeated testing.

[0030] In an optional embodiment, determining the target mixing ratio based on the initial mixing ratio and the feed correction factor includes: The first raw material correction weight and the second raw material correction weight are determined based on the feed correction coefficient. The initial mixing ratio is weighted and adjusted based on the first raw material adjustment weight and the second raw material adjustment weight to obtain the target mixing ratio.

[0031] It should be noted that the feed correction coefficient is a comprehensive correction factor that reflects the impact of process disturbances and mixer operating mode on the mixing ratio. Since the mixing ratio involves two raw materials, this single coefficient needs to be decomposed into two weight values ​​corresponding to the first raw material and the second raw material, namely the first raw material correction weight and the second raw material correction weight. For example, if the feed correction coefficient is greater than 1, it means that the relative proportion of the first raw material needs to be increased and the proportion of the second raw material needs to be decreased. In this case, the correction weight of the first raw material will be greater than that of the second raw material. Conversely, if the coefficient is less than 1, the correction weight of the first raw material will be smaller and the correction weight of the second raw material will be larger. A common practice is to set a benchmark allocation rule: the feed correction coefficient is equal to the ratio of the correction weight of the first raw material to the correction weight of the second raw material, and the sum of the two weights is fixed at 2 or 1. In this way, knowing the coefficient can uniquely determine the two weights. After obtaining these two weights, the initial mixing ratio is adjusted using a weighted average. The initial mixing ratio is a ratio, such as the initial mass ratio of the first raw material to the second raw material being 3:1. The weighted average adjustment means multiplying the weight of the first raw material by the proportion of the first raw material in the initial mixing ratio, multiplying the weight of the second raw material by the proportion of the second raw material, and then recalculating the ratio between the two. Alternatively, the initial mixing ratio is treated as a baseline, and the numerator and denominator are scaled using the two weights respectively to obtain a new target mixing ratio. The target mixing ratio obtained by weighted correction is used to control the flow rate of the two raw materials actually entering the mixing chamber, so that the mixed material can better adapt to the current disturbance conditions and mixer operation mode, and ensure the stability of downstream production.

[0032] In an optional embodiment, controlling the feed flow rates of the first and second raw materials into the target mixing chamber according to the target mixing ratio includes: Obtain the preset valve opening mapping table; The target opening of the first raw material regulating valve and the target opening of the second raw material regulating valve are obtained by querying the valve opening mapping table based on the target mixing ratio and total feed flow rate. The target opening degree of the first raw material regulating valve and the target opening degree of the second raw material regulating valve are respectively input into the corresponding regulating valves, so that the regulating valves control the feed flow rate into the target mixing chamber.

[0033] It should be noted that the valve opening mapping table is obtained through a large number of experiments or equipment calibrations. It records how much the first raw material regulating valve and the second raw material regulating valve should be opened under different target mixing ratios and different total feed flow requirements. The opening degree in the table is usually expressed as a percentage, such as 30% or 80%. Once the target mixing ratio and total feed flow rate are determined, they are used as query conditions to find the corresponding values ​​in the valve opening mapping table. The target mixing ratio reflects the required ratio of the two raw materials, and the total feed flow rate reflects the total amount of material that needs to enter the mixing chamber per unit time. By combining the two, the target opening degree of each regulating valve can be uniquely determined. For example, if the target mixing ratio requires more of the first raw material and less of the second raw material, and the total flow rate is large, then the target opening degree of the regulating valve for the first raw material will be larger, and the target opening degree of the regulating valve for the second raw material will be smaller. The query results in two specific opening values: the target opening of the first raw material regulating valve and the target opening of the second raw material regulating valve. These values ​​are then used as instructions and output to the regulating valves installed on the first raw material feed pipeline and the second raw material feed pipeline, respectively. After receiving the target opening degree, the regulating valve will automatically adjust the position of the valve core so that the valve opening area reaches the size required by the instruction. The opening area determines the flow rate of raw materials through the valve. The regulating valve usually has an electric or pneumatic actuator inside, which can accurately position the specified opening degree. In this way, the first raw material and the second raw material enter the target mixing chamber at their respective required flow rates, thereby realizing the feeding control according to the target mixing ratio.

[0034] In an optional embodiment, determining the predicted feed concentration for the downstream reactor based on real-time mixing uniformity includes: Determine the real-time time point corresponding to the real-time mixing uniformity; Determine the transfer time between warehouses and vessels, and then determine the predicted time point based on the real-time time point and the transfer time between warehouses and vessels. The real-time predicted concentration at a given time point is determined based on the real-time mixing uniformity and the preset concentration mapping relationship. The real-time predicted concentration is used as the predicted feed concentration of the downstream reactor at the predicted time point; Determining the transfer time between warehouses includes: The vertical transmission distance between the target discharge port of the target mixing bin and the radar level gauge is determined by the radar level gauge. Determine the length of the PTA delivery pipeline between the target mixing chamber and the downstream reactor, as well as the corresponding delivery speed of the PTA delivery pipeline; The first time interval is determined based on the transmission distance and the initial rotation speed, and the second time interval is determined based on the pipeline length and the conveying speed. The transfer time between the silos and the vessels is determined based on the first time interval and the second time interval.

[0035] It should be noted that the precise moment at which the real-time mixing uniformity is measured is called the real-time time point; for example, at 10:30:15 AM, the mixing uniformity is detected to be 95%. We need to know the total time required for the material to travel from a certain location in the mixing bin, through the discharge port and conveying pipeline, to the inlet of the downstream reactor. This time is called the inter-bin / reactor transfer time. After obtaining this transfer time, we add the transfer time to the real-time time point to get a future time point, which is called the predicted time point. For example, if the transfer time is 30 seconds, then the predicted time point is 10:30:45 AM. Based on the currently measured real-time mixing uniformity, combined with a pre-established concentration mapping relationship, the real-time predicted concentration of the material at that real-time point in time is calculated. The concentration mapping relationship is usually calibrated experimentally, and it can convert the mixing uniformity value into the corresponding material concentration value, for example, a uniformity of 95% corresponds to a concentration of 98.5%. This real-time predicted concentration is directly used as the feed concentration that the downstream reactor will receive at the predicted time point. In this way, even though the reactor has not yet actually received this batch of material, the control system already knows the future feed concentration in advance and can adjust the reactor's temperature, pressure and other parameters in advance to achieve feedforward control. The inter-warehouse transfer time consists of two time intervals. Radar level gauges are typically installed at the top of the mixing silo, measuring the distance from the material surface to the radar vertically downwards. The transmission distance mentioned here refers to the fixed vertical distance between the target discharge port and the radar level gauge, which can be understood as the total height from the radar installation position to the discharge port. This value is a constant determined after the equipment is installed. The pipeline length is a known design parameter, and the conveying speed depends on the conveying method, such as the wind speed in pneumatic conveying or the belt speed in mechanical conveying. The first time interval reflects the time required for the material to descend from the current level surface to the outlet in the mixing chamber; the transmission distance is a fixed height, but the actual material descent speed is related to the stirring speed: the faster the speed, the faster the material is pushed towards the outlet; therefore, the residence time of the material in the chamber can be calculated by dividing the transmission distance by a coefficient proportional to the speed, or more directly, by combining the distance and speed using an empirical formula. The second time interval is determined based on the pipeline length and the conveying speed; the pipeline length is divided by the conveying speed to obtain the time required for the material to travel from the mixing chamber outlet to the reactor inlet within the pipeline. Adding the first time interval to the second time interval yields the complete transfer time between the bins and the reactor. This total time includes the time for materials to fall or be discharged from the bins and the time for pipeline transport, and is used to align the current detection results of the mixing bins with the future feeding time of the reactor.

[0036] Example 2, please refer to Figure 2 This invention provides a technical solution: a control system for PTA mixing and feeding, applicable to the aforementioned control method for PTA mixing and feeding, comprising: Data acquisition unit 1 is used to acquire the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the real-time temperature and pressure of the reactor; determine the preliminary mixing ratio based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material and the preset mixing reference ratio; and determine the material characteristic index based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material and the preset raw material characteristic mapping relationship. Feed correction unit 2 is used to determine the process disturbance index based on the real-time temperature and pressure of the reactor and the material characteristic index; determine the mixer operation mode based on the current production mode; and determine the feed correction coefficient based on the process disturbance index and the mixer operation mode. Feed ratio unit 3 is used to determine the target mixing ratio based on the preliminary mixing ratio and the feed correction coefficient; and to control the feed flow rate of the first raw material and the second raw material into the target mixing chamber based on the target mixing ratio. The material level determination unit 4 is used to determine the expected material level height in the target mixing chamber after the feeding is completed, based on the target mixing ratio, the total feeding flow rate of the first raw material and the second raw material, the chamber structure parameters of the target mixing chamber and the bulk density of the material in the target mixing chamber. The raw material mixing unit 5 is used to determine the initial speed of the mixing motor based on the expected material level, bulk density, preset target mixing uniformity, and the change value of the mixing blade speed per unit speed; start the mixing motor to run at the initial speed, and determine the real-time mixing uniformity of the PTA mixed raw materials in the target mixing chamber at the initial speed. The speed adjustment unit 6 is used to determine the predicted feed concentration of the downstream reactor based on the real-time mixing uniformity; adjust the initial speed of the stirring motor according to the predicted feed concentration and the preset concentration threshold to obtain the target speed, and control the operation of the stirring motor at the target speed.

[0037] The embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited thereto. Various changes can be made within the scope of knowledge possessed by those skilled in the art without departing from the spirit of the present invention.

Claims

1. A method for controlling the mixing and feeding of PTA, characterized in that, include: The real-time flow rates of the first raw material and the second raw material, as well as the real-time temperature and pressure of the reactor, are obtained. The preliminary mixing ratio is determined based on the real-time flow rates of the first raw material and the second raw material and a preset mixing reference ratio. The material characteristic index is determined based on the real-time flow rates of the first raw material and the second raw material and a preset raw material characteristic mapping relationship. The process disturbance index is determined based on the real-time temperature and pressure of the reactor, as well as the material property index. The mixer operation mode is determined based on the current production mode, and the feed correction coefficient is determined based on the process disturbance index and the mixer operation mode. The target mixing ratio is determined based on the preliminary mixing ratio and the feed correction factor; The feed flow rates of the first and second raw materials into the target mixing chamber are controlled according to the target mixing ratio; After feeding is completed, the expected material level height in the target mixing chamber is determined based on the target mixing ratio, the total feed flow rate of the first and second raw materials, the structural parameters of the target mixing chamber, and the bulk density of the material in the target mixing chamber. The initial speed of the mixing motor is determined based on the expected material level, bulk density, preset target mixing uniformity, and the change in the rotational speed of the mixing blades per unit speed. The mixing motor is started and run at the initial speed to determine the real-time mixing uniformity of the PTA mixed raw materials in the target mixing chamber at the initial speed. The predicted feed concentration of the downstream reactor is determined based on the real-time mixing uniformity; the initial speed of the stirring motor is adjusted based on the predicted feed concentration and the preset concentration threshold to obtain the target speed, and the stirring motor is controlled to operate at the target speed. The preliminary mixing ratio is determined based on the real-time flow rates of the first raw material, the second raw material, and a preset mixing baseline ratio, including: The real-time flow ratio is determined based on the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material. When the real-time traffic ratio is greater than or equal to the preset traffic ratio threshold, the initial mixing ratio is determined based on the mixing baseline ratio and the first ratio correction coefficient. When the real-time flow ratio is less than the preset flow ratio threshold, the initial mixing ratio is determined based on the mixing baseline ratio and the second ratio correction coefficient. The material characteristic index is determined based on the real-time flow rates of the first raw material, the second raw material, and a preset raw material characteristic mapping relationship, including: The real-time flow ratio is determined based on the ratio of the real-time flow rate of the first raw material to the real-time flow rate of the second raw material. When the real-time flow ratio is greater than or equal to the preset characteristic mapping threshold, the first material characteristic index is obtained by mapping the real-time flow of the first raw material and the real-time flow of the second raw material in the preset raw material characteristic mapping relationship. When the real-time flow ratio is less than the preset characteristic mapping threshold, the real-time flow of the first raw material and the real-time flow of the second raw material are mapped in the preset raw material characteristic mapping relationship to obtain the second material characteristic index. The process disturbance index is determined based on the real-time temperature and pressure of the reactor, as well as the material property index, including: The reaction deviation level is determined based on the real-time temperature and pressure of the reactor, as well as the preset reaction parameter threshold range. The material deviation level is determined based on the material characteristic index and the preset material characteristic threshold range; The process disturbance index is determined based on the higher of the reaction deviation level and the material deviation level.

2. The method for controlling PTA mixing and feeding according to claim 1, characterized in that, The reaction parameter threshold range includes multiple temperature threshold ranges and multiple pressure threshold ranges; The reaction deviation is determined based on the reactor's real-time temperature, real-time pressure, and preset reaction parameter threshold ranges. Levels include: The first reaction deviation level is determined based on the reactor's real-time temperature and temperature threshold range; The second reaction deviation level is determined based on the real-time pressure and pressure threshold range of the reactor; The highest of the first and second reaction deviation grades is determined as the reaction deviation grade.

3. The method for controlling PTA mixing and feeding according to claim 2, characterized in that, The mixer operating mode is determined based on the current production mode, and the feed correction coefficient is determined based on the process disturbance index and the mixer operating mode, including: Obtain the current production mode and determine the corresponding mixer operation mode based on the current production mode; The feed correction coefficient is obtained by matching the process disturbance index and the mixer operating mode in a preset correction coefficient library. The construction of the correction coefficient library includes: Acquire test data of the test equipment under different process disturbance indices, different mixer operating modes, and different feed correction coefficients; Based on the test data, determine the target process disturbance index and the optimal feed correction coefficient under the target mixer operating mode, and use the target process disturbance index and the target mixer operating mode as keys and the optimal feed correction coefficient as values ​​to generate correction coefficient key-value pairs. Construct a correction coefficient library based on correction coefficient key-value pairs.

4. The method for controlling PTA mixing and feeding according to claim 3, characterized in that, The target mixing ratio is determined based on the preliminary mixing ratio and the feed correction factor, including: The first raw material correction weight and the second raw material correction weight are determined based on the feed correction coefficient. The initial mixing ratio is weighted and adjusted based on the first raw material adjustment weight and the second raw material adjustment weight to obtain the target mixing ratio.

5. The method for controlling PTA mixing and feeding according to claim 4, characterized in that, The feed flow rates of the first and second raw materials into the target mixing chamber are controlled according to the target mixing ratio, including: Obtain the preset valve opening mapping table; The target opening of the first raw material regulating valve and the target opening of the second raw material regulating valve are obtained by querying the valve opening mapping table based on the target mixing ratio and total feed flow rate. The target opening degree of the first raw material regulating valve and the target opening degree of the second raw material regulating valve are respectively input into the corresponding regulating valves, so that the regulating valves control the feed flow rate into the target mixing chamber.

6. The method for controlling PTA mixing and feeding according to claim 5, characterized in that, The predicted feed concentration for the downstream reactor is determined based on real-time mixing uniformity, including: Determine the real-time time point corresponding to the real-time mixing uniformity; Determine the transfer time between warehouses and vessels, and then determine the predicted time point based on the real-time time point and the transfer time between warehouses and vessels. The real-time predicted concentration at a given time point is determined based on the real-time mixing uniformity and the preset concentration mapping relationship. The real-time predicted concentration is used as the predicted feed concentration of the downstream reactor at the predicted time point; Determining the transfer time between warehouses includes: The vertical transmission distance between the target discharge port of the target mixing bin and the radar level gauge is determined by the radar level gauge. Determine the length of the PTA delivery pipeline between the target mixing chamber and the downstream reactor, as well as the corresponding delivery speed of the PTA delivery pipeline; The first time interval is determined based on the transmission distance and the initial rotation speed, and the second time interval is determined based on the pipeline length and the conveying speed. The transfer time between the silos and the vessels is determined based on the first time interval and the second time interval.

7. A control system for PTA mixing and feeding, applicable to the control method for PTA mixing and feeding as described in any one of claims 1-6, characterized in that, include: The data acquisition unit is used to acquire the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the real-time temperature and pressure of the reactor; determine the preliminary mixing ratio based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the preset mixing reference ratio; and determine the material characteristic index based on the real-time flow rate of the first raw material, the real-time flow rate of the second raw material, and the preset raw material characteristic mapping relationship. The feed correction unit is used to determine the process disturbance index based on the real-time temperature and pressure of the reactor and the material characteristic index; determine the mixer operation mode based on the current production mode; and determine the feed correction coefficient based on the process disturbance index and the mixer operation mode. The feed ratio unit is used to determine the target mixing ratio based on the initial mixing ratio and the feed correction factor. The feed flow rates of the first and second raw materials into the target mixing chamber are controlled according to the target mixing ratio; The material level determination unit is used to determine the expected material level height in the target mixing chamber after the feeding is completed, based on the target mixing ratio, the total feeding flow rate of the first raw material and the second raw material, the structural parameters of the target mixing chamber, and the bulk density of the material in the target mixing chamber. The raw material mixing unit is used to determine the initial speed of the mixing motor based on the expected material level, bulk density, preset target mixing uniformity, and the change in the rotational speed of the mixing blades per unit speed; the mixing motor is started to run at the initial speed to determine the real-time mixing uniformity of the PTA mixed raw materials in the target mixing chamber at the initial speed; The speed adjustment unit is used to determine the predicted feed concentration of the downstream reactor based on the real-time mixing uniformity; adjust the initial speed of the stirring motor according to the predicted feed concentration and the preset concentration threshold to obtain the target speed, and control the operation of the stirring motor at the target speed.

Citation Information

Patent Citations

  • Intelligent control method for reaction temp in liquid-phase oxidizing reactor of p-xylene

    CN1373118A

  • Computer controlled apparatus for preparation of polyethylene terephthalate

    US4106098A