By using a distributed pressure sensor and a closed-loop control system with an electronically controlled phase-change metal medium, the problem of pre-pressure adjustment in ball screw nut pairs during long-term operation has been solved. This has enabled automated adjustment and uniformity compensation of pre-pressure, improved the accuracy and lifespan of the equipment, and reduced maintenance costs.
Patent Information
- Application Number
- CN202611272749.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-21
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2046-08-21
AI Technical Summary
Existing ball screw nut assemblies are difficult to effectively adjust preload during long-term operation, especially when there is local wear and uneven circumferential load, resulting in problems such as concentrated adjustment position, delayed response, insufficient local compensation and high maintenance costs.
The closed-loop control system, consisting of distributed pressure sensors, electronically controlled phase change metal medium, and temperature control elements, achieves automatic pre-pressure adjustment of the ball screw nut pair through multi-point pressure detection, phase change adjustment, and limited liquid replenishment increment, avoiding mechanical moving parts and realizing local pre-pressure compensation and clearance maintenance.
It improves the efficiency and accuracy of preload adjustment, ensures uniform force on the balls, extends equipment accuracy and lifespan, reduces maintenance costs, and realizes a technological upgrade from open-loop manual adjustment to closed-loop automatic adjustment.
Smart Images

Figure CN122774459B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of precision transmission and intelligent control technology, and in particular to an automatic preload adjustment method and system for ball screw nut pairs. Background Technology
[0002] Ball screw nut assemblies eliminate or reduce transmission backlash through preload, improving axial stiffness and positioning accuracy. Existing double-nut preload structures typically rely on washers, disc springs, round nuts, fine-tuning screws, or other mechanical components to change the relative position between the two nuts. Some solutions use pressure sensors to detect the preload status and then perform temperature or mechanical compensation. These solutions can solve the initial preload or partial operational compensation problems, but under long-term operation, localized wear, and uneven circumferential loads, they are still prone to problems such as concentrated adjustment positions, delayed response, insufficient local compensation, and high maintenance costs.
[0003] For high-speed or high-precision feed systems, preload changes are often coupled with temperature rise, thermal deformation, wear, and local load distribution. If only a single mechanical adjustment component is used to uniformly change the preload state, it is difficult to handle pressure drops in different circumferential regions separately. If only pressure detection results are given without disclosing the connection relationships between pressure targets, temperature compensation, supply paths, and anomaly handling, technicians will still find it difficult to achieve stable closed-loop control.
[0004] Therefore, a ball screw nut pair is needed that can connect zone pressure detection, phase change pressure conversion, feedforward temperature control, feedback correction, and liquid metal supply without mechanical moving parts into a complete technical link, so as to achieve local pre-pressure compensation and clearance maintenance without increasing complex mechanical linkage. Summary of the Invention
[0005] This invention aims to at least solve one of the technical problems existing in related technologies. To this end, this invention provides an automatic preload adjustment method and system for ball screw nut assemblies, solving the technical problem of difficulty in controlling the preload of balls in existing ball screw nut assemblies and improving the preload adjustment efficiency.
[0006] This invention provides an automatic preload adjustment method for ball screw nut assemblies, comprising the following steps: The pre-pressure automatic adjustment system includes several pressure sensors installed in the ball groove, several pressure chambers filled with an electrically controlled phase change metal medium, and a gear pump for filling the metal medium. Temperature sensors and temperature control elements are installed in the pressure chambers. Obtain the pressure readings of several pressure sensors installed on the inner wall of the ball groove during the current control cycle, and discard pressure readings that exceed the effective range or lack the current control cycle time indicator. Based on the retained pressure readings, determine the multi-point average pre-pressure and multi-point pressure dispersion. When the average pre-pressure at multiple points is lower than the lower limit threshold of pre-pressure and the dispersion of the multiple-point pressure is not greater than the dispersion threshold, the temperature control element is controlled to heat the metal medium of the electronically controlled phase change to the liquid conditioning temperature. After the temperature sensor reading is maintained within the liquid temperature range for the phase change confirmation time, the gear pump is controlled to deliver a limited replenishment increment to the pressure chambers that are interconnected through the medium through holes. Stop the gear pump, determine the stable retest time based on the fact that the change in the multi-point average prepressure does not exceed the stable change threshold, and re-determine the multi-point average prepressure and the multi-point pressure dispersion; If the re-determined average prepressure at multiple points is still lower than the target prepressure and the dispersion of the multi-point pressure is not greater than the dispersion threshold, repeat the delivery of a finite replenishment increment. When the redefined average pre-pressure at multiple points is within the allowable range corresponding to the target pre-pressure and the dispersion of the multi-point pressure is not greater than the dispersion threshold, the temperature control element is turned off or the metal medium is cooled to below the curing temperature threshold, and pressure holding is confirmed after curing.
[0007] Furthermore, it also includes the following steps: when the multi-point pressure dispersion is greater than the dispersion threshold, the multi-point average pre-pressure is higher than the pre-pressure upper limit threshold, the temperature reading of the temperature sensor is abnormal, the pressure reading of the pressure sensor is abnormal, or an emergency stop signal is received, the gear pump is stopped, and the temperature control element is controlled to shut down or cool the metal medium and an alarm signal is output.
[0008] Furthermore, the formula for calculating the multi-point average preload is as follows: in, The multi-point average preload for the kth control cycle; The number of effective pressure readings used in the calculation; This is the serial number of the effective pressure reading; For the first The effective pressure sensor reads the pressure value during the k-th control cycle.
[0009] Furthermore, the formula for calculating the multi-point pressure dispersion is as follows: in, The multi-point pressure dispersion during the k-th control cycle; This represents the maximum effective pressure reading during the k-th control cycle. This represents the minimum effective pressure reading for the kth control cycle.
[0010] Furthermore, the limited replenishment increment is limited by the continuous operating time of the gear pump, which does not exceed the allowable operating time determined based on the gear pump's rated delivery capacity, pressure chamber volume, and pre-pressure upper limit threshold.
[0011] Furthermore, the determination of the stable retest time includes: The average prepressure at multiple points was continuously collected after the gear pump stopped. When the difference between two consecutive average preloads at multiple points is not greater than the stable change threshold, the stable observation operation begins. Once the stable observation operation continues for the stable observation period, the multi-point average pre-pressure and multi-point pressure dispersion are re-determined.
[0012] Furthermore, the pressure holding confirmation after curing includes: Determine whether the average pre-pressure at multiple points is within the allowable range corresponding to the target pre-pressure, whether the dispersion of the multi-point pressure is not greater than the dispersion threshold, whether the temperature is lower than the curing temperature threshold, and whether the change in the average pre-pressure at multiple points within the stable observation period is not greater than the stable change threshold. When all the determination results are yes, confirm that the automatic adjustment of the pre-pressure is completed.
[0013] Furthermore, when the pressure dispersion at multiple points exceeds the dispersion threshold, the controller will not execute the limited replenishment increment, will keep the gear pump stopped, and will output an alarm for abnormal pressure distribution after the metal medium has solidified. Once the pressure or temperature readings are restored to validity, the pressure readings and multi-point pressure dispersion are reacquired.
[0014] An automatic preload adjustment system for a ball screw nut assembly, used to execute the automatic preload adjustment method described above, includes: The main body includes an integrally formed head and tail. The tail is a tubular structure. The inner wall of the tail is provided with a plurality of limiting connecting plates at radial intervals. The tail has a connecting hole and the limiting connecting plates have medium through holes. The ball track includes several arc-shaped tube segments, each tube segment being tunably connected between two adjacent limiting connecting plates. A corresponding tube segment, two limiting connecting plates, a head side wall, and a tail inner wall together enclose a pressure chamber. Two connected pressure chambers are connected through a medium through hole. A temperature sensor and a temperature control element are arranged in the pressure chamber. The inner wall of the ball track and the inner wall of the head form a threaded ball groove. Several pressure sensors are arranged on the inner wall of the ball groove. A servo shaft passes through the head and the ball track and is connected by several balls distributed in the ball groove. An end cap is connected to the tail section, and the end cap is provided with a flow channel. The connecting hole and the flow channel are connected through a return pipe. A storage bin is connected to the flow channel. The storage bin is filled with an electrically controlled phase-change metal medium. A gear pump is installed in the storage bin to drive the metal medium to move within the pressure chamber, the return pipe, and the storage bin. The controller is connected to a pressure sensor, a temperature sensor, and a temperature control element; Based on the effective pressure readings of several pressure sensors, the multi-point average pre-pressure and multi-point pressure dispersion are determined. When the multi-point average pre-pressure is lower than the lower limit threshold of the pre-pressure and the multi-point pressure dispersion is not greater than the dispersion threshold, the temperature control element is controlled to make the metal medium reach the liquid conditioning temperature, and the gear pump is controlled to deliver a limited replenishment increment to the interconnected pressure chambers. After the gear pump is stopped and the stable retest is completed, the temperature control element is controlled to shut off or cool the metal medium to solidify it, or to stop the new replenishment increment and output an alarm signal, based on the retest results.
[0015] Furthermore, the head is provided with a guide strip, which extends radially along the tail, and the tube segment is provided with a guide opening corresponding to the guide strip, through which the tube segment slides on the guide strip.
[0016] This invention discloses an automatic preload adjustment system for ball screw nut assemblies. Through circumferentially distributed pressure sensors, multi-point real-time sampling is achieved to obtain accurate pressure detection values, significantly reducing preload control errors. The partitioned independent pressure chamber structure allows for differentiated compensation for wear conditions in different circumferential regions, solving the technical problem of traditional overall adjustment schemes failing to match uneven local loads, and greatly improving the uniformity of ball bearing force and the maintenance of transmission accuracy. An electrically controlled phase-change metal medium is used as the pressure transmission medium, facilitating the phase change from solid to liquid. The closed-loop control link in the controller automates the entire process of pressure detection, medium delivery, and position locking, eliminating the need for manual intervention. This method allows for dynamic compensation of pre-pressure during equipment operation intervals without affecting normal production cycles. It determines overall fluid replenishment requirements by averaging pre-pressure at multiple points, filters out unsuitable conditions for overall fluid replenishment based on multi-point pressure dispersion, and avoids the continuous superposition of unstable actions through limited fluid replenishment increments and stable retesting. Finally, it uses solidification and pressure holding confirmation as the criterion for completing pre-pressure adjustment. This represents a technological upgrade from open-loop manual adjustment to closed-loop automatic adjustment of the ball screw nut pair's pre-pressure. Compared to traditional pre-tightening structures, this method can control the pre-pressure deviation after long-term use within the design requirements, effectively extending the accuracy and lifespan of the ball screw nut pair and reducing equipment maintenance costs.
[0017] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0019] Figure 1 This is an exploded view of an automatic preload adjustment system for a ball screw nut assembly provided by the present invention.
[0020] Figure 2 This is a schematic diagram of the main body of an automatic preload adjustment system for a ball screw nut assembly provided by the present invention.
[0021] Figure 3 This is a schematic diagram of a tube segment in an automatic preload adjustment system for a ball screw nut assembly provided by the present invention.
[0022] Figure 4 This is a flowchart of an automatic preload adjustment method for a ball screw nut assembly provided by the present invention.
[0023] Figure label: 1. Main body; 11. Head; 12. Tail; 13. Limiting connecting plate; 14. Medium through hole; 15. Guide strip; 16. Tube segment; 17. Ball groove; 18. Guide port; 19. Connecting hole; 2. End cap; 21. Flow channel; 22. Anti-backflow cover; 3. Storage bin; 31. Gear pump; 32. Liquid replenishment nozzle; 5. Return pipe; 6. Fixed sheet metal. Detailed Implementation
[0024] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention. The following embodiments are used to illustrate this invention but should not be used to limit the scope of this invention.
[0025] The following is combined Figures 1 to 3 The present invention describes an automatic preload adjustment system for a ball screw nut assembly, comprising: The main body 1 includes an integrally formed head 11 and tail 12. The tail 12 is a tubular structure. The inner wall of the tail 12 is provided with a plurality of limiting connecting plates 13 at radial intervals. The tail 12 is provided with connecting holes 19, and the limiting connecting plates 13 are provided with medium through holes 14. The ball runner includes several arc-shaped tube segments 16, each tube segment 16 being tunably connected between two adjacent limiting connecting plates 13. A corresponding tube segment 16, two limiting connecting plates 13, the side wall of the head 11, and the inner wall of the tail 12 together enclose a pressure chamber. Two connected pressure chambers are connected through a medium through hole 14. A temperature sensor and a temperature control element are arranged in the pressure chamber. The inner wall of the ball runner and the inner wall of the head 11 form a threaded ball groove 17. Several pressure sensors are arranged on the inner wall of the ball groove 17. A servo shaft passes through the head 11 and the ball runner and is connected through several balls distributed in the ball groove 17. End cap 2, the end cap 2 is connected to the tail 12, the end cap 2 is provided with a flow channel 21, and the connecting hole 19 and the flow channel 21 are connected through a return pipe 5; Storage bin 3 is connected to flow channel 21. Storage bin 3 is filled with an electrically controlled phase change metal medium. A gear pump 31 is installed in storage bin 3. The gear pump 31 is used to drive the metal medium to move in the pressure chamber, return pipe 5 and storage bin 3. The controller is connected to a pressure sensor, a temperature sensor, and a temperature control element; Based on the effective pressure readings of several pressure sensors, the multi-point average pre-pressure and multi-point pressure dispersion are determined. When the multi-point average pre-pressure is lower than the lower limit threshold of the pre-pressure and the multi-point pressure dispersion is not greater than the dispersion threshold, the temperature control element is controlled to make the metal medium reach the liquid conditioning temperature, and the gear pump is controlled to deliver a limited replenishment increment to the interconnected pressure chambers. After the gear pump is stopped and the stable retest is completed, the temperature control element is controlled to shut off or cool the metal medium to solidify it, or to stop the new replenishment increment and output an alarm signal, based on the retest results.
[0026] Furthermore, the head 11 is provided with a guide strip 15, which extends radially along the tail 12, and the tube segment 16 is provided with a guide opening 18 corresponding to the guide strip 15, and the tube segment 16 is slidably disposed on the guide strip 15 through the guide opening 18.
[0027] Preferably, the guide bar 15 and the guide port 18 enable the segment 16 to always move in the preset direction when radially moving to compensate for prepressure, avoiding circumferential displacement of the segment 16 during movement, ensuring the directional accuracy of pressure compensation, avoiding uneven pressure distribution caused by displacement of the segment 16, and further improving the stability and accuracy of prepressure adjustment.
[0028] Preferably, a backflow prevention cover 22 is provided between the return pipe 5 and the flow channel 21 to prevent the metal medium from flowing back from the pressure chamber to the storage bin 3, thus ensuring the stability of the pressure in the pressure chamber.
[0029] Specifically, the return pipe 5 is fixed to the outer wall of the tail section 12 by a fixed sheet metal 6.
[0030] Preferably, the metal medium can be a gallium-based alloy.
[0031] Preferably, the pressure sensor can be a piezoelectric thin film sensor disposed on the inner wall of the ball groove, which can directly detect the actual contact pressure between the ball and the raceway, with high detection sensitivity, fast response speed, no need for additional modification of the internal structure of the nut, and better adaptability.
[0032] Preferably, the storage bin 3 is provided with a liquid replenishment nozzle 32 for replenishing the metal medium into the storage bin from the outside.
[0033] This invention also provides an automatic preload adjustment method for a ball screw nut assembly, applicable to the automatic preload adjustment system described above, such as... Figure 4 As shown, it includes the following steps: Obtain the pressure readings of several pressure sensors installed on the inner wall of the ball groove during the current control cycle, and discard pressure readings that exceed the effective range or lack the current control cycle time indicator. Based on the retained pressure readings, determine the multi-point average pre-pressure and multi-point pressure dispersion. When the average pre-pressure at multiple points is lower than the lower limit threshold of pre-pressure and the dispersion of the multiple-point pressure is not greater than the dispersion threshold, the temperature control element is controlled to heat the metal medium of the electronically controlled phase change to the liquid conditioning temperature. After the temperature sensor reading is maintained within the liquid temperature range for the phase change confirmation time, the gear pump is controlled to deliver a limited replenishment increment to the pressure chambers that are interconnected through the medium through holes. Stop the gear pump, determine the stable retest time based on the fact that the change in the multi-point average prepressure does not exceed the stable change threshold, and re-determine the multi-point average prepressure and the multi-point pressure dispersion; If the re-determined average prepressure at multiple points is still lower than the target prepressure and the dispersion of the multi-point pressure is not greater than the dispersion threshold, then repeat the delivery of a finite replenishment increment. When the re-determined multi-point average pre-pressure is within the allowable range corresponding to the target pre-pressure and the multi-point pressure dispersion is not greater than the dispersion threshold, the temperature control element is turned off or the metal medium is cooled to below the curing temperature threshold, and pressure holding is confirmed after curing. When the multi-point pressure dispersion exceeds the dispersion threshold, the multi-point average pre-pressure exceeds the pre-pressure upper limit threshold, the temperature reading of the temperature sensor is abnormal, the pressure reading of the pressure sensor is abnormal, or an emergency stop signal is received, the gear pump is stopped, and the temperature control element is controlled to shut down or cool the metal medium and an alarm signal is output.
[0034] Preferably, the contact pressure between the ball and the ball groove at the corresponding position is collected by multiple pressure sensors. Pressure readings that exceed the effective range or lack the current control cycle time stamp are discarded. Specifically, readings that are less than the minimum range of the pressure sensor or greater than the maximum range are directly identified as abnormal readings and discarded; readings that do not have a corresponding control cycle timestamp are identified as invalid readings and discarded.
[0035] Furthermore, the formula for calculating the multi-point average preload is as follows: in, The multi-point average preload for the kth control cycle; The number of effective pressure readings remaining after excluding readings that are outside the effective range or lack time indication; This is the serial number of the effective pressure reading; For the first The effective pressure sensor reads the pressure value during the k-th control cycle.
[0036] The controller will Compare with the lower pre-pressure threshold, the target pre-pressure, and the upper pre-pressure threshold to determine whether limited replenishment increments, repeated stabilization tests, or confirmation of curing commencement are permitted.
[0037] Furthermore, the formula for calculating the multi-point pressure dispersion is as follows: in, The multi-point pressure dispersion during the k-th control cycle; This represents the maximum effective pressure reading during the k-th control cycle. This represents the minimum effective pressure reading for the kth control cycle.
[0038] The controller will only allow the next round of adjustment based on the overall finite replenishment increment if the value is not greater than the dispersion threshold. When the pressure distribution exceeds the dispersion threshold, the controller stops the gear pump and the solidification medium and outputs an alarm for abnormal pressure distribution.
[0039] When the average prepressure at multiple points is lower than the lower limit threshold of prepressure and the dispersion of pressure at multiple points is not greater than the dispersion threshold, the controller enters the phase change gating step.
[0040] The phase change gating steps are as follows: the controller controls the temperature control element to heat the electrically controlled phase change metal medium in the pressure chamber; only when the temperature sensor reading enters the liquid temperature range and remains within that range during the phase change confirmation time, the controller confirms that the metal medium has a liquid state that can be adjusted; when the temperature is higher than the safe temperature range, the controller shuts off the temperature control element, stops the gear pump 31, and outputs a temperature abnormality alarm.
[0041] After the phase change gate passes, the controller starts the gear pump 31, allowing the liquid metal medium in the storage silo 3 to enter the pressure chamber, which is interconnected through the medium through hole 14, via the flow channel 21, return pipe 5, and connecting hole 19. The gear pump 31 runs only once for the allowed operating time to form a limited replenishment increment; the allowed operating time is determined based on the rated delivery capacity of the gear pump 31, the pressure chamber volume, and the upper limit threshold of the pre-pressure. After the allowed operating time is reached, the controller stops the gear pump 31 and does not output a replenishment increment exceeding that allowed operating time.
[0042] After the allowed operating time is reached, the controller stops gear pump 31 and continuously reads the multi-point average prepressure. Stability observation begins when the difference between two consecutive multi-point average prepressures is not greater than the stable change threshold. Stability observation continues until the specified duration, at which point the controller again determines the multi-point average prepressure and multi-point pressure dispersion. If the multi-point average prepressure is still lower than the target prepressure and the multi-point pressure dispersion is not greater than the dispersion threshold, phase change gating and a limited replenishment increment are executed again. If the multi-point pressure dispersion is greater than the dispersion threshold, new replenishment increments are stopped and an alarm signal is output.
[0043] When the average pre-pressure at multiple points measured during the retest is within the allowable range corresponding to the target pre-pressure and the dispersion of the multi-point pressure is not greater than the dispersion threshold, the controller shuts down the temperature control element or executes cooling control to lower the temperature of the metal medium below the curing temperature threshold. Thereafter, multi-point pressure and temperature data are continuously read during the stable observation period as input for confirming the pressure holding after curing.
[0044] Furthermore, the limited replenishment increment is limited by the continuous operating time of the gear pump, which does not exceed the allowable operating time determined based on the gear pump's rated delivery capacity, pressure chamber volume, and pre-pressure upper limit threshold.
[0045] Furthermore, the determination of the stable retest time includes: continuously collecting the average pre-pressure at multiple points after the gear pump stops; starting the stable observation operation when the difference between two adjacent average pre-pressures at multiple points is not greater than the stable change threshold; and re-determining the average pre-pressure at multiple points and the multi-point pressure dispersion after the stable observation operation continues for the stable observation period.
[0046] Furthermore, the pressure holding confirmation after curing includes: determining whether the average pre-pressure at multiple points is within the allowable range corresponding to the target pre-pressure, determining whether the dispersion of the multi-point pressure is not greater than the dispersion threshold, determining whether the temperature is lower than the curing temperature threshold, and determining whether the change in the average pre-pressure at multiple points within the stable observation period is not greater than the stable change threshold. When all the judgment results are yes, the automatic adjustment of the pre-pressure is confirmed to be complete.
[0047] The controller adopts The results of the pressure holding after curing are jointly evaluated, among which, This is the confirmation flag after curing in the kth control cycle; , and These are binary decision quantities for the target pressure condition, dispersion condition, and post-curing pressure holding stability condition, respectively. Their values are either 0 or 1, and they are only valid when all three conditions are met simultaneously. The value is 1. When the value is 1, the controller confirms that the automatic pre-pressure adjustment is complete. When the value is 0, the controller will perform a remeasurement, stop the gear pump and solidify the medium or alarm branch based on the invalid judgment result.
[0048] When the confirmation flag is 1 after curing, the controller confirms that the automatic pre-pressure adjustment is complete. When the confirmation flag is 0, the controller executes the corresponding branch based on the cause: if the target pressure condition is not met but the dispersion is acceptable, the next finite replenishment increment can proceed after re-measurement; if the dispersion condition is not met, the average pre-pressure is higher than the upper limit threshold of the pre-pressure, the pressure reading is invalid, the temperature reading is abnormal, or an emergency stop signal is received, the gear pump 31 is immediately stopped, the temperature control element is turned off or cooled to allow the medium to solidify, new replenishment increments are prohibited, and an alarm signal is output. This abnormal branch is not contingent on undisclosed reverse drainage or independent pressure chamber execution.
[0049] Furthermore, when the multi-point pressure dispersion is greater than the dispersion threshold, the controller does not execute the limited liquid replenishment increment, keeps the gear pump stopped, and outputs an abnormal pressure distribution alarm after the metal medium has solidified; when the pressure reading or temperature reading becomes valid again, the pressure reading and multi-point pressure dispersion are reacquired.
[0050] This invention discloses an automatic preload adjustment system for ball screw nut assemblies. Through circumferentially distributed pressure sensors, multi-point real-time sampling is achieved to obtain accurate pressure detection values, significantly reducing preload control errors. The partitioned independent pressure chamber structure allows for differentiated compensation for wear conditions in different circumferential regions, solving the technical problem of traditional overall adjustment schemes failing to match uneven local loads, and greatly improving the uniformity of ball bearing force and the maintenance of transmission accuracy. An electrically controlled phase-change metal medium is used as the pressure transmission medium, facilitating the phase change from solid to liquid. The closed-loop control link in the controller automates the entire process of pressure detection, medium delivery, and position locking, eliminating the need for manual intervention. Intervention allows for dynamic compensation of pre-pressure during equipment operation intervals without affecting normal production cycles. It determines overall fluid replenishment requirements by averaging pre-pressure at multiple points, filters out unsuitable conditions for overall fluid replenishment based on multi-point pressure dispersion, and avoids the continuous superposition of unstable actions through limited fluid replenishment increments and stable retesting. Finally, it uses solidification and pressure holding confirmation as the criterion for completing pre-pressure adjustment. This achieves a technological upgrade from open-loop manual adjustment to closed-loop automatic adjustment of the ball screw nut pair's pre-pressure. Compared to traditional pre-tightening structures, this method can control the pre-pressure deviation after long-term use within the design requirements, effectively extending the precision retention life of the ball screw nut pair and reducing equipment maintenance costs.
[0051] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for automatically adjusting the preload of a ball screw nut assembly, characterized in that, Includes the following steps: The pre-pressure automatic adjustment system includes several pressure sensors installed in the ball groove, several pressure chambers filled with an electrically controlled phase change metal medium, and a gear pump for filling the metal medium. Temperature sensors and temperature control elements are installed in the pressure chambers. Obtain the pressure readings of several pressure sensors installed on the inner wall of the ball groove during the current control cycle, and discard pressure readings that exceed the effective range or lack the current control cycle time indicator. Based on the retained pressure readings, determine the multi-point average pre-pressure and multi-point pressure dispersion. When the average pre-pressure at multiple points is lower than the lower limit threshold of pre-pressure and the dispersion of the multiple-point pressure is not greater than the dispersion threshold, the temperature control element is controlled to heat the metal medium of the electronically controlled phase change to the liquid conditioning temperature, and after the phase change confirmation time is maintained within the liquid temperature range of the temperature sensor reading, the gear pump is controlled to deliver a limited replenishment increment to several pressure chambers. Stop the gear pump, determine the stable retest time based on the fact that the change in the multi-point average prepressure does not exceed the stable change threshold, and re-determine the multi-point average prepressure and the multi-point pressure dispersion; If the re-determined average prepressure at multiple points is still lower than the target prepressure and the dispersion of the multi-point pressure is not greater than the dispersion threshold, repeat the delivery of a finite replenishment increment. When the redefined average pre-pressure at multiple points is within the allowable range corresponding to the target pre-pressure and the dispersion of the multi-point pressure is not greater than the dispersion threshold, the temperature control element is turned off or the metal medium is cooled to below the curing temperature threshold, and pressure holding is confirmed after curing.
2. The automatic preload adjustment method for a ball screw nut assembly according to claim 1, characterized in that, It also includes the following steps: When the multi-point pressure dispersion exceeds the dispersion threshold, the multi-point average pre-pressure exceeds the pre-pressure upper limit threshold, the temperature reading of the temperature sensor is abnormal, the pressure reading of the pressure sensor is abnormal, or an emergency stop signal is received, the gear pump is stopped, and the temperature control element is controlled to shut down or cool the metal medium and an alarm signal is output.
3. The method for automatically adjusting the preload of a ball screw nut assembly according to claim 1, characterized in that, The formula for calculating the multi-point average preload is as follows: in, The multi-point average preload for the kth control cycle; The number of effective pressure readings used in the calculation; This is the serial number of the effective pressure reading; For the first The effective pressure sensor reads the pressure value during the k-th control cycle.
4. The automatic preload adjustment method for a ball screw nut assembly according to claim 3, characterized in that, The formula for calculating the multi-point pressure dispersion is as follows: in, The multi-point pressure dispersion during the k-th control cycle; This represents the maximum effective pressure reading during the k-th control cycle. This represents the minimum effective pressure reading for the kth control cycle.
5. The automatic preload adjustment method for a ball screw nut assembly according to claim 4, characterized in that, The limited replenishment increment is determined by the duration of one continuous operation of the gear pump, which shall not exceed the allowable operating time determined based on the rated delivery capacity of the gear pump, the pressure chamber volume, and the upper limit threshold of the pre-pressure.
6. The method for automatically adjusting the preload of a ball screw nut assembly according to claim 5, characterized in that, The determination of the stable retest time includes: The average prepressure at multiple points was continuously collected after the gear pump stopped. When the difference between two consecutive average preloads at multiple points is not greater than the stable change threshold, the stable observation operation begins. Once the stable observation operation continues for the stable observation period, the multi-point average pre-pressure and multi-point pressure dispersion are re-determined.
7. The automatic preload adjustment method for a ball screw nut assembly according to claim 6, characterized in that, Post-curing pressure confirmation includes: Determine whether the average pre-pressure at multiple points is within the allowable range corresponding to the target pre-pressure, whether the dispersion of the multi-point pressure is not greater than the dispersion threshold, whether the temperature is lower than the curing temperature threshold, and whether the change in the average pre-pressure at multiple points within the stable observation period is not greater than the stable change threshold. When all the determination results are yes, confirm that the automatic adjustment of the pre-pressure is completed.
8. The automatic preload adjustment method for a ball screw nut assembly according to claim 7, characterized in that, When the pressure dispersion at multiple points exceeds the dispersion threshold, the controller will not execute the limited replenishment increment, keep the gear pump stopped, and output an alarm for abnormal pressure distribution after the metal medium has solidified. Once the pressure or temperature readings are restored to validity, the pressure readings and multi-point pressure dispersion are reacquired.
9. An automatic preload adjustment system for a ball screw nut assembly, used to execute the automatic preload adjustment method as described in any one of claims 1 or 8, characterized in that, include: The main body includes an integrally formed head and tail. The tail is a tubular structure. The inner wall of the tail is provided with a plurality of limiting connecting plates at radial intervals. The tail has a connecting hole and the limiting connecting plates have medium through holes. The ball track includes several arc-shaped tube segments, each tube segment being tunably connected between two adjacent limiting connecting plates. A corresponding tube segment, two limiting connecting plates, a head side wall, and a tail inner wall together enclose a pressure chamber. Two connected pressure chambers are connected through a medium through hole. A temperature sensor and a temperature control element are arranged in the pressure chamber. The inner wall of the ball track and the inner wall of the head form a threaded ball groove. Several pressure sensors are arranged on the inner wall of the ball groove. A servo shaft passes through the head and the ball track and is connected by several balls distributed in the ball groove. An end cap is connected to the tail section, and the end cap is provided with a flow channel. The connecting hole and the flow channel are connected through a return pipe. A storage bin is connected to the flow channel. The storage bin is filled with an electrically controlled phase-change metal medium. A gear pump is installed in the storage bin to drive the metal medium to move within the pressure chamber, the return pipe, and the storage bin. The controller is connected to a pressure sensor, a temperature sensor, and a temperature control element; Based on the effective pressure readings of several pressure sensors, the multi-point average pre-pressure and multi-point pressure dispersion are determined. When the multi-point average pre-pressure is lower than the lower limit threshold of the pre-pressure and the multi-point pressure dispersion is not greater than the dispersion threshold, the temperature control element is controlled to make the metal medium reach the liquid conditioning temperature, and the gear pump is controlled to deliver a limited replenishment increment to the interconnected pressure chambers. After the gear pump is stopped and the stable retest is completed, the temperature control element is controlled to shut off or cool the metal medium to solidify it, or to stop the new replenishment increment and output an alarm signal, based on the retest results.
10. The automatic preload adjustment system for a ball screw nut assembly according to claim 9, characterized in that, The head is provided with a guide strip, which extends radially along the tail. The tube segment is provided with a guide opening corresponding to the guide strip, and the tube segment slides on the guide strip through the guide opening.
Citation Information
Patent Citations
Double-station synchronous feeding device for machine tool
CN121572057A
Ball screw pair temperature displacement prediction method based on simulated annealing optimization neural network
CN122197588A