On-line cleaning system and method for dry quenching coke boiler bottom dust

By installing a clean gas main pipe and module at the bottom of the dry quenching coke boiler, and using crushing nozzles and suspended booster nozzles to remove ash accumulation during online production, the problems of increased flow resistance and safety risks caused by ash accumulation at the bottom of the boiler have been solved, and the system has achieved stable operation.

CN123063202APending Publication Date: 2026-11-10GUANGXI SHENGLONG METALLURGICAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611424765.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-14
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Ash accumulation and caking at the bottom of dry quenching coke boilers increases flow resistance in the boiler area. It is difficult to remove the ash by relying on the natural carrying of circulating air, and manual cleaning during shutdown is inefficient and poses a high safety risk.

Method used

A clean gas main pipe and multiple boiler bottom cleaning modules are installed at the bottom of the boiler. Using crushing nozzles and suspended booster nozzles, different ash accumulation zones are purged with staggered pulses while the circulating fan is running, breaking up loose ash and bringing it into the circulating airflow.

Benefits of technology

Without stopping production, reduce the impact of ash accumulation at the bottom of the boiler on flow resistance, improve the continuous operation stability of the dry quenching system, and reduce downtime losses and safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123063202A_ABST
    Figure CN123063202A_ABST
Patent Text Reader

Abstract

This application relates to the field of dry quenching technology, and provides an online cleaning system and method for bottom ash accumulation in a dry quenching boiler. The system includes a clean gas main pipe, multiple boiler bottom cleaning modules, a status monitoring unit, and a control unit. The clean gas main pipe is located outside the ash accumulation area at the bottom of the boiler and is connected to an inert gas source. The multiple boiler bottom cleaning modules are arranged corresponding to different ash accumulation zones at the bottom of the boiler. Each module includes a branch pipe passing through the bottom wall or lower side wall of the boiler, a nozzle assembly on the branch pipe, and a branch control valve. The nozzle assembly includes a breaking nozzle and a suspension booster nozzle. Under online production conditions with the circulating fan running, the control unit controls the clean gas to perform staggered pulse purging of different ash accumulation zones based on boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and the ash accumulation status at the bottom of the boiler. It also ensures that modules corresponding to adjacent ash accumulation zones are not activated simultaneously, causing the slab-hardened ash at the bottom of the boiler to break up and loosen, and be carried away by the circulating airflow in the boiler area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the field of dry quenching technology, and in particular relates to an online cleaning system and method for bottom ash accumulation in a dry quenching boiler. Background Technology

[0002] Dry quenching boilers are crucial equipment for waste heat recovery in dry quenching systems. During operation, high-temperature circulating gas carrying coke powder and fine ash enters the boiler area. Due to factors such as the boiler's internal spatial structure, flow velocity variations, heat exchange surface arrangement, and localized low-velocity zones, ash deposits easily accumulate at the bottom of the boiler. Unlike the continuous ash deposition along the bottom of the horizontal channel in the primary dust collector inlet section, ash accumulation at the boiler bottom typically manifests as buildup, caking, or localized thickening in different areas of the boiler bottom. It is particularly prone to forming deposit layers that are difficult to be naturally carried away by the circulating airflow in areas such as bottom corners, low-velocity zones, and areas where adjacent flow fields converge.

[0003] Increased ash accumulation at the bottom of a dry quenching coke boiler not only increases flow resistance in the boiler area but may also affect the distribution of circulating airflow and heat exchange stability within the boiler. This leads to increased resistance in the dry quenching system, higher pressure on the circulating fan, and further impacts coke cooling efficiency and continuous system operation. Manual cleaning of the boiler bottom area after shutdown requires a lengthy downtime, and the complex, high-temperature, and dusty internal environment of the boiler results in low efficiency, high labor intensity, and high safety risks.

[0004] Therefore, there is an urgent need to provide an online cleaning solution for the ash accumulation area at the bottom of dry quenching coke boilers, so as to break, loosen and suspend the slab-hardened ash at the bottom of the boiler while the circulating fan is running in production. Summary of the Invention

[0005] This application provides an online cleaning system and method for bottom ash accumulation in dry quenching coke boilers to solve the problems in the prior art where ash accumulation and caking at the bottom of dry quenching coke boilers leads to increased flow resistance in the boiler area. Relying on natural removal by circulating airflow is difficult, while manual cleaning during shutdown results in significant production losses, high labor intensity, and high operational safety risks.

[0006] The first aspect of this application provides an online cleaning system for bottom ash accumulation in a dry quenching coke boiler, including a cleaning gas main pipe, multiple boiler bottom cleaning modules, a status monitoring unit, and a control unit; The main clean gas pipe is located outside the ash accumulation area at the bottom of the dry quenching coke boiler and is used to connect with an inert gas source. Multiple boiler bottom cleaning modules are arranged corresponding to different ash accumulation zones at the bottom of the dry quenching coke boiler. Each boiler bottom cleaning module includes a branch pipe passing through the bottom wall or lower side wall of the dry quenching coke boiler, a nozzle group set on the branch pipe, and a branch control valve for controlling the opening and closing of the branch pipe. The nozzle group includes a breaking nozzle for outputting a disturbing and breaking jet toward the ash accumulation layer at the bottom of the boiler, and a suspended boosting nozzle for outputting a suspended boosting jet toward the main circulation airflow zone of the boiler area. The status monitoring unit is used to acquire status parameters including at least boiler operating resistance parameters, branch pipe pressure, clean gas main pressure, and ash accumulation status at the bottom of the boiler. The control unit is connected to the status monitoring unit and the branch control valves of each of the boiler bottom cleaning modules. It is used to control the cleaning gas to perform staggered pulse purging of different ash accumulation zones at the bottom of the dry quenching coke boiler through the main cleaning gas pipe, multiple branch pipes and the nozzle group according to the status parameters when the circulating fan is running in online production. It also prevents the boiler bottom cleaning modules corresponding to adjacent ash accumulation zones from being opened at the same time, so that the slab ash at the bottom of the boiler is broken and loosened and carried away by the circulating airflow in the boiler area.

[0007] A second aspect of this application provides an online cleaning method for bottom ash accumulation in a dry quenching coke boiler, employing the online cleaning system for bottom ash accumulation in a dry quenching coke boiler described in the first aspect. The method includes: While the circulating fan is running in online production mode, the boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and ash accumulation status at the bottom of the boiler are obtained. When the boiler operating resistance parameters, the branch pipe pressure, the main cleaning gas pipe pressure, and the ash accumulation status at the bottom of the boiler meet the set cleaning conditions, the branch control valves of the corresponding boiler bottom cleaning modules are opened in staggered shifts according to the degree of ash accumulation in different ash accumulation zones at the bottom of the boiler or the preset rotation sequence. The disturbed breaking jet output by the breaking nozzle breaks and loosens the slab-like ash at the bottom of the boiler. The suspended booster jet output by the suspended booster nozzle allows the loosened ash to enter the circulating airflow in the boiler area and be carried away by the circulating airflow in the boiler area.

[0008] In this embodiment of the above solution, a clean gas main pipe connected to an inert gas source is set outside the ash accumulation zone at the bottom of the dry quenching coke boiler, and multiple boiler bottom cleaning modules are arranged to correspond to different ash accumulation zones at the bottom of the dry quenching coke boiler. This allows the clean gas to be distributed through the clean gas main pipe to branch pipes and their nozzle assemblies that pass through the bottom wall or lower side wall of the boiler. Since the nozzle assembly includes a breaking nozzle for outputting a disturbing and breaking jet toward the ash accumulation layer at the bottom of the boiler, and a suspension boosting nozzle for suspending and diffusing the loosened ash into the circulating airflow in the boiler area, it can locally break, loosen, and suspend the slab-hardened ash in different ash accumulation zones at the bottom of the boiler, rather than relying solely on the circulating gas. The airflow carries the ash naturally; at the same time, the status monitoring unit acquires status parameters such as boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and ash accumulation status at the bottom of the boiler. Under the online production state where the circulating fan is running, the control unit controls the clean gas to perform staggered pulse purging of different ash accumulation zones at the bottom of the dry quenching boiler through the clean gas main pipe, multiple branch pipes, and nozzle groups based on the above status parameters. In this way, without stopping dry quenching production, the slab-hardened ash at the bottom of the boiler can be broken up and loosened and carried away by the circulating airflow in the boiler area, reducing the impact of ash accumulation at the bottom of the boiler on the flow resistance and airflow distribution stability in the boiler area, and improving the continuous operation stability of the dry quenching boiler and dry quenching system. Attached Figure Description

[0009] Various other advantages and benefits will become apparent to those skilled in the art upon reading the detailed description of the preferred embodiments below. The accompanying drawings are for illustrative purposes only and are not intended to limit the scope of this application. Furthermore, the same reference numerals denote the same parts throughout the drawings. In the drawings: Figure 1 This is a schematic diagram of the structure of an online cleaning system for bottom ash accumulation in a dry quenching coke boiler according to some embodiments of this application; Figure 2 This is a top view schematic diagram of the ash accumulation zone at the bottom of the dry quenching coke boiler and the arrangement of the boiler bottom cleaning module in some embodiments of this application; Figure 3 This is a schematic diagram of the structure and jet direction of the nozzle assembly in some embodiments of this application; Figure 4 This application describes the process of online cleaning of bottom ash accumulation in a dry quenching coke boiler according to some embodiments. Figure 1 ; Figure 5 This application describes the process of online cleaning of bottom ash accumulation in a dry quenching coke boiler according to some embodiments. Figure 2 .

[0010] Figure label: 10-Clean gas main pipe, 11-Solenoid main valve, 12-Remote pressure regulating valve, 13-Flow meter, 14-Drain outlet, 15-Unclogging interface, 20-Boiler bottom cleaning module, 21-Branch pipe, 22-Nozzle group, 221-Crushing nozzle, 222-Suspension booster nozzle, 223-Corner ash sweeping nozzle, 23-Branch control valve, 30-Status monitoring unit, 40-Control unit, 50-Dry quenching coke boiler, 51-Boiler bottom ash accumulation area, 511-Boiler bottom middle ash accumulation zone, 512-Boiler bottom side ash accumulation zones, 513-Boiler bottom corner ash accumulation zones, 514-Ash accumulation zone between adjacent branch pipes, 52-Boiler bottom ash accumulation bearing surface, 53-Boiler regional circulating airflow mainstream zone, 54-Boiler bottom ash accumulation layer, 60-Inert gas source. Detailed Implementation

[0011] The embodiments of the technical solution of this application will now be described in detail with reference to the accompanying drawings. These embodiments are only used to more clearly illustrate the technical solution of this application and are therefore merely examples, and should not be used to limit the scope of protection of this application.

[0012] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms “comprising” and “having”, and any variations thereof, in the specification, claims, and foregoing description of the drawings are intended to cover non-exclusive inclusion.

[0013] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.

[0014] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.

[0015] In the description of the embodiments in this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this document generally indicates that the preceding and following related objects have an "or" relationship.

[0016] In some dry quenching coke systems, the ash accumulated at the bottom of the boiler is mainly removed by the natural carry-over effect of the circulating airflow, or by manual cleaning of the boiler bottom area during shutdown maintenance. However, because there are several localized areas with low flow velocities at the boiler bottom, and the ash gradually compacts and hardens under high temperature, its own weight, and repeated heating, the natural carry-over effect of the circulating airflow is insufficient to re-enter the hardened ash. This results in the ash accumulation at the boiler bottom continuously thickening in multiple areas, forming layers of varying heights.

[0017] For example, under operating conditions where the coke particle size is low and the circulating air volume is consistently high, the amount of coke powder and fine ash entering the boiler area with the circulating gas increases significantly. Ash accumulation occurs in the central, side, and bottom corner areas of the boiler, with the accumulation height reaching 1.5m to 2m in severe cases. The surface strength of the ash layer at the bottom of the boiler is relatively high, and simply increasing the circulating air volume is insufficient to break up the caked ash; in fact, it increases the flow resistance in the boiler area, further burdening the regulating fan.

[0018] If the above problems are not addressed, the ash accumulation at the bottom of the boiler will continuously reduce the effective flow area of ​​the boiler zone, increasing the resistance of the dry quenching system and making it difficult to maintain the circulating air volume within the set range. This will result in inadequate coke cooling, increased coke discharge temperature, and affect the service life of downstream equipment such as the coke discharge belt. On the other hand, simply increasing the circulating air volume to reduce the coke discharge temperature will further increase the system resistance, posing a risk of coke suspension and disruption of normal dry quenching production. If manual cleaning of the boiler bottom area is carried out after shutdown, a single cleaning usually requires several days of downtime, resulting in significant production losses. Moreover, the cleaning operation takes place in a high-temperature, dusty, confined environment, leading to high labor intensity and safety risks.

[0019] This application addresses the problem of ash accumulation and caking at the bottom of dry quenching coke boilers, which leads to increased operating resistance in the boiler area. The system addresses the significant losses and high operational risks associated with manual cleaning during shutdowns. It provides an online ash cleaning system for the bottom of dry quenching coke boilers. This system, operating while the circulating fan is running, utilizes staggered pulse purging of different ash accumulation zones at the bottom of the boiler, taking into account boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and the state of ash accumulation at the bottom. This disturbs, breaks up, and loosens the caking ash at the bottom of the boiler, allowing it to enter the circulating airflow in the boiler area. This reduces the impact of ash accumulation at the bottom of the boiler on system resistance, airflow distribution in the boiler area, and the stability of continuous dry quenching operation.

[0020] For ease of understanding, the following explains some key terms in this embodiment: Dry quenching coke boiler: refers to the waste heat recovery equipment in the dry quenching system that uses the sensible heat of high-temperature circulating gas to generate steam. The high-temperature circulating gas enters the dry quenching coke boiler from the dry quenching furnace through the primary dust collector, exchanges heat with the boiler heat exchange surface to cool down, and then returns to the dry quenching furnace for recycling through subsequent equipment.

[0021] Ash accumulation zone at the bottom of the boiler: refers to the bottom space area of ​​the dry quenching coke boiler located below the heat exchange surface, where the airflow velocity is relatively low and particulate matter is prone to settling and accumulating. The cleaning target in this application is located in this area.

[0022] Boiler bottom ash bearing surface: refers to the bottom surface in the ash accumulation area at the bottom of the boiler that is used to bear the deposited ash, such as the bottom surface of the ash hopper, the horizontal bottom plate, or the inclined bottom plate at the bottom of the boiler, which constitutes the supporting base surface of the ash accumulation layer at the bottom of the boiler.

[0023] Boiler bottom ash layer: refers to the granular material accumulation layer deposited on the ash bearing surface at the bottom of the boiler and gradually compacted under high temperature and its own weight. The upper part is a loose ash layer, and the lower part or surface layer may form a hardened ash layer.

[0024] Cemented ash: refers to ash that has hardened into clumps due to long-term heating, pressure or moisture in the ash layer at the bottom of the boiler, has high strength, and cannot be directly carried by the circulating airflow.

[0025] Mainstream circulating airflow zone in boiler area: refers to the area where the main flow channel of circulating gas is located in dry quenching coke boiler. Its airflow velocity is significantly higher than that of the local low-velocity zone in the ash accumulation zone at the bottom of the boiler. Particles entering this zone can be carried away from the bottom of the boiler by the circulating airflow.

[0026] Ash accumulation zones: These refer to the multiple zones that are divided into at the bottom of the boiler based on the spatial distribution characteristics, deposition rate, or location of the ash accumulation. Examples include the ash accumulation zone in the middle of the bottom of the boiler, the ash accumulation zones on both sides of the bottom of the boiler, the ash accumulation zones at the corners of the bottom of the boiler, and the ash accumulation zones between adjacent branch pipes.

[0027] Inert gas source: refers to the gas source that provides clean gas for the clean system of this application, such as nitrogen pipeline network in the plant area, nitrogen generation unit or nitrogen storage tank, the gas provided by which does not participate in combustion or oxidation reaction under the operating temperature and atmosphere conditions of the dry quenching system.

[0028] Clean gas: refers to the gas supplied by an inert gas source, transported to the nozzle assembly through the main and branch pipes of the clean gas source, and used to purge the ash accumulated at the bottom of the boiler, such as nitrogen.

[0029] Clean gas main pipe: refers to the main gas pipeline located outside the ash accumulation area at the bottom of the dry quenching coke boiler, used to connect with the inert gas source and distribute clean gas to each bottom cleaning module of the boiler.

[0030] Boiler bottom cleaning module: refers to a cleaning unit corresponding to an ash accumulation zone, capable of independent on / off switching and independent purging, which includes at least branch pipes, nozzle groups and branch control valves.

[0031] Branch pipe: refers to the gas transmission branch pipe section that is led out from the main cleaning gas pipe and passes through the bottom wall or lower side wall of the dry quenching coke boiler to connect to the ash accumulation area at the bottom of the boiler.

[0032] Nozzle assembly: refers to a collection of nozzles with different spray directions installed on the same branch pipe, used to convert the clean gas in the branch pipe into jets with different directions of action.

[0033] Breaking nozzle: refers to a nozzle that sprays towards the ash layer at the bottom of the boiler and is used to output a disturbing and breaking jet to break up and loosen the clump of ash.

[0034] Suspension booster nozzle: refers to a nozzle whose spray direction is from the ash-bearing surface at the bottom of the boiler to the main circulation airflow area of ​​the boiler area, and is used to output a suspension booster jet to make the loosened ash float upward and diffuse into the circulation airflow of the boiler area.

[0035] Corner cleaning nozzle: refers to a nozzle that sprays towards the corner of the ash accumulation area at the bottom of the boiler and / or the bottom area between adjacent branch pipes, and is used to output corner cleaning jets to remove ash accumulation in the blind spot.

[0036] Staggered pulse purging: refers to a purging method in which clean gas is supplied to different ash accumulation zones at the bottom of the boiler in an intermittent pulse manner, and the boiler bottom cleaning modules corresponding to different ash accumulation zones, especially adjacent ash accumulation zones, are activated at staggered times.

[0037] Online production status: refers to the production status in which the circulating fan of the dry quenching system continues to operate, the circulating airflow in the boiler area is uninterrupted, and the dry quenching coke loading and unloading operations are carried out as usual.

[0038] Boiler operating resistance parameters: These are parameters used to characterize the flow resistance of circulating gas as it passes through the boiler area, such as the pressure difference between the boiler inlet and outlet and / or the pressure difference at the bottom of the boiler.

[0039] Boiler bottom ash accumulation status: refers to parameters used to characterize the amount or distribution of ash accumulation at the bottom of the boiler, including at least one of the following: dust concentration in the bottom area of ​​the boiler, ash accumulation thickness, ash accumulation level, or dust concentration change after purging.

[0040] Cleaning cycle: refers to the process of sequentially completing one round of staggered pulse purging for each ash accumulation zone at the bottom of the boiler, with a preset start interval between two adjacent cleaning cycles.

[0041] Cleaning and purging: This refers to the purging operation in which clean gas is introduced into the target branch pipe through the cleaning port on the main clean gas pipe, under the condition that the control valves of other branches are closed, in order to remove the blockages in the branch pipe and its nozzle assembly.

[0042] To illustrate the technical solution described in this application, specific embodiments are provided below.

[0043] This embodiment provides an online cleaning system for ash accumulation at the bottom of a dry quenching coke boiler, used to remove ash accumulation at the bottom of the dry quenching coke boiler while the circulating fan is running in online production.

[0044] Among them, combined Figure 1 As shown, the online cleaning system for bottom ash accumulation in the dry quenching coke boiler includes a cleaning gas main pipe 10, multiple boiler bottom cleaning modules 20, a status monitoring unit 30, and a control unit 40.

[0045] The bottom of the dry quenching coke boiler 50 has a boiler bottom ash accumulation area 51. The lower part of the boiler bottom ash accumulation area 51 is the boiler bottom ash accumulation bearing surface 52. The particles deposited on the boiler bottom ash accumulation bearing surface 52 constitute the boiler bottom ash accumulation layer 54. The upper part of the boiler bottom ash accumulation area 51 is the boiler area circulating airflow mainstream area 53. The circulating gas passes through the boiler area circulating airflow mainstream area 53 at a high flow rate and exchanges heat with the boiler heat exchange surface.

[0046] The clean gas main pipe 10 is located outside the ash accumulation area 51 at the bottom of the dry quenching coke boiler 50 and is used to connect to the inert gas source 60. The inert gas source 60 can be a nitrogen pipeline network, a nitrogen generator, or a nitrogen storage tank within the plant. The clean gas main pipe 10 does not enter the interior of the dry quenching coke boiler 50, thus preventing the main pipe from being deformed, worn, or ash-laden due to prolonged exposure to the high-temperature, dusty internal environment of the boiler. Optionally, the clean gas main pipe 10 can be a pressure-resistant pipeline with a nominal diameter of DN100, laid along a support outside the ash accumulation area 51 at the bottom of the boiler for easy installation, inspection, and maintenance.

[0047] Multiple boiler bottom cleaning modules 20 are arranged to correspond to different ash accumulation zones at the bottom of the dry quenching coke boiler 50. Each boiler bottom cleaning module 20 includes a branch pipe 21 passing through the bottom wall or lower side wall of the dry quenching coke boiler 50, a nozzle assembly 22 installed on the branch pipe 21, and a branch control valve 23 for controlling the opening and closing of the branch pipe 21.

[0048] Branch pipe 21 extends from the main cleaning gas pipe 10 and connects to the bottom ash accumulation zone 51 of the dry quenching boiler 50 via the bottom wall or lower side wall, with its end sealed. Optionally, branch pipe 21 can be a high-temperature resistant pipeline with a nominal diameter of DN50. Multiple branch pipes 21 are symmetrically laid relative to the bottom ash accumulation bearing surface 52 of the boiler, so that each ash accumulation zone is within the range of the jet. Branch control valve 23 can be an explosion-proof, high-temperature resistant remote solenoid valve, installed on the section of branch pipe 21 located outside the dry quenching boiler 50, so as to achieve independent on / off control and maintenance / replacement of a single branch pipe 21 without entering the boiler interior.

[0049] Nozzle groups 22 are installed on the pipe section of branch pipe 21 located within the ash accumulation zone 51 at the bottom of the boiler, and multiple nozzle groups 22 are arranged at intervals along the length of branch pipe 21. Each nozzle group 22 includes a breaking nozzle 221 for outputting a disturbing and breaking jet towards the ash accumulation layer 54 at the bottom of the boiler, and a suspended booster nozzle 222 for outputting a suspended booster jet towards the main circulating airflow zone 53 in the boiler area. Optionally, the nozzle groups 22 are arranged at intervals of 0.5m to 0.8m along the length of branch pipe 21, with each nozzle group 22 including 6 nozzles distributed circumferentially. The circumferential positions of the nozzles in adjacent nozzle groups 22 are staggered by 20° to 40° to ensure that the action areas of the jet on the ash accumulation bearing surface 52 at the bottom of the boiler are interconnected, reducing purging blind spots. Optionally, the inner diameter of each nozzle is 3mm to 6mm, and the outlet end of the nozzle extends beyond the wall of branch pipe 21 and is chamfered to prevent ash accumulation at the bottom of the boiler from flowing back into the interior of branch pipe 21.

[0050] The status monitoring unit 30 is used to acquire status parameters including at least boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and the state of ash accumulation at the bottom of the boiler. Among them, the boiler operating resistance parameter is used to characterize the overall flow status of the boiler area, the branch pipe pressure is used to characterize the gas supply and flow status of the individual boiler bottom cleaning module 20, the clean gas main pipe pressure is used to characterize the sufficiency and safety of the clean gas supply, and the state of ash accumulation at the bottom of the boiler is used to characterize the degree of ash accumulation at the bottom of the boiler and the actual effect of the purging action.

[0051] The control unit 40 is connected to the status monitoring unit 30 and the branch control valves 23 of each boiler bottom cleaning module 20. It is used to control the cleaning gas to perform staggered pulse purging on different ash accumulation zones at the bottom of the dry quenching coke boiler 50 through the cleaning gas main pipe 10, multiple branch pipes 21 and nozzle group 22 according to the above status parameters when the circulating fan is running in the online production state. It also causes the boiler bottom cleaning modules 20 corresponding to adjacent ash accumulation zones to not be opened at the same time, so that the slab ash accumulation at the bottom of the boiler is broken and loosened and carried away by the circulating airflow in the boiler area.

[0052] Optionally, the control unit 40 can be implemented using a programmable logic controller, a distributed control system, or an industrial computer. It includes a processor and a memory storing the purging control program, and is connected to the status monitoring unit 30, the branch control valve 23, and corresponding valves on the clean gas main 10 via a communication bus or hardwired. The control unit 40 can be located in a central control room, allowing operators to set purging parameters, start / stop purging operations, and monitor operating status from within the central control room without needing to enter the boiler body area.

[0053] In one optional implementation, combined with Figure 2 As shown, the ash accumulation area 51 at the bottom of the boiler is divided into multiple ash accumulation zones according to the spatial distribution characteristics of the ash accumulation, including the ash accumulation zone 511 in the middle of the bottom of the boiler, the ash accumulation zones 512 on both sides of the bottom of the boiler, the ash accumulation zone 513 at the corners of the bottom of the boiler, and the ash accumulation zone 514 between adjacent branch pipes; Optionally, the branch pipes 21 and their nozzle groups 22 of the multiple boiler bottom cleaning modules 20 are arranged one-to-one or in groups with the above-mentioned ash accumulation zones, so that each ash accumulation zone is cleaned by at least one boiler bottom cleaning module 20.

[0054] The ash accumulation zone 51 at the bottom of the boiler is distributed in a planar pattern along the horizontal projection direction. There is no single, continuous horizontal ash conveying direction within it; the airflow velocity, particle settling rate, and ash thickness all differ between the central, side, and corner areas. Therefore, in this embodiment, the boiler bottom cleaning modules 20 are arranged in a planar pattern according to ash accumulation zones, rather than sequentially arranged along a single direction. This ensures that the purging action covers the entire projected area of ​​the ash accumulation zone 51 at the bottom of the boiler, and that each ash accumulation zone can be purged independently according to its own degree of ash accumulation.

[0055] The working process of the online cleaning system for bottom ash accumulation in the dry quenching coke boiler in this embodiment is as follows: The status monitoring unit 30 collects boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and boiler bottom ash accumulation status online and uploads them to the control unit 40. When the control unit 40 determines that the above status parameters meet the set cleaning conditions, it sequentially opens the branch control valve 23 of the corresponding boiler bottom cleaning module 20 according to the degree of ash accumulation in each ash accumulation zone or the preset rotation sequence, so that the clean gas enters the corresponding branch pipe 21 through the clean gas main pipe 10 and is sprayed out by the nozzle group 22 in a pulse manner. The disturbed breaking jet output by the breaking nozzle 221 impacts the ash layer 54 at the bottom of the boiler, causing it to clump together. The ash is broken and loosened under the impact of the jet and the local pressure fluctuations; the suspended booster jet output by the suspended booster nozzle 222 lifts the broken and loosened ash towards the main flow area 53 of the boiler area circulation airflow, so that it enters the boiler area circulation airflow and is carried away from the ash accumulation area 51 at the bottom of the boiler by the circulation airflow; after a set number of pulse purgings are completed in an ash accumulation zone, the control unit 40 closes the branch control valve 23 corresponding to the ash accumulation zone and opens the branch control valve 23 corresponding to another ash accumulation zone that is not adjacent to it, until all ash accumulation zones in a cleaning cycle are purged.

[0056] In this embodiment, since the main cleaning gas pipe 10 is located outside the ash accumulation area 51 at the bottom of the boiler and is only connected to the wall by the branch pipe 21, the main pipe body does not bear the high temperature and erosion inside the boiler. Since multiple boiler bottom cleaning modules 20 are arranged according to the ash accumulation zones and can be independently switched on and off, the ash accumulation in different areas of the boiler bottom ash accumulation area 51 can be treated separately. Since the nozzle group 22 provides both disturbing and breaking jets and suspended booster jets, the breaking process of the slab ash accumulation and the removal process of the loose ash accumulation are connected, avoiding the situation where the ash accumulation is broken up but still remains in the low-speed zone at the bottom of the boiler. Since the control unit 40 implements staggered pulse purging according to the state parameters, and the boiler bottom cleaning modules 20 corresponding to adjacent ash accumulation zones are not turned on at the same time, the dust concentration and airflow disturbance in the local area at the bottom of the boiler are controlled within an acceptable range, and the main cleaning gas pipe 10 will not experience a sudden pressure drop due to multiple gas lines being used simultaneously. Therefore, this cleaning system can reduce the flow resistance in the boiler area without stopping dry quenching coke production, reduce the increase in coke discharge temperature and the increase in circulating fan load caused by ash accumulation, and avoid production loss and operational safety risks caused by shutdown for ash cleaning.

[0057] It should be noted that the cleaning targets, module arrangement, jet composition, purging sequence, and monitoring parameters of the online cleaning system for bottom ash accumulation in dry quenching coke boilers proposed in this application are significantly different from the online cleaning scheme used for the horizontal section of the primary dust removal inlet in dry quenching coke boilers. The two cannot be substituted for each other, specifically in the following aspects: First, the objects to be cleaned and the morphology of ash accumulation are different. The horizontal section of the primary dust collector inlet is a horizontal or near-horizontal channel between the dry quenching coke oven and the primary dust collector. The ash accumulation is continuously distributed along the length of the channel, and the thickness of the ash layer varies in a single direction. However, the ash accumulation area 51 at the bottom of the boiler is a three-dimensional accumulation space with a planar distribution. The ash accumulates and caking in multiple locations, such as the middle, both sides, corners, and between adjacent branch pipes. The thickness of the ash accumulation and the degree of caking are different in each location, and there is no pattern of continuous distribution in a single direction.

[0058] Secondly, the arrangement of the boiler bottom cleaning modules 20 is different. In this application, multiple boiler bottom cleaning modules 20 are arranged in a planar manner according to different ash accumulation zones at the bottom of the boiler, with each boiler bottom cleaning module 20 corresponding to one ash accumulation zone; while in the scheme for the primary dust removal inlet horizontal section, the cleaning modules are arranged in segments along the length of the horizontal section, which is a linear segmentation along a single direction.

[0059] Thirdly, the jet composition and ash removal path are different. There is no definite ash conveying direction pointing downstream within the ash accumulation zone 51 at the bottom of the boiler. If the dispersed ash cannot enter the main circulating airflow zone 53 of the boiler area, it will re-sink onto the ash-bearing surface 52 at the bottom of the boiler under gravity. Therefore, the nozzle group 22 of this application is equipped with a suspended booster nozzle 222 whose spray direction points from the ash-bearing surface 52 at the bottom of the boiler to the main circulating airflow zone 53 of the boiler area, allowing the loosened ash to gain upward suspension and diffusion momentum and enter the circulating airflow of the boiler area. In contrast, in the scheme for the primary dust collector inlet cross section, after the ash is lifted, it can be guided to the primary dust collector along the existing horizontal circulating airflow direction within the cross section, with the jet primarily acting as a guide following the horizontal flow direction.

[0060] Fourth, the purging timing control methods are different. In this application, the control unit 40 performs staggered pulse purging according to the degree of ash accumulation in each ash accumulation zone or a preset rotation sequence, and limits the boiler bottom cleaning module 20 corresponding to adjacent ash accumulation zones to not be turned on at the same time, so as to avoid the simultaneous dusting of adjacent zones causing a sudden increase in local dust concentration at the bottom of the boiler and disordered airflow distribution in the boiler area; while in the scheme for the horizontal section of the primary dust collector inlet, the purging is performed in a step-by-step manner from the end closer to the primary dust collector to the end farther away from the primary dust collector, the purpose of which is to prevent the ash raised upstream from settling again in the downstream section.

[0061] Fifth, the status parameters and safety interlock criteria differ. In this application, the status parameters acquired by the status monitoring unit 30 include boiler operating resistance parameters characterizing the flow conditions in the boiler area and boiler bottom ash accumulation status characterizing the degree of ash accumulation at the bottom of the boiler. The safety interlock logic is correspondingly set with a criterion to stop purging when the boiler bottom ash accumulation status exceeds a preset safety range. However, in the scheme for the primary dust collector inlet cross section, the status parameters are mainly the cross section pressure difference, the ash discharge status of the primary dust collector, and the dust concentration downstream of the cross section. Its safety interlock is mainly based on whether the primary dust collector can accept the coke powder generated by purging.

[0062] Therefore, the solution proposed in this application is a special design made for the spatial distribution characteristics and caking properties of the ash accumulation zone 51 at the bottom of the boiler. Its technical features, working mechanism and the technical effects achieved are all independent.

[0063] Based on the above-mentioned structure of the online cleaning system for bottom ash accumulation in dry quenching coke boilers, the following describes the composition and function of each part of the cleaning system through some implementation methods.

[0064] In some implementations, the state parameters also include the clean gas main flow rate; combined with Figure 1 As shown, the clean gas main pipe 10 is installed on the bracket outside the ash accumulation area 51 at the bottom of the dry quenching coke boiler 50. The clean gas main pipe 10 is equipped with a solenoid main valve 11, a remote pressure regulating valve 12, a flow meter 13, a drain port 14, and a blockage removal interface 15.

[0065] The system includes a solenoid main valve 11 for starting and stopping the supply of clean gas to the main pipe 10; a remote pressure regulating valve 12 for remotely regulating the pressure and / or flow rate of the clean gas; a flow meter 13 for acquiring the flow rate of the main pipe; a drain port 14 for discharging deposits from the main pipe 10 during online production; and a cleaning port 15 for connecting external clean gas in coordination with the opening and closing of the corresponding branch control valve 23, and for cleaning and purging the main pipe 10 and / or the target branch pipe 21. A status monitoring unit 30 is used to acquire the flow rate of the main pipe based on the flow meter 13. A control unit 40 is connected to the solenoid main valve 11 and the remote pressure regulating valve 12 of the main pipe 10, and is used to control the corresponding valves in the main pipe 10 to perform operational adjustments based on the status parameters.

[0066] The main clean gas pipe 10 is installed along the support outside the ash accumulation area 51 at the bottom of the boiler, keeping the main pipe relatively independent from the boiler body. The expansion displacement of the pipeline is absorbed by the support, and it is also convenient to inspect the working status of each valve and interface along the pipeline. Optionally, a drain port 14 and a cleaning port 15 are installed on the main clean gas pipe 10 every 4m to 6m. The drain port 14 is located at the lowest point of the pipeline. It can be opened briefly during online production to discharge the deposits generated in the pipe due to the moisture and dust in the gas source without disassembling the pipeline. The cleaning port 15, with the corresponding branch control valve 23 open and the other branch control valves 23 closed, concentrates the external clean gas into the target branch pipe 21 to achieve cleaning and purging of the branch pipe 21 and its nozzle assembly 22.

[0067] The remote pressure regulating valve 12 allows the pressure and flow rate of the cleaning gas to be adjusted in the central control room. This increases the purging pressure when the ash accumulation is high to enhance the impact of the disturbed breaking jet, and decreases the purging pressure when the ash accumulation is low to reduce the consumption of cleaning gas. The flow rate of the main cleaning gas pipe obtained by the flow meter 13, in conjunction with the main pipe pressure, can be used to determine whether the current gas consumption matches the number of boiler bottom cleaning modules 20 that are turned on. For example, when the main pipe pressure is normal but the main cleaning gas flow rate is significantly low, it can be determined that the branch pipe 21 or the nozzle group 22 has a tendency to be blocked. When the main pipe pressure drops but the main cleaning gas flow rate is significantly high, it can be determined that the pipeline has a tendency to leak.

[0068] The above-described embodiments of this application integrate a solenoid main valve 11, a remote pressure regulating valve 12, a flow meter 13, a drain port 14, and a blockage clearing interface 15 on the clean gas main pipe 10, and incorporate the clean gas main pipe flow rate into the status parameters. This allows the supply, regulation, metering, draining, and blockage clearing of clean gas to be completed outside the dry quenching coke boiler 50, ensuring the stability and adjustability of the purging gas supply during online production, and avoiding the need for shutdown due to dust accumulation in the main pipe or blockage in the branch pipe.

[0069] In some embodiments, each boiler bottom cleaning module 20 also includes a high-temperature resistant sealed through-wall sleeve, and the branch pipe 21 is connected to the bottom ash accumulation area 51 of the dry quenching boiler 50 from the bottom wall or the lower side wall of the dry quenching boiler 50 through the high-temperature resistant sealed through-wall sleeve; the outer side of the pipe section of the branch pipe 21 located in the dry quenching boiler 50 is provided with a heat-insulating and wear-resistant sleeve, and the pipe section where the nozzle group 22 is located is set higher than the bottom ash accumulation bearing surface 52 of the boiler.

[0070] A high-temperature resistant sealing through-wall sleeve is installed at the point where the branch pipe 21 passes through the boiler wall. On one hand, it seals the annular gap between the branch pipe 21 and the wall, preventing high-temperature dust-laden gas from leaking out of the boiler along the gap. On the other hand, it provides compensation space for the branch pipe 21's thermal expansion, preventing additional stress on the wall caused by the branch pipe 21's thermal elongation. Optionally, the high-temperature resistant sealing through-wall sleeve can be filled with high-temperature resistant sealing filler, and a removable gland can be installed on the outside of the boiler to allow for replacement of the seal without entering the boiler.

[0071] The heat-insulating and wear-resistant sleeve is wrapped around the outside of the branch pipe 21 located inside the boiler. It is used to reduce the heat transfer intensity of the high-temperature circulating gas to the pipe wall of the branch pipe 21, and to withstand the scouring and wear of the outer surface of the pipe section by the dust-laden airflow and ash particles. This inhibits the deformation and thinning of the branch pipe 21 in the high-temperature environment and extends its online service life.

[0072] The pipe section containing nozzle assembly 22 is positioned above the ash-bearing surface 52 at the bottom of the boiler, preventing the nozzle outlets of nozzle assembly 22 from being directly buried by deposited ash. Optionally, the centerline of the pipe section containing nozzle assembly 22 is positioned 100mm to 300mm above the ash-bearing surface 52 at the bottom of the boiler. This height allows the disturbed and breaking jet output from the breaking nozzle 221 to act on the ash layer 54 at the bottom of the boiler with an appropriate jet length, while also reducing the probability of the nozzle outlets being blocked by ash.

[0073] The above-described embodiments of this application, through the height setting of the high-temperature resistant sealed through-wall sleeve, the heat-insulating and wear-resistant sleeve, and the pipe section where the nozzle assembly 22 is located, enable the boiler bottom cleaning module 20 to withstand the high temperature, dust, and erosion environment in the ash accumulation area 51 at the bottom of the boiler for a long time, ensuring the operational reliability of the cleaning system in online production. At the same time, maintenance operations such as seal replacement and branch pipe repair can be completed outside the boiler, avoiding the safety risks of entering the boiler for work.

[0074] In some implementations, combined Figure 3 As shown, the nozzle group 22 also includes a corner sweeping nozzle 223. The breaking nozzle 221, the suspension booster nozzle 222 and the corner sweeping nozzle 223 are arranged circumferentially staggered in the same nozzle group 22 to form a disturbing breaking jet toward the ash layer 54 at the bottom of the boiler, a suspension booster jet toward the main circulation airflow zone 53 in the boiler area, and a corner sweeping jet toward the corner area at the bottom of the boiler or the blind area between adjacent branch pipes 21.

[0075] Among them, the crushing nozzle 221, the suspension booster nozzle 222 and the corner sweeping nozzle 223 are staggered along the circumference of the branch pipe 21, so that the same nozzle group 22 simultaneously forms three jets with different action directions during one pulse purging process. The three jets respectively undertake the functions of crushing, carrying out and filling blind spots of ash, and do not collide head-on with each other.

[0076] The disturbing and breaking jet impacts the ash layer 54 at the bottom of the boiler in an approximately vertical direction. Its function is to create a local high-pressure zone and pressure fluctuations on the surface of the ash layer, causing the hardened ash to crack along its internal cementing surface and be peeled off into loose particles. The suspended booster jet sweeps across the ash bearing surface 52 at the bottom of the boiler in an upward inclined direction. Its function is to apply upward momentum to the peeled loose particles, causing the particles to enter the main circulation airflow zone 53 in the boiler area, and thus be carried away by the circulation airflow. The corner sweeping jet is directed towards the corners of the ash accumulation area 51 at the bottom of the boiler and the bottom area between adjacent branch pipes 21, driving the ash in the above-mentioned areas into the range of action of the disturbing and breaking jet and the suspended booster jet.

[0077] The above-described embodiments of this application, by setting three nozzles with different spray directions circumferentially staggered in the same nozzle group 22, enable the breaking, suspension and removal of ash at the bottom of the boiler and the filling of blind spots at the edges and corners to be completed in the same pulse purging. This not only avoids the situation where the ash is broken up and then re-settled due to the single jet direction, but also reduces the purging blind spots in the ash accumulation area 51 at the bottom of the boiler, thereby improving the ash removal effect per unit of clean gas consumption.

[0078] In some embodiments, the spray direction of the crushing nozzle 221 forms an angle of 60° to 90° with the ash-bearing surface 52 at the bottom of the boiler; the spray direction of the suspension booster nozzle 222 points from the ash-bearing surface 52 at the bottom of the boiler to the main circulation airflow zone 53 in the boiler area, and forms an angle of 15° to 60° with the ash-bearing surface 52 at the bottom of the boiler; the spray direction of the corner sweeping nozzle 223 is toward the corner of the ash-bearing area 51 at the bottom of the boiler and / or the bottom area between adjacent branch pipes 21.

[0079] Among them, combined Figure 3 As shown, the angle between the injection direction of the crushing nozzle 221 and the ash-bearing surface 52 at the bottom of the boiler is α, and the angle between the injection direction of the suspended booster nozzle 222 and the ash-bearing surface 52 at the bottom of the boiler is β. When α is in the range of 60° to 90°, the momentum of the disturbed crushing jet is dominated by the normal component, and the impact pressure acting on the surface of the ash layer 54 at the bottom of the boiler is relatively large, which is conducive to cracking and breaking the slab-like ash. If α is too small, the tangential component of the jet increases, the jet sweeps across the surface of the ash layer, and the crushing effect weakens. When β is in the range of 15° to 60°, the suspended booster jet has both a pushing component along the bearing surface and a lifting component perpendicular to the bearing surface, which enables loose particles to obtain the lifting height required to enter the main circulation airflow zone 53 of the boiler area while being pushed. If β is too small, the particles will only move near the ash-accumulated bearing surface 52 at the bottom of the boiler and will have difficulty leaving the low-speed zone. If β is too large, the pushing effect of the jet on the particles will be insufficient, and the particles will easily re-settle in place after being lifted.

[0080] Optionally, α can be set to 75° to 90° and β to 25° to 45°, at which point the impact effect of the disturbed breaking jet and the carrying effect of the suspended booster jet are well matched. The spray direction of the corner ash-sweeping nozzle 223 can be determined according to the actual geometry of the ash accumulation area 51 at the bottom of the boiler, for example, towards the corner ash accumulation area 513 at the bottom of the boiler, or towards the ash accumulation area 514 between adjacent branch pipes 21.

[0081] The above-described embodiments of this application limit the injection angle range of the crushing nozzle 221 and the suspension booster nozzle 222, so that the normal impact component of the disturbed crushing jet and the lifting component of the suspension booster jet are at appropriate levels, thereby improving the crushing efficiency of slab ash and the proportion of loose ash entering the circulating airflow in the boiler area under the same clean gas supply pressure, and reducing the repeated settling of ash.

[0082] In some embodiments, multiple boiler bottom cleaning modules 20 are arranged according to different ash accumulation zones at the bottom of the dry quenching coke boiler 50. The different ash accumulation zones include at least two of the following: ash accumulation zone 511 in the middle of the boiler bottom, ash accumulation zones 512 on both sides of the boiler bottom, ash accumulation zone 513 at the corners of the boiler bottom, and ash accumulation zone 514 between adjacent branch pipes. The control unit 40 is configured to perform staggered pulse purging on the multiple boiler bottom cleaning modules 20 according to the degree of ash accumulation in the different ash accumulation zones or a preset rotation order within a cleaning cycle, so that the boiler bottom cleaning modules 20 corresponding to any two adjacent ash accumulation zones are not turned on at the same time or are turned on at different times.

[0083] The division of ash accumulation zones can be determined based on the geometry of the ash accumulation zone 51 at the bottom of the boiler, the velocity distribution of the circulating airflow at the bottom of the boiler, and the location of ash accumulation recorded during previous maintenance. The ash accumulation zone 511 in the middle of the bottom of the boiler is generally located in the middle of the ash accumulation bearing surface 52 at the bottom of the boiler. It has a large amount of ash accumulation but relatively good airflow conditions. The ash accumulation zones 512 on both sides of the bottom of the boiler are located on both sides of the middle area. The ash accumulation zone 513 at the corner of the bottom of the boiler is located at the corner of the ash accumulation zone 51 at the bottom of the boiler. It has the lowest airflow velocity and the highest degree of ash caking. The ash accumulation zone 514 between adjacent branch pipes is located between two adjacent branch pipes 21 and belongs to the area where the jet effect is relatively weak.

[0084] When performing staggered pulse purging according to the degree of ash accumulation, the control unit 40 can arrange the ash accumulation zones with higher ash accumulation levels at the beginning of the cleaning cycle and allocate more pulse purging times to them based on the ash accumulation thickness or ash accumulation level of each ash accumulation zone obtained by the ash accumulation status detection unit. When performing staggered pulse purging according to a preset rotation sequence, the control unit 40 can purge sequentially according to the pre-arranged zone sequence and change the starting zone of the sequence in each cleaning cycle to make the purging opportunities of each ash accumulation zone more balanced.

[0085] The purpose of activating the boiler bottom cleaning modules 20 at different times or at staggered times for any two adjacent ash accumulation zones is as follows: First, simultaneous purging of adjacent ash accumulation zones will cause a short-term sharp increase in dust concentration in the same local area at the bottom of the boiler, exceeding the carrying capacity of the circulating airflow in the boiler area, which will instead cause the raised ash to settle again in the adjacent area; Second, the simultaneous action of jets from adjacent zones can easily form mutually opposing airflows at the bottom of the boiler, disrupting the original distribution of the circulating airflow in the boiler area at the bottom of the boiler and affecting heat exchange stability; Third, the simultaneous use of gas by multiple boiler bottom cleaning modules 20 will cause a sudden drop in pressure in the main cleaning gas pipe 10, resulting in the pressure in each branch pipe being lower than the preset purging pressure threshold, weakening the impact intensity of the disturbed and broken jets.

[0086] The above-described embodiments of this application, by arranging the boiler bottom cleaning module 20 according to the ash accumulation zones and performing staggered pulse purging on it, enable the ash accumulation in each part of the boiler bottom ash accumulation zone 51 to be removed in a targeted and zone-by-zone manner. At the same time, the increase in dust concentration and airflow disturbance caused by a single purging are limited to a local range, which not only ensures the ash removal effect, but also maintains the stability of the boiler area circulating airflow distribution and heat exchange process under online production conditions.

[0087] In some embodiments, the status monitoring unit 30 includes a resistance detection unit for acquiring boiler operating resistance parameters, a branch pipe pressure sensor installed on the branch pipe 21, a main pipe pressure sensor installed on the clean gas main pipe 10, and an ash accumulation status detection unit for acquiring the ash accumulation status at the bottom of the boiler; wherein, the boiler operating resistance parameters include the boiler inlet and outlet pressure difference and / or the boiler bottom area pressure difference, and the boiler bottom ash accumulation status includes at least one of the following: dust concentration at the bottom of the boiler, ash accumulation thickness, ash accumulation level, or dust concentration change status after purging; the branch pipe pressure sensor is installed downstream of the corresponding branch control valve 23 and is used to acquire the branch pipe pressure of the corresponding branch pipe 21 after the corresponding branch control valve 23 is opened.

[0088] The resistance detection unit may include pressure transmitters and differential pressure calculation components installed at the inlet and outlet of the dry quenching coke boiler 50 to obtain the pressure difference between the boiler inlet and outlet; it may also include pressure transmitters installed at the upper and lower parts of the boiler bottom area to obtain the pressure difference in the boiler bottom area. The boiler operating resistance parameter reflects the change in the effective flow area of ​​the boiler area, and its value increases with the accumulation of ash at the bottom of the boiler, thus serving as the main basis for determining whether purging needs to be initiated.

[0089] The ash accumulation status detection unit may include a dust concentration detector, a level gauge, or a thickness detection device installed in the bottom area of ​​the boiler. The dust concentration detector is used to acquire the dust concentration in the bottom area of ​​the boiler and the change in dust concentration after purging. The level gauge or thickness detection device is used to acquire the ash level or thickness of each ash accumulation zone. The change in dust concentration after purging can be used to evaluate the actual effect of a single pulse purging. For example, if the dust concentration in the bottom area of ​​the boiler increases significantly after a single pulse purging and then gradually decreases, it indicates that the ash has been effectively lifted and carried away by the circulating airflow. If the dust concentration remains essentially unchanged, it indicates that the corresponding branch pipe 21 or nozzle group 22 may be blocked, or that the ash accumulation in that zone is highly compacted, requiring an increase in purging pressure or the number of pulse purgings.

[0090] The branch pipe pressure sensor is located downstream of the corresponding branch control valve 23, specifically on the pipe section between the branch control valve 23 and the nozzle assembly 22. Therefore, the branch pipe pressure obtained after the corresponding branch control valve 23 is opened accurately reflects the actual gas supply pressure within the branch pipe 21 and the flow status of the nozzle assembly 22: a persistently low branch pipe pressure indicates insufficient gas supply or leakage in the branch pipe 21; a persistently high branch pipe pressure indicates blockage at the outlet of the nozzle assembly 22. The main pipe pressure sensor, which obtains the clean gas main pipe pressure, characterizes the clean gas supply capacity and serves as the basis for overpressure protection.

[0091] The above-described embodiments of this application, through the cooperation of the resistance detection unit, the branch pipe pressure sensor, the main pipe pressure sensor and the ash accumulation status detection unit, enable the cleaning system to simultaneously possess online sensing capabilities for the overall flow status of the boiler area, the clean gas supply status, the unobstructed status of individual branch pipes, and the ash accumulation and removal effect at the bottom of the boiler, providing a complete parameter basis for the control unit 40 to determine cleaning conditions, adjust purging parameters and execute safety interlocks.

[0092] In some embodiments, the control unit 40 is equipped with safety interlock logic, which includes: stopping the purging of each boiler bottom cleaning module 20 and shutting off the gas supply to the clean gas main 10 and / or issuing an alarm when the circulating fan stops, the dry quenching boiler 50 or its circulating system is in an abnormal state that does not allow boiler bottom purging, the main pressure of the clean gas main 10 exceeds the preset safety pressure limit, or the ash accumulation at the bottom of the boiler exceeds the preset safety range; and stopping the purging of the corresponding branch pipe 21 or the corresponding boiler bottom cleaning module 20 and issuing an alarm when the branch control valve 23 of any boiler bottom cleaning module 20 is opened and the pressure of the corresponding branch pipe is lower than the preset purging pressure lower limit for a preset time.

[0093] When the circulating fan stops, the circulating airflow in the boiler area is interrupted, and the ash that is lifted cannot be carried away from the ash accumulation area 51 at the bottom of the boiler. At the same time, the continuously introduced clean gas may accumulate inside the boiler and affect the system pressure balance, so it is necessary to stop purging. If the dry quenching boiler 50 or its circulating system is in an abnormal state that does not allow the bottom purging of the boiler to be performed, such as abnormal pressure fluctuations in the boiler area, abnormal coke discharge system, maintenance of the circulating system or interlock tripping, it is also necessary to stop purging.

[0094] When the main pressure of the clean gas main pipe 10 exceeds the preset safe pressure limit, there is a risk of overpressure in the pipeline and its accessories. In this case, the solenoid main valve 11 should be closed and the pressure released through the safety valve. Optionally, the preset safe pressure limit is between 0.9 MPa and 1.1 MPa. If the ash accumulation at the bottom of the boiler exceeds the preset safe range, for example, when the dust concentration in the bottom area of ​​the boiler exceeds the preset concentration limit, it indicates that the amount of suspended dust at the bottom of the boiler is close to or exceeds the carrying capacity of the circulating airflow in the boiler area. Continuing to purge will cause the dust to re-settle inside the boiler or affect the normal operation of downstream equipment. Therefore, purging needs to be suspended and resumed only after the dust concentration has decreased.

[0095] For situations where the branch pipe pressure is lower than the preset lower limit of the purging pressure, the safety interlock logic includes a criterion for a continuous preset time. This is to prevent instantaneous pressure fluctuations caused by the pressure build-up process at the moment the branch control valve 23 opens or the intermittent characteristics of pulse purging from being mistakenly interpreted as abnormal. Optionally, the preset time is between 3 seconds and 10 seconds, and the preset lower limit of the purging pressure is between 0.5 MPa and 0.6 MPa. When the branch pipe pressure remains lower than the preset lower limit of the purging pressure for the continuous preset time, it is determined that the boiler bottom cleaning module 20 has insufficient gas supply or leakage, its purging is stopped, and an alarm is issued. Simultaneously, this does not affect the continued purging of other boiler bottom cleaning modules 20 according to the cleaning cycle.

[0096] The above-described embodiments of this application, by configuring the aforementioned safety interlock logic in the control unit 40, enable the online purging operation of the ash accumulation at the bottom of the boiler to mutually constrain the operating status of the dry quenching system. In cases such as the shutdown of the circulating fan, system abnormality, main pipe overpressure, or excessive dust concentration at the bottom of the boiler, the purging can be stopped in a timely manner. Furthermore, when a single boiler bottom cleaning module 20 experiences an abnormal air supply, local purging is stopped and an alarm is triggered. This ensures the effectiveness of online cleaning while also taking into account the operational safety of the dry quenching system and the equipment safety of the cleaning system itself.

[0097] Based on the same inventive concept, this application also provides an online cleaning method for bottom ash accumulation in a dry quenching coke boiler. This method is implemented using the online cleaning system for bottom ash accumulation in a dry quenching coke boiler described in any of the above embodiments. It can realize all the processes of the above cleaning system and achieve the same technical effect. Therefore, the specific limitations in the method embodiments provided below can be found in the above-mentioned limitations on the online cleaning system for bottom ash accumulation in a dry quenching coke boiler. To avoid repetition, it will not be repeated here.

[0098] Combination Figure 4 As shown, in some embodiments, the online cleaning method for bottom ash accumulation in the dry quenching boiler includes steps 401 to 403. Specifically: Step 401: Under the online production state where the circulating fan is running, obtain the boiler operating resistance parameters, the pressure of the clean gas main pipe, and the ash accumulation status at the bottom of the boiler.

[0099] The aforementioned status parameters used to determine whether to initiate purging are collected online by the status monitoring unit 30 and uploaded to the control unit 40. Boiler operating resistance parameters are obtained by the resistance detection unit, the clean gas main pipe pressure is obtained by the main pipe pressure sensor, and the ash accumulation status at the bottom of the boiler is obtained by the ash accumulation status detection unit. Branch pipe pressure is obtained by the branch pipe pressure sensor located downstream of the branch control valve 23, and serves as an operational feedback parameter for determining the actual gas supply pressure of the corresponding branch pipe 21 and the effectiveness of purging after the corresponding branch control valve 23 is opened.

[0100] The acquisition of the aforementioned status parameters for determining whether to initiate purging is performed under online production conditions where the circulating fan is running and the circulating airflow in the boiler area is uninterrupted. This means that the coking, coke discharge, and waste heat recovery operations for dry quenching continue as normal, without requiring a shutdown for ash removal. Optionally, the control unit 40 periodically acquires the aforementioned status parameters according to a set sampling period, and performs filtering and trend calculations on them to obtain derived parameters such as the rate of increase of the boiler operating resistance parameter within a preset detection period.

[0101] Step 402: When the boiler operating resistance parameters, the pressure of the main cleaning gas pipe, and the ash accumulation status at the bottom of the boiler meet the set cleaning conditions, the branch control valves of the corresponding bottom cleaning modules of the boiler are opened in staggered shifts according to the degree of ash accumulation in different ash accumulation zones at the bottom of the boiler or the preset rotation sequence.

[0102] The dust concentration detector is set to clean conditions including: the boiler operating resistance parameter is greater than or equal to the preset resistance threshold, and / or the rate of increase of the boiler operating resistance parameter within the preset detection cycle is greater than the preset resistance change threshold; the pressure of the clean gas main pipe is within the preset purging gas supply pressure range and less than the preset safety pressure threshold; and the ash accumulation at the bottom of the boiler is within the preset allowable range.

[0103] If the boiler operating resistance parameter is greater than or equal to the preset resistance threshold, it indicates that the effective flow area of ​​the boiler area has been significantly reduced due to ash accumulation, making purging necessary. If the rate of increase of the boiler operating resistance parameter within the preset detection period is greater than the preset resistance change threshold, it indicates that the ash accumulation rate is relatively fast. Even if the current resistance has not yet reached the preset resistance threshold, purging should be initiated in advance to prevent further ash compaction and difficulty in removal. If the clean gas main pipe pressure is within the preset purging gas supply pressure range and less than the preset safety pressure threshold, it indicates that the main pipe gas supply has both the basis for forming a purging jet and is within the safe tolerance range of the pipeline. If the ash accumulation at the bottom of the boiler is within the preset allowable range, it indicates that the dust concentration and other parameters in the bottom area of ​​the boiler have not yet approached the upper limit of the carrying capacity of the circulating airflow, and the conditions are met for accepting the dust raised by purging. The above conditions constrain whether to initiate purging from the aspects of purging necessity, gas supply basis and safety, and system acceptability.

[0104] When the branch control valve 23 corresponding to the boiler bottom cleaning module 20 is opened during off-peak hours, the control unit 40 opens only one or more branch control valves 23 corresponding to non-adjacent ash accumulation zones at the same time, and makes each branch control valve 23 repeatedly open and close in a pulse manner. After the corresponding branch control valve 23 is opened, the branch pipe pressure sensor located on its downstream side obtains the branch pipe pressure of the corresponding branch pipe 21; when the branch pipe pressure is greater than or equal to the preset purging pressure threshold, it indicates that the cleaning gas can form a jet with sufficient impact intensity at the nozzle group 22, and the pulse purging of the branch continues; when the branch pipe pressure is lower than the preset purging pressure lower limit and continues for a preset time, the purging of the corresponding branch pipe 21 or the corresponding boiler bottom cleaning module 20 is stopped according to the safety interlock logic and an alarm is issued. Optionally, the duration of a single pulse purging is 10 to 30 seconds, and the same dust accumulation zone is continuously purged 2 to 5 times within a cleaning cycle, with an interval of 5 to 15 seconds between two adjacent pulse purgings, so that the pressure in the cleaning gas main pipe 10 can be restored between the two pulses.

[0105] Step 403: After the corresponding branch control valve is opened and the branch pressure of the corresponding branch is obtained, when the branch pressure is greater than or equal to the preset purging pressure threshold, a disturbance breaking jet is output through the breaking nozzle to break and loosen the slab ash at the bottom of the boiler, and a suspension boosting jet is output through the suspension boosting nozzle to allow the loosened ash to enter the circulating airflow in the boiler area and be carried away with the circulating airflow in the boiler area.

[0106] After the branch control valve 23 is opened and the corresponding branch pressure reaches the preset purging pressure threshold, the cleaning gas enters the corresponding branch 21 through the cleaning gas main pipe 10 and is sprayed out by each nozzle of the nozzle group 22. The disruptive breaking jet output by the breaking nozzle 221 impacts the ash layer 54 at the bottom of the boiler at an angle of 60° to 90°. The jet creates local impact pressure and pressure pulsation on the surface of the ash layer, causing the clumped ash to crack along its cementing surface and be peeled off into loose particles. The suspended booster jet output by the suspended booster nozzle 222 sweeps across the ash bearing surface 52 at the bottom of the boiler at an angle of 15° to 60° and points towards the main circulation airflow zone 53 of the boiler area. This causes the peeled loose particles to gain an upward velocity component, cross the low-speed zone in the ash accumulation zone 51 at the bottom of the boiler, and enter the main circulation airflow zone 53 of the boiler area. Subsequently, they are carried away from the bottom of the dry quenching coke boiler 50 by the circulating airflow. In the embodiment with the corner sweeping nozzle 223, the corner sweeping jet simultaneously drives the ash in the corner ash accumulation zone 513 at the bottom of the boiler and the ash accumulation zone 514 between adjacent branch pipes into the range of action of the above two jets.

[0107] As the ash is removed zone by zone, the thickness of the ash layer 54 at the bottom of the boiler decreases, the effective flow area of ​​the boiler increases, and the boiler operating resistance parameters subsequently drop. The control unit 40 can compare the boiler operating resistance parameters with the values ​​before the start of the cleaning cycle at the end of a cleaning cycle to evaluate the actual cleaning effect.

[0108] In this embodiment, under the online production state where the circulating fan is running, the method first determines whether purging conditions are met based on the boiler operating resistance parameters, branch pipe pressure, clean gas main pipe pressure, and the ash accumulation status at the bottom of the boiler. Then, according to the degree of ash accumulation or a preset rotation sequence, the corresponding boiler bottom cleaning module 20 is activated in staggered shifts for different ash accumulation zones at the bottom of the boiler. The ash accumulation is broken and carried out by the combination of disturbing and breaking jet and suspended booster jet. This reduces the flow resistance in the boiler area without stopping the machine, avoids production loss caused by stopping the machine for ash cleaning, and also avoids the labor intensity and safety risks of manually entering the boiler for ash cleaning.

[0109] In some implementations, combined Figure 5 As shown, the online cleaning method for bottom ash accumulation in a dry quenching coke boiler also includes steps 501 to 503. Specifically: Step 501: After each cleaning cycle, obtain the decrease in boiler operating resistance parameters relative to the start of the cleaning cycle. If the decrease in dust concentration is less than the set value, extend the purging duration of at least one boiler bottom cleaning module in the next cleaning cycle, increase the number of pulse purgings, and / or shorten the start interval of the next cleaning cycle.

[0110] The decrease in boiler operating resistance parameters relative to the start of the cleaning cycle reflects the actual ash removal effect of this cleaning cycle. If the decrease is less than the set range, it indicates that insufficient ash has been removed during this cleaning cycle. This may be due to high ash compaction, a short pulse purging duration, or an excessively long start interval between cleaning cycles, causing excessive ash accumulation between cleaning cycles. The control unit 40 adjusts the purging parameters for the next cleaning cycle accordingly. For example, it may extend the pulse purging duration from 20s to 30s, increase the number of pulse purgings for the same ash accumulation zone from 2 to 4, or shorten the start interval between cleaning cycles from 2 hours to 1 hour. Optionally, the control unit 40 may adjust the purging parameters only for the boiler bottom cleaning module 20 corresponding to the ash accumulation zone with a smaller decrease in resistance, to avoid unnecessary consumption of cleaning gas.

[0111] Step 502: During the cleaning cycle, if the pressure of any branch pipe continuously exceeds the preset blockage judgment threshold when the corresponding branch control valve is open and the pressure of the main cleaning gas pipe is within the preset purging gas supply pressure range, the corresponding branch pipe is identified as the branch pipe to be cleared. The branch control valves of other branches except the branch pipe to be cleared are closed, and cleaning gas is introduced into the branch pipe to be cleared through the clearing interface set on the main cleaning gas pipe to clear the blockage and purge the branch pipe to be cleared.

[0112] The requirement that the main cleaning gas pressure be within the preset purging gas supply pressure range is used as a prerequisite for clogging detection. This serves to eliminate the possibility of increased branch pipe pressure caused by abnormally high main pipe supply pressure, thus avoiding misjudging high supply pressure as nozzle clogging. Under this prerequisite, if the branch pipe pressure of a certain branch pipe 21 continuously exceeds the preset clogging detection threshold, it indicates that the outlet flow area of ​​the nozzle assembly 22 in that branch pipe 21 has decreased, meaning that there is coke powder clogging at the nozzle outlet.

[0113] After identifying the branch pipe to be cleared, close the branch control valves 23 corresponding to all other branch pipes 21 except the one to be cleared. This allows the clean gas in the main clean gas pipe 10 to be concentrated and supplied to the branch pipe to be cleared. Clean gas is then connected externally through the clearing port 15 to increase the clearing and purging pressure. Optionally, the clearing and purging pressure is higher than the conventional purging pressure, for example, 0.8 MPa to 1.0 MPa, and the duration of the clearing and purging is 30 to 120 seconds. After the clearing and purging is completed, the blockage can be determined by whether the branch pipe pressure returns to the normal range. The above clearing process is completed outside the dry quenching boiler 50, without needing to stop the boiler and enter the boiler to clean the nozzle orifices.

[0114] Step 503: During the purging or leak detection procedure, if the pressure of any branch pipe continues to drop and meets the preset leak judgment condition, the branch control valves corresponding to each boiler bottom cleaning module are closed in sequence. Based on the changes in the main pipe pressure and / or branch pipe pressure before and after closing the corresponding branch control valve, the leaking branch pipe is determined and an alarm is issued.

[0115] The preset leakage judgment condition can be set as follows: the decrease in branch pipe pressure within a preset time period is greater than a preset pressure drop threshold, or the main pipe pressure of the clean gas continues to decrease when all branch control valves 23 are closed. The branch control valves 23 corresponding to each boiler bottom cleaning module 20 are closed sequentially, and the changes in main pipe pressure and / or branch pipe pressure before and after closure are observed. If the decrease in main pipe pressure significantly slows down or stops after closing a certain branch control valve 23, the branch pipe 21 corresponding to that branch control valve 23 can be determined to be a leaking branch pipe. After identifying the leaking branch pipe, the control unit 40 issues an alarm and can remove the leaking branch pipe from the purging sequence of subsequent cleaning cycles. When the maintenance time is right, the seals of its high-temperature resistant sealing through-wall sleeve or the corresponding pipe section can be replaced outside the boiler.

[0116] The above-described embodiments of this application, through closed-loop evaluation of cleaning effect and adaptive adjustment of purging parameters, match the purging intensity with the actual accumulation rate of ash at the bottom of the boiler; through blockage determination based on the premise that the pressure of the main cleaning gas pipe is within the preset purging gas supply pressure range and online unblocking purging, the unobstructed flow of branch pipe 21 and nozzle group 22 can be restored without shutting down the system; through a leak location method of sequential valve closure comparison, the leak point can be accurately located to a specific branch pipe. Therefore, the cleaning effect, unobstructed flow, and sealing performance of the cleaning system can be maintained during long-term online operation, further reducing reliance on shutdown maintenance.

[0117] The above technical solution will be illustrated with a specific example below.

[0118] Suppose that during the operation of a dry quenching coke unit, the particle size of the coke entering the furnace is too low due to the adjustment of the coal blending structure. As the amount of coke powder entering the dry quenching coke boiler 50 with the circulating gas increases, caking ash gradually forms in the ash accumulation zone 51 at the bottom of the boiler. The pressure difference between the boiler inlet and outlet continuously increases from the reference value, and the coke discharge temperature rises accordingly. During a maintenance of the device, a DN100 clean gas main pipe 10 is laid along the support outside the ash accumulation area 51 at the bottom of the boiler and connected to the plant's nitrogen pipeline network. A solenoid main valve 11, a remote pressure regulating valve 12, a flow meter 13, and a main pipe pressure sensor are installed sequentially on the clean gas main pipe 10. A drain outlet 14 and a blockage removal interface 15 are installed every 5m. Four DN50 branch pipes 21 are led out from the clean gas main pipe 10. Each branch pipe 21 is connected to the ash accumulation area 51 at the bottom of the boiler from the bottom wall of the boiler through a high-temperature resistant sealed through-wall sleeve. The pipe section inside the boiler is equipped with a heat-insulating and wear-resistant sleeve on the outside. A nozzle group 22 is installed every 0.6m along the length of the pipe section. Each nozzle group 22 includes 6 nozzles with an inner diameter of 5mm, an outlet end extending 10mm out of the pipe wall, and a chamfer. The nozzles of adjacent nozzle groups 22 are staggered by 30° in circumferential position. Each branch pipe 21 is equipped with an explosion-proof and high-temperature resistant branch control valve 23 and a branch pressure sensor located on its downstream side. The four branch pipes 21 and their nozzle groups 22 are respectively arranged to correspond to the ash accumulation zone 511 in the middle of the bottom of the boiler, the ash accumulation zones 512 on both sides of the bottom of the boiler, the ash accumulation zone 513 at the corner of the bottom of the boiler, and the ash accumulation zone 514 between adjacent branch pipes.

[0119] During operation, the control unit 40 sets the cleaning cycle start interval to 2 hours, the single pulse purging duration to 20 seconds, the preset purging pressure lower limit to 0.6 MPa, and the preset safety pressure upper limit to 1.0 MPa. When the pressure difference between the boiler inlet and outlet obtained by the resistance detection unit reaches the preset resistance threshold, and the clean gas main pipe pressure obtained by the main pipe pressure sensor is less than the preset safety pressure threshold, and the dust concentration in the boiler bottom area obtained by the ash accumulation status detection unit is within the preset allowable range, the control unit 40 first opens the branch control valve 23 of the boiler bottom cleaning module 20 corresponding to the ash accumulation zone 511 in the middle of the boiler bottom, and performs 3 pulse purgings; then it closes the branch control valve 23, skips the adjacent ash accumulation zones 512 on both sides of the boiler bottom, and instead opens the branch control valve 23 of the boiler bottom cleaning module 20 corresponding to the ash accumulation zone 513 at the corner of the boiler bottom; and so on, until all ash accumulation zones in a cleaning cycle are purged. During the purging process, the disturbing and breaking jet output by the breaking nozzle 221 breaks and loosens the clumped ash, and the suspended boosting jet output by the suspended boosting nozzle 222 causes the loose ash to enter the main circulation airflow zone 53 of the boiler area and be carried away from the bottom of the boiler by the circulation airflow. The corner sweeping jet output by the corner sweeping nozzle 223 drives the ash in the corners into the range of action of the above jet.

[0120] After a cleaning cycle ends, the control unit 40 compares the decrease in boiler inlet and outlet pressure difference with the decrease before the start of the cleaning cycle. If the decrease is less than the set range, the number of pulse purging cycles for the ash accumulation zone is increased from 3 to 5 in the next cleaning cycle. If, during the purging process, the branch pressure of a certain branch pipe 21 is found to be continuously higher than the preset blockage judgment threshold while the main clean gas pressure is normal, it is identified as a branch pipe to be cleared. The control valves 23 of the remaining branches are closed, and 0.8 MPa of clean gas is introduced through the clearing interface 15 to carry out clearing and purging. If the branch pressure of a certain branch pipe 21 continues to decrease and meets the preset leakage judgment condition, the control valves 23 of each branch are closed in sequence. The leaking branch pipe is located based on the change in main pressure before and after valve closure, and an alarm is issued. All of the above operations are completed remotely from the central control room, and the dry quenching unit is always in online production.

[0121] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages of other steps.

[0122] In the above embodiments of this application, the various embodiments and implementation methods can be combined with each other, and there is no obstacle to their combination due to the separate description of the embodiments and implementation methods. The implementation processes of the various embodiments and implementation methods can be referred to each other, and features can be integrated to form an overall solution that includes the technical features of the various embodiments or implementation methods.

[0123] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail or recorded in a certain embodiment, please refer to the relevant descriptions of other embodiments.

[0124] Those skilled in the art will understand that, for the sake of convenience and brevity, the above-described division of units and modules is merely an example. In practical applications, the functions described above can be assigned to different units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. Furthermore, the specific names of the functional units and modules are only for easy differentiation and are not intended to limit the scope of protection of this application. The specific working process of the units and modules in the above system can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.

[0125] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. An online cleaning system for bottom ash accumulation in a dry quenching coke boiler, characterized in that, Includes a clean gas main pipe, multiple boiler bottom cleaning modules, a status monitoring unit, and a control unit; The main clean gas pipe is located outside the ash accumulation area at the bottom of the dry quenching coke boiler and is used to connect with an inert gas source. Multiple boiler bottom cleaning modules are arranged corresponding to different ash accumulation zones at the bottom of the dry quenching coke boiler. Each boiler bottom cleaning module includes a branch pipe passing through the bottom wall or lower side wall of the dry quenching coke boiler, a nozzle group set on the branch pipe, and a branch control valve for controlling the opening and closing of the branch pipe. The nozzle group includes a breaking nozzle for outputting a disturbing and breaking jet toward the ash accumulation layer at the bottom of the boiler, and a suspended boosting nozzle for outputting a suspended boosting jet toward the main circulation airflow zone of the boiler area. The status monitoring unit is used to acquire status parameters including at least boiler operating resistance parameters, branch pipe pressure, clean gas main pressure, and ash accumulation status at the bottom of the boiler. The control unit is connected to the status monitoring unit and the branch control valves of each of the boiler bottom cleaning modules. It is used to control the cleaning gas to perform staggered pulse purging of different ash accumulation zones at the bottom of the dry quenching coke boiler through the main cleaning gas pipe, multiple branch pipes and the nozzle group according to the status parameters when the circulating fan is running in online production. It also prevents the boiler bottom cleaning modules corresponding to adjacent ash accumulation zones from being opened at the same time, so that the slab ash at the bottom of the boiler is broken and loosened and carried away by the circulating airflow in the boiler area.

2. The cleaning system according to claim 1, characterized in that, The status parameters also include the flow rate of the clean gas main pipe; the clean gas main pipe is installed along the support outside the ash accumulation area at the bottom of the dry quenching coke boiler, and the clean gas main pipe is equipped with a solenoid main valve, a remote pressure regulating valve, a flow meter, a drain port and a blockage removal interface; The solenoid main valve is used to start and stop the gas supply to the main clean gas pipe; the remote pressure regulating valve is used to remotely regulate the pressure and / or flow rate of the clean gas; the flow meter is used to obtain the flow rate of the main clean gas pipe; the drain port is used to discharge the deposits in the main clean gas pipe during the online production state; the unblocking interface is used to connect to the external clean gas under the opening and closing of the corresponding branch control valve, and to unblock and purge the main clean gas pipe and / or the target branch pipe. The status monitoring unit is used to obtain the flow rate of the clean gas main pipe based on the flow meter; The control unit is connected to the solenoid main valve and the remote pressure regulating valve of the clean gas main pipe, and is used to control the corresponding valves in the clean gas main pipe to perform operation adjustments according to the status parameters.

3. The cleaning system according to claim 1, characterized in that, Each of the boiler bottom cleaning modules also includes a high-temperature resistant sealed through-wall sleeve, through which the branch pipe is connected from the bottom wall or the lower side wall of the dry quenching coke boiler to the ash accumulation area at the bottom of the boiler. The branch pipe is provided with a heat-insulating and wear-resistant sleeve on the outside of the pipe section inside the dry quenching coke boiler, and the pipe section where the nozzle group is located is set higher than the ash bearing surface at the bottom of the boiler.

4. The cleaning system according to claim 1, characterized in that, The nozzle group also includes corner ash-sweeping nozzles. The breaking nozzle, the suspension booster nozzle and the corner ash-sweeping nozzle are arranged circumferentially staggered in the same nozzle group to form a disturbing breaking jet toward the ash layer at the bottom of the boiler, a suspension booster jet toward the main flow area of ​​the circulating air in the boiler area, and a corner ash-sweeping jet toward the corner area at the bottom of the boiler or the blind area between adjacent branch pipes, respectively.

5. The cleaning system according to claim 4, characterized in that, The spray direction of the crushing nozzle forms an angle of 60° to 90° with the ash-bearing surface at the bottom of the boiler; The injection direction of the suspended booster nozzle is from the ash-bearing surface at the bottom of the boiler to the main circulation airflow area of ​​the boiler region, and forms an angle of 15° to 60° with the ash-bearing surface at the bottom of the boiler. The spray direction of the corner ash removal nozzle is toward the corner of the ash accumulation area at the bottom of the boiler and / or the bottom area between adjacent branch pipes.

6. The cleaning system according to claim 1, characterized in that, Multiple boiler bottom cleaning modules are arranged according to different ash accumulation zones at the bottom of the dry quenching boiler. The different ash accumulation zones include at least two of the following: ash accumulation zone in the middle of the boiler bottom, ash accumulation zones on both sides of the boiler bottom, ash accumulation zone at the corners of the boiler bottom, and ash accumulation zone between adjacent branch pipes. The control unit is configured to perform staggered pulse purging on multiple boiler bottom cleaning modules within a cleaning cycle, according to the degree of ash accumulation in different ash accumulation zones or a preset rotation order, so that the boiler bottom cleaning modules corresponding to any two adjacent ash accumulation zones are not turned on at the same time or are turned on at different times.

7. The cleaning system according to claim 1, characterized in that, The status monitoring unit includes a resistance detection unit for acquiring boiler operating resistance parameters, a branch pipe pressure sensor installed on the branch pipe, a main pipe pressure sensor installed on the clean gas main pipe, and an ash accumulation status detection unit for acquiring the ash accumulation status at the bottom of the boiler. The boiler operating resistance parameters include the pressure difference between the boiler inlet and outlet and / or the pressure difference at the bottom of the boiler, and the ash accumulation status at the bottom of the boiler includes at least one of the following: dust concentration at the bottom of the boiler, ash accumulation thickness, ash accumulation level, or dust concentration change status after purging. The branch pressure sensor is located downstream of the corresponding branch control valve and is used to obtain the branch pressure of the corresponding branch after the corresponding branch control valve is opened.

8. The cleaning system according to claim 1, characterized in that, The control unit is configured with safety interlock logic, which includes: When the circulating fan stops, the dry quenching boiler or its circulating system is in an abnormal state that does not allow the bottom purging of the boiler to be performed, the main pressure of the clean gas main exceeds the preset safety pressure limit, or the ash accumulation at the bottom of the boiler exceeds the preset safety range, the purging of each bottom cleaning module of the boiler is stopped, the gas supply of the clean gas main is shut off and / or an alarm is issued. When the branch control valve of any boiler bottom cleaning module is opened, if the pressure of the corresponding branch pipe is lower than the preset purging pressure limit and this continues for a preset time, the purging of the corresponding branch pipe or the corresponding boiler bottom cleaning module will be stopped and an alarm will be issued.

9. A method for online cleaning of ash accumulation at the bottom of a dry quenching coke boiler, characterized in that, The online cleaning system for bottom ash accumulation in a dry quenching coke boiler according to any one of claims 1 to 8, the method comprising: While the circulating fan is running in online production, the boiler operating resistance parameters, the pressure of the clean gas main pipe, and the ash accumulation status at the bottom of the boiler are obtained. When the boiler operating resistance parameters, the pressure of the main cleaning gas pipe, and the ash accumulation status at the bottom of the boiler meet the set cleaning conditions, the branch control valves of the corresponding boiler bottom cleaning modules are opened in staggered shifts according to the degree of ash accumulation in different ash accumulation zones at the bottom of the boiler or the preset rotation sequence. The cleaning conditions include: the boiler operating resistance parameter is greater than or equal to a preset resistance threshold, and / or the rate of increase of the boiler operating resistance parameter within a preset detection period is greater than a preset resistance change threshold; the pressure of the main cleaning gas pipe is within a preset purging gas supply pressure range and less than a preset safety pressure threshold; and the ash accumulation at the bottom of the boiler is within a preset allowable range. After the corresponding branch control valve is opened, the branch pressure of the corresponding branch is obtained; when the branch pressure is greater than or equal to the preset purging pressure threshold, the disturbed breaking jet is output through the breaking nozzle to break and loosen the slab ash at the bottom of the boiler, and the suspended boosting jet is output through the suspended boosting nozzle to allow the loosened ash to enter the circulating airflow in the boiler area and be carried away by the circulating airflow in the boiler area.

10. The method according to claim 9, characterized in that, The method further includes: After each cleaning cycle, the decrease in the boiler operating resistance parameter relative to the start of the cleaning cycle is obtained. If the decrease is less than the set value, the purging duration of at least one boiler bottom cleaning module in the next cleaning cycle is extended, the number of pulse purgings is increased, and / or the start interval of the next cleaning cycle is shortened. During the cleaning cycle, if the pressure of any branch pipe continuously exceeds the preset blockage judgment threshold when the corresponding branch control valve is open and the pressure of the main cleaning gas pipe is within the preset purging gas supply pressure range, the corresponding branch pipe is identified as the branch pipe to be cleared. The branch control valves of other branches except the branch pipe to be cleared are closed, and cleaning gas is introduced into the branch pipe to be cleared through the clearing interface provided on the main cleaning gas pipe to clear the blockage and purge the branch pipe to be cleared. During the purging or leak detection procedure, if the pressure of any branch pipe continues to drop and meets the preset leak judgment conditions, the branch control valves corresponding to the bottom cleaning modules of each boiler will be closed in sequence. Based on the changes in the main pipe pressure and / or branch pipe pressure before and after closing the corresponding branch control valve, the leaking branch pipe will be identified and an alarm will be issued.