Construction method for controlling shrinkage and reducing deformation of foundation pit by using super-long concrete inner support
By employing segmented casting and pre-stress compensation construction methods, combined with temperature control measures, the problem of shrinkage cracking in ultra-long concrete internal supports was solved, effectively controlling the deformation of the foundation pit and reducing the amount of steel used.
Patent Information
- Application Number
- CN202611162937.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-03
- Publication Date
- 2026-11-10
AI Technical Summary
Existing ultra-long concrete internal supports are prone to shrinkage cracking during construction, leading to foundation pit deformation and retaining structure displacement. Especially when the length exceeds 100m, shrinkage deformation caused by hydration heating and environmental temperature difference is difficult to control.
The process of segmented casting + pre-stress compensation + temperature control is adopted. By arranging reinforced concrete internal supports at the cap beam and waist beam, segmented casting and the use of low heat of hydration shrinkage compensation concrete, combined with synchronous hydraulic jacking device and high-strength micro-expansion concrete, the shrinkage of the internal supports is controlled in real time by arranging reinforced concrete internal supports at the cap beam and waist beam, casting in segments and using low heat of hydration shrinkage compensation concrete, combined with synchronous hydraulic jacking device and high-strength micro-expansion concrete, temperature and stress are monitored in real time.
It effectively reduced the shrinkage deformation of the internal support, lowered the deformation of the foundation pit, avoided cracking, kept it within the specified limits, and reduced the amount of steel used, making it suitable for existing foundation pit continuous operation.
Smart Images

Figure CN123064166A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of foundation pit support construction technology, and in particular to a construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports. Background Technology
[0002] Excavation pit support is a set of measures for supporting, reinforcing, protecting, and controlling groundwater in the pit's sidewalls and surrounding environment to ensure the safety of the underground main structure construction and the surrounding environment. Internal bracing is a crucial structure in excavation pit support engineering, typically used in conjunction with the pit's retaining structure (such as retaining piles or diaphragm walls). Commonly used internal bracing types include steel bracing and concrete internal bracing. For ultra-long concrete internal bracing exceeding 100m in length, a one-time integral casting method is usually used. However, the hydration and heating of concrete, environmental temperature differences, and subsequent drying shrinkage can easily cause shrinkage and cracking of the internal bracing itself. After the release of the shrinkage internal force, axial retraction occurs, causing the pit's retaining structure to shift inward (towards the pit), leading to excessive deformation of the pit's sidewalls and settlement and cracking of the surrounding ground. Summary of the Invention
[0003] One of the objectives of this invention is, at least, to provide a construction method for controlling and reducing the deformation of an ultra-long concrete internal support in order to overcome the problems existing in the prior art. By using a combination of segmented pouring, pre-stress compensation, and temperature control, the shrinkage deformation of the internal support itself and the lateral deformation of the foundation pit can be controlled in a dual manner, thereby solving the defects of large shrinkage and easy deformation of the foundation pit caused by existing ultra-long concrete internal supports.
[0004] To achieve the above objectives, the technical solution adopted by the present invention includes the following aspects.
[0005] A construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports involves arranging multiple reinforced concrete internal supports horizontally side-by-side along the length of the foundation pit at the cap beam and / or lintel beam. The center-to-center distance between adjacent internal supports is 10-12m. The internal supports are constructed using a segmented casting method and employ a segmented temperature-controlled and shrinkage-compensating concrete mode. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports includes the following steps: Step S1: Install internal support steel bars and erect formwork; Step S2: Independently cast 3-6 pre-cast support sections along the inner support axis, leaving an 800-1200mm long post-cast strip between adjacent pre-cast support sections; Step S3: After the pre-cast support section reaches the design strength, a synchronous hydraulic jacking device is used to synchronously pre-jacke and pressurize the pre-cast support section axially. Step S4: Pour the post-pouring strip under the pressure-holding state of the synchronous hydraulic jacking device; Step S5: After the post-cast strip reaches the design strength, remove the synchronous hydraulic jacking device.
[0006] Preferably, in step S2, the pre-cast support section uses low-hydration heat-compensating shrinkage concrete, the concrete pouring temperature of the pre-cast support section is ≤28℃, and a temperature measuring element for real-time monitoring of its internal temperature changes is pre-embedded in the pre-cast support section.
[0007] Preferably, in step S2, when pouring the pre-cast support section, a pressure-bearing steel plate is pre-embedded at the joint end between the pre-cast support section and the post-cast strip. The pressure-bearing steel plate is fixed by anchors pre-embedded in the pre-cast support section. The pressure-bearing steel plate is arranged in the middle of the joint end of the pre-cast support section, with both ends extending out of the two sides of the pre-cast support section to form pressure-bearing side wings. The outer side of the pressure-bearing steel plate is flush with the end face of the pre-cast support section, and the outer side of the pressure-bearing steel plate is the side closer to the post-cast strip.
[0008] Preferably, in step S3, the synchronous hydraulic jacking device includes jacks, a PLC intelligent synchronous control system, and a hydraulic pump station. Before the post-cast strip is poured, each post-cast strip is synchronously axially pre-pressurized on the pre-cast support sections that have been formed on both sides by two jacks. The preset compression amount of the bidirectional hydraulic pre-jacking of a single post-cast strip is 12-15mm. The PLC intelligent synchronous control system realizes multi-point synchronous hydraulic jacking of the jacks, and the hydraulic pump station provides the jacking power and stabilizes and maintains pressure after the jacks are lifted into place.
[0009] Preferably, in step S3, the two jacks are respectively arranged on the two pressure-bearing side wings formed by the pressure-bearing steel plates, with the two ends of the jacks respectively abutting against the two corresponding pressure-bearing side wings of the two pressure-bearing steel plates, and located on the side of the two corresponding pressure-bearing side wings that are close to each other.
[0010] Preferably, in step S3, each jack is limited by a set of limiting components. The limiting components include a limiting groove and a fixing plate. Two limiting grooves are connected by the fixing plate and welded to the top of the fixing plate. A slot is opened from the top of the limiting groove to the bottom. A strip groove is opened on the fixing plate. When the limiting components are used to limit the jack, the hydraulic cylinder of the jack is arranged in the slot of the limiting groove.
[0011] Preferably, in step S3, the limiting component located on the same side as the pre-cast support section is fixed by a limiting frame arranged along the entire length of the inner support. Two sets of limiting frames are respectively arranged on both sides of the inner support. The two ends of the limiting frame are respectively fixedly connected to the crown beam / waist beam at the location of the inner support. The limiting frame is provided with a fixing groove corresponding to the strip groove on the fixing plate. The fixing plate and the limiting frame are detachably connected by bolts.
[0012] Preferably, in step S4, the post-cast strip is made of high-strength micro-expansion concrete, and the post-cast strip is cast and formed under the condition of pre-stress maintained by the jack.
[0013] Preferably, in step S4, a stress monitoring element is pre-embedded in the post-cast strip. The stress monitoring element is connected to the PLC intelligent synchronous control system and monitors the residual pre-compression stress inside the inner support in real time after the post-cast strip is formed. The PLC intelligent synchronous control system is also connected to a temperature measuring element located in the pre-cast support section.
[0014] Preferably, in step S5, after removing the synchronous hydraulic lifting device, the limiting component, the limiting frame, and the inner support template are removed, and diagonal braces are installed at both ends of the inner support to reinforce it; the diagonal braces are made of steel pipes, the first end of the diagonal brace is connected to the inner support through the second connector, and the second end of the diagonal brace is connected to the crown beam / waist beam through the first connector or the second connector. The first connector is a trapezoidal structure, and the second connector is a triangular structure.
[0015] In summary, by adopting the above technical solution, the present invention has at least the following beneficial effects: 1. Compared with the traditional monolithic casting process, the prestressed pre-topped shrinkage reduction structure of ultra-long concrete internal support uses a combination of segmented casting, pre-topped stress compensation, and temperature control to dually control the shrinkage deformation of the internal support itself and the lateral deformation of the foundation pit retaining wall, thereby solving the defects of large shrinkage and easy deformation of the foundation pit in existing ultra-long concrete internal supports. 2. By using a combination of segmented pouring, pre-stress compensation, and temperature control, the total amount of concrete shrinkage is reduced, making the shrinkage deformation of a single segment controllable and reducing the overall shrinkage deformation by more than 65%. This avoids self-cracking, eliminates the inward displacement of the pit sidewall caused by the shrinkage and retraction of the internal support, and keeps the pit deformation within the specified limits. 3. The internal support does not require the addition of a large number of anti-crack steel bars, which not only reduces the amount of steel used, but also makes the construction process compatible with existing foundation pit continuous operation. Attached Figure Description
[0016] Figure 1 A construction flowchart illustrating the reduction of foundation pit deformation using ultra-long concrete internal supports, which is an exemplary embodiment of the present invention.
[0017] Figure 2 This is a planar schematic diagram of the internal support.
[0018] Figure 3 This is a schematic diagram of the jack arrangement.
[0019] Figure 4 for Figure 3 Enlarged diagram of point A in the middle.
[0020] Figure 5 This is a schematic diagram showing the arrangement of the jack from another perspective.
[0021] Figure 6 This is a schematic diagram of the limit component.
[0022] Figure 7 This is a structural schematic diagram of the limiting component from another perspective.
[0023] Figure 8 for Figure 2 Enlarged diagram of point B in the middle.
[0024] The markings in the diagram are: 1-Cover beam, 2-Waist beam, 3-Foundation pit, 4-Pre-cast support section, 5-Post-cast strip, 6-Jack, 7-Bearing steel plate, 8-Limiting groove, 9-Fixing plate, 10-Limiting frame, 11-Diagonal brace, 12-First connector, 13-Second connector. Detailed Implementation
[0025] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments, so that the objectives, technical solutions, and advantages of the present invention will be clearer. It should be understood that the specific embodiments described herein are only for explaining the present invention and are not intended to limit the present invention.
[0026] In the description of this invention, it should be understood that if terms such as "upper," "lower," "left," and "right" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, they are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or component referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the accompanying drawings are only for illustrative purposes and should not be construed as limiting this patent. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances. Example
[0027] This embodiment provides a construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports. Figure 1 The construction flowchart is shown. This embodiment takes the arrangement of multiple internal supports along the depth direction of the foundation pit 3, with the internal supports arranged at the capping beam 1 and the waist beam 2 as an example (the depth of the foundation pit 3 is greater than 8m, and multiple waist beams 2 are arranged along the depth direction of the foundation pit 3). The capping beam 1 is located at the top of the retaining structure of the foundation pit 3, and the waist beam 2 is located inside the retaining structure of the foundation pit 3 (the side closer to the foundation pit 3). In actual application, all internal supports can also be arranged at the waist beam 2. When the depth of the foundation pit 3 is not greater than 8m, only one internal support can be arranged at the capping beam 1 / waist beam 2 (preferably arranged at the capping beam 1). The two ends of the internal support are fixedly connected to the inner side of the capping beam 1 / waist beam 2, and the inner side of the capping beam 1 / waist beam 2 is the side closer to the middle of the foundation pit 3.
[0028] refer to Figures 2-8 The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports includes the following steps: Step 1: Construct the retaining structure of the foundation pit 3. Construct the retaining structure (such as retaining piles or underground continuous walls) around the foundation pit 3 to be excavated. Step 2: Excavate the surface soil and construct the capping beam 1 on top of the retaining structure. Construct the first internal support on the inner side of the capping beam 1. After the retaining structure reaches the design strength, excavate the surface soil downwards and construct the capping beam 1 around the top of the retaining structure. The capping beam 1 is a reinforced concrete structure. After the capping beam 1 reaches the design strength, construct the first internal support on the inner side of the capping beam 1 (the side closest to the middle of the foundation pit 3). Step 3: Excavate the next layer of soil and construct the waist beam 2 inside the retaining structure. Then, construct the next internal support inside the waist beam 2. After the previous internal support reaches the design strength, excavate the next layer of soil downwards and construct the waist beam 2 around the inner side of the retaining structure. After the waist beam 2 reaches the design strength, construct the next internal support inside the waist beam 2 (on the side closest to the middle of the foundation pit 3). Step four: Repeat step three to complete the construction of the remaining internal supports; Step 5: Excavate the earthwork to the designed bottom elevation of foundation pit 3; In steps two through four, multiple reinforced concrete internal supports are arranged horizontally side-by-side along the length of the foundation pit 3 at the cap beam 1 and the waist beam 2. The center-to-center distance between two adjacent internal supports is 10-12m. The internal supports are constructed using a segmented casting method and a segmented temperature-controlled shrinkage-compensating concrete mode. The construction steps of the internal supports include: Step S1: Install internal support steel bars and erect formwork; Step S2: Independently cast 3-6 pre-cast support sections 4 along the inner support axis, leaving an 800-1200mm long post-cast strip 5 between adjacent pre-cast support sections 4. Step S3: After the pre-cast support section 4 reaches the design strength, a synchronous hydraulic jacking device is used to synchronously pre-jacke and pressurize the pre-cast support section 4 axially. Step S4: Pour the post-pouring strip 5 under the pressure-holding state of the synchronous hydraulic jacking device; Step S5: After the post-cast strip 5 reaches the design strength, remove the synchronous hydraulic jacking device.
[0029] Taking an internal support with a length of 110m and a cross-section of 1.2m wide and 1.0m high as an example (the cross-section of the internal support is rectangular), the internal support is divided into 6 independently cast-in-place support sections 4 along the axial direction, and a total of 5 post-cast strips 5 are arranged. The length of each cast-in-place support section 4 is 17.5m, and the length of each post-cast strip 5 is 1.0m.
[0030] In step S1, the reinforcing bars of the pre-cast support section 4 located at both ends of the inner support are lapped with the reinforcing bars of the cap beam 1 / waist beam 2 at the same location. During the construction of the cap beam 1 and waist beam 2, reinforcing bars that lap with the inner support reinforcing bars are reserved. The reserved reinforcing bars of the cap beam 1 and waist beam 2 extend towards the middle of the foundation pit 3.
[0031] In step S2, the pre-cast support section 4 uses low hydration heat compensation shrinkage concrete (such as C30 low hydration heat compensation shrinkage concrete) to reduce the shrinkage base from the material source and reduce the temperature shrinkage deformation caused by the hydration temperature difference. The concrete pouring temperature of the pre-cast support section 4 is ≤28℃. Temperature measuring elements (such as temperature sensors) are pre-embedded in the pre-cast support section 4. The temperature measuring elements are used to monitor the internal temperature change of the pre-cast support section 4 in real time.
[0032] In step S2, when pouring the pre-cast support section 4, a pressure-bearing steel plate 7 is pre-embedded at the joint end between the pre-cast support section 4 and the post-cast strip 5. The pressure-bearing steel plate 7 is fixed by anchors pre-embedded in the pre-cast support section 4. The pressure-bearing steel plate 7 is the force-bearing component when the synchronous hydraulic jacking device pre-pressurizes the pre-cast support section 4 on both sides of the post-cast strip 5. The pressure-bearing steel plate 7 is arranged in the middle of the joint end of the pre-cast support section 4, with both ends extending out from both sides of the pre-cast support section 4 to form pressure-bearing wings. The outer side of the pressure-bearing steel plate 7 is flush with the end face of the pre-cast support section 4, and the outer side of the pressure-bearing steel plate 7 is the side closer to the post-cast strip 5. Multiple anchors are welded to the inner side of the pressure-bearing steel plate 7, and the inner side of the pressure-bearing steel plate 7 is the side away from the post-cast strip 5. The anchors are made of HRB400 steel bars with a diameter of 28mm, and the pressure-bearing steel plate 7 is made of Q235 steel with a thickness of 20-30mm. The steel plate is used for the pressure-bearing steel plate 7, which is the load-bearing component when the jack 6 is pre-poured and pressurized on both sides of the post-pouring strip 5 and the pre-poured support section 4. In actual construction, when the internal support steel bars are laid, the main bars should be laid out to avoid the pressure-bearing steel plate 7.
[0033] In step S3, the synchronous hydraulic jacking device includes jacks 6, a PLC intelligent synchronous control system, and a hydraulic pump station. The jacks 6 are hydraulic jacks. Before the post-pouring strip 5 is poured, each post-pouring strip 5 is synchronously axially pre-pressurized on the pre-cast support sections 4 on both sides by two jacks 6. The two jacks 6 are respectively arranged at the two pressure-bearing side wings formed by the pressure-bearing steel plates 7. The two ends of the jacks 6 are respectively abutted on the two corresponding pressure-bearing side wings of the two pressure-bearing steel plates 7, and are located on the side of the two corresponding pressure-bearing side wings that are close to each other. The PLC intelligent synchronous control system realizes multi-point synchronous hydraulic jacking of the jacks 6. The hydraulic pump station provides the jacking power to the jacks 6 and locks the oil circuit after the jacks 6 are lifted into place to maintain the jacking force and achieve stable pressure. The pre-jacking load of the jacks 6 matches the theoretical shrinkage of the concrete in the pre-cast support section 4 in the later stage. The preset compression amount of the bidirectional hydraulic pre-jacking of a single post-pouring strip 5 is 12-15mm.
[0034] In step S3, each jack 6 is limited by a set of limiting components. The limiting components include limiting grooves 8 and fixing plates 9. Two limiting grooves 8 are connected by the fixing plates 9 and are located on the top of the fixing plates 9. The bottom of the limiting grooves 8 is welded to the top of the fixing plates 9. The two limiting grooves 8 are respectively arranged near the two ends of the fixing plates 9. The top of the limiting grooves 8 has a slot for placing the jack 6 from the bottom. The fixing plate 9 has a strip groove. Two strip grooves are located between the two limiting grooves 8 and are arranged near the two sides of the fixing plate 9. When the limiting components are used to limit the jack 6, the hydraulic cylinder of the jack 6 is arranged in the slot of the limiting groove 8. The limiting components located on the same side as the pre-cast support section 4 are fixed by a limiting frame 10 arranged along the length of the inner support. The limiting frame 10 is a steel structure (preferably made of steel). (Multi-beam I-beam), two sets of limiting frames 10 are respectively arranged on both sides of the inner support. The two ends of the limiting frame 10 are fixedly connected to the crown beam 1 / waist beam 2 at the location of the inner support. The inner side of the crown beam 1 / waist beam 2 is pre-embedded with fixing parts for fixing the limiting frame 10 (not shown in the figure). The inner side of the crown beam 1 / waist beam 2 is the side close to the middle of the foundation pit 3. The limiting frame 10 and the fixing parts can be welded together. The bottom of the limiting frame 10 is consistent with the bottom elevation of the template of the inner support (the bottom elevation of the limiting frame 10 can also be lower than the bottom elevation of the template of the inner support, preferably the bottom elevations of the two are consistent. When the template of the inner support is erected, the support arranged at the bottom of the template can be used to support the limiting frame 10 at the same time). The limiting frame 10 is provided with a fixing groove corresponding to the strip groove on the fixing plate 9. The fixing plate 9 and the limiting frame 10 are detachably connected by bolts.
[0035] In step S4, the post-cast strip 5 is made of high-strength micro-expansion concrete (strength grade ≥ C50, with added special expansion agent, which produces controllable micro-expansion during hardening and is a special compensating shrinkage concrete that offsets the huge self-shrinkage / drying shrinkage of high-strength concrete). The post-cast strip 5 is cast and formed under the condition of pre-stress maintained by the jack 6. The post-cast strip 5 is pre-embedded with stress monitoring elements (such as pressure sensors). The stress monitoring elements are connected to the PLC intelligent synchronous control system to monitor the residual pre-compression stress inside the internal support in real time after the post-cast strip 5 is formed. The PLC intelligent synchronous control system is also connected to the temperature measuring element located in the pre-cast support section 4.
[0036] By applying reverse prestress to the pre-cast support section 4 in advance using jack 6, the axial shrinkage caused by the drying shrinkage and thermal shrinkage of the concrete in the pre-cast support section 4 in the later stage can be offset. At the same time, it can also offset the internal tensile stress generated by the shrinkage of the post-cast strip 5 itself. The post-cast strip 5 is poured under the pressure of jack 6. The pre-cast support sections 4 on both sides of the post-cast strip 5 will continuously provide the post-cast strip 5 with compressive stress, which will offset the internal tensile stress generated by the expansion and contraction of the post-cast strip 5 itself.
[0037] In step S5, after removing the synchronous hydraulic jacking device, the limiting component, limiting frame 10, and inner support template are removed, and diagonal braces 11 are installed at both ends of the inner support to reinforce it. A first embedded part and a second embedded part (not shown in the figure) are pre-embedded inside the inner side of the crown beam 1 / waist beam 2 where the inner support is located. The first embedded part is located between two adjacent inner supports, and the second embedded part is located outside the inner support. A third embedded part (not shown in the figure) is pre-embedded on both sides of the inner support. The third embedded part is located on both sides of the pre-cast support section 4. When reinforcing one end of the inner support, the first ends of the two diagonal braces 11 are connected to the third embedded parts located on both sides of the inner support via second connectors 13. The first ends of the diagonal braces 11 are welded to the second connectors 13, and the second connectors 13 are connected to the third embedded parts (e.g., by welding). When reinforcing one end of the inner support near both ends of the foundation pit 3, the second end of one diagonal brace 11 is connected to the first embedded part via a second connector 13. A connector 12 is used for connection. The first end of the diagonal brace 11 is opposite to the second end. The second end of the diagonal brace 11 is welded to the first connector 12. The first connector 12 is connected to the first embedded part (e.g., by welding). The second end of another diagonal brace 11 is welded to the second embedded part through another second connector 13. The second connector 13 is connected to the second embedded part (e.g., by welding). When reinforcing one end of the inner support away from both ends of the foundation pit 3, the second ends of the two diagonal braces 11 are connected to the first embedded part through the first connector 12. The second end of the diagonal brace 11 is welded to the first connector 12. The first connector 12 is connected to the first embedded part (e.g., by welding). The second ends of the two diagonal braces 11 located between two adjacent inner supports are welded to the same first connector 12. The diagonal brace 11 is made of steel pipe. The first connector 12 has a trapezoidal structure. The second connector 13 has a triangular structure.
[0038] The above description is merely a detailed illustration of specific embodiments of the present invention and is not intended to limit the invention. Various substitutions, modifications, and improvements made by those skilled in the art without departing from the principles and scope of the present invention should be included within the protection scope of the present invention.
Claims
1. A construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports, characterized in that, At the cap beam (1) and / or the waist beam (2), multiple reinforced concrete internal supports are arranged horizontally side by side along the length of the foundation pit (3). The center-to-center distance between two adjacent internal supports is 10-12m. The internal supports are constructed by segmented casting and a segmented temperature control combined with shrinkage compensation concrete mode is adopted. The construction method of controlling and reducing the deformation of the foundation pit by ultra-long concrete internal supports includes the following steps: Step S1: Install internal support steel bars and erect formwork; Step S2: Independently cast 3-6 pre-cast support sections (4) along the inner support axis, and reserve a post-cast strip (5) of 800-1200mm in length between adjacent pre-cast support sections (4); Step S3: After the pre-cast support section (4) reaches the design strength, a synchronous hydraulic jacking device is used to synchronously pre-jacke and pressurize the pre-cast support section (4) axially. Step S4: Cast the post-cast strip (5) under the pressure-holding state of the synchronous hydraulic jacking device. Step S5: After the post-cast strip (5) reaches the design strength, remove the synchronous hydraulic jacking device.
2. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 1, characterized in that, In step S2, the pre-cast support section (4) uses low hydration heat compensation shrinkage concrete, the concrete pouring temperature of the pre-cast support section (4) is ≤28℃, and a temperature measuring element for real-time monitoring of its internal temperature change is pre-embedded in the pre-cast support section (4).
3. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 2, characterized in that, In step S2, when pouring the pre-cast support section (4), a pressure-bearing steel plate (7) is pre-embedded at the joint end of the pre-cast support section (4) and the post-cast strip (5), so that the pressure-bearing steel plate (7) is fixed by the anchors pre-embedded in the pre-cast support section (4), and the pressure-bearing steel plate (7) is arranged in the middle of the joint end of the pre-cast support section (4), with both ends extending out of the two sides of the pre-cast support section (4) to form a pressure-bearing side wing. The outer side of the pressure-bearing steel plate (7) is flush with the end face of the pre-cast support section (4), and the outer side of the pressure-bearing steel plate (7) is the side close to the post-cast strip (5).
4. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 3, characterized in that, In step S3, the synchronous hydraulic jacking device includes jacks (6), a PLC intelligent synchronous control system and a hydraulic pump station. Before the post-cast strip (5) is poured, each post-cast strip (5) is synchronously axially pre-pressurized by two jacks (6) on the pre-cast support sections (4) that have been formed on both sides. The preset compression amount of the bidirectional hydraulic pre-jacking of a single post-cast strip (5) is 12-15mm. The PLC intelligent synchronous control system realizes the synchronous hydraulic jacking of multiple points of jacks (6). The hydraulic pump station provides the jacks (6) with the jacking power and stabilizes and maintains the pressure after the jacks (6) are lifted into place.
5. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 4, characterized in that, In step S3, the two jacks (6) are respectively placed on the two pressure-bearing side wings formed by the pressure-bearing steel plate (7). The two ends of the jacks (6) are respectively abutted on the two pressure-bearing side wings corresponding to the two pressure-bearing steel plates (7), and are located on the side of the two pressure-bearing side wings that are close to each other.
6. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 5, characterized in that, In step S3, each jack (6) is limited by a set of limiting components. The limiting components include a limiting groove (8) and a fixing plate (9). The two limiting grooves (8) are connected by the fixing plate (9) and welded to the top of the fixing plate (9). The top of the limiting groove (8) has a slot from bottom to top, and the fixing plate (9) has a strip groove. When the limiting components are used to limit the jack (6), the oil cylinder of the jack (6) is arranged in the slot of the limiting groove (8).
7. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 6, characterized in that, In step S3, the limiting component located on the same side of the pre-cast support section (4) is fixed by the limiting frame (10) arranged along the entire length of the inner support. The two sets of limiting frames (10) are arranged on both sides of the inner support. The two ends of the limiting frame (10) are fixedly connected to the crown beam (1) / waist beam (2) where the inner support is located. The limiting frame (10) is provided with a fixing groove corresponding to the strip groove on the fixing plate (9). The fixing plate (9) and the limiting frame (10) are detachably connected by bolts.
8. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 7, characterized in that, In step S4, the post-cast strip (5) is made of high-strength micro-expansion concrete and is cast in place under the condition of pre-stress maintained by the jack (6).
9. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 8, characterized in that, In step S4, a stress monitoring element is pre-embedded in the post-cast strip (5). The stress monitoring element is connected to the PLC intelligent synchronous control system and monitors the residual pre-compression stress inside the inner support in real time after the post-cast strip (5) is formed. The PLC intelligent synchronous control system is also connected to the temperature measuring element located in the pre-cast support section (4).
10. The construction method for controlling and reducing foundation pit deformation using ultra-long concrete internal supports according to claim 9, characterized in that, In step S5, after removing the synchronous hydraulic lifting device, the limiting component, the limiting frame (10), and the inner support template are removed, and diagonal braces (11) are installed at both ends of the inner support to reinforce it. The diagonal braces (11) are made of steel pipes. The first end of the diagonal brace (11) is connected to the inner support through the second connector (13), and the second end of the diagonal brace (11) is connected to the crown beam (1) / waist beam (2) through the first connector (12) or the second connector (13). The first connector (12) is a trapezoidal structure, and the second connector (13) is a triangular structure.