A rapid house assembly process
By arranging water and electricity pipelines in the factory prefabrication stage and adopting window frame pre-embedding and integrated injection foaming technology, the problems of time-consuming and labor-intensive on-site water and electricity installation and easy window cracking and leakage in the quick-built house are solved, realizing the rapid, stable and sealed assembly of the quick-built house.
Patent Information
- Application Number
- CN202611250021.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-18
- Publication Date
- 2026-11-10
AI Technical Summary
Installing water and electricity lines on-site in existing prefabricated houses is time-consuming and labor-intensive, and the foaming agent in the windows is prone to aging and cracking, leading to water leakage problems.
During the factory prefabrication stage, water pipes and electrical wires are laid inside the modules, and a process of pre-embedding the window frame and integrally injecting foam is adopted to form an integrated window frame and wall, reducing on-site grooving operations and improving sealing and stability.
It shortened the assembly period, reduced labor input, improved structural stability and waterproof durability, avoided water leakage and seepage problems, and enhanced the quality control of water and electricity installation.
Smart Images

Figure CN123064243A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of quick-build housing technology, and in particular to a quick-build housing assembly process. Background Technology
[0002] Prefabricated houses, also known as modular integrated houses or modular temporary houses, are widely used in temporary offices and accommodations on construction sites, emergency disaster relief and resettlement, field work camps, and temporary commercial exhibition sites. The core requirements are fast construction speed, reusability, and reliable sealing and insulation performance. Existing prefabricated houses are generally composed of floor modules, wall modules, and roof modules. The modules are prefabricated in the factory and transported to the site for standardized assembly.
[0003] In traditional fast-produced houses, electrical wiring and water pipes need to be installed later. After the walls and floors are installed and assembled into the overall house frame, workers will cut grooves in the walls and floor to place and connect the water pipes and electrical wires. At the same time, windows are usually installed in the walls. The process is as follows: first, a set of wall panels is placed with a frame and foam is injected. Then, rectangular exterior wall panels are laid on the frame to form the exterior wall. After the foam has solidified, grooves are cut into the exterior wall to place the window frames. After the window frames are placed in the through holes, the excess gaps in the exterior wall are filled with foam again, and the surface is polished.
[0004] However, the process of having personnel go to the site to lay out water and electricity pipelines is very time-consuming and labor-intensive, and it can easily affect the overall support effect of the frame. In addition, the windows are filled with foam after the windows are installed. After a long time, the foaming agent ages and becomes damaged, and cracks are easily formed at the windows in the wall. Later, it is very easy for water to leak or seep from the cracks. Summary of the Invention
[0005] The purpose of this invention is to overcome the shortcomings of the prior art and provide a quick-assembly house assembly process.
[0006] The above-mentioned technical objective of the present invention is achieved through the following technical solution: a quick-assembly house assembly process, comprising the following steps: Step 1: placing a floor frame with a base plate on the assembly table, arranging water pipes and electrical wires inside the floor frame, and after the arrangement is completed, covering the floor to encapsulate the floor frame to form floor module 1, and installing floor module 2 with water pipes and electrical wires arranged inside on both sides of floor module 1. Step 2: Install several inner partition wall modules on floor module 1 to form an inner partition wall, and arrange water pipes and electrical wires inside the inner partition wall modules. Install outer wall modules 1 on opposite edges on both sides of floor module 1. Connect outer wall modules 1 to the inner partition wall to form a fixed wall. Step 3: Install the outer perimeter wall module 2 on both sides of the opposite edge of the floor module 2, and connect the outer perimeter wall module 2 on the floor module 2 with the outer perimeter wall module 1 on the floor module 1; Step 4: Lay electrical wires inside the roof module and install them horizontally above the fixed wall; Step 5: Lay electrical wires inside roof module 2 and install them horizontally above the outer wall module 2 on floor module 2. Connect roof module 2 to roof module 1. Step Six: Install the outer wall module three, which contains water pipes and electrical wires, on the side of floor module two away from floor module one, and connect the outer wall module three to the side of outer wall module two.
[0007] Preferably, each of the floor module 1, floor module 2, inner partition wall module, outer wall module 1, outer wall module 2, outer wall module 3, roof module 1, and roof module 2 has a through hole to allow water pipes and electrical wires inside to enter and exit.
[0008] Preferably, the outer wall module one, outer wall module two, and outer wall module three each include a supporting frame and inner wall panels and outer wall panels attached to their respective sides; the inner partition module includes an inner partition frame and wall panel one and wall panel two attached to its respective sides; the roof module one and roof module two each include a roof frame and outer cover plate and inner top plate attached to their respective sides; and the floor module one and floor module two each include a floor frame and floor and bottom plate attached to their respective sides.
[0009] Preferably, a foam frame composed of foaming strips is provided between the supporting frame and the inner wall panel, and between the roof frame and the inner top panel, and a foam plug is provided between the supporting frame and the outer wall panel.
[0010] As a preferred embodiment, the assembly of the outer wall panel module one and the outer wall panel module two with windows includes the following steps: Step one: Open an inner hole in the inner wall panel and insert an inner window sleeve through the inner hole. The tail end of the inner window sleeve passes through the inner hole, and its head end is attached to the surface of the inner wall panel. Step 2: Place the inner wall panel with the inner window frame on a horizontal surface with its inner wall facing upwards, and place the support frame on the inner wall panel. Step 3: Place the assembled window frame inside the support frame, and install multiple sets of steel strips in the support frame, with each steel strip connected to the four sides of the outer wall of the window frame. Step 4: Arrange water pipes and electrical wires inside the support frame, and then lay the outer wall panel on the side of the support frame away from the inner wall panel. After the laying is completed, an outer hole opposite to the inner hole is formed on the support frame. An outer window frame is placed at the outer hole, with the tail end of the outer window frame passing through the outer hole and the head end of the outer window frame fitting against the surface of the outer wall panel laid on the support frame. Step 5: Inject foaming agent into the interior of the support frame for filling.
[0011] Preferably, the length and width of the rear end of the inner window frame are smaller than the length and width of the inner hole, while the length and width of the front end are larger than the length and width of the inner hole, and the length and width of the window frame are larger than the length and width of the rear end of the inner window frame.
[0012] Preferably, the length and width of the rear end of the outer window frame are smaller than the length and width of the outer opening, while the length and width of the front end are larger than the length and width of the outer opening, and the length and width of the window frame are larger than the length and width of the rear end of the outer window frame.
[0013] As a preferred option, foaming ports are provided on all three outer perimeter wall modules: module one, module two, and module three.
[0014] Preferably, the floor, interior wall panels, wall panel one, and interior ceiling panel are all made of stone-plastic composite material, the exterior wall panels are made of metal carved panels, the base plate and the outer cover plate are both made of color steel plate, and wall panel two is made of inorganic fireproof board.
[0015] Preferably, the assembly of the inner partition wall includes the following steps: Step 1: Steel is welded and assembled into an inner partition wall frame, and the inner partition wall frame is powder coated; Step 2: Install wall panel 1 on one side of the inner partition wall frame, and arrange electrical wires and water pipes inside the inner partition wall frame; Step 3: Install several internal partition wall frames onto floor module 1, and connect them to the electrical wires and water pipes in floor module 1, roof module 1, and outer wall module 1 respectively; Step 4: Install wall panel 2 on the other side of the inner partition wall frame.
[0016] The beneficial effects of this invention are: 1. By pre-arranging water pipes and electrical wires appropriately inside each module during the prefabrication stage, and reserving through holes in each module for interconnection of pipelines, the assembly stage of the prefabricated house only requires completing the pipeline connection between modules. This reduces the process of on-site wall and floor slab trenching and wiring after the traditional house is formed, saving excessive on-site trenching work, significantly shortening the on-site assembly period, and reducing labor input. It solves the pain point of time-consuming and labor-intensive on-site water and electricity construction in traditional prefabricated house assembly. At the same time, it avoids the damage to the wall and floor support frame structure caused by trenching and cutting, reducing the impact on the original load-bearing performance of the frame in each module, improving the structural stability and service life of the prefabricated house. Furthermore, the pipelines are standardized and pre-packaged in the factory, allowing personnel to arrange the pipelines neatly and seal them uniformly. Compared with the messy trenching and laying on-site, it reduces the risk of pipeline bending, damage, and leakage at joints, and makes the quality control of water and electricity installation in the house stronger.
[0017] 2. Compared with the prior art, the two outer wall enclosure modules with windows in this invention adopt a pre-embedded window frame and integrated injection foaming prefabrication process: the inner wall panel is pre-installed with the inner window frame → the support frame is assembled → the window frame is pre-fixed in the support frame and fixed by steel band limit → after the pipeline is laid, the outer wall panel is sealed and the outer window frame is installed. Finally, the foaming agent is injected into the frame in one go to fill the interior of the frame. The window frame and the wall foaming material are formed simultaneously. There is no secondary repair layer or delamination interface in the foam layer. The foam can tightly bond with the window frame, inner and outer wall panels and window frame. The tight bonding ensures a seamless seal, far superior to post-foaming processes. This reduces issues like window edge cracking, rainwater leakage, and water seepage at the source, improving the waterproof durability of the exterior wall. Steel strips rigidly connect and fix the four sides of the window frame to the supporting frame, allowing for precise window frame installation and strong resistance to deformation. The window frame is less prone to displacement during long-term use or slight settlement of the building, further preventing cracking of the window edge sealing layer. Combined with the stepped limiting structure of the inner and outer double-layer window casing, it seals the gaps between wall holes and the window casing, forming multiple waterproof sealing barriers. Attached Figure Description
[0018] Figure 1 This is a flowchart illustrating the process steps for assembling a prefabricated house according to one embodiment of the present invention. Figure 2 This is a flowchart illustrating the assembly process steps of an outer perimeter wall module 1 with windows and an outer perimeter wall module 2 according to one embodiment of the present invention. Figure 3 This is a flowchart illustrating the assembly process steps of an internal partition wall module according to one embodiment of the present invention. Figure 4 This is a schematic diagram illustrating the external structure of a portion of the quick-build room according to one embodiment of the present invention; Figure 5 This is an exploded view used to show the upper part of the structure of the quick-build house in one embodiment of the present invention; Figure 6 This is a schematic diagram illustrating the use of a single outer perimeter wall module in one embodiment of the present invention; Figure 7 This is a structural schematic diagram of a floor module 1 used to separately demonstrate one embodiment of the present invention; Figure 8 This is a schematic diagram illustrating a roof module 1 separately in one embodiment of the present invention.
[0019] Reference numerals: 1. Floor module one; 2. Inner partition wall module; 3. Outer wall module one; 4. Roof module one; 401. Roof frame; 402. Outer cover plate; 403. Inner top plate; 5. Floor module two; 501. Floor frame; 502. Floor; 503. Base plate; 6. Outer wall module two; 601. Support frame; 602. Inner wall panel; 603. Outer wall panel; 7. Roof module two; 8. Outer wall module three. Detailed Implementation
[0020] The following description is merely a preferred embodiment of the present invention, and the scope of protection is not limited to this embodiment. All technical solutions that fall within the scope of the present invention should be considered within the scope of protection of the present invention. It should also be noted that for those skilled in the art, any improvements and modifications made without departing from the principle of the present invention should also be considered within the scope of protection of the present invention.
[0021] The directional terms mentioned in this embodiment, such as "up," "down," "left," and "right," are merely used to help those skilled in the art understand the relationships between various features or parts in conjunction with the accompanying drawings.
[0022] In this embodiment, unless otherwise explicitly specified and limited, the terms "connection" and "fixed" should be interpreted broadly. For example, "fixed" can be a fixed connection, a detachable connection, or an integral part; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two components or the interaction between two components. Unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0023] like Figures 1 to 8 As shown, a rapid house assembly process includes the following steps: Step 1: Place the floor frame 501 with the base plate 503 on the assembly platform. In this embodiment, the assembly platform is a horizontal platform that can support the floor frame 501 horizontally. The assembly of the floor frame 501 adopts the technical methods conventionally used by those skilled in the art. After placing the assembled quadrilateral floor frame 501 on the assembly platform, personnel begin to lay water pipes and electrical wires inside. It should be noted that the number and position of the water pipes and electrical wires inside are determined according to the actual application scenario, and personnel can add, remove, or change their placement. After the water pipes and electrical wires are placed... The suspended floor 502 is attached to the upper side of the floor frame 501 to form floor module 1. Before the floor 502 is installed on the floor frame 501, through holes are made in the floor 502 for water supply pipes and electrical wires. Floor modules 2 5 with water pipes and electrical wires arranged inside are installed on both sides of floor module 1. In this embodiment, floor module 2 5 uses the same components as floor module 1 in name and material. The two are assembled in the same way, but the length, width and shape of the components can be adjusted according to the actual application. Through holes are also made on floor module 2 5. Water pipes and electrical wires are connected between floor module 1 1 and floor module 2 5 through the through holes.
[0024] Step Two: Several internal partition wall modules 2 are installed on the upper side of the floor 502 template to form an internal partition wall. Each internal partition wall module 2 includes an internal partition wall frame and wall panels 1 and 2 attached to its opposite sides. In this embodiment, before installation onto the floor module 1, water pipes and electrical wires are installed within the internal partition wall frame. When installing onto the floor module 1, wall panel 1 is installed on one side of the internal partition wall frame and then placed on the upper side of the floor 502 template. Wall panel 2 is not attached to the other side temporarily. The internal partition wall frame is then hoisted to the ground. After the top of panel module 1 is reached, personnel can connect the water pipes and electrical wires inside the inner partition wall frame to the water pipes and electrical wires extending from the floor 502 template through the side not attached to wall panel 2. After the connection is completed, personnel can then hoist the outer wall panel module 3 onto the edge of floor module 1. In this embodiment, there are two sets of outer wall panel modules 3, each consisting of a support frame 601 and inner wall panels 602 and outer wall panels 603 attached to their opposite sides. Before hoisting, personnel can assemble the support frame 601. Water pipes and electrical wires will then be placed inside, and through holes will be made on the support frame 601. Depending on the actual application, through holes will be made on the outer wall of the support frame 601. When the outer wall module 3 is hoisted and connected to the edge of the floor module 1, the water pipes and electrical wires extending from the through holes of the outer wall module 3 can be connected to the water pipes and electrical wires inside the floor module 1 and the inner partition wall module 2 that is attached to the outer wall module 3. After the connection is completed, the outer wall module 3 is fixed to the upper edge of the floor module 1. The fixing and installation method of the outer wall module 3 to the floor module 1 adopts the technical method commonly used by the technicians in this field. The outer wall module 3 is connected to the inner partition wall module 2 that is partially attached to the inner partition wall so that the inner partition wall module 2 and the outer wall module 3 are combined to form a fixed wall. It should be noted that at this time, the inner partition wall module 2 fixed to the floor module 1 is still in the state of not installing the wall panel 2, which is used to facilitate personnel to check and adjust the installation inside.
[0025] Step 3: Install and fix the outer perimeter wall module 26 on both the front and rear sides of the two sets of floor module 25. The outer perimeter wall module 26 uses the same materials and names as the outer perimeter wall module 13. The length and width of the components on the outer perimeter wall module 26 can be adjusted according to the actual situation. The outer perimeter wall module 26 has through holes for connecting water pipes and electrical wires to the outer perimeter wall module 13, roof module 27, outer perimeter wall module 38, and floor module 25. It should be noted that whether there are water pipes and electrical wires connecting the two modules depends on whether the transportation path of water pipes or electrical wires between the two modules is required in actual use.
[0026] Step 4: Place and install roof module 4 directly above the fixed wall. Before installation, assemble roof module 4 using the assembly method conventionally used by those skilled in the art. It consists of a roof frame 401 and outer cover plate 402 and inner top plate 403 attached to its opposite sides. Electrical wires are arranged inside the roof frame 401, and through holes are made in the roof frame 401 for the power lines to enter and exit. After the outer cover plate 402 and inner top plate 403 encapsulate the roof frame 401 to form roof module 1, hoist roof module 4 directly above the fixed wall. After connecting the electrical wires extending from the roof frame 401 with the electrical wires extending from the fixed wall, place personnel on the fixed wall and fix them in place. It should be noted that the width of roof module 4 is larger than the width of outer wall module 3. The left and right ends of roof module 4 can press down on the outer wall module 6 and be connected and fixed thereto. The fixing method uses the technical method conventionally used by those skilled in the art.
[0027] Step 5: Install roof module 2 7 horizontally above outer wall module 2 6. Before installation, lay out the wires inside roof module 2 7 according to the actual application. Roof module 2 7 uses the same components as roof module 1 4 in name and material. After installing it above outer wall module 2 6, connect and fix roof module 2 7 to the side of roof module 1 4 to complete the roof construction of the quick-build house.
[0028] Step Six: Install the outer perimeter wall module three 8, which contains water pipes and electrical wires, on the edge of floor module two 5 furthest from floor module one 1. The outer perimeter wall module three 8 connects to the lower side of roof module two 7 at its upper end, to the side of floor module two 5 at its lower end, and to the sides of two opposing outer perimeter wall modules two 6 at its left and right ends respectively. Figure 4 As shown, the external frame of the prefabricated house is assembled and spliced. After the external frame is built, the staff begins to arrange and connect the water pipes and electrical wires in the internal partition walls. After the arrangement and connection are completed, the wall panels are covered onto the internal partition wall frame. Then, depending on the actual use, masking tape or wallpaper is attached to the interior walls of the prefabricated house.
[0029] Floor module 1, floor module 2, interior partition wall module 2, exterior wall module 1, exterior wall module 2, exterior wall module 3, exterior wall module 4, exterior wall module 5, roof module 1, and roof module 2 each have through holes for water pipes and electrical wires to enter and exit. These through holes are pre-drilled, and the process of creating the through holes precedes the assembly and splicing of the modules. For outer perimeter wall module 1 (3) and outer perimeter wall module 2 (6), if personnel need to install windows, the installation process during assembly is as follows: Step 1: Make an inner hole of a suitable size in the individual inner wall panel 602, which is generally square, and install an inner window frame through the inner hole. The tail end of the inner window frame passes through the inner hole, while its head end is attached to the surface of the inner wall panel 602.
[0030] Step 2: Place the inner wall panel 602 with the inner window frame in place horizontally on a suitable placement platform or support platform with the inner wall facing upwards. Then, the foam frame composed of foam strips is placed and attached to the support frame 601. The assembled support frame 601 is hoisted and moved to the upper side of the inner wall panel 602. The support frame 601 is aligned and attached to the inner wall of the inner wall panel 602, with the foam frame separating the two.
[0031] Step 3: Place the assembled square window frame inside the support frame 601 and at the inner hole of the inner wall panel 602. It should be noted that the window frame uses components commonly used by those skilled in the art, and its length and width dimensions are larger than the length and width dimensions of the inner hole. This prevents it from falling out of the inner hole when placed on the inner wall panel 602. Before placing the window frame, a foam frame is also attached to its surface, and it is on the same plane as the foam frame on the support frame 601. After the window frame is in place, multiple sets of steel strips are installed in a longitudinal and transverse manner inside the support frame 601. One end of the steel strip is fixed to the inner wall of the support frame 601, and the other end is fixedly connected to the outer wall of the window frame, thereby restricting the position of the window frame. The length and width dimensions of the rear end of the inner window frame are smaller than the length and width dimensions of the inner hole, while the length and width dimensions of the front end are larger than the length and width dimensions of the inner hole. The length and width dimensions of the window frame are larger than the length and width dimensions of the rear end of the inner window frame.
[0032] Step 4: Install water pipes and electrical wires within the support frame 601. Their distribution should be adjusted according to the actual application. After installation, lay the exterior wall panel 603 on the side of the support frame 601 away from the interior wall panel 602. In this embodiment, the exterior wall panel 603 is elongated and is laid onto the support frame 601 in a spliced manner. Foam sealing strips are attached to the support frame 601 and the window frame on the side away from the interior wall panel 602. After the exterior wall panel 603 is laid, install the exterior wall panel 603 on the support frame... An outer hole is formed on the frame 601, which is opposite to the inner hole. The length and width of the outer hole are the same as those of the inner hole. An outer window frame is placed in the outer hole. The tail end of the outer window frame passes through the outer hole. The head end of the outer window frame is attached to the surface of the outer wall panel 603 laid on the support frame 601. The length and width of the tail end of the outer window frame are smaller than the length and width of the outer hole, while the length and width of its head end are larger than those of the outer hole. The length and width of the window frame are larger than those of the tail end of the outer window frame.
[0033] Step 5: Inject foaming agent through the foaming port on the side of the support frame 601. The foaming agent will foam and fill the area between the support frame 601, the inner wall panel 602, and the outer wall panel 603 until it is full. It should be noted that before foaming, personnel can use hydraulic pressure to attach a movable pressure plate to the outer wall panel 603 to prevent the outer wall panel 603 from detaching during foaming. After foaming is completed, as shown... Figure 6 As shown, personnel can install windows by fitting the outer window frame and the inner window frame between the inner and outer openings. The specific installation method adopts the window installation method commonly used by those skilled in this technical field.
[0034] In this embodiment, foaming ports are provided on the outer perimeter wall module 1 3, outer perimeter wall module 2 6, and outer perimeter wall module 3 8, so that personnel can inject foaming agent from the outside.
[0035] Meanwhile, in this embodiment, the floor 502, inner wall panel 602, wall panel one, and inner ceiling panel 403 are all made of stone-plastic material, the outer wall panel 603 is made of metal carved panel, the bottom plate 503 and the outer cover plate 402 are both made of color steel plate, and the wall panel two is made of inorganic fireproof board. It should be noted that the materials can be changed and adjusted according to the actual situation to suit various environments.
[0036] When the inner partition wall module 2 is installed onto the floor module 1, the assembly of the inner partition wall module 2 includes the following steps: Step 1: The steel is welded and assembled into an internal partition frame, and then hoisted onto the powder coating production line for powder coating of the internal partition frame; Step 2: After the powder coating is completed, let it stand for a period of time to air dry. Then, the personnel will polish it according to the requirements. After that, the inner partition frame is hoisted onto the placement platform, and wall panel 1 is installed and attached to one side of its surface. After it is attached, the personnel will arrange the electrical wires and water pipes inside the inner partition frame. Step 3: Install several inner partition wall frames that have completed Step 1 to Step 2 onto Floor Module 1 to form inner partition walls, and connect the water pipes and electrical wires arranged in each inner partition wall frame to the electrical wires and water pipes in Floor Module 1, Roof Module 4, and Outer Wall Module 3 respectively. Step 4: After the water pipes and electrical wires arranged in each internal partition wall frame are connected and no further internal adjustments or construction are required, personnel hoist the second wall panel onto the other side of the internal partition wall frame to complete the construction of the overall internal partition wall frame.
[0037] When the prefabricated house is completed, the water pipes and electrical wires inside the house are already connected, avoiding the need to cut grooves in the walls, floors, and roof for wiring after assembly, thus reducing the workload for subsequent personnel.
[0038] The above embodiments are illustrative of the present invention and are not intended to limit the present invention. Any simple modifications to the present invention are within the scope of protection of the present invention.
Claims
1. A rapid house assembly process, characterized in that, Includes the following steps: Step 1: Place the floor frame (501) with the base plate (503) on the assembly table, arrange water pipes and wires inside the floor frame (501), and after the arrangement is completed, cover the floor (502) to encapsulate the floor frame (501) to form floor module one (1). Install floor module two (5) with water pipes and wires arranged inside on both sides of floor module one (1). Step 2: Install several inner partition wall modules (2) on floor module 1 (1) to form an inner partition wall, and arrange water pipes and wires inside the inner partition wall modules (2). Install outer wall modules 1 (3) on opposite sides of floor module 1 (1), and connect the outer wall modules 1 (3) with the inner partition wall to form a fixed wall. Step 3: Install the outer wall module 2 (6) on the opposite edges of the two sides of the floor module 2 (5), and connect the outer wall module 2 (6) on the floor module 2 (5) with the outer wall module 1 (3) on the floor module 1 (1); Step 4: Arrange the wires inside the roof module 1 (4) and install them horizontally above the fixed wall; Step 5: Arrange the wires inside the roof module 2 (7) and install them horizontally above the outer wall module 2 (6) on the floor module 2 (5). Connect the roof module 2 (7) to the roof module 1 (4). Step 6: Install the outer wall module 3 (8) with water pipes and wires inside on the side edge of floor module 2 (5) away from floor module 1 (1), and connect the outer wall module 3 (8) to the side end of outer wall module 2 (6).
2. The assembly process for a quick-build house according to claim 1, characterized in that, Each of the floor module 1 (1), floor module 2 (5), inner partition wall module (2), outer wall module 1 (3), outer wall module 2 (6), outer wall module 3 (8), roof module 1 (4), and roof module 2 (7) has a through hole for water pipes and electrical wires to enter and exit.
3. The assembly process for a quick-build house according to claim 1, characterized in that, The outer wall module 1 (3), outer wall module 2 (6), and outer wall module 3 (8) each include a support frame (601) and inner wall panels (602) and outer wall panels (603) attached to their opposite sides. The inner partition module (2) includes an inner partition frame and wall panels 1 and 2 attached to its opposite sides. The roof module 1 (4) and roof module 2 (7) each include a roof frame (401) and outer cover plates (402) and inner top plates (403) attached to their opposite sides. The floor module 1 (1) and floor module 2 (5) each include a floor frame (501) and floor panels (502) and bottom plates (503) attached to their opposite sides.
4. The assembly process for a quick-build house according to claim 3, characterized in that, A foam frame composed of foaming strips is provided between the support frame (601) and the inner wall panel (602), and between the roof frame (401) and the inner top panel (403). A foam plug is provided between the support frame (601) and the outer wall panel (603).
5. The assembly process for a quick-build house according to claim 4, characterized in that, The assembly of the outer perimeter wall module one (3) and the outer perimeter wall module two (6) with windows includes the following steps: Step 1: Make an inner hole in the inner wall panel (602) and install an inner window frame through the inner hole. The tail end of the inner window frame passes through the inner hole, and its head end is attached to the surface of the inner wall panel (602). Step 2: Place the inner wall panel (602) with the inner window frame on a horizontal surface with its inner wall facing upwards, and place the support frame (601) on the inner wall panel (602); Step 3: Place the assembled window frame inside the support frame (601), and install multiple sets of steel strips in the support frame (601) in both directions, with each steel strip connected to the four sides of the outer wall of the window frame. Step 4: Arrange water pipes and electrical wires in the support frame (601), and then lay the outer wall panel (603) on the side of the support frame (601) away from the inner wall panel (602). After laying, an outer hole opposite to the inner hole is formed on the support frame (601). An outer window frame is placed at the outer hole. The tail end of the outer window frame passes through the outer hole, and the head end of the outer window frame is attached to the surface of the outer wall panel (603) laid on the support frame (601). Step 5: Inject foaming agent into the interior of the support frame (601) for filling.
6. The assembly process for a quick-build house according to claim 5, characterized in that, The length and width of the rear end of the inner window frame are smaller than the length and width of the inner opening, while the length and width of the front end are larger than the length and width of the inner opening. The length and width of the window frame are larger than the length and width of the rear end of the inner window frame.
7. The assembly process for a quick-build house according to claim 5, characterized in that, The length and width of the rear end of the outer window frame are smaller than the length and width of the outer opening, while the length and width of the front end are larger than the length and width of the outer opening, and the length and width of the window frame are larger than the length and width of the rear end of the outer window frame.
8. The assembly process for a quick-build house according to claim 3, characterized in that, Foaming openings are provided on outer wall module one (3), outer wall module two (6), and outer wall module three (8).
9. The assembly process for a quick-build house according to claim 3, characterized in that, The floor (502), inner wall panel (602), wall panel one, and inner ceiling panel (403) are all made of stone-plastic material. The outer wall panel (603) is made of metal carved panel. The bottom plate (503) and outer cover plate (402) are both made of color steel plate. The second wall panel is made of inorganic fireproof board.
10. The assembly process for a quick-build house according to claim 1, characterized in that, The assembly of the internal partition wall includes the following steps: Step 1: Weld and assemble the steel into an internal partition wall frame, and then powder-coate the internal partition wall frame; Step 2: Install wall panel 1 on one side of the inner partition wall frame, and arrange electrical wires and water pipes inside the inner partition wall frame; Step 3: Install several internal partition wall frames onto floor module 1 (1) and connect them with the electrical wires and water pipes in floor module 1 (1), roof module 1 (4), and outer wall module 1 (3); Step 4: Install wall panel 2 on the other side of the inner partition wall frame.