Sliding rail type quick-lift cantilever unloading platform and construction method

The modular sliding rail cantilever unloading platform design solves the problems of damage to building structures and construction complexity caused by traditional cantilever unloading platforms, and realizes efficient, safe and intelligent transfer of building materials, improving construction efficiency and safety.

CN123064307APending Publication Date: 2026-11-10CHINA FIRST METALLURGICAL GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611148927.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-31
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing cantilevered unloading platforms in high-rise building construction suffer from problems such as significant damage to the building structure, complex construction, high safety risks, insufficient functionality, and low construction efficiency, making it difficult to meet the requirements of modern construction.

Method used

The platform adopts modular, split vertical slide rails and anchoring components, combined with lifting drive components and positioning locking components, to achieve detachable installation and automated lifting. It also integrates dust suppression components and a detection alarm system, forming a stable, safe, and efficient construction solution.

Benefits of technology

It avoids damage to the building structure, simplifies the construction process, improves construction efficiency and safety, enhances the stability and applicability of the platform, realizes intelligent monitoring and dust suppression functions, and reduces construction costs and safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064307A_ABST
    Figure CN123064307A_ABST
Patent Text Reader

Abstract

This invention discloses a sliding rail type quick-lifting cantilever unloading platform and its construction method, including two rows of vertical rails, anchoring components, a lifting drive component, a platform component, a connecting component, and a positioning and locking component. The two rows of vertical rails are arranged parallel to each other, and each row includes multiple vertical slide rails. Each vertical slide rail is detachably fixed to the edge of a building floor beam via the anchoring components. Adjacent vertical slide rails in each row are fixedly connected via the connecting components. The lifting drive component is fixed to the top of the top vertical slide rail of each row. The platform component is slidably connected to the vertical rail and connected to the lifting drive component. The positioning and locking component is located on the side of the vertical slide rail. This invention uses anchoring components to fix the vertical slide rails, eliminating the need for pre-embedding and secondary drilling, avoiding structural damage and reducing construction costs. Relying on the dual-rail sliding limit, the platform can be lifted and rotated by a single person, eliminating the risk of high-altitude handling and achieving high turnover efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of construction equipment technology, and more specifically, relates to a sliding rail type quick-lifting cantilever unloading platform and its construction method. Background Technology

[0002] In the construction of high-rise buildings, cantilevered unloading platforms are crucial temporary facilities for the vertical transfer of materials between floors. Currently, most conventional cantilevered unloading platforms employ a "pre-embedded U-bolts + steel cantilever" fixing method. During construction, U-bolts must be pre-embedded in the floor slab and wall structure to anchor the cantilevered main beam, meeting the requirements for material load-bearing and transfer operations. While some existing unloading platforms have improved their ease of assembly and disassembly through structural optimization, achieving functions such as folding and storage, telescopic adjustment, and convenient unlocking, they still suffer from inherent technical limitations in high-rise, multi-story, continuous construction scenarios, making them unsuitable for the demands of efficient, safe, and low-loss modern construction.

[0003] First, traditional pre-embedded fixing methods can easily cause irreversible damage to the main structure of the building. Pre-embedded U-bolts need to penetrate through the building's floor slabs and walls. After the platform is removed, a large number of structural holes will be left behind, requiring additional repair and sealing work. This not only increases the construction process and labor costs, but also makes the repaired areas prone to quality problems such as cracking and leakage, damaging the overall structural integrity and reducing the building's durability.

[0004] Secondly, the platform floor turnover and lifting process is cumbersome and poses high safety risks. After completing a single floor operation, traditional platforms require multiple people to work together to remove the embedded bolts and various connectors. The platform is then hoisted to the upper floor for repositioning, re-embedding, and installation. The overall turnover process is complex and time-consuming. The high-altitude disassembly and hoisting process is prone to accidents involving falling components and personnel, resulting in low construction turnover efficiency.

[0005] Furthermore, the platform has poor load-bearing reliability and significant safety hazards. The load-bearing and anti-overturning performance of traditional unloading platforms depends entirely on the anchoring quality of the pre-embedded bolts. This is greatly affected by on-site factors such as the pre-embedded depth, concrete strength, and bolt tightening accuracy, making it prone to problems such as bolt loosening, uneven stress, platform displacement, and overturning. The construction safety redundancy is also low.

[0006] Meanwhile, existing platforms lack functionality and are not well-suited for construction. The installation area of ​​unloading platforms often requires the removal of some external scaffolding, resulting in a lack of edge protection, difficulties in erection, and an inability to form a reliable safety protection system; moreover, a large amount of dust is easily generated during material transfer, and traditional platforms do not have dedicated dust suppression structures, making it difficult to meet the requirements of green and environmentally friendly construction on the construction site. Summary of the Invention

[0007] To address the aforementioned deficiencies or improvement needs of existing technologies, this invention provides a sliding rail-type quick-lifting cantilevered unloading platform and its construction method. By employing modular, split vertical sliding rails with anchoring components, detachable installation is achieved, eliminating the need for structural pre-embedding and secondary drilling. This completely avoids damage to building floor slabs and wall structures, saving on subsequent structural repair procedures and effectively reducing construction costs. The entire device adopts a double-rail parallel sliding structure, combined with a triangular stable bearing frame with A-frame braces and a spring-loaded automatic locking component. This solves the problems of positioning deviation, uneven stress, and easy swaying and overturning inherent in traditional platforms, significantly improving load-bearing stability and positioning accuracy. Furthermore, a lifting drive component is integrated at the top of the sliding rails, enabling automated lifting and turnover of the platform using an electric hoist. Only one person is required to complete floor switching operations, with short lifting times per cycle. No manual high-altitude component handling is required, greatly simplifying the construction process, improving turnover efficiency, and avoiding the safety hazards of falls from heights.

[0008] To achieve the above objectives, according to one aspect of the present invention, a sliding rail type quick-lifting cantilever unloading platform is provided, comprising two rows of vertical rails, an anchoring assembly, a lifting drive assembly, a platform assembly, a connecting assembly, and a positioning and locking assembly; wherein... The two rows of vertical tracks are arranged parallel to each other. Each row of vertical tracks includes multiple vertical slide rails. Each vertical slide rail is detachably fixed to the edge of the building floor beam by an anchoring component. Two adjacent vertical slide rails in each row of vertical tracks are fixedly connected by a connecting component. The lifting drive assembly is fixedly mounted on the top of the vertical slide rail at the very top of each row of vertical rails. A platform assembly is slidably connected to the vertical rail, and the platform assembly is connected to the lifting drive assembly. The positioning and locking assembly is located on the side of the vertical slide rail and is used to elastically insert and lock the platform assembly after it is lifted and positioned, limiting the vertical movement and horizontal deviation of the platform. The lifting drive assembly pulls the platform assembly to slide directionally along the double sets of vertical slide rails, and the positioning and locking assembly locks the platform assembly. The vertical slide rail is fixed only by the anchoring assembly, without the need for pre-embedded components and secondary drilling, thus preventing damage to the building floor slabs and walls.

[0009] Furthermore, the connecting assembly includes a fixing block, bolt holes, and fastening bolts. The fixing block is fixed to both ends of the vertical slide rail. The fixing block has through bolt holes. The fixing blocks of two adjacent vertical slide rail sections are aligned and fitted together. The fastening bolts pass through the aligned bolt holes to achieve a locking connection.

[0010] Furthermore, the platform component includes a main load-bearing beam, transverse connecting rods, diagonal braces, guardrails, and an anti-slip base plate. The transverse connecting rods are fixedly connected between the two ends of the main load-bearing beam. The main load-bearing beam and the transverse connecting rods together form a rectangular load-bearing frame. The guardrails are detachably mounted on the top of the rectangular load-bearing frame by bolts. An anti-slip base plate made of patterned steel plate is fixedly laid on the bottom of the rectangular load-bearing frame. Diagonal braces are provided at both ends of the bottom of the main load-bearing beam, inclined towards the middle of the frame. The ends of the two diagonal braces away from the main load-bearing beam are fixedly connected to each other.

[0011] Furthermore, the end of the main load-bearing beam near the vertical slide rail is configured as a T-shaped structure, and the vertical slide rail has a T-shaped groove along its own length. The T-shaped end of the main load-bearing beam is slidably assembled inside the T-shaped groove to achieve sliding fit.

[0012] Furthermore, the guardrail is a rectangular guardrail adapted to the rectangular load-bearing frame formed by the main load-bearing beam and the transverse connecting rods. The guardrail includes a bottom connecting rod, a top connecting rod, and vertical connecting rods. Multiple vertical connecting rods are fixed at intervals between the bottom connecting rod and the top connecting rod. The bottom connecting rod is detachably fixed to the top of the main load-bearing beam and the transverse connecting rods by bolts. The guardrail panel is fixedly installed in the space enclosed by the bottom connecting rod, the top connecting rod, and the vertical connecting rods. The guardrail is made of hollow rectangular steel tubes. The top connecting rods on its four sides are connected to each other, and the hollow inner cavities of the steel tubes are interconnected.

[0013] Furthermore, the positioning and locking assembly includes a locking pin, a return spring, and a positioning hole; The vertical slide rail has several positioning holes spaced apart along its length. A return spring is fixedly installed on the outside of the positioning hole corresponding to the stopping position of each floor platform. A T-shaped locking pin is inserted inside the return spring. The end of the locking pin is fixedly connected to the other end of the return spring. A through hole is opened on the T-shaped structure at the end of the main load-bearing beam at the position corresponding to the positioning hole. The locking pin can be inserted into both the positioning hole and the through hole at the same time, thereby fixing the main load-bearing beam to the vertical slide rail.

[0014] Furthermore, the lifting drive assembly includes a fixed plate, an electric hoist, a wire rope, a guide wheel, and a connecting ring; The fixed plate has an L-shaped structure, with its horizontal end fixedly installed on the top of the vertical slide rail. An electric hoist is fixedly installed on the inner side of the vertical plate of the fixed plate, and a steel wire rope is wound around the electric hoist. A hook is provided at the end of the steel wire rope. A connecting ring is fixedly installed on the inner side of the main load-bearing beam, and the hook is hooked onto the connecting ring. A guide wheel is rotatably mounted on the bottom of the horizontal plate of the fixed plate through a fixed bracket, and the steel wire rope is close to and abuts against the wheel surface of the guide wheel for guiding transmission.

[0015] Furthermore, it also includes a dust suppression component, which is located inside the platform component and includes a main spray pipe, a branch spray pipe, a nozzle, and a connecting pipe. The main sprinkler pipe is installed inside the hollow cavity of the top connecting rod of the guardrail. Multiple sprinkler branch pipes are spaced apart on the inner side of the main sprinkler pipe facing the platform. The sprinkler branch pipes pass through the top connecting rod and are equipped with nozzles at their exposed ends. The main sprinkler pipe is connected to a connecting pipe, which is equipped with a control valve and is used to connect to an external water supply pipeline.

[0016] According to a second aspect of the present invention, a construction method for a sliding rail type quick-lift cantilever unloading platform is provided, which is implemented using the aforementioned sliding rail type quick-lift cantilever unloading platform, and includes the following steps: S100: Multiple vertical slide rails are spliced ​​together using connecting components. The vertical slide rails are fixed to the edge of the floor beam and the vertical accuracy is corrected by anchoring components. The fixing plate of the lifting drive component is installed at the top of the vertical slide rail. Electric hoist, guide wheel and steel wire rope are installed in sequence. S200: A rectangular load-bearing frame is formed by welding the main load-bearing beam and the transverse connecting rod. The bottom of the frame is equipped with herringbone diagonal bracing and an anti-slip base plate. It is equipped with steel pipe guardrails with interconnected hollow cavities and a complete set of dust reduction components is installed in the inner cavity of the guardrails. S300: Slide the T-shaped structure at the end of the main load-bearing beam into the T-shaped groove of the vertical slide rail, hang the hook at the end of the wire rope on the connecting ring on the inner side of the main load-bearing beam, and assemble a positioning and locking assembly including a return spring and a locking pin at each floor stop of the vertical slide rail. S400: Control the lifting drive component to move the platform component to the vicinity of the construction floor, pull the locking pin outward to compress the return spring, continuously fine-tune the platform position, align the through hole of the main load-bearing beam with the positioning hole of the vertical slide rail, release the locking pin to lock the platform, and transfer materials on the anti-slip base plate. S500: After the material transfer operation on this floor is completed, pull the locking pin outward to release the locking constraint, operate the electric hoist to drive the platform component to the vicinity of the upper workstation, pull the locking pin outward to compress the reset spring, fine-tune the platform to the standard position to align the holes, release the locking pin to complete the locking, repeat the unlocking, lifting, and alignment locking process to complete the continuous material transfer of multiple floors.

[0017] Furthermore, before the material transfer operation begins, the connecting pipe of the dust suppression component is connected to the water source. The dust suppression component is continuously turned on to spray and suppress dust throughout the entire material transfer process. After all the materials have been transferred, the dust suppression component is turned off and the water source of the spray pipe is disconnected.

[0018] In summary, compared with the prior art, the above-described technical solutions conceived by this invention can achieve the following beneficial effects: 1. The sliding rail type quick-lift cantilever unloading platform of the present invention achieves detachable and fixed installation of vertical sliding rails by using anchoring components. It eliminates the need to pre-embed components in multiple places in the building floor slab and walls, and eliminates the need for secondary drilling and laying of U-bolts on site. It avoids damage to the main building structure caused by the installation of the unloading platform from the source, eliminates the need for subsequent structural repair work, greatly simplifies the construction process, and effectively reduces the overall construction cost.

[0019] 2. The sliding rail type quick-lifting cantilever unloading platform of the present invention achieves automated lifting and transportation of the platform through the electric hoist of the lifting drive component and the steel wire rope. It eliminates the traditional manual disassembly and assembly and high-altitude handling operation mode of unloading platforms. Only one person is needed to complete the lifting and floor switching operation of the platform. The time for a single lifting operation can be controlled within 30 minutes, which greatly improves the construction turnover efficiency and completely avoids the safety risks of falling objects and personnel falling from height caused by manual high-altitude handling.

[0020] 3. The sliding rail type quick-lift cantilever unloading platform of the present invention guides and limits the sliding of platform components through double-row rails. The platform components with triangular supports improve the structural rigidity, which can suppress the platform swaying and tilting during material loading and unloading, reduce the risk of overturning. The positioning and locking components can quickly fix the position after the platform reaches the working floor, which improves the problems of large positioning error and insufficient fixing reliability of traditional cantilever platforms with manual anchoring. The overall structure has stronger bending and deformation resistance, and more stable bearing conditions. It can be adapted to the requirements of continuous vertical material transfer operations on multiple floors of high-rise buildings.

[0021] 4. The sliding rail type quick-lift cantilever unloading platform of the present invention adopts a modular and separate design of sliding rail and platform components. Each component is easy to disassemble and reassemble and can be independently reused. It can adapt to the material transfer needs of different construction scenarios and solve the drawbacks of traditional integrated unloading platforms with fixed size, poor versatility and low adaptability. The equipment has a high recycling rate and significantly reduces equipment investment and consumable costs.

[0022] 5. The sliding rail type quick-lift cantilever unloading platform of the present invention integrates the dust suppression components inside the hollow interconnected guardrail, realizing an integrated structural design of edge protection and spray dust suppression. There is no need to set up additional spray pipelines and fixed supports. While ensuring the safety of operators and materials from falling, it can carry out all-round spray dust suppression in the unloading area of ​​the platform, effectively suppressing the dust generated during material transfer and optimizing the working environment at the construction site.

[0023] 6. The sliding rail type quick-lifting cantilever unloading platform of the present invention, through the integration of a multi-dimensional detection and alarm component consisting of a tension sensor, a displacement monitoring sensor and an alarm, can dynamically monitor the load and sliding displacement status of the platform in real time. Through intelligent analysis by the central processor, it can issue timely warnings when dangerous working conditions such as overload or platform deviation occur, realize intelligent monitoring and active risk avoidance of the entire platform operation process, comprehensively eliminate potential safety hazards in equipment operation, and improve the safety redundancy of platform operation. Attached Figure Description

[0024] Figure 1 This is a three-dimensional structural diagram of a sliding rail type quick-lifting cantilever unloading platform according to an embodiment of the present invention; Figure 2 This is a three-dimensional rear view of a sliding rail type quick-lifting cantilever unloading platform according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the vertical slide rail structure of a slide rail type quick-lifting cantilever unloading platform according to an embodiment of the present invention; Figure 4 for Figure 3 Enlarged view of a portion of point A in the middle; Figure 5 This is a schematic diagram of the dust suppression component structure of a sliding rail type quick-lifting cantilever unloading platform according to an embodiment of the present invention.

[0025] In all the accompanying drawings, the same reference numerals denote the same technical features, specifically: 1-vertical slide rail, 2-anchoring assembly, 21-lateral connector, 22-anchor bolt, 3-lifting drive assembly, 31-fixed plate, 32-electric hoist, 33-wire rope, 34-guide wheel, 35-connecting ring, 4-platform assembly, 41-main load-bearing beam, 42-lateral connecting rod, 43-diagonal brace, 44-guardrail, 45-anti-slip base plate, 5-connecting assembly, 51-fixing block, 52-bolt hole, 53-fastening bolt, 6-positioning and locking assembly, 61-locking pin, 62-reset spring, 63-positioning hole, 7-dust suppression assembly, 71-main spray pipe, 72-spray branch pipe, 73-spray head, 74-connecting pipe. Detailed Implementation

[0026] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.

[0027] Example 1 like Figure 1-5As shown, this embodiment of the invention provides a sliding rail type quick-lifting cantilever unloading platform, including two rows of vertical rails, an anchoring assembly 2, a lifting drive assembly 3, a platform assembly 4, a connecting assembly 5, and a positioning and locking assembly 6. The two rows of vertical rails are arranged parallel to each other, and each row of vertical rails includes multiple vertical slide rails 1. Each vertical slide rail 1 is detachably fixed to the edge of a building floor beam by the anchoring assembly 2. Adjacent vertical slide rails 1 in each row of vertical rails are fixedly connected by the connecting assembly 5. The lifting drive assembly 3 is fixedly mounted on each... At the top of the vertical slide rail 1 of the vertical track, a platform assembly 4 is slidably connected to the vertical track. The platform assembly 4 is connected to the lifting drive assembly 3. The positioning and locking assembly 6 is located on the side of the vertical slide rail 1 and is used to elastically lock the platform assembly 4 after it has been lifted and positioned, restricting vertical movement and horizontal displacement of the platform. The lifting drive assembly 3 pulls the platform assembly 4 to slide directionally along the double set of vertical slide rails 1, and the positioning and locking assembly 6 locks the platform assembly 4 in place. The vertical slide rails are only externally fixed by anchoring components, without the need for external anchoring. Pre-embedded structural components and secondary drilling prevent structural damage to floors and walls, eliminating the need for subsequent structural repairs, reducing material and labor inputs, and lowering overall construction costs. The dual parallel tracks form a stable guiding structure, which, combined with the elastic insertion and limiting of the positioning and locking components, effectively suppresses vertical movement and horizontal deviation during platform lifting and unloading operations. This results in uniform stress distribution on the platform, stronger resistance to eccentric loads, and significantly improved operational stability. The lifting drive component pulls the platform along the tracks for overall sliding and lifting, eliminating the need for manual high-altitude transport and disassembly / reassembly of platform components. This system significantly reduces high-altitude work procedures, lowering safety hazards such as falling objects and personnel falls. Floor-to-floor material handling can be operated by a single person. The cantilevered unloading platform allows for lifting operations requiring only one operator, with each lifting operation taking less than 30 minutes. Compared to the traditional manual disassembly and transport method using cantilevered unloading platforms, construction efficiency is greatly improved. The sliding rails adopt a segmented modular splicing design, facilitating disassembly, assembly, and transport. They can be reused layer by layer as construction progresses, resulting in a high component reuse rate and adapting to the continuous material transport needs of multi-floor high-rise buildings. Furthermore, the connecting component 5 includes a fixing block 51, bolt holes 52, and fastening bolts 53. The fixing block 51 is fixed to both ends of the vertical slide rail 1. The fixing block 51 has through bolt holes 52. The fixing blocks 51 of two adjacent vertical slide rails 1 are aligned and fitted together. The fastening bolts 53 pass through the aligned bolt holes 52 to achieve a locking connection. The slide rail is spliced ​​by the fixing block 51 and the fastening bolts 53. The disassembly and assembly operations are simple and efficient. After splicing, the slide rail joints are firmly fitted. During the lifting operation, the joints are not prone to misalignment or slippage, and the overall structure has good stability. No on-site welding is required, reducing the fire safety risk at the construction site. It is also convenient for the vertical slide rails to be disassembled in sections and reused in layers.

[0028] Furthermore, the platform component 4 includes a main load-bearing beam 41, a transverse connecting rod 42, diagonal bracing rods 43, a guardrail 44, and an anti-slip base plate 45. The transverse connecting rods 42 are fixedly connected between the two ends of the main load-bearing beam 41. The main load-bearing beam 41 and the transverse connecting rods 42 together form a rectangular load-bearing frame. The guardrail 44 is detachably mounted on the top of the rectangular load-bearing frame by bolts. An anti-slip base plate 45 made of patterned steel plate is fixedly laid on the bottom of the rectangular load-bearing frame. Diagonal bracing rods 43 are provided at both ends of the bottom of the main load-bearing beam 41 and are inclined towards the middle of the frame. The ends of the two diagonal bracing rods 43 away from the main load-bearing beam 41 are fixedly connected to each other. The main load-bearing beams, combined with transverse connecting rods, form an integral load-bearing frame. These, along with diagonal braces, create a triangular stable force-bearing system, significantly improving the platform's overall bending and deformation resistance, enabling it to withstand larger stacking loads. The patterned steel anti-slip base plate increases the friction of the material contact surface, effectively preventing building materials from slipping and falling. The guardrails are bolted and detachable, facilitating individual disassembly, transportation, and maintenance. The overall frame exhibits uniform stress distribution, a stable and durable structure, reducing the risk of deformation and cracking under heavy loads, and enhancing the stability and safety of unloading operations.

[0029] Furthermore, the end of the main load-bearing beam 41 near the vertical slide rail 1 is configured as a T-shaped structure, and the vertical slide rail 1 has a T-shaped groove along its own length. The T-shaped end of the main load-bearing beam 41 is slidably assembled inside the T-shaped groove to achieve sliding fit. Through the mutual locking and sliding connection between the T-shaped end and the T-shaped groove, a lateral limiting constraint can be formed on the platform component, making it difficult for the platform to detach from the slide rail during operation, and providing excellent anti-overturning performance.

[0030] Furthermore, the cantilevered unloading platform also includes a positioning and locking assembly 6, which includes a locking pin 61, a return spring 62, and positioning holes 63. The vertical slide rail 1 has several positioning holes 63 spaced apart along its length on its sidewall. A return spring 62 is fixedly installed on the outside of the positioning hole 63 corresponding to each floor platform stopping position. A T-shaped locking pin 61 passes through the inside of the return spring 62, and one end of the locking pin 61 is fixedly connected to the other end of the return spring 62. The end of the main load-bearing beam 41... A through hole is provided on the T-shaped structure corresponding to the positioning hole 63. The locking pin 61 can be inserted into both the positioning hole 63 and the through hole simultaneously to fix the main load-bearing beam 41 to the vertical slide rail 1. The T-shaped locking pin is driven by the return spring to simultaneously pass through the positioning hole of the slide rail and the through hole of the main load-bearing beam, realizing the bidirectional insertion and limiting of the platform, effectively restraining the vertical movement of the platform, and eliminating the risk of the platform falling during the unloading process. The spring has an automatic rebound locking function, which eliminates the need for additional fastening tools. The unlocking and locking operations are completed in one step, and the floor positioning efficiency is high.

[0031] When the lifting platform is needed, pull the locking pin 61 outward to stretch the return spring 62, allowing the locking pin 61 to disengage from the positioning hole 63 and the through hole of the main load-bearing beam, thus releasing the locking constraint. Then, the platform assembly 4 is driven by the drive component to slide along the vertical slide rail 1, moving the platform assembly 4 to the vicinity of the target floor. Pull the locking pin 61 outward to continue driving the platform assembly 4 to fine-tune to the working position until the through hole on the main load-bearing beam is precisely aligned with the positioning hole 63 on the side wall of the vertical slide rail 1. Release the locking pin 61, and the return spring 62 rebounds and pushes the locking pin 61 forward. The locking pin 61 simultaneously passes through the positioning hole 63 and the through hole of the main load-bearing beam, locking the main load-bearing beam 41 tightly onto the vertical slide rail 1, completing the platform positioning and locking. After the material transfer operation on this floor is completed, repeat the pin-pulling and unlocking operation process to lift the platform again and switch to the next construction floor for use.

[0032] Furthermore, the lifting drive assembly 3 includes a fixed plate 31, an electric hoist 32, a wire rope 33, a guide wheel 34, and a connecting ring 35. The fixed plate 31 has an L-shaped structure. The horizontal end of the fixed plate 31 is fixedly installed on the top of the vertical slide rail 1. The electric hoist 32 is fixedly installed on the inner side of the vertical plate of the fixed plate 31. The electric hoist 32 is wound with a wire rope 33. The end of the wire rope 33 is provided with a hook. The inner side of the main load-bearing beam 41 is fixedly provided with a connecting ring 35. The hook is hooked onto the connecting ring 35. The bottom of the horizontal plate of the fixed plate 31 is rotatably equipped with a guide wheel 34 through a fixed bracket. The wire rope 33 fits against the wheel surface of the guide wheel 34 for guidance and transmission. The electric hoist is centrally supported by an L-shaped fixed plate, ensuring stable installation and balanced force distribution. The overall drive structure is integrated at the top of the slide rail, eliminating the need for on-site cantilever traction supports. The guide wheels limit and guide the wire rope, preventing bending, wear, and deviation, thus extending its service life and ensuring smooth operation during lifting and traction. The electric hoist, in conjunction with the wire rope, enables electric lifting and lowering, allowing a single person to operate the platform, significantly reducing manual high-altitude operations, lowering construction safety risks, and improving the efficiency of floor turnover operations.

[0033] Furthermore, the guardrail 44 is a rectangular guardrail adapted to the rectangular load-bearing frame formed by the main load-bearing beam 41 and the transverse connecting rod 42. The guardrail 44 includes a bottom connecting rod, a top connecting rod, vertical connecting rods, and a guardrail panel. Multiple vertical connecting rods are fixed at intervals between the bottom connecting rod and the top connecting rod, and the bottom connecting rod is detachably fixed to the top of the main load-bearing beam 41 and the transverse connecting rod 42 by bolts. The guardrail panel is fixedly installed in the space enclosed by the bottom connecting rod, the top connecting rod, and the vertical connecting rods, which can form a complete closed protection around the unloading platform, prevent materials and personnel from falling accidentally, and improve the safety protection performance of operations near the edge. The protective railing 44 is made of hollow rectangular steel tubes, with its four top connecting rods connected to each other. The hollow cavities of the steel tubes are interconnected, and the hollow cavities are used to install matching dust suppression components. The protective railing adopts an integrated, interconnected hollow steel tube structure, which reduces its own weight and reduces the additional load on the platform while ensuring impact resistance and protective rigidity. The interconnected cavities can be directly used as channels for dust suppression water pipes. The railing is detachable and assembled using bolts, making disassembly, transportation, and maintenance convenient. The multi-layered vertical connecting rods combined with the closed-loop top connecting rods form a complete enclosure, effectively preventing personnel and materials from falling from heights, and simultaneously achieving the dual functions of edge protection and dust suppression during construction.

[0034] Furthermore, the cantilevered unloading platform also includes a dust suppression component 7, which is located inside the platform component 4. The dust suppression component 7 includes a main spray pipe 71, spray branch pipes 72, nozzles 73, and connecting pipes 74. The main spray pipe 71 is located inside the hollow cavity of the top connecting rod of the guardrail 44. The main spray pipe 71 has multiple spray branch pipes 72 spaced apart facing the inside of the platform. The spray branch pipes 72 pass through the top connecting rod and are equipped with nozzles 73 at their exposed ends. The main spray pipe 71 is connected to the connecting pipe 74, which is equipped with a control valve and is used to connect to an external water supply pipeline. The main sprinkler pipe is built into the hollow cavity of the guardrail, eliminating the need for a separate water supply support. This simplifies the external pipeline layout of the platform, prevents the sprinkler pipe from occupying the unloading operation space, and reduces the risk of pipeline damage from impacts. The valves on the connecting pipes allow for flexible control of the sprinkler's start and stop. The nozzles are evenly distributed along the guardrail, ensuring comprehensive coverage of the platform area during unloading operations. This effectively suppresses construction waste dust and improves the working environment at the construction site.

[0035] Furthermore, the cantilevered unloading platform also includes a central processing unit and a detection and alarm component. The detection and alarm component includes a tension sensor, a displacement monitoring sensor, and an alarm. The tension sensor is installed on the section of the wire rope 33 near the hook and is used to collect the lifting load data of the material carried on the platform in real time. The displacement monitoring sensor is fixedly mounted on the bottom of the main load-bearing beam 41 and is used to monitor the vertical slippage offset of the platform component 4 in real time. The alarm is arranged at the bottom of the main load-bearing beam 41. The central processing unit is located at the bottom of the main load-bearing beam 41. The tension sensor and the displacement monitoring sensor are both connected to the central processing unit for signal transmission, and the alarm is electrically connected to the central processing unit. By monitoring the platform's load-bearing weight in real time using a tension sensor, overload conditions can be identified. Displacement monitoring sensors collect abnormal displacement data of the platform in real time. Both types of sensors transmit the monitoring data to the central processor for judgment. Once dangerous conditions such as overload or platform slippage occur, the central processor immediately drives the alarm to issue an audible and visual warning, promptly reminding on-site operators to stop the machine for inspection. This helps to avoid safety accidents such as platform overload deformation, slippage, and derailment, achieving intelligent monitoring and proactive early warning of the entire unloading platform process, and significantly improving the safety redundancy of the equipment.

[0036] Example 2 Combination Figure 1-5 This invention provides a construction method for a sliding rail type quick-lift cantilever unloading platform. The specific steps of using this sliding rail type quick-lift cantilever unloading platform are as follows: S100: Use connecting component 5 to splice multiple vertical slide rails 1, fix the vertical slide rails 1 to the edge of the floor beam through anchoring component 2 and correct the vertical accuracy, install the fixing plate 31 of lifting drive component 3 at the top of vertical slide rail 1, and assemble electric hoist 32, guide wheel 34 and wire rope 33 in sequence. S200: A rectangular load-bearing frame is formed by welding the main load-bearing beam 41 and the transverse connecting rod 42. The bottom of the frame is equipped with a herringbone structure diagonal brace 43 and an anti-slip base plate 45. A steel pipe guardrail 44 with interconnected hollow inner cavities is assembled. A complete set of dust suppression components 7 is installed in the inner cavity of the guardrail. A central processing unit, displacement monitoring sensor, alarm and tension sensor are installed on the steel wire rope 33 at the bottom of the main load-bearing beam 41. S300: Slide the T-shaped structure at the end of the main load-bearing beam 41 into the T-shaped groove of the vertical slide rail 1, hang the hook at the end of the wire rope 33 on the connecting ring 35 on the inner side of the main load-bearing beam 41, and assemble the positioning and locking assembly 6, which includes a return spring 62 and a locking pin 61, at each floor stop position of the vertical slide rail 1. S400: Control the lifting drive component 3 to move the platform component 4 to the vicinity of the construction floor, pull the locking pin 61 outward to compress the reset spring 62, continuously fine-tune the platform position, align the through hole of the main load-bearing beam 41 with the positioning hole 63 of the vertical slide rail 1, release the locking pin 61 to lock the platform, transfer materials on the anti-slip base plate 45, turn on the dust suppression component 7 to spray dust suppression, and the detection alarm component collects load and displacement data in real time throughout the process; S500: After the material transfer operation on this floor is completed, pull the locking pin 61 outward to release the locking constraint, operate the electric hoist 32 to drive the platform component 4 to rise to the vicinity of the upper work station, pull the locking pin 61 outward to compress the reset spring 62, fine-tune the platform to the standard position to align the holes, release the locking pin 61 to complete the locking, repeat the unlocking, lifting, and alignment locking process to complete the continuous material transfer of multiple floors.

[0037] Before the material transfer operation begins, the connecting pipe 74 of the dust suppression component 7 is connected to the water source. The dust suppression component 7 is continuously turned on to spray and suppress dust throughout the entire material transfer process. After all the materials have been transferred, the dust suppression component 7 is turned off and the water source of the spray pipe is disconnected.

[0038] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A sliding rail type quick-lifting cantilever unloading platform, characterized in that, It includes two rows of vertical rails, an anchoring assembly (2), a lifting drive assembly (3), a platform assembly (4), a connecting assembly (5), and a positioning and locking assembly (6); among which, The two rows of vertical rails are arranged parallel to each other. Each row of vertical rails includes multiple vertical slide rails (1). Each vertical slide rail (1) is detachably fixed to the edge of the building floor beam by an anchoring component (2). Two adjacent vertical slide rails (1) in each row of vertical rails are fixedly connected by a connecting component (5). The lifting drive assembly (3) is fixedly mounted on the top of the vertical slide rail (1) at the top of each row of vertical rails. A platform assembly (4) is slidably connected on the vertical rail. The platform assembly (4) is connected to the lifting drive assembly (3). The positioning and locking assembly (6) is located on the side of the vertical slide rail (1) and is used to elastically plug and lock the platform assembly (4) after it is lifted and positioned, limiting the vertical movement and horizontal displacement of the platform. The lifting drive assembly (3) pulls the platform assembly (4) to slide along the double set of vertical slide rails (1) in a directional manner. The positioning and locking assembly (6) is used to lock the platform assembly (4). The vertical slide rail (1) is fixed only by the anchoring assembly (2). There is no need for pre-embedded components and secondary drilling, which prevents damage to the building floor and walls.

2. The sliding rail type quick-lifting cantilever unloading platform according to claim 1, characterized in that, The connecting component (5) includes a fixing block (51), bolt holes (52), and fastening bolts (53). The fixing block (51) is fixed to both sides of the vertical slide rail (1). The fixing block (51) has through bolt holes (52). The fixing blocks (51) of two adjacent vertical slide rails (1) are aligned and fitted together. The fastening bolts (53) pass through the aligned bolt holes (52) to achieve a locking connection.

3. The sliding rail type quick-lifting cantilever unloading platform according to claim 1, characterized in that, The platform component (4) includes a main load-bearing beam (41), a transverse connecting rod (42), a diagonal brace (43), a guardrail (44), and an anti-slip base plate (45). The two ends of the main load-bearing beam (41) are fixedly connected to the transverse connecting rod (42). The main load-bearing beam (41) and the transverse connecting rod (42) together form a rectangular load-bearing frame. The top of the rectangular load-bearing frame is detachably fitted with a guardrail (44) by bolts. The bottom of the rectangular load-bearing frame is fixedly laid with an anti-slip base plate (45) made of patterned steel plate. Both ends of the bottom of the main load-bearing beam (41) are provided with diagonal braces (43) that are inclined toward the middle of the frame. The ends of the two diagonal braces (43) away from the main load-bearing beam (41) are fixedly connected to each other.

4. The sliding rail type quick-lifting cantilever unloading platform according to claim 3, characterized in that, The end of the main load-bearing beam (41) near the vertical slide rail (1) is configured as a T-shaped structure. The vertical slide rail (1) has a T-shaped groove along its length. The T-shaped end of the main load-bearing beam (41) is slidably assembled inside the T-shaped groove to achieve sliding fit.

5. A sliding rail type quick-lifting cantilever unloading platform according to claim 4, characterized in that, The guardrail (44) is a rectangular guardrail adapted to the rectangular load-bearing frame formed by the main load-bearing beam (41) and the transverse connecting rod (42). The guardrail (44) includes a bottom connecting rod, a top connecting rod and a vertical connecting rod. Multiple vertical connecting rods are fixed at intervals between the bottom connecting rod and the top connecting rod. The bottom connecting rod is detachably fixed to the top of the main load-bearing beam (41) and the transverse connecting rod (42) by bolts. The guardrail plate is fixedly installed in the space formed by the bottom connecting rod, the top connecting rod and the vertical connecting rod. The guardrail (44) is made of hollow rectangular steel pipe. The top connecting rods on its four sides are connected to each other. The hollow inner cavity of the steel pipe is interconnected.

6. The sliding rail type quick-lifting cantilever unloading platform according to claim 1, characterized in that, The positioning and locking assembly (6) includes a locking pin (61), a return spring (62), and a positioning hole (63). The vertical slide rail (1) has a number of positioning holes (63) spaced apart along its length. A return spring (62) is fixedly installed on the outside of the positioning hole (63) corresponding to the stopping position of each floor platform. A T-shaped locking pin (61) is inserted inside the return spring (62). The end of the locking pin (61) is fixedly connected to the other end of the return spring (62). A through hole is opened on the T-shaped structure at the end of the main load-bearing beam (41) at the position corresponding to the positioning hole (63). The locking pin (61) can be inserted into the positioning hole (63) and the through hole at the same time, thereby fixing the main load-bearing beam (41) to the vertical slide rail (1).

7. The sliding rail type quick-lifting cantilever unloading platform according to claim 1, characterized in that, The lifting drive assembly (3) includes a fixed plate (31), an electric hoist (32), a wire rope (33), a guide wheel (34), and a connecting ring (35); The fixed plate (31) has an L-shaped structure. Its horizontal plate end is fixedly installed on the top of the vertical slide rail (1). An electric hoist (32) is fixedly installed on the inner side of the vertical plate of the fixed plate (31). The electric hoist (32) is wound with a wire rope (33). The end of the wire rope (33) is provided with a hook. A connecting ring (35) is fixedly installed on the inner side of the main load-bearing beam (41). The hook is hooked on the connecting ring (35). The bottom of the horizontal plate of the fixed plate (31) is rotatably equipped with a guide wheel (34) through a fixed bracket. The wire rope (33) fits against the wheel surface of the guide wheel (34) for guidance and transmission.

8. The sliding rail type quick-lifting cantilever unloading platform according to claim 1, characterized in that, It also includes a dust suppression component (7), which is located inside the platform component (4). The dust suppression component (7) includes a main spray pipe (71), a spray branch pipe (72), a nozzle (73), and a connecting pipe (74). The main sprinkler pipe (71) is installed inside the hollow cavity of the top connecting rod of the guardrail (44). The main sprinkler pipe (71) has multiple sprinkler branch pipes (72) spaced apart on the inner side of the platform. The sprinkler branch pipes (72) pass through the top connecting rod and are equipped with nozzles (73) at their exposed ends. The main sprinkler pipe (71) is connected to a connecting pipe (74). The connecting pipe (74) is equipped with a control valve and is used to connect to an external water supply pipeline.

9. A construction method for a sliding rail type quick-lifting cantilevered unloading platform, characterized in that, The application of a sliding rail type quick-lifting cantilever unloading platform as described in any one of claims 1-8 is characterized by comprising the following steps: S100: Use the connecting component (5) to splice multiple vertical slide rails (1), fix the vertical slide rails (1) to the edge of the floor beam and correct the vertical accuracy through the anchoring component (2), install the fixing plate (31) of the lifting drive component (3) at the top of the vertical slide rails (1), and install the electric hoist (32), guide wheel (34) in sequence and arrange the steel wire rope (33). S200: A rectangular load-bearing frame is formed by welding the main load-bearing beam (41) and the transverse connecting rod (42). The bottom of the frame is equipped with a herringbone structure diagonal brace (43) and an anti-slip base plate (45). A steel pipe guardrail (44) with interconnected hollow inner cavities is assembled, and a complete set of dust reduction components (7) is installed in the inner cavity of the guardrail. S300: Slide the T-shaped structure at the end of the main load-bearing beam (41) into the T-shaped groove of the vertical slide rail (1), hang the hook at the end of the wire rope (33) on the connecting ring (35) inside the main load-bearing beam (41), and assemble a positioning and locking assembly (6) including a reset spring (62) and a locking pin (61) at each floor stop position of the vertical slide rail (1). S400: Control the lifting drive assembly (3) to move the platform assembly (4) to the vicinity of the construction floor, pull the locking pin (61) outward to compress the reset spring (62), continuously fine-tune the platform position, align the through hole of the main load-bearing beam (41) with the positioning hole (63) of the vertical slide rail (1), release the locking pin (61) to lock the platform, and transfer materials on the anti-slip base plate (45); S500: After the material transfer operation on this floor is completed, pull the locking pin (61) outward to release the locking constraint, operate the electric hoist (32) to drive the platform component (4) to rise to the vicinity of the upper work station, pull the locking pin (61) outward to compress the reset spring (62), fine adjust the platform to the standard position to align the holes, release the locking pin (61) to complete the locking, repeat the unlocking, lifting, and alignment locking process to complete the continuous material transfer of multiple floors.

10. The construction method of a sliding rail type quick-lifting cantilever unloading platform according to claim 9, characterized in that, Before the material transfer operation begins, connect the water source to the connecting pipe (74) of the dust suppression component (7). During the entire material transfer process, continuously turn on the dust suppression component (7) to spray and suppress dust. After all the materials have been transferred, turn off the dust suppression component (7) and disconnect the water source of the spray pipe.