A seismic-resistant joint structure for a pipe jacking tunnel without a handhole circumferential joint
By using the mating structure of the tenon and mortise units, combined with the design of rubber sleeves and shock-absorbing balls, the stress concentration problem of traditional pipe jacking tunnels without manhole joints in high-intensity seismic zones is solved, achieving efficient assembly and multi-level shock absorption, thus improving the seismic performance of the tunnel.
Patent Information
- Application Number
- CN202611502299.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-24
- Publication Date
- 2026-11-10
AI Technical Summary
The traditional manhole-less joint design of pipe jacking tunnels is difficult to effectively dissipate seismic energy in high seismic intensity areas, leading to stress concentration and segment damage at the joints, and failing to meet the seismic service requirements of high-intensity areas.
The structure employs a combination of tenon and mortise units, utilizing the connection of pre-embedded rods and frames, combined with the design of rubber sleeves, damping balls, and buffer cavities, to achieve rapid assembly of segments without handholes and multi-stage vibration damping and energy dissipation. Vibration energy is dissipated through elastic deformation and displacement of damping balls.
It enables rapid assembly without manholes, improving construction efficiency and enhancing the stability and reliability of segment connections under seismic conditions, avoiding stress concentration and preventing concrete collapse of segments.
Smart Images

Figure CN123064490A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of segment circumferential joint technology, and in particular to a seismic-resistant circumferential joint structure for pipe jacking tunnels without manholes. Background Technology
[0002] Pipe jacking tunnels are a modern tunnel construction method that uses a pipe jacking machine for excavation and then assembles the pipe segments into a ring to form the entire tunnel. The circumferential joints between the pipe segments are key force transmission parts of the tunnel structure, and their connection performance directly determines the overall structural strength, integrity, and service durability of the tunnel.
[0003] Traditional pipe jacking tunnel segment rings are typically formed by bolting together several prefabricated segments. Because of this bolting, manholes need to be pre-drilled in the segments. During long-term tunnel operation, the manhole sealing material is prone to aging and detachment due to repeated vibrations from vehicles, air pressure waves, and erosion from alternating wet and dry groundwater. This not only damages the integrity of the tunnel wall but also leads to further problems such as steel corrosion and water leakage, seriously affecting the structural safety of the tunnel. To address these issues, patent CN114810135B discloses a longitudinal joint for pipe jacking tunnel segments. The manhole-free multi-point connection structure uses two sets of "C"-shaped snap-fit embedded parts to replace the traditional bolt and manhole structure, realizing the manhole-free connection of the longitudinal joint of the tunnel segment. This solves the problem of manhole seal falling off and structural weakening at the longitudinal joint to a certain extent. However, most existing manhole-free joint designs do not consider seismic resistance and vibration reduction requirements. In areas with high seismic intensity, stress concentration is likely to occur at the joint of the tunnel segment under seismic load, leading to damage to the joint components and cracking and collapse of the tunnel segment concrete. This makes it difficult to effectively dissipate seismic energy and meet the seismic service requirements of pipe jacking tunnels in high-intensity areas.
[0004] Therefore, there is an urgent need to provide a manhole-free circumferential joint structure for pipe jacking tunnels that can simultaneously achieve rapid assembly without manholes and has multi-level vibration reduction and energy dissipation capabilities. Summary of the Invention
[0005] Therefore, it is necessary to provide a seismic-resistant joint structure for pipe jacking tunnels without manholes and circumferential joints, in order to solve the technical problems mentioned in the background art.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: a seismic-resistant joint structure for a pipe jacking tunnel without a manhole circumferential joint, comprising: a tenon unit, wherein the tenon unit is pre-embedded in the longitudinal splicing end on one side of the pipe segment, the tenon unit includes a pre-embedded rod pre-embedded in the pipe segment, a tenon column is installed at the end of the pre-embedded rod away from the pipe segment, the tenon column is provided with a plurality of circumferentially evenly distributed snap-fit parts, and the tenon column is also provided with a seismic-resistant part.
[0007] The manhole-free circumferential joint structure of the pipe jacking tunnel also includes a tenon unit. The tenon unit is pre-embedded at the longitudinal splicing end on the other side of the pipe segment. The tenon unit includes a pre-embedded frame pre-embedded in the pipe segment. A tenon joint is installed on the inner end face of the bottom wall of the pre-embedded frame. A insertion hole is opened in the middle of the tenon joint. Multiple circumferentially evenly distributed limiting holes are opened on the inner wall of the insertion hole. The limiting holes cooperate with the corresponding locking parts to provide a rigid connection between the tenon column and the tenon joint.
[0008] The seismic-resistant part includes a rubber sleeve fitted around the outer periphery of the tenon column. The rubber sleeve is tightly fitted to the inner wall of the insertion hole. The deformation of the rubber sleeve provides space for movement between the tenon column and the tenon joint. A seismic-resistant cavity is opened at one end of the tenon column near the pre-embedded rod. Multiple shock-absorbing balls are placed inside the seismic-resistant cavity. When the segment is vibrated, the force generated by the vibration is transmitted to the shock-absorbing balls, and the shock-absorbing balls are displaced by the force to alleviate the force generated by the vibration.
[0009] Preferably, the tenon unit further includes a rubber pad tube installed at the end of the pre-embedded rod away from the segment.
[0010] Preferably, the tenon unit further includes a plurality of clamping members that are circumferentially and evenly hinged to the upper end of the tenon joint.
[0011] Preferably, the snap-fit part includes a snap-fit hole formed on the outer ring surface of the tenon post, a snap-fit plate slidably connected in the snap-fit hole, the snap-fit plate slidably passes through the rubber sleeve and cooperates with the limiting hole, and a plurality of evenly distributed return springs are installed between the snap-fit plate and the side wall of the snap-fit hole near the axis of the tenon post.
[0012] Preferably, the end of the tenon near the pre-embedded rod is a frustum shape with a larger top and a smaller bottom. The annular inclined surface at the upper end of the tenon guides multiple clamping components, causing the clamping components to rotate toward the rubber pad tube and press tightly against the surface of the rubber pad tube.
[0013] Preferably, the pre-embedded rod is equipped with a plurality of evenly distributed connecting anchor bars at one end near the segment.
[0014] Preferably, the pre-embedded frame body is a frustum shape with a smaller top and a larger bottom, and multiple evenly distributed connecting anchor bars are installed at one end of the pre-embedded frame near the pipe segment.
[0015] Preferably, the snap-fit plate has an inclined surface on the lower side of the end away from the reset spring, and the inclined surface cooperates with the inner wall of the tenon joint.
[0016] Preferably, the main body of the tenon joint is a frustum shape with a smaller top and a larger bottom, and a buffer cavity is provided between the tenon joint and the pre-embedded frame, and the buffer cavity is inserted and matched with the rubber pad tube.
[0017] In summary, the present invention has the following beneficial technical effects:
[0018] 1. The tenon unit and the tenon unit used in this invention can be used to connect two segments using a spring self-locking snap-fit structure. During the segment hoisting and docking process, the snap-fit plate is automatically retracted by the pressure of the inner wall of the tenon joint. After the tenon column is inserted into place, it automatically springs into the limiting hole under the action of the return spring to complete the locking. There is no need to open hand holes in the segments for manual operation throughout the process, which simplifies the circumferential joint splicing process and improves the efficiency of segment assembly construction.
[0019] 2. The seismic-resistant component used in this invention can provide a small relative displacement space between the segments through elastic deformation, avoiding stress concentration at the connection between the embedded rod, the embedded frame and the concrete under seismic load, and preventing the concrete of the segments from collapsing; the tenon column is equipped with a seismic-resistant cavity and a built-in damping ball, which dissipates the vibration energy through the force displacement of the damping ball and weakens the vibration transmission effect; and the rubber pad tube is inserted and matched with the buffer cavity to further buffer the axial vibration impact, thereby improving the overall stability and reliability of the segment connection under seismic conditions. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.
[0021] Figure 1 A three-dimensional structural schematic diagram of the present invention is shown;
[0022] Figure 2 A front view of the invention is shown;
[0023] Figure 3 It shows Figure 2 Sectional view of AA;
[0024] Figure 4 A schematic diagram of the structure of the tenon unit of the present invention for removing the rubber pad tube is shown;
[0025] Figure 5 A perspective sectional view of the tenon unit of the present invention is shown;
[0026] Figure 6 A schematic diagram of the tenon unit of the present invention is shown;
[0027] Figure 7 A perspective sectional view of the tenon unit of the present invention is shown;
[0028] Figure 8 A schematic diagram of the splicing of adjacent tunnel segments is shown.
[0029] The above-mentioned attached drawings include the following reference numerals: 1. Tenon unit; 10. Embedded rod; 100. Connecting anchor bar one; 11. Tenon column; 12. Snap-fit part; 120. Snap-fit hole; 121. Snap-fit plate; 122. Return spring; 13. Seismic part; 130. Rubber sleeve; 131. Seismic cavity; 132. Shock-absorbing ball; 14. Rubber pad tube; 2. Tongue unit; 20. Embedded frame; 200. Connecting anchor bar two; 21. Tongue joint; 22. Insertion hole; 23. Limiting hole; 24. Clamping part. Detailed Implementation
[0030] To make the above-mentioned objects, features, and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of the present invention. However, the present invention can be practiced in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0031] See Figure 1 and Figure 2 A seismic-resistant joint structure for a pipe jacking tunnel without manholes includes a tenon unit 1 pre-embedded in the longitudinal splicing end of one side of the pipe segment. The tenon unit 1 includes a pre-embedded rod 10 pre-embedded in the pipe segment. A tenon column 11 is installed at the end of the pre-embedded rod 10 away from the pipe segment. A plurality of evenly distributed connecting anchor bars 100 are installed at the end of the pre-embedded rod 10 near the pipe segment. The seismic-resistant joint structure for a pipe jacking tunnel without manholes also includes a tenon unit 2 pre-embedded in the longitudinal splicing end of the other side of the pipe segment. The tenon unit 2 includes a pre-embedded frame 20 pre-embedded in the pipe segment. The main body of the pre-embedded frame 20 is a frustum shape with a smaller top and a larger bottom. A plurality of evenly distributed connecting anchor bars 200 are installed at the end of the pre-embedded frame 20 near the pipe segment.
[0032] In practice, before the tunnel segment is cast, multiple tenon units 1 and multiple tenon units 2 are transported to the processing site using existing conveying equipment. Then, multiple embedded rods 10 are tied evenly with wire to the steel reinforcement skeleton inside the same side of the tunnel segment. While tying the embedded rods 10, multiple connecting anchor bars 100 are simultaneously fixed to the steel reinforcement skeleton. Subsequently, multiple embedded frames 20 are tied evenly with wire to the steel reinforcement skeleton inside the other side of the tunnel segment. While tying the embedded frames 20, multiple connecting anchor bars 200 are simultaneously fixed to the steel reinforcement skeleton on the other side. After that, the tunnel segment is cast. The multiple connecting anchor bars 100 effectively improve the connection strength between the embedded rods 10 and the concrete, and the multiple connecting anchor bars 200 effectively improve the connection strength between the embedded frames 20 and the concrete.
[0033] Repeat the steps of binding the pre-embedded rod 10 and the pre-embedded frame 20 and pouring the segments until multiple segments are poured.
[0034] See Figures 3-5 The tenon post 11 is provided with a plurality of circumferentially evenly distributed snap-fit parts 12. Each snap-fit part 12 includes a snap-fit hole 120 opened on the outer ring surface of the tenon post 11. A snap-fit plate 121 is slidably connected in the snap-fit hole 120. A plurality of evenly distributed return springs 122 are installed between the snap-fit plate 121 and the side wall of the snap-fit hole 120 near the axis of the tenon post 11.
[0035] See Figure 1 , Figure 3 , Figure 6 and Figure 7 The inner end face of the bottom wall of the pre-embedded frame 20 is equipped with a tenon joint 21. The tenon joint 21 has an insertion hole 22 in the middle. Multiple circumferentially distributed limiting holes 23 are opened on the inner wall of the insertion hole 22. The limiting holes 23 cooperate with the corresponding snap-fit parts 12 to provide a rigid connection between the tenon column 11 and the tenon joint 21. The snap-fit plate 121 is inserted into the limiting holes 23.
[0036] See Figure 3 The snap-fit plate 121 has an inclined surface on the lower side of the end away from the reset spring 122, and the inclined surface cooperates with the inner wall of the tenon joint 21.
[0037] In specific operations, when binding the embedded rods 10 and embedded frames 20, it is important to ensure that the positions of the multiple limiting holes 23 within the bound embedded frame 20 correspond one-to-one with the positions of the multiple corresponding snap-fit plates 121 on the adjacent segments. When two segments are joined, one segment is fixed so that its multiple embedded frames 20 face upwards. Then, the other segment is lifted using existing hoisting equipment so that its multiple embedded rods 10 face downwards. The hoisting equipment then gradually moves the upper segment downwards, causing the embedded rods 10 to move the tenon 11 downwards. The tenon 11 then moves the multiple snap-fit plates 121 towards the corresponding tenon joints 21. After the inclined surfaces at the ends of the multiple snap-fit plates 121 contact the tenon joints 21, the snap-fit plates 121 are subjected to force. The plates move into the corresponding snap-fit holes 120 and compress the corresponding return springs 122, thereby releasing the obstruction of the snap-fit plate 121 on the movement of the tenon column 11. The hoisting equipment continues to lower the upper segment, and the tenon column 11 drives multiple snap-fit plates 121 into the insertion holes 22 until the tenon column 11 is fully inserted into the insertion holes 22 and its lower end contacts the bottom wall of the pre-embedded frame 20. At this time, the multiple snap-fit plates 121 move to the multiple limiting holes 23, and the compressed return springs 122 reset and press the snap-fit plates 121 into the corresponding limiting holes 23. The multiple snap-fit plates 121 and the multiple limiting holes 23 are inserted and engaged, quickly realizing the rigid connection between the tenon column 11 and the tenon joint 21, thereby realizing the rapid splicing of the two segments (e.g., Figure 8 (As shown).
[0038] See Figures 3-5The tenon post 11 is also provided with a shock-resistant part 13. The shock-resistant part 13 includes a rubber sleeve 130 sleeved on the outer periphery of the tenon post 11. The rubber sleeve 130 is made of existing high elasticity rubber. The snap plate 121 slides through the rubber sleeve 130. The rubber sleeve 130 is in close contact with the inner wall of the insertion hole 22. The deformation of the rubber sleeve 130 provides space for movement between the tenon post 11 and the tenon joint 21. A shock-resistant cavity 131 is opened at one end of the tenon post 11 near the pre-embedded rod 10. Multiple shock-absorbing balls 132 are placed inside the shock-resistant cavity 131.
[0039] In specific operation, when the tenon 11 and the tenon joint 21 are connected, the tenon 11 drives the rubber sleeve 130 into the insertion hole 22 and tightly adheres to the inner wall of the insertion hole 22. When vibration occurs, that is, when the pipe segment is subjected to vibration, the deformation of the rubber sleeve 130 can provide space for movement between the tenon 11 and the tenon joint 21. That is, a small distance of relative sliding can occur between two adjacent pipe segments, which can effectively avoid stress concentration at the connection between the embedded rod 10, the embedded frame 20 and the concrete, thereby avoiding the phenomenon of collapse at the connection between the pipe segment and the embedded rod 10 and the embedded frame 20. At the same time, the force generated by the vibration is transmitted to the damping ball 132, and the damping ball 132 is displaced under the force. Through collision and friction, the force generated by the vibration is released, improving the stability of the connection between pipe segments under seismic conditions.
[0040] See Figure 5 The tenon unit 1 also includes a rubber pad tube 14 installed at the end of the pre-embedded rod 10 away from the tube segment. The rubber pad tube 14 is made of existing high-elasticity rubber. The main body of the tenon joint 21 is a frustum shape with a smaller top and a larger bottom. A buffer cavity is provided between the tenon joint 21 and the pre-embedded frame 20. The buffer cavity is inserted and matched with the rubber pad tube 14.
[0041] See Figure 5 , Figure 6 and Figure 7 The tenon unit 2 also includes multiple clamping members 24 that are circumferentially and evenly hinged to the upper end of the tenon joint 21. The clamping members 24 have an arc-shaped plate structure. The end of the tenon post 11 near the pre-embedded rod 10 is a frustum shape with a larger top and a smaller bottom. The annular inclined surface at the upper end of the tenon post 11 guides the multiple clamping members 24, causing the clamping members 24 to rotate toward the rubber pad tube 14 and press tightly against the surface of the rubber pad tube 14.
[0042] In specific operation, when the tenon column 11 and the tenon joint 21 are connected, the embedded rod 10 simultaneously moves the rubber pad tube 14 into the corresponding buffer cavity and fills the buffer cavity. During the descent of the embedded rod 10, the annular inclined surface on the tenon column 11 pushes and guides multiple clamping parts 24. The multiple clamping parts 24 are subjected to force and rotate towards the rubber pad tube 14 and tightly adhere to the rubber pad tube 14. The multiple clamping parts 24 limit the rubber pad tube 14, and the rubber pad tube 14 plays a role in shock absorption, further ensuring the stability of the connection between the tube segments.
[0043] Then, the splicing steps of two adjacent segments are repeated until multiple adjacent segments are spliced into a semi-circle. Then, multiple segments in another semi-circle are spliced together. Finally, the spliced segments of the two semi-circles are spliced together to form a complete ring of segments, and then the subsequent pipe jacking tunnel construction work is carried out.
[0044] In the description of the embodiments of the present invention, it should be noted that the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "top," and "bottom," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the embodiments of the present invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the embodiments of the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise stated, "a plurality of" means two or more.
[0045] In the description of this invention, it should also be noted that, unless otherwise explicitly specified and limited, the terms "set," "install," and "connect" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0046] The embodiments described herein are preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, all equivalent changes made in accordance with the structure, shape and principle of the present invention should be covered within the scope of protection of the present invention.
Claims
1. A seismic-resistant joint structure for a pipe jacking tunnel without a handhole, characterized in that, include: The tenon unit is pre-embedded at the longitudinal splicing end on one side of the pipe segment. The tenon unit includes a pre-embedded rod pre-embedded in the pipe segment. A tenon post is installed at the end of the pre-embedded rod away from the pipe segment. Multiple circumferentially evenly distributed snap-fit parts are provided on the tenon post. Seismic-resistant parts are also provided on the tenon post. The tenon unit is pre-embedded at the longitudinal splicing end on the other side of the pipe segment. The tenon unit includes a pre-embedded frame pre-embedded in the pipe segment. A tenon joint is installed on the inner end face of the bottom wall of the pre-embedded frame. A insertion hole is opened in the middle of the tenon joint. Multiple circumferentially evenly distributed limiting holes are opened on the inner wall of the insertion hole. The limiting holes cooperate with the corresponding snap-fit parts to provide a rigid connection between the tenon column and the tenon joint. The seismic-resistant part includes a rubber sleeve fitted around the outer periphery of the tenon column. The rubber sleeve is tightly fitted to the inner wall of the insertion hole. The deformation of the rubber sleeve provides space for movement between the tenon column and the tenon joint. A seismic-resistant cavity is opened at one end of the tenon column near the pre-embedded rod. Multiple shock-absorbing balls are placed inside the seismic-resistant cavity. When the segment is vibrated, the force generated by the vibration is transmitted to the shock-absorbing balls, and the shock-absorbing balls are displaced by the force.
2. The seismic-resistant joint structure of a manhole-less circumferential joint for pipe jacking tunnels according to claim 1, characterized in that: The tenon unit also includes a rubber pad tube installed on the end of the pre-embedded rod away from the segment.
3. The seismic-resistant joint structure of a manhole-less circumferential joint for pipe jacking tunnels according to claim 2, characterized in that: The tenon unit also includes multiple clamping members that are circumferentially and evenly hinged to the upper end of the tenon joint.
4. The seismic-resistant joint structure of a manhole-less circumferential joint for pipe jacking tunnels according to claim 1, characterized in that: The locking part includes a locking hole on the outer ring surface of the tenon column, a locking plate slidably connected in the locking hole, the locking plate slidably passes through the rubber sleeve and cooperates with the limiting hole, and a plurality of evenly distributed return springs are installed between the locking plate and the side wall of the locking hole near the axis of the tenon column.
5. The seismic-resistant joint structure of a manhole-less circumferential joint for pipe jacking tunnels according to claim 3, characterized in that: The tenon post is shaped like a frustum with a larger top and a smaller bottom at the end near the pre-embedded rod. The annular inclined surface at the upper end of the tenon post guides multiple clamping components, causing the clamping components to rotate towards the rubber pad tube and press tightly against the surface of the rubber pad tube.
6. The seismic-resistant joint structure of a manhole-less circumferential joint for pipe jacking tunnels according to claim 1, characterized in that: The pre-embedded rod has multiple evenly distributed connecting anchor bars installed at one end near the segment.
7. The seismic-resistant joint structure of a manhole-less circumferential joint for pipe jacking tunnels according to claim 1, characterized in that: The main body of the pre-embedded frame is a frustum shape with a smaller top and a larger bottom. Multiple evenly distributed connecting anchor bars are installed at one end of the pre-embedded frame near the pipe segment.
8. The seismic-resistant joint structure of a manhole-free circumferential joint for pipe jacking tunnels according to claim 4, characterized in that: The snap-fit plate has an inclined surface on the lower side of the end away from the reset spring, and the inclined surface cooperates with the inner wall of the tenon joint.
9. The seismic-resistant joint structure of a manhole-less circumferential joint in a pipe jacking tunnel according to claim 2, characterized in that: The main body of the tenon joint is a frustum shape with a smaller top and a larger bottom. A buffer cavity is provided between the tenon joint and the pre-embedded frame, and the buffer cavity is inserted and matched with the rubber pad tube.
Citation Information
Patent Citations
A multi-point connection structure for longitudinal joints of shield tunnel segments without handholes
CN114810135B