A method and apparatus for layered support and filling in ultra-high mining areas

By setting staggered isolation components and material placing valves on the rear side of the hydraulic support assembly, upper and lower filling spaces are formed, which solves the problems of low sealing efficiency and poor safety in the filling of paste in ultra-high mining height, realizes efficient layered support filling, and improves coal recovery rate and structural stability.

CN123064516APending Publication Date: 2026-11-10ZHENGMEIJI ZHIDING HYDRAULIC CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611508107.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing hydraulic supports for filling paste in ultra-high mining heights suffer from low efficiency, poor safety, low reliability, and long solidification time during sealing operations. In particular, in layered mining, repeated arrangement of mining roadways is required, increasing production costs and failing to guarantee sealing performance, resulting in low filling efficiency.

Method used

A layered support and filling device for ultra-high mining height is designed. By setting several isolation components on the rear side of the hydraulic support assembly, staggered upper and lower filling spaces are formed. Filling material is pumped into these spaces alternately or simultaneously using a material distribution valve. Combined with the movement of the hydraulic support assembly, staggered upper and lower filling solidification zones are formed, thus optimizing the solidification time of the filling space.

Benefits of technology

It improved filling efficiency, reduced construction risks, enhanced structural stability, shortened sealing operation time, increased coal recovery rate, and reduced downtime during stratified mining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064516A_ABST
    Figure CN123064516A_ABST
Patent Text Reader

Abstract

This invention provides a method and apparatus for layered support and filling in ultra-high mining areas, comprising a hydraulic support assembly, several isolation components, and several placing valves. The isolation components are installed on the rear side of the hydraulic support assembly and are staggered horizontally and sequentially spliced ​​vertically to form several filling spaces that are staggered left and right, layered vertically, and spliced ​​together on the rear side of the hydraulic support assembly. In two adjacent isolation components, the lower isolation component is positioned in front of the upper isolation component in the direction of travel, and the horizontal distance between them is greater than the span of one filling space, so that the filling space formed by the upper isolation component serves as the base of the already filled space below. The placing valves are used to alternately or simultaneously pump filling material into the several filling spaces. This ultra-high mining area layered support and filling apparatus can increase the filling height in a single mining operation, solve problems such as multiple coal layers in the working face, low recovery rate, and long downtime, and also improve the filling stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of coal mine support and filling equipment, and more specifically, to a method and apparatus for layered support and filling in ultra-high mining heights. Background Technology

[0002] Currently, backfilling technology is an effective mining method for controlling rock strata subsidence in underground coal mines. Paste backfilling involves mixing coal gangue, fly ash, cement, and other binding materials in a specific ratio, and then pumping the mixture to the working face via backfilling pumps and pipelines. However, because the pumped materials need to have high fluidity, isolation work is required at the rear of the backfilling support to prevent the backfill material from flowing into the working face from behind. Existing equipment typically equips the base component with an isolation device, allowing only one-time backfilling and limiting the backfilling height. For ultra-high mining height backfilling, isolation and sealing require personnel to work at heights, posing a significant risk and compromising sealing performance, potentially leading to slurry leakage from the working face. This necessitates layered mining in conventional high-mining backfilling operations, resulting in low coal recovery rates and significant challenges in safety control.

[0003] Patent application CN114352351A discloses a hydraulic support for filling paste at ultra-high mining heights, comprising a base, column, top beam, side guard plate, rear beam, rear telescopic beam, top baffle, upper baffle, lower baffle seat, lower baffle, filling pipe, and placing valve. The front end of the top beam is hinged to the side guard plate. One end of a side guard jack is hinged to the front end of the top beam, and the other end of the side guard jack is hinged to the side guard plate. The side guard jack extends and retracts to cause the side guard plate to swing relative to the front end of the top beam. The rear end of the top beam is hinged to the front end of the rear beam. One end of a rear beam jack is hinged to the rear end of the top beam, and the other end of the rear beam jack is hinged to the front end of the rear beam. The rear beam jack extends and retracts to cause the rear beam to swing relative to the rear end of the top beam. A rear telescopic beam is slidably connected to the rear beam. The telescopic beam can extend or retract from the rear end of the rear beam. One end of a jack for the telescopic beam is hinged to the rear beam, and the other end of the jack is also hinged to the telescopic beam. The jack extends or retracts to cause the telescopic beam to extend or retract from the rear end of the rear beam. A top baffle is provided at the end of the telescopic beam. The upper end of an upper baffle is hinged to the rear end of the rear beam. One end of an upper baffle jack is hinged to the rear beam, and the other end of the jack is hinged to the upper baffle. The jack extends or retracts to cause the upper baffle to swing relative to the rear end of the rear beam. A lower baffle seat is provided at the rear end of the base. The inner side of the lower baffle is slidably connected to the lower baffle seat. The lower baffle can move vertically relative to the lower baffle seat. One end of a lower baffle jack is hinged to the lower baffle seat, and the other end of the jack is also hinged to the lower baffle. The jack extends or retracts to cause the lower baffle to move vertically relative to the lower baffle seat. When the rear telescopic beam retracts from the rear end of the rear beam, the lower end of the top baffle overlaps the outer side of the upper baffle. After the upper baffle swings backward relative to the rear end of the rear beam and the lower baffle moves downward vertically relative to the lower baffle seat, the inner side of the lower end of the upper baffle overlaps the outer side of the upper end of the lower baffle. The upper baffle is provided with a filling interface, which is connected to a filling pipe. A material placing valve is installed on the filling pipe near the filling interface. This ultra-high mining height paste filling hydraulic support can simultaneously realize the support and filling operations of the working face.

[0004] In summary, the existing hydraulic supports for ultra-high mining height paste filling have excessively high filling space due to the splicing of the top and bottom baffles. This necessitates personnel working at height before filling, posing a significant safety hazard and compromising the seal between the support and the roof. The sealing process is exponentially longer, resulting in extremely low efficiency. Furthermore, the damage to the seal caused by large-drop grouting is unknown, and failure to maintain the original seal necessitates rework, leading to low reliability. After grouting, a long solidification period is required before the support can be moved and refilled, further complicating the process and reducing filling efficiency. Consequently, the efficiency of ultra-high mining height coal mining is significantly constrained by the paste filling solidification time. Therefore, those skilled in the art urgently need to improve this technology to address these issues. Summary of the Invention

[0005] To address the problems in existing high-extraction mining processes, such as low efficiency of isolation and sealing operations, low construction safety and reliability, and long solidification time, especially for layered mining, which requires repeated arrangement of mining roadways, increasing production costs, and necessitates repeated relocation and face-changing, this invention provides a technical solution to improve the efficiency of paste filling in ultra-high extraction and reduce production costs: an ultra-high extraction layered support and filling device, comprising a hydraulic support assembly, several isolation components, and several material placing valves; A plurality of the isolation components are installed on the rear side of the hydraulic support assembly, and the plurality of isolation components are staggered in the horizontal direction and sequentially spliced ​​in the vertical direction, so as to form a plurality of filling spaces that are staggered left and right, layered up and down and spliced ​​on the rear side of the hydraulic support assembly. In two adjacent isolation components, the lower isolation component is located in front of the upper isolation component in the direction of travel, and the horizontal distance between the two is greater than the span of a filling space, so that the filling space formed by the upper isolation component is based on the filling space already filled below. Several of the aforementioned feed valves are used to alternately or simultaneously pump filling material into several of the aforementioned filling spaces.

[0006] Beneficial effects: It can fill materials in both the upper and lower filling spaces that are staggered, shortening the time for rear isolation and sealing operations, reducing construction risks, optimizing the solidification time of materials in a single filling space, and increasing the filling height in a single mining operation.

[0007] Based on the above, the isolation components include an upper isolation component and a lower isolation component. The lower isolation component is installed on the rear side of the base of the hydraulic support assembly to isolate the rear side of the base of the hydraulic support assembly into a lower filling space. The upper isolation component is installed on the rear side of the top beam of the hydraulic support assembly to isolate the rear side of the top beam of the hydraulic support assembly into an upper filling space. The bottom end of the upper isolation component and the top end of the lower isolation component are connected by a construction platform to close the lower filling space. The plurality of material distribution valves include a first upper material distribution valve and a first lower material distribution valve, which are respectively installed on the construction platform. The construction platform has a lower packing hole that communicates with the lower filling space, and the upper isolation assembly has an upper packing hole that communicates with the upper filling space, so that the first lower material distribution valve fills the lower filling space with material through the lower packing hole, and the first upper material distribution valve fills the upper filling space with material through the upper packing hole.

[0008] Beneficial effects: It can divide the filling space into two staggered filling spaces, reducing the operation time and risk required for rear sealing and isolation, shortening the solidification time of the filling material, and facilitating integration with hydraulic support components.

[0009] Based on the above, the hydraulic support assembly includes a front top beam, a rear top beam, a front base, a rear base, a front column, a rear column, and a connecting rod assembly; the rear top beam is hinged to the rear side of the front top beam, the rear base is hinged to the rear side of the front base, the front column is connected between the front top beam and the front base, the rear column is connected between the rear top beam and the rear base, and the connecting rod assembly is connected between the front top beam and the front base.

[0010] Beneficial effects: It can increase the structural stability and allow the support height to be adjusted according to the actual working conditions.

[0011] Based on the above, the upper isolation assembly includes a tail beam, a tail beam jack, an upper isolation baffle, an upper isolation telescopic beam, and an upper isolation telescopic jack. The tail beam is hinged to the rear side of the rear top beam. The tail beam jack is connected between the tail beam and the rear top beam for deploying the tail beam. The upper isolation baffle is installed on the lower side of the tail beam. The upper isolation telescopic beam is installed at the lower end of the upper isolation baffle. The upper isolation telescopic jack is installed between the upper isolation baffle and the upper isolation telescopic beam for pushing the upper isolation telescopic beam to extend or retract.

[0012] Beneficial effects: The isolation length of the upper isolation component can be changed according to the actual working conditions, thus expanding the scope of application.

[0013] Based on the above, the lower isolation assembly includes a rear base guide mechanism and a lower isolation telescopic jack. The rear base guide mechanism is installed on the rear base, and the lower isolation telescopic jack is connected between the rear base and the rear base guide mechanism to push the rear base guide mechanism to extend or retract.

[0014] Beneficial effects: The isolation length of the isolation component can be changed according to the actual working conditions, thus expanding the scope of application.

[0015] Based on the above, the construction platform is a primary L-shaped construction platform. The primary L-shaped construction platform is installed on the top of the rear base guide mechanism and is located on the side near the upper isolation baffle. The side of the primary L-shaped construction platform near the upper isolation baffle extends to the lower end of the upper isolation telescopic beam.

[0016] Beneficial effects: It facilitates the filling of materials into the upper filling space by the first upper feeding valve, and allows the use of the first-stage L-shaped construction platform to constrain the upper filling space.

[0017] Based on the above, a climbing platform is also installed on the rear base. The climbing platform is located on the side of the first-level L-shaped construction platform away from the upper isolation baffle, and a climbing ladder is installed on the climbing platform.

[0018] Beneficial effect: It facilitates operators to access the first-level L-shaped construction platform from the elevated platform.

[0019] Based on the above, a middle isolation component is also provided between the upper isolation component and the lower isolation component. The middle isolation component is used to isolate the rear side of the base of the hydraulic support component into a middle filling space. A middle material placing valve is also provided on the first-stage L-shaped construction platform. The middle isolation component has a middle filling hole that communicates with the middle filling space so that the middle material placing valve can fill the middle filling space with material through the middle filling hole.

[0020] The first upper material distribution valve, the first lower material distribution valve, and the middle material distribution valve are each connected to a ground grouting station via filling pipes.

[0021] The present invention also provides a method for filling using the above-mentioned ultra-high mining height layered support and filling device, the steps of which include: First, the lower isolation component is used to form the first lower filling space at the rear end of the goaf to be filled. The first lower material distribution valve is used to pump filling material into the initial lower filling space. After solidification, the first end lower filling solidification zone is formed at the rear end of the goaf to be filled. After the working face moves a set step distance, the hydraulic support assembly moves forward. The upper isolation assembly forms the first upper filling space with the top surface of the first lower filling solidification zone as the bottom, and the lower isolation assembly forms the second lower filling space in front of the first end lower filling solidification zone. Then, the first lower distribution valve is used to pump filling material into the lower filling space. After solidification, the second lower filling solidification zone is formed. The first upper distribution valve is used to pump filling material into the upper filling space. After solidification, the first upper filling solidification zone is formed. The frame moving and filling actions are repeated to complete the layered support filling of the filling area of ​​the ultra-high mining height.

[0022] The present invention also provides a method for filling using the above-mentioned ultra-high mining height layered support and filling device, the steps of which include: First, the lower isolation component is used to form the first lower filling space at the rear end of the goaf to be filled and bag hanging operation is performed. The first lower material distribution valve is used to pump filling material into the bag hanging in the first lower filling space. After solidification, the first end lower filling solidification zone is formed at the rear end of the goaf to be filled. After the working face moves a set step distance for the first time, the hydraulic support assembly moves forward. The middle isolation assembly forms the first middle filling space with the top surface of the first lower filling solidification zone as the bottom, and the lower isolation assembly forms the second lower filling space in front of the first end lower filling solidification zone. After the bag hanging operation is performed, the first lower material distribution valve is used to pump filling material into the bag hanging in the second lower filling space. After solidification, the second lower filling solidification zone is formed. The middle material distribution valve is used to pump filling material into the bag hanging in the first middle filling space. After solidification, the first middle filling solidification zone is formed. After the working face moves a set step distance again, the hydraulic support assembly moves forward, and the upper isolation assembly forms the first upper filling space with the top surface of the first middle filling solidification zone as the bottom, the middle isolation assembly forms the second middle filling space with the top surface of the second lower filling solidification zone as the bottom, and the lower isolation assembly forms the third lower filling space in front of the second middle filling solidification zone. After the bag hanging operations are performed, filling material is pumped into the bag hanging in the third lower filling space using the first lower material distribution valve. After solidification, a third lower filling solidification zone is formed. Filling material is pumped into the bag hanging in the second middle filling space using the middle material distribution valve. After solidification, a second middle filling solidification zone is formed. Filling material is pumped into the bag hanging in the upper filling space using the first upper material distribution valve. After solidification, a first upper filling solidification zone is formed. The frame moving and filling operations are repeated to complete the layered support filling of the ultra-high mining area.

[0023] This invention has significant substantive features and remarkable progress compared to existing technologies. Specifically, the invention provides a method and apparatus for layered support and filling in ultra-high mining areas. By setting several isolation components on the rear side of the hydraulic support assembly, and arranging and splicing these isolation devices in a staggered manner in the vertical direction, along with a material placing valve, the lower isolation components can isolate the area to be filled from below, and the upper isolation components can isolate the area to be filled from above. This forms upper and lower filling spaces that are staggered in the horizontal direction and spliced ​​in the vertical direction. The material placing valve can then fill these spaces in a staggered manner, ensuring that the filling space formed by the upper isolation components is based on the already filled space below. Ultimately, staggered upper and lower filling solidification zones are formed on the rear side of the working face, which are spliced ​​in layers. This significantly increases the filling height in a single mining operation, shortens the rear isolation and sealing operation time, reduces construction risks, and optimizes the solidification time of the material in a single filling space, thus improving filling efficiency. This solves problems such as multiple coal layers in the working face, low recovery rate, and long downtime after layered mining. At the same time, the upper and lower filling condensation zones after solidification can form an interlocking structure, improving the structural stability of the filling condensation zone.

[0024] Furthermore, several sets of isolation components can move forward together with the hydraulic support components during the shifting process, thereby continuously forming upper and lower filling spaces that are staggered in the horizontal direction and spliced ​​in the vertical direction in the mining direction of the waiting-to-fill area with ultra-high mining height, thus improving the convenience of filling.

[0025] Furthermore, by setting up a primary L-shaped construction platform on the lower isolation component and a climbing platform on one side of the primary L-shaped construction platform, it is easier for operators to perform climbing operations.

[0026] Furthermore, by designing the upper isolation baffle and the rear base guide mechanism as telescopic structures, the lengths of the upper and lower isolation components can be adjusted in a timely manner according to the on-site working conditions, thereby improving the application range of the equipment. Attached Figure Description

[0027] Figure 1 This is a schematic diagram of a layered support and filling device for ultra-high mining height provided by the present invention, in the filling space under backfill.

[0028] Figure 2 This is a schematic diagram of an ultra-high mining height layered support and filling device provided by the present invention, located in the backfill filling space.

[0029] Figure 3 This is a schematic diagram of the layout of an ultra-high mining height layered support and filling device on the working face provided by the present invention.

[0030] Figure 4 This is a schematic diagram of the filling space and the upper filling space of an ultra-high mining layered support and filling device provided in Embodiment 3 of the present invention.

[0031] Figure 5 This is a schematic diagram of the layout of an ultra-high mining height layered support and filling device on the working face, provided in Embodiment 3 of the present invention.

[0032] In the diagram: 1. Front top beam; 2. Rear top beam; 3. Front column; 4. Front base; 5. Rear base; 6. Ladder; 7. Balancing jack; 8. Upper connecting rod; 9. Front connecting rod; 10. Rear connecting rod; 11. Rear column; 12. Tail beam jack; 13. Tail beam; 14. Upper isolation baffle; 15. Upper isolation telescopic jack; 16. Upper filling space; 17. Upper filling solidification zone; 18. Lower filling solidification zone; 19. Upper isolation telescopic beam; 20. First lower placing valve; 21. First-stage L-shaped construction platform; 22. Rear base guide mechanism; 23. Ladder; 24. Lower isolation telescopic jack; 25. Lower filling space; 26. 27. First upper placing valve; 28. Ground grouting station; 29. ​​Sedimentation tank; 30. Ventilation tunnel; 31. Working face; 32. Filling pipe; 33. Second lower placing valve; 34. Third lower placing valve; 35. Third upper placing valve; 36. Fourth lower placing valve; 37. Fourth upper placing valve; 38. First end lower filling solidification zone; 39. Middle filling solidification zone; 40. Middle placing valve; 41. Secondary L-shaped construction platform; 42. Middle filling space; 43. First end middle filling solidification zone; 44. First middle placing valve; 45. Second middle placing valve; 46. Third middle placing valve; 47. Fourth middle placing valve. Detailed Implementation

[0033] The technical solution of the present invention will be further described in detail below through specific embodiments. Example 1

[0034] This embodiment provides a layered support and filling device for ultra-high mining heights, such as... Figure 1 , Figure 2 As shown, it includes a hydraulic support assembly, an upper isolation assembly, a lower isolation assembly, a first-stage L-shaped construction platform 21, a first upper placing valve 26, and a first lower placing valve 20.

[0035] The lower isolation assembly is installed on the rear side of the base of the hydraulic support assembly, and is used to isolate the rear side of the base of the hydraulic support assembly into a lower filling space 25. The upper isolation assembly is installed on the rear side of the top beam of the hydraulic support assembly, and is used to isolate the rear side of the top beam of the hydraulic support assembly into an upper filling space 16.

[0036] The lower isolation component and the upper isolation component are offset in the horizontal direction and spliced ​​together in the vertical direction, so that the lower filling space 25 and the upper filling space 16 are offset vertically.

[0037] That is, in the lower isolation component and the upper isolation component, the lower isolation component is located in front of the upper isolation component in the direction of travel, and the horizontal distance between the two is greater than the span of a filling space, so that the upper filling space 16 formed by the upper isolation component is based on the lower filling space 25 that has been filled below.

[0038] The first upper material distribution valve 26 and the first lower material distribution valve 20 are respectively installed on the primary L-shaped construction platform 21. The primary L-shaped construction platform 21 is installed on top of the lower isolation assembly.

[0039] The primary L-shaped construction platform 21 has a lower filling hole that connects to the lower filling space 25. The upper isolation assembly has an upper filling hole that connects to the upper filling space 16, so that the first lower material distribution valve 20 fills material into the lower filling space 25 through the lower filling hole, and the first upper material distribution valve 26 fills material into the upper filling space 16 through the upper filling hole.

[0040] Specifically, such as Figure 1 and Figure 2 As shown, the hydraulic support assembly includes a front top beam 1, a rear top beam 2, a front base 4, a rear base 5, a front column 3, a rear column 11, and a connecting rod assembly. The rear top beam 2 is hinged to the rear side of the front top beam 1. The rear base 5 is hinged to the rear side of the front base 4. The front column 3 connects the front top beam 1 and the front base 4. The rear column 11 connects the rear top beam 2 and the rear base 5. The connecting rod assembly connects the front top beam 1 and the front base 4.

[0041] The linkage assembly includes an upper linkage 8, a front linkage 9, a rear linkage 10, and a balancing jack 7. The upper linkage 8 is hinged to the front top beam 1. The balancing jack 7 is connected between the front top beam 1 and the upper linkage 8. The lower ends of the front linkage 9 and the rear linkage 10 are respectively connected to the front base 4. The upper ends of the front linkage 9 and the rear linkage 10 are respectively connected to the upper linkage 8.

[0042] Specifically, the upper isolation assembly includes a tail beam 13, a tail beam jack 12, an upper isolation baffle 14, an upper isolation telescopic beam 19, and an upper isolation telescopic jack 15. The tail beam 13 is hinged to the rear side of the rear top beam 2. The tail beam jack 12 is connected between the tail beam 13 and the rear top beam 2 for deploying the tail beam 13.

[0043] The upper isolation baffle 14 is installed on the lower side of the tail beam 13, and the upper isolation telescopic beam 19 is installed at the lower end of the upper isolation baffle 14. The upper isolation telescopic jack 15 is installed between the upper isolation baffle 14 and the upper isolation telescopic beam 19, and is used to push the upper isolation telescopic beam 19 to extend or retract.

[0044] The lower isolation assembly includes a rear base guide mechanism 22 and a lower isolation telescopic jack 24. The rear base guide mechanism 22 is mounted on the rear base 5. The lower isolation telescopic jack 24 is connected between the rear base 5 and the rear base guide mechanism 22, and is used to push the rear base guide mechanism 22 to extend or retract. Example 2

[0045] This embodiment provides a layered support and filling device for ultra-high mining heights. The main difference from Embodiment 1 is that in this embodiment, the primary L-shaped construction platform 21 is installed on top of the rear base guide mechanism 22 and is positioned near the upper isolation baffle 14. The primary L-shaped construction platform 21 extends from the side near the upper isolation baffle 14 to the lower end of the upper isolation telescopic beam 19.

[0046] A climbing platform 23 is also installed on the rear base 5. The climbing platform 23 is located on the side of the first-level L-shaped construction platform 21 away from the upper isolation baffle 14. A climbing ladder 6 is installed on the climbing platform 23.

[0047] Specifically, such as Figure 3 As shown, in actual production, several sets of the hydraulic support assemblies are arranged sequentially along the width direction of the working surface 30. Each set of the hydraulic support assemblies is equipped with an upper isolation assembly, a lower isolation assembly, a primary L-shaped construction platform, and multiple material placing valves.

[0048] Depending on their location, the multiple material placing valves can be designated as the first upper material placing valve 26, the first lower material placing valve 20, the second upper material placing valve 32, the second lower material placing valve 33, the third lower material placing valve 34, the third upper material placing valve 35, the fourth lower material placing valve 36, and the fourth upper material placing valve 37. Each of the multiple material placing valves is connected to a surface grouting station 27 via a filling pipe 31. The filling pipe 31 is installed within the ventilation tunnel 29. A sedimentation tank 28 is also provided on the opposite side of the surface grouting station 27. Example 3

[0049] This embodiment provides a layered support and filling device for ultra-high mining heights. The main difference from Embodiment 1 is that in this embodiment: Figure 4 and Figure 5 As shown, three sets of isolation components, staggered horizontally and sequentially spliced ​​vertically, are installed on the rear side of the hydraulic support assembly. Three sets of material placing valves are installed on the construction platform.

[0050] Specifically, in this embodiment, the isolation assembly includes an upper isolation assembly, a middle and lower isolation assembly, and a lower isolation assembly. The lower isolation assembly is installed on the rear side of the base of the hydraulic support assembly and is used to isolate the rear side of the base of the hydraulic support assembly into a lower filling space 25.

[0051] The intermediate isolation component is installed on top of the primary L-shaped construction platform 21 and is used to isolate a central filling space 42 behind the base of the hydraulic support assembly. Specifically, the intermediate isolation component can be configured as a secondary L-shaped construction platform 41.

[0052] The upper isolation component is installed on the rear side of the top beam of the hydraulic support assembly to isolate the rear side of the top beam of the hydraulic support assembly into an upper filling space 16.

[0053] The plurality of the material placing valves include a first upper material placing valve 26, a middle material placing valve 40, and a first lower material placing valve 20, wherein the first upper material placing valve 26, the middle material placing valve 40, and the first lower material placing valve 20 are respectively installed on the first-stage L-shaped construction platform 21.

[0054] The primary L-shaped construction platform 21 has a lower filling hole that connects to the lower filling space 25. The upper isolation assembly has an upper filling hole that connects to the upper filling space 16. The secondary L-shaped construction platform 41 has a middle filling hole that connects to the middle filling space 42.

[0055] The first lower feeding valve 20 fills the lower filling space 25 with material through the lower packing hole, and forms a lower filling solidification zone after solidification.

[0056] The middle feeding valve 40 fills the middle filling space 42 with material through the middle packing hole, and after solidification, it forms the middle filling solidification zone 39.

[0057] The first upper feeding valve 26 fills the upper filling space 16 with material through the upper packing hole, and forms an upper filling solidification zone after solidification.

[0058] Specifically, such as Figure 5 As shown, in actual production, several sets of the hydraulic support assemblies are arranged sequentially along the width direction of the working surface 30. Each set of the hydraulic support assemblies is equipped with an upper isolation assembly, a middle isolation assembly, a lower isolation assembly, a primary L-shaped construction platform, a secondary L-shaped construction platform, and multiple material placing valves.

[0059] Depending on their location, the multiple material placing valves can be designated as: First Upper Material Placing Valve 26, First Lower Material Placing Valve 20, Second Upper Material Placing Valve 32, Second Lower Material Placing Valve 33, Third Lower Material Placing Valve 34, Third Upper Material Placing Valve 35, Fourth Lower Material Placing Valve 36, Fourth Upper Material Placing Valve 37, First Middle Material Placing Valve 44, Second Middle Material Placing Valve 45, Third Middle Material Placing Valve 46, and Fourth Middle Material Placing Valve 47. Each of the multiple material placing valves is connected to a surface grouting station 27 via a filling pipe 31. The filling pipe 31 is installed within the ventilation tunnel 29. A sedimentation tank 28 is also provided on the opposite side of the surface grouting station 27. Example 4

[0060] This embodiment provides a method for filling using the ultra-high mining height layered support and filling device provided in Embodiment 1 or Embodiment 2, the steps of which include: First, the lower isolation component is used to form the first lower filling space at the rear end of the goaf to be filled and bag hanging operation is performed. The first lower material distribution valve 20 is used to pump filling material into the bag hanging in the initial lower filling space. After solidification, the first end lower filling solidification zone 38 is formed at the rear end of the goaf to be filled. After the working face moves a set step distance, the hydraulic support assembly moves forward. The upper isolation assembly forms the first upper filling space 16 with the top surface of the first lower filling solidification zone 38 as the bottom, and the lower isolation assembly forms the second lower filling space 25 in front of the first end lower filling solidification zone 38. After bag hanging operations are performed, the first lower distribution valve 20 is used to pump filling material into the bag hanging in the lower filling space 25. After solidification, the second lower filling solidification zone 18 is formed. The first upper distribution valve 26 is used to pump filling material into the bag hanging in the upper filling space 16. After solidification, the first upper filling solidification zone 17 is formed.

[0061] Repeat the frame shifting and filling actions to complete the layered support filling of the ultra-high mining area. After filling is completed, the filling pipe 31 is flushed with a combination of air and water. Example 5

[0062] This embodiment provides a method for filling using the ultra-high mining height layered support and filling device provided in Embodiment 3, the steps of which include: First, the lower isolation component is used to form the first lower filling space at the rear end of the goaf to be filled and a bag hanging operation is performed. The first lower material distribution valve 20 is used to pump filling material into the bag hanging in the first lower filling space. After solidification, the first end lower filling solidification zone 38 is formed at the rear end of the goaf to be filled.

[0063] After the working face moves a set step distance for the first time, the hydraulic support assembly moves forward, and the middle isolation assembly forms the first middle filling space 42 with the top surface of the first lower filling solidification zone 38 as the bottom, and the lower isolation assembly forms the second lower filling space 25 in front of the first end lower filling solidification zone 38.

[0064] After the bag hanging operations are performed, filling material is pumped into the bag hanging in the second lower filling space 25 using the first lower material distribution valve 20. After solidification, the second lower filling solidification zone 18 is formed. Filling material is pumped into the bag hanging in the first middle filling space 42 using the middle material distribution valve 40. After solidification, the first middle filling solidification zone 43 is formed.

[0065] After the working face moves a set step distance again, the hydraulic support assembly moves forward, and the upper isolation assembly forms the first upper filling space 16 with the top surface of the first middle filling condensation zone 43 as the bottom, the middle isolation assembly forms the second middle filling space 42 with the top surface of the second lower filling condensation zone 18 as the bottom, and the lower isolation assembly forms the third lower filling space 25 in front of the second middle filling condensation zone 39.

[0066] After the bag hanging operation is carried out, the filling material is pumped into the bag hanging in the third lower filling space 25 using the first lower material valve 20. After solidification, the third lower filling solidification zone 18 is formed.

[0067] Filling material is pumped into the hanging bag of the second intermediate filling space 42 using the intermediate material distribution valve 40. After solidification, the second intermediate filling solidification zone 43 is formed.

[0068] Filling material is pumped into the hanging bag of the upper filling space 16 using the first upper filling valve 26, and after solidification, the first upper filling solidification zone 17 is formed.

[0069] Repeat the frame shifting and filling actions to complete the layered support filling of the ultra-high mining area. After filling is completed, the filling pipe 31 is flushed with a combination of air and water.

[0070] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them; although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications can still be made to the specific implementation of the present invention or equivalent substitutions can be made to some technical features without departing from the spirit of the technical solutions of the present invention, and all such modifications and substitutions should be covered within the scope of the technical solutions claimed in the present invention.

Claims

1. A layered support and filling device for ultra-high mining depth, characterized in that: Includes hydraulic support assemblies, several isolation assemblies, and several material distribution valves; A plurality of the isolation components are installed on the rear side of the hydraulic support assembly, and the plurality of isolation components are staggered in the horizontal direction and sequentially spliced ​​in the vertical direction, so as to form a plurality of filling spaces that are staggered left and right, layered up and down and spliced ​​on the rear side of the hydraulic support assembly. In two adjacent isolation components, the lower isolation component is located in front of the upper isolation component in the direction of travel, and the horizontal distance between the two is greater than the span of a filling space, so that the filling space formed by the upper isolation component is based on the filling space already filled below. Several of the aforementioned feed valves are used to alternately or simultaneously pump filling material into several of the aforementioned filling spaces.

2. The ultra-high mining height layered support and filling device according to claim 1, characterized in that: Several isolation components include an upper isolation component and a lower isolation component. The lower isolation component is installed on the rear side of the base of the hydraulic support assembly to isolate the rear side of the base of the hydraulic support assembly into a lower filling space (25). The upper isolation component is installed on the rear side of the top beam of the hydraulic support assembly to isolate the rear side of the top beam of the hydraulic support assembly into an upper filling space (16). The bottom end of the upper isolation component and the top end of the lower isolation component are connected by a construction platform to close the lower filling space (25). The plurality of the material distribution valves include a first upper material distribution valve (26) and a first lower material distribution valve (20), the first upper material distribution valve (26) and the first lower material distribution valve (20) are respectively installed on the construction platform, the construction platform is provided with a lower packing hole communicating with the lower filling space (25), and the upper isolation assembly is provided with an upper packing hole communicating with the upper filling space (16), so that the first lower material distribution valve (20) fills the lower filling space (25) with material through the lower packing hole, and the first upper material distribution valve (26) fills the upper filling space (16) with material through the upper packing hole.

3. The ultra-high mining height layered support and filling device according to claim 2, characterized in that: The hydraulic support assembly includes a front top beam (1), a rear top beam (2), a front base (4), a rear base (5), a front column (3), a rear column (11), and a connecting rod assembly; the rear top beam (2) is hinged to the rear side of the front top beam (1), the rear base (5) is hinged to the rear side of the front base (4), the front column (3) is connected between the front top beam (1) and the front base (4), the rear column (11) is connected between the rear top beam (2) and the rear base (5), and the connecting rod assembly is connected between the front top beam (1) and the front base (4).

4. The ultra-high mining height layered support and filling device according to claim 3, characterized in that: The upper isolation assembly includes a tail beam (13), a tail beam jack (12), an upper isolation baffle (14), an upper isolation telescopic beam (19), and an upper isolation telescopic jack (15). The tail beam (13) is hinged to the rear side of the rear top beam (2). The tail beam jack (12) is connected between the tail beam (13) and the rear top beam (2) for unfolding the tail beam (13). The upper isolation baffle (14) is installed on the lower side of the tail beam (13). The upper isolation telescopic beam (19) is installed at the lower end of the upper isolation baffle (14). The upper isolation telescopic jack (19) is installed between the upper isolation baffle (14) and the upper isolation telescopic beam (19) for pushing the upper isolation telescopic beam (19) to extend and retract.

5. The ultra-high mining height layered support and filling device according to claim 4, characterized in that: The lower isolation assembly includes a rear base guide mechanism (22) and a lower isolation telescopic jack (24). The rear base guide mechanism (22) is installed on the rear base (5), and the lower isolation telescopic jack (24) is connected between the rear base (5) and the rear base guide mechanism (22) to push the rear base guide mechanism (22) to extend and retract.

6. The layered support and filling device for ultra-high mining height according to claim 5, characterized in that: The construction platform is a first-level L-shaped construction platform (21). The first-level L-shaped construction platform (21) is installed on the top of the rear base guide mechanism (22) and is set on the side close to the upper isolation baffle (14). The first-level L-shaped construction platform (21) extends to the lower end of the upper isolation telescopic beam (19) on the side close to the upper isolation baffle (14).

7. A layered support and filling device for ultra-high mining height according to claim 6, characterized in that: A climbing platform (23) is also installed on the rear base (5). The climbing platform (23) is located on the side of the first-level L-shaped construction platform (21) away from the upper isolation baffle (14). A climbing ladder (6) is installed on the climbing platform (23).

8. A layered support and filling device for ultra-high mining height according to claim 7, characterized in that: A middle isolation component is also provided between the upper isolation component and the lower isolation component. The middle isolation component is used to isolate the rear side of the base of the hydraulic support component into a middle filling space (42). A middle material placing valve (41) is also provided on the first-level L-shaped construction platform (21). A middle filling hole is opened on the middle isolation component to connect the middle filling space (42) so that the middle material placing valve (41) can fill the middle filling space (42) with material through the middle filling hole.

9. A method for filling using the ultra-high mining height layered support and filling device according to any one of claims 2 to 7, characterized in that the steps include... include: First, the lower isolation component is used to form the first lower filling space at the end of the goaf to be filled and bag hanging operation is performed. The first lower material distribution valve (20) is used to pump filling material into the bag hanging in the initial lower filling space. After solidification, the first end lower filling solidification zone (38) is formed at the end of the goaf to be filled. After the working face moves a set step distance, the hydraulic support assembly moves forward. The upper isolation assembly forms the first upper filling space (16) with the top surface of the first lower filling solidification zone (38) as the bottom, and the lower isolation assembly forms the second lower filling space (25) in front of the first end lower filling solidification zone (38). After hanging bags are hung, the first lower material distribution valve (20) is used to pump filling material into the hanging bags of the lower filling space (25). After solidification, the second lower filling solidification zone (18) is formed. The first upper material distribution valve (26) is used to pump filling material into the hanging bags of the upper filling space (16). After solidification, the first upper filling solidification zone (17) is formed. The frame moving and filling actions are repeated to complete the layered support filling of the filling area of ​​the ultra-high mining height.

10. A method for filling using the ultra-high mining height layered support and filling device as described in claim 8, characterized in that the steps include... include: First, the lower isolation component is used to form the first lower filling space at the end of the goaf to be filled and bag hanging operation is performed. The first lower material distribution valve (20) is used to pump filling material into the bag hanging in the first lower filling space. After solidification, the first end lower filling solidification zone (38) is formed at the end of the goaf to be filled. After the working face moves a set step distance for the first time, the hydraulic support assembly moves forward. The middle isolation assembly forms the first middle filling space (42) with the top surface of the first lower filling solidification zone (38) as the bottom. The lower isolation assembly forms the second lower filling space (25) in front of the first end lower filling solidification zone (38). After the bag hanging operation is performed, the first lower material distribution valve (20) is used to pump filling material into the bag hanging in the second lower filling space (25). After solidification, the second lower filling solidification zone (18) is formed. The middle material distribution valve (40) is used to pump filling material into the bag hanging in the first middle filling space (42). After solidification, the first middle filling solidification zone (43) is formed. After the working face moves a set step distance again, the hydraulic support assembly moves forward and uses the upper isolation assembly to form the first upper filling space (16) with the top surface of the first middle filling condensation zone (43) as the bottom, uses the middle isolation assembly to form the second middle filling space (42) with the top surface of the second lower filling condensation zone (18) as the bottom, and uses the lower isolation assembly to form the third lower filling space (25) in front of the second middle filling condensation zone (39). After the bag hanging operation is carried out, the filling material is pumped into the bag hanging in the third lower filling space (25) through the first lower material valve (20). After solidification, the third lower filling solidification zone (18) is formed. Using the middle material distribution valve (40), filler is pumped into the hanging bag of the second middle filling space (42), and after solidification, the second middle filling solidification zone (43) is formed; using the first upper material distribution valve (26), filler is pumped into the hanging bag of the upper filling space (16), and after solidification, the first upper filling solidification zone (17) is formed. The frame shifting and filling actions are repeated to complete the layered support filling of the filling area of ​​the ultra-high mining height.