A method for zoning grounding capacitance current of new grid-connected entities accessing rural power distribution networks
By constructing a radial topology network and a partitioned contribution matrix for rural power distribution networks, the problem of difficulty in reflecting the differences in access locations of new grid-connected entities is solved. This enables accurate partitioned modeling and compensation verification of grounding capacitance current, and is applicable to various new grid-connected entity access scenarios.
Patent Information
- Application Number
- CN202611266089.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-10
AI Technical Summary
Existing methods for modeling small-current grounding capacitance current in rural power distribution networks cannot effectively distinguish the differences in access locations of new grid-connected entities. This makes it difficult for the total network model to reflect the specific impact of the access location. Furthermore, the additional ground capacitance parameters are difficult to separate from the topology influence, and the lack of a unified partitioned output affects the accuracy of zero-sequence current measurement on fault lines.
The rural power distribution network is abstracted into a radial topology network. A set of candidate fault lines, zero-sequence measurement points and new grid-connected main access points is established. By differential calculation of the baseline operating condition and the single access point operating condition, a partition contribution matrix and normalized contribution coefficient are constructed to identify the dominant contribution access points and calculate the equivalent ground capacitance and the residual current after compensation.
It improves the spatial resolution capability of the grounding capacitance current model, can update the partition calculation results without changing the network topology and fault conditions, has good reusability and scalability, can quickly identify the dominant contributing access point, and provides unified partition basic parameters. It is suitable for scenarios such as distributed photovoltaic, energy storage and electric vehicle charging and swapping facilities.
Smart Images

Figure CN123069679A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of modeling and fault analysis technology for low-current grounding systems in rural power distribution networks, specifically a method for zoning grounding capacitance current for new grid-connected entities accessing rural power distribution networks. Background Technology
[0002] In rural power distribution networks with ungrounded neutral points or grounded via arc suppression coils, the single-phase ground fault current is mainly determined by the system-to-ground capacitance current, the grounding transition resistance, and the arc suppression coil compensation current. The calculation results of the ground capacitance current directly affect the residual current estimation, arc suppression coil compensation verification, and zero-sequence measurement configuration.
[0003] Existing methods typically calculate the ground capacitance of each overhead line and cable line based on their length and capacitance per unit length, summing the total ground capacitance of the entire network, and then estimating the system grounding capacitance current. This type of method uses the total network capacitance as the primary output and is suitable for scenarios where the line structure and equipment connection status are relatively stable.
[0004] However, with the integration of new grid-connected entities such as distributed photovoltaics, energy storage, and electric vehicle charging / swapping facilities into rural power distribution networks, their connection lines, grid-connected cables, filter branches, and related equipment form additional ground capacitance near the connection point. For multi-branch radial rural power distribution networks, the electrical paths between the same additional ground capacitance and candidate fault lines and zero-sequence measurement points differ depending on the connection location, resulting in varying impacts on the measured zero-sequence current of the fault line. Existing research primarily analyzes the impact of these new grid-connected entities from the perspectives of total capacitance changes, fault transient characteristics, or changes in protection criteria. A method is lacking that unifies the correlation between candidate fault lines, the connection point of new grid-connected entities, and zero-sequence measurement points, and characterizes the capacitive current contribution of each connection point in a computable matrix form.
[0005] Against this backdrop, existing methods for modeling small-current grounding capacitance current in rural power distribution networks still have the following shortcomings: The total capacitance model for the entire network is difficult to preserve the differences in access locations. Existing methods aggregate the capacitance to ground of each line and access equipment into a single total parameter, which can reflect the overall capacitance level of the system, but cannot distinguish the different impacts on the measurement of zero-sequence current of the faulty line when the same additional capacitance to ground is located in the same branch of the faulty line, the upper or lower branches of the same power supply path, or other first-level zones.
[0006] Additional ground capacitance parameters and topology effects are intertwined. The values of additional ground capacitance at different access points and the topological location simultaneously affect the zero-sequence current variation. Existing methods lack a univariate comparison process, making it difficult to separate the independent influence of a single access point from the measurement results, and also making it difficult to reuse existing modeling results when the access capacitance parameters change.
[0007] There is a lack of unified partitioned output for faulty lines. Existing methods rarely establish the correspondence between candidate faulty lines, access points, and zero-sequence measurement points simultaneously, making it difficult to form a partitioned contribution matrix that can be used for comparison, updating, and expansion. Therefore, it is not convenient to calculate the grounding capacitance current and the residual current after compensation for different candidate faulty lines. Summary of the Invention
[0008] To address the shortcomings of existing technologies, this invention provides a method for modeling the grounding capacitance current partitioning of rural power distribution networks for new grid-connected entities. The aim is to solve the problems that traditional total grid model cannot reflect differences in access location, the difficulty in separating additional ground capacitance parameters from topological effects, and the lack of unified partitioning output for different faulty lines.
[0009] To achieve the above objectives, the present invention provides the following technical solution: a method for zoning and modeling the grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network, comprising the following steps: The rural power distribution network is abstracted into a radial topology network. The set of candidate fault lines, the set of zero-sequence measurement points, and the set of access points for new grid-connected entities are determined. The additional ground capacitance corresponding to each access point of the new grid-connected entities is used as a modeling object with topological location attributes. For the same candidate fault line, a baseline operating condition and a single access point operating condition are set. The baseline operating condition is that all additional ground capacitors are not connected, and the single access point operating condition is that only the additional ground capacitor of the target access point is connected. Based on the change of zero-sequence current at the zero-sequence measurement point under the baseline operating condition and the single access point operating condition, the partition contribution of the target access point to the current candidate fault line is obtained. Traverse the set of candidate fault lines and the set of new grid-connected main access points, construct a partition contribution matrix with candidate fault lines as rows and new grid-connected main access points as columns, and normalize the partition contribution matrix by row to obtain normalized contribution coefficients. Identify the dominant contributing access points under each candidate fault line based on the normalized contribution coefficients. Based on the normalized contribution coefficients corresponding to each candidate faulty line and the actual additional ground capacitance of each new grid-connected entity access point, the additional ground capacitance of the candidate faulty line partition is calculated. The additional ground capacitance is added to the original line ground capacitance of the partition to obtain the equivalent ground capacitance. Based on the equivalent ground capacitance, the partition ground capacitance current and the residual current after compensation are calculated, thus completing the partition modeling of small current ground capacitance current of rural power distribution network for new grid-connected entities.
[0010] Furthermore, the method for establishing a radial topology network includes: representing the radial topology network as a set of nodes and a set of line branches; for each line branch in the set of line branches, recording its starting node, ending node, line length, and capacitance to ground per unit length, and calculating the original equivalent capacitance to ground of the line branch.
[0011] Furthermore, the additional ground capacitance corresponding to the access point of the new grid-connected main body consists of the ground capacitance formed by the access cable or access line, the equivalent ground capacitance of the grid-connected filter branch, and the converted capacitance of the grid-connected equipment.
[0012] Furthermore, let the candidate faulty line be... The zero-sequence measurement point is The zero-sequence current under the reference operating condition is denoted as The first one was put into operation under single access point conditions. Additional ground capacitance at the new grid-connected main access point The zero-sequence current after that is denoted as The change in zero-sequence current The calculation formula is: .
[0013] Furthermore, when the zero-sequence measurement point coincides with the location of the candidate faulty line, the partition contribution of the measurement point of the candidate faulty line is... The calculation formula is: ,in, This represents the change in zero-sequence current when the location of the zero-sequence measurement point is consistent with the location of the candidate faulty line.
[0014] Furthermore, it also includes calculating the unit additional capacitance response coefficient to ground, the formula of which is: ,in Used to characterize the response strength of a unit additional capacitance to ground at the access point to the zero-sequence current of a candidate faulty line under given network topology and fault conditions.
[0015] Furthermore, the partition contribution matrix The matrix elements represent the partition contribution. The formula for calculating the normalized contribution coefficient is: ,in Indicates the first The maximum value of all matrix elements is used to determine the new grid-connected main access point with a normalized contribution coefficient of 1 as the dominant contributing access point under the candidate fault line, and a normalized contribution matrix is constructed accordingly.
[0016] Furthermore, the reduced value of the additional ground capacitance is calculated based on each normalized contribution coefficient and each actual additional ground capacitance. The reduced value of the additional ground capacitance is the sum of the actual additional ground capacitance of each new grid-connected main access point and the normalized contribution coefficient corresponding to the candidate fault line.
[0017] Furthermore, the equivalent ground capacitance is the sum of the original line ground capacitance and the additional ground capacitance of the zone; the zone grounding capacitance current is determined by the product of the three-phase ratio, the power grid frequency angular frequency, the zero-sequence voltage, and the equivalent ground capacitance.
[0018] Furthermore, the residual current after compensation is the difference between the zone grounding capacitor current and the compensation current of the arc suppression coil.
[0019] Compared with existing technologies, the present invention has the following advantages: This invention extends the traditional total network model into a two-dimensional matrix of candidate fault lines and access points, preserving the correspondence between access locations, fault lines, and zero-sequence measurement locations, and improving the spatial resolution of the grounding capacitance current model. This invention extracts independent responses through differential calculation between baseline operating conditions and single access point operating conditions, and separates the influence of capacitance parameters and topology location using unit additional ground capacitance response coefficient. Under the condition that the network topology and fault conditions remain unchanged, new additional ground capacitance parameters can be directly substituted to update the partition calculation results, which has good reusability and scalability. The partitioned contribution matrix and normalized contribution matrix constructed by this invention can output the equivalent capacitance to ground, grounding capacitance current and the compensated residual current corresponding to different candidate fault lines. It provides unified partitioned basic parameters for arc suppression coil compensation verification, residual current estimation and zero-sequence measurement configuration, and can quickly identify the dominant contribution access point of each fault line. This invention has good model expansion capabilities. When the structure of rural power distribution network lines, the number of new grid-connected entities, or the access location change, the model can be adjusted by updating the line topology, access point parameters, and partition contribution matrix without changing the overall modeling process. It can be widely applied to various new grid-connected entity access scenarios such as distributed photovoltaic, energy storage, and electric vehicle charging and swapping facilities. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the overall process of the present invention; Figure 2 Modeling topology and access configuration diagram of new grid-connected entities for rural power distribution network zones; Figure 3 Heatmap of contribution coefficients for normalized partitioning. Detailed Implementation
[0021] This invention proposes a method for zoning and modeling the grounding capacitance current of new grid-connected entities accessing rural power distribution networks. This method integrates the rural power distribution network topology, the access point of the new grid-connected entity, candidate fault lines, and zero-sequence measurement points into the modeling process. It also correlates the additional ground capacitance formed by the access lines, grid-connected cables, filter branches, and related equipment with their actual access locations, thus preserving the topological location attributes of different access points.
[0022] To address the issue that traditional total network capacity models struggle to reflect differences in access locations, this invention establishes a baseline operating condition with no additional ground capacitance and a comparative operating condition with only a single access point having additional ground capacitance. While maintaining consistency in network topology, line parameters, fault conditions, and measurement conditions, the contribution of each access point to different candidate fault lines is obtained based on the zero-sequence current changes in both operating conditions.
[0023] Further, a partitioned contribution matrix is constructed with candidate faulty lines as rows and new grid-connected main access points as columns, and the relative contribution relationship of each access point under the same faulty line is characterized by normalization processing. Based on this, combined with the actual additional ground capacitance parameters of each access point, the grounding capacitance current and the compensated residual current corresponding to different fault partitions are calculated. The overall technical route of this invention is as follows: Figure 1 As shown, the specific implementation steps of the plan are as follows: I. Topology partitioning and equivalent capacitance to ground at access points
[0024] The rural power grid is abstracted as a radial topology network, which contains a set of nodes. and line branch set Then the radial topology of the rural power distribution network It can be represented as: (1); Among them, the node set Each node in the diagram corresponds to an electrical connection point in the rural power distribution network, including but not limited to busbar nodes, low-voltage side nodes of transformers, line branch / break points (T-junctions), and the actual grid connection point of the new grid-connected entity; line branch set. Each line branch in the network corresponds to a physical transmission and distribution line segment in the rural power distribution network used to connect adjacent electrical connection points. The physical transmission and distribution line segment includes overhead line segments and / or cable line segments.
[0025] For the set of line branches For each line branch in the set, record the topology parameters of that line branch; specifically, for the set of line branches... The first in Branch lines The start and end intervals are determined by its first and last nodes, and the physical parameters of this interval are recorded (the first node). The line length and capacitance to ground per unit length of each branch line are specifically represented as follows: (2); In the formula, and They represent the first The first and last nodes of each branch line. Indicates the first The length of each branch line. Indicates the first The capacitance to ground per unit length of each line branch; Based on this, obtain the first... The length of the branch line and the first The product of the capacitance to ground per unit length of each branch line is used to obtain the product of the capacitances of the first branch line. The original equivalent capacitance to ground of the branch line , can be represented as: (3).
[0026] After the new grid-connected main body is connected, its access line, grid-connected cable, filter branch and related equipment will form additional ground capacitance near the access point; The additional ground capacitance of the new grid-connected main access point is denoted as Its ground capacitance is formed by the access cable or access line. Equivalent capacitance to ground of grid-connected filter branch Other grid-connected equipment's equivalent capacitance Composition, represented as: (4); Among them, the ground capacitance formed by the access cable or access line The dedicated tie line (overhead line or cable) that corresponds to the new grid-connected entity is led from the T-junction of the public distribution network to its grid connection point; there is an insulating medium between the conductor of the overhead line and the power cable and the ground (or the metal shielding layer of the cable), which constitutes a natural distributed capacitance; Equivalent capacitance to ground of grid-connected filter branch Filter capacitor banks for the AC output terminals of new grid-connected devices (such as photovoltaic inverters and energy storage converters); Capacitance of other grid-connected equipment Corresponding to the first The equivalent parasitic / stray capacitance of primary and secondary equipment other than lines and filters related to the access point of a new type of grid-connected main body.
[0027] This invention will Additional ground capacitance at the new grid-connected main access point It is treated as a modeling object with topological location attributes. For multi-branch rural distribution networks, when a single-phase ground fault occurs in different line sections, the first... A new type of grid-connected main access point With faulty lines and zero-sequence measurement point The topological relationships between different fault zones vary, and the degree to which their additional ground capacitance contributes to the zero-sequence current also differs. Therefore, this invention retains the correspondence between the access location of the new grid-connected entity and the line topology during the capacitive current modeling process to characterize the differences in the contribution of ground capacitive current under different fault zones.
[0028] II. Calculation of Zero-Sequence Current Change and Regional Contribution
[0029] This step aims to extract the independent impact of a single access point; after completing topology partitioning and equivalent ground capacitance of the access point, this invention denotes the set of candidate fault lines for single-phase ground faults as follows: The set of zero-order measurement points is denoted as The set of access points for new grid-connected entities is denoted as , is represented as: (5); In the formula, Indicates the first Candidate faulty lines, , Indicates the number of candidate faulty lines; Indicates the first Zero-sequence measurement points, , Indicates the number of zero-sequence measurement points; Indicates the first A new type of grid-connected entity access point, , This indicates the number of access points for the new grid-connected entities.
[0030] When the Candidate fault lines When a single-phase ground fault occurs, the zero-sequence measurement point will be... The three-phase currents at point A are denoted as follows: , , The three-phase voltages are denoted as follows: , , Thus, the zero-sequence measurement point is obtained through the symmetric component method. zero-sequence current at and zero sequence voltage , can be represented as: (6); In the formula, , , They represent the first Candidate fault lines When a single-phase ground fault occurs, the zero-sequence measurement point The currents of phases A, B, and C at the location; , , They represent the first Candidate fault lines When a single-phase ground fault occurs, the zero-sequence measurement point The voltages of phases A, B, and C at the location.
[0031] To ensure that the change in zero-sequence current reflects the independent impact of the additional ground capacitance at the connection point of a single new grid-connected entity, this invention employs a comparative calculation between a baseline operating condition and a single connection point operation condition. For the same candidate fault line and the same zero-sequence measurement point, both operating conditions use the same rural distribution network topology, line parameters, fault location, fault time, grounding transition resistance, and data extraction time window, only changing the connection status of the additional ground capacitance at the target connection point; specifically: For the same candidate fault line, under the baseline operating condition, only the original line-to-ground capacitance of the rural power distribution network is retained, and the additional line-to-ground capacitance at the access point of all new grid-connected entities is not activated. The zero-sequence current at the zero-sequence measurement point at this time is recorded as the baseline zero-sequence current. This operating condition is used to characterize the zero-sequence current response under the combined effect of the original line-to-ground capacitance and the inherent parameters of the system. In single access point operation, only the first one is put into operation. A new type of grid-connected main access point Additional ground capacitance The additional grounding capacitors at the other new grid-connected main access points remain unconnected. The zero-sequence current at the zero-sequence measurement point at this time is recorded as the single-access point zero-sequence current. In this calculation process, except for the additional ground capacitor status at the new grid-connected main access point, all other calculation conditions are consistent with the baseline operating conditions.
[0032] The difference in zero-sequence current under the two operating conditions (baseline operating condition and single-connection-point operating condition) is defined as the change in zero-sequence current caused by the new grid-connected entity's connection point. , is represented as: (7); In the formula, This represents the reference zero-sequence current under the reference operating condition; This represents the zero-sequence current at a single access point under single access point operating conditions. For the same faulty line The access points of the new grid-connected entities are changed sequentially. By separately activating the additional ground capacitors at each of the new grid-connected main access points, the zero-sequence current change corresponding to different access points can be obtained. Since only the additional ground capacitor of one access point is activated at a time, the calculation results can characterize the independent impact of that access point on the current candidate fault line and the location of the zero-sequence measurement point, avoiding the superposition of contributions caused by the simultaneous activation of additional ground capacitors at multiple access points.
[0033] Since the current reference direction may differ at different zero-sequence measurement points, directly using a signed change in current is easily affected by the measurement direction setting. Therefore, this invention uses a zero-sequence current change. The absolute value represents the magnitude of the contribution, and the first Candidate fault lines Next, the A new type of grid-connected main access point For zero-sequence measurement points The contribution of the partition is recorded as : (8); When it is necessary to focus on reflecting the zero-sequence response of the candidate faulty line itself, the location of the zero-sequence measurement point should be consistent with that of the candidate faulty line, i.e. Under these conditions, the contribution of the measuring points on the candidate faulty line is recorded as... , indicating the first Candidate fault lines When a single-phase ground fault occurs, the first A new type of grid-connected main access point The contribution of the zero-sequence current at the measuring point of the candidate faulty line to the overall fault is calculated using the following formula: (9); In the formula, This represents the change in zero-sequence current when the location of the zero-sequence measurement point coincides with the location of the candidate faulty line. To further eliminate the direct influence of the additional ground capacitance value on the result, the contribution of the test points on the candidate faulty line can also be used. and the Additional ground capacitance at the new grid-connected main access point The unit additional ground capacitance response coefficient was calculated. : (10); The unit additional ground capacitance response coefficient refers to the change in zero-sequence current at the corresponding candidate fault line zero-sequence measurement point when a unit capacity of additional ground capacitance is put into a certain new grid-connected main access point, under the premise that the radial topology, line parameters and fault conditions (including but not limited to fault location, grounding transition resistance, fault occurrence time and data extraction time window) of the rural power distribution network are completely consistent.
[0034] The unit is ampere per farad, used to characterize the unit of additional capacitance to ground at the access point under given network topology and fault conditions. For the faulty line The response intensity generated by the zero-sequence current is measured. This allows us to separate the magnitude of the capacitance parameter at the connection point from its topological location.
[0035] Through the above processing, the additional ground capacitance at the access point is no longer simply a superposition in the total ground capacitance of the entire network, but is transformed into a zonal contribution related to the location of the faulty line, access point, and zero-sequence measurement point. This zonal contribution can reflect the differences in the impact of the access locations of different new grid-connected entities on the distribution of small-current grounding capacitance current.
[0036] III. Construction of Partition Contribution Matrix and Correction of Ground Capacitance Current
[0037] Traverse the set of candidate faulty lines and the set of access points for new grid-connected entities (Calculated according to formula (9)), the contribution of the corresponding candidate fault line measurement point is used as matrix element to construct the partition contribution matrix. The rows of this partition contribution matrix correspond to candidate faulty lines, and the columns correspond to the access points of new grid-connected entities. The matrix elements are the contribution amounts of the measurement points on the corresponding candidate faulty lines, expressed as follows: (11); Among them, matrix elements Indicates the first Candidate fault lines When a single-phase ground fault occurs, the first A new type of grid-connected main access point Contribution of zero-sequence measurement points to the faulty line. Zonal contribution matrix. The absolute contribution of different new grid-connected main access points to each candidate faulty line is retained. For a certain candidate faulty line, the larger the value in that row of the matrix, the more significant the impact of the additional ground capacitance of the corresponding new grid-connected main access point on the zero-sequence current of the zero-sequence measurement point of the faulty line.
[0038] To further compare the relative contribution strength of each new grid-connected entity access point under the same candidate fault line, this invention uses a partitioned contribution matrix. By normalizing by row, we obtain the normalized contribution coefficient: (12); In the formula, Indicates the first The first candidate fault line Normalized contribution coefficient of each new grid-connected main access point; Indicates the first line (number) (Candidate fault lines) All matrix elements The maximum value is the maximum contribution of all new grid-connected access points under the same candidate fault line.
[0039] The new grid-connected main access point with a normalized contribution coefficient of 1 is taken as the dominant contributing access point under the candidate fault line.
[0040] A normalized contribution matrix is constructed based on the normalized contribution coefficients of each new grid-connected entity access point for each candidate faulty line. : (13); In the formula, Indicates the first The first candidate fault line The normalized contribution coefficient of the new grid-connected main access point.
[0041] Original partition contribution matrix The normalized contribution matrix is used to characterize the magnitude of the contribution. Used to identify the dominant contributing access point under the same candidate fault line. When used together, these two methods can avoid misclassifying weakly correlated branches with very small absolute contributions as strongly correlated regions based solely on the normalization coefficient.
[0042] After obtaining the normalized contribution coefficient, the grounding capacitance current is corrected, and the first... Additional ground capacitance at the new grid-connected main access point The additional ground capacitance value for the current candidate faulty line is obtained by converting it with the normalized contribution coefficient of the corresponding candidate faulty line: (14); In the formula, Indicates the first The additional capacitance to ground of each candidate faulty line is calculated.
[0043] This formula retains the actual parameters of the additional ground capacitance at different access points, while using a normalized contribution coefficient to reflect the influence of access location, fault location, and zero-sequence measurement point location on its effect. For access points with a larger contribution coefficient, the reduction ratio of their additional ground capacitance under the current fault line is higher; for access points with a smaller contribution coefficient, the reduction ratio of their additional ground capacitance is correspondingly lower.
[0044] The first The foundation-to-ground capacitance formed by the original lines within the corresponding section of the faulty line is denoted as . This capacitor is composed of the equivalent ground capacitance of each line branch within the corresponding zone. With the Additional ground capacitance of candidate fault lines Adding them together yields the equivalent capacitance to ground for the current candidate faulty line section. , is represented as: (15); Equivalent capacitance to ground It also includes the ground capacitance formed by the original rural power grid line structure and the additional ground capacitance formed after the new grid-connected entity is connected, and reflects the difference in the impact of different access locations on the current faulty line through the zoning contribution coefficient.
[0045] Based on the equivalent capacitance to ground for the current candidate fault line section The calculated zone grounding capacitance current is expressed as: (16); In the formula, Indicates the first The zone grounding capacitance current corresponding to each candidate fault line; Indicates the number of phases, used to convert the single-phase-to-ground capacitance to the total three-phase-to-ground capacitance current; Indicates the power frequency angular frequency of the power grid system; This represents the zero-sequence voltage used for capacitor current calculation under fault conditions.
[0046] For rural power distribution networks equipped with arc suppression coils, the compensation current of the arc suppression coils will offset part of the grounding capacitance current; the compensation current of the arc suppression coils is denoted as... Based on the zoned grounding capacitance current corresponding to the candidate fault line and the compensation current of the arc suppression coil The residual current corresponding to the candidate faulty line is calculated and expressed as: (17); In the formula, Indicates the first The residual current corresponding to each candidate faulty line.
[0047] Through the above processing, this invention transforms the method of uniformly integrating the additional ground capacitance of the new grid-connected entity into the total ground capacitance of the entire network into a partitioned calculation result related to the candidate faulty line, the connection location, and the location of the zero-sequence measurement point. The partitioned contribution matrix is used to store the actual zero-sequence current change generated by each connection point, and the normalized contribution matrix is used to characterize the relative influence of different connection points under the same faulty line.
[0048] Through the calculations and constructions in the first to third stages described above, the partition contribution corresponding to the access point of each new grid-connected entity can be obtained (i.e., The partition contribution matrix is constructed by arranging the contribution values of each partition. By normalizing the matrix row-wise, the dominant contributing access point under each candidate faulty line is identified. Finally, by adding ground capacitance reduction and current calculation, the estimated results of the zoned grounding capacitance current and the compensated residual current are obtained. Thus, the zoned modeling of small-current grounding capacitance current in rural power distribution networks for new grid-connected entities is completed.
[0049] Specific implementation steps
[0050] To illustrate the specific implementation process of the method of the present invention, the following is established: Figure 2 The two-layer radial agricultural power distribution network model is shown. Figure 2 In the diagram, "measurement point" corresponds to the zero-sequence measurement point of the present invention, "new grid-connected main body" symbol corresponds to the access point of each new grid-connected main body of the present invention, "line impedance" (represented by a series circle symbol in the figure) is used to simulate the electrical parameters of the transmission and distribution line, "mountain and forest rural load" (represented by a rectangle symbol in the figure) represents the end load, and "fault simulation" (represented by a switch symbol in the figure) is used to preset the location where a single-phase ground fault occurs.
[0051] The model includes four primary lines. , , and ,in , and Each terminal is connected to a load, and two secondary lines are branched off from the terminal nodes. End division and , End division and , End division and . It is a primary line without secondary branches, and its end is directly connected to the load.
[0052] The model sets up four new grid-connected main access points: Access At the end, Connect to the L1 terminal, Access At the end, Access End-point connection. Zero-sequence measurement points are set at the transformer outlet, the beginning of the primary line, and the beginning of the secondary line. This connection method covers typical locations such as end-point connection of the primary line, end-point connection of the secondary line, and end-point connection of the line without secondary branches. To individually identify the impact of the location of the additional ground capacitance, the grid-connected current output of the new grid-connected main unit was set to zero, retaining only the additional ground capacitance formed by the access line, grid-connected cable, filter branch, and related equipment. This setting is only for control variable identification and does not represent the actual operation mode of the new grid-connected main unit. The test additional ground capacitance of the four access points of the new grid-connected main unit was taken as... This ensures that the results from different access points primarily reflect differences in topological location. The fault type is a single-phase ground fault. The candidate faulty line is... to Zero-sequence measurement point coverage to The detailed calculation conditions set in this example are shown in Table 1.
[0053] Table 1. Calculation conditions for partitioned modeling
[0054] First, set the grounding transition resistance to... In sequence to A single-phase ground fault is set up in phase A; for each candidate fault line, the baseline operating condition and four single-connection-point operating conditions are calculated separately. Since the additional capacitance to ground is the same in all four tests, and Since they differ only by the same constant and their relative order is consistent, Table 2 directly lists the original contribution matrix in the form of zero-sequence current change.
[0055] Table 2 Grounding transition resistance is Contribution matrix of faulty line measurement points at time (unit: A)
[0056] The largest contribution in Table 2 is... The minimum contribution is The difference between the two is approximately The multiple indicates that the impact of the access location on the measurement of zero-sequence current in faulty lines has significant spatial differences. Represents a new type of grid-connected entity It has been connected to a secondary line. At the end, Represents a new type of grid-connected entity It has been connected to the primary line. At the end, Represents a new type of grid-connected entity It has been connected to a secondary line. At the end, Represents a new type of grid-connected entity It was connected to a primary line without secondary branches. The end of.
[0057] when , and In the event of a fault, the access points of the new grid-connected main body directly connected to this line are as follows: , and Their contributions were approximately 20.13 times, 59.93 times, and 28.83 times that of the second-largest contributor, respectively, indicating that the access point for the same line has a significant dominant role. When When a malfunction occurs, The largest contributor, located at its lower level. of The contribution is secondary, reflecting that both upstream and downstream access points on the same power supply path will have a significant impact on the measurement of zero-sequence current of the upstream line.
[0058] and No new grid-connected entities directly connected, and their overall original contributions in each column were relatively low. This result also indicates that the normalized matrix can only be used for relative comparisons within the same row, and cannot be used to judge the actual impact independently of the original contribution.
[0059] Figure 3 The heatmap of the normalized regional contribution coefficients corresponding to this example is shown. The darkest color block in each row (i.e., the normalized contribution coefficient is 1) marks the dominant contribution connection point for that candidate fault line. To examine the impact of changes in grounding transition resistance on the dominant contribution relationship, candidate lines were selected. , , and Four typical lines, with the grounding transition resistance set as follows: , and The dominant contribution access point and the maximum contribution amount were recalculated using the same method, as shown in Table 3.
[0060] Table 3. Dominant contribution points and maximum contribution under different grounding transition resistances.
[0061] Table 3 contains 12 sets of calculation results for 4 typical lines and 3 types of grounding transition resistance. The dominant contribution access point for each candidate fault line remains consistent across all 12 sets of results (100% consistency rate of dominant access point). The maximum contribution decreases as the grounding transition resistance increases, indicating that the grounding transition resistance mainly affects the response amplitude, while the topological relationship between the new grid-connected main access point and the candidate fault line determines the relative dominance within the tested range.
[0062] Through the above process, the original contribution matrix, the unit additional ground capacitance response coefficient and the normalized contribution matrix can be obtained. The actual additional ground capacitance of each access point is substituted into equations (14) to (18) to complete the calculation of ground capacitance current, equivalent ground capacitance and compensated residual current corresponding to different candidate fault lines.
[0063] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A method for zoning and modeling the grounding capacitance current of new grid-connected entities accessing rural power distribution networks, characterized in that, Includes the following steps: The rural power distribution network is abstracted into a radial topology network. The set of candidate fault lines, the set of zero-sequence measurement points, and the set of access points for new grid-connected entities are determined. The additional ground capacitance corresponding to each access point of the new grid-connected entities is used as a modeling object with topological location attributes. For the same candidate faulty line, a baseline operating condition and a single access point operating condition are set; the baseline operating condition is that all additional ground capacitors are not activated, and the single access point operating condition is that only the additional ground capacitors of the target access point are activated. Based on the change in zero-sequence current at the zero-sequence measurement point under the baseline operating condition and the single access point operating condition, the partition contribution of the target access point to the current candidate fault line is obtained. Traverse the set of candidate fault lines and the set of new grid-connected main access points, construct a partition contribution matrix with candidate fault lines as rows and new grid-connected main access points as columns, and normalize the partition contribution matrix by row to obtain normalized contribution coefficients. Identify the dominant contributing access points under each candidate fault line based on the normalized contribution coefficients. Based on the normalized contribution coefficients corresponding to each candidate faulty line and the actual additional ground capacitance of each new grid-connected entity access point, the additional ground capacitance of the candidate faulty line partition is calculated. The additional ground capacitance is added to the original line ground capacitance of the partition to obtain the equivalent ground capacitance. Based on the equivalent ground capacitance, the partition ground capacitance current and the residual current after compensation are calculated, thus completing the partition modeling of small current ground capacitance current of rural power distribution network for new grid-connected entities.
2. The method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 1, characterized in that: The method for establishing a radial topology network includes: representing the radial topology network as a set of nodes and a set of line branches; for each line branch in the set of line branches, recording its starting node, ending node, line length, and capacitance to ground per unit length, and calculating the original equivalent capacitance to ground of the line branch.
3. The method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 2, characterized in that: The additional ground capacitance corresponding to the access point of the new grid-connected main body consists of the ground capacitance formed by the access cable or access line, the equivalent ground capacitance of the grid-connected filter branch, and the converted capacitance of the grid-connected equipment.
4. A method for modeling the grounding capacitance current partitioning of a new type of grid-connected entity accessing a rural power distribution network according to claim 3, characterized in that: [The method is described in the original text, but the provided text is incomplete and requires further context.] Candidate faulty line is The zero-sequence measurement point is The zero-sequence current under the reference operating condition is denoted as The first one was put into operation under single access point conditions. Additional ground capacitance at the new grid-connected main access point The zero-sequence current after that is denoted as The change in zero-sequence current The calculation formula is: .
5. The method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 4, characterized in that: When the zero-sequence measurement point coincides with the location of the candidate faulty line, the partition contribution of the measurement point of the candidate faulty line is... The calculation formula is: ,in, This represents the change in zero-sequence current when the location of the zero-sequence measurement point is consistent with the location of the candidate faulty line.
6. The method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 5, characterized in that: It also includes calculating the unit additional capacitance response coefficient to ground, the formula for which is: ,in Used to characterize the response strength of a unit additional capacitance to ground at the access point to the zero-sequence current of a candidate faulty line under given network topology and fault conditions.
7. A method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 6, characterized in that: Partition Contribution Matrix The matrix elements represent the partition contribution. The formula for calculating the normalized contribution coefficient is: ,in Indicates the first The maximum value of all matrix elements is used to determine the new grid-connected main access point with a normalized contribution coefficient of 1 as the dominant contributing access point under the candidate fault line, and a normalized contribution matrix is constructed accordingly.
8. A method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 7, characterized in that: The additional ground capacitance is calculated based on each normalized contribution coefficient and each actual additional ground capacitance. The additional ground capacitance is calculated as the sum of the actual additional ground capacitance of each new grid-connected main access point and the normalized contribution coefficient corresponding to the candidate fault line.
9. A method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 8, characterized in that: The equivalent ground capacitance is the sum of the original line ground capacitance and the additional ground capacitance of the zone; the zone grounding capacitance current is determined by the product of the three-phase ratio, the power grid frequency angular frequency, the zero-sequence voltage, and the equivalent ground capacitance.
10. A method for zoning and modeling grounding capacitance current of a new type of grid-connected entity accessing a rural power distribution network according to claim 9, characterized in that: The residual current after compensation is the difference between the zone grounding capacitor current and the compensation current of the arc suppression coil.