A design method and device for grounding grid diagnostic nodes

By diverting stray currents in the grounding grid using current transformers and passive filter networks, and by using low-power comparators to distinguish between wake-up signals and background interference, the problem of low-power operation of grounding grid diagnostic nodes is solved, and reliable diagnosis is achieved in complex electromagnetic environments.

CN123074128APending Publication Date: 2026-11-10XI AN JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611410478.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-11
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Grounding grid diagnostic nodes are difficult to operate with low power consumption in environments without external power supply, and stray currents and transient electromagnetic interference can easily lead to false wake-ups and increased energy consumption.

Method used

The stray current of the grounding grid is sensed by a current transformer. The component with a frequency lower than the cutoff frequency is rectified and stored in the energy storage capacitor for power supply. The component with a frequency higher than the cutoff frequency is filtered by a passive filter network and then input to a low-power comparator. The cutoff frequency is configured to distinguish between power frequency background interference and wake-up signals. The low-power comparator performs amplitude threshold judgment to wake up the main control unit.

Benefits of technology

It achieves low-power operation in the complex electromagnetic environment of the grounding grid, reduces false wake-ups and energy consumption, and ensures long-term autonomous power supply and reliability of the diagnostic nodes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123074128A_ABST
    Figure CN123074128A_ABST
Patent Text Reader

Abstract

This invention discloses a design method and apparatus for a grounding grid diagnostic node, relating to the field of power equipment monitoring technology. The invention uses a current transformer sleeved on the outside of the grounding grid conductor to sense stray currents and convert them into secondary-side induced currents. Components with frequencies below the cutoff frequency are rectified and stored in an energy storage capacitor to power a low-power comparator during sleep mode. Components with frequencies above the cutoff frequency are filtered by a passive filter network and then input to the low-power comparator. The cutoff frequency is higher than the upper limit of power frequency background interference but lower than the lower limit of the wake-up signal. The filtered signal voltage is compared with a preset reference voltage; if it exceeds the reference voltage, a wake-up level is output to trigger the main control unit to wake up. This method achieves long-term low-power operation in grounding grid environments without external power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power equipment monitoring technology, and in particular to a design method and device for a grounding grid diagnostic node. Background Technology

[0002] As an important safety guarantee facility for substations and transmission line towers, the grounding grid's diagnostic nodes need to be buried underground for a long time. They lack sunlight and significant temperature differences, making it difficult to supply power through conventional micro-energy harvesting methods. This places special requirements on the low-power operation of the diagnostic nodes.

[0003] The existing technology connects the current transformer to the grounding grid conductor. The energy harvesting circuit and the wake-up circuit are both connected to the secondary output terminal of the current transformer. The energy harvesting circuit uses the power frequency induced current to charge the energy storage capacitor for power supply after rectification. The wake-up circuit is started by the main control unit at time intervals set by the internal clock and samples to determine whether a wake-up signal has arrived. After completing the data acquisition, it re-enters the sleep state.

[0004] However, since the recognition of the wake-up signal depends on the sampling and judgment after the main control starts at a certain time, and the main control start-up, sampling and judgment process itself consumes the electrical energy stored in the energy storage capacitor, each wake-up attempt will consume additional energy that has been collected. Furthermore, power frequency interference in the power frequency stray current is easily misjudged as a valid wake-up signal, resulting in frequent false wake-ups, which further aggravates energy consumption. Summary of the Invention

[0005] Therefore, it is necessary to provide a design method and device for grounding grid diagnostic nodes to address the aforementioned technical problems.

[0006] The following technical solution is adopted in this specification: This specification provides a design method for grounding grid diagnostic nodes, including: The stray current in the grounding grid is sensed by a current transformer connected to the outside of the grounding grid conductor and converted into a secondary induced current. The component of the secondary induced current with a frequency lower than the cutoff frequency is rectified and stored in the energy storage capacitor. The energy storage capacitor supplies power to the low-power comparator when the diagnostic node is in a dormant state. The component of the secondary side induced current with a frequency higher than the cutoff frequency is filtered by a passive filter network and then input into a low-power comparator. The cutoff frequency is configured to be higher than the upper limit of the power frequency background interference in the grounding grid and lower than the lower limit of the frequency of the externally injected wake-up signal. The filtered signal voltage is compared with a preset reference voltage. When the filtered signal voltage exceeds the preset reference voltage, the low-power comparator outputs a wake-up level, triggering the main control unit of the diagnostic node to switch from sleep mode to working mode.

[0007] Optionally, after the main control unit is woken up, it detects the voltage of the energy storage capacitor. When the voltage of the energy storage capacitor reaches the preset working voltage threshold, it performs a diagnostic task. When the voltage of the energy storage capacitor is lower than the preset working voltage threshold, it re-enters the sleep state. After the diagnostic task is completed, the main control unit re-enters the sleep state.

[0008] Optionally, the externally injected wake-up signal is a high-frequency sine wave signal with a frequency range of 1000Hz to 10000Hz, and the cutoff frequency of the passive filter network is between 500Hz and 1000Hz.

[0009] This specification provides a grounding grid diagnostic node device, including a current transformer, a rectifier bridge, an energy storage capacitor, a passive filter network, a low-power comparator, and a main control unit; The current transformer is sleeved on the outside of the grounding grid conductor, and the secondary output terminal of the current transformer is connected to the input terminal of the rectifier bridge and the input terminal of the passive filter network, respectively. The output of the rectifier bridge is connected to an energy storage capacitor, which is then connected to the power supply of a low-power comparator. The output of the passive filter network is connected to the input of the low-power comparator, and the output of the low-power comparator is connected to the wake-up terminal of the main control unit. The passive filter network is used to filter the components of the induced current output from the secondary side of the current transformer whose frequency is higher than the cutoff frequency. The rectifier bridge is used to rectify the components of the induced current whose frequency is lower than the cutoff frequency and store them in the energy storage capacitor. The low-power comparator is used to compare the filtered signal voltage with the preset reference voltage and output a wake-up level to the main control unit when the preset reference voltage is exceeded. The cutoff frequency is higher than the upper limit of the power frequency background interference in the grounding grid and lower than the lower limit of the frequency of the externally injected wake-up signal. The resistor in the passive filter network also serves as the discharge resistor on the secondary side of the current transformer.

[0010] Optionally, the passive filter network includes a first resistor, a second resistor, and a filter capacitor. The first resistor and the filter capacitor are connected in series and then connected in parallel with the second resistor across the secondary side of the current transformer. The output terminal of the passive filter network is the connection node between the first resistor and the filter capacitor.

[0011] Optionally, the device also includes an isolation current-limiting resistor connected between the output of the passive filter network and the input of the low-power comparator.

[0012] Optionally, the device further includes an input clamping protection branch connected to the input of the low-power comparator, which is composed of two diodes connected in reverse series.

[0013] Optionally, the device further includes a bidirectional transient voltage protection branch, which is connected in parallel to the secondary output terminal of the current transformer. The bidirectional transient voltage protection branch is in a high-resistance state under normal operating conditions and is turned on when the induced voltage on the secondary side exceeds the clamping threshold.

[0014] Optionally, the energy storage capacitor is also connected to the power supply terminal of the main control unit.

[0015] Optionally, after the main control unit is woken up, it detects the voltage of the energy storage capacitor. When the voltage of the energy storage capacitor reaches the preset working voltage threshold, it performs a diagnostic task. When the voltage of the energy storage capacitor is lower than the preset working voltage threshold, it re-enters the sleep state. After the diagnostic task is completed, the main control unit re-enters the sleep state.

[0016] The above-mentioned technical solutions adopted in this specification can achieve the following beneficial effects: This invention utilizes the parallel shunt of the secondary current of the same current transformer in the frequency domain. The component with a frequency lower than the cutoff frequency is rectified and stored in the energy storage capacitor for power supply. The component with a frequency higher than the cutoff frequency is input to a low-power comparator through a passive filter network for wake-up discrimination. This makes the wake-up signal identification process unnecessary for the main control unit. Moreover, the high-frequency component used for wake-up discrimination and the low-frequency component used for energy extraction come from the same induced current and occur in parallel. The wake-up operation itself does not consume the energy stored in the energy storage capacitor, thus breaking the inherent technical prejudice that "wake-up means increased power consumption". At the same time, by configuring the cutoff frequency to be higher than the upper limit of the power frequency background interference and lower than the lower limit of the wake-up signal frequency, the power frequency interference is attenuated at the physical layer and the wake-up signal is retained. The low-power comparator only needs simple amplitude threshold judgment to reliably identify the wake-up signal, avoiding the power consumption caused by the main control timing sampling and the frequent false wake-ups caused by power frequency interference. Thus, low-power long-term operation is achieved in a grounding grid environment without external power supply. Attached Figure Description

[0017] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings:

[0018] Figure 1 This document provides a schematic flowchart of a design method for a grounding grid diagnostic node. Figure 2 This is a schematic diagram of the filtering effect of the wake-up circuit in the grounding grid scenario provided in this manual, where (a) is the input current waveform before filtering; and (b) is the response current waveform after filtering. Figure 3 This is a basic structural diagram of the pulse wake-up circuit in the grounding grid scenario provided in this manual. Figure 4 This is a schematic diagram of a design device for a grounding grid diagnostic node provided in this specification. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of this specification clearer, the technical solutions of this application will be clearly and completely described below in conjunction with specific embodiments and corresponding drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments in this specification without creative effort are within the scope of protection of this application.

[0020] As a crucial safety assurance facility for substations and transmission line towers, the grounding grid is buried underground for extended periods, playing a vital role in discharging fault currents and ensuring the safe grounding of equipment. Due to soil corrosion, mechanical damage, and long-term changes in the operating environment, the grounding grid may develop structural defects such as fractures and corrosion thinning, thereby reducing its grounding performance and threatening the safe operation of the power system. Therefore, conducting long-term, accurate online monitoring and defect diagnosis of the grounding grid is of great significance.

[0021] In recent years, with the development of sensing and intelligent monitoring technologies, using distributed diagnostic nodes to detect the status of grounding grids has gradually become a feasible solution. However, unlike traditional ground monitoring equipment, grounding grid diagnostic nodes need to be installed underground or near the grounding conductor for extended periods, resulting in a unique working environment. On the one hand, nodes are difficult to power continuously via wired connections, and manual battery replacement increases maintenance costs; therefore, a low-power design with long-term autonomous operation capability is required. On the other hand, as a crucial component of the power system, the grounding grid is constantly exposed to a complex electromagnetic environment, including stray currents generated by three-phase imbalance, electromagnetic induction, and nonlinear loads, as well as transient strong electromagnetic disturbances caused by lightning strikes, short-circuit faults, and switching operations.

[0022] Currently, existing low-power monitoring technologies are mainly geared towards conventional applications such as environmental monitoring and industrial equipment monitoring. Their power supply methods, wake-up mechanisms, and protection designs are all based on relatively stable operating environments. For example, micro-energy harvesting methods such as photovoltaics, temperature differences, and mechanical vibrations are difficult to apply to underground grounding grids that are buried for long periods without sunlight or significant temperature differences. Low-power control methods based on timed wake-up or ordinary event triggering cannot effectively distinguish between normal power frequency stray signals in the grounding grid and artificially injected diagnostic wake-up signals, which can easily lead to false wake-ups or additional energy consumption. At the same time, existing node protection schemes are usually designed for general electronic equipment and cannot simultaneously meet the needs of weak energy harvesting in the grounding grid and the safety protection requirements under lightning surges and fault current impacts.

[0023] Existing underground monitoring nodes typically use battery power and internal clock periodic wake-up. For grounding grid diagnostic nodes, which are buried underground for extended periods, manual battery replacement and wired power supply are both difficult. Furthermore, grounding grid diagnostic signals are intermittent and irregular. If low-frequency timed wake-up is used, diagnostic signals may be missed, while increasing the wake-up frequency will significantly increase the node's standby power consumption.

[0024] The grounding grid conductors are perpetually affected by stray power frequency currents and low-order harmonics generated by three-phase imbalance, electromagnetic induction, and nonlinear loads. If a standard amplitude threshold comparison method is directly used for event wake-up, these background disturbances can easily cause false triggering of nodes. On the other hand, the grounding grid may also be affected by lightning surges, short-circuit fault currents, and transient switching operations, and the resulting transient overvoltages may damage the energy extraction rectification, sampling, and comparison circuits.

[0025] Furthermore, while stray electromagnetic energy from the power frequency in the grounding grid can serve as a weak energy source for underground nodes, its energy amplitude is small, highly fluctuating, and coexists with large-amplitude transient impacts. Existing technologies typically design separate energy harvesting circuits, wake-up circuits, and protection circuits, resulting in complex circuit structures, high static power consumption, and protection devices affecting the efficiency of weak energy harvesting.

[0026] The technical solutions provided by the various embodiments of this application are described in detail below with reference to the accompanying drawings.

[0027] Figure 1 This is a schematic diagram of a design method for a grounding grid diagnostic node in this specification, which specifically includes the following steps: S101: The stray current in the grounding grid is sensed by the current transformer connected to the outside of the grounding grid conductor and converted into secondary induced current. The component of the secondary induced current with a frequency lower than the cutoff frequency is rectified and stored in the energy storage capacitor. The energy storage capacitor supplies power to the low-power comparator when the diagnostic node is in a dormant state.

[0028] In one embodiment of this specification, a front-end bidirectional transient overvoltage protection unit is disposed at the secondary output terminal of the current transformer (CT), including Zener diodes D7 and D8 and an impedance matching and bleedering resistor R2. Zener diodes D7 and D8 are connected in reverse series and then in parallel across the secondary side of the CT, forming a bidirectional voltage clamping branch; resistor R2 is also connected in parallel across the secondary side of the CT to provide a load and current bleedering path for the CT secondary side.

[0029] In this embodiment, under normal grounding grid operation, the induced voltage on the secondary side of the CT is lower than the reverse breakdown voltage of Zener diodes D7 and D8. The protection branch formed by D7 and D8 is in a high-resistance state and does not participate in normal conduction. Therefore, it will not significantly affect the normal operation of the subsequent micro-energy extraction rectifier circuit and wake-up sampling circuit. At this time, the power frequency stray current in the grounding grid, after being coupled by the CT, enters part of the bridge rectifier circuit composed of D1 to D4 and charges the energy storage capacitor C1, while the other part enters the filter sampling circuit composed of R1, R2, and C2.

[0030] In this embodiment, when the grounding grid is subjected to transient impacts such as lightning strikes, short-circuit faults, or switching operations, the primary current of the current transformer (CT) may increase rapidly in a short period of time, thereby generating a high-amplitude positive or negative transient overvoltage on the secondary side of the CT. When the voltage on the secondary side of the CT exceeds the clamping threshold of the bidirectional protection branch formed by D7 and D8, the Zener diode in the corresponding direction enters the reverse avalanche breakdown state, and the other Zener diode conducts in the forward direction, allowing the transient current to be discharged through the protection branch formed by D7 and D8, and limiting the voltage on the secondary side of the CT within a predetermined range.

[0031] In this embodiment, resistor R2 provides an auxiliary discharge path for transient current and prevents the CT secondary side from being in an open-circuit state when the subsequent circuit is disconnected or the energy storage capacitor is fully charged. Through the bidirectional voltage clamping effect of D7 and D8 and the impedance matching and discharge effect of R2, the overvoltage stress borne by the subsequent bridge rectifier diodes D1-D4, energy storage capacitor C1, filter sampling circuit, and comparator TS881ICT can be reduced, thereby improving the operational reliability of the diagnostic node in the complex electromagnetic environment of the grounding grid.

[0032] Furthermore, to improve the surge current carrying capacity of the protection unit, D7 and D8 can each be composed of multiple Zener diodes of the same type connected in parallel to form a forward clamping array and a reverse clamping array, respectively. The two clamping arrays are then connected in series in reverse and then in parallel to the secondary side of the CT. By sharing the surge current with multiple devices, the current stress and thermal stress borne by a single protection device can be reduced. As an optional implementation, the Zener diodes can also be replaced by transient voltage suppressor diodes (TVS) or varistors (MOV). The clamping voltage of the protection device should be higher than the maximum operating voltage corresponding to the normal power extraction and wake-up signal of the circuit, while being lower than the maximum input voltage allowed by the subsequent devices.

[0033] S102: The component of the secondary side induced current with a frequency higher than the cutoff frequency is filtered by a passive filter network and then input into a low-power comparator. The cutoff frequency is configured to be higher than the upper limit of the power frequency background interference in the grounding grid and lower than the lower limit of the frequency of the externally injected wake-up signal.

[0034] In one embodiment of this specification, the externally injected wake-up signal is a high-frequency sine wave signal with a frequency range of 1000Hz to 10000Hz, and the cutoff frequency of the passive filter network is between 500Hz and 1000Hz.

[0035] In one embodiment of this specification, the substation and tower grounding network are constantly exposed to 50Hz power frequency fundamental wave and its low-order harmonic interference, mainly manifested as the 3rd harmonic at 150Hz and the 5th harmonic at 250Hz. To effectively distinguish the wake-up signal from the background electromagnetic noise of the grounding network, a high-frequency sinusoidal carrier signal is used as the active wake-up source. On the other hand, high-frequency electromagnetic signals exhibit a significant skin effect when propagating in metallic grounding conductors, and their skin depth satisfies… ,in For frequency, The material's magnetic permeability, Let be the electrical conductivity. Therefore, for a perimeter of , C , length is L The high-frequency equivalent resistance of a grounded conductor can be characterized as When the injected wake-up signal frequency is too high, the skin depth of the conductor decreases sharply, leading to a significant increase in the high-frequency equivalent resistance. At this point, the high-frequency attenuation characteristics of the signal in the grounding conductor are exacerbated, severely limiting the effective transmission distance of the wake-up signal. Therefore, by combining the material parameters of the actual grounding conductor (such as conductivity and permeability) with the topology of the grounding grid, the above boundary constraint formula can accurately evaluate and establish a reasonable wake-up signal frequency range. For conventional substation grounding grid topologies and galvanized flat steel materials, the preferred frequency range for this wake-up signal is typically limited to between 1000Hz and 10000Hz.

[0036] S103: Compare the filtered signal voltage with the preset reference voltage. When the filtered signal voltage exceeds the preset reference voltage, the low-power comparator outputs a wake-up level, triggering the main control unit of the diagnostic node to switch from sleep state to working state.

[0037] In one embodiment of this specification, after the main control unit is woken up, it detects the voltage of the energy storage capacitor. When the voltage of the energy storage capacitor reaches a preset operating voltage threshold, it performs a diagnostic task. When the voltage of the energy storage capacitor is lower than the preset operating voltage threshold, it re-enters the sleep state. After the diagnostic task is completed, the main control unit re-enters the sleep state.

[0038] In one embodiment of this specification, the front end of the wake-up circuit consists of a resistor. R 2. R 1 and filter capacitor C The system consists of two components, whose output voltage amplitude and input current amplitude satisfy the following relationship: Its cutoff frequency satisfies Considering that the interference in the grounding grid is generally below 500Hz and the injected wake-up signal is above 1000Hz, a cutoff frequency of 500-1000Hz can be selected. At this point, the following conditions must be met: Two typical sets of values ​​are as follows: R 1= R 2 = 500Ω C 2 = 250nF, at which point the cutoff frequency is 636.62Hz; select R 1= R 2 = 1kΩ C 2 = 100nF, at which point the cutoff frequency is 795.77Hz. R 2. Simultaneously serving as both a filter resistor and a bleeder resistor, its resistance value directly affects the maximum voltage on the secondary side of the CT. ,when When the voltage is too high, the upper limit of the secondary side voltage is large, which is not conducive to the safety protection of the equipment. When the time is too short, a large amount of electrical energy passes through Discharge is detrimental to energy harvesting; therefore, The typical value ranges from 100Ω to 1000Ω. Figure 2 This document presents a schematic diagram illustrating the filtering effect of the wake-up circuit in a grounding grid scenario. Figure (a) shows the input current waveform before filtering; Figure (b) shows the response current waveform after filtering. The filtering effect under typical parameter values ​​is as follows: Figure 2 As shown in the figure, the blue curve represents the current waveform containing only stray interference, while the red curve represents the total current waveform after the stray current is superimposed on the signal current. The waveform comparison reveals that the original current before filtering is severely distorted due to stray interference. After processing by this filtering circuit, the stray interference components are significantly attenuated, the effective signal loss is small, and the signal-to-noise ratio of the output signal is significantly improved, which is beneficial for signal identification at the back end.

[0039] In this embodiment, by using the secondary current of the same current transformer in parallel in the frequency domain, the low-frequency component is used for energy extraction and the high-frequency component is used for wake-up, so that the wake-up operation does not require additional energy stored in the energy storage capacitor. At the same time, by sharing the load resistor, the energy extraction path and the wake-up path are at the same impedance reference point, eliminating the current distribution conflict caused by independent design. The low-frequency and high-frequency components in the same induced current are naturally divided to their respective functional paths according to their frequency domain characteristics, enabling low-interference coexistence of energy extraction and wake-up under the same current, thereby achieving a low-power design for the complex electromagnetic environment of the grounding grid.

[0040] In one embodiment of this specification, in addition to the sinusoidal signal wake-up method described above, the present invention also provides a pulse signal-based wake-up implementation method. This method is an optional alternative to the sinusoidal signal wake-up method and can be selected according to actual diagnostic needs. Figure 3 This manual provides a basic structural diagram of the pulse wake-up circuit in a grounding grid scenario, as shown below. Figure 3 As shown, inductors L1 and L2 are coupled inductors with mutual inductance, representing the primary and secondary sides of a Rogowski coil, respectively. The resistor... R 2 represents the high impedance between the primary and secondary sides of the Rogowski coil. Utilizing the rapidly changing edge characteristics of pulse signals, a transient induced voltage is generated through the induction coil, and low-power wake-up is achieved using peak detection. Its basic principle is based on the physical characteristics of the Rogowski coil; since the inductive output of the Rogowski coil obeys... Therefore, when the input pulse signal contains steep edges with high amplitude, a significant voltage spike is generated on the secondary side of the Rogowski coil. This voltage spike is transmitted through a low-dropout diode. D 1. Perform unidirectional rectification and input it into the capacitor. C Peak latching is performed on 1, and then the low-power comparator TS881ICT is used to compare the magnitude with the reference voltage Vset and trigger the wake-up signal. The comparison triggering logic of its back-end is consistent with the sine wave wake-up scheme.

[0041] In this embodiment, the common Rogowski coil mutual inductance is in the microhenry level (e.g., 2 microhenries), the stray current of the grounding grid is mainly at the power frequency, typically 50 Hz, and the amplitude is usually in the 1A level. The resulting secondary side induced voltage amplitude is only in the microvolt level (about 0.63 mV), which is far below the trigger threshold of the subsequent comparator. Thus, it naturally shields the false wake-up caused by conventional power grid fluctuations at the physical level. The pulse signal rise time is extremely short (up to the microsecond or nanosecond level), and according to the differential characteristics, it can generate transient voltage spikes with amplitudes up to the volt level. It has extremely high characteristic signal-to-noise ratio in both the time and frequency domains, so it can accurately distinguish and filter out the wake-up signal from strong power frequency stray interference.

[0042] In this embodiment, in the circuit, the resistor With capacitor A discharge circuit is constructed in parallel to discharge current, and the time constant of this circuit satisfies Because the propagation delay of the low-power comparator TS881ICT is 10 to 20 microseconds, in order to ensure that it has sufficient time to complete the state transition, R 3 and When selecting a time constant, it should be greater than or equal to 3 to 5 times the comparator propagation delay to provide a sufficiently wide pulse transition window. Considering... If the value is too small (e.g., at the pF level), it is easily overridden by parasitic capacitances on the circuit board, severely affecting the accuracy and stability of the time constant. This solution recommends a value of [value missing]. >1nF; Meanwhile, to maintain extremely low dynamic charging current and high input impedance, the resistor... R 3 should be matched with the capacitor so that the time constant R3* The voltage stabilizes at the 100 microsecond level. Based on the above principles, this circuit provides a set of typical values, namely the capacitor... =1nF, resistance R =3 = 100kΩ, corresponding to a time constant of 100 microseconds, which precisely ensures the correct and reliable triggering of the comparator TS881ICT. If other low-power comparators are used, the resistor and capacitor parameters can also be adjusted and selected according to the principles of this solution.

[0043] In this embodiment, the present invention employs a low-power operation mode that combines micro-power extraction, hardware comparison wake-up, and automatic sleep mode after task completion. When there are no diagnostic tasks, the backend main control unit, sensor acquisition unit, and communication unit enter a low-power sleep state as loads, with only the micro-power extraction rectification and storage circuit and the low-power comparison wake-up circuit remaining operational, thereby reducing the standby power consumption of the diagnostic node.

[0044] In this embodiment, under normal operating conditions, stray power frequency currents generated by factors such as three-phase imbalance, electromagnetic induction, and nonlinear loads exist in the grounding grid conductors for a long time. A current transformer (CT) is sleeved on the outside of the grounding grid conductors, coupling the stray power frequency currents in the grounding grid to the secondary side of the CT, thus forming... Figure 1 The secondary side induced current I2 is shown. This induced current is converted into DC power by a bridge rectifier circuit composed of diodes D1, D2, D3, and D4, and then charges the energy storage capacitor C1. The energy storage capacitor C1 stores the collected weak electromagnetic energy and provides the necessary power for the low-power comparator and the downstream load.

[0045] In this embodiment, during the micro-energy extraction process, resistor R2 is connected in parallel to the secondary side of the CT. On one hand, it serves as an impedance matching and bleedering resistor for the CT secondary side, preventing the CT secondary side from being in an open-circuit state when the downstream load is disconnected or the energy storage capacitor C1 has finished charging. On the other hand, R2, R1, and C2 together form a wake-up signal filtering network. Zener diodes D7 and D8 are connected in reverse series and then in parallel to the CT secondary side to clamp positive and negative transient overvoltages caused by lightning strikes, short-circuit faults, or switching operations, protecting the bridge rectifier circuit, energy storage capacitor C1, and the downstream wake-up detection circuit.

[0046] In this embodiment, when the system is in sleep mode and no valid wake-up signal is injected, the 50 Hz power frequency fundamental wave and low-order harmonic signals in the grounding grid are suppressed by the high-pass filter network composed of R1, R2 and C2. The filtered sampling voltage is lower than the reference voltage Vset of the comparator TS881ICT. At this time, the comparator output terminal signal remains in a non-wake-up state, and the back-end main control unit, sensor acquisition unit and communication unit continue to be in a low-power sleep state.

[0047] In this embodiment, when a grounding grid diagnostic task needs to be initiated, an external signal injection device injects a high-frequency sinusoidal wake-up signal of predetermined frequency and amplitude into the grounding grid conductor. This high-frequency wake-up signal is coupled to the secondary side via a CT, passes through a high-pass filter network composed of R1, R2, and C2, and is input to the low-power comparator TS881ICT via an isolation resistor R3. R3 limits the current entering the comparator input and reduces the impact of the back-end sampling circuit on the front-end filtering characteristics; diodes D5 and D6 clamp the comparator input voltage at upper and lower limits, keeping it within a safe input range.

[0048] In this embodiment, when the sampling voltage at the comparator input exceeds the reference voltage Vset, the low-power comparator TS881ICT undergoes a state flip, and its output signal generates a wake-up level. The signal output is connected to the external interrupt terminal, wake-up terminal, or power enable terminal of the back-end main control unit, thereby causing the main control unit, which is in a sleep state, to exit sleep and initiate the grounding grid defect diagnosis process.

[0049] In this embodiment, after the main control unit is woken up, it preferably first detects the voltage across the energy storage capacitor C1. When the voltage of the energy storage capacitor C1 reaches the preset operating voltage threshold, the main control unit activates the sensing acquisition, analog-to-digital conversion, and communication modules to perform grounding grid defect diagnosis and data transmission tasks. When the voltage of the energy storage capacitor C1 is lower than the preset operating voltage threshold, the main control unit does not activate the high-power sensing acquisition and communication modules and re-enters sleep mode to avoid repeated system resets or abnormal data acquisition caused by insufficient energy storage.

[0050] In this embodiment, after the diagnostic task is completed, the main control unit shuts down the sensors, analog-to-digital converter, and communication module, and re-enters a low-power sleep state. At this time, the CT micro-energy harvesting circuit continues to collect stray electromagnetic energy from the grounding grid and charge the energy storage capacitor C1, while the low-power comparator TS881ICT continues to monitor for the next valid wake-up signal. This forms a cyclical working process of "micro-energy harvesting and storage—low-power sleep—hardware signal wake-up—execution of diagnostic task—re-entering sleep".

[0051] In this embodiment, the present invention does not require the main control unit to run continuously, nor does it require a high-frequency timed wake-up method. It is kept online by a low-power comparator and uses a micro-power extraction loop to replenish the system with energy. This ensures that effective diagnostic signals can be identified in a timely manner, while reducing the average power consumption of the grounding grid diagnostic nodes and extending their long-term underground operation time.

[0052] When applying the design method for grounding grid diagnostic nodes provided in this manual, it is not necessary to follow the instructions provided. Figure 1 The steps shown are executed in sequence. The specific execution order of each step can be determined as needed, and this manual does not impose any restrictions on it.

[0053] The above describes the design method for grounding grid diagnostic nodes provided by one or more embodiments of this specification. Based on the same idea, this specification also provides corresponding grounding grid diagnostic node devices, such as... Figure 4 As shown.

[0054] Figure 4 This specification provides a schematic diagram of a grounding grid diagnostic node device, which includes: a current transformer (CT), a rectifier bridge (D1~D4), an energy storage capacitor (C1), a passive filter network, a low-power comparator (U1), and a main control unit (MCU). The current transformer (CT) is sleeved on the outside of the grounding grid conductor. The secondary output terminal of the current transformer (CT) is connected to the input terminal of the rectifier bridge (D1~D4) and the input terminal of the passive filter network, respectively. The output of the rectifier bridge (D1~D4) is connected to the energy storage capacitor (C1), and the energy storage capacitor (C1) is connected to the power supply terminal of the low-power comparator (U1). The output of the passive filter network is connected to the input of the low-power comparator (U1), and the output of the low-power comparator (U1) is connected to the wake-up terminal of the main control unit (MCU). The passive filter network is used to filter the components of the induced current output from the secondary side of the current transformer (CT) whose frequency is higher than the cutoff frequency. The rectifier bridge (D1~D4) is used to rectify the components of the induced current whose frequency is lower than the cutoff frequency and store them in the energy storage capacitor (C1). The low-power comparator (U1) is used to compare the filtered signal voltage with the preset reference voltage (Vset) and output a wake-up level to the main control unit (MCU) when it exceeds the preset reference voltage (Vset). The cutoff frequency is higher than the upper limit of the power frequency background interference in the grounding grid and lower than the lower limit of the frequency of the externally injected wake-up signal. The resistor in the passive filter network also serves as the discharge resistor on the secondary side of the current transformer (CT).

[0055] In one embodiment of this specification, the passive filter network includes a first resistor (R1), a second resistor (R2), and a filter capacitor (C2). The first resistor (R1) and the filter capacitor (C2) are connected in series and then connected in parallel with the second resistor (R2) at both ends of the secondary side of the current transformer (CT). The output end of the passive filter network is the connection node of the first resistor (R1) and the filter capacitor (C2).

[0056] In one embodiment of this specification, the device further includes an isolation current-limiting resistor (R3) connected between the output of the passive filter network and the input of the low-power comparator (U1).

[0057] In one embodiment of this specification, the device further includes an input clamping protection branch connected to the input of the low-power comparator (U1), which is composed of two diodes (D5, D6) connected in reverse series.

[0058] In one embodiment of this specification, the device further includes bidirectional transient voltage protection branches (D7, D8), which are connected in parallel to the secondary output terminal of the current transformer (CT). The bidirectional transient voltage protection branches (D7, D8) are in a high-resistance state under normal operating conditions and are turned on when the induced voltage on the secondary side exceeds the clamping threshold.

[0059] In one embodiment of this specification, the energy storage capacitor (C1) is also connected to the power supply terminal of the main control unit (MCU).

[0060] In one embodiment of this specification, after the main control unit (MCU) is woken up, it detects the voltage of the energy storage capacitor (C1). When the voltage of the energy storage capacitor (C1) reaches a preset operating voltage threshold, it performs a diagnostic task. When the voltage of the energy storage capacitor (C1) is lower than the preset operating voltage threshold, it re-enters the sleep state. After the diagnostic task is completed, the main control unit (MCU) re-enters the sleep state.

[0061] Specific limitations regarding the design device for grounding grid diagnostic nodes can be found in the design method limitations for grounding grid diagnostic nodes described above, and will not be repeated here. Each module in the aforementioned design device for grounding grid diagnostic nodes can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device in hardware form, or stored in the memory of a computer device in software form, so that the processor can call and execute the corresponding operations of each module.

[0062] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, storage, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, or optical storage, etc. Volatile memory can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM), etc.

[0063] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

Claims

1. A design method for a grounding grid diagnostic node, characterized in that, include: The stray current in the grounding grid is sensed by a current transformer sleeved on the outside of the grounding grid conductor and converted into a secondary induced current. The component of the secondary induced current with a frequency lower than the cutoff frequency is rectified and stored in an energy storage capacitor. The energy storage capacitor supplies power to the low-power comparator when the diagnostic node is in a dormant state. The component of the secondary side induced current with a frequency higher than the cutoff frequency is filtered by a passive filter network and then input into a low-power comparator. The cutoff frequency is configured to be higher than the upper limit of the power frequency background interference in the grounding grid and lower than the lower limit of the frequency of the externally injected wake-up signal. The filtered signal voltage is compared with a preset reference voltage. When the filtered signal voltage exceeds the preset reference voltage, the low-power comparator outputs a wake-up level, triggering the main control unit of the diagnostic node to switch from sleep mode to working mode.

2. The method as described in claim 1, characterized in that, After being woken up, the main control unit detects the voltage of the energy storage capacitor. When the voltage of the energy storage capacitor reaches the preset working voltage threshold, it performs a diagnostic task. When the voltage of the energy storage capacitor is lower than the preset working voltage threshold, it re-enters the sleep state. After the diagnostic task is completed, the main control unit re-enters the sleep state.

3. The method as described in claim 1, characterized in that, The externally injected wake-up signal is a high-frequency sine wave signal with a frequency range of 1000Hz to 10000Hz, and the cutoff frequency of the passive filter network is between 500Hz and 1000Hz.

4. A grounding grid diagnostic node device according to the design method of the grounding grid diagnostic node according to any one of claims 1-3, characterized in that, It includes current transformers, rectifier bridges, energy storage capacitors, passive filter networks, low-power comparators, and main control units; The current transformer is sleeved on the outside of the grounding grid conductor, and the secondary output terminal of the current transformer is connected to the input terminal of the rectifier bridge and the input terminal of the passive filter network, respectively. The output terminal of the rectifier bridge is connected to the energy storage capacitor, and the energy storage capacitor is connected to the power supply terminal of the low-power comparator. The output of the passive filter network is connected to the input of the low-power comparator, and the output of the low-power comparator is connected to the wake-up terminal of the main control unit. The passive filter network is used to filter the component of the induced current output from the secondary side of the current transformer whose frequency is higher than the cutoff frequency. The rectifier bridge is used to rectify the component of the induced current whose frequency is lower than the cutoff frequency and store it in the energy storage capacitor. The low-power comparator is used to compare the filtered signal voltage with a preset reference voltage and output a wake-up level to the main control unit when the voltage exceeds the preset reference voltage. The cutoff frequency is higher than the upper limit of the power frequency background interference in the grounding grid and lower than the lower limit of the frequency of the externally injected wake-up signal. The resistor in the passive filter network also serves as the discharge resistor on the secondary side of the current transformer.

5. The apparatus as described in claim 4, characterized in that, The passive filter network includes a first resistor, a second resistor, and a filter capacitor. The first resistor and the filter capacitor are connected in series and then connected in parallel with the second resistor to the two ends of the secondary side of the current transformer. The output end of the passive filter network is the connection node of the first resistor and the filter capacitor.

6. The apparatus as claimed in claim 4, characterized in that, The device also includes an isolation current-limiting resistor connected between the output of the passive filter network and the input of the low-power comparator.

7. The apparatus as claimed in claim 4, characterized in that, The device also includes an input clamping protection branch, which is connected to the input of the low-power comparator and is composed of two diodes connected in reverse series.

8. The apparatus as claimed in claim 4, characterized in that, The device also includes a bidirectional transient voltage protection branch, which is connected in parallel to the secondary output terminal of the current transformer. The bidirectional transient voltage protection branch is in a high-resistance state under normal operating conditions and is turned on when the induced voltage on the secondary side exceeds the clamping threshold.

9. The apparatus as claimed in claim 4, characterized in that, The energy storage capacitor is also connected to the power supply terminal of the main control unit.

10. The apparatus as claimed in claim 4, characterized in that, After being woken up, the main control unit detects the voltage of the energy storage capacitor. When the voltage of the energy storage capacitor reaches a preset working voltage threshold, a diagnostic task is executed. When the voltage of the energy storage capacitor is lower than the preset working voltage threshold, it re-enters the sleep state. After the diagnostic task is completed, the main control unit re-enters the sleep state.