Multi-stage high-pressure powder airflow conveying control method and system for fried dough stick production line

By combining segmented cooling of a multi-stage high-pressure powder pneumatic conveying system with a rotary feeder, the problem of uneven flour temperature and moisture content within batches in the fried dough stick production line was solved. This achieved stability of flour entering the machine and efficient operation of the cooling system, thereby improving the quality and production efficiency of the fried dough sticks.

CN123100679APending Publication Date: 2026-11-17SHANDONG GUANZHENXUAN FOOD TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611603808.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing multi-stage high-pressure powder pneumatic conveying system of the raw dough production line for fried dough sticks has the problem of uneven flour temperature and moisture content within batches, resulting in unstable quality of fried dough sticks. In addition, the cooling system is prone to condensation or waste of cooling capacity in high humidity environments.

Method used

A multi-stage high-pressure powder pneumatic conveying system is adopted, which combines segmented cooling through a closed heat exchange cooling channel with a rotary feeder, along with online sensors and intelligent control, to achieve real-time monitoring and adjustment of flour temperature and moisture content. The powder column sliding friction is used to peel off the powder layer adhering to the wall surface, avoiding secondary dust.

Benefits of technology

It achieves stable control of the temperature and moisture content of flour when it enters the machine, reduces fluctuations in the quality of fried dough sticks, lowers the energy consumption and maintenance frequency of the cooling system, and improves the stability and efficiency of production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123100679A_ABST
    Figure CN123100679A_ABST
Patent Text Reader

Abstract

This invention relates to the field of powder pneumatic conveying control technology, particularly a multi-stage high-pressure powder pneumatic conveying control method and system for a fried dough stick production line. The method includes: pushing flour towards the cooling channel to maintain a dilute phase conveying state; the flour flowing through a closed heat exchange cooling channel; collecting workshop temperature and humidity data, adjusting the wall temperature of the closed heat exchange cooling channel to be higher than the dew point and maintaining a margin; measuring the incoming flour temperature and moisture content; adjusting the water supply temperature and flow rate; adjusting the water addition and saline-alkali water concentration in the dough mixer; simultaneously collecting the dough temperature at the dough mixer outlet, and correcting the target powder temperature range based on the collected dough temperature; and feeding the powder into the dough mixer to form dough. This solution uses temperature and moisture sensors at the cooling channel outlet transfer section to measure the incoming flour temperature and moisture content, and synchronously adjusts the cooling capacity, water addition, and dough mixing water temperature using the dew point of the air inside the pipe as the central point, ensuring that the flour temperature and moisture content upon entering the machine are stable within a narrow range matching the workshop air dew point.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of powder pneumatic conveying control technology, and in particular to a multi-stage high-pressure powder pneumatic conveying control method and system for a fried dough stick production line. Background Technology

[0002] The preparation of fried dough sticks uses medium-gluten flour as the main raw material, and involves kneading, proofing, stacking, and frying. The kneading process follows low-temperature quality control requirements; if the flour temperature is too high when it enters the machine, it will accelerate the softening of gluten proteins and the oxidation of fats, resulting in a decrease in air-holding capacity and an increase in oil absorption during frying. The industry-standard powder conveying chain involves unloading the powder from bulk tank trucks at the plant, pneumatically conveying it to a vertical storage silo via onboard compressed air, and then pushing it to the kneading section of the workshop by a Roots high-pressure blower. The multi-stage high-pressure airflow carries the powder at high speed, and the frictional heat and compression heat accumulate continuously, causing the powder temperature to rise significantly.

[0003] To meet the low-temperature requirements of dough kneading, existing technologies generally incorporate post-temperature control measures such as ice water preparation, manual ice addition, and whole-area cooling in the dough kneading process, along with dedicated ice-making and ice-adding processes. Some production lines have water-cooled jackets installed on the powder conveying pipes, with chillers supplying water at a constant temperature to cool the pipe walls. Online monitoring uses single-point temperature and moisture sensors at the cooling channel outlet to determine the powder temperature and moisture content based on the average readings.

[0004] However, the above-mentioned constant refrigeration plus single-point monitoring at the outlet has the following shortcomings in actual production:

[0005] Firstly, the pulse exhaust of the Roots high-pressure blower causes the powder flow to be in a slug flow pattern in the powder conveying pipe. The powder column and the air plug alternately pass through the cooling channel, resulting in batch-to-batch unevenness in temperature, particle size distribution, and air content of the flour entering the dough mixer. The short proofing and instant frying process of the fried dough sticks means that the time required for homogenization of the gluten network is shorter than the digestion cycle of batch-to-batch unevenness. Batch-to-batch unevenness is directly manifested in the dispersion of the fluffiness and oil absorption rate of the fried dough sticks in the same batch.

[0006] Secondly, the water-cooling jacket lowers the flour temperature below the dew point of the workshop air. In the hot and humid workshop environment in summer, the temperature difference between the flour temperature and the air dew point causes the flour to continuously absorb moisture as it is transferred from the cooling channel to the dough mixer in the warm and humid air of the workshop. The existing moisture measuring point is located at the outlet of the cooling channel, which measures the dry moisture content in the channel, not the actual value at the inlet of the dough mixer. The operator adjusts the amount of water added based on experience to compensate for this increase, and the compensation level varies from shift to shift. After this moisture absorption increase is added to the flour's own moisture content, it causes the dough to deviate from the symmetrical window required by the salt and alkali water stacking process. If it is too high, the two pieces of dough will stick together and cannot be separated; if it is too low, the two pieces of dough will not separate into a hollow shape.

[0007] Based on this, a multi-stage high-pressure powder airflow conveying control method for a fried dough stick production line was designed. This method coordinates the homogenization within the slug flow batch and the moisture absorption compensation outside the channel, which is necessary in actual production control. Summary of the Invention

[0008] To solve one of the above-mentioned technical problems, the technical solution adopted by this invention is as follows: This invention provides a multi-stage high-pressure powder airflow conveying and control method for a fried dough stick raw material production line. This method relies on a multi-stage high-pressure powder airflow conveying system for the fried dough stick raw material production line. The system includes a vertical storage silo, a Roots high-pressure blower, a closed heat exchange cooling channel, a cyclone separator, a rotary feeder, and a dough mixer arranged sequentially along the flour conveying direction. The closed heat exchange cooling channel consists of a cooling space located in the center and an annular space arranged around the cooling space. The annular space of the closed heat exchange cooling channel is divided into a front strong cooling section and a rear fine adjustment section along the powder flow direction by a partition.

[0009] Specifically, the present invention also provides a multi-stage high-pressure powder pneumatic conveying system for a dough stick production line, comprising a vertical storage silo, a Roots high-pressure blower, a sealed heat exchange cooling channel, a cyclone separator, a rotary feeder, and a dough mixer arranged sequentially along the flour conveying direction; the sealed heat exchange cooling channel includes a cooling space at the center and an annular space surrounding it, both ends of the cooling space and the annular space are sealed by end caps, and the center of each end cap is provided with a reserved hole for the corresponding powder conveying pipe to move through and pass through in a sealed manner; the annular space is divided into a front strong cooling section and a rear fine-tuning section along the powder flow direction; the vertical storage silo is vertically installed at the front end, with a feed inlet at its top, and a feed temperature sensor is installed at the feed inlet; the discharge port at the bottom of the vertical storage silo is connected to the inlet of the Roots high-pressure blower through a powder conveying pipe, and the outlet of the Roots high-pressure blower is connected to the sealed heat exchange cooling channel through the powder conveying pipe.

[0010] The outlet of the Roots high-pressure blower is connected to the inlet of the cooling space via a powder conveying pipeline.

[0011] The cooling space outlet of the enclosed heat exchange cooling channel is connected to the inlet of the cyclone separator via a powder conveying pipeline. An exhaust port is opened at the top of the cyclone separator, and the coarse powder outlet at the bottom is connected to the central feed zone of the rotary feeder via a pipeline, while the fine powder outlet on the side wall is connected to the edge feed zone of the rotary feeder via a pipeline.

[0012] The rotary feeder outlet is connected to the dough mixer's inlet via a transfer pipe. An inlet powder temperature sensor and a microwave transmission-type online moisture meter are installed on the transfer pipe to measure the inlet powder temperature and moisture content. The dough mixer's top is connected to a water supply line and a salt-alkali water supply line. A dough temperature sensor is installed at the dough mixer's outlet, and a current sensor is installed in the motor circuit of the dough mixer.

[0013] Low-temperature cooling water is introduced into the front-end strong cooling section, with the water flow direction opposite to the powder flow direction, arranged in a counter-current arrangement. The cooling water enters the front-end strong cooling section from the side near the rear fine-tuning section and exits from the side near the Roots high-pressure blower. Higher-temperature cooling water is introduced into the rear fine-tuning section, with the water flow direction the same as the powder flow direction, arranged in a co-current arrangement. The cooling water enters the rear fine-tuning section from the side near the front-end strong cooling section and exits from the side near the cyclone separator. Both the low-temperature and higher-temperature cooling water are supplied by external refrigeration units.

[0014] The length of the front-end strong cooling section accounts for 60% to 70% of the total length of the cooling channel, while the length of the rear fine-tuning section accounts for 30% to 40% of the total length of the cooling channel.

[0015] At the junction of the front-end strong cooling section and the rear-end fine-tuning section, there is a dry air supply interface for connecting to the interior of the cooling space. The temperature difference between the supplied air and the powder flow temperature at the front-end outlet does not exceed ±2℃, and the dew point of the supplied air is more than 5℃ lower than the dew point of the workshop air.

[0016] A pressure sensor is installed on the powder conveying pipeline between the outlet of the Roots high-pressure blower and the inlet of the closed heat exchange cooling channel to detect pulsation signals inside the pipe.

[0017] Temperature and relative humidity sensors are installed in the workshop to collect ambient temperature and relative humidity data.

[0018] The inner wall of the cooling space of the closed heat exchange cooling channel is coated with a polytetrafluoroethylene coating with a thickness of 0.1 to 0.3 mm, and several wall temperature sensors are arranged along the wall.

[0019] The flour flows as follows: it exits from the bottom of the vertical storage silo, is pressurized by a Roots high-pressure blower, and then enters the cooling space of the closed heat exchange cooling channel to complete segmented cooling from front to back. It then undergoes gas-solid separation by a cyclone separator and is graded according to particle size. Subsequently, it is evenly fed by a rotary feeder, and after online detection in the transfer section, it is sent to the dough mixer to be mixed with dough water and salt-alkali water to form dough.

[0020] The multi-stage high-pressure powder pneumatic conveying control method for the fried dough stick production line includes the following steps: Step 1, storage silo discharge and high-pressure pneumatic conveying: the bottom of the vertical storage silo discharges the flour, which is then pushed to the cooling channel by a Roots high-pressure blower in a pneumatic conveying manner, so that the flour is kept in a dilute phase conveying state.

[0021] The second step is segmented gradient cooling and air replenishment for speed stabilization: the flour flows through a closed heat exchange cooling channel, which is divided into a front strong cooling section and a rear fine-tuning section along the flour flow direction. Low-temperature cooling water is introduced into the front section and higher-temperature cooling water is introduced into the rear section. Then, dry air is replenished according to the air temperature difference between the inlet and outlet of the cooling space to maintain a stable flour conveying speed and prevent flour from settling.

[0022] The third step is slug flow identification and air-powder replacement: A pressure sensor is installed on the powder conveying pipeline between the Roots high-pressure blower and the closed heat exchange cooling channel to detect the pulsation signal inside the pipe and identify the intensity of the slug flow according to the pulsation frequency and amplitude; accordingly, the rotor speed inside the rotary feeder is adjusted to shear the incoming slug flow and replace the air between the powder particles; at the same time, the downstream water supply temperature is adjusted according to the intensity of the slug flow.

[0023] The fourth step is to follow the wall temperature and dew point: collect the temperature and humidity of the workshop, calculate the dew point of the air inside the pipe, and adjust the wall temperature of the closed heat exchange cooling channel to be higher than the dew point and maintain a margin.

[0024] Step 5: Online monitoring at the input end: Temperature and moisture sensors are installed at the transfer section from the outlet of the sealed heat exchange cooling channel to the feed inlet of the dough mixer to measure the temperature and moisture content of the powder entering the machine.

[0025] Step 6, Adjusting the cooling capacity: Based on the dew point of the air inside the pipe and the temperature rise of the dough mixing machinery calculated by the motor current of the dough mixer, calculate the target powder temperature range; based on the comparison between the measured value of the powder temperature entering the machine and the target powder temperature range, adjust the water supply temperature and flow rate of the refrigeration unit.

[0026] Step 7, Dough Compensation and Feedback: Adjust the amount of water added to the dough mixer and the concentration of salt and alkali water according to the deviation between the moisture content of the dough entering the machine and the symmetrical window of the salt and alkali water stack; at the same time, collect the dough temperature at the outlet of the dough mixer and correct the target flour temperature range according to the collected dough temperature.

[0027] Step 8, feeding and start / stop purging: The homogenized powder is fed into the dough mixer and mixed with the dough water and salt water to form dough; when stopping the machine, first cut off the cooling water supply, and then introduce dry air to purge the channels inside the cooling space; when starting the machine, first introduce dry air to warm the walls, and then feed the powder.

[0028] Preferably, the third step specifically includes the following steps: (1) continuously acquiring the pressure signal inside the tube at a sampling rate of not less than 100Hz.

[0029] (2) The collected pressure signal is filtered in the time domain to remove the high-frequency noise generated by the pipeline vibration and extract the main frequency component and peak-to-peak value of the pressure fluctuation.

[0030] (3) When the main frequency is not higher than 10Hz and the ratio of peak value to average pressure in the pipe is not lower than 5%, it is determined to be a slug flow condition; when the main frequency is higher than 10Hz, or the ratio of peak value to average pressure is lower than 5%, it is determined to be a dilute phase condition.

[0031] (4) Under the slug flow condition, the rotor speed of the rotary feeder is increased to 130% to 150% of the base speed. The rotor blades shear the edge of the incoming powder column, and the main body of the powder column is retained and continuously pushed along the pipeline.

[0032] (5) Under slug flow conditions, the water supply temperature of the downstream fine-tuning section is reduced by 2 to 5°C compared with the basic setting value; under dilute phase conditions, the rotor speed drops back to the basic speed and the water supply temperature of the downstream section rises back to the basic setting value.

[0033] (6) The powder column body advances along the wall and carries away the powder layer attached to the wall. The peeled powder layer enters the rotary feeder along with the powder column.

[0034] Preferably, the specific steps of the second step include: (1) front-end strong cooling: low-temperature cooling water and powder flow exchange heat in countercurrent, and the length of the front section accounts for 60% to 70% of the total length of the cooling channel.

[0035] (2) A temperature sensor is installed at the front outlet to measure the flour temperature and confirm that it drops to 3-5°C above the dew point of the workshop air.

[0036] (3) Rear section fine adjustment: Cooling water with a temperature 8-15°C higher than the front section water supply is introduced. The cooling water and powder flow exchange heat in the same direction. The length of the rear section accounts for 30%-40% of the total length of the cooling channel.

[0037] (4) Based on the slug flow intensity change cycle identified in the third step, increase the downstream cooling water flow rate in advance during the gas slug period before the powder column arrives to pre-cool the wall surface; maintain the basic cooling water flow rate when the powder column passes through the downstream section.

[0038] (5) Dry air is added at the junction of the front and rear sections. The temperature difference between the added air and the outlet powder flow temperature of the front section shall not exceed ±2℃. The dew point of the added air shall be more than 5℃ lower than the dew point of the workshop air.

[0039] (6) The ratio of cooling water mass flow rate to flour mass flow rate is 1:1 to 3:1.

[0040] Preferably, the specific steps of the fourth step include: (1) continuously collecting ambient temperature and relative humidity through workshop temperature sensor and humidity sensor.

[0041] (2) Calculate the dew point temperature of the air inside the pipe from the ambient temperature and relative humidity according to the Antoni equation.

[0042] (3) Generate the wall temperature setpoint by adding a margin value to the dew point temperature, with a basic margin value of 2 to 5℃.

[0043] (4) When the relative humidity of the workshop is not lower than 70%, the margin value is increased to 5-8℃; when the relative humidity is lower than 60%, the margin value is decreased to 1-3℃.

[0044] (5) The wall temperature is measured by a temperature sensor attached to the wall and fed back to the refrigeration unit so that the deviation between the wall temperature and the set value does not exceed ±1℃.

[0045] (6) When the temperature change rate of the workshop environment exceeds 2℃ / min, repeat step (2) to update the dew point temperature and wall temperature settings.

[0046] Preferably, the sixth step includes the following steps: (1) obtaining the dew point temperature of the air inside the pipe calculated in the fourth step.

[0047] (2) Determine the load rate based on the ratio of the motor current to the rated current of the dough mixer, and calculate the temperature rise of the dough due to mechanical friction by combining the actual output power of the motor calculated based on the load rate and the dough mixing time.

[0048] (3) The lower limit of the target powder temperature range is 2℃ above the dew point temperature, and the upper limit is 6℃ above the dew point temperature.

[0049] (4) Compare the measured powder temperature in the fifth step with the target range: if the measured value is lower than the lower limit, increase the water supply temperature of the chiller unit or reduce the cooling water flow rate; if the measured value is higher than the upper limit, decrease the water supply temperature or increase the cooling water flow rate. The adjustment step should not exceed 1℃ / min.

[0050] (5) When the motor current of the dough mixer exceeds 110% of the rated current and the duration exceeds 30s, the target powder temperature range will be lowered by 1 to 2℃.

[0051] (6) When the dough temperature collected in step 7 is higher than 28℃, the target powder temperature range is shifted down by 1 to 2℃; when the dough temperature is lower than 22℃, the target powder temperature range is shifted up by 1 to 2℃.

[0052] Preferably, the specific steps of the seventh step include: (1) using 48% to 52% as the basic range of the symmetrical window of the salt-alkali water stacking.

[0053] (2) During the dough mixing stage, 30% to 50% of the total amount of salt and alkali water is pre-added to the dough mixer, and the remaining 50% to 70% is added during the stacking process.

[0054] (3) Adjust the water temperature for kneading dough according to the temperature of the powder entering the machine in the fifth step: when the powder temperature entering the machine is higher than 28℃, the water temperature for kneading dough is set to 0~2℃; when the powder temperature entering the machine is lower than 24℃, it is set to 5~10℃; and when it is between the two, it is set to 2~5℃.

[0055] (4) Compare the moisture content of the dough into the machine with the window: when it is below 48%, increase the amount of water added to the dough mixer linearly according to the deviation; when it is above 52%, decrease the amount of water added linearly according to the deviation. The single adjustment step should not exceed 0.5% of the flour mass.

[0056] (5) After each adjustment, wait for the dough mixer to complete one mixing cycle before making the next adjustment.

[0057] (6) Collect the dough temperature at the outlet of the dough mixer: When the dough temperature is higher than 28℃, increase the total mass concentration of sodium carbonate and sodium bicarbonate in the saline solution (based on the total mass of the dough) by 0.2% to 0.5% on the basis of 0.5% to 1.5%; when the dough temperature is lower than 22℃, decrease it by 0.2% to 0.5%; so that the dough temperature is controlled at 24 to 28℃.

[0058] Preferably, the specific steps of the eighth step include: (1) when shutting down, first cut off the cooling output of the external refrigeration unit.

[0059] (2) Keep the Roots high-pressure blower running at low speed so that the workshop air flows through the wall of the cooling space of the cooling channel. The residual cold energy of the wall is used to cool the air to below the dew point. After the air precipitates moisture, it forms dry air, which is then blown across the channel wall.

[0060] (3) After the wall temperature is measured by the wall temperature sensor and confirmed to rise to 3°C above the dew point of the workshop air, the Roots high-pressure blower is stopped.

[0061] (4) When starting the machine, first introduce dry air to warm the wall: warm the wall for 5 minutes when the interval between shutdowns is no more than 30 minutes; warm the wall for 5 to 15 minutes when the interval between shutdowns is between 30 minutes and 2 hours; warm the wall for 15 to 20 minutes when the interval between shutdowns exceeds 2 hours.

[0062] (5) After confirming that the wall temperature is stable at 3°C ​​above the dew point of the workshop air, start the refrigeration unit and begin feeding powder.

[0063] Preferably, the seventh step also includes the following steps: (1) Recording the dough mixing time when the motor current of the dough mixer reaches the rated current.

[0064] (2) When the duration is shorter than the baseline duration, it is determined that the water absorption rate of the batch of flour is too high, and the lower limit of the window is raised to 49% and the upper limit is raised to 53%.

[0065] (3) When the duration is longer than the baseline duration, it is determined that the water absorption rate of the batch of flour is too low, and the lower limit of the window is lowered to 47% and the upper limit is lowered to 51%.

[0066] (4) Adjust the water volume according to the updated window.

[0067] Preferably, in the second step: the cooling contraction rate is calculated based on the temperature difference between the inlet and outlet air of the cooling channel, and the air supply volume is corrected according to the measured value of the wall temperature, so that the air velocity at the outlet of the cooling channel is maintained at 15-18 m / s, where 15 m / s is the lower limit of the non-settling air velocity for horizontal conveying of flour, and the dew point of the replenished dry air is more than 5°C lower than the dew point of the workshop air.

[0068] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0069] First, this solution sets up temperature and moisture sensors at the cooling channel outlet transfer section to measure the temperature and moisture content of the incoming flour. It also uses the dew point of the air inside the pipe as the central point to synchronously adjust the cooling capacity, water addition, and the temperature of the water used for kneading. This keeps the temperature and moisture content of the flour entering the machine within a narrow range that matches the dew point of the workshop air, avoiding the problem of operators repeatedly adjusting the amount of water based on experience in the existing technology. The temperature fluctuation range of the dough exiting the machine is narrowed, and the expansion rate of fried dough sticks is stable.

[0070] Secondly, this solution does not break up the powder column after identifying the slug flow. Instead, it keeps the main body of the powder column and continuously advances it along the inner wall of the cooling channel. It uses the sliding friction between the powder column and the wall to peel off the powder layer attached to the wall as a whole. At the same time, the rotating feeder rotor only shears the loose powder at the edge of the powder column, without generating secondary dust. This avoids the problem of fine powder particles re-attaching to the wall and accumulating into a hardened powder layer due to the high-speed dispersal of the powder column in the existing technology. The effective cross-sectional area of ​​the pipeline remains stable in the long term, and the slug flow morphology no longer deteriorates due to powder accumulation on the wall.

[0071] Third, this solution uses the Antoine equation to calculate the dew point of the air inside the pipe in real time. The wall temperature setpoint is dynamically adjusted according to the dew point, and the margin value changes with the relative humidity. In extreme winter and summer conditions, the margin is further narrowed or widened, so that the wall temperature of the cooling channel is higher than the dew point in any season to prevent condensation, but does not deviate too much from the dew point to cause waste of cooling capacity. This overcomes the two-way defect of the existing technology, which has a fixed cooling water temperature, resulting in condensation on the wall in the high humidity season of summer and excessive cooling capacity in the dry season of winter.

[0072] Fourth, when the machine is shut down, the residual cold energy on the cooling channel wall will automatically separate the workshop air into dry air to blow on the wall, eliminating the need for an external dry air source and avoiding the problem of secondary pollution of the wall caused by the oil and water in the external compressed air. When the machine is started, the wall is warmed in stages according to the shutdown interval, and the powder is introduced only after confirming that the wall temperature is higher than the dew point to prevent the flour from condensing and clumping when it comes into contact with the cold wall at the moment of startup. When switching batches, the fan is kept running to vent the residual flour and the cooling channel is kept running, avoiding the wall re-cooling process caused by stopping and restarting. The polytetrafluoroethylene coating on the inner wall of the pipe, combined with the self-cleaning effect of the powder column, further reduces the frequency of manual cleaning. Attached Figure Description

[0073] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. In all the drawings, similar elements or components are generally identified by similar reference numerals. In the drawings, the elements or components are not necessarily drawn to scale.

[0074] Figure 1 This is a process flow diagram of the multi-stage high-pressure powder airflow conveying and control method for the dough stick production line of the present invention.

[0075] Figure 2 This is a schematic diagram of the multi-stage high-pressure powder airflow conveying system for the dough stick production line of the present invention.

[0076] In the diagram: 1. Vertical storage silo; 2. Roots high-pressure blower; 3. Sealed heat exchange and cooling channel; 301. Cooling space; 302. Front-end strong cooling section; 303. Rear-end fine-tuning section; 4. Cyclone separator; 5. Rotary feeder; 6. Dough mixer; 7. Feed temperature sensor; 8. Powder conveying pipeline; 9. Transfer pipeline; 10. Online moisture meter; 11. Dough mixing water pipeline; 12. Salt and alkali water pipeline; 13. Make-up drying air interface; 14. Pressure sensor; 15. Wall temperature sensor. Detailed Implementation

[0077] The embodiments of the technical solution of the present invention will now be described in detail with reference to the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore merely examples and should not be used to limit the scope of protection of the present invention. The specific structure of the present invention is as follows: Figures 1-2 As shown in the image.

[0078] Example 1: This example provides a multi-stage high-pressure powder pneumatic conveying control method for a fried dough stick raw material production line. This method relies on the multi-stage high-pressure powder pneumatic conveying system of the fried dough stick raw material production line. The system includes a vertical storage silo 1, a Roots high-pressure blower 2, a closed heat exchange cooling channel 3, a cyclone separator 4, a rotary feeder 5, and a dough mixer 6 arranged sequentially along the flour conveying direction. The closed heat exchange cooling channel 3 consists of a cooling space 301 located in the center and an annular space arranged around the cooling space 301. The annular space of the closed heat exchange cooling channel 3 is divided into a front strong cooling section 302 and a rear fine adjustment section along the powder flow direction.

[0079] The vertical storage silo 1 is installed vertically at the front end, with a feed inlet at its top and a feed temperature sensor 7 installed at the inlet. The discharge outlet at the bottom of the vertical storage silo 1 is connected to the inlet of the Roots high-pressure blower 2 via a powder conveying pipe 8, and the outlet of the Roots high-pressure blower 2 is connected to the sealed heat exchange and cooling channel 3 via the powder conveying pipe 8.

[0080] The outlet of the Roots high-pressure blower 2 is connected to the inlet of the cooling space 301 via the powder conveying pipe 8.

[0081] The outlet of the cooling space 301 of the closed heat exchange cooling channel 3 is connected to the inlet of the cyclone separator 4 via the powder conveying pipe 8. The top of the cyclone separator 4 has an exhaust port, the bottom coarse powder outlet is connected to the central feed area of ​​the rotary feeder 5 via a pipe, and the side wall fine powder outlet is connected to the edge feed area of ​​the rotary feeder 5 via a pipe.

[0082] The rotary feeder 5 outlet is connected to the feed inlet of the dough mixer 6 via a transfer pipe 9. An inlet powder temperature sensor and a microwave transmission type online moisture meter 10 are installed on the transfer pipe 9 to measure the inlet powder temperature and moisture content. The dough mixer 6 is connected to a dough mixing water pipe 11 and a salt-alkali water pipe 12 at its top. A dough temperature sensor is installed at the outlet of the dough mixer 6, and a current sensor is installed in the motor circuit of the dough mixer 6.

[0083] Low-temperature cooling water is introduced into the front-end strong cooling section 302. The water flow direction is opposite to the powder flow direction and is arranged in a counter-current manner. The cooling water enters the front-end strong cooling section 302 from the side near the rear fine-tuning section and exits from the side near the Roots high-pressure blower 2. Higher-temperature cooling water is introduced into the rear fine-tuning section. The water flow direction is the same as the powder flow direction and is arranged in a co-current manner. The cooling water enters the rear fine-tuning section from the side near the front-end strong cooling section 302 and exits from the side near the cyclone separator 4. Both the low-temperature cooling water and the higher-temperature cooling water are supplied by external refrigeration units.

[0084] The length of the front-end strong cooling section 302 accounts for 60% to 70% of the total length of the cooling channel, while the length of the rear fine-tuning section accounts for 30% to 40% of the total length of the cooling channel.

[0085] At the junction of the front-end strong cooling section 302 and the rear-end fine-tuning section, there is a dry air supply interface 13 for connecting to the interior of the cooling space 301. The temperature difference between the supplied air and the front-end outlet powder flow temperature does not exceed ±2℃, and the dew point of the supplied air is more than 5℃ lower than the dew point of the workshop air.

[0086] A pressure sensor 14 is installed on the powder conveying pipe 8 between the outlet of the Roots high-pressure blower 2 and the inlet of the closed heat exchange cooling channel 3 to detect the pulsation signal inside the pipe.

[0087] Temperature and relative humidity sensors are installed in the workshop to collect ambient temperature and relative humidity data.

[0088] The inner wall of the cooling space 301 of the closed heat exchange cooling channel 3 is coated with a polytetrafluoroethylene coating with a thickness of 0.1 to 0.3 mm, and several wall temperature sensors 15 are arranged along the wall.

[0089] The flour flows as follows: it exits from the bottom of the vertical storage silo 1, is pressurized by the Roots high-pressure blower 2, and then enters the cooling space 301 of the closed heat exchange cooling channel 3 to complete segmented cooling from front to back. It then undergoes gas-solid separation and is graded according to particle size by the cyclone separator 4. Subsequently, it is evenly fed by the rotary feeder 5, and after online detection in the transfer section, it is sent to the dough mixer 6 to be mixed with the dough water and salt-alkali water to form dough.

[0090] The multi-stage high-pressure powder pneumatic conveying control method for the fried dough stick production line includes the following steps: Step 1, storage silo discharge and high-pressure pneumatic conveying: the bottom of the vertical storage silo 1 discharges the flour, which is then pushed to the cooling channel direction by the Roots high-pressure blower 2 in a pneumatic conveying manner, so that the flour is kept in a dilute phase conveying state.

[0091] The second step is segmented gradient cooling and air replenishment for speed stabilization: the flour flows through the closed heat exchange cooling channel 3, which is divided into a front strong cooling section 302 and a rear fine adjustment section along the flour flow direction. Low-temperature cooling water is introduced into the front section and higher-temperature cooling water is introduced into the rear section. Then, dry air is replenished according to the air temperature difference between the inlet and outlet of the cooling space 301 to maintain a stable flour conveying speed and prevent flour from settling.

[0092] The third step is slug flow identification and air-powder replacement: A pressure sensor 14 is installed on the powder conveying pipeline between the Roots high-pressure blower 2 and the closed heat exchange cooling channel 3 to detect the pulsation signal in the pipeline and identify the intensity of the slug flow according to the pulsation frequency and amplitude; accordingly, the rotor speed inside the rotary feeder 5 is adjusted to shear the incoming slug flow and replace the air between the powder particles; at the same time, the downstream water supply temperature is adjusted according to the intensity of the slug flow.

[0093] The fourth step is to follow the wall temperature and dew point: collect the temperature and humidity of the workshop, calculate the dew point of the air inside the pipe, and adjust the wall temperature of the sealed heat exchange cooling channel 3 to be higher than the dew point and maintain a margin.

[0094] Step 5, online monitoring at the input end: Temperature and moisture sensors are installed in the transfer section from the outlet of the sealed heat exchange cooling channel 3 to the feed inlet of the dough mixer 6 to measure the temperature and moisture content of the powder entering the machine.

[0095] Step 6, Adjust the cooling capacity accordingly: Calculate the target powder temperature range based on the dew point of the air inside the pipe and the mechanical friction temperature rise of the dough mixing machine calculated by the current of motor 6 of the dough mixer; adjust the water supply temperature and flow rate of the refrigeration unit based on the comparison between the measured value of the powder temperature entering the machine and the target powder temperature range.

[0096] Step 7, Dough Compensation and Feedback: Based on the deviation between the moisture content at the machine input and the symmetrical window of the salt and alkali water stacking, adjust the amount of water added to the dough mixer 6 and the concentration of the salt and alkali water; at the same time, collect the dough temperature at the discharge port of the dough mixer 6, and correct the target flour temperature range based on the collected dough temperature.

[0097] Step 8, feeding and start / stop purging: The homogenized powder is fed into the dough mixer 6 and mixed with the dough water and salt water to form dough; when stopping the machine, first cut off the cooling water supply, and then introduce dry air to purge the channels inside the cooling space 301; when starting the machine, first introduce dry air to warm the walls, and then feed the powder.

[0098] After the flour is pressurized and heated by the Roots high-pressure blower 2, it enters the cooling space 301 of the closed heat exchange cooling channel 3. During the cooling and contraction process, the volume of air decreases significantly, and the air velocity inside the pipe will continue to decrease. The flour particles change from dilute phase suspension to sedimentation and accumulation. When the flour layer that has settled and accumulated is started up again, it will be pushed by the airflow to form a slug flow. The slug flow releases a large number of flour particles in a short period of time, resulting in large fluctuations in the temperature and moisture content of the flour entering the machine within the batch.

[0099] The conventional approach for those skilled in the art to deal with slug flow is to increase the rotor speed at the inlet of the air-powder displacement homogenizer to completely break the powder column into a dilute phase. The rationale is that concentrated powder delivery would lead to inconsistent powder input. However, this approach ignores the adhesion characteristics of flour to the pipe wall. When the flour moisture content is in the range of 12% to 14%, there are van der Waals forces and electrostatic adsorption forces between the powder particles and the wall. The fine powder particles generated by high-speed dispersal are more easily blown back to the inner wall of the cooling channel by the airflow, forming secondary dust and re-adhering. Over time, this forms a hardened powder layer that accumulates and clumps on the wall, changing the effective cross-sectional area of ​​the pipe and making the subsequent slug flow pattern more unstable.

[0100] This solution divides the action into two parts: The first station is in the cooling space 301 of the closed heat exchange cooling channel 3: The main body of the powder column remains intact and does not break apart. It is continuously advanced along the center of the cooling channel. The outer wall of the powder column contacts the inner wall of the cooling channel. Using the positive pressure generated by the weight of the powder column itself and the air pressure thrust, the powder layer adhering to the pipe wall is scraped off as a whole by the sliding friction force. The scraped-off powder layer flows downstream with the powder column, and there is no secondary dust path.

[0101] When the continuous length of the powder column exceeds three times the pipe diameter, the powder layer attached to the wall is peeled off entirely by the contact pressure between the powder column and the wall surface.

[0102] The second station is located at the inlet of the rotary feeder 5: Since the inner diameter of the housing of the rotary feeder 5 in existing technology is generally large, and a model can be selected as needed to make it larger than the diameter of the powder column in the pipe, the internal rotor blades extend outward from the central axis. An annular gap is left between the outer end of the blade and the inner wall of the housing. When the powder column enters the rotary feeder 5 from the pipe, the dense central part of the powder column has a smaller diameter and passes through the central area of ​​the blade without contacting it; the looser edge part of the powder column has a larger diameter, extending to the area covered by the outer end of the blade and being scraped in by the rotating blade. The loose powder at the edge is scraped in by the blade and discharged with the rotation of the rotor, while the dense central part of the powder column passes continuously through the compartment without being dispersed. The scraped-off loose powder enters the next process together with the main body, thus eliminating secondary dust generation.

[0103] Therefore, when the powder column reaches the rotary feeder 5, the rotor blades of the rotary feeder 5 only shear the loose powder at the edge of the powder column, making the edge of the powder column neat and easy to enter the rotor blade groove smoothly, while retaining the main body of the powder column to enter the blade groove, without breaking the entire powder column.

[0104] Preferably, the third step specifically includes the following steps: (1) continuously acquiring the pressure signal inside the tube at a sampling rate of not less than 100Hz.

[0105] (2) The collected pressure signal is filtered in the time domain to remove the high-frequency noise generated by the pipeline vibration and extract the main frequency component and peak-to-peak value of the pressure fluctuation.

[0106] (3) When the main frequency is not higher than 10Hz and the ratio of peak value to average pressure in the pipe is not lower than 5%, it is determined to be a slug flow condition; when the main frequency is higher than 10Hz, or the ratio of peak value to average pressure is lower than 5%, it is determined to be a dilute phase condition.

[0107] (4) Under the slug flow condition, the rotor speed of the rotary feeder 5 is increased to 130% to 150% of the base speed. The rotor blades shear the edge of the incoming powder column, and the main body of the powder column is retained and continuously pushed along the pipeline.

[0108] (5) Under slug flow conditions, the water supply temperature of the downstream fine-tuning section is reduced by 2 to 5°C compared with the basic setting value; under dilute phase conditions, the rotor speed drops back to the basic speed and the water supply temperature of the downstream section rises back to the basic setting value.

[0109] (6) The powder column body advances along the wall and carries away the powder layer attached to the wall. The peeled powder layer enters the rotary feeder 5 along with the powder column.

[0110] This technical solution uses dual thresholds of main frequency and peak-to-peak value in the slug flow identification process. After confirming the slug flow, it only increases the rotor speed to 130% to 150% of the base speed instead of continuously operating at high speed. At the same time, it lowers the downstream water supply temperature by 2 to 5°C, forming a three-step linkage of shearing the edge, preserving the main body, and synchronous precooling.

[0111] Here, "powder column" refers to the form of a plug flow (plunger flow) in the middle section of pneumatic conveying—the flour is no longer dispersed and suspended in the airflow, but densely aggregated into a continuous columnar powder mass, occupying the cross-section of the pipe like a plug, and being pushed forward by the airflow; the difference between a powder column and a normal powder flow: in a normal powder flow, the powder particles are dispersed and suspended, with a low concentration and continuous uniformity; in a powder column, the powder particles are densely piled up, with a high concentration, and appear as discontinuous segments.

[0112] In this solution, preserving the main body of the powder column means not breaking up this dense powder mass, but allowing it to continue as a continuous column along the wall, using the sliding friction between the powder column and the wall to scrape off the powder layer adhering to the wall.

[0113] Centralized conveying can lead to inconsistent amounts of powder entering the machine. The conventional approach for those skilled in the art to deal with slug flow is to increase the rotor speed to completely break up the powder column. However, this approach ignores the adhesion characteristics of flour to the pipe wall. When the moisture content of flour is in the range of 12% to 14%, there are van der Waals forces and electrostatic adsorption forces between the powder particles and the wall. The fine powder particles generated by high-speed dispersal are more likely to adhere to the wall and form an agglomerate layer. As the thickness of the agglomerate layer gradually increases, it changes the effective cross-sectional area of ​​the pipe, making the subsequent slug flow pattern more unstable.

[0114] This solution involves retaining the main body of the powder column as it propels along the wall, utilizing the sliding friction between the powder column and the wall as a self-cleaning force: when the continuous length of the powder column exceeds three times the pipe diameter, the contact pressure between the powder column and the wall peels off the powder layer adhering to the wall. Without breaking the powder column, the wall is self-cleaned using the powder column's own weight and friction under impact.

[0115] Among them, the dual threshold judgment requires a main frequency not higher than 10Hz and a peak-to-peak ratio not lower than 5%: the period of the flour block flow is determined by the superposition of the discharge rhythm of the storage silo outlet and the pulsation of the Roots blower. The main frequency is usually in the range of 2 to 8Hz, while the main frequency of the pseudo signal generated by pipeline vibration is mostly above 50Hz. After time-domain filtering, the main frequency component and peak-to-peak value are extracted, which can distinguish between the real powder column pulsation and the blower pulsation. In addition, the synergistic effect of the downstream water supply temperature being reduced by 2 to 5℃ is that when the powder column passes through the downstream section, the heat capacity of the powder particles is concentrated. If the wall temperature is not reduced in advance, the temperature of the powder column center will not have time to cool down before entering the dough mixer 6, resulting in uneven powder temperature within the batch. However, by reducing the downstream water temperature in advance, the wall surface is in a state of excess cold when the powder column passes through, and the powder column surface cools down rapidly, avoiding a temperature gradient between the center and the surface of the powder column.

[0116] Preferably, the specific steps of the second step include: (1) front-end strong cooling: low-temperature cooling water and powder flow exchange heat in countercurrent, and the length of the front section accounts for 60% to 70% of the total length of the cooling channel.

[0117] (2) A temperature sensor is installed at the front outlet to measure the flour temperature and confirm that it drops to 3-5°C above the dew point of the workshop air.

[0118] (3) Rear section fine adjustment: Cooling water with a temperature 8-15°C higher than the front section water supply is introduced. The cooling water and powder flow exchange heat in the same direction. The length of the rear section accounts for 30%-40% of the total length of the cooling channel.

[0119] (4) Based on the slug flow intensity change cycle identified in the third step, increase the downstream cooling water flow rate in advance during the gas slug period before the powder column arrives to pre-cool the wall surface; maintain the basic cooling water flow rate when the powder column passes through the downstream section.

[0120] (5) Dry air is added at the junction of the front and rear sections. The temperature difference between the added air and the outlet powder flow temperature of the front section shall not exceed ±2℃. The dew point of the added air shall be more than 5℃ lower than the dew point of the workshop air.

[0121] (6) The ratio of cooling water mass flow rate to flour mass flow rate is 1:1 to 3:1.

[0122] The conventional design of existing flour cooling and conveying systems uses counter-current cooling water heat exchange throughout the entire channel. While this performs well in dilute phase conveying, under slug flow conditions, when a concentrated column of flour passes through, the cooling energy in the front section is rapidly absorbed by the flour column, causing the wall temperature to rise instantly. By the time the flour column reaches the rear section, the wall surface is still in a state of residual cooling from the previous batch of flour, and the cooling energy cannot be replenished in time. This technical solution divides the cooling channel along the flour flow direction into a counter-current strong cooling front section and a co-current fine-tuning rear section. The rear section wall surface is pre-cooled during the airlock period, and dry air with a temperature difference not exceeding ±2℃ is introduced at the junction of the front and rear sections. The segmented approach of counter-current strong cooling and co-current fine-tuning utilizes the physical characteristic of the largest temperature difference in the counter-current flow to achieve rapid cooling, quickly lowering the flour temperature from the feed temperature. The rear co-current heat exchange utilizes the characteristic of a smaller temperature difference along the co-current flow to achieve fine-tuning, avoiding excessive temperature difference between the wall surface and the flour flow at the co-current outlet, which could cause local condensation.

[0123] During the airlock period, the downstream wall surface is pre-cooled. Since there is no powder flow in the pipe during this period, conventional practice would be to reduce the cooling water flow rate to save energy. However, this solution increases the downstream cooling water flow rate during the powder-free period, causing the downstream wall surface temperature to drop to the target value before the powder column arrives. The flow rate is then restored to the baseline after the powder column arrives. Because the powder column has concentrated heat capacity, if the wall surface is not pre-cooled, the wall temperature will rise as the powder column passes through the downstream section due to heat release, leading to uneven powder column outlet temperature. Pre-cooling ensures that the wall surface temperature is in a state of excess cooling capacity when the powder column arrives, resulting in minimal temperature fluctuations as the powder column passes through.

[0124] In addition, the dew point of the replenished dry air is more than 5°C lower than that of the workshop air. Its function is to use the dry air to form an air curtain barrier at the junction of the front and rear sections. The temperature of the flour at the front outlet has dropped to close to the dew point. If it comes into direct contact with the warm and humid air in the workshop, it will absorb moisture again. The replenished low dew point dry air replaces the warm and humid air at the front outlet, so that the flour is always in a low humidity environment in the transfer section.

[0125] Preferably, the specific steps of the fourth step include: (1) continuously collecting ambient temperature and relative humidity through workshop temperature sensor and humidity sensor.

[0126] (2) Calculate the dew point temperature of the air inside the pipe from the ambient temperature and relative humidity according to the Antoni equation.

[0127] (3) Generate the wall temperature setpoint by adding a margin value to the dew point temperature, with a basic margin value of 2 to 5℃.

[0128] (4) When the relative humidity of the workshop is not lower than 70%, the margin value is increased to 5-8℃; when the relative humidity is lower than 60%, the margin value is decreased to 1-3℃.

[0129] (5) The wall temperature is measured by a temperature sensor attached to the wall and fed back to the refrigeration unit so that the deviation between the wall temperature and the set value does not exceed ±1℃.

[0130] (6) When the temperature change rate of the workshop environment exceeds 2℃ / min, repeat step (2) to update the dew point temperature and wall temperature settings.

[0131] In this technical solution, the critical condition for wall condensation is not the absolute value of the wall temperature, but rather the relative relationship between the wall temperature and the dew point of the air inside the pipe. As long as the wall temperature is higher than the dew point, condensation will not occur even if the absolute value of the wall temperature is low; conversely, even if the wall temperature is high, condensation will occur if it is lower than the dew point. Therefore, the wall temperature setpoint must be dynamically adjusted according to the dew point. A basic margin of 2–5°C is set. If the margin is too small (e.g., less than 1°C), instantaneous fluctuations in the wall temperature during the refrigeration unit's adjustment process may cause the wall temperature to briefly fall below the dew point, resulting in localized condensation. If the margin is too large (e.g., greater than 8°C), there will be excess cooling capacity, leading to a higher flour outlet temperature.

[0132] In high humidity seasons, the air dew point is already high. As the wall temperature rises with the dew point, if the margin is still 2-5℃, the wall temperature may be too high, resulting in insufficient cooling of the flour. After adjusting to 5-8℃, the safe distance between the wall temperature and the dew point increases, avoiding instantaneous condensation on the wall when the dew point rises suddenly due to fluctuations in workshop humidity.

[0133] When the rate of change in workshop ambient temperature exceeds 2℃ / min, the dew point must be recalculated. For example, in situations where workshop windows are opened for ventilation in the early morning or evening, causing a sudden temperature change, the air dew point will also change drastically. If the previously calculated dew point value is still used, the wall temperature setpoint will become incompatible with the actual dew point. The Antoni equation is used to calculate the relationship between the saturated vapor pressure of water and temperature. The partial pressure of water vapor in the air can be obtained from the workshop temperature and relative humidity, and the temperature corresponding to that partial pressure is the dew point temperature.

[0134] Specifically, the dew point temperature of the air inside the pipe is calculated using the following steps: The ambient temperature T (°C) and relative humidity RH (%) are measured using a workshop temperature sensor. First, the saturated vapor pressure Ps of water at that temperature is calculated using the Antoine equation:

[0135] lgPs = A−B / (C+T); where Ps is the saturated vapor pressure of water at temperature T (kPa); T is the ambient temperature (°C); A, B, and C are the Antoine constants of water, taken according to the temperature range, with A = 8.07131, B = 1730.63, and C = 233.426 for the range of 0–100°C. Then, the partial pressure of water vapor in the air, Pv, is calculated from the relative humidity:

[0136] Pv = Ps × RH / 100; Finally, look up the Antoni equation to find the temperature at which Ps = Pv, which is the dew point temperature Td of the air inside the pipe.

[0137] Preferably, the sixth step includes the following steps: (1) obtaining the dew point temperature of the air inside the pipe calculated in the fourth step.

[0138] (2) Determine the load rate based on the ratio of motor current to rated current of dough mixer 6, and calculate the temperature rise of dough mechanical friction by combining the actual output power of the motor calculated based on the load rate and the dough mixing time.

[0139] (3) The lower limit of the target powder temperature range is 2℃ above the dew point temperature, and the upper limit is 6℃ above the dew point temperature.

[0140] (4) Compare the measured powder temperature in the fifth step with the target range: if the measured value is lower than the lower limit, increase the water supply temperature of the chiller unit or reduce the cooling water flow rate; if the measured value is higher than the upper limit, decrease the water supply temperature or increase the cooling water flow rate. The adjustment step should not exceed 1℃ / min.

[0141] (5) When the motor current of the dough mixer 6 exceeds 110% of the rated current and lasts for more than 30 seconds, the target powder temperature range will be lowered by 1 to 2 degrees Celsius.

[0142] (6) When the dough temperature collected in step 7 is higher than 28℃, the target powder temperature range is shifted down by 1 to 2℃; when the dough temperature is lower than 22℃, the target powder temperature range is shifted up by 1 to 2℃.

[0143] When flour is mixed in the dough mixer 6, the temperature rise due to friction of the dough mixing machinery is not constant. It is directly related to the motor load rate, mixing time, and dough hardness. When the flour water absorption rate is high and the dough is soft, the motor load rate is low and the friction temperature rise is small. When the flour water absorption rate is low and the dough is hard, the motor load rate is high and the friction temperature rises. Secondly, the dew point of the workshop air varies greatly in different seasons. In winter, the dew point may be as low as 5°C, while in summer it may be as high as 25°C. Fixing the target flour temperature may cause the flour temperature to be much higher than the dew point in winter, resulting in a waste of cooling capacity. In summer, it may cause the flour temperature to be lower than the dew point, resulting in secondary moisture absorption.

[0144] This plan anchors the target flour temperature range to 2°C to 6°C above the dew point: a flour temperature 2°C above the dew point ensures the flour won't condense and absorb moisture during transport, while a temperature 6°C above the dew point provides sufficient margin during the high-humidity summer season. If the motor current exceeds 110% of the rated current for 30 seconds, the range is lowered by 1-2°C: this is because motor overload indicates overly stiff dough and excessive mixing resistance. Overly stiff dough is often caused by excessively high flour temperature leading to rapid gluten softening and reduced gas retention. Lowering the target flour temperature range reduces the incoming flour temperature and slows down gluten softening. Lowering the range when the dough temperature exceeds 28°C is because excessively high dough temperatures accelerate fermentation and cause gluten network breakage; reducing the flour temperature inhibits subsequent fermentation.

[0145] In addition, the adjustment step size should not exceed 1℃ / min. This restriction is to avoid frequent and large-scale adjustments by the external refrigeration unit used to supply cooling water, which would cause wall temperature oscillations. Flour has a large heat capacity, and wall temperature oscillations will be smoothed out by the flour. However, the adjustment inertia of the refrigeration unit itself needs to be constrained by the step size limit.

[0146] Preferably, the specific steps of the seventh step include: (1) using 48% to 52% as the basic range of the symmetrical window of the salt-alkali water stacking.

[0147] (2) During the dough mixing stage, 30% to 50% of the total amount of salt and alkali water is pre-added to the dough mixer 6, and the remaining 50% to 70% is added during the stacking process.

[0148] (3) Adjust the water temperature for kneading dough according to the temperature of the powder entering the machine in the fifth step: when the powder temperature entering the machine is higher than 28℃, the water temperature for kneading dough is set to 0~2℃; when the powder temperature entering the machine is lower than 24℃, it is set to 5~10℃; and when it is between the two, it is set to 2~5℃.

[0149] (4) Compare the moisture content of the dough into the machine with the window: when it is below 48%, increase the amount of water added by the dough mixer 6 linearly according to the deviation; when it is above 52%, decrease the amount of water added linearly according to the deviation. The single adjustment step should not exceed 0.5% of the flour mass.

[0150] (5) After each adjustment, wait for the dough mixer 6 to complete one mixing cycle before making the next adjustment.

[0151] (6) Collect the dough temperature at the discharge port of the dough mixer: When the dough temperature is higher than 28°C, increase the total mass concentration of sodium carbonate and sodium bicarbonate in the saline solution (based on the total mass of the dough) by 0.2% to 0.5% on the basis of 0.5% to 1.5%; when the dough temperature is lower than 22°C, decrease it by 0.2% to 0.5%; so that the dough temperature is controlled at 24 to 28°C.

[0152] The existing process for making fried dough sticks involves brushing the salt and alkali solution onto the dough during the stacking process, while only water is added when kneading the dough. This method allows the salt and alkali components to be evenly distributed on the surface of the dough during the stacking stage, resulting in faster surface rise when the fried dough sticks are fried.

[0153] However, sodium carbonate and sodium bicarbonate are not only leavening agents but also gluten improvers. Sodium carbonate reacts chemically with gliadin and glutenin in gluten proteins, enhancing the cross-linking density of the gluten network and improving the extensibility and toughness of the dough. If the salt and alkali solution is applied entirely during the dough-making stage, the gluten proteins will not have the salt and alkali components to participate in cross-linking during the kneading stage. The dough will lack sufficient strength and is prone to collapsing during frying due to insufficient gluten network strength.

[0154] This method moves 30%–50% of the salt and alkali solution to the dough mixing stage, allowing the gluten proteins to fully react with the salt and alkali components during mixing, forming an initial cross-linked network. The remaining salt and alkali solution brushed onto the dough during subsequent layering further enhances surface leavening. The water temperature for dough mixing is adjusted in three levels. When the flour temperature entering the machine is above 28℃, the flour itself is already hot; using room temperature water will result in an excessively high dough temperature upon exiting the machine, causing the gluten to soften. Using 0–2℃ ice water can neutralize the heat from the flour, bringing the dough temperature back to the ideal range of 24–28℃. When the flour temperature entering the machine is below 24℃, use 5–10℃ warm water to prevent the dough temperature from becoming too low, which would delay gluten formation.

[0155] The amount of water added should not be adjusted in increments of more than 0.5% of the flour mass at a time. This is to prevent the operator from adding too much water at once, which would result in the dough being too soft or too hard. After each adjustment, wait for one mixing cycle before making the next adjustment. This is because the gluten network gradually forms during the mixing process, and the effect of the amount of water added needs to be reflected in the dough hardness after a complete mixing cycle.

[0156] Preferably, the specific steps of the eighth step include: (1) when shutting down, first cut off the cooling output of the external refrigeration unit.

[0157] (2) Keep the Roots high-pressure blower 2 running at low speed so that the workshop air flows through the wall of the cooling space 301 of the cooling channel and uses the residual cold energy of the wall to cool the air to below the dew point. After the air precipitates moisture, it forms dry air, which is then blown across the channel wall.

[0158] (3) After the wall temperature is measured by the wall temperature sensor 15 and confirmed that the wall temperature has risen to 3°C above the dew point of the workshop air, the Roots high-pressure blower 2 is stopped.

[0159] (4) When starting the machine, first introduce dry air to warm the wall: warm the wall for 5 minutes when the interval between shutdowns is no more than 30 minutes; warm the wall for 5 to 15 minutes when the interval between shutdowns is between 30 minutes and 2 hours; warm the wall for 15 to 20 minutes when the interval between shutdowns exceeds 2 hours.

[0160] (5) After confirming that the wall temperature is stable at 3°C ​​above the dew point of the workshop air, start the refrigeration unit and begin feeding powder.

[0161] Existing flour conveyor systems require external compressed air or dry air source to purge the pipelines during shutdown, necessitating additional compressed air lines and dryers, increasing equipment costs and maintenance complexity. More importantly, external compressed air typically contains oil and water, leaving oil and water films on the walls after purging, leading to more severe flour adhesion upon the next startup.

[0162] Because residual cold energy remains on the walls of the sealed heat exchange cooling channel 3 after shutdown, and the wall temperature has been cooled to near the dew point at the time of shutdown, if the workshop air is allowed to flow naturally over the walls, the air temperature will be cooled below the dew point by the walls, and water vapor in the air will condense and precipitate on the walls—this process itself is a self-drying process: the air loses moisture and becomes low-dew-point dry air, which then blows across the walls, carrying away the residual moisture. No external drying air source is needed; instead, the air is dried using the residual cold energy of the walls themselves.

[0163] In this plan, the wall warming time is divided into three levels according to the shutdown interval. When the shutdown time is short (not exceeding 30 minutes), the wall temperature is still maintained near the dew point, and a short wall warming time is sufficient. When the shutdown time is medium (30 minutes to 2 hours), the wall temperature has partially risen, and a medium-length wall warming time is required to make the wall temperature uniform. When the shutdown time is long (more than 2 hours), the wall temperature is close to the workshop air temperature, and a longer wall warming time is required to stabilize the wall temperature at 3°C ​​above the dew point. Powder is only introduced after confirming that the wall temperature is stable at 3°C ​​above the dew point to avoid instantaneous condensation when the flour comes into contact with the wall surface below the dew point upon startup, which could cause flour agglomeration and block the pipes.

[0164] Preferably, the seventh step also includes the following steps: (1) Recording the dough mixing time when the motor current of the dough mixer 6 reaches the rated current.

[0165] (2) When the duration is shorter than the baseline duration, it is determined that the water absorption rate of the batch of flour is too high, and the lower limit of the window is raised to 49% and the upper limit is raised to 53%.

[0166] (3) When the duration is longer than the baseline duration, it is determined that the water absorption rate of the batch of flour is too low, and the lower limit of the window is lowered to 47% and the upper limit is lowered to 51%.

[0167] (4) Adjust the water volume according to the updated window.

[0168] Current methods for testing flour water absorption involve sampling and then determining the moisture content in a laboratory using a drying method. This method is significantly time-consuming, taking at least 2-3 hours from sampling to obtaining results, making it impossible to provide real-time guidance for batch production. Another method involves operators judging the dough's consistency by touch, but this method is highly subjective, leading to significant differences in judgment among different operators. This technical solution uses the dough mixing time when the current of the six motors in the dough mixer reaches its rated current as an indirect criterion for flour water absorption, and adjusts the symmetrical window for salt-alkali water layering accordingly.

[0169] As the dough mixer 6 mixes the dough, the motor current gradually increases during the gluten network formation process. When the gluten network is fully formed, the motor current reaches the rated current. The mixing time required for the current to reach the rated current is directly related to the flour's water absorption rate. When the flour's water absorption rate is high, the gluten proteins absorb water sufficiently, the gluten network forms quickly, and the motor current reaches the rated current more quickly, resulting in a shorter mixing time. Conversely, when the flour's water absorption rate is low, the gluten proteins do not absorb water sufficiently, the gluten network forms slowly, and the time it takes for the motor current to reach the rated current is longer.

[0170] This indirect measurement requires no additional sensors; real-time judgment can be achieved solely using the motor current signal of the dough mixer 6 itself. When the mixing time is shorter than the baseline time, the window is adjusted upwards to 49%–53%: a higher flour water absorption rate means the flour has actually absorbed more water. With the same amount of water added, the free water in the dough is reduced, making the dough drier. Therefore, the water addition window needs to be adjusted upwards to compensate for the excess water absorbed by the flour. This correction works synergistically with the linear water addition adjustment step: the linear water addition adjustment adjusts the amount of water added in a given batch based on the deviation of the initial moisture content. This solution, however, judges the water absorption rate shift trend of the entire batch of flour based on the mixing time and shifts the window accordingly. The combination of these two approaches ensures that the water addition can respond to instantaneous moisture content fluctuations while compensating for batch-to-batch differences in flour water absorption. This dual-layer correction structure, combining instantaneous deviation and batch trend, is more stable than a single instantaneous adjustment, avoiding repeated adjustments to the water addition due to errors in a single moisture content measurement.

[0171] Preferably, in the second step: the cooling contraction rate is calculated based on the temperature difference between the inlet and outlet air of the cooling channel, and the air supply volume is corrected according to the measured value of the wall temperature, so that the air velocity at the outlet of the cooling channel is maintained at 15-18 m / s, where 15 m / s is the lower limit of the non-settling air velocity for horizontal conveying of flour, and the dew point of the replenished dry air is more than 5°C lower than the dew point of the workshop air.

[0172] The existing pneumatic conveying system uses a fixed air supply port on the pipeline to replenish the air volume. However, as the air cools in the cooling channel, its volume shrinks. Since air volume is proportional to absolute temperature, if the inlet air temperature is 30℃ (303K) and the outlet air temperature is 20℃ (293K), the air volume shrinks by about 3.3%, and the air velocity in the pipeline decreases by 3.3% accordingly. In long pipeline conveying, this shrinkage, combined with friction loss, can easily cause the outlet air velocity to drop below the non-settling air velocity of flour during horizontal conveying, leading to powder settling.

[0173] This scheme calculates the shrinkage rate by measuring the temperature difference between the inlet and outlet, and then adjusts the air supply volume according to the measured wall temperature to keep the outlet air velocity consistently within the range of 15–18 m / s. For flour particles with a diameter of approximately 100 μm, the critical suspension velocity in a horizontal pipe is about 12–14 m / s. Considering the fluctuation of pipe friction resistance and the instantaneous velocity reduction of slug flow, 15 m / s is set as the lower safety limit and 18 m / s as the upper limit—below 15 m / s there is a risk of settling, while above 18 m / s the energy consumption for conveying is too high and pipe wear is aggravated.

[0174] The dew point of the replenished dry air is more than 5°C lower than that of the workshop air, which works in conjunction with the replenishment air temperature control step: the replenishment air temperature control ensures that the replenished air does not disturb the powder flow temperature field, and the replenishment air dew point control ensures that the replenished air does not introduce additional moisture. The combination of these two measures ensures that the replenished air matches the pipe environment in both temperature and humidity dimensions, avoiding the problem of localized moisture absorption caused by replenishing only temperature without replenishing humidity.

[0175] Based on the use of an annular jacket structure in the cooling channel, with counter-current flow in the front section and co-current flow in the rear section, and using the dew point of the air inside the pipe as the benchmark for setting the wall temperature, this embodiment proposes a segmented control method for the wall temperature, which is implemented according to the following steps.

[0176] The first step is on-site calibration. Calibration is performed before the cooling channel is put into use to establish the correspondence between the adjustment amount and the wall temperature. Calibration is conducted under the condition that the conveying system is normally conveying powder and the powder flow is stable through the cooling channel: Keep the cooling water supply temperature constant, and gradually increase the cooling water flow rate starting from 50% of the rated flow rate, changing by 10% of the rated flow rate at each level. Maintain operation at each level until the wall temperature stabilizes and record the corresponding wall temperature, up to 120% of the rated flow rate. Then, keeping the cooling water flow rate constant, gradually increase the cooling water supply temperature starting from the lowest operating temperature, increasing by 1℃ at each level. Maintain operation at each level until the wall temperature stabilizes and record the corresponding wall temperature, up to the highest operating temperature.

[0177] During the calibration process, the powder temperature at the boundary of each gear and the powder temperature entering the machine in the transfer section are recorded simultaneously, forming the corresponding relationship between the wall temperature at the boundary and the powder temperature at the boundary, and the corresponding relationship between the wall temperature at the outlet of the downstream section and the powder temperature entering the machine. During operation, the corresponding powder temperature is deduced from the measured wall temperature based on the corresponding relationship.

[0178] The calibration results are used to generate tables corresponding to the cooling water flow rate and wall temperature, the cooling water supply temperature and wall temperature, the boundary wall temperature and the boundary powder temperature, and the downstream outlet wall temperature and the inlet powder temperature, which serve as the basis for determining the adjustment objects and adjustment ranges during subsequent operation.

[0179] The second step is parameter setting before operation. Based on the measured values ​​of air temperature and humidity in the workshop, the dew point of the air inside the pipe is calculated according to the known relationship between saturated vapor pressure and temperature. After replenishing with dry air, the mixing ratio is determined according to the ratio of replenished air flow rate to the air flow rate delivered in the pipe, and the dew point of the air inside the pipe is updated according to the mixing ratio. On this basis, four wall-mounted temperature measuring points are arranged along the powder flow direction on the inner wall of the cooling channel, namely the front inlet measuring point, the middle measuring point of the front section, the measuring point at the boundary between the front and rear sections, and the rear outlet measuring point; the wall temperature setpoint of each measuring point is taken as the dew point of the air inside the pipe plus an anti-condensation margin. The anti-condensation margin is categorized according to the relative humidity of the workshop: 1–3℃ for relative humidity below 60%, 2–5℃ for relative humidity between 60% and 70%, and 5–8℃ for relative humidity above 70%. In winter, when relative humidity is below 40% or the dew point temperature of the air inside the pipe is below 10℃, 0–2℃ is used; in summer, when relative humidity is above 80% or the dew point temperature of the air inside the pipe is above 28℃, 8–12℃ is used. The winter and summer categories take precedence over the general humidity categories. Under high humidity conditions in summer, the dew point of the supplied dry air is maintained at least 5℃ lower than the workshop air dew point, causing the air dew point inside the pipe to decrease accordingly, ensuring that both anti-condensation margin and cooling capacity are achieved simultaneously. During operation, when the rate of change in the workshop ambient temperature exceeds 2℃ / min, the air dew point inside the pipe is recalculated, and the wall temperature setpoints at each measuring point and the powder temperature target conversion value at the boundary are updated synchronously, allowing the setpoints to adjust bidirectionally with seasonal changes and ambient humidity. The minimum and maximum operating temperatures are determined according to the specifications of the selected refrigeration unit; the minimum allowable flow rate is determined by on-site testing based on the minimum cooling water flow rate required to maintain stable operation of the cooling water pump and heat exchange effect.

[0180] The third step is to determine the main control measuring points and feedback responsibilities. In the front-end strong cooling section, the measuring point at the boundary between the front and rear sections is the main control measuring point, executing a wall temperature feedback cycle. The wall temperature setpoint at the boundary measuring point is determined according to this step, aiming to reduce the powder temperature at that point to 3-5°C above the workshop air dew point. The correspondence between the boundary wall temperature and this powder temperature target is obtained from the calibration in the first step. The wall temperature setpoint is also constrained by the air dew point plus anti-condensation margin in the second step; the higher of the anti-condensation margin requirement and the converted powder temperature target value is used, with anti-condensation requirements taking priority. The wall temperature setpoints at the front-end inlet measuring point and the front-end middle measuring point are determined according to the second step. In the rear-end fine-tuning section, the measured value of the powder temperature entering the machine from the transfer section is the main feedback quantity, executing inlet powder temperature feedback adjustment. The rear-end outlet measuring point only undertakes anti-condensation safety monitoring and does not participate in the regular wall temperature feedback cycle. The target powder temperature zone at the boundary partially overlaps with the target range for the incoming powder temperature. This overlap serves as a tolerance margin under disturbances such as slug flow and batch switching. Under normal operating conditions, the latter section only requires minor fine-tuning, while under disturbances, it provides a safety net for adjustment. With this division, the first section is responsible for bringing the powder temperature into a safe temperature range 3-5°C above the workshop air dew point, while the second section is responsible for fine-tuning the incoming powder temperature to the target range. The responsibilities of the two sections are clearly defined.

[0181] The fourth step is wall temperature sampling. The measured wall temperature at the boundary point is collected in the first stage at a period of 10 to 30 seconds. The sampling period is longer than the pulsation period of the pneumatic conveying pressure, so that the single reading is not dominated by the pulsation peak and the adjustment decision is based on the minute-level wall temperature trend.

[0182] Step 5: Deviation Comparison and Dead Zone Judgment. Compare the measured wall temperature at the front section boundary with the set value: if the measured value is higher than the set value, it indicates that the front section cooling capacity is insufficient; if the measured value is lower than the set value, it indicates that the front section cooling capacity is too high. If the absolute value of the deviation does not exceed 0.5℃, keep the current cooling water supply temperature and cooling water flow rate unchanged and return to step 4. If the absolute value of the deviation exceeds 0.5℃, proceed to step 6.

[0183] Step 6: Single-step adjustment. When the wall temperature is higher than the set value, reduce the front-end cooling water supply temperature or increase the front-end cooling water flow rate; when the wall temperature is lower than the set value, increase the front-end cooling water supply temperature or decrease the front-end cooling water flow rate. Only one item can be adjusted at a time. The cooling water supply temperature can be adjusted by no more than 1°C at a time, and the cooling water flow rate can be adjusted by no more than 5% of the rated flow rate of that section at a time, so that the disturbance amplitude of each action is less than the response range allowed by the wall temperature time constant.

[0184] Step 7: Stabilization and Cycling. After performing the adjustment, wait for the wall temperature to stabilize again, then return to step 4 to resample, repeating the deviation comparison and adjustment until the deviation between the measured wall temperature and the set value falls within the 0.5℃ dead zone, completing one adjustment cycle. Specifically, wall temperature changes caused by adjusting the cooling water flow rate should reach a stable state within 60 seconds; for wall temperature changes caused by adjusting the cooling water supply temperature, the waiting time should be extended to over 120 seconds before resampling and judgment.

[0185] Step 8: Feedback Adjustment of Inlet Powder Temperature. The inlet powder temperature is sampled at the same cycle as in Step 4, and the single adjustment range is limited as in Step 6. Compare the measured inlet powder temperature in the transfer section with the target range of 2-6°C above the dew point of the air inside the pipe: If the inlet powder temperature is higher than the upper limit of the range, prioritize reducing the downstream cooling water supply temperature or increasing the downstream cooling water flow rate. If the downstream section is already adjusted to the upper limit (rear cooling water supply temperature reduced to the minimum operating temperature or downstream cooling water flow rate opened to the calibrated upper limit, which is 120% of the rated flow rate) and still insufficient, then further reduce the upstream cooling water supply temperature or increase the upstream cooling water flow rate. If the inlet powder temperature is lower than the lower limit of the range, prioritize increasing the downstream cooling water supply temperature or decreasing the downstream cooling water flow rate. If the downstream section is already adjusted to the lower limit (rear cooling water supply temperature raised to the maximum operating temperature or downstream cooling water flow rate reduced to the minimum allowable flow rate) and still insufficient, then further increase the upstream cooling water supply temperature or decrease the upstream cooling water flow rate. The front-end intervention is conditional on the measured wall temperature at the boundary of the front-end being no lower than the set value of the wall temperature at that measuring point. If the wall temperature is already lower than the set value, the front-end intervention will not proceed, prioritizing safety to prevent condensation.

[0186] Step 9: Anti-condensation safety constraints. If the measured wall temperature at any measuring point is lower than the corresponding pipe dew point plus the minimum safety margin of 0.5°C, immediately implement anti-condensation measures for that section: first, reduce the cooling water flow rate, using the valve's rapid response to quickly raise the wall temperature, shortening the interval to 30 seconds; if the cooling water flow rate in that section is still insufficient even after reducing to the minimum allowable flow rate, then increase the cooling water supply temperature, extending the waiting interval to over 120 seconds. Continue this action until the measured wall temperature rises to at least 1.5°C above the pipe dew point before releasing the anti-condensation measure. The trigger line for anti-condensation is 0.5°C above the pipe dew point, and the release line is 1.5°C above the pipe dew point, with a 1°C hysteresis between the two lines to prevent repeated triggering of the wall temperature near the threshold. During the anti-condensation action, the remaining sections maintain their current state without adjustment.

[0187] Step 10: Coordinating Operating Conditions and Priority Arbitration. During the slug flow blockage period, pre-cooling is performed on the downstream section in advance according to the slug flow intensity change cycle: First, increase the downstream cooling water flow rate, and use the valve's rapid response to establish a pre-cooling effect in a short time. After the wall temperature reaches a stable state, the downstream cooling water supply temperature is reduced in stages, with a single reduction not exceeding 1℃, for a cumulative reduction of 2-5℃, so that the wall temperature is already at a lower level when the powder column reaches the downstream section. Pre-cooling is defined by the measured wall temperature of this section not being lower than the air dew point in the pipe plus 1.5℃, which is consistent with the anti-condensation release line in Step 9. Pre-cooling is stopped when the wall temperature drops to this boundary to avoid pre-cooling directly triggering the anti-condensation action. After the powder column passes through the downstream section, the downstream cooling water flow rate and cooling water supply temperature are restored to the pre-cooling level in stages according to the single amplitude limit in Step 6. During start-up wall warming and shutdown purging, the cooling water supply temperature and flow rate remain unchanged, and the start-up and shutdown procedures are followed. During batch switching purging, the cooling channel remains operational, but the cooling water parameters are not adjusted, and the anti-condensation safety constraints are not affected. Anti-condensation action is triggered when the wall temperature approaches the air dew point inside the pipe. Inlet powder temperature feedback adjustment is triggered when the inlet powder temperature exceeds the range and the wall temperature at each measuring point is safe. Slug flow identification triggers condition coordination action. Only the highest priority action is executed at any given time, with other actions postponed to the next adjustment cycle. When slug flow identification triggers pre-cooling, pre-cooling takes precedence over inlet powder temperature feedback adjustment. The pre-cooling operation window is short; missing the window results in the loss of pre-cooling effect. Pre-cooling and inlet powder temperature feedback adjustment are executed concurrently when their directions are the same; when their directions are opposite, pre-cooling takes precedence. After pre-cooling is completed, inlet powder temperature feedback adjustment continues according to the second-level rules.

[0188] The above segmented control method has the following effects:

[0189] Firstly, by using the dew point of the air inside the pipe as the central setting point for the wall temperature, the two opposing demands of preventing condensation and cooling are unified under a single criterion. This implementation allows the wall temperature setpoint to dynamically fluctuate with the dew point of the air inside the pipe, and the anti-condensation margin to vary with the relative humidity levels. The wall temperature is always kept within a controllable distance above the dew point of the air inside the pipe, and the two opposing demands no longer restrict each other.

[0190] Secondly, the primary control point in the front section is the boundary measuring point. The control focuses not on the outlet state but on the intermediate state of the front-end cooling process. In the counter-current heat exchange, the powder temperature decreases most rapidly at the inlet section. The boundary wall temperature and the boundary powder temperature have a correspondence established in the first calibration step. Controlling the boundary wall temperature indirectly constrains the boundary powder temperature, thereby controlling the front-end cooling effect. Conventional heat exchanger control uses the outlet temperature as feedback. This implementation avoids the outlet and uses the intermediate boundary point because the rear section requires fine-tuning. The front section only needs to keep the powder temperature within a safe range of 3-5°C above the workshop air dew point. The boundary measuring point can detect excess or insufficient cooling earlier than the outlet measuring point, and it does not occupy the adjustment freedom of the rear section, leaving independent fine-tuning space for the rear section.

[0191] Third, the adjustment sequence of adjusting the downstream section first and then supplementing the upstream section is the opposite of the conventional method where the upstream section is responsible for the main cooling and should be adjusted first. The upstream section also undertakes the task of preventing condensation, and the wall temperature at the boundary is constrained within the safe zone of the air dew point in the pipe plus a corresponding margin. Significant adjustments to the upstream section will simultaneously change the safety boundary. The downstream section only changes the inlet powder temperature and does not affect the safety boundary of the upstream section. Therefore, adjusting the downstream section first is safer. Only when the downstream section is adjusted to the lowest cooling water supply temperature or the upper limit of the cooling water flow is still insufficient, will the upstream section intervene under the condition that the wall temperature at the boundary is safe. The adjustment sequence is arranged according to the degree to which the safety boundary is affected, rather than according to the proportion of cooling capacity distribution.

[0192] Fourth, the intermittent stepping method, consisting of dead zone, single-step amplitude, and waiting interval, actively filters out the interference of pneumatic conveying pulsations on feedback. Powder conveying itself has pressure pulsations and powder quantity pulsations, with pulsation periods on the order of seconds, while the time constant of the wall temperature response reaches the order of minutes. If executed in a continuous adjustment mode, the pulsations will be misjudged as trends, resulting in adjustment oscillations. When the oscillation amplitude is large, the wall temperature will drop instantaneously or even fall below the air dew point inside the pipe. This implementation method uses a 0.5℃ dead zone, a single step size of 1℃ or 5% of the rated flow, and waiting intervals differentiated by means, so that each action is based on the wall temperature trend on the order of minutes. The adjustment is stable and the frequency of electric regulating valve operation is significantly reduced, which is contrary to the conventional understanding that the more sensitive the feedback, the better.

[0193] Fifth, the anti-condensation margin is divided into two levels based on both season and ambient humidity, with the margin adjustment in opposite directions for winter and summer. Conventional solutions typically select a fixed margin for a single operating condition. In this embodiment, when the relative humidity is below 40% in winter or the dew point temperature of the air inside the pipe is below 10℃, the margin is narrowed to 0-2℃, allowing the wall temperature to be closer to the dew point of the air inside the pipe, thus lowering the cooling water supply temperature and fully utilizing the cooling capacity. In summer, when the relative humidity is above 80% or the dew point temperature of the air inside the pipe is above 28℃, the margin is widened to 8-12℃, keeping the wall temperature away from the dew point of the air inside the pipe, prioritizing preventing condensation. The margin is not a constant but varies bidirectionally with the environment, allowing the same water circuit to operate in two states—cooling priority and anti-condensation priority—in winter and summer respectively.

[0194] The dew point tracking provides the target wall temperature value for each section; and it relies on segmented water circuits for execution. However, without the order rule of adjusting the later section first and supplementing the earlier section, the adjustment of the earlier section will also change the safety boundary at the boundary, and the independent water circuits will become a source of mutual interference. The order rule ensures the safe sequence of adjustment, and at the same time, the intermittent stepping action mode ensures that oscillations under the delivery pulsation are avoided during continuous adjustment, so as to obtain stable results. Only by combining the above methods can the overall effect of no condensation throughout the year, stable powder temperature at the inlet air dew point plus 2-6°C, and no oscillation during the adjustment process be achieved.

[0195] Among these, the combination of dew point tracking and intermittent stepping is particularly crucial: During the rapid rise in humidity in the summer afternoons, dew point tracking requires a corresponding increase in the wall temperature setpoint. If this increase is performed continuously, humidity fluctuations are amplified cycle by cycle into wall temperature oscillations. The wall temperature may momentarily drop below the dew point of the air inside the pipe during these oscillations, leading to condensation, thus rendering dew point tracking ineffective. Intermittent stepping, with its differentiated waiting intervals, filters out humidity fluctuations, ensuring that each increase in the wall temperature setpoint is based on actual operating conditions, thus enabling reliable dew point tracking. Conversely, without dew point tracking, intermittent stepping can only stabilize the wall temperature around a fixed value, unable to automatically switch between cooling priority and anti-condensation priority states according to the season. Both are interdependent; the absence of either significantly reduces the overall effect, resulting in a gain exceeding the expectations of either alone.

[0196] With this implementation method, the cooling channel wall surface remains above the air dew point throughout the year: in summer, when the relative humidity in the workshop reaches 70%–80%, the wall temperature automatically increases by a margin of 5–8°C, preventing condensation and powder particles from sticking to the wall and keeping the channel wall dry. This avoids the cumulative deterioration caused by condensation, powder hardening, and narrowing of the conveying cross-section during the afternoon high humidity period in conventional fixed water temperature schemes. In winter, when the relative humidity is below 40%, the margin narrows to 0–2°C, allowing the cooling water supply temperature to be lowered further, and the refrigeration unit operates with lower cooling capacity consumption while ensuring safety. After feedback adjustment, the powder temperature entering the machine stabilizes within the range of 2–6°C above the air dew point, reducing batch fluctuations. The amount of water added during the dough mixing process no longer needs frequent adjustments based on the powder temperature, and the dough exit temperature tends to stabilize. After pre-cooling during the slug flow stage, the sudden increase in wall temperature when the powder column passes through is reduced, and the heat exchange capacity of the later stage remains stable. The overall adjustment process is smooth and oscillating, the cooling water electric regulating valve operates at a low frequency, the valve and refrigeration unit lifespan is extended, and the long-term operation and maintenance workload is reduced.

[0197] Example 2: Compared with Example 1, this example also includes: In the first step: a temperature measuring point is set at the feed inlet of the vertical storage silo 1. When the feed temperature of this batch of flour changes by more than 3°C compared with the previous batch, the feed temperature is used as a feedforward quantity and added to the target flour temperature calculation in the sixth step. The external refrigeration unit water supply temperature is adjusted 5 to 10 minutes in advance.

[0198] This scheme introduces feedforward temperature control. When the feed temperature of the current batch of flour changes by more than 3°C compared to the previous batch, the change is immediately added to the target flour temperature calculation, adjusting the refrigeration unit's water supply temperature 5-10 minutes in advance. Since the conveying time of flour from the storage silo outlet through the Roots blower and cooling channel to the dough mixer's inlet 6 is typically 5-10 minutes, when the feed temperature undergoes a step change, the refrigeration unit needs to adjust its cooling capacity within this timeframe to ensure the flour reaches the target temperature range upon arrival at the outlet. The feedforward adjustment in this scheme does not directly change the water supply temperature; instead, it is added to the target flour temperature calculation, and the cooling capacity is adjusted accordingly for unified processing—thus leveraging the rapid response advantage of feedforward while retaining the accuracy correction capability of feedback.

[0199] Preferably, in the second step: the inner wall of the sealed heat exchange cooling channel 3 is sprayed with a polytetrafluoroethylene coating with a thickness of 0.1 to 0.3 mm.

[0200] Gluten in flour becomes sticky under the influence of moisture. Even when a stainless steel surface is polished to a mirror finish, the gluten will still adhere to the microscopic pits on the surface through van der Waals forces and mechanical interlocking. The polytetrafluoroethylene coating used in this solution has low surface energy, and the adhesion force of gluten to its surface is much lower than that of stainless steel, which can effectively reduce flour adhesion.

[0201] This coating design synergizes with the self-cleaning wall features of the powder column: the PTFE coating makes the powder layer adhering to the wall thinner and easier to peel off, and the powder column body can more effectively scrape off the residual powder layer as it advances along the wall. The combination of these two features ensures that the wall remains clean during long-term operation, eliminating the need for manual cleaning during downtime. In existing technologies, PTFE coatings are mostly used for chemical corrosion protection and food demolding. Using it for anti-sticking on the inner wall of the cooling space 301 is an application based on the niche mechanism of the change in the viscosity of flour gluten protein with moisture content. Those skilled in the art would not typically transfer the design concept of demolding coatings to powder conveying channels.

[0202] Preferably, in the fifth step: the moisture sensor is an online moisture meter 10 with a measurement accuracy of ±0.2% and a response time of no more than 3 seconds.

[0203] The water addition adjustment step is 0.5% of the flour mass. The moisture content measurement accuracy must be higher than the adjustment step, otherwise the measurement noise will be misinterpreted as a signal that needs adjustment. The reason for choosing a response time of no more than 3 seconds is that the conveying speed of flour in the pipeline is about 15 to 18 m / s, and the 3-second response time corresponds to a pipeline length of about 45 to 54 m. This response speed can ensure that the moisture content deviation is detected in time and triggers the water addition adjustment.

[0204] Preferably, the sixth step further includes the following steps:

[0205] (1) Monitor the measured value of the powder temperature in the fifth step of the machine.

[0206] (2) When the temperature of the powder entering the machine is higher than 28°C, the temperature setting of the downstream proofing chamber is lowered by 1-2°C and the proofing time is shortened; when the temperature of the powder entering the machine is lower than 24°C, the temperature setting of the proofing chamber is raised by 1-2°C and the proofing time is extended.

[0207] (3) Collect the temperature of the dough at the outlet of the proofing chamber.

[0208] (4) When the temperature of the dough deviates from the range of 24 to 28°C, adjust the proofing time in step (2).

[0209] In current fried dough stick production, the dough mixer and proofing chamber are typically controlled independently: fluctuations in the incoming flour temperature are transmitted to the outgoing dough temperature, and changes in dough temperature affect the proofing speed—if the incoming flour temperature is too high, the initial dough temperature is high, and during proofing, the internal fermentation heat of the dough combined with the ambient temperature results in the dough exiting the proofing chamber at an excessively high temperature, indicating over-fermentation; conversely, if the incoming flour temperature is too low, fermentation is insufficient. By collecting the dough temperature at the proofing chamber exit and correcting it in reverse, a two-stage correction is implemented: the first stage predictively adjusts the proofing parameters based on the incoming flour temperature, and the second stage adjusts the adjustment range based on the actual dough temperature, avoiding over-adjustment due to inaccurate predictions. The proofing chamber temperature and proofing time are adjusted simultaneously, rather than individually, because temperature affects the speed of fermentation, while time affects the degree of fermentation; only by working together can the dough exiting the proofing chamber meet both temperature and fermentation requirements.

[0210] Preferably, in the fourth step: when the relative humidity of the workshop is below 40% and the air dew point is below 10℃ in winter, the margin value is narrowed to 0-2℃; when the relative humidity of the workshop is above 80% and the air dew point is above 28℃ in summer, the margin value is widened to 8-12℃.

[0211] This winter-summer differentiated design and humidity level adjustment steps form a continuous spectrum, with five levels covering the humidity variation range of the workshop throughout the year, so that the wall temperature can both prevent condensation and make full use of the cooling capacity in any season.

[0212] Example 3: Compared with Example 1, this example also includes: the coarse powder outlet of the cyclone separator 4 set between the second and third steps leads to the central feeding area of ​​the rotary feeder 5, and the fine powder outlet leads to the edge feeding area of ​​the rotary feeder 5.

[0213] This solution upgrades the cyclone separator 4 from a separation device to a particle size classification device. Utilizing the physical properties of coarse particles falling along the outer wall under centrifugal force and fine particles rising with the internal swirling airflow, the flour is separated into two streams based on particle size: coarse flour and fine flour. The rotary feeder 5 has a central feeding zone for coarse flour and an edge feeding zone for fine flour. When the rotor blades of the rotary feeder 5 rotate, the linear velocity is low in the central area and high in the edge area.

[0214] After separation, coarse powder goes to the center and fine powder goes to the edge, so that powder particles of different sizes are evenly pushed by the blades in their respective suitable areas, improving the uniformity of the material. This design works in conjunction with the slug flow recognition characteristics. After the cyclone separator 4 initially separates the coarse and fine powder in the slug flow, the rotary feeder 5 processes the two powder streams separately. The impact of the slug flow on the rotary feeder 5 is dispersed to the two feeding zones, reducing the instantaneous load on the rotary feeder 5.

[0215] Preferably, in the first step: when switching production batches, the Roots high-pressure blower 2 is kept running for 3 to 5 minutes to empty the residual flour in the flour conveying pipe, and then the new batch is started to feed. During the emptying process, the sealed heat exchange and cooling channel 3 is kept running but no new flour is fed in.

[0216] This solution allows for switching without stopping the machine. The fan keeps running to blow the residual flour in the pipes to the dough mixer 6, while the cooling channel continues to operate. At this time, only air passes through the cooling channel, and the wall temperature of the cooling channel will not rise due to the cessation of flour feeding. When a new batch of flour enters, the wall temperature is still under control.

[0217] This batch switching process complements the start-stop purging process: the start-stop purging process handles the warming and purging of the walls after a long shutdown, while this step handles the residual venting during a short batch switching process. Both cover the entire operating condition from batch switching to a long shutdown.

[0218] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention. For those skilled in the art, any alternative improvements or transformations made to the implementation of the present invention fall within the protection scope of the present invention.

[0219] Any aspects of this invention not described in detail are well-known to those skilled in the art.

Claims

1. A method for controlling multi-stage high-pressure powder pneumatic conveying in a fried dough stick production line, the method being implemented using a multi-stage high-pressure powder pneumatic conveying system in the fried dough stick production line, characterized in that... The system includes a vertical storage silo, a Roots high-pressure blower, a closed heat exchange and cooling channel, a cyclone separator, a rotary feeder, and a dough mixer arranged sequentially along the flour conveying direction; the closed heat exchange and cooling channel includes a cooling space located in the center and an annular space set around it, and the annular space is divided into a front strong cooling section and a rear fine adjustment section along the flour flow direction. The method includes the following steps: The first step is to push the flour towards the cooling channel using pneumatic conveying, so that the flour is kept in a dilute phase conveying state; The second step is that the flour flows through a closed heat exchange and cooling channel. The channel is divided into a front strong cooling section and a rear fine-tuning section along the flour flow direction. Low-temperature cooling water is introduced into the front section and higher-temperature cooling water is introduced into the rear section. The third step is slug flow identification and gas-powder replacement; The fourth step is to collect the temperature and humidity data of the workshop, calculate the dew point of the air inside the pipe, and adjust the wall temperature of the sealed heat exchange cooling channel to be higher than the dew point while maintaining a margin. Fifth, temperature and moisture sensors are installed in the transfer section from the outlet of the closed heat exchange cooling channel to the feed inlet of the dough mixer to measure the temperature and moisture content of the powder entering the machine. Step 6: Adjust the water supply temperature and flow rate based on the comparison between the measured value of the powder temperature entering the machine and the target powder temperature range. Step 7: Adjust the amount of water added to the dough mixer and the concentration of the salt and alkali solution; at the same time, collect the dough temperature at the outlet of the dough mixer and adjust the target flour temperature range according to the collected dough temperature. Step 8: The powder is fed into the dough mixer and mixed into dough. When stopping the machine, first cut off the cooling water, then blow dry air through the channel. When starting the machine, first blow dry air through the wall to warm it, then feed in the powder.

2. The multi-stage high-pressure powder airflow conveying and control method for the fried dough stick raw material production line according to claim 1, characterized in that, The third step specifically includes the following steps: (1) Continuously acquire the pressure signal inside the tube at a sampling rate of not less than 100Hz; (2) Perform time-domain filtering on the collected pressure signal to remove high-frequency noise generated by pipeline vibration and extract the main frequency component and peak-to-peak value of pressure fluctuation; (3) When the main frequency is not higher than 10Hz and the ratio of peak-to-peak value to average pressure in the pipe is not lower than 5%, it is determined to be a slug flow condition; when the main frequency is higher than 10Hz, or the ratio of peak-to-peak value to average pressure is lower than 5%, it is determined to be a dilute phase condition. (4) Under the slug flow condition, the rotor speed of the rotary feeder is increased to 130% to 150% of the base speed. The rotor blades shear the edge of the incoming powder column, and the main body of the powder column is retained and continuously pushed along the pipeline. (5) Under slug flow conditions, the water supply temperature of the downstream fine-tuning section is reduced by 2-5℃ compared with the basic setting value; under dilute phase conditions, the rotor speed drops back to the basic speed and the water supply temperature of the downstream section rises back to the basic setting value. (6) The powder column body advances along the wall and carries away the powder layer attached to the wall. The peeled powder layer enters the rotary feeder along with the powder column.

3. The multi-stage high-pressure powder airflow conveying and control method for the fried dough stick raw material production line according to claim 1, characterized in that, The specific steps of the second step include: (1) Front-end forced cooling: Low-temperature cooling water exchanges heat with the powder flow in a counter-current manner, and the length of the front section accounts for 60% to 70% of the total length of the cooling channel; (2) A temperature sensor is installed at the front outlet to measure the flour temperature and confirm that it drops to 3-5°C above the dew point of the workshop air; (3) Rear section fine adjustment: Cooling water with a temperature 8-15°C higher than that of the front section is introduced. The cooling water and powder flow exchange heat in the same direction. The length of the rear section accounts for 30%-40% of the total length of the cooling channel. (4) Based on the slug flow intensity change cycle identified in the third step, increase the downstream cooling water flow rate in advance during the gas slug period before the powder column arrives to pre-cool the wall surface; maintain the basic cooling water flow rate when the powder column passes through the downstream section. (5) Dry air is added at the junction of the front and rear sections. The temperature difference between the added air and the outlet powder flow temperature of the front section shall not exceed ±2℃. The dew point of the added air shall be more than 5℃ lower than the dew point of the workshop air. (6) The ratio of cooling water mass flow rate to flour mass flow rate is 1:1 to 3:

1.

4. The multi-stage high-pressure powder airflow conveying and control method for the fried dough stick raw material production line according to claim 1, characterized in that, The specific steps of the fourth step include: (1) The ambient temperature and relative humidity are continuously collected by the workshop temperature sensor and humidity sensor; (2) Calculate the dew point temperature of the air inside the pipe using the ambient temperature and relative humidity according to the Antoine equation; (3) Generate the wall temperature setpoint by adding a margin value to the dew point temperature, with a basic margin value of 2 to 5℃; (4) When the relative humidity of the workshop is not lower than 70%, the margin value is increased to 5-8℃; when the relative humidity is lower than 60%, the margin value is decreased to 1-3℃. (5) The wall temperature is measured by a temperature sensor attached to the wall and fed back to the refrigeration unit so that the deviation between the wall temperature and the set value does not exceed ±1℃; (6) When the temperature change rate of the workshop environment exceeds 2℃ / min, repeat step (2) to update the dew point temperature and wall temperature settings.

5. The multi-stage high-pressure powder airflow conveying and control method for the fried dough stick raw material production line according to claim 1, characterized in that, The specific steps of the sixth step include: (1) Obtain the dew point temperature of the air inside the pipe calculated in step four; (2) Determine the load rate based on the ratio of the motor current to the rated current of the dough mixer, and calculate the temperature rise of the dough due to mechanical friction by combining the actual output power of the motor calculated based on the load rate and the dough mixing time. (3) The lower limit of the target powder temperature range is 2°C above the dew point temperature, and the upper limit is 6°C above the dew point temperature; (4) Compare the measured powder temperature in the fifth step with the target range: if the measured value is lower than the lower limit, increase the water supply temperature of the chiller unit or reduce the cooling water flow rate; if the measured value is higher than the upper limit, decrease the water supply temperature or increase the cooling water flow rate. The adjustment step should not exceed 1℃ / min. (5) When the motor current of the dough mixer exceeds 110% of the rated current and the duration exceeds 30s, the target powder temperature range will be lowered by 1 to 2℃. (6) When the dough temperature collected in step 7 is higher than 28℃, the target powder temperature range is shifted down by 1 to 2℃; when the dough temperature is lower than 22℃, the target powder temperature range is shifted up by 1 to 2℃.

6. The multi-stage high-pressure powder airflow conveying and control method for the fried dough stick raw material production line according to claim 1, characterized in that, The specific steps of step seven include: (1) The basic range of 48% to 52% is used as the symmetrical window for stacking in saline-alkali water; (2) During the dough mixing stage, 30% to 50% of the total amount of salt and alkali water is pre-added to the dough mixer, and the remaining 50% to 70% is added during the stacking process; (3) Adjust the water temperature for kneading dough according to the powder temperature of the fifth step: when the powder temperature is higher than 28℃, the water temperature for kneading dough is set to 0-2℃; when the powder temperature is lower than 24℃, it is set to 5-10℃; when it is between the two, it is set to 2-5℃. (4) Compare the moisture content of the dough entering the machine with the window: when it is below 48%, increase the amount of water added to the dough mixer linearly according to the deviation; when it is above 52%, decrease the amount of water added linearly according to the deviation. The adjustment step should not exceed 0.5% of the flour mass in a single adjustment. (5) After each adjustment, wait for the dough mixer to complete one mixing cycle before making the next adjustment; (6) Collect the dough temperature at the outlet of the dough mixer: When the dough temperature is higher than 28℃, increase the total mass concentration of sodium carbonate and sodium bicarbonate in the saline solution (based on the total mass of the dough) by 0.2% to 0.5% on the basis of 0.5% to 1.5%; when the dough temperature is lower than 22℃, decrease it by 0.2% to 0.5%; so that the dough temperature is controlled at 24 to 28℃.

7. The multi-stage high-pressure powder airflow conveying and control method for the fried dough stick raw material production line according to claim 1, characterized in that, The specific steps of step eight include: (1) When shutting down, first disconnect the cooling output of the external refrigeration unit; (2) Keep the Roots high-pressure blower running at low speed so that the workshop air flows through the wall of the cooling space of the cooling channel. Use the residual cold energy of the wall to cool the air to below the dew point. After the air precipitates moisture, it forms dry air, which is then blown across the channel wall. (3) After the wall temperature is measured by the wall temperature sensor and confirmed to rise to 3°C above the dew point of the workshop air, the Roots high-pressure blower is stopped. (4) When starting the machine, first introduce dry air to warm the wall: warm the wall for 5 minutes when the interval between shutdowns is no more than 30 minutes; warm the wall for 5 to 15 minutes when the interval between shutdowns is between 30 minutes and 2 hours; warm the wall for 15 to 20 minutes when the interval between shutdowns exceeds 2 hours. (5) After confirming that the wall temperature is stable at 3°C ​​above the dew point of the workshop air, start the refrigeration unit and begin feeding powder.

8. The method for controlling the multi-stage high-pressure powder airflow conveying in a fried dough stick production line according to claim 3, characterized in that, In the second step: calculate the cooling contraction rate based on the temperature difference between the inlet and outlet air of the cooling channel, and correct the air supply volume according to the measured value of the wall temperature, so that the air velocity at the outlet of the cooling channel is maintained at 15-18 m / s. 15 m / s is the lower limit of the non-settling air velocity for horizontal conveying of flour. The dew point of the replenished dry air is more than 5°C lower than the dew point of the workshop air.

9. The multi-stage high-pressure powder airflow conveying and control method for the dough stick production line according to claim 1, characterized in that, In the first step: set a temperature measuring point at the feed inlet of the vertical storage silo. When the feed temperature of this batch of flour changes by more than 3°C compared with the previous batch, the feed temperature is added as a feedforward quantity to the target flour temperature calculation in the sixth step. Adjust the water supply temperature of the external refrigeration unit 5 to 10 minutes in advance.

10. A multi-stage high-pressure powder pneumatic conveying system for a fried dough stick production line, the system being used in the multi-stage high-pressure powder pneumatic conveying control method for a fried dough stick production line as described in any one of claims 1-9, characterized in that: The system includes a vertical storage silo, a Roots high-pressure blower, a closed heat exchange and cooling channel, a cyclone separator, a rotary feeder, and a dough mixer arranged sequentially along the flour conveying direction; the closed heat exchange and cooling channel includes a cooling space located in the center and an annular space set around it, and the annular space is divided into a front strong cooling section and a rear fine adjustment section along the flour flow direction.