A die forging method for a disc-shaped forging with a groove at the bottom
By breaking down the forging process into multiple stages and using auxiliary tools with different structures and displacement monitoring, the problems of incomplete filling and die wear in one-time forging of disc-shaped forgings with grooves at the bottom were solved, achieving high-precision forging and extending die life.
Patent Information
- Application Number
- CN202611436637.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-16
- Publication Date
- 2026-11-17
AI Technical Summary
The existing technology for one-time die forging of disc-shaped forgings with grooves at the bottom has problems such as difficulty in filling the root of the groove, excessive forming load, severe die wear, and poor forming accuracy.
The traditional one-time die forging process is broken down into three stages, using auxiliary tools with different structures (first disc auxiliary tool, ring auxiliary tool, and second disc auxiliary tool), combined with displacement measurement components for real-time monitoring, to precisely control the metal flow path and complete the groove forming and forging flattening step by step.
It significantly improves the dimensional accuracy and wall thickness uniformity of the bottom groove of forgings, reduces the tonnage requirements of forging equipment, extends the die life, and improves production stability and controllability.
Smart Images

Figure CN123102898A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of die forging technology, and particularly relates to a die forging method for a disc-shaped forging with a groove at the bottom. Background Technology
[0002] Disc-shaped forgings with a groove at the bottom are a typical type of structural component. The main body is disc-shaped, and the bottom end face has a bowl-shaped or disc-shaped groove at the center. They are widely used in gear blanks, flanges and rotating parts.
[0003] Currently, this type of forging is conventionally produced using a one-time die forging process, where the billet is filled and formed into a single piece in a single die-closing operation. However, this process has the following prominent problems: On the one hand, filling the rounded corner area at the root of the groove is difficult. The outward flow of the disc metal and the inward flow of the groove metal interfere with each other, resulting in a complex deformation path. As the end of the metal flow, the rounded corner area at the root of the groove is prone to incomplete filling. Forcibly increasing the load can easily cause internal defects such as folding and flow line disorder. On the other hand, if the forming load is too large, the entire blank undergoes large-scale plastic deformation within the closed mold cavity. The metal must overcome significant flow resistance to reach the far end of the cavity, causing a sharp increase in the forming load, which will exacerbate mold wear and shorten mold life. Summary of the Invention
[0004] In view of the above analysis, the present invention aims to provide a die forging method for a disc-shaped forging with a groove at the bottom, so as to solve at least one of the following problems in the prior art: incomplete filling in a one-time die forging process of a disc-shaped forging with a groove at the bottom, the metal having to overcome a large flow resistance to reach the far end of the cavity, poor forming accuracy, insufficient monitoring of the degree of deformation of the billet, and poor die forging quality.
[0005] The objective of this invention is mainly achieved through the following technical solutions: This invention provides a die forging method for a disc-shaped forging with a groove at the bottom, comprising the following steps: Step 1: Place the billet in the cavity of the mold. The bottom of the cavity is provided with a forming boss for forming the bottom groove of the disc forging. Place the first disc fixture on the billet and perform a single die forging. During the single die forging process, monitor the first displacement of the billet part corresponding to the position of the forming boss in real time. Step 2: After the first displacement reaches the preset amount, continue to descend to the set height, replace the first disc fixture with a ring fixture, and perform secondary die forging on the billet. During the secondary die forging process, monitor the second displacement of the billet part corresponding to the bottom position of the cavity in real time. Step 3: After the second displacement reaches the preset amount, replace the ring fixture with the second disc fixture, perform three die forgings on the billet, flatten the upper surface of the billet, and obtain a disc-shaped forging with a groove at the bottom.
[0006] Furthermore, the applied pressure during a single forging is 0.9 × 10⁻⁶. 8 N ~ 1.1 × 10 8 N.
[0007] Furthermore, the applied pressure for the secondary forging is 2.8 × 10⁻⁶. 8 N ~ 3.2 × 10 8 N.
[0008] Furthermore, the applied pressure for the three forging processes is 0.5 × 10⁻⁶. 8 N ~ 0.8 × 10 8 N.
[0009] Furthermore, the upper end face of the forming boss is provided with at least one first displacement measuring component, and the bottom of the cavity is provided with at least one second displacement measuring component.
[0010] Furthermore, the number of first displacement measuring components is one, and the number of second displacement measuring components is multiple.
[0011] Furthermore, multiple second displacement measuring components are uniformly arranged along the cavity axis.
[0012] Furthermore, in step 2, determining that the second displacement has reached the preset amount includes the following steps: The displacement values measured by multiple second displacement measuring components are obtained, the average value of multiple displacement values is calculated, and the average value is used as the measured value of the second displacement. When the measured value reaches the preset amount, it is determined that the blank part corresponding to the bottom position of the cavity has reached the expected deformation amount.
[0013] Furthermore, before calculating the average, the following steps are also included: Determine whether the displacement values of multiple second displacement measurement components are within the preset tolerance range. If a displacement value deviates from the average of the other displacement values by more than a set threshold, then remove the outlier and recalculate the average value.
[0014] Furthermore, when more than two displacement values are abnormal among multiple second displacement measurement components, an alarm signal is issued and the forging process is suspended.
[0015] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects: A) The die forging method for disc-shaped forgings with grooves at the bottom provided by this invention decomposes the traditional one-time die forging into three stages and uses auxiliary fixtures with different structures (first disc auxiliary fixture, ring auxiliary fixture, and second disc auxiliary fixture). This enables effective control of metal flow, effectively reduces local underfilling or overfilling defects caused by different forming forces and flow paths required in different parts, and significantly improves the dimensional accuracy and wall thickness uniformity of the groove at the bottom of the forging. The entire process not only reduces the tonnage requirements of the die forging equipment and extends the die life, but also improves process controllability and production stability through displacement monitoring. It is especially suitable for disc-shaped forgings with large groove depths or high dimensional accuracy requirements.
[0016] B) The forging method for a disc-shaped forging with a groove at the bottom provided by this invention firstly applies pressure to the entire area of the billet using a first disc fixture, and in conjunction with the bottom forming boss, prioritizes and precisely fills the root of the groove, alleviating incomplete filling and folding defects caused by the mutual interference of the lateral and longitudinal flow of metal. Simultaneously, by real-time monitoring and precise control of the first displacement, the forming quality of the critical groove area is ensured. In subsequent steps, a second forging is performed using a ring fixture, shifting the deformation focus to the periphery of the disc, allowing the metal to expand orderly from the center to the outer edge, further reducing the overall forming resistance and optimizing the stress state of the die. Finally, a second disc fixture is used for leveling, ensuring the flatness and dimensional accuracy of the upper surface of the forging.
[0017] In this invention, the above-described technical solutions can be combined with each other to achieve more preferred combinations. Other features and advantages of this invention will be set forth in the following description, and some advantages may become apparent from the description or be learned by practicing the invention. The objects and other advantages of this invention can be realized and obtained from what is particularly pointed out in the description and drawings. Attached Figure Description
[0018] The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Throughout the drawings, the same reference numerals denote the same parts.
[0019] Figure 1 This is a flowchart illustrating a die forging method for a disc-shaped forging with a groove at the bottom, as provided in Embodiment 1 of the present invention. Figure 2 This is a flow chart of a die forging method for a disc-shaped forging with a groove at the bottom, provided in Embodiment 1 of the present invention. Figure 3 This is a schematic diagram of the structure of the first displacement measuring component and the second displacement measuring component in the die forging method of the disc-shaped forging with a groove at the bottom provided in Embodiment 2 of the present invention; Figure 4This is a state diagram of the first displacement measuring component and the second displacement measuring component before displacement in the die forging method of the disc-shaped forging with a groove at the bottom provided in Embodiment 2 of the present invention. Figure 5 This is a diagram showing the state of the first displacement measuring component and the second displacement measuring component after displacement in the die forging method for a disc-shaped forging with a groove at the bottom, provided in Embodiment 2 of the present invention.
[0020] Figure label: 1. Touch mold end; 2. Push rod; 3. Upper piston end; 4. Hydraulic cylinder; 5. Lower piston end; 6. Scale slider; 7. Return spring; 8. First displacement sensor; 9. Second displacement sensor; 10. First disc fixture; 11. Ring fixture; 12. Second disc fixture; 13. Mold; 14. Blank. Detailed Implementation
[0021] Preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings, which form part of this application and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not intended to limit the scope of the present invention.
[0022] Example 1 This embodiment provides a die forging method for a disc-shaped forging with a groove at the bottom. See [link to documentation]. Figures 1 to 2 It includes the following steps: Step 1: Place the blank 14 in the cavity of the mold 13. The bottom of the cavity is provided with a forming boss for forming the bottom groove of the disc forging. Place the first disc auxiliary tool 10 on the blank 14 and perform a die forging on the blank 14. During the die forging process, monitor the first displacement of the blank 14 part corresponding to the position of the forming boss in real time. Step 2: When the first displacement reaches the preset amount, it means that the part of the blank 14 corresponding to the position of the forming boss has reached the expected deformation amount. Continue to descend and set the height. The set height is 1 / 3 to 1 / 2 of the height of the forming boss. Replace the first disc auxiliary tool 10 with the ring auxiliary tool 11 and perform secondary die forging on the blank 14. During the secondary die forging process, monitor the second displacement of the part of the blank 14 corresponding to the bottom position of the cavity in real time. Step 3: When the second displacement reaches the preset amount, it means that the part of the billet 14 corresponding to the bottom position of the cavity has reached the expected deformation amount. Replace the ring auxiliary tool 11 with the second disc auxiliary tool 12, perform three die forgings on the billet 14, and flatten the upper end surface of the billet 14 to obtain a disc-shaped forging with a groove at the bottom.
[0023] Compared with the prior art, the die forging method for disc-shaped forgings with grooves at the bottom provided in this embodiment decomposes the traditional one-time die forging into three stages and uses auxiliary fixtures with different structures (first disc auxiliary fixture 10, ring auxiliary fixture 11 and second disc auxiliary fixture 12). This can effectively control the metal flow, effectively reduce local underfilling or overfilling defects caused by different forming forces and flow paths in different parts, and significantly improve the dimensional accuracy and wall thickness uniformity of the groove at the bottom of the forging. The entire process can not only reduce the tonnage requirements of the die forging equipment and extend the life of the die 13, but also improve the process controllability and production stability through displacement monitoring. It is especially suitable for disc-shaped forgings with large groove depth or high dimensional accuracy requirements.
[0024] Specifically, firstly, pressure is applied to the entire area of the blank 14 using the first disc fixture 10, and in conjunction with the bottom forming boss, the filling of the groove root is completed first and accurately, alleviating the filling inadequacy and folding defects caused by the mutual interference of the lateral and longitudinal flow of metal; at the same time, the forming quality of the key groove area is ensured by real-time monitoring and precise control of the first displacement.
[0025] In subsequent steps, by replacing the ring fixture 11 with a secondary die forging, the deformation focus is shifted to the periphery of the disc, allowing the metal to expand in an orderly manner from the center to the outer edge, further reducing the overall forming resistance and optimizing the stress state of the die 13.
[0026] Finally, the second disc fixture 12 is used for leveling, which can ensure the flatness and dimensional accuracy of the upper surface of the forging.
[0027] Furthermore, in order to solve the problem of poor forging quality, taking 30CrNiMo8 (forming temperature 1250℃) as an example, the applied pressure in one forging is 0.9×10⁻⁶. 8 N ~ 1.1 × 10 8 N, the applied pressure for secondary forging is 2.8 × 10⁻⁶. 8 N ~ 3.2 × 10 8 N, the applied pressure for the three forging processes is 0.5 × 10 N. 8 N ~ 0.8 × 10 8 N. By limiting the pressure applied in each stage to the above range, it is possible to ensure that the first stage prioritizes filling the root of the groove, preventing the metal from flowing outwards in a disorderly manner due to excessive pressure. It also ensures that the second stage has sufficient load to drive the metal flow and forming in the surrounding area, alleviating underfilling. At the same time, the third stage only requires a small pressure to complete the leveling, preventing the already formed groove structure from being damaged by excessive pressure, thus further ensuring the forming quality.
[0028] Furthermore, in order to solve the problem of inaccurate displacement monitoring, at least one first displacement measuring component is provided on the upper end face of the forming boss, and at least one second displacement measuring component is provided at the bottom of the cavity.
[0029] For example, there is one first displacement measuring component and multiple second displacement measuring components, which are evenly arranged along the cavity axis.
[0030] Since there are multiple second displacement measuring components, step 2 above, determining that the second displacement has reached a preset amount, includes the following steps: The displacement values measured by multiple second displacement measuring components are obtained, the average value of multiple displacement values is calculated, and the average value is used as the measured value of the second displacement. When the measured value reaches the preset amount, it is determined that the blank 14 part corresponding to the bottom position of the cavity has reached the expected deformation amount.
[0031] Furthermore, before calculating the average, the following steps are also included: It determines whether the displacement values of multiple second displacement measuring components are within the preset tolerance range. If a certain displacement value deviates from the average of the other displacement values by more than a set threshold, the abnormal value is removed and the average value is recalculated to ensure the accuracy and reliability of the measured value.
[0032] Furthermore, when more than two displacement values are abnormal in multiple second displacement measurement components, an alarm signal is issued and the forging process is suspended, prompting the operator to check whether there are foreign objects at the bottom of the cavity of mold 13 or whether mold 13 has undergone abnormal deformation, thereby reducing the forging size deviation or mold 13 damage caused by displacement monitoring distortion.
[0033] Example 2 This embodiment provides a die forging method for a disc-shaped forging with a groove at the bottom. The steps are basically the same as the die forging method for a disc-shaped forging with a groove at the bottom provided in Embodiment 1, with the difference being: The structures of the first displacement measuring component and the second displacement measuring component are basically the same, see [link to relevant documentation]. Figure 3 Each component includes a touch mold end 1, a push rod 2, an upper piston end 3, a hydraulic cylinder 4, hydraulic oil, a lower piston end 5, and a scale slider 6.
[0034] The upper piston end 3 and the lower piston end 5 are slidably connected to the side wall of the hydraulic cylinder body 4, and the sealed space between the upper piston end 3 and the lower piston end 5 is filled with hydraulic oil; the contact end 1 is located in the cavity and is in contact with the blank 14; one end of the push rod 2 is fixedly connected to the contact end 1, and the other end of the push rod 2 passes through the bottom of the mold 13 and is fixedly connected to the upper piston end 3; the scale slider 6 is fixedly connected to the side of the lower piston end 5 away from the upper piston end 3.
[0035] When the billet 14 shifts downward during the forging process, it pushes the die end 1 and the push rod 2 downward simultaneously. The push rod 2 drives the upper piston end 3 to slide downward within the hydraulic cylinder 4, squeezing the hydraulic oil filled in the hydraulic cylinder 4. The hydraulic oil then transmits pressure downward, pushing the lower piston end 5 downward, which in turn causes the scale slider 6, which is fixedly connected to the lower piston end 5, to extend synchronously. See below. Figures 4 to 5 .
[0036] In this way, by using the principle of hydraulic equal transmission, the invisible displacement of the blank 14 inside the cavity of mold 13 is accurately converted into the linear displacement of the scale slider 6 on the outside of the hydraulic cylinder 4. This enables real-time and intuitive observation of the metal flow at the bottom of the groove and the bottom of the cavity during the die forging process. Moreover, it eliminates the need to place electronic sensors inside the high-temperature and high-pressure cavity of mold 13, thus solving problems such as sensor damage, signal interference, and sealing difficulties.
[0037] Furthermore, to address the issue of displacement measurement failure to return to the original position, the aforementioned first and second displacement measurement components also include a return spring 7 sleeved on the outer wall of the push rod 2. One end of the return spring 7 is fixedly connected to the hydraulic cylinder 4, and the other end is fixedly connected to the upper piston end 3. Thus, when the die 13 opens after forging, the return spring 7 can pull the upper piston end 3 back to its original position, thereby synchronously returning the push rod 2, the contact end 1, the lower piston end 5, and the scale slider 6 to their initial positions, preparing for the next displacement measurement in the forging process. This eliminates the need for manual reset, effectively improving the convenience and repeatability of the measurement operation.
[0038] Furthermore, since the compression deformation of hydraulic oil is unavoidable, in order to solve the problem of compression deformation affecting the accuracy of displacement monitoring, the above-mentioned first displacement measuring component and second displacement measuring component also include a first displacement sensor 8 and a second displacement sensor 9, wherein the first displacement sensor 8 is disposed on the upper piston end 3 and the second displacement sensor 9 is disposed on the lower piston end 5.
[0039] Based on the setup of the first displacement sensor 8 and the second displacement sensor 9, the measurement steps for the displacement consumed by the compression deformation of the hydraulic oil are as follows: Step A: At the start of a forging process, the first displacement sensor 8 and the second displacement sensor 9 are turned on simultaneously to collect the displacement signals of the upper piston end 3 and the lower piston end 5, respectively. At this time, due to the hysteresis effect of hydraulic oil compression deformation, the upper piston end 3 is displaced first, while the pressure has not yet been transmitted to the lower piston end 5. Therefore, the measured value of the second displacement sensor 9 is zero. Step B: Continuously monitor the output value of the second displacement sensor 9. When the output value of the second displacement sensor 9 changes from zero to non-zero, it is determined that the hydraulic oil has completed compression and has begun to push the lower piston end 5 to move. This moment is the end point of compression deformation of the hydraulic oil. Immediately close the first displacement sensor 8 and the second displacement sensor 9 at the same time to stop data acquisition. Step C: Read the cumulative displacement value recorded by the first displacement sensor 8 at the moment of closing. The cumulative displacement value is the amount of displacement consumed by the compression and deformation of the hydraulic oil.
[0040] In this way, the displacement error caused by hydraulic oil compression under different working conditions can be calibrated in advance. In the displacement calculation of the subsequent die forging process, the calibration error can be directly substituted into the calculation as a correction term, further improving the accuracy of displacement monitoring.
[0041] It should be noted that the first displacement sensor 8 and the second displacement sensor 9 are turned on only for a very short time window at the beginning of the measurement and then immediately turned off. This reduces the time that the first displacement sensor 8 and the second displacement sensor 9 are exposed to the harsh forging environment such as high temperature, vibration and dust to the millisecond level, which can effectively reduce the risk of electronic components failing due to heat radiation and impact load and extend their service life. At the same time, the main bodies of the first displacement sensor 8 and the second displacement sensor 9 are both mounted on the hydraulic cylinder 4 outside the mold 13, away from the high temperature heat source and metal splash area near the cavity, so there is no need to add a complicated heat insulation or sealing protection structure.
[0042] Specifically, in step 1 above, the process of reaching the preset displacement includes the following steps: Step 11: Before a forging begins, execute steps A to C above to calibrate the displacement consumed by the hydraulic oil compression deformation of the first displacement measuring component under the current working condition, denoted as ΔX1, as the correction value of the first displacement measuring component. Step 12: During a single forging process, the real-time displacement value of the scale slider 6 is read and recorded as X1(t); Step 13: Calculate the sum of the real-time displacement value X1(t) of the scale slider 6 and the displacement ΔX1 consumed by the compression deformation of the hydraulic oil to obtain the corrected actual displacement value; Step 14: Compare the corrected actual displacement value with the preset first displacement threshold in real time. When the corrected actual displacement value is greater than or equal to the first displacement threshold, it is determined that the blank 14 part corresponding to the forming boss position has reached the expected deformation amount.
[0043] In this way, by adding the real-time displacement value of the scale slider 6 to the pre-calibrated hydraulic oil compression consumption, the total stroke of the upper piston end 3 (i.e., the actual downward movement of the billet 14) is directly used as the judgment basis. Monitoring can be completed simply by reading the mechanical displacement value of the scale slider 6 on the outside of the mold 13, without the need to continuously turn on the electronic displacement sensor during the die forging process. At the same time, this method fully considers the displacement consumed by the hydraulic oil compression deformation, and includes the displacement difference caused by compression deformation in the actual displacement of the billet 14, thereby ensuring the accuracy of the first displacement measurement result and improving the reliability of the groove forming accuracy control in the first die forging stage.
[0044] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.
Claims
1. A die forging method for a disc-shaped forging with a groove at the bottom, characterized in that, Includes the following steps: Step 1: Place the billet in the cavity of the mold. The bottom of the cavity is provided with a forming boss for forming the bottom groove of the disc forging. Place the first disc fixture on the billet and perform a single die forging. During the single die forging process, monitor the first displacement of the billet part corresponding to the position of the forming boss in real time. Step 2: After the first displacement reaches the preset amount, continue to descend to the set height, replace the first disc fixture with a ring fixture, and perform secondary die forging on the billet. During the secondary die forging process, monitor the second displacement of the billet part corresponding to the bottom position of the cavity in real time. Step 3: After the second displacement reaches the preset amount, replace the ring fixture with the second disc fixture, perform three die forgings on the billet, flatten the upper surface of the billet, and obtain a disc-shaped forging with a groove at the bottom.
2. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 1, characterized in that, The applied pressure during the first forging is 0.9 × 10⁻⁶. 8 N ~ 1.1 × 10 8 N.
3. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 1, characterized in that, The applied pressure during the secondary forging is 2.8 × 10⁻⁶. 8 N ~ 3.2 × 10 8 N.
4. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 1, characterized in that, The applied pressure during the three-stage forging was 0.5 × 10⁻⁶. 8 N ~ 0.8 × 10 8 N.
5. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 1, characterized in that, The upper end face of the forming boss is provided with at least one first displacement measuring component, and the bottom of the cavity is provided with at least one second displacement measuring component.
6. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 5, characterized in that, The number of the first displacement measuring components is one, and the number of the second displacement measuring components is multiple.
7. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 6, characterized in that, Multiple second displacement measuring components are evenly arranged along the cavity axis.
8. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 6, characterized in that, Step 2, determining that the second displacement has reached the preset amount, includes the following steps: The displacement values measured by multiple second displacement measuring components are obtained, the average value of multiple displacement values is calculated, and the average value is used as the measured value of the second displacement. When the measured value reaches the preset amount, it is determined that the blank part corresponding to the bottom position of the cavity has reached the expected deformation amount.
9. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 8, characterized in that, Before calculating the average, the following steps are also included: Determine whether the displacement values of multiple second displacement measurement components are within the preset tolerance range. If a displacement value deviates from the average of the other displacement values by more than a set threshold, then remove the outlier and recalculate the average value.
10. The die forging method for a disc-shaped forging with a groove at the bottom according to claim 9, characterized in that, When more than two displacement values are abnormal in multiple second displacement measurement components, an alarm signal is issued and the forging process is suspended.