Floating concrete fan foundation and its construction method

By using a concrete structure design with multiple columns and pontoons, combined with prestressed steel-concrete segments and ballast tank design, the problem of high construction difficulty and insufficient durability of existing floating wind turbine foundations has been solved, achieving high rigidity and stability, and adapting to the long-term stable operation of large wind turbine units.

CN123104865APending Publication Date: 2026-11-17OCEAN UNIV OF CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610820218.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-08
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing floating wind turbine foundations have significant defects in terms of structural selection, construction technology, connection durability, and operation and maintenance. In particular, during the development of large-scale wind turbines, steel consumption is high, construction is difficult, and structural durability and safety are hard to guarantee.

Method used

The system employs a concrete structure design with multiple columns and pontoons. Each pontoon is composed of multiple prestressed steel-concrete sections. The compressive force is applied through steel connection structures and pre-tensioned tendons. Combined with the design of ballast tanks and bulkheads, it forms a high-rigidity, adjustable buoyancy system.

Benefits of technology

It simplifies the construction process, reduces costs, improves structural durability and anti-overturning ability, ensures stable operation in complex marine environments, and meets the long-term stable operation requirements of large wind turbine units.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123104865A_ABST
    Figure CN123104865A_ABST
Patent Text Reader

Abstract

This invention discloses a floating concrete wind turbine foundation, comprising multiple outer columns, one central column, and multiple pontoons. Each outer column is connected to the central column via a pontoon. Each pontoon includes multiple prestressed steel-concrete segments. Each prestressed steel-concrete segment includes an outer shell, two steel connection structures, and pretensioning tendons. Each steel connection structure is installed at one end of the outer shell. Multiple pretensioning tendons are arranged on the outer shell to apply compressive force. Each steel connection structure is fixedly connected to one end of a pretensioning tendon. The two adjacent steel connection structures of any two adjacent prestressed steel-concrete segments are fixedly connected by sealed welding. Any two adjacent prestressed steel-concrete segments are separated by a partition plate. This invention can reduce structural costs, improve foundation durability, simplify construction processes, optimize structural stress, and is suitable for the long-term stable operation of large wind turbine units in complex deep-sea environments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of offshore wind turbines, and more specifically, relates to floating concrete wind turbine foundations and their construction methods. Background Technology

[0002] In the development of deep-sea wind energy resources, floating wind turbine foundations, as key equipment supporting wind turbine units, directly affect the safety, economy, and long-term operation of offshore wind power projects. However, the technology of offshore floating wind turbine foundations is still in the process of continuous exploration and iteration. Existing floating wind turbine foundation solutions still have many significant defects and technical bottlenecks in terms of structural selection, construction technology, connection durability, and operation and maintenance.

[0003] Currently, most mainstream deep-sea floating wind turbine foundations adopt an all-steel structure. Although steel structures have certain advantages in standardization during manufacturing and installation, steel itself is a high-energy-consuming and high-cost industrial material. As offshore wind turbines develop towards larger sizes (such as 15MW and above units), the size and weight of the foundation structure increase exponentially, resulting in huge steel consumption. This directly drives up the initial investment cost of the project, and the economic disadvantage becomes increasingly apparent in the context of large-scale deep-sea development.

[0004] To replace steel structures, some existing technologies attempt to use concrete structures or steel-concrete composite structures, often employing an integral floating body design. However, this integral design has shortcomings in practical construction and mechanical performance. Regarding prestressing tensioning, the large volume of the integral floating body makes it difficult to achieve precise prestressing application in sections and stages. In practice, the integral prestressing tensioning of large-volume concrete is extremely difficult, often leading to uneven stress transmission within the structure, easily causing localized stress concentration, which can then trigger micro-cracks in the concrete or even structural damage, severely affecting the structural strength and stiffness of the floating body. Simultaneously, the large-volume concrete foundation places extremely high load requirements on lifting equipment during factory prefabrication, land transport, and offshore installation, severely limiting construction flexibility. Once even minor stress loss occurs during prefabrication or construction, subsequent repairs are difficult, and it is hard to adapt to the complex offshore construction environment. Therefore, the structural durability and safety of integral structures facing the massive loads of deep-sea environments cannot be effectively guaranteed. Summary of the Invention

[0005] In response to the above-mentioned defects or improvement needs of existing technologies, this invention provides a floating concrete wind turbine foundation and its construction method, which can reduce structural costs, improve foundation durability, simplify construction process, optimize structural stress, and adapt to the long-term stable operation of large wind turbine units in the complex marine environment of deep sea.

[0006] To achieve the above objectives, according to one aspect of the present invention, a floating concrete wind turbine foundation is provided, comprising multiple columns and multiple pontoons. The columns include multiple outer columns and a central column. The outer columns are distributed at the vertices of a polygon and surround the central column. Each outer column is connected to the central column via a pontoon, wherein: Each of the aforementioned pontoons comprises multiple prestressed reinforced concrete sections sequentially spliced ​​along the direction from the central column to the outer columns. Each prestressed reinforced concrete section includes an outer shell, two steel connecting structures, and pretensioning tendons. The outer shell is made of reinforced concrete and includes a concrete body and a steel reinforcement skeleton embedded in the concrete body. Each steel connecting structure is welded to the steel reinforcement skeleton. The two steel connecting structures are arranged along the direction from the central column to the outer columns, and each steel connecting structure is installed at one end of the outer shell. Multiple pretensioning tendons are arranged on the outer shell to apply compressive force to the outer shell. The length direction of each pretensioning tendon extends along the direction from the central column to the outer columns. Each steel connecting structure is fixedly connected to one end of a pretensioning tendon. The two steel connecting structures of any two adjacent prestressed reinforced concrete sections are fixedly connected together by sealing welding. Any two adjacent prestressed reinforced concrete sections are separated by partition plates, thereby forming ballast tanks within each outer shell.

[0007] Preferably, each of the steel connection structures includes a steel end plate, a wedge-type anchor, and an enclosing shell. One side of the steel end plate is welded to the reinforcing steel skeleton. The wedge-type anchor and the enclosing shell are respectively fixed to the side of the steel end plate away from the reinforcing steel skeleton. The wedge-type anchor is fixedly connected to one end of the pretensioning bar. The end of the enclosing shell away from the steel end plate is open. The steel end plate is provided with a process manhole communicating with the inner cavity of the shell at a position corresponding to the enclosing shell. For any two adjacent prestressed steel-concrete sections, the open ends of their two close-to-each-other enclosed shells are fixedly connected by a sealed welding method.

[0008] Preferably, each end of the outer shell is provided with a plurality of pre-embedded steel plates, each steel end plate is welded to the pre-embedded steel plate at the corresponding end, and a reinforcing rib is provided between the steel end plate and the pre-embedded steel plate.

[0009] Preferably, the sealing weld is a double-sided full penetration weld, thereby forming a continuous closed circumferential weld at the joint of two adjacent enclosed shell plates.

[0010] Preferably, the outer surface of the continuous closed-loop weld seam on the outer side of the enclosed shell is ground smooth and then coated with anti-corrosion paint.

[0011] Preferably, the three outer pillars are arranged in an equilateral triangle around the outer edge of the central pillar.

[0012] Preferably, the side of the steel connection structure closest to the reinforcing steel frame is pre-coated with an interface adhesive and a waterproof sealant to prevent seawater from seeping in along the joint between the steel connection structure and the concrete body.

[0013] Preferably, each of the outer shells has multiple ballast chambers, and these ballast chambers are separated by a first partition plate; Each of the aforementioned shells is further divided into pedestrian passages by a second partition.

[0014] Preferably, the reinforcing steel cage has multiple anchoring reinforcing bars connected to the steel connection structure; The length by which each anchoring rebar penetrates into the concrete is not less than 35 times the diameter of the anchoring rebar itself.

[0015] Preferably, the concrete body in the middle region of the pontoon is made of ultra-high performance concrete material doped with steel fibers; The concrete bodies at both ends of the pontoon are made of ultra-high performance concrete material without steel fibers, or high performance concrete material without steel fibers. The upper part of each column is made of ultra-high performance concrete material mixed with steel fibers; The lower part of each column is made of ultra-high performance concrete without steel fibers, or high performance concrete without steel fibers.

[0016] According to another aspect of the present invention, a construction method for the aforementioned floating concrete wind turbine foundation is also provided, comprising the following steps: 1) A steel reinforcement cage, including anchor steel bars, is laid in the mold. Pipes are installed on the steel reinforcement cage to form prestressed ducts. The steel connection structure is welded and fixed at both ends of the steel reinforcement cage. Then, concrete is poured to form the outer shell. After the concrete reaches the preset strength, multiple pre-tensioned tendons are arranged on the shell. The ends of the pre-tensioned tendons are tensioned and fixed by the clamp-type anchors on the steel connection structure, thereby applying compressive force to the shell. After tensioning is completed, the prestressed ducts are grouted and sealed. A partition plate is welded on a steel connection structure of each shell. In this way, the prefabrication of each prestressed steel-concrete segment is completed. 2) The prefabricated prestressed steel-concrete segments are sequentially connected and arranged. The open ends of the enclosed shells that are close to each other are sealed and welded to form a continuous closed circumferential weld, so that the adjacent prestressed steel-concrete segments are fixedly connected together. The partition plates separate the adjacent prestressed steel-concrete segments, so that each shell forms a ballast chamber. 3) After grinding the outer surface of the continuous closed circumferential weld on the outside of the enclosed plate shell to a smooth finish, apply anti-corrosion paint. 4) Repeat steps 1 to 3) to form multiple pontoons; 5) The intermediate column and each of the outer columns are fixedly connected by the pontoons to form a floating wind turbine foundation. A water injection system and a mooring system are installed on the floating wind turbine foundation. 6) Launch the floating wind turbine foundation as a whole into the water, and use the water injection system to inject water into each ballast tank to adjust the buoyancy of the floating wind turbine foundation so that the floating wind turbine foundation maintains the designed horizontal floating posture. 7) Tow the floating wind turbine foundation to the designated offshore wind farm location, connect the mooring system to the anchoring device, and complete the positioning and anchoring of the floating wind turbine foundation.

[0017] Preferably, in step 1), the concrete body in the middle region of the pontoon made of ultra-high performance concrete material doped with steel fibers is the intermediate concrete body, and the concrete body at the end of the pontoon made of ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers is the end concrete body. The intermediate concrete body and each end concrete body are compacted by vibration in layers, and the interface at both ends of the intermediate concrete body is roughened to ensure that the interface between the intermediate concrete body and the end concrete body is tightly bonded. For each column, the upper part of the column is made of ultra-high performance concrete material mixed with steel fibers, which is called the upper concrete body. The lower part of the column is made of ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers, which is called the lower concrete body. The lower concrete body and the upper concrete body are compacted in layers by vibration, and the interface of the lower concrete body is roughened to ensure a tight bond between the lower concrete body and the upper concrete body.

[0018] In summary, compared with the prior art, the above-described technical solutions conceived by this invention can achieve the following beneficial effects: 1) Because each prestressed steel-concrete segment is prefabricated as an independent unit, this structural design simplifies the manufacturing and installation process of large floating components. The prestressed steel-concrete segments complete concrete pouring, welding of the reinforcing steel frame and steel connection structure, and the arrangement and tensioning of prestressing bars in a factory environment, ensuring the dimensional accuracy and construction quality of each individual segment. In subsequent on-site assembly, only sealed welding of the steel connection structure is needed to achieve rapid connection of each module. Since tensioning is handled in sections, the assembly plant does not need to perform overall tensioning after assembling, reducing construction difficulty and assembly costs at the assembly plant, while also reducing assembly time and increasing the quality of the final assembly. This improves the safety and reliability of the floating structure during offshore operations.

[0019] 2) The floating concrete wind turbine foundation of this invention comprises multiple outer columns distributed at the vertices of a polygon, surrounding the central column, thus forming a geometrically symmetrical and stable support system in the horizontal plane. This spatial arrangement allows the foundation system to effectively disperse and transmit the overturning moment generated during wind turbine operation through the outer columns distributed at the vertices of the polygon. When wind loads or wave forces act on the wind turbine tower, the central column, as the structural center point, transforms the load into axial forces and bending moments within each pontoon through the supporting force provided by the outer columns. This results in the overall structure exhibiting good anti-overturning capability, maintaining the structural attitude balance in complex marine environments, and ensuring the operational stability of the wind turbine under dynamic floating conditions.

[0020] 3) The floating concrete wind turbine foundation of this invention comprises multiple prestressed steel-concrete segments sequentially spliced ​​along the direction from the central column to the outermost columns. Each prestressed steel-concrete segment adopts a prestressed concrete structure, with its outer shell made of reinforced concrete and containing a steel reinforcement skeleton embedded within the concrete. This construction method significantly improves the structure's adaptability to tensile and compressive loads. The concrete body and the steel reinforcement skeleton embedded within it are rigidly connected to form the main load-bearing structure, giving the outer shell high strength and rigidity. The box-section design effectively improves the structure's load-bearing capacity against bending and shearing, ensuring that each prestressed steel-concrete segment can maintain structural stability when subjected to water pressure and various loads generated by the wind turbine, avoiding brittle failure and fully utilizing the structural potential of prestressed concrete.

[0021] 4) In the floating concrete wind turbine foundation of this invention, multiple pre-tensioned reinforcing bars are arranged on the outer shell, extending along the length from the central column to the outermost columns. Each of the steel connection structures is fixedly connected to one end of a pre-tensioned reinforcing bar. By tensioning the pre-tensioned reinforcing bars, compressive force is applied to the outer shell. This ensures that the outer shell is always in a state of pre-stress, effectively counteracting the external tensile stress generated during operation, thereby increasing the cracking load of the concrete under bending moment and delaying the process of tensile cracking. The prestressing process is precisely anchored through the steel connection structure, ensuring a uniform distribution of compressive stress on the outer shell cross-section, significantly improving the stress state of the structure under complex load combinations, and enhancing the overall fatigue resistance and durability of the structure.

[0022] 5) In the floating concrete wind turbine foundation of this invention, the steel connection structure directly converts the end load of the prestressed tendons into a compressive force on the concrete body. Through the welded joints between the steel reinforcement cage and the steel connection structure, the stress is smoothly transferred from the steel connection structure to the concrete body. This combination of metal and concrete not only achieves stable anchorage of the prestressed tendons but also serves as a rigid connection interface between segments, strengthening the structural continuity of the float along the longitudinal direction. The welding process between the steel connection structure and the steel reinforcement cage ensures the reliability of load transmission, allowing the entire prestressed steel-concrete segment to behave as a unified load-bearing unit when subjected to external water and wind loads, significantly improving the bearing capacity limit of the structural joints.

[0023] 6) In the floating concrete wind turbine foundation of the present invention, two adjacent steel connection structures of any two prestressed steel-concrete sections are fixedly connected together by sealed welding. This connection method forms a continuous structural force path at the splice of the pontoons, ensuring the integrity of the prestressed pontoons on a macroscopic scale. Through sealed welding, the joint between two adjacent prestressed steel-concrete sections can not only transmit axial tensile force, compressive force, and shear force, but also maintain the structural stiffness of the connection interface. This ensures that when the spliced ​​pontoons are subjected to dynamic bending moments generated by waves, the deformation of the connection node remains consistent with that of the main components, preventing local stress concentration at the joint and ensuring the reliability of the structural connection of the pontoons under long-term repeated wave action.

[0024] 7) The floating concrete wind turbine foundation of the present invention separates any two adjacent prestressed steel-concrete sections with partition plates, forming ballast chambers within each outer shell. This design allows the floating concrete wind turbine foundation to achieve buoyancy control by adjusting the medium within the ballast chambers using their volume. The partition plates divide the pontoon cavity into independent compartments, ensuring independent stress distribution in each section and allowing for precise adjustment of ballast water distribution within the compartments based on real-time buoyancy monitoring. This structural arrangement enables the foundation system to actively adjust the draft, inclination, and center of gravity of the foundation under different marine environmental conditions by controlling the water level in each ballast chamber, thereby optimizing the buoyancy balance of the floating wind turbine foundation and adapting to dynamic requirements under different wave cycles and wind loads. Attached Figure Description

[0025] Figure 1 This is a top view of the present invention; Figure 2 for Figure 1 A sectional view along line AA. Figure 3 This is a schematic diagram of the prestressed steel-concrete segmentation in this invention; Figure 4This is a schematic diagram of the connection between the central column and the outer columns of the present invention via floats; Figure 5 This is a design diagram of the local gradient distribution of (ultra) high-performance concrete in the floating concrete wind turbine foundation of the present invention; In all the accompanying drawings, the same reference numerals denote the same technical features, specifically: 1. Outer columns; 2. Intermediate columns; 3. Buoys; 31. Prestressed steel-concrete sections; 311. Outer shell; 312. Steel connection structure; 313. Pre-tensioning tendons; 314. Ballast tanks; 315. Steel end plates; 316. Wedge-type anchors; 317. Enclosed shell; 318. Inner steel shell; 319. Outer steel shell; 32. Intermediate concrete body; 33. End concrete body; 4. Partition plates; 5. Embedded steel plates; 6. Reinforcing ribs; 7. First partition plate; 8. Second partition plate; 10. Pedestrian walkway; 11. Upper concrete body; 12. Lower concrete body. Detailed Implementation

[0026] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.

[0027] Reference Figures 1-5 A floating concrete wind turbine foundation includes multiple columns and multiple pontoons 3. These columns include multiple outer columns and one intermediate column. The outer columns 1 are distributed at the vertices of a polygon and surround the intermediate column 2. Each outer column 1 is connected to the intermediate column 2 via a pontoon 3. The intermediate column 2 is used to install the wind turbine.

[0028] Each of the aforementioned pontoons 3 comprises multiple prestressed reinforced concrete sections 31 sequentially spliced ​​along the direction from the central column 2 to the outermost column 1. Each prestressed reinforced concrete section 31 includes an outer shell 311, two steel connecting structures 312, and pretensioning bars 313. The outer shell 311 is made of reinforced concrete and includes a concrete body and a steel reinforcement skeleton embedded in the concrete body. Each steel connecting structure 312 is welded to the steel reinforcement skeleton. The two steel connecting structures 312 are arranged along the direction from the central column 2 to the outermost column 1, and each steel connecting structure 312 is installed at one end of the outer shell 311. The pretensioning tendons 313 are arranged on the outer shell 311 to apply compressive force to the outer shell 311. The length direction of each pretensioning tendon 313 extends along the direction from the middle column 2 to the outer column 1. Each steel connection structure 312 is fixedly connected to one end of a pretensioning tendon 313. The two steel connection structures 312 of any two adjacent prestressed steel-concrete sections 31 are fixedly connected together by sealing welding. Any two adjacent prestressed steel-concrete sections 31 are separated by partition plates 4, so that ballast chambers 314 are formed in each outer shell 311.

[0029] The floating concrete wind turbine foundation of the present invention, through the coordinated work of the outer shell 311, pretensioning bars 313, steel connection structure 312 and other structures, constructs an overall system with high rigidity, active floating state adjustment capability and reliable structural connection, which meets the long-term load-bearing and operation requirements of large floating wind turbine foundations in complex marine dynamic environments.

[0030] Furthermore, each of the steel connection structures 312 includes a steel end plate 315, a wedge-type anchor 316, and an enclosing shell 317. One side of the steel end plate 315 is welded to the reinforcing bar skeleton. The wedge-type anchor 316 and the enclosing shell 317 are respectively fixed on the side of the steel end plate 315 away from the reinforcing bar skeleton. The wedge-type anchor 316 is fixedly connected to one end of the pretensioning bar 313. The enclosing shell 317 can be a single-layer shell or a double-layer shell.

[0031] The enclosed shell 317 of the present invention preferably adopts a double shell. The enclosed shell 317 includes an inner steel shell 318 and an outer steel shell 319 arranged sequentially from the inside to the outside. A welding operation space is formed between the inner steel shell 318 and the outer steel shell 319. The end of the enclosed shell 317 away from the steel end plate 315 is open. The steel end plate 315 is provided with a process manhole communicating with the inner cavity of the outer shell 311 at a position corresponding to the enclosed shell 317.

[0032] For any two adjacent prestressed steel-concrete segments 31, the open ends of their two close-to-each-other enclosed shells 317 are fixedly connected by a sealed welding method.

[0033] If the enclosed shell 317 adopts a double-layer shell, the outer and inner walls of the outer steel shell 319 are connected by sealed welding, and the outer and inner walls of the inner steel shell 318 are also connected by sealed welding. Then, operators can exit the enclosed shell 317 through the process manhole on the steel end plate 315. The design of the enclosed shell 317 provides a specific spatial layout. The welding work space formed between the inner steel shell 318 and the outer steel shell 319 provides an operating area for the construction of adjacent prestressed steel-concrete sections 31 at the connection point. This structure allows for sealed welding of the open ends of the inner steel shell 318 and the outer steel shell 319 from within the welding work space when adjacent prestressed steel-concrete sections 31 are joined. This double-sealed structure, through independent sealed welding of the inner steel shell 318 and the outer steel shell 319, constructs multiple barriers, effectively preventing external environmental media from entering the interior of the outer shell 311.

[0034] By sealing and welding the open ends of the two enclosed shell plates 317 of adjacent prestressed steel-concrete sections 31, a continuous connection structure is formed on the outer steel shell 319 and the inner steel shell 318, achieving a high-strength connection between adjacent prestressed steel-concrete sections 31. This connection method ensures the structural integrity of adjacent sections and enhances the bending and shear resistance of the pontoon 3 under water pressure and other external loads. The geometric dimensions of the enclosed shell plate 317 structure match the end face of the outer shell 311, allowing for a smooth transition of structural stress. Furthermore, this connection structure possesses excellent sealing capabilities. Through the double welding of the outer steel shell 319 and the inner steel shell 318, a closed, surrounding connection is constructed, enhancing the structural reliability and stability of the floating concrete wind turbine foundation in complex sea conditions. This connection form based on steel structure shells not only meets the structural strength requirements but also provides a guarantee of structural sealing, thereby maintaining the normal buoyancy and operational performance of the floating concrete wind turbine foundation in deep-sea environments.

[0035] The steel end plate 315 has a through hole for the pipe to pass through, and the inner cavity of the pipe is used to install the pretensioning bar 313. The pretensioning bar 313 also passes through the steel end plate 315.

[0036] The aforementioned steel connection structure 312 ensures a reliable connection between the prestressed steel-concrete segment 31 and the steel connection structure 312. The welding and fixing of the steel end plate 315 to the reinforcing steel cage establishes a rigid force transmission path between the prestressed steel-concrete segment 31 and the steel connection structure 312, ensuring effective load transfer between the concrete and steel structural members. By fixing the wedge-type anchor 316 to the side of the steel end plate 315 away from the reinforcing steel cage, a direct anchorage point is provided for the pretensioner 313, enabling the pretensioner 313 to apply continuous and stable compressive force to the outer shell 311. This improves the stress distribution of the outer shell 311 and helps maintain the overall structural morphology of the prestressed steel-concrete segment 31.

[0037] After the adjacent prestressed steel-concrete section 31 is transferred to the land prefabrication and assembly site, the enclosed shell 317 to be joined is welded together using a full penetration welding process. The welding bevel adopts a full enclosed design. After welding, the weld is treated with anti-corrosion and waterproof sealing to form a complete and sealed connection node, avoiding seawater leakage at the connection point, while ensuring that the structural rigidity and stress performance of the node are consistent with those of the pontoon 3.

[0038] The enclosed shell 317 combined with the steel end plate 315 can withstand lateral water pressure loads on one hand, and tensile and compressive loads under the bending state of the entire floating body on the other hand.

[0039] The process manhole on the steel end plate 315, which communicates with the inner cavity of the outer shell 311, plays an important role in the actual structural layout. This process manhole allows the inner cavity of the outer shell 311 to communicate with the working space of the enclosed plate shell 317. After the welding construction of the enclosed plate shell 317, the construction personnel inside the enclosed plate shell 317 can enter the interior of the outer shell 311 of the adjacent prestressed steel-concrete segment 31 from inside the enclosed plate shell 317.

[0040] Furthermore, each end of the outer shell 311 is provided with a plurality of pre-embedded steel plates 5, each steel end plate 315 is welded to the pre-embedded steel plate 5 at the corresponding end, and a reinforcing rib 6 is provided between the steel end plate 315 and the pre-embedded steel plate 5.

[0041] The use of multiple embedded steel plates 5 enables the floating concrete wind turbine foundation to achieve coordinated stress distribution between the steel structure and the concrete body when subjected to complex tensile, compressive, and bending loads in a marine environment. The multiple embedded steel plates 5 effectively distribute concentrated loads from the outside to the end concrete body of the outer shell 311, avoiding localized stress concentration caused by excessive stress at a single point. This significantly improves the overall load-bearing capacity and stress uniformity of the end structure of the outer shell 311, ensuring the long-term stable operation of the entire structure in the complex marine environment of the deep sea.

[0042] Each of the steel end plates 315 is welded to the corresponding embedded steel plate 5, achieving a high-rigidity connection between the steel materials. Through welding, the steel end plates 315 and the embedded steel plates 5 are integrated into one, forming a seamless rigid connection. This allows them to work together to withstand tensile, compressive, and bending loads, preventing relative slippage between the structures. This rigid welded connection not only ensures the continuity of the force path, allowing the load acting on the steel end plates 315 to be smoothly and stably transferred to the embedded steel plates 5, and then to the main body of the outer shell 311; at the same time, the continuous weld joints also help to form a tight protective interface at the steel-concrete joint. Combined with waterproof barriers such as interface adhesives, this effectively prevents seawater from seeping in through the gaps in the steel-concrete joint, significantly improving the overall impermeability and corrosion resistance of the connection node.

[0043] The reinforcing ribs 6 are structurally connected to the steel end plates 315, providing strong local support and increasing the moment of inertia of the cross section. When the floating concrete wind turbine foundation is subjected to overall bending in the ocean, the presence of the reinforcing ribs 6 ensures the continuity of stress and load-bearing state. Specifically, the reinforcing ribs 6 prevent the steel end plates 315 from warping under huge lateral water pressure or external bending moments, and smoothly disperse the concentrated stress along the distribution direction of the reinforcing ribs 6, guiding it to multiple embedded steel plates 5. This structure significantly improves the overall deformation resistance of the interface between the steel end plates 315 and the embedded steel plates 5, enabling the entire floating concrete wind turbine foundation to maintain excellent fatigue resistance and structural geometric stability even under extreme wind, wave, and current loads.

[0044] Furthermore, the sealing weld is a double-sided full penetration weld, thereby forming a continuous closed circumferential weld at the joint of two adjacent enclosed shell plates.

[0045] In the connection process of the prestressed steel-concrete segment 31 of the floating concrete wind turbine foundation, a double-sided full penetration welding process is adopted to ensure complete fusion and penetration of the weld joint, thereby constructing a high-quality continuous closed-loop weld at the junction of two adjacent enclosed shell plates. This welding method ensures that the weld itself has extremely high density at the structural level, avoiding potential weak points in the connection caused by incomplete welding or gaps. The connection structure formed by double-sided full penetration welding enables the two adjacent prestressed steel-concrete segments 31 to form a unified and stable mechanical whole through the enclosed shell plate 317, effectively improving the load-bearing capacity of the connection part to complex marine dynamic loads. While achieving structural strength, the continuous closed-loop weld formed on the enclosed shell plate 317 constitutes a tight defense line. Because the weld itself is in a continuous closed loop state, and the double-sided full penetration method eliminates the unfused area on the welding interface, the weld has higher stability in terms of sealing performance. This design ensures that the ballast chambers 314 formed inside each prestressed steel-concrete segment 31 can be safely and reliably isolated, preventing external seawater from seeping into the ballast chambers 314 through the segment connections, thereby maintaining the accuracy and stability of the floating state control of the entire floating concrete wind turbine foundation.

[0046] Furthermore, the continuous, closed-loop weld formed by double-sided full penetration welding ensures a more uniform stress distribution at the connection point, reducing the probability of localized stress concentration. Under the complex wave and current loads of deep-sea environments, this weld structure ensures stable stress transfer between the enclosed shell 317 and the adjacent prestressed steel-concrete segment 31, which is beneficial for improving the fatigue life and long-term structural safety of the overall structure. Welding can be assisted by ladders or construction platforms fixed within the working space of the enclosed shell 317.

[0047] Furthermore, the outer surface of the continuous closed-loop weld seam on the outside of the enclosed shell 317 is ground smooth and then coated with anti-corrosion paint.

[0048] Grinding the outer surface of the continuous closed-loop weld on the outer side of the enclosed shell 317 to a smooth finish improves the contact tightness between the subsequent anti-corrosion coating and the metal substrate, providing a smooth base for the coating application and ensuring uniform coating thickness. The anti-corrosion coating ensures the corrosion resistance and stability of the continuous closed-loop weld, preventing steel oxidation and rust. This anti-corrosion treatment of the continuous closed-loop weld enhances the structural durability of the floating concrete wind turbine foundation in deep-sea environments, maintains the long-term integrity and stability of the connection points, meets the structural durability requirements of large offshore wind turbines, and supports the long-term stable operation of the floating concrete wind turbine foundation in complex marine environments.

[0049] Furthermore, the three outer pillars 1 are arranged in an equilateral triangle around the middle pillar 2.

[0050] The floating concrete wind turbine foundation employs a structure in which three outer columns 1 are arranged in an equilateral triangle around the central column 2, creating a star-shaped geometric layout with high symmetry and spatial stability. In this structural design, with the central column 2 as the core and the three evenly spaced outer columns 1, the entire floating concrete wind turbine foundation exhibits more balanced stress characteristics in the horizontal direction. The equilateral triangular arrangement formed by the three outer columns 1 effectively disperses wave and current loads acting on the floating concrete wind turbine foundation, ensuring that the foundation maintains its designed horizontal attitude in the marine environment and reducing the risk of tilting due to uneven distribution of external loads. Regarding the arrangement and connection of the pontoons 3, the equilateral triangular distribution of the three outer columns 1 ensures that the length and stress characteristics of each pontoon 3 are consistent. Each of the outer columns 1, connected to the intermediate column 2 via the pontoon 3, forms a standardized frame structure in three directions. This symmetrical connection layout facilitates the modular design and construction of the prestressed steel-concrete sections 31, improving the consistency of force transmission among the various prestressed steel-concrete sections 31. Simultaneously, the equilateral triangular spatial geometry provides a larger base support radius for the floating concrete wind turbine foundation, significantly increasing its overturning resistance and ensuring the dynamic stability of the wind turbine tower supported by the intermediate column 2 under complex wind loads. Furthermore, the equilateral triangular distribution of the three outer columns 1 optimizes the force distribution and buoyancy balance position of the entire floating concrete wind turbine foundation in the water. Through the coordinated action of the water injection system and the mooring system, and by adjusting the water injection status of each ballast tank 314, the equilateral triangular support system can precisely adjust the buoyancy of the floating concrete wind turbine foundation. This spatial layout not only meets the structural mechanical performance requirements of marine engineering but also ensures that the floating concrete wind turbine foundation maintains its designed floating posture during towing, installation, and long-term operation. The floating concrete wind turbine foundation, through the balanced distribution of the three outer columns 1, constructs a modular offshore wind power foundation with clear structural stress, standardized construction layout, and good operational stability, providing spatial geometric support for the stable operation of large offshore wind turbine units.

[0051] Furthermore, the side of the steel connection structure 312 closest to the reinforcing steel frame is pre-coated with an interface adhesive and a waterproof sealant to prevent seawater from seeping in along the joint between the steel connection structure 312 and the concrete body.

[0052] During the prefabrication of floating concrete wind turbine foundations, a bonding interface exists between the steel connection structure 312 and the concrete body. Due to the differences in the two materials, this interface often becomes a weak point in the structural connection. By pre-applying an interface adhesive and waterproof sealant to the steel connection structure 312, a targeted waterproof and seepage-proof barrier can be formed. The application of the interface adhesive enhances the interfacial bonding strength between the surface of the steel connection structure 312 and the concrete body. Utilizing its chemical anchoring and bonding properties, it strengthens the fusion of the two materials with different properties at the microscopic level, enabling them to form a highly coherent load-bearing whole, thereby reducing the possibility of micro-cracks at the bonding interface due to uneven stress transmission. Simultaneously, the waterproof sealant plays a sealing and filling role at the junction of the steel connection structure 312 and the concrete body. The waterproof sealant possesses good ductility and adhesion, effectively filling any tiny gaps that may exist at the bonding interface. By constructing a flexible barrier layer, it enhances the interface's resistance to external erosion. During the long-term service of floating concrete wind turbine foundations in marine environments, applying interface adhesives and waterproof sealants effectively prevents seawater from seeping into the foundation through the joint between the steel connection structure 312 and the concrete body, maintaining the dryness of internal structural components and ensuring stable sealing performance within the ballast tank 314. Furthermore, this pre-application of interface adhesives and waterproof sealants not only enhances the overall structural rigidity between the steel connection structure 312 and the concrete body but also extends the anti-aging period of the joint through interface sealing protection. By ensuring the tightness of the interface joint, the steel connection structure 312 and the prestressed steel-concrete segment 31 can achieve efficient synergistic stress distribution, preventing relative displacement or loosening of the interface under cyclic loading. This measure plays a crucial role in maintaining the structural integrity of floating concrete wind turbine foundations in deep-sea environments. By enhancing the sealing protection function of the joint interface, it can stably guarantee the long-term operational stability of floating concrete wind turbine foundations under complex sea conditions, meeting the technical requirements for the durability of offshore wind power equipment foundation structures.

[0053] Furthermore, each of the outer shells 311 has multiple ballast chambers 314 inside, and these ballast chambers 314 are isolated by a first partition plate 7; Each of the outer shells 311 is further divided into a pedestrian passage 10 by a second partition plate 8.

[0054] In the structural design of the floating concrete wind turbine foundation, multiple ballast chambers 314 are set inside each of the outer shells 311 and separated by the first partition plate 7, enabling high-level zoning management of the ballast chamber space 314. The division of multiple ballast chambers 314 allows for more precise and flexible control of ballast water injection and drainage operations. By storing ballast water in separate compartments, the total amount of water injected into each ballast chamber 314 can be independently adjusted according to the real-time attitude of the floating concrete wind turbine foundation in the marine environment, thereby achieving refined attitude balance management of the foundation's buoyancy. This structural layout enhances the dynamic anti-interference performance of the floating concrete wind turbine foundation under wave and wind loads, helping to maintain the floating concrete wind turbine foundation in its designed horizontal floating attitude and meeting the precise stability control requirements of offshore wind power equipment. Simultaneously, a pedestrian passage 10, separated by the second partition plate 8, is provided inside each of the outer shells 311. The pedestrian passage 10 can connect to the process manhole on the steel end plate 315, providing a convenient spatial path for the construction and maintenance of the internal structure of the floating concrete wind turbine foundation. This spatial organization method, while ensuring the structural strength of the outer shell 311, achieves efficient combined utilization of ballast space and passage space, reduces dead corners within the structure, and facilitates the installation and maintenance of relevant monitoring equipment. Dividing the internal space into multiple ballast chambers 314, supplemented by pedestrian walkways 10, enhances the spatial integration and management level of the floating concrete wind turbine foundation. Independent zoning control of the multiple ballast chambers 314 ensures that ballast water allocation can meet the needs under different operating conditions, while the unobstructed pedestrian walkways 10 ensure the orderly conduct of internal construction work. Through this refined division of internal structural space, each outer shell 311 can serve as both a pivotal unit for buoyancy adjustment and an important passage for internal inspection and maintenance, enhancing the autonomous operation and maintenance capabilities of the floating concrete wind turbine foundation in deep-sea environments and providing technical support at the internal spatial structure level for the long-term stable operation of large wind turbine units. Process manholes are also provided on the outer column 1 and / or the middle column 2. Construction workers can leave through the process manholes on the outer column 1 and / or the middle column 2, and then the process manholes on the columns are sealed by sealing welding.

[0055] Furthermore, the reinforcing steel cage has multiple anchoring reinforcing bars connected to the steel connection structure 312; The length by which each anchoring rebar penetrates into the concrete is not less than 35 times the diameter of the anchoring rebar itself.

[0056] During the prefabrication of the prestressed steel-concrete segment 31 of the floating concrete wind turbine foundation, the connection quality between the reinforcing steel skeleton and the steel connection structure 312 directly affects the effective transmission of prestressing tension and the overall load-bearing capacity of the structure. By setting multiple anchoring steel bars connected to the steel connection structure 312, and limiting the length of each anchoring steel bar penetrating into the concrete to be no less than 35 times its own diameter, the anchoring stability of the steel connection structure 312 at the end of the outer shell 311 can be significantly enhanced. This setting of the anchoring length, based on the bond anchoring mechanism between the anchoring steel bar and the concrete, ensures that the prestress generated by the pretensioning tendon 313 can be smoothly and fully transmitted to the concrete of the outer shell 311 through the steel connection structure 312.

[0057] When the length of each anchoring rebar extending into the concrete reaches 35 times its own diameter, a stable stress transmission zone can be formed at the interface between the steel connection structure 312 and the concrete of the outer shell 311. During prestressing tensioning, this stress transmission zone can distribute the concentrated tension load to the surrounding concrete through the anchoring rebars, reducing the local tensile stress level at the contact surface of the steel connection structure 312. This design ensures that the steel connection structure 312 will not slip or loosen under prestressing, realizing the coordinated work of the steel connection structure 312 and the outer shell 311 under overall stress, thereby improving the structural stress continuity of the prestressed steel-concrete segment 31.

[0058] The evenly distributed arrangement of multiple anchoring steel bars extending deep into the concrete body of the outer shell 311 optimizes the stress distribution of the structure under complex marine dynamic loads. When the floating concrete wind turbine foundation is subjected to wave or reciprocating loads generated by wind turbine operation, the anchoring effect between the anchoring steel bars and the concrete body effectively suppresses the development of cracks that may occur between the steel connection structure 312 and the concrete body. The design that each anchoring steel bar extends into the concrete body for a length no less than 35 times its own diameter not only ensures the rigid connection stability between the steel connection structure 312 and the steel reinforcement frame, but also ensures that the concrete material can fully bond with the steel components, maintaining the structural integrity of the outer shell 311 in deep-sea environments. This technical approach of achieving reliable load transfer through anchoring length control provides reliable structural support for maintaining the pre-stressed state of the floating concrete wind turbine foundation during long-term service.

[0059] Furthermore, the concrete in the middle region of the pontoon 3 is made of ultra-high performance concrete material doped with steel fibers. Additionally, the volume ratio of the steel fibers to the concrete in the middle region is preferably 1% to 2%. The concrete bodies at both ends of the pontoon 3 are made of ultra-high performance concrete material without steel fibers, or high performance concrete material without steel fibers (such as C80). The upper part of each column is made of ultra-high performance concrete material doped with steel fibers. Furthermore, in the upper part of the steel fiber-doped column, the ratio of the volume of the steel fibers to the volume of the upper part of the column is preferably 1% to 2%. The lower part of each column is made of ultra-high performance concrete without steel fibers, or high performance concrete without steel fibers (such as C80).

[0060] The floating concrete wind turbine foundation of this invention constructs a rigid-flexible load-bearing structure by employing a locally gradient material system in each column and each pontoon 3. This locally gradient material distribution design can accurately match mechanical properties to the specific load transmission patterns in the complex marine environment of the deep sea. During the operation of the floating concrete wind turbine foundation, the upper area of ​​each column directly bears huge wind vibration loads and overturning moments, while the concrete body in the middle area of ​​the pontoon 3 bears significant overall bending moments and local stress concentrations while the overall structure resists wave impacts and maintains a horizontal floating attitude.

[0061] This invention utilizes ultra-high performance concrete material doped with steel fibers to create the aforementioned high-stress regions. The ratio of the steel fiber volume to the corresponding concrete volume is preferably controlled at 1% to 2%, endowing these critical stress nodes with extremely high compressive strength and excellent tensile toughness. Under the effect of this specific ratio of randomly distributed three-dimensional steel fibers, a dense micro-interwoven network can be formed within the concrete matrix, effectively inhibiting the initiation and propagation of microcracks. When subjected to extreme cyclic loading from wind and waves, the ultra-high performance concrete material doped with steel fibers exhibits excellent strain hardening characteristics, significantly improving the structural fatigue resistance and bearing capacity of the high-stress regions, ensuring the structural integrity of the upper regions of each column and the middle region of the pontoon 3 under long-term dynamic stress. Simultaneously, the concrete at both ends of the pontoon 3 and the lower regions of each column serve as structural connection transitions and stress release hubs, exhibiting complex shear transmission and multi-directional strain characteristics. By using either fiber-free ultra-high performance concrete or fiber-free high performance concrete at both ends of the pontoon 3, and by using either fiber-free ultra-high performance concrete or fiber-free high performance concrete in the lower part of each column, these areas exhibit more suitable structural flexibility compared to high-stiffness steel fiber-doped areas. This gradient material structure allows the fiber-free areas to provide good deformation coordination when facing extreme deformation conditions in the marine environment, significantly increasing the overall structural flexibility.

[0062] During stress transmission, when strong external environmental loads are transmitted from the upper to the lower regions of each column, or from the concrete in the middle region of the pontoon 3 to the concrete at both ends of the pontoon 3, the aforementioned local gradient material distribution can smoothly transition the elastic modulus of the materials. This significantly reduces the local stress peaks generated in the concrete at both ends of the pontoon 3 and in the lower regions of each column due to abrupt changes in cross-sectional stiffness, fully releasing the concentrated stress at the interfaces of the structure. Through this spatial coupling of material strength and flexibility, the floating concrete wind turbine foundation can maintain the high spatial stiffness required to support the wind turbine while adapting to the forced displacement caused by wave undulations by relying on the flexible deformation of the fiberless region, greatly improving the stress distribution of the overall structure. This spatially oriented material configuration based on the structural stress characteristics improves the overall crack resistance and fatigue life of the floating concrete wind turbine foundation, ensuring the safety and stability of the structure throughout its entire life cycle.

[0063] According to another aspect of the present invention, a construction method for the aforementioned floating concrete wind turbine foundation is also provided, comprising the following steps: 1) A steel reinforcement cage including anchor bars is laid in the mold. Pipes are installed on the steel reinforcement cage to form prestressed ducts. The steel connection structure 312 is welded and fixed to both ends of the steel reinforcement cage. Then, concrete is poured to form the outer shell 311. After the concrete reaches the preset strength, multiple pre-tensioned tendons 313 are arranged on the outer shell 311. The ends of the pre-tensioned tendons 313 are tensioned and fixed by the clip-type anchors 316 on the steel connection structure 312, thereby applying compressive force to the outer shell 311. After tensioning, the prestressed ducts are grouted and sealed. A partition plate 4 is welded on a steel connection structure 312 of each outer shell 311. In this way, the prefabrication of each prestressed steel-concrete segment 31 is completed. 2) The prefabricated prestressed steel-concrete segments 31 are sequentially connected and arranged. The open ends of the close-to-each enclosed shell 317 are sealed and welded to form a continuous closed circumferential weld, so that the adjacent prestressed steel-concrete segments 31 are fixedly connected together. The partition plate 4 separates the adjacent prestressed steel-concrete segments 31, so that each shell 311 forms a ballast chamber 314. 3) After grinding the outer surface of the continuous closed circumferential weld on the outside of the enclosed plate shell 317, apply anti-corrosion paint. 4) Repeat steps 1 to 3) to form multiple pontoons 3; 5) The intermediate column 2 and each of the outer columns 1 are fixedly connected by the pontoons 3 to form a floating wind turbine foundation. A water injection system and a mooring system are installed on the floating wind turbine foundation. 6) Launch the floating wind turbine foundation as a whole into the water, and inject water into each ballast tank 314 through the water injection system to adjust the buoyancy of the floating wind turbine foundation so that the floating wind turbine foundation maintains the designed horizontal floating posture. 7) Tow the floating wind turbine foundation to the designated offshore wind farm location, connect the mooring system to the anchoring device, and complete the positioning and anchoring of the floating wind turbine foundation.

[0064] The continuous implementation of the above construction steps realizes a closed-loop process from the prefabrication of prestressed steel-concrete segments in the factory, the modular splicing of offshore components, the high-strength sealing treatment of connection nodes, to the overall launching and offshore turbine positioning. This significantly improves the structural installation accuracy and safety during construction, ensures the overall structural stability of the floating concrete wind turbine foundation in the deep-sea environment, meets the long-term service requirements of large floating wind turbine units under offshore operating conditions, and enhances the structural durability and construction organization level of the wind turbine foundation in marine engineering applications.

[0065] The pontoon 3 of this invention is assembled from prestressed steel-concrete segments 31, abandoning the traditional integral pontoon 3 design. Instead, the pontoon 3 is divided into several standardized prestressed steel-concrete segments 31 along its length. The length of each prestressed steel-concrete segment 31 is evenly divided according to the needs of on-site and off-site transportation, hoisting, and stress, realizing modular prefabrication in the factory. Each prestressed steel-concrete segment 31 adopts a prestressed structure design independently and completes the prestressing tensioning construction independently.

[0066] Each prestressed steel-concrete segment 31 has a steel connection structure 312 fixedly installed at both ends of its edge. The steel connection structure 312 is rigidly connected to the shell 311, and the two work together to bear the force. The steel connection structure 312 serves as the anchoring end of the pretensioning tendon 313 inside the prestressed steel-concrete segment 31, providing a solid anchoring support for the pretensioning tendon 313, realizing independent prestressing tensioning of a single concrete body, and avoiding uneven stress and local damage caused by uniform tensioning of the entire floating body. The enclosed shell 317 of the steel connection structure 312 matches the end face of the steel end plate 315, and the extension length meets the welding construction requirements. Adjacent prestressed steel-concrete segments 31 are connected through the corresponding steel structure shell structure.

[0067] The outer column 1 and the middle column 2 are conventional structures, which can be made of concrete or steel-concrete composite structures. The bottom of the column is rigidly connected to the pontoon 3, and the top of the column is equipped with a connection platform for the installation of the mooring system and electrical equipment. The foundation is equipped with a ballast tank 314, which can achieve the buoyancy and stability control of the foundation through ballast water regulation, and is suitable for the installation and operation conditions of wind turbine units.

[0068] This invention utilizes a modular, segmented design to disassemble the large-sized pontoon 3 into smaller modules that are easy to prefabricate, transport, and hoist in the factory. Each concrete section independently undergoes prestressing tensioning, precisely controlling the stress performance of each segment and avoiding stress imbalance during overall tensioning. The end steel connection structure 312 achieves an integrated design for anchoring the prestressed tendons 313 and connecting the segments, ensuring the reliability of the prestressed steel-concrete segments and achieving complete sealing of the joints through full penetration welding, eliminating leakage. The star-shaped layout consisting of three outer columns 1 and one middle column 2 ensures the overall floating stability of the foundation. The prestressed steel-concrete segments enhance the foundation's corrosion resistance and wind and wave load resistance, reducing the total life cycle cost.

[0069] Furthermore, in step 1), refer to Figure 5 The concrete body in the middle region of the pontoon 3, made of ultra-high performance concrete material mixed with steel fibers, is the intermediate concrete body 32 (see [reference]). Figure 5 The black area of ​​the horizontal pontoon 3), the concrete body at the end of the pontoon 3 is made of ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers (such as C80) as the end concrete body 33 (see Figure 5The gray areas at both ends of the horizontal pontoon 3), the intermediate concrete body 32 and each end concrete body 33 are compacted by vibration in layers, and the interfaces at both ends of the intermediate concrete body 32 are roughened to ensure that the interfaces between the intermediate concrete body 32 and the end concrete bodies 33 are tightly bonded; as mentioned above, the volume fraction of steel fibers in the intermediate concrete body 32 is 1%~2%.

[0070] For each column, the upper part of the column is made of ultra-high performance concrete material mixed with steel fibers, which is called the upper concrete body 11 (see [reference]). Figure 5 The black area of ​​each vertical column), the lower part of the column is made of ultra-high performance concrete without steel fibers or high performance concrete without steel fibers (such as C80) as the lower concrete body 12 (see Figure 5 The lower concrete body 12 and the upper concrete body 11 are compacted in layers by vibration, and the interface of the lower concrete body 12 is roughened to ensure a tight bond between the two. As mentioned earlier, the volume fraction of steel fibers in the upper concrete body 11 is 1% to 2%.

[0071] In the prefabrication process of the pontoon 3, the intermediate concrete body 32, made of ultra-high performance concrete material doped with steel fibers, and the end concrete bodies 33, made of ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers, are clearly defined. By separately vibrating and compacting the intermediate concrete body 32 and each end concrete body 33 in layers, the disordered mixing of concrete materials with different compositions and steel fiber contents during the pouring and flowing process can be effectively avoided.

[0072] The layered vibration compaction process allows the pores and air bubbles within each layer of concrete material to fully escape, significantly improving the internal density and homogeneity of the intermediate concrete body 32 and the end concrete body 33. This high standard of compaction ensures that the ultra-high performance concrete material with steel fibers can fully utilize its high strength and high toughness mechanical characteristics, while also guaranteeing that the ultra-high performance concrete material without steel fibers or the high performance concrete material without steel fibers possesses excellent flexibility and deformation coordination characteristics, laying a solid material foundation for resisting complex marine dynamic loads.

[0073] For the interface between different material systems inside the pontoon 3, this construction method proposes roughening treatment at both ends of the intermediate concrete body 32. The transition zone between materials with different stiffness properties is often a high-incidence area of ​​stress concentration. Roughening the interface significantly increases the surface area and microscopic interlocking of the ends of the intermediate concrete body 32. When the end concrete body 33 is subsequently poured, the new and old concrete materials can form a strong mechanical embedding and chemical bonding force at the roughened interface. This effectively ensures a tight bond between the intermediate concrete body 32 and the end concrete body 33, allowing the pontoon 3 to smoothly and continuously transmit loads between the intermediate concrete body 32 and the end concrete body 33 through the tightly bonded interface when subjected to the enormous dynamic bending moment and shear force of deep-sea waves. This weakens the stress peak at the abrupt change in cross-section and avoids the risk of strain abrupt changes, interlayer slip, or microcrack propagation at the interface.

[0074] The molding process for each column specifies that an upper concrete body 11 is made of ultra-high performance concrete material doped with steel fibers, and a lower concrete body 12 is made of either ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers. The lower concrete body 12 and the upper concrete body 11 are compacted in layers using vibration, ensuring that the matrix properties of different sections of each column along the vertical stress direction meet the designed load-bearing capacity, maintaining high-strength support in high-stress areas and deformation adaptability in low-stress areas. Simultaneously, the interface of the lower concrete body 12 is roughened to construct a high-strength micro-interlocking structure, ensuring a tight bond between the lower concrete body 12 and the upper concrete body 11.

[0075] When the huge overturning moment and wind vibration load of the wind turbine are transmitted from top to bottom, the tightly bonded interface ensures that the force is released smoothly and continuously from the high-rigidity upper concrete body 11 to the lower concrete body 12, which has better deformation coordination.

[0076] In summary, the prefabrication process for the columns and pontoons 3, through precise zonal casting, layered vibration compaction, and roughening of key bonding surfaces, reliably implements a localized gradient material distribution process. This technical solution enhances the continuity of mechanical transmission and the balance of stress distribution within the foundation, improves the crack resistance and load-bearing fatigue life of the floating concrete wind turbine foundation throughout its entire life cycle, and ensures that the floating concrete wind turbine foundation can maintain structural stability and safe operation in the complex and harsh deep-sea environment for a long period of time.

[0077] Before pouring, templates and isolation measures should be laid out according to gradient zones, and material mixing should be avoided in sections with different fiber contents during layered vibration. This local gradient structure enables the structure to maintain high strength and toughness in high-stress areas and better flexibility and deformation coordination in low-stress areas when subjected to wave, wind vibration and self-weight loads. It effectively reduces stress peaks at abrupt changes in cross-section and opening locations, improves the overall stress distribution, enhances the structure's crack resistance and fatigue life, and meets the durability requirements for long-term service in deep-sea areas.

[0078] In addition, the following explanations are provided for some key structural points: (a) Node between the outer shell 311 and the steel connection structure 312 This node is the integrated joint between the outer shell 311 and the steel connection structure 312 at the end. It is a core transition node for structural stress and sealing, and its specific structure is as follows: 1. Steel connection structure 312: It adopts an enclosed plate shell 317 to facilitate welding construction. The length of the enclosed plate shell 317 is controlled between 500mm and 1500mm. The steel is selected from marine engineering special steel such as DH36, and the steel wall thickness is not less than 20mm. It is equipped with reinforcing ribs 6. The reinforcing ribs 6 are fully fused to the steel end plates to ensure continuous stress when the whole is subjected to bending.

[0079] 2. Steel-concrete anchorage structure: The steel end plate 315 is welded to the pre-embedded steel plate 5, and multiple rows of anchoring steel bars are uniformly welded on the steel end plate 315. The anchoring steel bars are HRB400 grade threaded steel bars, and the length of the steel bars penetrating into the concrete body is not less than 35 times the diameter of the steel bars. Grouting holes and venting holes are opened on the formwork. When the concrete body is poured, the grout fully fills the gap between the box body and the steel bars, realizing a seamless rigid connection between the steel connection structure and the concrete body. The two work together to bear tensile, compressive and bending loads, and prevent relative slippage.

[0080] 3. Sealing and protection design: The side of the steel connection structure 312 closest to the steel reinforcement skeleton is pre-coated with interface adhesive and waterproof sealant to form a waterproof barrier, effectively preventing seawater from seeping in along the steel-concrete joint and improving the joint's impermeability.

[0081] (ii) Anchorage nodes of pretensioned reinforcement bar 313 This node is integrated inside the steel connection structure 312, providing a wedge-type anchor 316 as an anchorage point for the pretensioning reinforcement. The specific structure is as follows: 1) Anchoring pad of the wedge-type anchor 316: On the inner side of the steel connection structure 312, a thickened steel anchoring pad is welded, with a pad thickness of not less than 30mm, and is fully penetrated welded to the steel structure box to ensure the bearing capacity of the anchoring end; the center of the anchoring pad corresponds to the position of the prestressing duct in the concrete, and a pretensioning bar insertion hole is opened.

[0082] 2) Wedge-type anchor 316: The anchor is pre-embedded and fixed to the anchor plate in advance. After the prestressed tendon 313 passes through the prestressed duct in the concrete, both ends are directly anchored to the anchor on the corresponding end steel connection structure 312 to achieve independent tensioning of a single section. After tensioning, the anchor and the end of the prestressed tendon 313 are sealed and grouted in the enclosed shell 317 to form a sealed protective layer to prevent corrosion of the prestressed tendon 313 in the marine environment.

[0083] 3) Stress transmission design: The tension force generated by the pretensioner 313 is directly transmitted to the steel connection structure 312 through the anchor plate, and then to the concrete body, so that the concrete body is in a pre-stress state throughout the process, avoiding the concrete body from cracking under tension, and avoiding the problem of uneven stress transmission and local stress concentration damage when the whole floating body is tensioned uniformly.

[0084] (iii) Welded connection nodes of adjacent prestressed steel-concrete segments 31 This node is the core sealing and load-bearing node of the prestressed steel-concrete segment 31 of pontoon 3. It adopts a full penetration welded integral connection, and the specific structure is as follows: 1. The end face of the enclosed plate shell 317 is machined into a V-shaped full penetration welding groove with a groove angle of 30°-45° and a 2mm blunt edge reserved at the root of the groove to ensure the welding penetration depth.

[0085] 2. Butt welding process: After the two adjacent prestressed steel-concrete sections 31 are hoisted and positioned at the land assembly station, the enclosed shell 317 at their ends are completely fitted and aligned. The double-sided full penetration welding process is adopted. The inner weld is welded first, and then the outer weld is welded. The weld is a continuous closed-loop weld with no welding breaks. The weld grade is Grade 1 and requires 100% non-destructive testing to ensure that there are no defects such as cracks, incomplete penetration, or porosity.

[0086] 3. Multi-layer sealing protection: After welding, the weld surface is first ground smooth and then coated with anti-corrosion paint.

[0087] The specific manufacturing and installation process of floating concrete fan foundations is as follows: (I) Modular prestressed steel-concrete segmented prefabrication 31 1. Fabricate prestressed steel-concrete segment mold 31 according to the design dimensions, and lay out the steel skeleton, prestressed ducts and end steel connection structure 312 in the mold. Weld the steel connection structure 312 to the steel skeleton to ensure that the pre-embedded structure is firm. 2. Pour concrete and after the concrete has cured to the design strength, perform pre-tensioning, tensioning, and anchoring operations on the prestressed steel-concrete segment 31. After tensioning, grout the prestressed ducts to seal them, thus completing the modular segment prefabrication. 3. The steel connection structure 312 at the end is treated with anti-corrosion coating and coated with marine heavy-duty anti-corrosion coating to improve its corrosion resistance in marine environment.

[0088] (ii) Land-based integral assembly and welding 1. The precast prestressed steel-concrete segments 31, intermediate columns 2, and outer columns 1 are transported to the land assembly wharf / precast assembly site and arranged and positioned on the land using a large gantry crane or hoist. 2. Position and install the central column 2 and three outer columns 1 on the land assembly platform to form a four-column overall layout; then hoist each pontoon 3 prestressed steel-concrete segment 31 in sequence to complete the precise alignment of the segments; 3. At the land-based work site, the steel structure plate shell connection structure at the end of adjacent sections is constructed by full penetration welding. Welding process parameters are strictly controlled to ensure full cross-section penetration. After welding is completed, non-destructive testing is carried out one by one. 4. All segmented welding and joint anti-corrosion sealing construction are completed on land, forming a complete and enclosed floating wind turbine foundation structure, avoiding the risks of high-altitude and waterborne welding operations at sea, and ensuring controllable assembly and welding quality.

[0089] (III) Overall launching and offshore commissioning 1. After the overall assembly, anti-corrosion, and testing on land have all passed the acceptance, the complete floating concrete wind turbine foundation will be launched into the water by means of sliding on a slipway, transporting in a floating dock, or hoisting as a whole by a large crane. 2. After the floating concrete fan foundation is submerged in water, the buoyancy is adjusted by injecting water into the internal ballast chamber 314 to maintain the foundation in the designed horizontal floating posture. 3. The tugboat tows the entire foundation to the designated offshore wind farm location, and the anchoring device at sea is connected to the mooring system to complete the positioning and anchoring; then the tower and wind turbine are installed, and the foundation's buoyancy, stability and stress performance are tested and tested to meet the design requirements before being put into operation.

[0090] The present invention provides an independent prestressed tensioning method for each prestressed steel-concrete segment 31, which precisely controls the structural stress, avoids stress concentration damage, and improves the overall stress performance and structural safety of the pontoon 3.

[0091] This invention has excellent sealing performance. The full penetration welding connection method achieves complete sealing of the nodes, prevents seawater leakage, and ensures the buoyancy stability of the float.

[0092] The pontoon 3 of this invention is assembled on land, and its quality is controllable. All assembly, welding and anti-corrosion processes of the pontoon 3 are completed on land, which is not limited by sea winds, waves, weather and hydrological conditions. Welding quality and sealing quality are easy to control, and construction precision is higher.

[0093] This invention uses prestressed steel-concrete segmentation, which reduces the amount of steel used and lowers construction costs. The concrete has better resistance to marine corrosion than steel structures, which extends the service life of the foundation and reduces operation and maintenance costs. At the same time, it eliminates the need to rent large offshore work vessels and machinery, significantly reducing construction costs.

[0094] The four-column structure layout of this invention ensures good floating stability of the foundation, can be adapted to large offshore wind turbines of different power, and meets the needs of use in complex marine environments in deep sea.

[0095] The technical parameters and applicable scope of floating concrete fan foundations are as follows: 1. Concrete strength grade of prestressed steel-concrete segment 31: not lower than C80 high-performance marine concrete.

[0096] 2. The pretensioning tendon 313 uses high-strength, low-relaxation steel strand, and the tensioning control stress meets the design and specification requirements.

[0097] 3. The steel connection structure 312 uses marine high-strength steel of grade DH36 or higher; 4. Full penetration weld grade: Grade I weld, meeting the stress and sealing requirements of marine engineering structures.

[0098] The floating concrete wind turbine foundation of the present invention is suitable for deep-sea areas with a water depth of more than 40m, and can be adapted to large offshore floating wind turbines of 15MW and above. It can also be extended to floating foundation structures such as offshore floating platforms and marine energy equipment.

[0099] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A floating concrete fan foundation, characterized in that, It includes multiple columns and multiple pontoons. The columns consist of multiple outer columns and one central column. The outer columns are distributed at the vertices of the polygon and surround the central column. Each outer column is connected to the central column via a pontoon. Wherein: Each of the aforementioned pontoons comprises multiple prestressed reinforced concrete sections sequentially spliced ​​along the direction from the central column to the outer columns. Each prestressed reinforced concrete section includes an outer shell, two steel connecting structures, and pretensioning tendons. The outer shell is made of reinforced concrete and includes a concrete body and a steel reinforcement skeleton embedded in the concrete body. Each steel connecting structure is welded to the steel reinforcement skeleton. The two steel connecting structures are arranged along the direction from the central column to the outer columns, and each steel connecting structure is installed at one end of the outer shell. Multiple pretensioning tendons are arranged on the outer shell to apply compressive force to the outer shell. The length direction of each pretensioning tendon extends along the direction from the central column to the outer columns. Each steel connecting structure is fixedly connected to one end of a pretensioning tendon. The two steel connecting structures of any two adjacent prestressed reinforced concrete sections are fixedly connected together by sealing welding. Any two adjacent prestressed reinforced concrete sections are separated by partition plates, thereby forming ballast tanks within each outer shell.

2. The floating concrete fan foundation according to claim 1, characterized in that, Each of the steel connection structures includes a steel end plate, a wedge-type anchor, and an enclosing shell. One side of the steel end plate is welded to the reinforcing steel skeleton. The wedge-type anchor and the enclosing shell are respectively fixed on the side of the steel end plate away from the reinforcing steel skeleton. The wedge-type anchor is fixedly connected to one end of the pretensioning bar. The end of the enclosing shell away from the steel end plate is open. The steel end plate is provided with a process manhole communicating with the inner cavity of the shell at a position corresponding to the enclosing shell. For any two adjacent prestressed steel-concrete sections, the open ends of their two close-to-each-other enclosed shells are fixedly connected by a sealed welding method.

3. The floating concrete wind turbine foundation according to claim 2, characterized in that, Each end of the outer shell is provided with a plurality of embedded steel plates, each steel end plate is welded to the embedded steel plate at the corresponding end, and a reinforcing rib is provided between the steel end plate and the embedded steel plate.

4. The floating concrete wind turbine foundation according to claim 2, characterized in that, The sealing weld is a double-sided full penetration weld, thereby forming a continuous closed circumferential weld at the joint of two adjacent enclosed shell plates.

5. The floating concrete fan foundation according to claim 4, characterized in that, The outer surface of the continuous closed-loop weld seam on the outside of the enclosed plate shell is ground smooth and then coated with anti-corrosion paint.

6. The floating concrete fan foundation according to claim 1, characterized in that, The three outer pillars are arranged in an equilateral triangle around the central pillar.

7. The floating concrete wind turbine foundation according to claim 1, characterized in that, The steel connection structure is pre-applied with interface adhesive and waterproof sealant on the side closest to the reinforcing steel frame to prevent seawater from seeping in at the joint between the steel connection structure and the concrete body.

8. The floating concrete fan foundation according to claim 1, characterized in that, Each of the aforementioned outer shells contains multiple ballast chambers, and these ballast chambers are separated by a first partition. Each of the aforementioned shells is further divided into pedestrian passages by a second partition.

9. The floating concrete fan foundation according to claim 1, characterized in that, The steel reinforcement cage has multiple anchoring steel bars connected to the steel connection structure; The length by which each anchoring rebar penetrates into the concrete is not less than 35 times the diameter of the anchoring rebar itself.

10. The floating concrete wind turbine foundation according to claim 1, characterized in that, The concrete in the middle area of ​​the pontoon is made of ultra-high performance concrete material mixed with steel fibers. The concrete bodies at both ends of the pontoon are made of ultra-high performance concrete material without steel fibers, or high performance concrete material without steel fibers. The upper part of each column is made of ultra-high performance concrete material mixed with steel fibers; The lower part of each column is made of ultra-high performance concrete without steel fibers, or high performance concrete without steel fibers.

11. The construction method of the floating concrete wind turbine foundation according to any one of claims 1 to 10, characterized in that, Includes the following steps: 1) A steel reinforcement cage, including anchor steel bars, is laid in the mold. Pipes are installed on the steel reinforcement cage to form prestressed ducts. The steel connection structure is welded and fixed at both ends of the steel reinforcement cage. Then, concrete is poured to form the outer shell. After the concrete reaches the preset strength, multiple pre-tensioned tendons are arranged on the shell. The ends of the pre-tensioned tendons are tensioned and fixed by the clamp-type anchors on the steel connection structure, thereby applying compressive force to the shell. After tensioning is completed, the prestressed ducts are grouted and sealed. A partition plate is welded on a steel connection structure of each shell. In this way, the prefabrication of each prestressed steel-concrete segment is completed. 2) The prefabricated prestressed steel-concrete segments are sequentially connected and arranged. The open ends of the enclosed shells that are close to each other are sealed and welded to form a continuous closed circumferential weld, so that the adjacent prestressed steel-concrete segments are fixedly connected together. The partition plates separate the adjacent prestressed steel-concrete segments, so that each shell forms a ballast chamber. 3) After grinding the outer surface of the continuous closed circumferential weld on the outside of the enclosed plate shell to a smooth finish, apply anti-corrosion paint. 4) Repeat steps 1 to 3) to form multiple pontoons; 5) The intermediate column and each of the outer columns are fixedly connected by the pontoons to form a floating wind turbine foundation. A water injection system and a mooring system are installed on the floating wind turbine foundation. 6) Launch the floating wind turbine foundation as a whole into the water, and use the water injection system to inject water into each ballast tank to adjust the buoyancy of the floating wind turbine foundation so that the floating wind turbine foundation maintains the designed horizontal floating posture. 7) Tow the floating wind turbine foundation to the designated offshore wind farm location, connect the mooring system to the anchoring device, and complete the positioning and anchoring of the floating wind turbine foundation.

12. The construction method for the floating concrete wind turbine foundation according to claim 11, characterized in that, In step 1), the concrete body in the middle area of ​​the pontoon, made of ultra-high performance concrete material mixed with steel fibers, is the intermediate concrete body, and the concrete body at the end of the pontoon, made of ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers, is the end concrete body. The intermediate concrete body and each end concrete body are compacted by vibration in layers, and the interface at both ends of the intermediate concrete body is roughened to ensure that the interface between the intermediate concrete body and the end concrete body is tightly bonded. For each column, the upper part of the column is made of ultra-high performance concrete material mixed with steel fibers, which is called the upper concrete body. The lower part of the column is made of ultra-high performance concrete material without steel fibers or high performance concrete material without steel fibers, which is called the lower concrete body. The lower concrete body and the upper concrete body are compacted in layers by vibration, and the interface of the lower concrete body is roughened to ensure a tight bond between the lower concrete body and the upper concrete body.