An automatic pipe packaging machine
By designing an automatic packaging machine, which utilizes roller conveyors and hydraulic systems to automate the packaging and shaping of pipes, the problems of time-consuming and labor-intensive manual bundling and surface oxidation are solved, thereby improving the protection and service life of the pipes.
Patent Information
- Application Number
- CN202611579831.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, after the pipes are processed, they need to be manually bundled, which is time-consuming and labor-intensive, and there is no protective layer to isolate them, which makes the surface easy to scratch and oxidize, affecting product quality and lifespan.
Design an automatic pipe packaging machine, which adopts a roller conveyor, material rack, packaging mechanism, centering mechanism and transverse movement mechanism. The automatic packaging and shaping of pipes is realized through a worm gear screw jack and hydraulic system. Nylon wheels and rotating grinding wheels are used to wrap the packaging paper to ensure full-enclosed protection.
It enables automated loading and unloading of pipes, reduces manual labor intensity, prevents surface scratches, improves product quality, and extends service life.
Smart Images

Figure CN123105033A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pipe packaging technology, specifically to an automatic pipe packaging machine. Background Technology
[0002] Pipes are the basic raw material for manufacturing pipe fittings. Different specifications of pipe fittings require different materials and specifications of pipes. After the pipes are processed and formed, they usually need to be bundled and packaged in a specified quantity. This reduces the storage space occupied by stacking pipes and prevents them from colliding with each other during transportation, thus reducing the risk of damage from impacts.
[0003] Currently, pipe bundling is mostly done manually. While this method allows for the collection and organization of pipes, the pipes are generally long and bulky, making manual bundling labor-intensive and difficult to automate. After bundling, pipes are mostly stored exposed without a protective layer, making their surfaces easily scratched during storage and transportation, leading to a decline in product quality. Furthermore, prolonged direct exposure to the air accelerates surface oxidation and corrosion, further shortening the pipes' lifespan. Therefore, there is an urgent need for an automatic pipe bundling machine to solve these technical problems during pipe storage and transportation. Summary of the Invention
[0004] The purpose of this invention is to provide an automatic pipe packaging machine, which at least solves the problems of time-consuming and labor-intensive manual bundling, inability to isolate pipes, and severe oxidation caused by exposure during storage in the prior art.
[0005] To achieve the above objectives, the present invention provides the following technical solution: an automatic pipe packaging machine, comprising a plurality of roller conveyors and a plurality of material racks, wherein the plurality of roller conveyors are arranged from left to right, the material racks are installed at the front end of the roller conveyors, a packaging mechanism is provided at the center of the roller conveyors, a centering mechanism is installed in the middle of the roller conveyors, and a transverse movement mechanism is installed between two roller conveyors. The transverse movement mechanism allows the pipes to be transferred between the material racks and the roller conveyors, the centering mechanism gathers the pipes together to shape and package them, and the packaging mechanism packages the pipes together.
[0006] Preferably, the packaging mechanism includes a first frame installed at the center of the roller conveyor. Guide rods are installed at both the front and rear ends of the inner side of the first frame. A slide block is slidably connected to the outer wall of the guide rod. A first motor and a worm gear screw jack are installed in the middle of the upper surface of the first frame. The first motor provides input power to the worm gear screw jack, which drives the slide block to move up and down. A cylinder frame is installed on the inner edge of the left side wall of the slide block, and a packaging assembly is installed on the right side wall of the slide block. A second motor is installed at the bottom of the left side wall of the first frame, and the second motor provides rotational power to the packaging assembly through a belt. The packaging assembly is raised and lowered by the cooperation of the first motor and the worm gear screw jack to adjust the center of the wrapping paper. Then, the packaging assembly spirally wraps the packaging paper around the pipe to seal and package the pipe, thereby improving the protection of the pipe.
[0007] Preferably, the packaging assembly includes a plurality of first nylon wheels circumferentially mounted on the outer edge of the right side wall of the slide, and a plurality of second nylon wheels circumferentially mounted on the inner edge of the right side wall of the slide. A rotating grinding wheel is clamped between the first and second nylon wheels. The second nylon wheels are connected to a second motor via a belt. The second motor rotates the first nylon wheels, and the rotating grinding wheel is rotated by the rolling of the first and second nylon wheels. An expansion shaft is mounted on the right side wall of the rotating grinding wheel for mounting the packaging roll material. Two guide rollers are mounted on the right side wall of the rotating grinding wheel to guide the roll material.
[0008] Preferably, the center of the rotating grinding wheel and the centerline of the roller conveyor are in the same plane.
[0009] Preferably, the centering mechanism includes a second frame installed inside the roller conveyor. A first hydraulic cylinder is installed at the bottom of the second frame. A connecting block is installed at the output end of the first hydraulic cylinder. A Y-type connector is installed on the connecting block through a connecting assembly. The Y-type connector is driven to rise and fall by the first hydraulic cylinder. Two locking plates are installed at the front and rear ends of the top right side wall of the second frame. A centering component is installed on the left end of the locking plate through a connecting assembly. One end of a connecting rod is installed at the bottom end of the centering component through a connecting assembly. The other end of the connecting rod is connected to the end of the Y-type connector through a connecting assembly. Through the linkage of the connecting block, the Y-type connector, and the connecting rod, the two centering components swing in opposite directions to shape the pipe according to its volume, so that the pipe is close to a circle after packaging, reducing the friction caused by the shaking between the pipes.
[0010] Preferably, the connecting assembly includes a pin, and a first copper sleeve is installed on the outer wall of the pin. The first copper sleeve is inserted between the centering assembly and the connecting rod, between the connecting rod and the Y-type connector, and on the centering assembly. A first retaining spring is engaged on the outer wall of the pin to prevent the components on the first copper sleeve from falling off.
[0011] Preferably, the centering assembly includes a centering shaft sleeved on the outer wall of the first copper sleeve, a centering wheel sleeved on the outer wall of the centering shaft, and a second retaining spring snapped at the top of the centering shaft to prevent the centering wheel from falling off.
[0012] Preferably, the transverse movement mechanism includes a base plate installed between two roller conveyors. A transverse movement component and a limiting plate are installed on the upper surface of the base plate. The limiting plate limits the movement of the transverse movement component. A frame is installed at the moving end of the transverse movement component. A second hydraulic cylinder is installed inside the frame. A lifting component is installed at the top of the frame. The second hydraulic cylinder drives the lifting component to move up and down. The transverse movement component is responsible for lateral movement, and the lifting component is responsible for longitudinal movement, achieving two-dimensional movement of the support block and realizing automatic loading and unloading of pipes.
[0013] Preferably, the transverse component includes two slide rails mounted on the left and right sides of the upper surface of the base plate. A third motor is mounted on the front end of the upper surface of the base plate. The output end of the third motor is locked with a lead screw through a coupling. A movable seat is slidably connected to the outer wall of the slide rails, and the movable seat is threadedly engaged with the lead screw. The top end of the movable seat is connected to the bottom end of the frame. When the third motor drives the lead screw to rotate clockwise or counterclockwise, the rotational force of the lead screw thread drives the movable seat to move forward or backward.
[0014] Preferably, the lifting assembly includes a second copper sleeve installed on the top of the frame, a pressure cap installed on the top of the second copper sleeve, a lifting column slidably connected to the inner cavity of the second copper sleeve, and the bottom end of the lifting column is installed with the output end of the second hydraulic cylinder. The pressure cap reinforces the lifting column and prevents the second copper sleeve from deforming due to lateral force. A mounting plate is installed on the top of the lifting column, and a guide shaft slidably connected to the frame is installed on the outer side of the lower surface of the mounting plate. The guide shaft guides the mounting plate, and a support block is installed on the top of the mounting plate.
[0015] Preferably, the upper surface of the support block is concave.
[0016] The automatic pipe packaging machine proposed in this invention has the following advantages: 1. This invention uses a third motor to drive a lead screw to rotate in both directions. The axial force provided by the lead screw thread drives the moving seat to move horizontally. A second hydraulic cylinder drives a lifting column to complete the lifting action, and under the guidance and constraint of a guide shaft, the support block moves up and down. This gives the support block two-dimensional motion capabilities of horizontal and vertical movement, enabling automatic loading and unloading of pipes. This improves the efficiency of pipe loading and unloading operations, eliminates the need for manual pipe handling, and avoids the workplace injury risks associated with manual loading and unloading.
[0017] 2. This invention drives the Y-type connector to perform lifting and lowering movements through the first hydraulic cylinder. With the help of the connecting rod transmission pair formed by the Y-type connector and the connecting rod, the centering shaft is driven to complete the outward or inward swinging action, thereby realizing the adjustment of the distance between the centering wheels. It can be adapted to the centering and conveying operation of pipes with different quantities and different bundle volumes, and meet the bundling and shaping process requirements of various specifications of pipes before packaging.
[0018] 3. In this invention, the first motor, in conjunction with a worm gear screw jack, drives the rotating grinding wheel to rise and fall. The height of the packaging operation center can be adjusted according to the actual position of the pipe. The second motor outputs power to drive the first nylon wheel to rotate. The first and second nylon wheels together provide limiting support for the rotating grinding wheel, causing the rotating grinding wheel, its side expansion shaft, and guide rollers to rotate around the pipe, completing the wrapping of the pipe with packaging paper. This achieves fully enclosed packaging protection for the pipe, preventing scratches on the pipe surface, inhibiting oxidation, ensuring product quality, and extending the pipe's service life. Attached Figure Description
[0019] Figure 1 This is a perspective view of the present invention; Figure 2 This is the front view of the present invention; Figure 3 This is a top view of the present invention; Figure 4 This is a perspective view of the packaging mechanism of the present invention; Figure 5 This is a right view of the packaging mechanism of the present invention; Figure 6 This is a front view of the packaging mechanism of the present invention; Figure 7 This is a top view of the packaging mechanism of the present invention; Figure 8 This is a perspective view of the centering mechanism of the present invention; Figure 9 This is a left view of the centering mechanism of the present invention; Figure 10 This is a front view of the centering mechanism of the present invention; Figure 11 This is a top view of the centering mechanism of the present invention; Figure 12 This is a partial cross-sectional view at point AA of the present invention; Figure 13 This is a partial cross-sectional view at point BB of the present invention; Figure 14 This is a perspective view of the transverse movement mechanism of the present invention; Figure 15 This is a front view of the transverse movement mechanism of the present invention; Figure 16 This is a right view of the transverse movement mechanism of the present invention; Figure 17 This is a top view of the transverse movement mechanism of the present invention; Figure 18 This is a partial cross-sectional view at point CC of the present invention; Figure 19 For the present invention Figure 18 Enlarged view of point G in the middle.
[0020] In the diagram: 1. Roller conveyor; 2. Material rack; 3. Packing mechanism; 4. Centering mechanism; 5. Transverse mechanism; 31. First frame; 32. Guide rod; 33. Slide; 34. First motor; 35. Worm gear screw jack; 36. Cylinder frame; 37. Packing assembly; 38. Second motor; 371. First nylon wheel; 372. Second nylon wheel; 373. Rotary grinding wheel; 374. Expansion shaft; 375. Guide roller; 41. Second frame; 42. First hydraulic cylinder; 43. Connecting block; 44. Y-joint; 45. Locking plate; 46. Connector Components; 47. Centering assembly; 48. Connecting rod; 461. Pin; 462. First copper sleeve; 463. First snap ring; 471. Centering shaft; 472. Centering wheel; 473. Second snap ring; 51. Base plate; 52. Lateral movement assembly; 53. Limiting plate; 54. Frame; 55. Second hydraulic cylinder; 56. Lifting assembly; 521. Slide rail; 522. Third motor; 523. Lead screw; 524. Moving seat; 561. Second copper sleeve; 562. Pressure cover; 563. Lifting column; 564. Mounting plate; 565. Guide shaft; 566. Support block. Detailed Implementation
[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0022] This invention provides a technical solution: such as Figures 1-19 As shown, an automatic pipe packaging machine includes several roller conveyors 1 and several material racks 2. The roller conveyors 1 are arranged from left to right. The material racks 2 are installed at the front end of the roller conveyors 1. A packaging mechanism 3 is set at the center of the roller conveyors 1. A centering mechanism 4 is installed in the middle of the roller conveyors 1. A transverse movement mechanism 5 is installed between two roller conveyors 1. The transverse movement mechanism 5 allows the pipes to be transferred between the material racks 2 and the roller conveyors 1. The centering mechanism 4 gathers the pipes together to shape and package them. The packaging mechanism 3 packages the pipes together. As a preferred option, further, such as Figure 4 , Figure 6 and Figure 7As shown, the packaging mechanism 3 includes a first frame 31 installed at the center of the roller conveyor 1. Guide rods 32 are installed at both the front and rear ends of the inner side of the first frame 31. A slide block 33 is slidably connected to the outer wall of the guide rods 32, so that the slide block 33 can always be kept vertically raised and lowered. A first motor 34 and a worm gear screw jack 35 are installed in the middle of the upper surface of the first frame 31. The first motor 34 provides input power to the worm gear screw jack 35, and the worm gear screw jack 35 drives the slide block 33 to move up and down. A cylinder frame 36 is installed on the inner edge of the left side wall of the slide block 33. A packaging assembly 37 is installed on the right side wall of the slide block 33. A second motor 38 is installed at the bottom of the left side wall of the first frame 31. The second motor 38 provides rotational power to the packaging assembly 37 through a belt.
[0023] As a preferred option, further, such as Figure 4 and Figure 5 As shown, the packaging assembly 37 includes several first nylon wheels 371 circumferentially mounted on the outer edge of the right side wall of the slide 33, and several second nylon wheels 372 circumferentially mounted on the inner side wall of the right side of the slide 33. Nylon is self-lubricating and has good wear resistance, avoiding the problem of frequent replacement of the first nylon wheels 371 and second nylon wheels 372, and ensuring the rotational stability of the rotating grinding wheel 373. The rotating grinding wheel 373 is clamped between the first nylon wheels 371 and second nylon wheels 372. The center of the rotating grinding wheel 373 is in the same plane as the centerline of the roller conveyor 1. 3. It can rotate with the center of the tube as the center to prevent misalignment when the packaging paper wraps the tube. The second nylon wheel 372 is connected to the second motor 38 by a belt. The second motor 38 makes the first nylon wheel 371 rotate. The first nylon wheel 371 and the second nylon wheel 372 roll to make the rotating grinding wheel 373 rotate. An expansion shaft 374 is installed on the right side wall of the rotating grinding wheel 373. The expansion shaft 374 is used to install the packaging roll. Two guide rollers 375 are installed on the right side wall of the rotating grinding wheel 373. The guide rollers 375 guide the roll and control the winding angle of the packaging paper.
[0024] The rotating grinding wheel 373 is clamped and supported by the first nylon wheel 371 and the second nylon wheel 372. The self-lubricating and wear-resistant properties of nylon material are utilized to reduce roller wear, reduce the frequency of parts replacement, and ensure the smooth rotation of the rotating grinding wheel 373. The center of the rotating grinding wheel 373 is coplanar with the centerline of the roller conveyor 1, which can prevent the packaging paper from being misaligned. The expansion shaft 374 can be easily installed with the packaging roll, and together with the guide roller 375, it can constrain the winding angle of the packaging paper to achieve a fully enclosed wrapping operation for the tube.
[0025] As a preferred option, further, such as Figure 8 , Figure 9 , Figure 10 and Figure 11As shown, the centering mechanism 4 includes a second frame 41 installed inside the roller conveyor 1. A first hydraulic cylinder 42 is installed at the bottom of the second frame 41. A connecting block 43 is installed at the output end of the first hydraulic cylinder 42. A Y-type connector 44 is installed on the connecting block 43 through a connecting assembly 46. The Y-type connector 44 is driven to rise and fall by the first hydraulic cylinder 42. Two locking plates 45 are installed at the front and rear ends of the top right side wall of the second frame 41. The locking plates 45 play a positioning role for the pin 461. A centering assembly 47 is installed on the left end of the locking plates 45 through the connecting assembly 46. One end of a connecting rod 48 is installed at the bottom end of the centering assembly 47 through the connecting assembly 46. The other end of the connecting rod 48 is connected to the end of the Y-type connector 44 through the connecting assembly 46. The two connecting rods 48 are symmetrical with respect to the Y-type connector 44. As the Y-type connector 44 rises and falls, the Y-type connector 44 and the connecting rod 48 work together to make the two centering assemblies 47 swing outward or inward at the same time.
[0026] The linkage swing mechanism, consisting of the first hydraulic cylinder 42, Y-type connector 44, and symmetrically arranged connecting rods 48, can drive two sets of centering components 47 to swing synchronously in opposite directions, flexibly adjusting the centering distance. It can adapt to the gathering and shaping of pipes with different quantities and outer diameters, making the pipe bundles neatly formed before packaging, reducing the shaking and friction between the pipes after packaging, and improving the tightness of the pipe packaging.
[0027] As a preferred option, further, such as Figure 9 and Figure 12 As shown, the connecting assembly 46 includes a pin 461, and a first copper sleeve 462 is installed on the outer wall of the pin 461. Copper has high compressive strength, can withstand radial loads, has strong thermal stability, and is suitable for frequent use. The first copper sleeve 462 is inserted between the centering assembly 47 and the connecting rod 48, between the connecting rod 48 and the Y-type connector 44, and on the centering assembly 47. A first retaining spring 463 is snapped onto the outer wall of the pin 461 to prevent the parts on the first copper sleeve 462 from falling off.
[0028] As a preferred option, further, such as Figure 9 and Figure 13 As shown, the centering assembly 47 includes a centering shaft 471 sleeved on the outer wall of the first copper sleeve 462. A centering wheel 472 is sleeved on the outer wall of the centering shaft 471. The centering wheel 472 rolls on the centering shaft 471, which can not only shape the pipe, but also conduct the pipe. A second retaining spring 473 is snapped at the top of the centering shaft 471 to prevent the centering wheel 472 from falling off.
[0029] As a preferred option, further, such as Figure 14As shown, the transverse mechanism 5 includes a base plate 51 installed between two roller conveyors 1. A transverse component 52 and a limiting plate 53 are installed on the upper surface of the base plate 51. The movement of the transverse component 52 is limited by the limiting plate 53. A frame 54 is installed at the moving end of the transverse component 52. A second hydraulic cylinder 55 is installed inside the frame 54. A lifting component 56 is installed at the top of the frame 54. The lifting component 56 is driven by the second hydraulic cylinder 55 to perform lifting and lowering movements.
[0030] As a preferred option, further, such as Figure 14 As shown, the transverse assembly 52 includes two slide rails 521 mounted on the left and right sides of the upper surface of the base plate 51. The slide rails 521 are dovetail-shaped or T-shaped to prevent the moving seat 524 from shaking when it moves and to reduce the load on the lead screw 523. A third motor 522 is mounted on the front end of the upper surface of the base plate 51. The output end of the third motor 522 is locked to the lead screw 523 through a coupling. The moving seat 524 is slidably connected to the outer wall of the slide rails 521, and the moving seat 524 is threadedly engaged with the lead screw 523. The top end of the moving seat 524 is connected to the bottom end of the frame 54. When the third motor 522 drives the lead screw 523 to rotate clockwise or counterclockwise, the rotational force of the lead screw 523 drives the moving seat 524 to move forward or backward.
[0031] As a preferred option, further, such as Figure 14 , Figure 15 , Figure 16 and Figure 17 As shown, the lifting assembly 56 includes a second copper sleeve 561 mounted on the top of the frame 54. Copper has high compressive strength, can withstand radial loads, and has strong thermal stability, making it suitable for frequent use. A pressure cap 562 is mounted on the top of the second copper sleeve 561. A lifting column 563 is slidably connected to the inner cavity of the second copper sleeve 561, and the bottom end of the lifting column 563 is installed with the output end of the second hydraulic cylinder 55. The pressure cap 562 reinforces the lifting column 563, preventing the second copper sleeve 561 from deforming due to lateral forces. The top of the lifting column 563 is equipped with... There is a mounting plate 564, and a guide shaft 565 that is slidably connected to the frame 54 is installed on the outer side of the lower surface of the mounting plate 564. The guide shaft 565 guides the mounting plate 564. A support block 566 is installed on the top of the mounting plate 564. The support block 566 is moved in two dimensions by the second hydraulic cylinder 55 and the third motor 522 to achieve the purpose of loading and unloading pipes. The upper surface of the support block 566 is concave. The groove on the upper surface of the support block 566 plays a positioning role for the pipes and prevents the pipes from rolling down due to inertia.
[0032] The second copper sleeve 561 bears the radial and lateral loads during the working process, the pressure cover 562 reinforces and protects the second copper sleeve 561, the guide shaft 565 guides and constrains the lifting motion, and the two-dimensional movement of the support block 566 is realized under the coordinated drive of the second hydraulic cylinder 55 and the third motor 522 to complete the pipe loading and unloading operation. The concave structure of the support block 566 can position the pipe, prevent the pipe from rolling off, and ensure the safe and reliable operation of the pipe loading and unloading process.
[0033] Its detailed connection method is a well-known technology in this field. The following mainly introduces the working principle and process, and the specific work is as follows.
[0034] Step 1: Pipes are stacked on the rack 2. The third motor 522 drives the screw 523 to rotate clockwise or counterclockwise. The rotational force of the screw 523 drives the moving seat 524 to move forward or backward. When the support block 566 reaches below the pipe, the second hydraulic cylinder 55 drives the lifting column 563 to rise and fall. The support block 566 moves with the lifting column 563, realizing the two-dimensional movement of the support block 566. The support block 566 uses its own groove to transfer the pipe to the roller conveyor 1, or remove the packaged pipe from the roller conveyor 1. Step 2: Centering is performed according to the volume of the pipe. When the first hydraulic cylinder 42 drives the connecting block 43 to rise and fall, the Y-type connector 44 pushes up or pulls down the connecting rod 48. Since the centering shaft 471 rotates around the pin 461, the connecting rod 48 pulls the two centering wheels 472 to swing outward or inward at the same time. The distance between the centering wheels 472 increases or decreases. The centering wheels 472 are used to control the pipe gathering shape. The pipe is gathered and transported by the roller conveyor 1. Step 3: The first motor 34 provides input power to the worm gear screw jack 35. Under the guidance of the guide rod 32, the worm gear screw jack 35 pulls the slide 33 up and down, allowing the pipe to pass through the center of the slide 33 and adjusting the pipe packaging position. Step four: The second motor 38 drives the first nylon wheel 371 to rotate via a belt. Under the limiting action of the first nylon wheel 371 and the second nylon wheel 372 on the rotating grinding wheel 373, the expansion shaft 374 and the guide roller 375 on the rotating grinding wheel 373 rotate around the tube. The guide roller 375 limits the packaging paper. As the tube moves, the packaging paper is spirally wrapped around the tube, realizing automated packaging of the tube.
[0035] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. An automatic pipe packaging machine, comprising a plurality of roller conveyors (1) and a plurality of material racks (2), wherein the plurality of roller conveyors (1) are arranged from left to right, and the material racks (2) are installed at the front end of the roller conveyors (1), characterized in that, A packaging mechanism (3) is provided at the center of the roller conveyor (1), a centering mechanism (4) is installed in the middle of the roller conveyor (1), and a transverse mechanism (5) is installed between the two roller conveyors (1). The transverse mechanism (5) allows the pipe to be transferred between the material rack (2) and the roller conveyor (1), the centering mechanism (4) gathers the pipe together, and packages and shapes the pipe. The packaging mechanism (3) packages the pipe together. The packaging mechanism (3) includes a first frame (31) installed at the center of the roller conveyor (1). Guide rods (32) are installed at both the front and rear ends of the inner side of the first frame (31). A slide block (33) is slidably connected to the outer wall of the guide rod (32). A first motor (34) and a worm gear screw jack (35) are installed in the middle of the upper surface of the first frame (31). The first motor (34) provides input power to the worm gear screw jack (35). The worm gear screw jack (35) drives the slide block (33) to perform lifting and lowering movements. A cylinder frame (36) is installed on the inner edge of the left side wall of the slide block (33). A packaging assembly (37) is installed on the right side wall of the slide block (33). A second motor (38) is installed at the bottom of the left side wall of the first frame (31). The second motor (38) provides rotational power to the packaging assembly (37) through a belt.
2. The automatic pipe packaging machine according to claim 1, characterized in that, The packaging assembly (37) includes several first nylon wheels (371) circumferentially mounted on the outer edge of the right side wall of the slide (33), and several second nylon wheels (372) circumferentially mounted on the inner side wall of the right side wall of the slide (33). A rotating grinding wheel (373) is clamped between the first nylon wheels (371) and the second nylon wheels (372). The second nylon wheels (372) are connected to a second motor (38) via a belt. The second motor (38) rotates the first nylon wheels (371), and the rotating grinding wheel (373) is rotated by the rolling of the first nylon wheels (371) and the second nylon wheels (372). An expansion shaft (374) is mounted on the right side wall of the rotating grinding wheel (373). The expansion shaft (374) is used to install the packaging roll material. Two guide rollers (375) are mounted on the right side wall of the rotating grinding wheel (373). The guide rollers (375) guide the roll material.
3. The automatic pipe packaging machine according to claim 2, characterized in that, The center of the rotating grinding wheel (373) is in the same plane as the centerline of the roller conveyor (1).
4. The automatic pipe packaging machine according to claim 3, characterized in that, The centering mechanism (4) includes a second frame (41) installed inside the roller conveyor (1). A first hydraulic cylinder (42) is installed at the bottom of the second frame (41). A connecting block (43) is installed at the output end of the first hydraulic cylinder (42). A Y-type connector (44) is installed on the connecting block (43) through a connecting assembly (46). The Y-type connector (44) is driven to rise and fall by the first hydraulic cylinder (42). Two locking plates (45) are installed at the front and rear ends of the top right side wall of the second frame (41). A centering assembly (47) is installed on the left end of the locking plate (45) through the connecting assembly (46). A connecting rod (48) is installed at the bottom end of the centering assembly (47) through the connecting assembly (46). The other end of the connecting rod (48) is connected to the end of the Y-type connector (44) through the connecting assembly (46).
5. The automatic pipe packaging machine according to claim 4, characterized in that, The connecting assembly (46) includes a pin (461), on the outer wall of which a first copper sleeve (462) is installed. The first copper sleeve (462) is inserted between the centering assembly (47) and the connecting rod (48), between the connecting rod (48) and the Y-type connector (44), and on the centering assembly (47). A first retaining ring (463) is snapped onto the outer wall of the pin (461) to prevent the components on the first copper sleeve (462) from falling off.
6. An automatic pipe packaging machine according to claim 5, characterized in that, The centering assembly (47) includes a centering shaft (471) sleeved on the outer wall of the first copper sleeve (462), a centering wheel (472) sleeved on the outer wall of the centering shaft (471), and a second snap ring (473) snapped at the top of the centering shaft (471) to prevent the centering wheel (472) from falling off.
7. An automatic pipe packaging machine according to claim 6, characterized in that, The transverse mechanism (5) includes a base plate (51) installed between two roller conveyors (1). A transverse component (52) and a limiting plate (53) are installed on the upper surface of the base plate (51). The movement of the transverse component (52) is limited by the limiting plate (53). A frame (54) is installed at the moving end of the transverse component (52). A second hydraulic cylinder (55) is installed inside the frame (54). A lifting component (56) is installed at the top of the frame (54). The lifting component (56) is driven by the second hydraulic cylinder (55) to perform lifting and lowering movements.
8. An automatic pipe packaging machine according to claim 7, characterized in that, The transverse assembly (52) includes two slide rails (521) installed on the left and right sides of the upper surface of the base plate (51). A third motor (522) is installed at the front end of the upper surface of the base plate (51). The output end of the third motor (522) is locked with a lead screw (523) through a coupling. A movable seat (524) is slidably connected to the outer wall of the slide rail (521), and the movable seat (524) is threadedly engaged with the lead screw (523). The top end of the movable seat (524) is connected to the bottom end of the frame (54). When the third motor (522) drives the lead screw (523) to rotate clockwise or counterclockwise, the rotational force of the lead screw (523) thread drives the movable seat (524) to move forward or backward.
9. An automatic pipe packaging machine according to claim 8, characterized in that, The lifting assembly (56) includes a second copper sleeve (561) installed on the top of the frame (54). A pressure cap (562) is installed on the top of the second copper sleeve (561). A lifting column (563) is slidably connected to the inner cavity of the second copper sleeve (561). The bottom end of the lifting column (563) is installed with the output end of the second hydraulic cylinder (55). The pressure cap (562) reinforces the lifting column (563) to prevent the second copper sleeve (561) from deforming due to lateral force. An installation plate (564) is installed on the top of the lifting column (563). A guide shaft (565) slidably connected to the frame (54) is installed on the outer side of the lower surface of the installation plate (564). The guide shaft (565) guides the installation plate (564). A support block (566) is installed on the top of the installation plate (564).
10. An automatic pipe packaging machine according to claim 9, characterized in that, The upper surface of the support block (566) is concave.