An automatic loading and unloading device and method for an airtight wire hub motor

Through the coordinated operation of roller conveyors, storage components, gripping components, and collaborative robots, fully automated loading and unloading of hub motors has been achieved, solving the problem of low efficiency in manual loading and unloading, improving production efficiency and precision, and meeting the needs of intelligent production.

CN123105295APending Publication Date: 2026-11-17CHENZHUO INTELLIGENT TECH (ZHEJIANG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611284022.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the current production process of hub motors, manual loading and unloading is inefficient, difficult to match the rhythm of the production line, the heavy weight leads to high physical consumption, and it is difficult to unify the precision and rhythm, which cannot meet the needs of intelligent production.

Method used

By employing the coordinated operation of roller conveyors, storage components, gripping components, collaborative robots, and cameras, fully automated loading and unloading of materials via hub motors is achieved. Material positions are identified through visual detection, and pallets are automatically retrieved and replenished using independently driven roller conveyors and storage components. The gripping components enable cross-station transfer.

Benefits of technology

It realizes fully automated loading and unloading of wheel hub motors between palletized materials and circulating production lines, reduces manual operation, improves production efficiency and accuracy, adapts to mass production needs, reduces the risk of equipment malfunction, and enhances the automation and intelligence level of production lines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105295A_ABST
    Figure CN123105295A_ABST
Patent Text Reader

Abstract

This invention discloses an automatic loading and unloading device and method for in-line hub motors in an airtight conveyor. The conveyor includes a loading station, an unloading station, and a storage station. The loading and unloading stations are located at opposite ends of the conveying direction of the storage station. The loading and unloading stations accommodate stacked pallets, on which in-line motors are placed. A collaborative robot is installed on one side of each loading and unloading station. The collaborative robot transfers the in-line motors to the circulating conveyor line and to the unloading station. A gripper transports empty pallets from the loading station to the storage component and then transfers empty pallets to the unloading station. A camera is installed above each loading and unloading station, corresponding to the number of in-line motors. This invention achieves fully automated loading, unloading, and transfer of in-line motors between pallets of material and the circulating conveyor line, significantly reducing manual operation and waiting time. It is suitable for production scenarios where individual in-line motors are heavy and have high production cycle requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field, and more specifically, to an automatic loading and unloading device and method for an airtight wire hub motor. Background Technology

[0002] With the rapid development of the new energy two-wheeled vehicle and low-speed electric vehicle industries, the market demand for hub motors continues to rise. The loading and unloading of materials between various processes during production is a key link to ensure the continuous operation of the entire assembly line.

[0003] Currently, most wheel hub motor manufacturing workshops in China still rely on manual handling for material loading and unloading between processes. Workers manually move the workpieces to tooling fixtures, process them, and then remove them to the next workstation or material storage area. Due to the inherent structure and weight characteristics of wheel hub motors, this operating mode presents many challenges in adapting to mass production requirements.

[0004] Manual labor has a low efficiency ceiling, while the airtightness testing production line for hub motors operates at a very fast pace, making it difficult to match the production line's rhythm. Hub motors integrate stators, rotors, and hub housings, with each unit weighing several kilograms to tens of kilograms. Manual handling is physically demanding, and the number of loading and unloading operations per unit time is limited. When the production line speeds up, manual labor cannot keep up with the output frequency, easily leading to workpiece accumulation in upstream processes and work stoppages in downstream processes due to material shortages, directly reducing overall line capacity and becoming a bottleneck for production line automation upgrades. Furthermore, manual labor is greatly affected by subjective states, making it difficult to uniformly control the accuracy and pace of loading and unloading, and failing to meet the data traceability requirements of intelligent production. This makes it difficult to satisfy the development trend of large-scale, high-efficiency hub motor production. Therefore, a technical solution is needed to address these issues. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of the prior art and enable fully automated loading and unloading of hub motors between pallets of materials and circulating production lines, reducing manual operation and waiting time. It is suitable for production scenarios where hub motors are heavy and have high production cycle requirements, and provides an automatic loading and unloading device and method for airtight hub motors.

[0006] To achieve the above objectives, the present invention adopts the following technical solution:

[0007] This invention discloses an automatic loading and unloading device and method for airtight conveyor hub motors, comprising a roller conveyor, a storage component, a gripping component, a collaborative robot, and a camera. The roller conveyor includes a loading station, an unloading station, and a storage station. The loading station and the unloading station are located at opposite ends of the conveying direction of the storage station. The loading station and the unloading station are capable of accommodating stacked trays. Multiple hub motors are placed on the upper surface of the trays. One collaborative robot is installed on each side of the conveying direction of the loading station and the unloading station. The collaborative robot transfers the hub motors located at the loading station to the circulating production line, and the collaborative robot transfers the hub motors on the circulating production line to the unloading station. The gripping component includes a gripping fixture, which can transfer the empty pallet from the loading station to the storage component, and the gripping fixture can transfer the empty pallet from the storage component to the unloading station. A camera is installed above each of the loading and unloading stations, and the camera identifies the number of hub motors on the top pallet.

[0008] Furthermore, the roller conveyor also includes a loading temporary storage station and a unloading temporary storage station. The loading temporary storage station is located at the end of the loading station away from the storage station, and the unloading temporary storage station is located at the end of the unloading station away from the storage station. Each station of the roller conveyor is an independently driven roller conveyor belt.

[0009] Furthermore, the storage component includes a frame and a lifting component. The lifting component is installed within the frame and includes a receiving component and a driving component. The receiving component includes a bracket and a slide rail. Two slide rails are symmetrically fixedly installed on the frame, and the bracket is slidably connected to the slide rail. The driving component is located below the bracket and includes multiple telescopic rods that can synchronously extend and retract up and down. The upper end of each telescopic rod is fixedly connected to the bracket.

[0010] Furthermore, the storage component includes a guiding component and a regulating component. The frame has a rectangular temporary storage space inside, and the upper opening of the frame serves as the inlet and outlet of the tray. The guiding component is installed on the side wall of the temporary storage space. The guiding component includes a guide plate, which is vertically arranged and has its upper part bent outward. Four regulating components are installed at the four corners of the upper end of the temporary storage space. Each regulating component includes a retractable push block, which corresponds to a corner of the tray. The guiding component is installed on both sides of each regulating component.

[0011] Furthermore, the tray at the bottom of the stack is placed on the upper surface of the base tray. The lower end of the side wall of the frame is provided with an opening for the base tray to enter and exit. The opening is located on the side wall of the frame facing the loading station and the unloading station. The empty base tray of the loading station can be sent into the frame, and the empty base tray inside the frame can be sent to the unloading position.

[0012] Furthermore, a lifting component is installed within the frame, which can raise or lower the base located inside the frame. A limiting component is also installed within the frame, located at the opening on the side of the frame for the base to enter and exit, and the limiting component can prevent the base from entering or leaving the frame.

[0013] Furthermore, the gripping assembly includes a drive frame, which drives the gripping assembly to move laterally along the conveying direction of the roller conveyor. The drive frame can drive the gripping fixture to move up and down. The gripping fixture includes multiple gripping plates that can be opened and closed laterally. The side wall of the tray is provided with multiple grooves, and the gripping plates can be closed and locked into the grooves.

[0014] Furthermore, it includes two sets of temporary storage auxiliary lines and transfer devices. The temporary storage auxiliary lines are arranged parallel to the circulating production line. The temporary storage auxiliary lines and the circulating production line are connected through the transfer devices. One set of the temporary storage auxiliary lines and transfer devices corresponds to the loading station, and the other set of the temporary storage auxiliary lines and transfer devices corresponds to the unloading station. The collaborative robot can pick up and place hub motors on the temporary storage auxiliary lines.

[0015] Furthermore, the temporary storage auxiliary line includes a vertically arranged annular line body, on which multiple temporary storage brackets for placing hub motors are installed. The upper part of the annular line body is horizontally arranged. The circulating assembly line circulates multiple pallets, and the transfer device transfers the hub motors between the pallets and the temporary storage brackets.

[0016] This invention also discloses an automatic loading and unloading method for an airtight wire hub motor, comprising the following steps:

[0017] S1. Use a forklift to place the entire pallet of hub motors at the loading temporary storage station of the roller conveyor. When there is no bottom support at the loading station, the roller conveyor will transport the entire pallet of hub motors to the loading station.

[0018] S2. The camera takes pictures to identify the position of the hub motor. The collaborative robot picks up the hub motor and places it into the temporary storage line corresponding to the loading station. The transfer device transfers the hub motor from the temporary storage line to the tray of the circulating production line.

[0019] S3. When the camera recognizes that the current pallet of the loading station has no hub motor, the gripping component places the empty pallet of the loading station into the storage component of the storage station. After all the pallets leave the bottom tray, the bottom tray is sent to the storage station for temporary storage.

[0020] When the material feeding station has no base tray, the storage component outputs a base tray to the material feeding station, and the gripping component takes out a tray from the storage component and places it on the base tray.

[0021] S4. After the hub motor passes through the circulating production line, it reaches the transfer device corresponding to the unloading station. This transfer device transfers the hub motor from the pallet to the temporary storage auxiliary line corresponding to the unloading station. The camera identifies the slot position of the pallet, and the collaborative robot grabs the hub motor and places it on the pallet of the unloading station. When the camera identifies that the current pallet of the unloading station is full of hub motors, the grabbing component takes out the next pallet from the storage component.

[0022] S5. After the hub motors are fully loaded, the roller conveyor transports the entire pallet of hub motors from the unloading station to the unloading temporary storage station, and then a forklift removes the entire pallet of hub motors.

[0023] The beneficial effects of this invention are:

[0024] 1. This invention achieves fully automated loading and unloading of materials between hub motors and circulating production lines through the coordinated operation of roller conveyors, storage components, gripping components, collaborative robots, and vision inspection units. It effectively replaces manual handling operations. The device relies on multi-station independently driven roller conveyors to connect forklift loading and unloading with station operations. The storage component enables automatic recycling and temporary storage of empty pallets and empty bottom trays, as well as on-demand replenishment. The gripping component can accurately complete the cross-station transfer and stacking of pallets. No manual intervention is required to organize materials throughout the process, greatly reducing manual operation steps and material waiting time. It is suitable for production scenarios where hub motors are heavy and have high production cycle requirements.

[0025] 2. The loading and unloading stations of this invention are equipped with camera vision-guided collaborative robots, which can accurately identify the position of the hub motor and the empty slot of the pallet, ensuring the positioning accuracy of gripping and placement, ensuring the consistency and controllability of the operation rhythm and quality, and adapting to the data traceability and management requirements of intelligent production. At the same time, the storage component has a built-in guide and regular structure, which can ensure that the pallets are stacked neatly and aligned, reducing the risk of equipment malfunction and jamming. The overall solution is stable and reliable, adapting to the needs of large-scale mass production of hub motors, and effectively promoting the automation and intelligent upgrading of the production line.

[0026] 3. The present invention forms a material buffer by adding a temporary storage auxiliary line and a transfer device, which can effectively balance the working rhythm of the collaborative robot and the production rhythm of the cyclic assembly line, avoid the problem of workpiece accumulation in the previous process and the work stoppage in the subsequent process due to waiting for materials, and significantly improve the smoothness of the entire line operation and the capacity utilization rate. Attached Figure Description

[0027] Figure 1 This is a layout diagram of one embodiment.

[0028] Figure 2 This is a perspective view of this embodiment.

[0029] Figure 3 This is a top view of this embodiment.

[0030] Figure 4 This is a perspective view of the roller conveyor and storage component in this embodiment.

[0031] Figure 5 This is a perspective view of the storage component in this embodiment.

[0032] Figure 6 This is a perspective view of the lifting component in this embodiment.

[0033] Figure 7 This is a schematic diagram of the temporary auxiliary line, transfer device, and circulating production line in this embodiment.

[0034] Figure 8 This is a three-dimensional view of the temporary auxiliary lines in this embodiment.

[0035] Figure 9 This is a 3D view of the grasping component in this embodiment.

[0036] Reference numerals: 1. Roller conveyor; 11. Loading station; 12. Unloading station; 13. Storage station; 14. Temporary loading station; 15. Temporary unloading station; 16. Blocking assembly; 2. Storage assembly; 21. Frame; 22. Lifting assembly; 221. Receiving assembly; 2211. Bracket; 2212. Slide rail frame; 222. Drive assembly; 2221. Telescopic rod; 23. Organizing assembly; 24. Guide assembly; 25. Lifting assembly; 26. Limiting assembly; 3. Gripping assembly; 31. Gripping fixture; 311. Gripping plate; 32. Drive frame; 4. Collaborative robot; 5. Temporary storage auxiliary line; 51. Circular line; 52. Temporary storage bracket; 6. Transfer device; 61. Transfer gripper; 7. Camera; 8. Pallet; 81. Groove; 82. Recess; 9. Base support; 10. Hub motor; 101. Circulating production line. Detailed Implementation

[0037] The technical solutions in this embodiment will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0038] like Figures 1 to 9 As shown, this embodiment discloses an automatic loading and unloading device and method for airtight hub motors. The device is used in conjunction with a circulating production line 101 to realize fully automated loading and unloading transfer of hub motors 10 between pallets of materials and the production line. The automatic loading and unloading method for hub motors is based on the above-mentioned automatic loading and unloading device for hub motors. By using material buffering, visual guidance, and automatic pallet flow to match the production line cycle, the loading and unloading efficiency and accuracy are improved.

[0039] like Figure 1 , Figure 2 , Figure 3 As shown, an automatic loading and unloading device for an airtight wire hub motor mainly includes a roller conveyor 1, a storage component 2, a gripping component 3, two collaborative robots 4, two cameras 7, two sets of temporary auxiliary lines 5, and two sets of transfer devices 6.

[0040] like Figure 3 , Figure 4 As shown, the roller conveyor 1 has a loading temporary storage station 14, a loading station 11, a storage station 13, a unloading station 12, and an unloading temporary storage station 15 arranged sequentially along the straight conveying direction. The loading station 11 and the unloading station 12 are located at opposite ends of the conveying direction of the storage station 13, the loading temporary storage station 14 is located at the end of the loading station 11 away from the storage station 13, and the unloading temporary storage station 15 is located at the end of the unloading station 12 away from the storage station 13.

[0041] Each station of the roller conveyor 1 is an independently driven roller conveyor belt, which can be started, stopped and speed adjusted independently. The rear end of the conveying direction of the loading station 11 and the unloading station 12 is equipped with a blocking component 16. The blocking component 16 is driven by a cylinder to rise and fall, and is used to block and accurately position the base 9.

[0042] Multiple trays 8 can be stacked on the workstation. The upper and lower surfaces of the trays 8 are arranged with multiple slots 81 that are adapted to the shape of the hub motor 10 for positioning and placing the hub motor 10. In the stacked state, the bottom tray 8 is supported by the upper surface of the base 9, and the base 9 carries the entire stacked trays 8 to be transferred between the workstations of the roller line 1.

[0043] like Figure 4 , Figure 5 , Figure 6 As shown, the storage component 2 is installed at the storage station 13 to temporarily store empty pallets 8 and empty base trays 9, thereby realizing the automatic recycling and replenishment of empty pallets. The storage component 2 includes a frame 21, a lifting component 22, a regulating component 23, a guiding component 24, a lifting component 25, and a limiting component 26.

[0044] The frame 21 forms a rectangular temporary storage space inside. The frame 21 is made of aluminum alloy frame splicing. The upper opening of the frame 21 serves as the storage and retrieval entrance and exit of the tray 8. The lower ends of the two side walls of the frame 21 facing the conveying direction of the roller line 1 are provided with openings, which serve as the channels for the bottom tray 9 to enter and exit the frame 21. The two openings correspond to the loading station 11 and the unloading station 12 respectively.

[0045] The lifting assembly 22 is installed inside the frame 21 and is used to support and lift stacked empty pallets 8. The lifting assembly 22 includes a receiving assembly 221 and a driving assembly 222. The receiving assembly 221 includes a bracket 2211 and two slide rails 2212. The two slide rails 2212 are symmetrically fixedly installed on the inner side wall of the frame 21. The two sides of the bracket 2211 slide with the slide rails 2212 and can be vertically and smoothly lifted and lowered along the slide rails 2212. The driving assembly 222 is located below the bracket 2211 and includes multiple telescopic rods 2221 that can be synchronously extended and retracted. The upper end of the telescopic rods 2221 is fixedly connected to the lower end face of the bracket 2211. The extension and retraction of the telescopic rods 2221 drives the bracket 2211 to rise and fall, thereby adjusting the height of the supported pallet 8 layers and cooperating with the gripping assembly 3 to complete the storage and retrieval operation of the pallet 8.

[0046] Multiple guide components 24 are installed on the inner wall of the temporary storage space. Each guide component 24 includes a vertically arranged guide plate with its upper part bent outwards, forming an flared structure at the top of the space enclosed by the multiple guide plates. This flared structure is used to guide and correct the tray 8 when it is placed in from the top opening, preventing the tray 8 from shifting or getting stuck. Four alignment components 23 are installed at the four corners of the upper part of the rectangular temporary storage space. Each alignment component 23 includes a horizontally retractable push block, which corresponds to the corner position of the tray 8. The end face of the push block facing the tray 8 has a right-angled groove. After the tray 8 falls into the temporary storage space, the push blocks at the four corners extend synchronously, pushing the tray 8 to align and center it, thus achieving alignment of the stacked position of the trays 8. Guide components 24 are correspondingly set on both sides of each alignment component 23 to ensure the stability of the tray 8 during the falling and alignment process.

[0047] Lifting components 25 are installed in the lower part of the frame 21. Two lifting components 25 are symmetrically installed. Lifting components 25 can lift or lower the empty base tray 9 that enters the frame 21, realizing the temporary storage and release of the base tray 9. Limiting components 26 are installed at the inlet and outlet of the base tray 9 on the side wall of the frame 21. They adopt a cylinder-driven plate-shaped retractable blocking structure to control the entry and exit of the base tray 9 from the frame 21 and prevent the base tray 9 from accidentally shifting.

[0048] like Figure 2 , Figure 9As shown, the gripping component 3 is positioned above the roller conveyor 1 and is used to transfer empty pallets 8 between the storage component 2 and the loading station 11 and unloading station 12. The gripping component 3 includes a drive frame 32 and a gripping fixture 31. The drive frame 32 integrates a lateral movement drive mechanism and a lifting drive mechanism, which can drive the gripping fixture 31 to move horizontally along the conveying direction of the roller conveyor 1, and can also drive the gripping fixture 31 to lift vertically. The gripping fixture 31 includes multiple gripping plates 311 that can be retracted laterally. The side wall of the pallet 8 is provided with multiple grooves 82. When the gripping plates 311 are retracted, they can be inserted into the grooves 82 on the side wall of the pallet 8 to achieve stable clamping of the pallet 8. When the gripping plates 311 are opened, the restriction on the pallet 8 is released.

[0049] like Figure 3 As shown, two collaborative robots 4 are respectively installed on the same side of the conveying direction of the loading station 11 and the unloading station 12: the collaborative robot 4 corresponding to the loading station 11 is used to take out the hub motor 10 in the tray 8 of the loading station 11 and place it on the temporary storage auxiliary line 5 on the corresponding side; the collaborative robot 4 corresponding to the unloading station 12 is used to take out the hub motor 10 on the temporary storage auxiliary line 5 on the corresponding side and stack it in the tray 8 of the unloading station 12.

[0050] Two cameras 7 are respectively installed directly above the loading station 11 and the unloading station 12: the camera 7 at the loading station 11 is used to identify the number and position coordinates of the hub motors 10 on the top tray 8, guiding the collaborative robot 4 to accurately grasp them; the camera 7 at the unloading station 12 is used to identify the position and empty status of the slots 81 on the tray 8, guiding the collaborative robot 4 to accurately place the hub motors 10.

[0051] like Figure 1 , Figure 2 , Figure 3 As shown, two sets of temporary storage auxiliary lines 5 correspond one-to-one with two sets of transfer devices 6, which are respectively set up with loading station 11 and unloading station 12. The temporary storage auxiliary lines 5 are arranged in parallel with the circulating production line 101, and the temporary storage auxiliary lines 5 and the circulating production line 101 are connected by transfer devices 6, which are used to balance the working rhythm of the collaborative robot 4 and the circulating production line 101 and realize material buffering.

[0052] like Figure 7 , Figure 8 As shown, the temporary storage auxiliary line 5 includes a vertically arranged circular line body 51, on which multiple temporary storage brackets 52 are installed at intervals. Each temporary storage bracket 52 can hold one hub motor 10. The upper part of the circular line body 51 is a horizontal section, matching the working height of the collaborative robot 4 and the transfer device 6. Multiple pallets circulate on the circulating production line 101 to carry the hub motors 10 as they move along the production line process. The transfer device 6 is equipped with transfer grippers 61, which can transfer the hub motors 10 between the temporary storage brackets 52 and the pallets of the circulating production line 101, realizing material buffering and cycle time matching.

[0053] This embodiment also discloses an automatic loading and unloading method for an airtight wire hub motor, including the following steps:

[0054] S1. Pallet loading: Workers use forklifts to place pallets of material, stacked with hub motors 10, into the loading temporary storage station 14 of the roller conveyor 1. The system detects whether there is a base tray 9 at the loading station 11. If there is no base tray 9 at the loading station 11, the roller conveyor belt of the loading temporary storage station 14 is started to transport the pallet of material to the loading station 11. After it arrives at the station, it is positioned by the blocking component 16 and waits for the loading operation.

[0055] S2, Material loading station: The camera 7 above the loading station 11 takes a picture of the top tray 8 to obtain the position and quantity information of the hub motors 10 on the tray 8, and transmits the data to the collaborative robot 4 on the loading side; the collaborative robot 4 grabs the hub motors 10 on the tray 8 in sequence according to the recognition results and places them on the empty temporary storage bracket 52 of the temporary storage auxiliary line 5 on the loading side.

[0056] The ring line 51 of the temporary storage auxiliary line 5 moves in a stepping motion, transferring the temporary storage bracket 52 carrying the hub motor 10 to the working end of the transfer device 6; the transfer device 6 grabs the hub motor 10 through the transfer gripper 61 and transfers it from the temporary storage bracket 52 to the tray of the circulating production line 101, and the circulating production line 101 drives the hub motor 10 into the subsequent processing and inspection process to complete the loading operation.

[0057] S3. Empty Pallet and Empty Base Tray Recycling and Replenishment: When the camera 7 detects that there is no hub motor 10 on the current pallet 8 of the loading station 11, the gripping component 3 moves to above the loading station 11, drives the gripping clamp 31 to descend, and the gripping plate 311 retracts and locks into the groove 82 of the empty pallet 8, holding the empty pallet 8 to rise; then the gripping component 3 moves laterally to above the storage component 2 of the storage station 13, and places the empty pallet 8 into the bracket 2211 in the frame 21; each time an empty pallet 8 is placed, the lifting component 22 drives the bracket 2211 to descend by the height of one pallet 8, continuously receiving subsequent empty pallets 8.

[0058] After all the pallets 8 at the loading station 11 have been transferred to the storage component 2, the remaining empty bottom pallets 9 are conveyed to the storage station 13 by the roller conveyor 1. They enter the interior of the frame 21 through the opening in the side wall of the frame 21. The lifting component 25 lifts the empty bottom pallets 9 for temporary storage, while the limiting component 26 extends to block them, thus completing the recycling of the empty bottom pallets 9.

[0059] At the same time, the system detects whether there is a base tray 9 at the unloading station 12; if there is no base tray 9 at the unloading station 12, the lifting component 25 lowers an empty base tray 9, the limiting component 26 retracts, and the empty base tray 9 is transported to the unloading station 12 and positioned via the roller conveyor 1; then the gripping component 3 clamps an empty pallet 8 from the storage component 2, moves it laterally and places it on the base tray 9 of the unloading station 12, and the lifting component 22 rises synchronously to fill the gap, waiting for unloading and palletizing.

[0060] S4, Unloading Station Return and Tray Loading: The hub motor 10, after processing and inspection, flows along the circulating production line 101 to the transfer device 6 on the unloading side. The transfer device 6 uses the transfer gripper 61 to remove the hub motor 10 from the tray of the circulating production line 101 and place it on the empty temporary storage bracket 52 of the temporary storage auxiliary line 5 on the unloading side. The circular line 51 moves in a stepping motion to transfer the hub motor 10 to the working end of the collaborative robot 4.

[0061] The camera 7 above the unloading station 12 takes a picture of the current pallet 8 and identifies it to obtain the position and empty status of the slot 81 on the pallet 8; the collaborative robot 4 on the unloading side grabs the hub motor 10 on the temporary storage bracket 52 and accurately places it into the slot 81 of the pallet 8 according to the identification result.

[0062] When the camera 7 detects that the current layer of tray 8 is full of hub motor 10, the gripping component 3 takes out an empty tray 8 from the storage component 2 and stacks it on top of the tray 8 layer at the unloading station 12 to continue the next layer of tray loading operation.

[0063] S5. Pallet Unloading: When the pallets 8 at the unloading station 12 are stacked to the set quantity and the top pallet 8 is full of hub motors 10, if the unloading temporary storage station 15 has no bottom support 9, the roller conveyor belt at the unloading station 12 will start and transport the fully loaded hub motors 10 to the unloading temporary storage station 15; finally, the forklift will remove the entire pallet of material from the unloading temporary storage station 15 to complete the unloading of the entire pallet.

[0064] The above description is merely a preferred embodiment of the present invention. The scope of protection of the present invention is not limited to the above embodiments. All technical solutions falling within the scope of the present invention's concept are within the scope of protection of the present invention. It should be noted that for those skilled in the art, any improvements and modifications made without departing from the principles of the present invention should also be considered within the scope of protection of the present invention.

Claims

1. An automatic loading and unloading device for an airtight wire hub motor, characterized in that, The system includes a roller conveyor (1), a storage component (2), a gripping component (3), a collaborative robot (4), and a camera (7). The roller conveyor (1) includes a loading station (11), a unloading station (12), and a storage station (13). The loading station (11) and the unloading station (12) are located at opposite ends of the conveying direction of the storage station (13). The loading station (11) and the unloading station (12) can accommodate stacked trays (8). Multiple hub motors (10) are placed on the upper surface of the trays (8). One collaborative robot (4) is installed on each side of the conveying direction of the loading station (11) and the unloading station (12). The collaborative robot (4) will be positioned at the loading station (11) (2) (3) (4) (5) (6) (7) (7). The hub motor (10) of 11) is transferred to the circulating production line (101). The collaborative robot (4) transfers the hub motor (10) on the circulating production line (101) to the unloading station (12). The gripping component (3) includes a gripping fixture (31). The gripping fixture (31) can transfer the empty pallet (8) of the loading station (11) to the storage component (2). The gripping fixture (31) can transfer the empty pallet (8) of the storage component (2) to the unloading station (12). A camera (7) is installed above the loading station (11) and the unloading station (12). The camera (7) identifies the number of hub motors (10) on the top pallet (8).

2. The automatic loading and unloading device for an airtight wire hub motor according to claim 1, characterized in that, The roller conveyor (1) also includes a loading temporary storage station (14) and a unloading temporary storage station (15). The loading temporary storage station (14) is located at the end of the loading station (11) away from the storage station (13), and the unloading temporary storage station (15) is located at the end of the unloading station (12) away from the storage station (13). Each station of the roller conveyor (1) is an independently driven roller conveyor belt.

3. The automatic loading and unloading device for an airtight wire hub motor according to claim 1, characterized in that, The storage component (2) includes a frame (21) and a lifting component (22). The lifting component (22) is installed inside the frame (21). The lifting component (22) includes a receiving component (221) and a driving component (222). The receiving component (221) includes a bracket (2211) and a slide rail (2212). Two slide rails (2212) are symmetrically fixedly installed on the frame (21). The bracket (2211) is slidably connected to the slide rail (2212). The driving component (222) is located below the bracket (2211). The driving component (222) includes a plurality of telescopic rods (2221) that can extend and retract synchronously. The upper end of the telescopic rod (2221) is fixedly connected to the bracket (2211).

4. The automatic loading and unloading device for an airtight wire hub motor according to claim 3, characterized in that, The storage component (2) includes a guide component (24) and a tidying component (23). The frame (21) has a rectangular temporary storage space inside. The upper opening of the frame (21) is the inlet and outlet of the tray (8). The guide component (24) is installed on the side wall of the temporary storage space. The guide component (24) includes a guide plate. The guide plate is set vertically and the upper part of the guide plate is bent outward. Four tidying components (23) are installed at the four corners of the upper end of the temporary storage space. The tidying component (23) includes a retractable push block. The push block corresponds to the corner of the tray (8). The guide component (24) is installed on both sides of each tidying component (23).

5. The automatic loading and unloading device for an airtight wire hub motor according to claim 3, characterized in that, The tray (8) at the bottom of the stack is placed on the upper surface of the base tray (9). The lower end of the side wall of the frame (21) is provided with an opening for the base tray (9) to enter and exit. The opening is located on the side wall of the frame (21) facing the loading station (11) and the unloading station (12). The empty base tray (9) of the loading station (11) can be sent into the frame (21), and the empty base tray (9) inside the frame (21) can be sent to the unloading position.

6. The automatic loading and unloading device for an airtight wire hub motor according to claim 5, characterized in that, A lifting component (25) is installed inside the frame (21). The lifting component (25) can lift or lower the base (9) located inside the frame (21). A limiting component (26) is also installed inside the frame (21). The limiting component (26) is located at the opening on the side of the frame (21) for the base (9) to enter and exit. The limiting component (26) can prevent the base (9) from entering or leaving the frame (21).

7. The automatic loading and unloading device for an airtight wire hub motor according to claim 1, characterized in that, The gripping assembly (3) includes a drive frame (32), which drives the gripping assembly (3) to move laterally along the conveying direction of the roller line (1). The drive frame (32) can drive the gripping fixture (31) to move up and down. The gripping fixture (31) includes multiple gripping plates (311) that can be opened and closed laterally. The side wall of the tray (8) is provided with multiple grooves (82). The gripping plates (311) can be closed and inserted into the grooves (82).

8. The automatic loading and unloading device for an airtight wire hub motor according to claim 1, characterized in that, It includes two sets of temporary auxiliary lines (5) and a transfer device (6). The temporary auxiliary lines (5) are arranged parallel to the circulating production line (101). The temporary auxiliary lines (5) and the circulating production line (101) are connected by the transfer device (6). One set of the temporary auxiliary lines (5) and the transfer device (6) corresponds to the loading station (11), and the other set of the temporary auxiliary lines (5) and the transfer device (6) corresponds to the unloading station (12). The collaborative robot (4) can pick up and put down the hub motor (10) on the temporary auxiliary lines (5).

9. The automatic loading and unloading device for an airtight wire hub motor according to claim 8, characterized in that, The temporary storage auxiliary line (5) includes a vertically arranged annular line (51), on which multiple temporary storage brackets (52) are installed for placing hub motors (10). The upper part of the annular line (51) is horizontally arranged. The circulating assembly line (101) circulates multiple pallets. The transfer device (6) transfers the hub motors (10) between the pallets and the temporary storage brackets (52).

10. An automatic loading and unloading method for an airtight hub motor, based on the automatic loading and unloading device for hub motors according to any one of claims 1 to 9, characterized in that, Includes the following steps: S1. The whole pallet hub motor (10) is placed in the loading temporary storage station (14) of the roller line (1) by a forklift. When the loading station (11) has no bottom support (9), the roller line (1) transports the whole pallet hub motor (10) to the loading station (11). S2. The camera (7) takes a picture to identify the position of the hub motor (10). The collaborative robot (4) grabs the hub motor (10) and places it into the temporary storage auxiliary line (5) corresponding to the loading station (11). The transfer device (6) transfers the hub motor (10) from the temporary storage auxiliary line (5) to the tray of the circulating production line (101). S3. When the camera (7) identifies that the current layer pallet (8) of the loading station (11) has no hub motor (10), the gripping component (3) places the empty pallet (8) of the loading station (11) into the storage component (2) of the storage station (13). When all pallets (8) leave the bottom tray (9), the bottom tray (9) is sent to the storage station (13) for temporary storage. When there is no base (9) at the material feeding station (12), the storage component (2) outputs a base (9) to the material feeding station (12), and the gripping component (3) takes out a tray (8) from the storage component (2) and places it on the base (9); S4. After the hub motor (10) passes through the circulating production line (101), it reaches the transfer device (6) corresponding to the unloading station (12). This transfer device (6) transfers the hub motor (10) from the pallet to the temporary storage auxiliary line (5) corresponding to the unloading station (12). The camera (7) identifies the slot (81) position of the pallet (8). The collaborative robot (4) grabs the hub motor (10) and places it on the pallet (8) of the unloading station (12). When the camera (7) identifies that the current layer pallet (8) of the unloading station (12) is full of hub motors (10), the gripping component (3) takes out the next pallet (8) from the storage component (2). S5. After the hub motor (10) is fully loaded, the roller line (1) transports the entire pallet of hub motor (10) from the unloading station (12) to the unloading temporary storage station (15), and the entire pallet of hub motor (10) is taken away by a forklift.