A dual-lift coordinated installation device for medium-water pontoons

By using a dual-lift collaborative installation device for mid-water pontoons, the first and second crane cables are used for coordinated lifting, and the connection is automatically disconnected after launching. This solves the problem of insufficient vessel resources in the single-lift installation scheme and achieves efficient and safe installation of mid-water pontoons.

CN123105431APending Publication Date: 2026-11-17SHENZHEN OFFSHORE OIL ENG UNDERWATER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611484327.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-22
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the existing technology, there are few vessels available that can meet the requirements for lifting height and weight for single-lift installation schemes, resulting in high costs and high risks for underwater operations.

Method used

The system employs a dual-crane collaborative installation device with mid-water pontoons. The first and second crane cables share the lifting pressure, and an automatic disconnection component automatically disconnects the crane cables from the counterweight foundation after launching, reducing the requirements for the lifting height and weight capacity of a single vessel and achieving stable load transfer and automatic underwater disconnection.

Benefits of technology

It expands the range of available vessel resources, improves the adaptability and economy of offshore installation, reduces the risks of underwater operations, and enhances the reliability and efficiency of disconnection operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105431A_ABST
    Figure CN123105431A_ABST
Patent Text Reader

Abstract

This application provides a dual-crane collaborative installation device for mid-water pontoons, relating to the field of dual-crane collaborative installation. It includes a first crane cable and a second crane cable. The lower end of the first crane cable is fixedly connected to a first connecting end, and the lower end of the first connecting end is fixedly connected to a first lifting ring. A counterweight foundation is provided on the lower side of the first crane cable. A limiting cylinder is fixedly connected to the upper surface of the counterweight foundation. A connecting column is movably connected inside the limiting cylinder. A second lifting ring is fixedly connected to the upper end of the connecting column. Both the second and first lifting rings are provided with first connecting rings, and a lifting rope is fixedly connected between the two first connecting rings. This application achieves coordinated lifting and stable load transfer of mid-water pontoons, mooring anchor chains, and counterweight foundations by two cranes, reducing the requirements for single-ship lifting height and lifting capacity, expanding the range of available vessel resources, and improving the adaptability and economy of offshore installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of dual-lift coordinated installation, and more specifically, to a dual-lift coordinated installation device for a medium-water float. Background Technology

[0002] In the field of offshore oil engineering, the medium-water pontoon system is widely used in dynamic cable configurations. It typically consists of the pontoon body, mooring chains, and counterweight foundations. Taking the Wenchang Oilfield Cluster Resumption Project as an example, on September 6, 2024, Typhoon "Mangkut," the strongest autumn typhoon to make landfall in my country since 1949, directly struck the Haiyang Shiyou 116 FPSO, causing a significant shift and resulting in the breakage of three mooring cables, two dynamic cables, and three dynamic risers. The oilfield cluster was completely shut down. In the resumption plan design, the original design of a steep-wave structure with dynamic pontoons was changed to a steep-wave structure with medium-water pontoons. The top of the medium-water pontoon has three channels, which are used to pass through one riser and two cables respectively. Two sets of mooring eyes are arranged on the outer side of the bottom. The mooring eyes are connected to the mooring chains and moored to the medium-water pontoon base. The medium-water pontoon system has a static load of approximately 254.5 Te and a dynamic load of approximately 361.3 Te in the air, and the overall hoisting height is close to approximately 100m.

[0003] Based on the single-crane installation scheme, resources for large crane vessels with a lifting height of at least 100m and corresponding lifting capacity are extremely limited and expensive. Therefore, existing technology proposes a dual-crane installation method. This involves using two cranes to simultaneously lift the buoy, mooring chain, and counterweight foundation in the air. After being transported to the outside of the ship's side, crane 1 lowers the buoy, while crane 2 lowers the counterweight foundation. A winch system is used to control the relative attitude of the buoy and the counterweight foundation. When the counterweight foundation contacts the water surface and continues to be lowered, the load on crane 2... The load should be reduced, while the weight of the mid-water pontoon is still mainly borne by crane 1, thus achieving a smooth transfer of load from crane 2 to crane 1. After the load transfer is completed, the ROV disconnects the rigging connection between crane 2 and the counterweight foundation, and disconnects the winch tail rope used for attitude control from the structure. After that, crane 1 independently controls the mid-water pontoon to accurately lower it to the designed interface position on the counterweight foundation, completing the final installation. Since there are few ships that meet the requirements based on the single-crane installation scheme, we propose a dual-crane collaborative installation device for mid-water pontoons. Summary of the Invention

[0004] The purpose of this invention is to solve the problem that there are relatively few ships that meet the requirements of the current single-lift installation scheme.

[0005] To achieve the above-mentioned objectives and improve the above-mentioned problems, the present invention provides a double-lifting cooperative installation device for a medium-water pontoon, including a first crane cable and a second crane cable. The lower end of the first crane cable is fixedly connected to a first connecting end, and the lower end of the first connecting end is fixedly connected to a first lifting ring. A counterweight foundation is provided on the lower side of the first crane cable. A limiting cylinder is fixedly connected to the upper surface of the counterweight foundation. A connecting column is movably connected inside the limiting cylinder. A second lifting ring is fixedly connected to the upper end of the connecting column. Both the second lifting ring and the first lifting ring are provided with first connecting rings. A lifting rope is fixedly connected between the two first connecting rings. An automatic disconnection component is provided on the counterweight foundation.

[0006] As a preferred technical solution of this application, the automatic disconnection component includes two sets of guide columns, both sets of guide columns are fixedly connected to the upper surface of the counterweight base, the outer surface of the two guide columns is slidably fitted with a displacement disk, the outer surface of the displacement disk is fixedly connected with a pull rope, the end of the pull rope is fixedly connected with a fixing pin, and the upper surface of the limiting cylinder is provided with a notch.

[0007] As a preferred technical solution of this application, the notch extends to the outside of the limiting cylinder, the second lifting ring is located inside the notch, the limiting cylinder is provided with a plug hole, the fixing pin fits into the plug hole, the fixing pin contacts the upper surface of the connecting column, and an unlocking rope is fixedly connected to the upper surface of the displacement plate.

[0008] As a preferred technical solution of this application, a buoyancy plate is provided on the upper side of the counterweight base, and two sets of connecting ears are fixedly connected to the lower surface of the buoyancy plate, with a winding drum rotatably connected between the two connecting ears.

[0009] As a preferred technical solution of this application, the end of the unlocking rope is fixedly connected to the winding drum, the front surface of the winding drum is provided with a locking hole, and the front surface of the front connecting ear is fixedly connected with a locking cylinder.

[0010] As a preferred technical solution of this application, a displacement plate is slidably connected inside the locking cylinder, and a locking rod is fixedly connected to the rear surface of the displacement plate.

[0011] As a preferred technical solution of this application, the rear end of the locking rod slides through into the interior of the locking hole, and the front surface of the displacement plate is rotatably connected to an adjusting screw.

[0012] As a preferred technical solution of this application, the front end of the adjusting screw is threaded through to the front surface of the locking cylinder, and a knob is fixedly connected to the front end of the adjusting screw.

[0013] As a preferred technical solution of this application, the lower end of the second crane cable is fixedly connected to a second connecting end, and the lower end of the second connecting end is provided with a strut hoisting sling, and the lower side of the strut hoisting sling is provided with a mid-water float.

[0014] As a preferred technical solution of this application, a second connecting ring is fixedly connected to the lower side of the middle-water pontoon, and a second connecting ring is also fixedly connected to the outer surface of the counterweight foundation. A mooring anchor chain is fixedly connected between the two sets of second connecting rings.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: In the scheme of this application: 1. Through the coordination between the first crane cable, the second crane cable, the first connecting end, the first lifting ring, the counterweight foundation, the limiting cylinder, the connecting column, the second lifting ring, the first connecting ring, the lifting rope, the second connecting end, the strut lifting sling, the mid-water buoy, the second connecting ring, and the mooring anchor chain, the coordinated lifting and stable load transfer of the mid-water buoy, the mooring anchor chain, and the counterweight foundation by the two cranes are realized. This reduces the requirements for the lifting height and lifting capacity of a single vessel, expands the range of available vessel resources, and improves the adaptability and economy of offshore installation. 2. Through the coordination of structures such as guide posts, displacement discs, pull ropes, fixing pins, notches, insertion holes, unlocking ropes, buoyancy plates, connecting ears, winding drums, locking holes, locking cylinders, displacement plates, locking rods, adjusting screws, and knobs, the automatic disconnection of the first crane cable from the counterweight foundation is achieved after the counterweight foundation reaches the predetermined depth in the water. This eliminates the need for manual rigging removal, reducing the risk of underwater operations and improving the reliability and efficiency of the disconnection operation. Attached Figure Description

[0016] Figure 1 A schematic diagram of the dual-lift coordinated installation device for the reclaimed water pontoon provided in this application; Figure 2 This is a front view of the double-lift coordinated installation device for the reclaimed water pontoons provided in this application. Figure 3 A schematic diagram of the limiting cylinder in the double-lift coordinated installation device for the medium-water pontoon provided in this application; Figure 4 A schematic diagram of the displacement plate in the double-lift coordinated installation device for the middle-water pontoon provided in this application; Figure 5 A schematic diagram of the winding drum in the double-lift coordinated installation device for the middle-water pontoon provided in this application; Figure 6 The double-lift coordinated installation device for the reclaimed water pontoon provided in this application Figure 1 Enlarged view of point A in the middle.

[0017] The image shows: 1. First crane cable; 2. Second crane cable; 3. First connecting end; 4. First lifting ring; 5. Counterweight foundation; 6. Limiting cylinder; 7. Connecting column; 8. Second lifting ring; 9. First connecting ring; 10. Lifting rope; 11. Guide column; 12. Displacement plate; 13. Pull rope; 14. Fixing pin; 15. Notch; 16. Insertion hole; 17. Unlocking rope; 18. Buoyancy plate; 20. Connecting lug; 21. Rewind drum; 22. Locking hole; 23. Locking cylinder; 24. Displacement plate; 25. Locking rod; 26. Adjusting screw; 27. Knob; 28. Second connecting end; 29. ​​Support rod lifting rigging; 30. Mid-water buoy; 31. Second connecting ring; 32. Mooring anchor chain. Detailed Implementation

[0018] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.

[0019] It should be noted that, unless otherwise specified, the embodiments and features and technical solutions in the present invention can be combined with each other.

[0020] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0021] Example 1 Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6A dual-lift collaborative installation device for mid-water pontoons includes a first crane cable 1 and a second crane cable 2. A first connecting end 3 is fixedly connected to the lower end of the first crane cable 1, and a first lifting ring 4 is fixedly connected to the lower end of the first connecting end 3. A counterweight foundation 5 is provided on the lower side of the first crane cable 1, and a limiting cylinder 6 is fixedly connected to the upper surface of the counterweight foundation 5. A connecting column 7 is movably connected inside the limiting cylinder 6, and a second lifting ring 8 is fixedly connected to the upper end of the connecting column 7. Both the second lifting ring 8 and the first lifting ring 4 are provided with first connecting rings 9, and a lifting rope 10 is fixedly connected between the two first connecting rings 9. An automatic disconnection assembly is provided on the counterweight foundation 5. By having the first crane cable 1 and the second crane cable 2 jointly bear the lifting pressure, the problem of insufficient vessels meeting the requirements of a single-lift scheme is avoided. Simultaneously, the automatic disconnection assembly automatically disconnects the first crane cable 1 from the counterweight foundation 5 after reaching the predetermined depth in the water, eliminating the need for manual disconnection by launching the cable into the water, improving work efficiency and reducing personnel hazards.

[0022] In practical implementation, both the first crane cable 1 and the second crane cable 2 can be made of high-strength steel wire rope or cable commonly used in the art. The first connecting end 3 and the second connecting end 28 can be rigging joints, shackles, or connecting sleeves. The first lifting ring 4, the second lifting ring 8, the first connecting ring 9, and the second connecting ring 31 can be standard lifting rings, shackles, or connecting rings. The lifting rope 10, the pull rope 13, and the unlocking rope 17 can be made of high-strength steel wire rope, synthetic fiber cable, or chain. The fixing pin 14 and the locking rod 25 can be made of stainless steel pins or high-strength alloy pins. The buoyancy plate 18 can be made of buoyancy material, such as buoyancy foam board, hollow buoyancy box, or marine engineering buoyancy structures commonly used in the art.

[0023] By using the first crane cable 1 and the second crane cable 2 to jointly bear the lifting pressure, the problem of insufficient vessels can be avoided by using a single crane solution. At the same time, by using an automatic disconnection component, the first crane cable 1 can be automatically disconnected from the counterweight foundation 5 after the water reaches the predetermined depth, eliminating the need for manual disconnection by going into the water, thus improving work efficiency and reducing personnel hazards.

[0024] Example 2 The double-lift coordinated installation device for the middle-water pontoon provided in Example 1 has been further optimized, specifically, as follows: Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6As shown, the automatic disconnection assembly includes two sets of guide posts 11, both of which are fixedly connected to the upper surface of the counterweight base 5. A displacement disc 12 is slidably fitted onto the outer surface of the two guide posts 11. A pull rope 13 is fixedly connected to the outer surface of the displacement disc 12, and a fixing pin 14 is fixedly connected to the end of the pull rope 13. A notch 15 is formed on the upper surface of the limiting cylinder 6, extending to the outside of the limiting cylinder 6. The second lifting ring 8 is located inside the notch 15. A insertion hole 16 is formed on the limiting cylinder 6, and the fixing pin 14 engages with the insertion hole 16. The fixing pin 14 contacts the upper surface of the connecting post 7, thereby restricting the upward movement of the connecting post 7 relative to the limiting cylinder 6. An unlocking rope 17 is fixedly connected to the upper surface of the displacement disc 12.

[0025] A buoyancy plate 18 is provided on the upper side of the counterweight foundation 5. Two sets of connecting lugs 20 are fixedly connected to the lower surface of the buoyancy plate 18. A winding drum 21 is rotatably connected between the two connecting lugs 20. The end of the unlocking rope 17 is fixedly connected to the winding drum 21. A locking hole 22 is provided on the front surface of the winding drum 21, and a locking cylinder 23 is fixedly connected to the front surface of the front connecting lug 20. A displacement plate 24 is slidably connected inside the locking cylinder 23. A locking rod 25 is fixedly connected to the rear surface of the displacement plate 24. The rear end of the locking rod 25 slides through into the interior of the locking hole 22. An adjusting screw 26 is rotatably connected to the front surface of the displacement plate 24. The front end of the adjusting screw 26 is threaded through into the front surface of the locking cylinder 23. A knob 27 is fixedly connected to the front end of the adjusting screw 26. A second connecting end 28 is fixedly connected to the lower end of the second crane cable 2. A support rod lifting sling 29 is provided at the lower end of the second connecting end 28. A mid-water buoy 30 is provided on the lower side of the strut lifting sling 29. A second connecting ring 31 is fixedly connected to the lower side of the mid-water buoy 30. A second connecting ring 31 is also fixedly connected to the outer surface of the counterweight foundation 5. A mooring anchor chain 32 is fixedly connected between the two sets of second connecting rings 31.

[0026] During hoisting, the first crane cable 1 and the second crane cable 2 can be used to hoist the counterweight foundation 5 and the mid-water buoy 30 respectively, reducing the requirements for the single vessel's lifting height and weight capacity. Before launching, the winding degree of the winding drum 21 can be adjusted according to the predetermined depth to allow for a suitable length of the unlocking rope 17. During adjustment, the knob 27 is turned, which drives the adjusting screw 26 to rotate. Since the thread at the front end of the adjusting screw 26 passes through the front surface of the locking cylinder 23, the rotation of the adjusting screw 26 will drive the displacement plate 24 to move horizontally along the locking cylinder 23. When the displacement plate 24 moves, it will drive the locking rod 25 to insert into the locking hole 22 on the front surface of the winding drum 21, thereby preventing the winding drum 21 from rotating accidentally and ensuring that the reserved length of the unlocking rope 17 remains unchanged during hoisting and launching. Subsequently, after the counterweight foundation 5 falls into the water, the buoyancy plate 18 can float on the water surface. After the counterweight foundation 5 reaches the predetermined depth, the unlocking rope 17 is tightened. At this point, as the counterweight base 5 continues to be lowered, the displacement disc 12 can be moved upward along the guide post 11 by the unlocking rope 17. As the displacement disc 12 moves upward, the fixing pin 14 is disengaged from the insertion hole 16 by the two pull ropes 13. At this time, the locking of the connecting post 7 is released, thereby separating the connecting post 7 from the limiting cylinder 6, and realizing the automatic disconnection of the counterweight base 5.

[0027] To further improve the reliability of the equipment, the first crane cable 1 and the second crane cable 2 are made of high-strength steel wire rope, with a breaking strength selected to be at least four times the overall dynamic load of the mid-water buoy 30, mooring anchor chain 32, and counterweight foundation 5 (361.3Te). The first connecting end 3 and the second connecting end 28 are made of forged alloy steel shackles with a safety factor of not less than 4. The first lifting ring 4, the second lifting ring 8, the first connecting ring 9, and the second connecting ring 31 are made of 316L stainless steel or 42CrMo tempered steel, with hot-dip galvanizing or Dacromet anti-corrosion treatment. The lifting rope 10, the pull rope 13, and the unlocking rope 17 are made of galvanized steel wire rope with a diameter of not less than 12mm, and the rope ends are fixed with aluminum alloy pressed joints or wedge-shaped collars to avoid seawater corrosion and loosening.

[0028] The limiting cylinder 6 is made of 316L stainless steel seamless pipe, with the inner wall precision machined to below Ra1.6. It has a clearance fit with the outer wall of the connecting column 7, with the clearance controlled between 0.5mm and 1.5mm. This ensures that the connecting column 7 does not sway during lifting and that it can smoothly disengage from the limiting cylinder 6 during automatic disconnection. The connecting column 7 is made of 17-4PH precipitation hardening stainless steel, which has undergone solution treatment and aging treatment, and has a yield strength of not less than 1000MPa. The second lifting ring 8 is fixed to the upper end of the connecting column 7 by threaded connection and welding. The weld is pickled and passivated. The width of the notch 15 is greater than the outer diameter of the second lifting ring 8, and the depth of the notch 15 extends below the upper end face of the limiting cylinder 6, so that the second lifting ring 8 can be disengaged from the notch 15 together with the connecting column 7 after the fixing pin 14 is removed.

[0029] The guide post 11 is made of stainless steel round bar with a hard chrome plated surface. A self-lubricating copper sleeve or linear bearing is installed between the guide post 11 and the displacement disk 12 to reduce frictional resistance in seawater environments. The displacement disk 12 is machined from 316L stainless steel plate, and its outer surface pull rope 13 is connected to the fixing pin 14 via a shackle. The fixing pin 14 is made of 17-4PH stainless steel with a nitrided surface. The fixing pin 14 and the insertion hole 16 are fitted with a clearance fit, with a clearance of 0.2mm to 0.5mm, which can withstand the upward pushing force of the connecting post 7 and can be easily disengaged under the pulling force of the unlocking rope 17. The inner wall of the insertion hole 16 is equipped with a wear-resistant bushing to prevent wear from repeated insertion and removal.

[0030] The buoyancy plate 18 is made of closed-cell foam glass or glass microsphere composite buoyancy material, and is covered with a fiberglass anti-corrosion layer. The net buoyancy of the buoyancy plate 18 is greater than the total weight of the moving parts such as the unlocking rope 17, the displacement disc 12, the pull rope 13, and the fixing pin 14, ensuring that the buoyancy plate 18 floats stably on the water surface after entering the water. The connecting lug 20 is welded to the lower surface of the buoyancy plate 18. A stainless steel shaft pin and a copper sleeve are set between the connecting lug 20 and the winding drum 21 to ensure that the winding drum 21 can rotate flexibly. The winding drum 21 is made of stainless steel tube, and the locking holes 22 are evenly distributed around the circumference of the winding drum 21. The number of locking holes 22 is 6 to 12, which facilitates the adjustment of the length of the unlocking rope 17 under different water depth conditions. The locking cylinder 23 is welded to the front connecting lug 20. The inner wall of the locking cylinder 23 is clearance-fitted with the outer wall of the displacement plate 24. The displacement plate 24 is made of stainless steel plate, and the locking rod 25 is welded to its rear side. The locking rod 25 is made of 40Cr tempered steel with a galvanized surface. The rear end of the locking rod 25 is inserted into the locking hole 22 to restrict the rotation of the winding drum 21. The adjusting screw 26 uses a trapezoidal thread or a fine thread and has a self-locking function. The outer surface of the knob 27 is knurled or has anti-slip texture for easy manual adjustment before underwater operations.

[0031] During assembly, first weld or bolt the guide post 11, the limiting cylinder 6, and the connecting lug 20 to the corresponding positions on the counterweight foundation 5 and the buoyancy plate 18; insert the connecting post 7 into the limiting cylinder 6 so that the second lifting ring 8 is located within the notch 15; pass the fixing pin 14 through the insertion hole 16 and make the end of the fixing pin 14 contact the upper surface of the connecting post 7; connect one end of the pull rope 13 to the fixing pin 14 and the other end to the displacement disc 12; connect one end of the unlocking rope 17 to the displacement disc 12 and the other end around the winding drum 21 and fix it. After adjusting the length of the unlocking rope 17, turn the knob 27 to insert the locking rod 25 into the locking hole 22 to prevent the winding drum 21 from rotating. Before lifting, check the connection status of each pin, shackle, and wire rope, and apply waterproof grease to the fixing pin 14, locking rod 25, and adjusting screw 26 to prevent seawater corrosion and jamming.

[0032] The usage process of the double-lift coordinated installation device for medium-water floats provided by this invention is as follows: Step 1, Pre-assembly and Connection. Connect the first crane cable 1 and the second crane cable 2 to the two cranes respectively. The lower end of the first crane cable 1 is connected to the first lifting ring 4 via the first connecting end 3. The first lifting ring 4 and the second lifting ring 8 are flexibly connected via the first connecting ring 9 and the lifting rope 10. The second lifting ring 8 is fixed to the upper end of the connecting column 7, which is movably inserted into the limiting cylinder 6 on the upper side of the counterweight foundation 5, thus ensuring a reliable connection between the counterweight foundation 5 and the first crane cable 1 during the lifting phase. The lower end of the second crane cable 2 is connected to the strut lifting sling 29 via the second connecting end 28, and the strut lifting sling 29 is connected to the mid-water buoy 30. A mooring anchor chain 32 is connected between the second connecting ring 31 on the lower side of the mid-water buoy 30 and the second connecting ring 31 on the outer side of the counterweight foundation 5, so that the mid-water buoy 30, the mooring anchor chain 32, and the counterweight foundation 5 constitute an integrated lifting system.

[0033] Step 2: Pre-adjustment of the unlocking rope length and locking of the winding drum. Before entering the water, adjust the reserved length of the unlocking rope 17 according to the predetermined water depth. The upper end of the unlocking rope 17 is fixed to the upper side of the displacement plate 12, and the lower end is wound around the winding drum 21. The winding drum 21 is rotatably connected between the two sets of connecting ears 20 on the lower side of the buoyancy plate 18. During adjustment, turn the knob 27, which drives the adjusting screw 26 to rotate. The adjusting screw 26 pushes the displacement plate 24 to move horizontally along the locking cylinder 23. The displacement plate 24 drives the locking rod 25 to insert into the locking hole 22 on the front surface of the winding drum 21, thereby locking the winding drum 21 and preventing the unlocking rope 17 from accidentally loosening or changing length. The buoyancy plate 18 is placed above the counterweight base 5 and can be launched into the water along with the counterweight base 5 and float on the water surface after entering the water.

[0034] Step 3, Coordinated Lifting and Transfer. Two cranes work together to lift the mid-water buoy 30, mooring chain 32, and counterweight foundation 5 to the outside of the ship's side. During this process, the first crane cable 1 bears the load of the counterweight foundation 5 through the first connecting end 3, the first lifting ring 4, the first connecting ring 9, the lifting rope 10, the second lifting ring 8, and the connecting post 7; the second crane cable 2 bears the load of the mid-water buoy 30 through the second connecting end 28 and the strut lifting sling 29, and forms a coordinated connection with the counterweight foundation 5 through the mooring chain 32. The fixing pin 14 is inserted into the insertion hole 16 and contacts the upper surface of the connecting post 7, preventing the connecting post 7 from dislodging from the limiting cylinder 6, ensuring lifting safety.

[0035] Step four, water entry and lowering. The two cranes then lower the counterweight foundation 5 and the mid-water pontoon 30 into the water simultaneously. After entry, the buoyancy plate 18 floats on the surface, and the counterweight foundation 5 continues to sink. When the counterweight foundation 5 reaches the predetermined depth, the unlocking rope 17 is tightened. The counterweight foundation 5 continues to be lowered, and the unlocking rope 17 pulls the displacement disc 12 upwards along the two sets of guide posts 11. The pull rope 13 on the outer surface of the displacement disc 12 moves accordingly, and the fixing pin 14 at the end of the pull rope 13 disengages from the insertion hole 16 on the limiting cylinder 6.

[0036] Step 5, automatic disconnection. The fixing pin 14 was originally in contact with and restraining the upper surface of the connecting column 7. After the fixing pin 14 disengages, the connecting column 7 is unlocked, and the second lifting ring 8, together with the connecting column 7, disengages from the notch 15 on the upper side of the limiting cylinder 6, thus achieving automatic disconnection between the first crane cable 1 and the counterweight foundation 5. At this time, the entire weight of the counterweight foundation 5 is transferred to the second crane cable 2.

[0037] Step Six: Load Transfer and Final Installation. The second crane cable 2 then continues to lower the counterweight foundation 5 to its designed seabed position. The first crane cable 1 then independently controls the mid-water pontoon 30, precisely lowering it to the designed interface position on the counterweight foundation 5, completing the final installation of the mid-water pontoon 30. Through this process, this device can achieve coordinated lifting of the mid-water pontoon 30, mooring anchor chain 32, and counterweight foundation 5 within the same lifting system, ensuring stable load transfer and automatic underwater disconnection. This reduces the requirements for single-vessel lifting height and weight capacity, expands the range of available vessel resources, and improves the adaptability and economy of offshore installation.

[0038] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0039] Obviously, the embodiments described above are merely some embodiments of the present invention, not all embodiments. The accompanying drawings show preferred embodiments of the present invention, but do not limit the patent scope of the present invention. The present invention can be implemented in many different forms; rather, these embodiments are provided to provide a more thorough and complete understanding of the disclosure of the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing specific embodiments, or make equivalent substitutions for some of the technical features. Any equivalent structures made using the content of this specification and drawings, directly or indirectly applied to other related technical fields, are similarly within the patent protection scope of this invention.

Claims

1. A double-lift coordinated installation device for a medium-water float, characterized in that, The system includes a first crane cable (1) and a second crane cable (2). The lower end of the first crane cable (1) is fixedly connected to a first connecting end (3). The lower end of the first connecting end (3) is fixedly connected to a first lifting ring (4). A counterweight foundation (5) is provided on the lower side of the first crane cable (1). A limit cylinder (6) is fixedly connected to the upper surface of the counterweight foundation (5). A connecting column (7) is movably connected inside the limit cylinder (6). A second lifting ring (8) is fixedly connected to the upper end of the connecting column (7). A first connecting ring (9) is provided on both the second lifting ring (8) and the first lifting ring (4). A lifting rope (10) is fixedly connected between the two first connecting rings (9). An automatic disconnection assembly is provided on the counterweight foundation (5).

2. The double-lift coordinated installation device for a medium-water float as described in claim 1, characterized in that, The automatic disconnection assembly includes two sets of guide columns (11), both sets of guide columns (11) are fixedly connected to the upper surface of the counterweight base (5), the outer surfaces of the two guide columns (11) are slidably fitted with displacement discs (12), the outer surfaces of the displacement discs (12) are fixedly connected with pull ropes (13), the ends of the pull ropes (13) are fixedly connected with fixing pins (14), and the upper surface of the limiting cylinder (6) is provided with a notch (15).

3. The double-lift coordinated installation device for a floating pontoon in medium water as described in claim 2, characterized in that, The notch (15) extends to the outside of the limiting cylinder (6), the second lifting ring (8) is located inside the notch (15), the limiting cylinder (6) is provided with a plug hole (16), the fixing pin (14) fits into the plug hole (16), the fixing pin (14) contacts the upper surface of the connecting column (7), and the upper surface of the displacement disc (12) is fixedly connected with an unlocking rope (17).

4. The double-lift coordinated installation device for a floating pontoon in medium water as described in claim 3, characterized in that, The upper side of the counterweight base (5) is provided with a buoyancy plate (18), and two sets of connecting ears (20) are fixedly connected to the lower surface of the buoyancy plate (18). A winding drum (21) is rotatably connected between the two connecting ears (20).

5. The double-lift coordinated installation device for a medium-water float as described in claim 4, characterized in that, The end of the unlocking rope (17) is fixedly connected to the winding drum (21), and a locking hole (22) is provided on the front surface of the winding drum (21). A locking cylinder (23) is fixedly connected to the front surface of the connecting ear (20).

6. The double-lift coordinated installation device for a medium-water float as described in claim 5, characterized in that, The locking cylinder (23) is slidably connected to a displacement plate (24), and a locking rod (25) is fixedly connected to the rear surface of the displacement plate (24).

7. The double-lift coordinated installation device for a medium-water float as described in claim 6, characterized in that, The rear end of the locking rod (25) slides through into the interior of the locking hole (22), and the front surface of the displacement plate (24) is rotatably connected to the adjusting screw (26).

8. The double-lift coordinated installation device for a medium-water float as described in claim 7, characterized in that, The front end of the adjusting screw (26) is threaded through to the front surface of the locking cylinder (23), and a knob (27) is fixedly connected to the front end of the adjusting screw (26).

9. A double-lift coordinated installation device for a medium-water float as described in claim 8, characterized in that, The lower end of the second crane cable (2) is fixedly connected to a second connecting end (28), and the lower end of the second connecting end (28) is provided with a strut hoisting sling (29), and the lower side of the strut hoisting sling (29) is provided with a mid-water float (30).

10. A double-lift coordinated installation device for a medium-water float as described in claim 9, characterized in that, The lower side of the middle water pontoon (30) is fixedly connected to a second connecting ring (31), and the outer surface of the counterweight foundation (5) is also fixedly connected to a second connecting ring (31). A mooring anchor chain (32) is fixedly connected between the two sets of second connecting rings (31).