A hoisting platform anchored to a wind turbine foundation and its construction method

By setting up a bidirectional anchoring mechanism and adjustable support components on the wind turbine foundation, the problem of slippage and overturning of the mountain hoisting platform under the load of large equipment was solved, realizing safe, stable and efficient hoisting in mountain wind power construction.

CN123105486APending Publication Date: 2026-11-17SHANDONG JIANZHU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611138428.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-29
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, temporary hoisting platforms in mountain wind power foundation capacity expansion and renovation projects have insufficient anti-slip and anti-overturning capabilities under the eccentric load of large lifting equipment, which easily leads to uneven settlement and instability, posing safety hazards.

Method used

An installation platform anchored to the wind turbine foundation is adopted, and the existing wind turbine foundation is connected to the support frame through a two-way anchoring mechanism. Horizontal and inclined tension components provide limiting and pull-out resistance, and combined with adjustable support components and elastic buffers, a stable force-bearing system is formed.

Benefits of technology

It improves the anti-slip and anti-overturning capabilities of the hoisting platform, ensuring the platform's safety and stability in complex mountainous environments, avoiding large-scale foundation excavation, and reducing the consumption of temporary engineering materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105486A_ABST
    Figure CN123105486A_ABST
Patent Text Reader

Abstract

This invention provides a hoisting platform and construction method anchored to a wind turbine foundation, relating to the field of wind power construction. Addressing the problem of insufficient anti-slip and anti-overturning capabilities of current temporary hoisting platforms in mountainous areas under eccentric loads from lifting equipment, this invention establishes a bidirectional anchoring mechanism connecting the existing wind turbine foundation and the supporting frame. A first horizontally positioned tension member provides horizontal limiting force, while a second inclined tension member provides vertical pull-out resistance. This structural design directly transfers and distributes the horizontal lateral slippage force and the upward pull-out overturning moment caused by eccentric hoisting to the massive and highly stable existing wind turbine foundation. This allows the hoisting platform to achieve higher anti-slip and anti-overturning capabilities without large-scale deep foundation pit excavation, improving the safety boundaries for large equipment operations in mountainous slope environments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of wind power construction, specifically to a hoisting platform and construction method that relies on wind power foundation anchorage. Background Technology

[0002] In mountainous wind power foundation capacity expansion and renovation projects, to meet the operational needs of large lifting equipment, existing technologies mostly adopt the method of expanding temporary steel structure hoisting platforms to the outside of the slope. In terms of spatial layout and structure, existing platforms typically support independently assembled steel frames on the bearing surface outside the slope, and are fixed with ordinary bases at the bottom of the platform. Some solutions will use ground anchor systems for auxiliary traction to maintain the levelness and stability of the working surface.

[0003] When dealing with complex mountainous environments and large-scale lifting requirements, the existing technologies employ a spatial layout where the platform body is fixed to loose backfill or shallow ground on the slope solely by its own support base and ordinary ground anchors. Under the enormous eccentric load of a large crane, a settlement difference will occur between the support end and the soft foundation, failing to provide sufficient rigid restraint. This leads to the platform being vulnerable to outward slippage along the slope or uneven settlement. Especially in scenarios where the lifting equipment is performing heavy-load slewing lifting, the movement of the boom causes the center of gravity of the entire machine to shift towards the slope side, generating enormous uplift force and overturning moment on the platform. In this situation, since the overturning restraint of the existing platform mainly relies on the friction of the shallow geological layer and the counterweight, drastic changes in external loads can cause the foundation anchoring end to yield or pull out, resulting in the platform's slope side lifting, overall instability, or even overturning, creating operational safety hazards. Summary of the Invention

[0004] The purpose of this invention is to address the deficiencies of existing technologies by providing a hoisting platform and construction method anchored to wind power foundations. This solves the problem that existing temporary hoisting platforms in mountainous areas have insufficient anti-slip and anti-overturning capabilities under the eccentric load of lifting equipment, and are prone to uneven settlement and instability.

[0005] The primary objective of this invention is to provide a hoisting platform anchored to a wind turbine foundation, employing the following solution: It includes a support frame, a load-bearing panel laid on top of the support frame, an adjustable support assembly set at the bottom of the support frame, and a two-way anchoring mechanism; The bidirectional anchoring mechanism connects the existing wind power foundation and the support frame, and includes a first tension member and a second tension member; The first tension member is set in the horizontal direction, with its two ends fixedly connected to the existing wind power foundation and the support frame, respectively, to provide a horizontal limiting function; The second tension member is installed along the inclined direction, with its two ends fixedly connected to the existing wind power foundation and the support frame, respectively, to provide vertical pull-out resistance.

[0006] Furthermore, both the first and second tension components are inserted into the pre-embedded isolation sleeve and are detachably connected to the support frame and the existing wind power foundation. The pre-embedded isolation sleeve is fixedly embedded in the end of the existing wind power foundation, and a grout-stopping sealing structure is provided at one end close to the interior of the existing wind power foundation.

[0007] Furthermore, the support frame includes vertical load-bearing rods, and the bidirectional anchoring mechanism further includes anchoring connectors; Anchoring connectors are sleeved and fixed to the outside of the vertical load-bearing rod. The first tension member and the second tension member are respectively connected to and locked to the corresponding anchoring connectors at the end near the support frame. There are multiple first tension members and second tension members, which are radially distributed with the existing wind power foundation as the origin.

[0008] Furthermore, the vertical force-bearing rod is a hollow tubular structure, and an inner reinforcing member is fixedly provided inside the vertical force-bearing rod at the position corresponding to the clamping force of the anchoring connector. The anchoring connector includes a connecting beam that simultaneously connects multiple first tension members and / or multiple second tension members.

[0009] Furthermore, an inclined pressure-bearing member is fixedly provided on the outer side of the anchoring connection corresponding to the second tension member, and the inclined pressure-bearing surface of the inclined pressure-bearing member is perpendicular to the axial direction of the second tension member.

[0010] Furthermore, a foundation reinforcement structure is provided on the existing wind power foundation, and the foundation reinforcement structure is connected to the existing wind power foundation as a whole through a rebar anchoring structure; The foundation ends of both the first and second tension structural members are embedded and anchored inside the foundation reinforcement.

[0011] Furthermore, the adjustable support assembly includes a first adjusting rod, a second adjusting rod, and a bidirectional adjusting sleeve; One end of the first adjusting rod and the second adjusting rod are respectively connected to the two ends of the bidirectional adjusting sleeve. Both the first adjusting rod and the second adjusting rod are provided with locking nuts that abut against and lock the bidirectional adjusting sleeve.

[0012] Furthermore, the top of the support frame is provided with a support bracket and a T-shaped bearing plate, and the splicing edge of the bearing panel is provided with a locally thickened part, which is limited to the area between the support bracket and the T-shaped bearing plate. An elastic buffer is provided between the load-bearing panel and the support bracket. An assembly gap is reserved between the load-bearing panel and the T-shaped bearing plate in the pre-assembled state. The size of the assembly gap is smaller than the allowable compression of the elastic buffer under the design pre-tightening force.

[0013] The second objective of this invention is to provide a construction method for a hoisting platform anchored to a wind turbine foundation, utilizing the hoisting platform anchored to a wind turbine foundation as provided in the first objective, comprising: Rebar is installed on the surface of the existing wind power foundation and poured to form a foundation reinforcement body; foundation end anchoring components are pre-embedded during the pouring process, and pre-embedded isolation sleeves are installed around the foundation end anchoring components; Adjustable support components and support frames are installed on the outside of the existing wind power foundation. The length of the adjustable support components is adjusted to achieve leveling of the support frame and then locked. Anchoring connectors are installed at the corresponding stress positions of the support frame; the first tension member and the second tension member are respectively inserted into the corresponding pre-embedded isolation sleeves, so that one end is connected to the foundation end anchoring component and the other end is connected to the anchoring connector and tensioned and locked. An elastic buffer is placed on top of the support frame, and then a load-bearing panel is laid on top of it. A tightening force is applied to deform the elastic buffer under pressure, thus completing the construction of the hoisting platform.

[0014] Furthermore, after the hoisting operation is completed, the following dismantling steps are also included: Release the fastening constraints, disassemble the bearing panel in sequence, and disconnect the connection between the first and second tension members and the anchoring connector; The first and second tension components were extracted and recovered from the pre-embedded isolation sleeve, and the ends of the pre-embedded isolation sleeve remaining in the foundation reinforcement body were sealed with sealing material. Release the locking state of the adjustable support component and retract it, then disassemble and remove the support frame and adjustable support component in sequence for reuse.

[0015] Compared with the prior art, the advantages and positive effects of this invention are: To address the issue of insufficient anti-slip and anti-overturning capacity of current temporary hoisting platforms in mountainous areas under eccentric loads from lifting equipment, this invention employs a bidirectional anchoring mechanism connecting the existing wind turbine foundation and the supporting frame. A first horizontally positioned tension member provides horizontal restraint force, while a second inclined tension member provides vertical pull-out resistance. Multiple adjacent vertical load-bearing members are bridged by the anchoring connectors, and multiple tension members are connected on the same connecting beam. This transforms the concentrated tensile force of a single tension member into a distributed force across the connecting beam, which is then transmitted to multiple vertical member nodes. Combined with graded and symmetrical pre-tightening processes, this reduces pre-tightening force dispersion among multiple tension members and stress concentration at single nodes. When individual tension members experience force fluctuations, the anchoring connectors can redistribute the load among adjacent tension members, improving the overall stability of the connection system. This structural design directly transfers and distributes the horizontal lateral sliding force and the upward overturning moment caused by eccentric hoisting to the existing wind power foundation, which is massive and extremely stable. This allows the hoisting platform to achieve higher resistance to sliding and overturning without large-scale deep foundation pit support excavation, thus improving the safety boundary for large equipment operations in mountainous slope environments. Attached Figure Description

[0016] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an improper limitation of the invention.

[0017] Figure 1 This is a schematic diagram of the overall structure of the adaptive hoisting platform anchored to the wind power foundation in Embodiments 1 and 2 of the present invention; Figure 2 This is a schematic plan view of the overall structure of the adaptive hoisting platform anchored to the wind power foundation in Embodiments 1 and 2 of the present invention; Figure 3 This is a schematic cross-sectional view of the connection node between the load-bearing panel and the top horizontal bar of the frame in Embodiments 1 and 2 of the present invention; Figure 4 These are schematic diagrams of the adjustable support component structure in Embodiments 1 and 2 of the present invention; Figure 5 This is a schematic elevation view of the connection nodes between the vertical and horizontal members in the middle and side of the support frame in Embodiments 1 and 2 of the present invention; Figure 6 This is a schematic elevation view of the connection node between the vertical force-bearing rod and the horizontal rod at the corner of the support frame in Embodiments 1 and 2 of the present invention; Figure 7 This is a schematic elevation view of the connection node between the vertical force-bearing rod, horizontal rod and double frame diagonal web member in the middle of the support frame in Embodiments 1 and 2 of the present invention; Figure 8This is a schematic elevation view of the connection node between the vertical and horizontal members of the support frame and the diagonal web members of the double frame in Embodiments 1 and 2 of the present invention. Figure 9 This is a schematic diagram of the cross-shaped splicing node of the horizontal bar in the middle of the support frame in Embodiments 1 and 2 of the present invention; Figure 10 This is a schematic diagram of the T-shaped splicing node of the horizontal bar at the edge of the support frame in Embodiments 1 and 2 of the present invention; Figure 11 This is a schematic diagram of the L-shaped splicing node of the horizontal bar at the corner of the support frame in Embodiments 1 and 2 of the present invention; Figure 12 This is a schematic cross-sectional view of the connection node between the first tension member and the vertical force-bearing rod in Embodiments 1 and 2 of the present invention; Figure 13 This is a schematic cross-sectional view of the connection node between the second tension member and the vertical force-bearing rod in Embodiments 1 and 2 of the present invention; Figure 14 This is a schematic diagram of the connection between the first tension member and the second tension member and the vertical force-bearing rod in Embodiments 1 and 2 of the present invention.

[0018] The components include: 1. Existing wind turbine foundation; 2. Top newly poured concrete reinforcement layer; 3. Laterally newly poured concrete reinforcement body; 4. Bidirectional anchoring mechanism; 5. Support frame; 6. Adjustable support assembly; 7. Bearing panel; 8. Top horizontal bar of the frame; 9. Bolt removal and installation operation hole; 10. T-shaped bearing plate; 11. Welded nut; 12. High-strength bolt; 13. Convex upper pressure plate; 14. Locking cap; 15. Elastic buffer; 16. Removable cover plate; 17. Bottom horizontal bar of the frame; 18. First adjusting rod. 19. Second adjusting rod; 20. Two-way adjusting sleeve; 21. Adjusting operation hole; 22. Locking nut; 23. Anti-slip support base; 24. Base connecting bolt; 25. Support connecting plate; 26. Partial leveling bearing layer; 27. Vertical load-bearing bar; 28. Vertical bar connecting kit; 29. ​​Horizontal bar connecting plate; 30. Diagonal web bar connecting kit; 31. Frame diagonal web bar; 32. Internal reinforcing member; 33. Anchoring connector; 34. Tensioner component; 35. Embedded isolation sleeve; 36. Inclined pressure-bearing stiffening plate. Detailed Implementation

[0019] Example 1 In a typical embodiment of the present invention, such as Figures 1-14 As shown, a hoisting platform anchored to a wind turbine foundation is presented.

[0020] In the expansion and renovation of mountain wind power facilities, there are problems such as large eccentric loads on lifting equipment, insufficient bearing capacity of the original site, and the risk of slope instability due to outward expansion. Therefore, this embodiment provides an adaptive hoisting platform anchored to the wind turbine foundation, suitable for mountain wind power site expansion scenarios, and equipped with large lifting equipment to achieve stable hoisting. By introducing a bidirectional anchoring mechanism 4, a rigid connection between the platform and the existing wind turbine foundation 1 is achieved, solving the problem of insufficient overturning restraint of independent support platforms in existing technologies. This eliminates the need for large-scale peak shaving and slope filling of the original mountain and the construction of permanent retaining walls, and can meet the construction operation requirements of large equipment.

[0021] like Figures 1-14 As shown, the adaptive hoisting platform anchored to the wind power foundation in this embodiment includes a support frame 5 that provides the main load-bearing capacity, a load-bearing panel 7 that directly bears the equipment load, an adjustable support component 6 that provides compensation for irregular terrain below, and a bidirectional anchoring mechanism 4 that connects the platform to the existing wind power foundation 1 as a whole under stress.

[0022] The bidirectional anchoring mechanism 4 is connected between the existing wind power foundation 1 and the support frame 5, and includes a first tension member 34 and a second tension member 34. The first tension member 34 is arranged in the horizontal direction, and its two ends are fixedly connected to the existing wind power foundation 1 and the support frame 5 respectively, for providing horizontal limiting function. The second tension member 34 is arranged in the inclined direction, and its two ends are fixedly connected to the existing wind power foundation 1 and the support frame 5 respectively, for providing vertical pull-out resistance.

[0023] The existing wind turbine foundation 1 is equipped with a foundation reinforcement structure at its end, specifically including a top newly poured concrete reinforcement layer 2 at the top and a lateral newly poured concrete reinforcement body 3 on the side. When this overall structure operates in concert, the vertical gravity applied by the lifting equipment is transmitted from the bearing panel 7 to the support frame 5, and then transmitted downward to the ground surface through the adjustable support components 6; while the horizontal sliding tendency force and lateral overturning moment during operation are connected to the top newly poured concrete reinforcement layer 2 and the lateral newly poured concrete reinforcement body 3 of the existing wind turbine foundation 1 through the bidirectional anchoring mechanism 4, thereby achieving force distribution and balance.

[0024] like Figure 1 As shown, the support frame 5 is horizontally arranged in the working area outside the slope. In this embodiment, the support frame 5 is a modularly assembled steel truss platform. The steel truss platform is assembled from multiple standardized truss units, which are internally spliced ​​using high-strength bolts 12. Figure 4 and Figure 5 As shown, the internal skeleton of the support frame 5 is mainly composed of the top horizontal bar 8, the bottom horizontal bar 17, the vertical load-bearing bar 27, and the diagonal web bar 31. Figure 9 , Figure 10 and Figure 11As shown, at the internal assembly nodes, the vertical load-bearing rod 27 is connected to the horizontal rod via a vertical rod connecting kit 28; as Figure 6 , Figure 8 As shown, adjacent horizontal bars are joined together by horizontal bar connecting plates 29; Figure 7 , Figure 8 As shown, the frame diagonal web members 31 are connected to the frame nodes through the diagonal web member connecting kit 30, together forming a high-rigidity truss load-bearing system.

[0025] The load-bearing panel 7 is laid and fixed to the top working surface of the support frame 5. The adjustable support components 6 are arrayed between the bottom nodes of the support frame 5 and the ground to compensate for the design height difference between the original ground and the bottom of the frame.

[0026] like Figure 2 As shown, the bidirectional anchoring mechanism 4 is the core component that changes the traditional platform force-bearing system. It is arranged radially between the existing wind power foundation 1 on the side near the platform and the support frame 5 on the side near the foundation. The bidirectional anchoring mechanism 4 includes multiple first tension members 34 and multiple second tension members 34. In this embodiment, the first tension member 34 is a horizontal prestressed anchor rod at the top, and the second tension member 34 is a diagonal prestressed anchor rod at the bottom. The upper horizontal prestressed anchor rod is arranged along the horizontal axis, with one end anchored to the corresponding position of the existing wind power foundation 1 and the other end fastened to the upper stress node of the steel truss platform; the lower diagonal prestressed anchor rod is arranged along the downward inclined axis and connected to the lower middle node of the foundation and the platform.

[0027] like Figure 1 As shown, when the lifting equipment operates on the bearing panel 7, if the equipment generates a horizontal component force that moves outwards from the slope, this horizontal load acts directly on the steel truss platform, causing the platform to tend to slide outwards. At this time, the upper horizontal prestressed anchor rods are under tension, and the massive self-weight of the wind turbine foundation generates a reverse horizontal limiting force to counteract the sliding tendency. Similarly, when the boom extends towards the slope to lift a heavy object, the platform's center of gravity shifts outwards, and the platform end near the foundation tends to lift upwards. At this time, the lower oblique prestressed anchor rods enter a state of tension, and the vertical component force provided by their axis firmly restrains the platform, thereby providing vertical pull-out resistance.

[0028] like Figure 12 and Figure 13As shown, both the first and second tension members 34 are inserted into the pre-embedded isolation sleeve 35. In this embodiment, the pre-embedded isolation sleeve 35 is preferably a PVC sleeve. The PVC sleeve is pre-fixed and embedded in the concrete at the end of the existing wind turbine foundation 1. The tension members 34 pass through the inside of the PVC sleeve and are isolated from the surrounding concrete. At the same time, a grout-stopping sealing structure is provided at the end of the PVC sleeve near the inside of the existing wind turbine foundation 1, which enables the recyclability of the anchoring components.

[0029] This embodiment uses PVC sleeves for isolation, along with end grout sealing structures to prevent the intrusion of cement grout during pouring, ensuring that the tension member 34 maintains its free sliding characteristics under tension. After the hoisting task is completed, simply remove the fastening nuts at both ends to extract and recycle the upper horizontal prestressed anchor rod and the lower inclined prestressed anchor rod as a whole from the PVC sleeve, significantly reducing material consumption for temporary works.

[0030] Specifically, to achieve the detachability and recyclability of the aforementioned tension member 34, a foundation end anchoring assembly is pre-embedded at the end of the existing wind turbine foundation 1. This foundation end anchoring assembly specifically uses a high-strength anchor with internal threads, which serves as a permanent stress point fixed inside the foundation reinforcement. During assembly, the first tension member 34 and the second tension member 34 penetrate the inner cavity of the pre-embedded isolation sleeve 35, i.e., the PVC sleeve, and their external threads are screwed into and connected to the internal foundation end anchoring assembly. In this structure, the concrete only wraps around the outer wall of the pre-embedded isolation sleeve 35, and there is no direct bond between the tension member 34 and the concrete.

[0031] When dismantling and recycling are required, first remove the outer locking fittings to release the axial prestress of the tension member 34; then rotate the tension member 34 in the opposite direction so that its bottom thread is unscrewed from the foundation end anchoring component inside the concrete; since the tension member 34 is in a free and unbonded state inside the pre-embedded isolation sleeve 35, it can be smoothly pulled out along the sleeve channel after uncoupling, thus achieving the recycling of high-value load-bearing components while ensuring the anchoring force.

[0032] For the connection between the anchoring component and the platform body, the support frame 5 includes a vertical load-bearing rod 27. In this embodiment, as shown... Figure 12 , Figure 13 As shown, the vertical load-bearing member 27 is specifically a rectangular section steel pipe in the assembled steel truss structure. Correspondingly, the bidirectional anchoring mechanism 4 also includes an anchoring connector 33, as shown in this embodiment. Figure 14As shown, the anchoring connector 33 includes an anchor rod connecting sleeve and a connecting beam. The anchor rod connecting sleeve is fixed to the outside of the rectangular cross-section steel pipe by wrapping it around the pipe. The end of the tension member 34 near the platform is inserted into the anchor rod connecting sleeve and locked by a pre-tightening member. The connecting beam spans multiple anchor rod connecting sleeves fixed to the outside of the rectangular cross-section steel pipe. The connecting beam simultaneously connects multiple first tension members or multiple second tension members, so that the concentrated tension of a single anchor rod is converted into a distributed force on the connecting beam, allowing them to share the force and then transfer it to the vertical load-bearing member. Combined with graded and symmetrical pre-tightening processes, the dispersion of pre-tightening force between anchor rods and the stress concentration at single nodes are reduced, achieving a heavy load distribution of anchor rod tension and improving the overall stability of the connection system. If the anchor is directly anchored by drilling holes in the truss member, it will not only weaken the member cross-section, but also cause local tearing of the member due to the concentrated tension of tens of tons of anchor rod. The use of an externally wrapped anchor bolt connection sleeve can transform the high-intensity concentrated tensile force generated at the end of the tension member 34 into surface contact friction and local extrusion force distributed along the outer wall of the rectangular cross-section steel pipe, making stress transmission smoother and more uniform.

[0033] To further facilitate the stress distribution of the anchor bolt connecting sleeve, the vertical load-bearing rod 27 is a hollow tubular structure, with an inner reinforcing member 32 fixedly installed at the position where the anchor bolt connecting member 33 is clamped and subjected to stress. In this embodiment, as shown... Figure 12 and Figure 13 As shown, the inner stiffener 32 is specifically a vertical stiffening plate welded to the inner wall of the rectangular cross-section steel pipe. When the anchor bolt connecting sleeve applies a locking clamping force from the outside and the tension member 34 is subjected to unilateral compressive force, the hollow steel pipe cross-section is prone to inward deformation or even local buckling instability. The vertical stiffening plate provides lateral support stiffness inside the pipe cavity, forming a mechanically stable state of internal and external clamping with the outer sleeve, thereby improving the fatigue life of this node area under high-frequency alternating loads.

[0034] For the inclined force path resisting overturning, an inclined pressure-bearing member is fixedly provided on the outer side of the anchoring connection 33 corresponding to the second tension member 34. In this embodiment, as... Figure 13 As shown, the inclined bearing member specifically consists of an inclined bearing plate and an inclined bearing stiffening plate 36 connected to its back. The inclination angle of the bearing surface of the inclined bearing plate is calculated to keep it perpendicular to the axial direction of the lower inclined prestressed anchor rod. In actual tensioning and service, the end pad of the inclined tension member 34 needs to have a flat load-bearing end face. Without this inclined bearing member, the nut washer and the outer wall of the sleeve will have sharp point contact, causing edge stress concentration and shear failure. By setting an inclined bearing plate with a perpendicular surface, the axial tensile force of the lower inclined prestressed anchor rod is transformed into end face normal pressure in a perpendicular and orthogonal form, reducing the additional bending moment and shear force.

[0035] At one end of the existing wind turbine foundation, a foundation reinforcement structure is installed. In this embodiment, as shown... Figure 1 As shown, the foundation reinforcement specifically consists of a top newly poured concrete reinforcement layer 2 attached to the surface of the original foundation and a lateral newly poured concrete reinforcement body 3. The foundation reinforcement is embedded into the existing foundation body through a rebar anchoring structure and cast as a whole. The foundation ends of the first tension member 34 and the second tension member 34 are both embedded and anchored inside the foundation reinforcement, thus expanding the load-bearing interface of the existing wind power foundation 1.

[0036] Because early wind turbine foundations were not designed with reserved connection nodes for external lateral tie rods, directly damaging the original foundation structure would affect the safety of the wind turbine itself. By roughening the surface and adding a concrete reinforcement layer, a bearing space specifically designed to accommodate the bidirectional anchoring ends is constructed on the outside without weakening the overall strength of the original structure, allowing the force transmission to smoothly transition to the entire foundation structure.

[0037] like Figure 4 As shown, to address the adaptive leveling requirements at the bottom of the platform, the adjustable support assembly 6 includes a first adjusting rod 18, a second adjusting rod 19, and a bidirectional adjusting sleeve 20. In this embodiment, the first adjusting rod 18 is an upper adjusting screw, the second adjusting rod 19 is a lower adjusting screw, and the bidirectional adjusting sleeve 20 is specifically a forward and reverse thread adjusting sleeve. The upper and lower adjusting screws have oppositely oriented external threads on their surfaces, and one end of each screw is screwed into the internal threaded holes at both ends of the forward and reverse thread adjusting sleeve. Locking nuts 22 are screwed onto both screws to abut and lock the end faces of the forward and reverse thread adjusting sleeve.

[0038] In addition, such as Figure 4 , Figure 5 As shown, the top end of the first adjusting rod 18 is connected to a support connecting plate 25 for fastening to the support frame 5; the bottom end of the second adjusting rod 19 is connected to an anti-slip support base 23, which is fixed to the local leveling bearing layer 26 on the ground surface by a base connecting bolt 24 to improve the single-point bearing capacity and anti-slip ability. At the same time, an adjusting operation hole 21 is provided on the bidirectional adjusting sleeve 20 to facilitate the insertion of construction tools to apply force.

[0039] During construction, the local leveling bearing layer 26 in mountainous environments will still have elevation errors ranging from millimeters to centimeters. During installation, a tool is inserted into the adjustment operation hole 21 to rotate the positive and negative thread adjusting sleeve in the middle, which acts as a bidirectional adjusting sleeve 20. Since the upper and lower screws rotate in opposite directions, the unidirectional rotation of the sleeve can drive the upper and lower screws to extend or retract synchronously, thereby achieving continuous stepless adjustment of the height of the corresponding support point of the support frame 5. After the support point height is compensated and the frame reaches the designed levelness, the locking nuts 22 on both sides are tightened in the opposite direction to make them fit and press against the two end faces of the positive and negative thread adjusting sleeve. During the hoisting operation, the crane engine and rotating mechanism will generate vibration. If there is no locking nut 22 to resist, the threaded pair is prone to self-rotation and uncoupling under long-term vibration, resulting in the support point height shrinkage and settlement. By setting the locking nut 22, the friction of the threaded pair is increased, maintaining the stability of the support height.

[0040] like Figure 3 As shown, the top horizontal load-bearing member of the supporting frame 5 is an I-shaped cross-section frame top horizontal bar 8. Along the splicing direction of the load-bearing panel 7, support brackets and T-shaped bearing plates 10 are arranged on the top surface of the frame top horizontal bar 8. The T-shaped bearing plate 10 is centrally located directly below the splice of the adjacent panel, and the support brackets are distributed on both sides of the T-shaped bearing plate 10, together forming the supporting foundation for the edge of the load-bearing panel 7.

[0041] The splicing edge of the bearing panel 7 has a downwardly protruding, locally thickened portion. An elastic buffer 15 is provided between the bearing panel 7 and the support bracket. In this embodiment, the elastic buffer 15 is a rubber anti-slip limiting pad. The locally thickened portion of the bearing panel 7 extends downward and is embedded in the physical limiting groove formed by the support bracket and the T-shaped pressure plate 10. It limits movement in the horizontal direction. When the lifting equipment rotates under heavy load and generates lateral shear force, the side wall of the locally thickened portion rigidly abuts against the vertical side wall of the T-shaped pressure plate 10, blocking the horizontal sliding path of the bearing panel 7.

[0042] Along the vertical assembly and clamping direction, before the tightening operation, the elastic buffer 15 provides temporary elastic support for the bearing panel 7, so that a specific vertical assembly gap is reserved between the bottom surface of the locally thickened part of the bearing panel 7 and the T-shaped bearing plate 10. Above the splicing position of adjacent bearing panels 7, a convex upper pressure plate 13 is installed across the seam. Welded nuts 11 are pre-fixed in the horizontal bar at the top of the support frame 5, and high-strength bolts 12 are used as fasteners. The high-strength bolts 12 pass through the convex upper pressure plate 13 and the splicing seam of the bearing panel 7 from top to bottom, and are screwed into the welded nuts 11 at the bottom.

[0043] During the locking action, as the fasteners gradually apply preload, the convex upper pressure plate 13 forcibly presses downwards against the two load-bearing panels 7, causing the elastic buffer 15 at the bottom to compress and deform. As the elastic buffer 15 sinks, the reserved vertical assembly gap decreases until the bottom surface of the locally thickened portion of the load-bearing panel 7 is rigidly pressed against the T-shaped pressure plate 10, completely closing the gap. The T-shaped pressure plate 10 stably transmits heavy vertical lifting loads, while the convex upper pressure plate 13 limits the vertical upward floating and edge warping of the load-bearing panel 7. Simultaneously, the compression displacement of the elastic buffer 15 compensates for manufacturing and installation errors in the steel components, providing continuous vibration reduction and cushioning during platform use.

[0044] In addition, the support panel 7 has bolt removal and installation operation holes 9 at corresponding positions, facing downwards. Construction personnel can directly install and inspect fasteners and locking caps 14 from the top surface of the platform. After the tightening work is completed, a removable cover plate 16 is installed at the top opening of the bolt removal and installation operation hole 9. The upper surface of the removable cover plate 16 is flush with the upper surface of the support panel 7 to maintain the smoothness and continuity of the top working surface and prevent interference or personnel tripping during on-site operations.

[0045] The immense shearing force of the lifting equipment poses a risk of horizontal slippage to the load-bearing panel 7. The locally thickened section is embedded in the geometric limiting groove of the T-shaped bearing plate 10, blocking the horizontal sliding path of the panel through rigid contact of the metal components. Dimensional errors exist in the processing and on-site assembly of large steel structures; if a rigid fit of the panel is required, the accumulation of errors can easily lead to misalignment of bolt holes, making installation impossible. The reserved assembly gap provides initial installation tolerance. As the load-bearing panel 7 is gradually pressed downwards by the high-strength bolts 12 with preload, the rubber anti-slip limiting pad is gradually compressed. The design requires the assembly gap to be smaller than the allowable compression of the rubber pad under the design preload. Therefore, as the rubber pad deforms and sinks, the assembly gap decreases until it is completely closed. During its service life, the elastic restoring force of the rubber pad maintains a floating, supporting, and buffering effect on the panel, effectively absorbing the impact load of the lifting operation and forming a constraint system with the rigid limiting of the T-shaped bearing plate 10.

[0046] Example 2 In another typical implementation of this embodiment, such as Figures 1-14 As shown, a construction method for an adaptive hoisting platform anchored to a wind turbine foundation is presented. The construction of the adaptive hoisting platform anchored to a wind turbine foundation as in Example 1 includes: Rebar installation was carried out on the surface of the existing wind power foundation 1 and the foundation reinforcement was formed by pouring concrete; during the pouring process, foundation end anchoring components were pre-embedded and pre-embedded isolation sleeves 35 were installed around the foundation end anchoring components; An adjustable support assembly 6 and a support frame 5 are arranged on the outside of the existing wind power foundation 1. The length of the adjustable support assembly 6 is adjusted to achieve leveling of the support frame 5 and then locked. Anchoring connectors 33 are installed at the corresponding stress positions of the support frame 5; the first tension member 34 and the second tension member 34 are respectively inserted into the corresponding pre-embedded isolation sleeves 35, so that one end is connected to the foundation end anchoring component and the other end is connected to the anchoring connector 33 and tensioned and locked. An elastic buffer 15 is placed on top of the support frame 5, and then a bearing panel 7 is laid on top of it. A fastening force is applied to deform the elastic buffer 15 under pressure, thus completing the construction of the hoisting platform.

[0047] After the hoisting operation is completed, the following dismantling steps are also included: Release the fastening constraints, disassemble the bearing panel 7 in sequence, and disconnect the connection between the first tension member 34 and the second tension member 34 and the anchoring connector 33; The first tension member 34 and the second tension member 34 are extracted and recovered from the pre-embedded isolation sleeve 35, and the end of the pre-embedded isolation sleeve 35 remaining in the foundation reinforcement body is sealed with sealing material. Release the locking state of the adjustable support component 6 and retract it, then disassemble and remove the support frame 5 and the adjustable support component 6 in sequence for reuse.

[0048] This embodiment provides a detailed explanation of the construction method based on the adaptive hoisting platform anchored to the wind power foundation provided in Embodiment 1.

[0049] The construction method includes steps S1 to S4 in the hoisting platform erection stage, and steps S5 to S7 in the dismantling stage after the work is completed.

[0050] Step S1: Clean the surface of the existing wind power foundation 1 and perform roughening and rebar installation, and tie the structural steel bars; pre-embed and position the foundation end anchoring components in the rebar cage, and put the positioning and pre-embedded isolation sleeve 35 around it; then erect the formwork and pour concrete, and after curing, form the foundation reinforcement body.

[0051] The logic behind this step is to break the smooth boundary of the original foundation surface at the micro level by installing rebar, so as to ensure the shear force transfer efficiency between the old and new concrete; at the same time, the isolation sleeve is pre-cured inside the structure to create a channel for subsequent cable connection.

[0052] Step S2: On the sloping working surface outside the existing wind turbine foundation 1, arrange multiple sets of adjustable support components 6 and the assembled support frame 5. Workers adjust the length of the components by rotating the adjusting sleeves in the same direction to compensate for the ground height differences at different support points until the support frame 5 is leveled as a whole. Then, tighten all locking nuts 22 to lock the support height.

[0053] This step first establishes the platform's levelness and static stability in space. After leveling and locking the elevation, subsequent lateral force-bearing connections are made to reduce force deviations caused by the lack of a fixed height.

[0054] Step S3: Arrange anchoring connectors 33 on the outer side of the support frame 5 at the corresponding elevation; insert the first tension member 34 and the second tension member 34 into the pre-embedded isolation sleeve 35 at the corresponding end of the existing wind power foundation 1, so that one end is anchored into the foundation end anchoring assembly, and the other end passes through and connects to the anchoring connector 33 on the support frame 5. Apply the design prestress using tensioning equipment and tighten the fasteners for tensioning and locking.

[0055] Applying prestress reduces the initial assembly clearance between nodes, so that the platform forms a pre-tensioned whole with the wind power foundation before bearing the external load of hoisting.

[0056] Step S4: Place the elastic buffer 15 on the top support of the support frame 5, then lift and lay the load-bearing panel 7 on top of the frame, so that the thickened part of the panel enters the positioning area. Insert the fastening bolts one by one and gradually apply the specified torque. As the fastening force increases, the elastic buffer 15 is compressed and undergoes vertical deformation, causing the panel to move laterally to close the reserved assembly gap, ultimately achieving a tight fit between the panel and the frame and completing the overall platform construction.

[0057] By using rubber compression displacement to close the rigid gap, the final closure and limiting lock of the upper working surface were completed.

[0058] Upon completion of the hoisting operation and the commencement of the platform dismantling and recycling cycle, the following steps shall be performed: Step S5: Release the fastening constraints at the panel nodes, lift and disassemble each load-bearing panel 7 in sequence. Then release the axial prestress of the first tension member 34 and the second tension member 34, and disassemble the connecting fittings between them and the anchoring connector 33.

[0059] Step S6: From the outside in, completely extract the first tension member 34 and the second tension member 34 along the internal channel of the pre-embedded isolation sleeve 35 and collect and store them. Use sealing material to seal the exposed port of the pre-embedded isolation sleeve 35 remaining inside the foundation reinforcement body.

[0060] The presence of the isolation sleeve ensures that the pull rod is not interfered with by cement lumps, while the sealed end blocks the erosion path of subsequent surface water vapor penetrating into the wind turbine foundation.

[0061] Step S7: Loosen the locking nut 22 on the adjustable support assembly 6 in the reverse direction, and rotate the bidirectional adjusting sleeve 20 to retract the support height, so that the adjustable support assembly 6 is released from the pressure state of the support frame 5. Finally, disassemble and remove the support frame 5 and the adjustable support assembly 6 in sequence, and sort and transport them for reuse in the next machine position.

[0062] The above are merely preferred embodiments of this example and are not intended to limit the scope of this example. Those skilled in the art will recognize that this example can have various modifications and variations. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of this example should be included within the protection scope of this example.

Claims

1. A hoisting platform anchored to a wind turbine foundation, characterized in that, It includes a support frame, a load-bearing panel laid on top of the support frame, an adjustable support assembly set at the bottom of the support frame, and a two-way anchoring mechanism; The bidirectional anchoring mechanism connects the existing wind power foundation and the support frame, and includes a first tension member and a second tension member; The first tension member is set in the horizontal direction, with its two ends fixedly connected to the existing wind power foundation and the support frame, respectively, to provide a horizontal limiting function; The second tension member is installed along the inclined direction, with its two ends fixedly connected to the existing wind power foundation and the support frame, respectively, to provide vertical pull-out resistance.

2. The hoisting platform anchored to a wind turbine foundation as described in claim 1, characterized in that, Both the first and second tension components are installed in the pre-embedded isolation sleeve and are detachably connected to the support frame and the existing wind power foundation. The pre-embedded isolation sleeve is fixedly embedded in the end of the existing wind power foundation, and a grout-stopping sealing structure is provided at one end close to the interior of the existing wind power foundation.

3. The hoisting platform anchored to a wind turbine foundation as described in claim 1 or 2, characterized in that, The support frame includes vertical load-bearing rods, and the bidirectional anchoring mechanism also includes anchoring connectors; Anchoring connectors are sleeved and fixed to the outside of the vertical load-bearing rod. The first tension member and the second tension member are respectively connected to and locked to the corresponding anchoring connectors at the end near the support frame. There are multiple first tension members and second tension members, which are radially distributed with the existing wind power foundation as the origin.

4. The hoisting platform anchored to a wind turbine foundation as described in claim 3, characterized in that, The vertical force-bearing rod is a hollow tubular structure. An inner reinforcing member is fixedly installed inside the vertical force-bearing rod at the position where the anchoring connector is clamped and subjected to force. The anchoring connector includes a connecting beam that simultaneously connects multiple first tension members and / or multiple second tension members.

5. The hoisting platform anchored to a wind turbine foundation as described in claim 3, characterized in that, An inclined pressure-bearing member is fixedly installed on the outer side of the anchoring connection corresponding to the second tension member. The inclined pressure-bearing surface of the inclined pressure-bearing member is inclined in a direction perpendicular to the axial direction of the second tension member.

6. The hoisting platform anchored to a wind turbine foundation as described in claim 1, characterized in that, The existing wind power foundation is equipped with a foundation reinforcement structure, which is connected to the existing wind power foundation as a whole through a rebar anchoring structure; The foundation ends of both the first and second tension structural members are embedded and anchored inside the foundation reinforcement.

7. The hoisting platform anchored to a wind turbine foundation as described in claim 1, characterized in that, The adjustable support assembly includes a first adjusting rod, a second adjusting rod, and a bidirectional adjusting sleeve; One end of the first adjusting rod and the second adjusting rod are respectively connected to the two ends of the bidirectional adjusting sleeve. Both the first adjusting rod and the second adjusting rod are provided with locking nuts that abut against and lock the bidirectional adjusting sleeve.

8. The hoisting platform anchored to a wind turbine foundation as described in claim 1, characterized in that, The top of the support frame is provided with a support bracket and a T-shaped pressure plate, and the splicing edge of the load-bearing panel is provided with a locally thickened part, which is limited to the area between the support bracket and the T-shaped pressure plate. An elastic buffer is provided between the load-bearing panel and the support bracket. An assembly gap is reserved between the load-bearing panel and the T-shaped bearing plate in the pre-assembled state. The size of the assembly gap is smaller than the allowable compression of the elastic buffer under the design pre-tightening force.

9. A construction method for a hoisting platform anchored to a wind turbine foundation, wherein the construction of the hoisting platform anchored to a wind turbine foundation as described in any one of claims 1-8 is characterized in that, include: Rebar installation was carried out on the surface of the existing wind turbine foundation, and a foundation reinforcement structure was formed by pouring concrete. During the pouring process, foundation end anchoring components are pre-embedded, and pre-embedded isolation sleeves are installed around the foundation end anchoring components; Adjustable support components and support frames are installed on the outside of the existing wind power foundation. The length of the adjustable support components is adjusted to achieve leveling of the support frame and then locked. Anchoring connectors are installed at the corresponding stress positions of the support frame; the first tension member and the second tension member are respectively inserted into the corresponding pre-embedded isolation sleeves, so that one end is connected to the foundation end anchoring component and the other end is connected to the anchoring connector and tensioned and locked. An elastic buffer is placed on top of the support frame, and then a load-bearing panel is laid on top of it. A tightening force is applied to deform the elastic buffer under pressure, thus completing the construction of the hoisting platform.

10. The construction method of the hoisting platform anchored to the wind turbine foundation as described in claim 9, characterized in that, After the hoisting operation is completed, the following dismantling steps are also included: Release the fastening constraints, disassemble the bearing panel in sequence, and disconnect the connection between the first and second tension members and the anchoring connector; The first and second tension components were extracted and recovered from the pre-embedded isolation sleeve, and the ends of the pre-embedded isolation sleeve remaining in the foundation reinforcement body were sealed with sealing material. Release the locking state of the adjustable support component and retract it, then disassemble and remove the support frame and adjustable support component in sequence for reuse.