A method for vertical rotation of hinged inclined supports in cast-in-place sections of rigid frame bridge side spans

By pre-embedding hinged supports in the pier cap and adopting a construction method of vertical segmented installation and overall rotation of hinged inclined supports, the difficulties of high-altitude assembly and dismantling of the cast-in-place section of the long side span of the high pier were solved, achieving an efficient and safe construction process.

CN123109068APending Publication Date: 2026-11-17SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611499282.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional methods for constructing cast-in-place sections of rigid frame bridge side spans present challenges such as difficulties in high-altitude assembly, difficulty in controlling installation accuracy, large workload of high-altitude operations, high safety risks, and difficulties in dismantling, especially in cases with high piers and long side spans.

Method used

The construction method of vertical rotation of hinged inclined brackets is adopted. By pre-embedding hinged supports in the foundation, the steel pipe brackets are first installed in sections in a vertical state. The brackets are then controlled to rotate around the bottom hinge point to the design position using devices such as chain hoists and jacks. After they are in place, they are fixed to form a stable load-bearing system. After the construction is completed, the fixing is released and the brackets are rotated in the opposite direction and lowered.

Benefits of technology

It reduces the difficulty of high-altitude assembly and dismantling, improves installation accuracy and safety, reduces investment in temporary facilities, is suitable for complex terrain, and saves construction costs and material utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109068A_ABST
    Figure CN123109068A_ABST
Patent Text Reader

Abstract

This invention discloses a method for vertically rotating a hinged inclined support for a cast-in-place side span of a rigid frame bridge, relating to the field of cast-in-place side span construction of rigid frame bridges. Addressing the challenges of high-altitude oblique assembly, precision control difficulties, large workload at heights, high safety risks, and dismantling difficulties associated with high piers and long side span cast-in-place steel pipe supports, this invention sets a hinged support at the top of the pier cap. The inclined leg steel pipes are first assembled into a whole in a near-vertical state, then rotated around the bottom hinge point to the designed inclined support position using chain hoists, jacks, or traction devices. Once in position, the hinged joint is fixed and the attached steel pipe is installed, converting it into a stable load-bearing system. After construction, the fixing is released, the hinge is restored, and the system is rotated in the opposite direction and lowered for dismantling. This method achieves a state transition from "rotatable installation—fixed load-bearing—restored rotation and dismantling," reducing the difficulty of high-altitude assembly and dismantling, improving installation accuracy and safety, reducing temporary access facilities and foundation treatment, and is suitable for complex terrains such as high piers, riverbanks, and steep slopes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of construction of cast-in-place sections of side spans of rigid frame bridges, specifically a method for vertical rotation construction of cast-in-place sections of side spans of rigid frame bridges using hinged inclined supports. Background Technology

[0002] The cast-in-place side span of a rigid frame bridge is an important component of the closure construction of a continuous rigid frame bridge. Traditionally, cast-in-place side spans are constructed using methods such as ground-supported full-span scaffolding, beam-column steel pipe scaffolding, or pier-top corbel brackets.

[0003] For projects with relatively low pier height, good foundation bearing capacity, and relatively flat construction sites, the above construction methods are applicable to a certain extent. However, in mountainous areas, high piers, riverbanks, and other complex terrain conditions at the bridge site, traditional construction methods have significant limitations.

[0004] 1. Ground-mounted support systems have high requirements for terrain and foundation conditions. Full-span scaffolding or traditional beam-column scaffolding usually requires the construction of scaffolding foundations next to the piers. When the bridge site is located in a riverbed, steep slope, or soft foundation area, additional work is required, including excavation of the foundation pit, foundation treatment, concrete foundation construction, and slope protection. This results in a large amount of construction work and may increase disturbance to the original terrain and surrounding environment.

[0005] 2. The high-altitude assembly of long steel pipe supports is quite difficult. For a 40m long steel pipe support, if it is assembled section by section according to the final tilt posture, the workers need to spend a long time at high altitude to connect, weld, install horizontally, and adjust the posture of the steel pipes.

[0006] At high altitudes, components are easily affected by hoisting sway, wind loads, and limited operating space, making it difficult to adjust the steel pipe axis, node position, and overall tilt.

[0007] Meanwhile, in order to meet construction needs, additional temporary ladders, suspended baskets, operating platforms and other high-altitude facilities need to be set up, making construction organization complex.

[0008] 3. Working at heights carries higher safety risks. In traditional construction methods, a large amount of work, such as steel pipe assembly, welding, and attachment installation, needs to be completed at high altitude outside the support frame.

[0009] As the height of the piers increases, workers face risks such as falls from heights, being struck by objects, structural instability, and collisions during hoisting. The longer the work is done at height, the greater the construction risks become.

[0010] 4. Difficulty in adjusting installation deviations Long steel pipe components are quite long, and when assembled in multiple sections at an incline at high altitude, even small local installation errors can easily lead to significant positional deviations at the top of the support.

[0011] When using fully rigid nodes for direct positioning, installation errors may cause additional internal forces to be generated in the support, which is not conducive to the overall stress state of the support.

[0012] 5. The scaffold is difficult to remove. After the construction of the cast-in-place side span is completed, the traditional long steel pipe support still needs to be cut, hoisted and dismantled in sections at high altitude.

[0013] During construction, not only is it necessary to rebuild the high-altitude operating conditions, but the scaffolding is also in an inclined state, making it difficult to control the dismantling sequence and stability of the components. Summary of the Invention

[0014] Therefore, to address the aforementioned shortcomings, this invention provides a method for vertically rotating articulated inclined supports in the cast-in-place section of a rigid frame bridge side span. This patent relates to the field of construction of cast-in-place sections of rigid frame bridge side spans, primarily addressing the problems arising from the need for high-altitude assembly, connection, and adjustment of long steel pipe columns or inclined bracing components when using steel pipe supports for high piers and long side span cast-in-place sections. These problems include high construction difficulty, difficulty in controlling installation accuracy, large workload at heights, long construction period, high safety risks, and difficulties in subsequent dismantling.

[0015] This invention is implemented as follows: a method for vertically rotating a hinged inclined support in the cast-in-place section of a rigid frame bridge side span is constructed, characterized by the following steps: Step 1: During the construction of the foundation, steel plates are pre-embedded at the corresponding positions of the hinged supports of the inclined leg steel pipes; during the construction of the pier column, connectors are pre-embedded at the wall attachment positions. Step 2: After the substructure construction is completed, install hinged supports on the embedded steel plates of the pier cap, and connect the bottom of the inclined leg steel pipe to the hinged supports through pins, so that the inclined leg steel pipe can rotate around the pins in the designed rotation plane; set up a temporary working platform on the pier column. Step 3: Hoist the bottom segment inclined leg steel pipe to the hinged support in a basically vertical state, and install the horizontal horizontal bracing between the two main steel pipes to form the bottom segment steel pipe frame. At this time, the formal wall attachment between the inclined leg steel pipe and the pier is not installed. Step 4: Hoist the inclined steel pipe of the top segment and connect it with the bottom segment. Simultaneously install the top horizontal bracing to form a complete long steel pipe frame. At this time, do not install the formal wall attachments to maintain the freedom of the steel pipe frame to rotate around the bottom hinge point. Step 5: Install the top bracket and rotation control device while the steel pipe frame is in a vertical position. The rotation control device includes a chain hoist, a hand chain hoist, a jack, a ground traction device and / or guy ropes. Step 6: Release the temporary constraints that restrict the rotation of the column base, so that the column base is restored to a rotatable hinged state. Use the push device and / or traction device to make the steel pipe frame rotate outward around the bottom pin axis. At the same time, use the chain hoist or traction device to control the rotation speed and attitude, so that the steel pipe frame slowly rotates to the designed diagonal brace position. Step 7: After the steel pipe frame is in place, measure and adjust the position of the top of the steel pipe, the inclination of the support and the position of the axis. After confirming that it meets the design requirements, fix the hinge joint of the column base to change the hinge joint from a rotatable state to a fixed state. Step 8: Install the wall-mounted steel pipes between the inclined leg steel pipes and the pier from bottom to top, so that the inclined leg steel pipes, the pier, and the top bracket together form a stable spatial support system. Step nine: Install the bottom formwork platform on the top bracket and carry out the formwork, reinforcement, prestressing system and concrete construction of the side span cast-in-place section.

[0016] 2. The method for vertical rotation construction of hinged inclined support for cast-in-place section of rigid frame bridge side span according to claim 1, characterized in that the hinged support is made of steel plate and has pin holes, and the bottom of the inclined leg steel pipe is rotatably connected to the hinged support through a pin shaft; during the support installation and vertical rotation stage, the hinged support allows the inclined leg steel pipe to rotate around the pin shaft; before the side span concrete is poured, the hinged joint is fixed by wrapping steel plate and / or welding, so that the column foot forms a fixed support.

[0017] 3. The method for vertical rotation of hinged inclined supports in the cast-in-place section of a rigid frame bridge side span according to claim 1, characterized in that the inclined leg steel pipe is a φ820×12mm spiral steel pipe with a length of approximately 40.7m; the horizontal connection between two inclined leg steel pipes is a φ630×7mm steel pipe; the wall-mounted steel pipe between the inclined leg steel pipe and the pier is a φ426×7mm steel pipe; and three wall-mounted steel pipes are installed along the height. The bottom segment of the inclined leg steel pipe is about 21m long, and the top segment of the inclined leg steel pipe is about 21m long. After the bottom segment and the top segment are connected, they form an integral steel pipe frame of about 40m.

[0018] 4. The method for vertical rotation of the hinged inclined support of the cast-in-place section of the side span of a rigid frame bridge according to claim 1, characterized in that the temporary working platform is set at a distance of about 20m from the ground.

[0019] 5. The method for vertical rotation of the hinged inclined support of the cast-in-place section of the side span of a rigid frame bridge according to claim 1, characterized in that, in step five, a chain hoist or hand-operated hoist is installed on the top of the pier or the top of the cap beam, with one end anchored to the cap beam or the top of the pier and the other end connected to the top of the steel pipe frame; a ground traction rope, guy rope or winch is installed on the outside of the steel pipe frame; and / or a mechanical jack is used to apply a horizontal external thrust to the steel pipe frame.

[0020] 6. The method for vertical rotation of the hinged inclined support of the cast-in-place section of the side span of a rigid frame bridge according to claim 1, characterized in that, in step six, jacks are used to push the steel pipe frame horizontally outward and / or the ground traction rope on the river center side is used to pull the steel pipe frame outward, and the chain hoist or hoist connected to the top of the steel pipe frame is gradually loosened, so that the steel pipe frame rotates slowly, continuously and controllably outward around the bottom hinged support to the design position; during the rotation, the traction devices on both sides are adjusted according to the measurement results to keep the steel pipe frame stable.

[0021] 7. The method for vertical rotation of the hinged inclined support of the cast-in-place section of the side span of a rigid frame bridge according to claim 1, characterized in that, in step seven, a total station is used to check the position of the top of the steel pipe, the inclination of the support and the position of the axis; the consolidation adopts steel plate wrapping, welding connection or other connection structure that restricts the hinge node from continuing to rotate.

[0022] 8. The method for vertical rotation of the hinged inclined support of the cast-in-place section of the side span of a rigid frame bridge according to claim 1, characterized in that, in step eight, the steel pipes attached to the wall between the inclined leg steel pipes and the pier columns are installed sequentially from bottom to top using a tower crane.

[0023] 9. The method for vertical rotation of hinged inclined support for cast-in-place section of rigid frame bridge side span according to claim 1, characterized in that, in step nine, a bottom formwork platform, crossbeams, longitudinal beams and distribution beams are installed on the top bracket, and then the formwork, reinforcing bars and prestressing system are installed, and concrete is poured by continuous pumping of the entire cross section, and the deformation of the support is monitored during the construction process.

[0024] 10. The method for vertical rotation of the hinged inclined support of the cast-in-place section of the side span of a rigid frame bridge according to claim 1, characterized in that, after the construction of the cast-in-place section of the side span is completed and the conditions for demolition are met, it further includes a demolition step: Temporarily anchor the bottom formwork platform using pre-drilled holes in the beam or reliable anchor points, and install wire ropes, winches, or guy ropes. Remove or cut off the connection between the wall-mounted steel pipe and the pier column, release the rigid fixation at the column base, and restore the column base to a hinged state that can rotate around the pin. By coordinating the release and retraction of guy ropes and / or winches on both sides of the support, the inclined leg steel pipe frame is slowly rotated around the bottom hinge point in the opposite direction to the installation process and lowered to the ground; After the steel pipe scaffolding reaches the ground, it is dismantled, dismantled, and the materials are transferred. Dismantle the pier top bracket and bottom formwork platform using the pre-reserved holes in the beam and / or the bridge deck winch; After removing the attached steel pipes and releasing the column base fasteners, the hinged connection was restored first. Then, the guy ropes on both sides were used to coordinate the raising and lowering of the approximately 40m-long inclined support, allowing it to be rotated and leveled to the ground as a whole, avoiding the need for segmented high-altitude cutting and hoisting from top to bottom.

[0025] Traditional construction of cast-in-place side spans typically employs ground-supported scaffolding, beam-column scaffolding, or pier-top brackets. However, in situations where transition piers are high, terrain is steep, or the bridge site is located on a riverbank or has poor foundation conditions, conventional ground-supported scaffolding requires extensive foundation treatment, earthwork excavation, and concrete foundation construction. Construction conditions are significantly influenced by terrain and geology.

[0026] For cast-in-place side span sections using long steel pipe columns as the support system, directly assembling them at high altitude according to the final diagonal bracing state not only requires setting up a large number of temporary operating platforms, ladders, and hoisting auxiliary facilities, but also makes it difficult to position, weld, and adjust the steel pipe segments at high altitude, making it difficult to effectively guarantee installation accuracy and construction safety. The original technical briefing also clearly pointed out that conventional beam-column scaffolding has problems such as difficulty in high-altitude assembly, low construction accuracy, large amount of high-altitude work, difficulty in dismantling, and long construction period.

[0027] Therefore, this patent proposes a construction method of "vertical segmented installation - hinged rotation and external placement - in-place consolidation - wall attachment to form a stable system - reverse rotation and removal after construction".

[0028] By setting a rotatable hinged support on the top of the pier, the long steel pipe inclined support can be assembled in sections in an almost vertical state during the installation stage. After the main body of the support is assembled, the support is rotated around the bottom hinge point to the designed inclined support position using a chain hoist, jack or traction device. Then the bottom hinge node is fixed and the wall-attached steel pipe is installed, so that it is converted into a stable cast-in-place construction load-bearing system.

[0029] Therefore, the following technical issues need to be addressed: 1. Solve the problem of difficulties in directly assembling and constructing long steel pipe inclined supports at an angle in the air at high altitude; 2. Reduce the difficulty of high-altitude operations such as steel pipe splicing and horizontal connection installation; 3. Improve the controllability of installation, positioning, and attitude adjustment of long steel pipe supports; 4. Solve the functional conversion problem between the need for rotation during the bracket installation stage and the requirement to form a stable rigid support during the concrete construction stage; 5. Reduce safety risks during the installation and dismantling of the side span supports for high piers; 6. Reduce investment in foundation treatment and temporary facilities for large-scale ground-supported structures under complex terrain conditions; 7. After construction is completed, the support can be rotated in the opposite direction and lowered after the hinge is restored, which improves dismantling efficiency and safety.

[0030] This invention has the following advantages: It discloses a method for vertically rotating a hinged inclined support for a cast-in-place side span of a rigid frame bridge, relating to the field of cast-in-place side span construction for rigid frame bridges. Addressing the difficulties in high-altitude oblique assembly, precision control challenges, large workload at heights, high safety risks, and dismantling difficulties associated with high piers and long side span cast-in-place steel pipe supports, this invention sets a hinged support at the top of the pier cap. The inclined leg steel pipes are first assembled into a whole in a near-vertical state, then rotated around the bottom hinge point to the designed inclined support position using chain hoists, jacks, or traction devices. Once in position, the hinged joint is fixed and the attached steel pipe is installed, converting it into a stable load-bearing system. After construction, the fixing is released, the hinge is restored, and the system is rotated in the opposite direction and lowered for dismantling. This method achieves a state transition from "rotatable installation—fixed load-bearing—restored rotation and dismantling," reducing the difficulty of high-altitude assembly and dismantling, improving installation accuracy and safety, reducing temporary climbing facilities and foundation treatment, and is suitable for complex terrains such as high piers, riverbanks, and steep slopes. Attached Figure Description

[0031] Figure 1 This is a process flow diagram of the cast-in-place section of the side span. Figure 2. Elevation layout of the ground-mounted hinged inclined support. Figure 3. Detailed view of the hinged support Figure 4. Hinge Support Diagram Figure 5. On-site installation diagram of column base segment and horizontal coupling. Figure 6. On-site installation diagram of column top segment and horizontal coupling Figure 7. Layout of the externally fixed column Figure 8. Installation diagram of steel pipe attached to the column wall Figure 9. Installation diagram of formwork and reinforcement for the cast-in-place section of the side span. Figure 10 Concrete pouring diagram of the side span cast-in-place section Figure 11 Elevation view of the cast-in-place section of the side span of the Yangliutan Tuojiang Grand Bridge Figure 12 Midas model of a ground-mounted hinged inclined support. Detailed Implementation

[0032] The present invention will now be described in detail with reference to the accompanying drawings, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0033] This invention provides a method for vertically rotating articulated inclined supports in the construction of cast-in-place sections of rigid frame bridge side spans. This patent relates to the field of construction of cast-in-place sections of rigid frame bridge side spans, and mainly addresses the problems arising from the need for high-altitude assembly, connection, and adjustment of long steel pipe columns or inclined bracing components when using steel pipe supports for the construction of high piers and long side span cast-in-place sections. These problems include high construction difficulty, difficulty in controlling installation accuracy, large workload at heights, long construction period, high safety risks, and difficulties in subsequent dismantling.

[0034] 1. Overall Technical Principles The basic principle of this patent is: Using a foundation cap as the basis for the inclined support, a hinged support with rotational function is installed between the foundation cap and the inclined leg steel pipe, allowing the steel pipe support to rotate around the hinged node during installation. During construction, the steel pipe support is first installed in sections in a near-vertical state to form a whole. Then, using traction and pushing devices, the steel pipe support is gradually rotated outward around the bottom hinge point to the design position. Once in place, the hinged support is rigidly fixed, and the support is connected to the pier body via wall-mounted steel pipes, transforming it from a "rotatable installation system" to a "fixed load-bearing system." After construction, the corresponding fixing is released, allowing the support to return to a rotatable state, and it is then rotated in the opposite direction and lowered to the ground for dismantling.

[0035] The key to this method is: Rotation is permitted during the installation phase, restricted during the usage phase, and resumed during the dismantling phase.

[0036] Thus, the structural state transitions of the bracket installation, operation, and dismantling can be completed using the same bottom hinge node.

[0037] 2. Composition of the scaffold system The cast-in-place support for the side span mainly includes: abutment, pier, embedded steel plate, hinged support, pin, inclined leg steel pipe column, steel pipe horizontal bracing, wall-mounted steel pipe, temporary working platform, bracket, upper cast-in-place bottom formwork platform, chain hoist or hand chain hoist, jack and / or ground traction device, temporary guy rope and corresponding anchoring device.

[0038] In the embodiment of the Yangliutan Tuojiang Grand Bridge project, the inclined leg support uses φ820×12mm spiral steel pipe as the main load-bearing component, with a length of about 40.7m; φ630×7mm steel pipe is used as a horizontal connection between the two inclined leg steel pipes, and φ426×7mm steel pipe is used as an attachment component between the support and the pier column to ensure the overall stability of the support system.

[0039] The above dimensions are the implementation parameters for this project and do not limit the steel pipe diameter, wall thickness, support length, and number of wall attachments in other projects.

[0040] 3. Structure and function of hinged supports A special hinged support is installed at the bottom of the inclined leg steel pipe on the top surface of the foundation.

[0041] The hinged support is made of steel plate and has pin holes. The bottom of the inclined leg steel pipe is rotatably connected to the hinge through a pin.

[0042] During the installation and rotation of the support, the hinged support allows the inclined leg steel pipe to rotate around the center of the pin, enabling the steel pipe frame to switch between the vertical state and the designed inclined bracing state.

[0043] In this embodiment of the project, Bailey pins are used as rotating pivots. After the main support structure is installed and rotated, and before the side span concrete is poured, the hinged joints are fixed by methods such as wrapping with steel plates, so that the construction load is no longer mainly borne by the pivot, but rather the column base forms a stable fixed support.

[0044] Therefore, this node has two states: The first state is a rotatable state.

[0045] Used for bracket installation, vertical rotation, and subsequent dismantling.

[0046] The second state is a fixed state.

[0047] Used for the formwork, reinforcement installation and concrete pouring stages of the side span cast-in-place section to meet the overall load-bearing and stability requirements of the support.

[0048] The structural transformation of "rotatable-consolidated-re-rotatable" is one of the important technical features of this patent.

[0049] 4. Specific construction steps Step 1: Construction of Embedded Parts During the construction phase of the foundation, embedded steel plates corresponding to the inclined leg steel pipe hinged supports are installed according to the design location.

[0050] During the pier construction phase, pre-embedded steel plates or connecting components required for permanent and temporary attachments are pre-embedded according to the location of the support wall attachment.

[0051] By pre-embedding, a reliable connection foundation is provided for subsequent hinged supports, wall-mounted components, and traction control systems.

[0052] The drawings clearly state that steel plates should be pre-embedded during the construction of the foundation and at the corresponding positions of permanent and temporary attachments during the construction of the pier body.

[0053] Step 2: Install the articulated support and temporary work platform After the substructure is completed, hinged supports are installed at the locations where steel plates are embedded in the foundation.

[0054] The bottom of the inclined leg steel pipe is connected to the hinge support by a pin, so that the steel pipe can rotate around the hinge point in the longitudinal direction of the bridge or in the designed rotation plane.

[0055] In addition, temporary operating platforms will be set up at appropriate heights on the piers to accommodate the extension and installation of the support structure. In this project, a temporary working platform will be set up approximately 20m above the ground.

[0056] Step 3: Vertical installation of the bottom section steel pipe frame The bottom section of the inclined leg steel pipe is hoisted onto the hinged support in an approximately vertical state using a tower crane or other lifting equipment.

[0057] After the bottom section steel pipe is installed, a horizontal bracing is installed between the two main steel pipes to form an integral frame.

[0058] In this embodiment of the project, the length of the bottom segment is approximately 21m.

[0059] At this stage, the formal wall-mounted rods between the inclined leg steel pipes and the pier body will not be installed, so that the steel pipe frame can rotate around the column foot hinge point as a whole in subsequent steps.

[0060] Vertical installation ensures that the hoisting direction of long steel pipe segments is basically consistent with the direction of gravity, facilitating axis control, steel pipe butt joints, and parallel connections.

[0061] Step 4: Installation of top section steel pipe and horizontal coupling After the bottom section is installed, the top steel pipe section is then hoisted using lifting equipment.

[0062] Connect the top steel pipe to the bottom steel pipe, and simultaneously install the corresponding horizontal connecting components at the top so that the upper and lower sections together form a complete long steel pipe frame.

[0063] In this embodiment, the top segment is approximately 21m long, and when connected to the bottom segment, it forms an integral steel pipe support of approximately 40m.

[0064] After the top segment is completed, the formal wall-mounted device will not be installed yet, so as to maintain the freedom of the entire support to rotate around the bottom hinge.

[0065] Step 5: Install the top bracket and rotation control device Install the top bracket and corresponding platform structure in the vertical position of the steel pipe scaffold.

[0066] At the same time, chain hoists, hand-operated hoists, or other controllable traction devices are installed on the top of the pier or the top of the cap beam.

[0067] One end of the traction device is reliably anchored to the cap beam or pier top, and the other end is connected to the top of the steel pipe frame.

[0068] Depending on the construction conditions, ground traction ropes, guy ropes, or winches can also be installed on the outside of the steel pipe frame.

[0069] The above-mentioned devices together constitute the attitude and speed control system during the rotation of the support.

[0070] Step Six: Release temporary constraints and initiate vertical rotation After verifying that the overall connection of the support, the hinged support, the traction system, and the safety measures meet the requirements, remove the temporary fixing device that restricts the rotation of the steel pipe column base, so that the bottom is restored to a rotatable hinged state.

[0071] Then, mechanical jacks are used to apply a horizontal outward thrust to the steel pipe frame, or a traction device set on the ground is used to pull the steel pipe frame outward.

[0072] Under the action of horizontal external thrust or traction, the steel pipe frame begins to rotate outward with the bottom pin as the rotation center.

[0073] Step 7: Control the steel pipe frame to rotate slowly. As the steel pipe frame rotates outward, the chain hoist or chain wheel connected to the top of the steel pipe is gradually loosened.

[0074] An outward pusher or outer traction device provides active rotational power, while a top chain hoist is used to control rotational speed and support posture.

[0075] The two types of devices work together to enable the entire steel pipe frame to rotate slowly, continuously, and controllably around the bottom hinged support to the designed position.

[0076] The drawings clearly state that the column should be moved to the predetermined position by "horizontal pushing with jacks or pulling with ropes on the ground in the middle of the river and gradually loosening the chain hoist".

[0077] During construction, the traction devices on both sides are adjusted at any time according to the measurement results to keep the steel pipe frame stable and avoid large lateral deviations and uncontrolled swaying.

[0078] Step 8: Frame in place and column base secured After the steel pipe frame is rotated to the designed diagonal brace position, it stops rotating and temporary stabilization measures are immediately taken.

[0079] After checking the position of the top of the steel pipe, the inclination of the support and the position of the axis by measuring equipment such as a total station, and confirming that the design requirements are met, the hinge joint of the column base is fixed.

[0080] Consolidation can be achieved by using steel plates, welding, or other connection structures that can restrict the hinge joint from continuing to rotate, thus changing the hinge joint from a rotatable state to a fixed state.

[0081] Step Nine: Install the wall-mounted steel pipes After the steel pipe inclined support is in place and the column base is fixed, the wall-mounted steel pipes between the inclined leg steel pipes and the pier column are installed sequentially from bottom to top using equipment such as tower cranes.

[0082] In this embodiment of the project, three wall-mounted connections were installed.

[0083] The wall-mounted components connect the inclined leg supports to the piers, so that the inclined leg steel pipes, pier columns and upper brackets together form a stable spatial support system.

[0084] Step 10: Install the bottom formwork platform and carry out the cast-in-place construction of the side spans. After the bracket is fixed, install the bottom formwork platform, crossbeams, longitudinal beams and distribution beams on the top bracket.

[0085] Then, the formwork, reinforcement, prestressing system and other structures were installed according to the normal construction process for cast-in-place box girders.

[0086] The concrete for this project was poured using continuous pumping across the entire cross section, and the deformation of the support structure was monitored during construction.

[0087] In the embodiment of the Yangliutan Tuojiang Grand Bridge project, the length of the cast-in-place straight section of the side span is 6.89m, the beam height is 4.0m, the amount of concrete is about 167.4m³, and the total weight is about 427t. The above-mentioned support system was used to complete the construction.

[0088] 5. Scaffold Removal Method This patent not only includes the bracket installation and vertical rotation construction process, but also allows the bracket to be rotated and dismantled in the opposite direction using the same hinge structure.

[0089] After the construction of the side span cast-in-place section is completed and the conditions for scaffold removal are met, proceed with the following steps: first step Temporarily anchor the bottom formwork platform using the pre-drilled holes in the completed beams or other reliable anchor points, and install the steel wire ropes, winches, or guy ropes required for the dismantling of the supports.

[0090] Step 2 Remove or cut off the connection between the attached steel pipe and the pier column.

[0091] The rigid structure at the column base is then removed, restoring the previously fixed column base to a hinged state where it can rotate around the pivot pin.

[0092] Step 3 By coordinating the release and retraction of guy ropes, winches, or other traction devices on both sides of the support, the inclined steel pipe frame is slowly rotated around the bottom hinge point in the opposite direction of the installation process.

[0093] The steel pipe support gradually changed from an inclined working state to a tilting state, and finally rotated smoothly and lowered to the ground.

[0094] Step 4 After the steel pipe scaffolding reaches the ground, it is dismantled in sections and the materials are transferred.

[0095] Step 5 The pier top bracket and bottom formwork platform were dismantled using pre-reserved holes in the beam and bridge deck winches.

[0096] The drawings clearly state that the dismantling method is "removing the column base fixing - restoring the hinge - coordinating the release and retraction of the guy ropes on both sides - rotating the whole structure to flatten it to the ground".

[0097] This dismantling method avoids the need for high-altitude cutting and hoisting of the 40m-class inclined support section by section from top to bottom.

[0098] This patent has the following advantages and beneficial effects; 1. Significantly reduce high-altitude steel pipe assembly work This method first involves installing the long steel pipe support in sections while it is in a near-vertical position, and then rotating the whole structure to the designed position.

[0099] Compared to directly splicing at height while tilted, steel pipe hoisting, docking, and parallel installation are more convenient and can significantly reduce the difficulty of high-altitude operations.

[0100] The original technical briefing proposed, based on the on-site construction conditions, that the steel pipe installation efficiency is increased by approximately 50% compared to the aerial connection method.

[0101] 2. Improve construction safety The main assembly process of the steel pipe is completed in a relatively regular and stable vertical state, which can reduce the time that workers spend welding and assembling at high altitudes on the outside of the inclined support for a long time.

[0102] The vertical rotation process is mechanically controlled by devices such as chains, jacks, and traction ropes, which can reduce the direct involvement of personnel in adjusting the posture of long components.

[0103] 3. Improve bracket installation accuracy In a vertical position, the axis of the steel pipe is easy to measure and correct, which facilitates the control of the joint quality and parallel connection position of the steel pipe segments.

[0104] After the bracket is rotated vertically to the designed position, it can be fine-tuned in the unfixed state. After measurement confirmation, the column base is fixed and the wall is attached, thereby reducing the cumulative installation error.

[0105] 4. Achieve the transition between the stress state during the installation and load-bearing phases. The hinged support allows rotation during the bracket installation phase, enabling the long steel pipe to rotate vertically as a whole; after the bracket is in place, it is then fixed by methods such as wrapping with steel plates, transforming the hinged node into a stable fixed node.

[0106] Therefore, the same node can meet both the activity requirements of the construction and installation phase and the load-bearing and stability requirements of the concrete pouring phase.

[0107] 5. The bracket is easier to remove. After the cast-in-place construction is completed, the hinge joints can be untied and the steel pipe frame can be rotated and lowered to the ground using the traction system.

[0108] Compared with dismantling by cutting and removing sections at high altitude, this method can significantly reduce the amount of high-altitude demolition work and construction risks.

[0109] 6. Reduce investment in temporary access facilities Because the main steel pipe installation adopts a vertical segmented installation and overall vertical rotation method, the need for specially set up suspended baskets, ladders and large-area temporary operating platforms for inclined high-altitude assembly can be reduced.

[0110] 7. Highly adaptable to complex terrain This method can directly utilize existing bridge abutments as the main support foundation for inclined steel pipes. Under applicable conditions, it does not require separate large-scale excavation of ground support foundations and construction of concrete foundations. It is especially suitable for areas with limited construction sites such as high piers, riverbanks, and steep slopes.

[0111] 8. Minimize disturbance to the surrounding environment By utilizing existing abutments as supporting foundations, additional earthwork excavation, temporary foundations, and slope treatment works can be reduced, thereby minimizing the disturbance of temporary works to the bridge site topography and vegetation.

[0112] 9. Possesses certain economic benefits According to the implementation calculations of the Yangliutan Tuojiang Grand Bridge project, compared with the traditional ground-supported structure, this construction method saves approximately 72,200 yuan by reducing foundation excavation, concrete foundation, protective works, material turnover losses, and some labor input.

[0113] 10. Components are reusable. The main components, such as steel pipes, horizontal bracing, and brackets, are all made of steel structure, which can be disassembled and reused after the project is completed, which helps to improve the utilization rate of temporary project materials.

[0114] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for vertically rotating a hinged inclined support in the cast-in-place section of a rigid frame bridge side span, characterized in that... Includes the following steps: Step 1: During the construction of the foundation, steel plates are pre-embedded at the corresponding positions of the hinged supports of the inclined leg steel pipes; during the construction of the pier column, connectors are pre-embedded at the wall attachment positions. Step 2: After the substructure construction is completed, install hinged supports on the embedded steel plates of the pier cap, and connect the bottom of the inclined leg steel pipe to the hinged supports through pins, so that the inclined leg steel pipe can rotate around the pins in the designed rotation plane; set up a temporary working platform on the pier column. Step 3: Hoist the bottom segment inclined leg steel pipe to the hinged support in a basically vertical state, and install the horizontal horizontal bracing between the two main steel pipes to form the bottom segment steel pipe frame. At this time, the formal wall attachment between the inclined leg steel pipe and the pier is not installed. Step 4: Hoist the inclined steel pipe of the top segment and connect it with the bottom segment. Simultaneously install the top horizontal bracing to form a complete long steel pipe frame. At this time, do not install the formal wall attachments to maintain the freedom of the steel pipe frame to rotate around the bottom hinge point. Step 5: Install the top bracket and rotation control device while the steel pipe frame is in a vertical position. The rotation control device includes a chain hoist, a hand chain hoist, a jack, a ground traction device and / or guy ropes. Step 6: Release the temporary constraints that restrict the rotation of the column base, so that the column base is restored to a rotatable hinged state. Use the push device and / or traction device to make the steel pipe frame rotate outward around the bottom pin axis. At the same time, use the chain hoist or traction device to control the rotation speed and attitude, so that the steel pipe frame slowly rotates to the designed diagonal brace position. Step 7: After the steel pipe frame is in place, measure and adjust the position of the top of the steel pipe, the inclination of the support and the position of the axis. After confirming that it meets the design requirements, fix the hinge joint of the column base to change the hinge joint from a rotatable state to a fixed state. Step 8: Install the wall-mounted steel pipes between the inclined leg steel pipes and the pier from bottom to top, so that the inclined leg steel pipes, the pier, and the top bracket together form a stable spatial support system. Step nine: Install the bottom formwork platform on the top bracket and carry out the formwork, reinforcement, prestressing system and concrete construction of the side span cast-in-place section.

2. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, The hinged support is made of steel plate and has pin holes. The bottom of the inclined leg steel pipe is rotatably connected to the hinged support through a pin. During the installation and vertical rotation of the support, the hinged support allows the inclined leg steel pipe to rotate around the pin. Before the side span concrete is poured, the hinged joint is fixed by wrapping steel plate and / or welding to form a fixed support for the column base.

3. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, The inclined leg steel pipe is a φ820×12mm spiral steel pipe with a length of approximately 40.7m; the horizontal connection between the two inclined leg steel pipes is a φ630×7mm steel pipe; the wall-mounted steel pipe between the inclined leg steel pipe and the pier column is a φ426×7mm steel pipe; the wall-mounted steel pipe is set in three rows along the height. The bottom segment of the inclined leg steel pipe is about 21m long, and the top segment of the inclined leg steel pipe is about 21m long. After the bottom segment and the top segment are connected, they form an integral steel pipe frame of about 40m.

4. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, The temporary work platform is set up about 20m above the ground.

5. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, In step five, a chain hoist or hand-operated hoist is installed on the top of the pier or the top of the cap beam, with one end anchored to the cap beam or the top of the pier and the other end connected to the top of the steel pipe frame; a ground traction rope, guy rope or winch is installed on the outside of the steel pipe frame; and / or a mechanical jack is used to apply a horizontal external thrust to the steel pipe frame.

6. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, In step six, the steel pipe frame is pushed outward horizontally using jacks and / or pulled outward using traction ropes on the ground side of the river center. The chain hoist or hoist connected to the top of the steel pipe frame is gradually loosened, so that the steel pipe frame can slowly, continuously, and controllably rotate outward around the bottom hinged support to the design position. During the rotation, the traction devices on both sides are adjusted according to the measurement results to keep the steel pipe frame stable.

7. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, In step seven, a total station is used to check the position of the top of the steel pipe, the inclination of the support, and the position of the axis; the consolidation is achieved by using steel plates, welding connections, or other connection structures that restrict the continued rotation of the hinge nodes.

8. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, In step eight, the inclined leg steel pipes and the wall-mounted steel pipes between the pier columns are installed sequentially from bottom to top using a tower crane.

9. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, In step nine, the bottom formwork platform, crossbeams, longitudinal beams, and distribution beams are installed on the top bracket. Then, the formwork, reinforcing bars, and prestressing system are installed, and concrete is poured using a full-section continuous pump. During construction, the deformation of the support is monitored.

10. The method for vertical rotation construction of hinged inclined supports for cast-in-place sections of rigid frame bridge side spans according to claim 1, characterized in that, After the construction of the cast-in-place side span is completed and the conditions for demolition are met, the demolition process also includes: Temporarily anchor the bottom formwork platform using pre-drilled holes in the beam or reliable anchor points, and install wire ropes, winches, or guy ropes. Remove or cut off the connection between the wall-mounted steel pipe and the pier column, release the rigid fixation at the column base, and restore the column base to a hinged state that can rotate around the pin. By coordinating the release and retraction of guy ropes and / or winches on both sides of the support, the inclined leg steel pipe frame is slowly rotated around the bottom hinge point in the opposite direction to the installation process and lowered to the ground; After the steel pipe scaffolding reaches the ground, it is dismantled, dismantled, and the materials are transferred. Dismantle the pier top bracket and bottom formwork platform using the pre-reserved holes in the beam and / or the bridge deck winch; After removing the steel pipes attached to the wall and releasing the column base fixings, the hinged state is restored first. Then, the guy ropes on both sides are coordinated to rotate the approximately 40m-class inclined support as a whole to be laid flat on the ground, avoiding high-altitude cutting and hoisting from top to bottom section by section.