Immersed tunnel pushing type final joint device and construction method
Through the combination of water injection system adjustment of water pressure and push jack, the impact of huge water pressure on push device in immersed pipe tunnel construction in deep water environment is solved, and the use of smaller power equipment and the stability and efficiency of the construction process are achieved. promote.
Patent Information
- Application Number
- CN202411051833.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-01
AI Technical Summary
In deep water environments, the over-push final joint device of the immersed tube tunnel increases construction difficulty due to huge water pressure. The existing technology requires the use of high-power push-out equipment, and its stability is affected, making it difficult to effectively control the construction process.
The water pressure on both sides of the door seal at the end of the outgoing section is adjusted through the water injection system to maintain dynamic balance, and use the push-push jack to push and connect the push-push section to reduce the jack load, and use a smaller power equipment to complete the push-push operation. At the same time, control and adjust in real time Construction process.
It has achieved the reduction of the load of the pushing equipment in a deep water environment, saving costs, improving construction quality and efficiency, and ensuring the stability and accuracy of the construction process.
Smart Images

Figure CN118933078A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of immersed tube tunnel construction, and more specifically, relates to an immersed tube tunnel top-pushing type final joint device and a construction method. Background Art
[0002] With the introduction of modernization, people's demand for transportation is increasing. Land transportation can no longer meet daily travel needs. When crossing a river or sea, people usually travel by ferry. However, this public transportation cannot meet the needs of fast travel. There are a large number of passengers who need to drive themselves, so building bridges on both sides of the river or sea has become the simplest solution. As the planned span connecting the two sides becomes larger and larger, the difficulty of bridge construction also increases. Building tunnels under water has become the best construction solution for large-span rivers and seas. In order to shorten the project cycle, when building underwater tunnels, the commonly used solution is to simultaneously sink the pipe sections of the immersed tube tunnel from both sides of the longitudinal direction, and use the final joint in the middle to connect them to form a completed underwater tunnel.
[0003] At present, the final joints of immersed tube tunnels include water stop plates, V-block method, Key pipe section method, integral lifting method and final immersed tube method. In the final immersed tube method, small pipe sections with the same cross-section as standard pipe sections are generally prefabricated, with GINA water stop strips set at one end and temporary sealing doors set at the back. An expansion section is set at the bow end of the last pipe section to be sunk, and the final joint is placed in the expansion section. After the last pipe section is sunk, the push-out system is used to push the push-out section out of the expansion section so that it contacts the end face of the adjacent pipe section, completing the initial crimping of the GINA water stop strip, and then pumping out the water in the docking cavity, using hydraulic crimping to fully compress the GINA water stop strip, and finally, water stopping and longitudinal locking construction are carried out inside the immersed tube tunnel.
[0004] However, this push-out solution has a great resistance to the push-out process because the push-out side is in contact with the water at the bottom of the water. In extremely deep water, a higher-powered push-out device is required for push-out. Moreover, due to the effect of water pressure, the stability of the high-powered push-out device will be affected. Therefore, a push-out final joint device and construction method for immersed tube tunnels are needed to overcome the influence of huge water pressure on construction in deep water. Summary of the invention
[0005] In view of the above defects or improvement needs of the prior art, the present invention provides a top-pushing final joint device and construction method for an immersed tube tunnel, wherein water is injected into the cavity through a water injection system to adjust the water pressure on both sides of the end sealing door of the push-out section, so that the water pressure on both sides of the end sealing door of the push-out section always maintains a dynamic balance, and then the push-out section is pushed out and connected to the connecting section through a push-out jack to achieve the connection of the final joint of the immersed tube tunnel, so as to reduce the load of the push-out jack, so that a smaller power jack can be selected when selecting the device to complete the push operation, thereby saving the cost of use. At the same time, under the pressure balanced working condition, the push operation can be better controlled and adjusted in real time, thereby improving the quality and efficiency of the operation.
[0006] According to a first aspect of an embodiment of the present invention, there is provided a top-pushing final joint device for an immersed tube tunnel, comprising: a foundation cushion, an enlarged section, a connecting section and a pushing section arranged on the foundation cushion;
[0007] The front end of the enlarged section is provided with an enlarged end, the push-out section is arranged inside the enlarged end, and a push jack is arranged between the two;
[0008] The rear end of the expansion section is provided with an expansion section end sealing door, and the push-out section is provided with a push-out section end sealing door. A cavity is formed between the expansion section and the push-out section through the two end sealing doors, and a water injection system is connected to the cavity;
[0009] The water injection system includes a water injection pipe, a water injection tank, a pressure regulating pipe and a water outlet pipe. The water injection pipe connects the water injection tank and the cavity. One end of the pressure regulating pipe is connected to the cavity, and the other end passes through the expansion section to above the water surface. The water outlet pipe connects the cavity and the external water. The water injection tank is arranged at the rear end of the expansion section.
[0010] The pushing jacks are divided into two groups, one for normal use and the other for standby. The two groups are equal in number and staggered. Water is injected into the cavity through a water injection system to balance the water pressure on both sides of the sealing door at the end of the push-out section. The push-out section is pushed out to connect with the connecting section in combination with the pushing jacks.
[0011] Furthermore, the enlarged section is also provided with a stiffening rib plate and a first slideway;
[0012] The stiffening rib plate is a trapezoidal plate, and is arranged between the enlarged end and the rear end of the enlarged section;
[0013] The first slideway is embedded in the bottom plate inside the enlarged end, and a second slideway is provided at a corresponding position of the pushing section, and the first slideway and the second slideway cooperate with each other.
[0014] Furthermore, at least two deviation-correcting jacks are respectively provided on the side plates on both sides of the enlarged end, and the deviation-correcting jacks are used to apply lateral force to the pushing section to adjust its pushing direction in real time.
[0015] Furthermore, a water-stop structure is provided between the pushing section, the enlarged section and the connecting section;
[0016] The water-stop structure includes an M water-stop strip arranged at the end of the enlarged end and the push-out section, an inflatable water-stop strip arranged in the connecting gap between the enlarged end and the push-out section, and a GINA water-stop strip arranged at the end of the connecting section and the push-out section.
[0017] Furthermore, a temporary slide rail is provided on the foundation cushion between the enlarged section and the connecting section, the bottom of the temporary slide rail is supported by a pier, and a leveling base is provided between the temporary slide rail and the pier;
[0018] An auxiliary jack is also provided on the temporary slide rail, and the auxiliary jack is connected to the temporary slide rail through a sliding connection base, and the sliding connection base slides on the temporary slide rail.
[0019] Furthermore, a combination cavity is formed between the pushing section and the connecting section, and a temporary water tank is provided in the combination cavity;
[0020] The temporary water tank is provided with a crossbeam and a steel support, and the temporary water tank is connected to the inner wall of the push-out section into a whole through the crossbeam and the steel support.
[0021] According to another aspect of an embodiment of the present invention, a construction method for an immersed tube tunnel top-pushing type final joint device is provided, comprising the following steps:
[0022] S100, selecting a window period to float the expansion section and the push-out section as a whole to the installation position of the immersed tube tunnel, with the expansion end facing the connection section;
[0023] S200, slowly injecting water into the cavity through the water injection system to sink the expansion section and the push-out section to the installation position, and releasing the locking device between the expansion section and the push-out section;
[0024] S300, continuously injecting water into the cavity to balance the water pressure in the cavity with the water pressure outside the sealing door at the end of the push-out section;
[0025] S400, start the push jack to provide thrust to the push-out section, and at the same time continue to inject water into the cavity to keep the water pressure on both sides of the sealing door at the end of the push-out section in dynamic balance, so that the push-out section is slowly pushed out until it is initially pressed together with the connecting section;
[0026] S500, draining the water in the coupling cavity, achieving crimping between the connecting section and the pushing section, and connecting the connecting section and the pushing section using a temporary tie rod;
[0027] S600, drain the water in the cavity, weld the rear weld section steel plate, perform grouting operation on the connection between the push-out section and the connection section and the expansion section, and remove the temporary tie rod;
[0028] S700. Complete the grouting of the bottom foundation of the push-out section and the backfilling of the pipe sections, remove temporary components including the sealing door at the end of the expanded section, the sealing door at the end of the push-out section and the temporary water tank, and construct the road surface and ancillary facilities.
[0029] Furthermore, during the water injection process, the water in the water injection tank is injected into the cavity through the water injection pipe by a water pump. After the cavity is filled with water, the water flows upward into the pressure regulating pipe. By adjusting the height of the water in the pressure regulating pipe, the water pressure in the cavity is adjusted.
[0030] In steps S200 and S300, during the process of continuously injecting water into the cavity, the pressure regulating pipe is connected to the external water environment, and the water level in the pressure regulating pipe is flush with the external water surface by gravity injection, so that the water pressure in the cavity is the same as the water pressure outside;
[0031] In step S200, water is injected into the cavity to overcome the upward buoyancy of the water, so that the expansion section and the push-out section continue to sink to the preset position of the base cushion layer at a slow speed, and the water level in the pressure regulating pipe is kept below the external liquid level;
[0032] In step S300, water is injected until the water level in the pressure regulating pipe is flush with the external liquid surface, and at this time, the water pressure on both sides of the sealing door at the end of the push-out section reaches equilibrium.
[0033] Further, in step S400, the push jack is controlled to overcome the initial resistance to realize the initial pushing of the pushing section, wherein the initial resistance includes the water resistance at the front end of the pushing section sealing door when the pushing section is pushed out at a uniform speed, the viscous resistance at the rear end of the pushing section sealing door when the pushing section is pushed out at a uniform speed, and the friction between the pushing section and the slide rail;
[0034] When the push-out section is pushed out at a uniform speed, the water resistance at the front end of the push-out section sealing door is:
[0035]
[0036] Among them, F w The water resistance at the front end of the push-out section sealing door.
[0037] C w is the water flow resistance coefficient,
[0038] ρ is the density of water,
[0039] V is the flow rate of water,
[0040] A is the projection area of the push-out section in the push-out direction.
[0041] When the push-out section is pushed out at a uniform speed, the viscous resistance at the rear end of the push-out section sealing door is:
[0042]
[0043] Among them, D is the viscous resistance at the rear end of the sealing door in the push-out section,
[0044] C d is the resistance coefficient.
[0045] The friction force between the push-out section and the slide rail is:
[0046]
[0047] Among them, D f is the friction between the push-out section and the slide rail,
[0048] C f is the friction coefficient,
[0049] L is the length of the push-out section.
[0050] Wherein, the friction resistance coefficient C f for:
[0051]
[0052] where Re is the Reynolds number, and
[0053] μ is the dynamic viscosity of water.
[0054] The initial resistance F c for:
[0055] F c =F w +D+D f ;
[0056] During this process, the water in the water injection tank is continuously injected into the cavity through the water injection pipe, so that the water level in the pressure regulating pipe is always kept at the same height as the external liquid level, so as to achieve a dynamic balance of water pressure on both sides of the end sealing door of the push-out section.
[0057] Furthermore, the pushing process of the pushing section further includes:
[0058] S410, during the pushing process, the posture of the pushing section is monitored by a monitoring system to determine whether the pushing direction thereof is offset;
[0059] S420, providing a lateral force to the push-out section by means of a deviation-correcting jack, and adjusting the push-out direction of the push-out section by means of the lateral force, so as to ensure that the push-out path of the push-out section always remains within a design range;
[0060] S430, the auxiliary jack slides on the temporary slide rail according to the speed of the push-out section, and provides a pulling force for the push-out section at the same time, and the auxiliary push-out jack pushes the push-out section out of the enlarged end;
[0061] S440, when the push-out section is pushed to the point where the nose of the GINA waterstop is 3-5 cm away from the end face of the connecting section, both sets of push jacks are started, and the two sets of push jacks are used to push synchronously to compress the GINA waterstop, so as to achieve the initial pressing between the connecting section and the push-out section;
[0062] In step S410, the monitoring system is arranged on the end face of the pushing section, and is used to monitor the information of the pushing section including the pushing speed, direction and angle, so as to adjust the pushing action. When it is detected that the angle deviation of the pushing section is too large and it cannot continue to push, a rollback operation is required, which is specifically:
[0063] S411, stop the output of the push jack and the auxiliary jack, adjust the force output by the push jack to a pulling force, so that the push-out section is loosened at the original stuck position, so as to facilitate subsequent retreat;
[0064] S412, after the push-out section is stuck and loosened, the correction jack is started to adjust the angle of the push-out section so that it returns to the set push-out angle;
[0065] S413, adjusting the force output by the auxiliary jack to thrust, and the auxiliary jack moves on the temporary slide rail as the push-out section retreats, to assist the push-out section in retreating;
[0066] S414, drain the water in the cavity into the water injection tank through the outlet pipe, control the increase of the water level in the pressure regulating pipe when the push-out section retreats, and keep the water level in the pressure regulating pipe flush with the external water surface.
[0067] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:
[0068] 1. The construction method of a top-pushing final joint device for an immersed tube tunnel of the present invention comprises the following steps: injecting water into a cavity through a water injection system to adjust the water pressure on both sides of the end sealing door of the push-out section, so that the water pressure on both sides of the end sealing door of the push-out section always maintains a dynamic balance; and then the push-out section is pushed out and connected to the connecting section through a top-pushing jack to realize the connection of the final joint of the immersed tube tunnel, so as to reduce the load of the top-pushing jack, so that a jack with smaller power can be selected to complete the top-pushing operation when selecting the top-pushing jack, thereby saving the cost of use; at the same time, under the condition of pressure balance, the top-pushing operation can be better controlled and adjusted in real time, thereby improving the quality and efficiency of the operation.
[0069] 2. The construction method of the immersed tube tunnel top-pushing final joint device of the present invention directly utilizes the pressure-regulating pipe to connect the external water to realize water intake when balancing the pressure on both sides of the sealing door at the end of the push-out section, and there is no need to control the water flow rate. In the subsequent process of adjusting the water pressure, the water level in the pressure-regulating pipe is adjusted by the water stored in the water injection tank, thereby realizing the precise adjustment of the pressure on both sides of the sealing door at the end of the balanced push-out section.
[0070] 3. According to the construction method of the immersed tube tunnel top-pushing final joint device of the present invention, when floating the expansion section and the push-out section, the rear weld section steel plate is placed at the rear end of the large section and floated simultaneously, and the transportation of multiple prefabricated parts can be completed by one floating and sinking, which saves construction procedures and construction time, and provides counterweights for the expansion section and the push-out section, which is convenient for subsequent sinking.
[0071] 4. In a construction method of a top-pushing final joint device for an immersed tube tunnel of the present invention, a temporary water tank is set in the connecting cavity formed by the pushing section and the connecting section to balance the buoyancy thereof, thereby avoiding the degradation of the anti-corrosion performance after drainage in the connecting cavity, which results in the failure of normal connection between the pushing section and the connecting section. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] Figure 1 It is a structural schematic diagram of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0073] Figure 2 It is a schematic structural diagram of an enlarged section and a pushed-out section of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0074] Figure 3 It is a schematic diagram of sinking a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0075] Figure 4 This is a schematic diagram of the structure of an immersed tube tunnel top-pushing final joint device after installation according to an embodiment of the present invention;
[0076] Figure 5 This is a schematic diagram of the structure of an enlarged section of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0077] Figure 6 This is a schematic diagram of a water-stop structure of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0078] Figure 7 This is a schematic diagram of the position of the deviation-correcting jack of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0079] Figure 8 This is a schematic diagram of a temporary slide rail structure of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0080] Fig. 9 A top view of a temporary slide rail structure of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention;
[0081] Fig.10 The present invention is a schematic diagram of a construction method of a top-pushing final joint device for an immersed tube tunnel according to an embodiment of the present invention.
[0082] In all the drawings, the same figure marks represent the same technical features, specifically: 1-foundation cushion, 2-expanded section, 21-expanded end, 22-expanded section end sealing door, 23-stiffening rib plate, 24-first slide, 3-connecting section, 4-push-out section, 41-push-out section end sealing door, 42-second slide, 5-pushing jack, 6-correcting jack, 7-water injection system, 71-water injection pipe, 72-water injection tank, 73-pressure regulating pipe, 74-water outlet pipe, 8-water stop structure, 81-M waterstop, 82-inflatable waterstop, 83-GINA waterstop, 9-temporary slide rail, 91-pier, 92-leveling base, 93-auxiliary jack, 94-sliding connection base, 10-temporary water tank, 101-beam, 102-steel support, 11-temporary pull rod, 12-manhole, 13-rear welded section steel plate. DETAILED DESCRIPTION
[0083] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0084] Example 1
[0085] like Figure 1-4As shown, an embodiment of the present invention provides a top-pushing final joint device for an immersed tube tunnel, comprising an expansion section 2, a connection section 3 and a push-out section 4, wherein the expansion section 2, the connection section 3 and the push-out section 4 are all arranged on a foundation cushion layer 1, the rear end of the expansion section 2 is the same size as other pipe sections of the immersed tube tunnel, and the front end is arranged as an expansion end 21 with a larger size, the push-out section 4 is arranged in the expansion end 21, the two are connected by a locking device, a top-pushing jack 5 is also arranged between the two, and the rear end of the expansion section 2 is provided with an expansion section end sealing door 22, and the push-out section 4 is provided with a push-out section end sealing door 41, a cavity is formed between the expansion section 2 and the push-out section 4 through the two end sealing doors, a water injection system 7 is connected to the cavity, water is injected into the cavity through the water injection system 7 to adjust the water pressure on both sides of the push-out section end sealing door 41, so that the water pressure on both sides of the push-out section end sealing door 41 always maintains a dynamic balance, and then the push-out section 4 is pushed out and connected to the connection section 3 through the top-pushing jack 5 to achieve the connection of the final joint of the immersed tube tunnel. Water pressure is used to balance the pressure on both sides of the push-out section end sealing door 41, and then the push-out section 4 is pushed out by the push-out jack 5 to complete the connection of the final joint, so as to reduce the load of the push-out jack 5, so that a smaller power jack can be selected when selecting the type to complete the push-out operation, thus saving the cost of use. At the same time, under the condition of balanced pressure, the push-out operation can be better controlled and adjusted in real time, thereby improving the quality and efficiency of the operation.
[0086] like Figure 5 As shown, the enlarged section 2 is further provided with a stiffening rib plate 23 and a first slideway 24. The stiffening rib plate 23 is a trapezoidal plate, which is provided between the enlarged end 21 and the rear end of the enlarged section 2 and is used to reinforce the top plate and side plates of the enlarged end 21. The first slideway 24 is embedded in the bottom plate inside the enlarged end 21, and a second slideway 42 is provided at a corresponding position of the push-out section 4. The cooperation between the first slideway 24 and the second slideway 42 improves the push-out stability of the push-out section 4.
[0087] The bottom plates at the rear end of the expansion section 2 and the front end of the connection section 3 are partially thickened to adapt to the height of the bottom plate of the push-out section 4 from the foundation cushion layer 1, ensuring the smooth push-out and connection of the push-out section 4. The bottom plate of the expansion section 2 adopts a steel shell concrete composite structure, and the top plate and side plates are pure steel structures. The end of the connection section 3 close to the push-out section 4 adopts a steel shell concrete composite structure, and the rest adopts a steel structure. The push-out section 4 is cast by self-compacting concrete.
[0088] The fixed ends of the push jacks 5 are arranged on the top plate and the bottom plate fixed to the rear end of the expansion section 2, and the output ends are connected to the top plate and the bottom plate of the push section 4. The push jacks 5 are divided into two groups, one for normal use and the other for standby, and the two groups have the same number and are staggered.
[0089] The water injection system 7 includes a water injection pipe 71, a water injection tank 72, a pressure regulating pipe 73 and a water outlet pipe 74. One end of the water injection pipe 71 is connected to the water injection tank 72, and the other end passes through the expansion section end sealing door 22 to connect to the cavity. The water in the water injection tank 72 is injected into the cavity by the water injection pipe 71. One end of the pressure regulating pipe 73 is connected to the cavity, and the other end passes through the expansion section 2 to above the water surface. The water outlet pipe 74 connects the cavity and the external environment. The water injection tank 72 is arranged at the rear end of the expansion section 2, and the water injection tank 72 is connected to a water storage tank arranged above the water surface by a water pipe. The water storage tank stores the same water as the external environment of the immersed tube tunnel. Water is replenished into the water injection tank 72 through the water storage tank, and then the water injection tank 72 injects water into the cavity to achieve dynamic balance of the water level.
[0090] like Figure 6 As shown, a water-stop structure 8 is provided between the push-out section 4 and the expansion section 2 and the connecting section 3, and the water-stop structure 8 includes an M water-stop strip 81 provided at the expansion end 21 and the end of the push-out section 4, an inflatable water-stop strip 82 provided in the connecting gap between the expansion end 21 and the push-out section 4, and a GINA water-stop strip 83 provided at the end of the connecting section 3 and the push-out section 4.
[0091] like Figure 7 As shown, during the pushing process, affected by the thrust of the lateral water flow, the pushing section 4 will deviate from the original forward direction, resulting in the inability to ensure the pushing direction, or even a stuck situation, which affects the efficiency and quality of the construction work. Therefore, at least two deviation correction jacks 6 are provided on the side panels on both sides of the enlarged end 21, and the deviation correction jacks 6 are used to apply lateral force to the pushing section 4 to adjust its pushing direction in real time to ensure the normal progress of the pushing operation.
[0092] like Figure 8 , 9 As shown, a temporary slide rail 9 is also provided on the foundation cushion 1 between the expansion section 2 and the connection section 3. The bottom of the temporary slide rail 9 is supported by a pier, and a leveling base is provided between the temporary slide rail 9 and the pier, and the level of the temporary slide rail 9 is adjusted by the leveling base. An auxiliary jack 93 is also provided on the temporary slide rail 9, and the auxiliary jack 93 is connected between the temporary slide rail 9 through a sliding connection base 94, and the sliding connection base 94 slides on the temporary slide rail 9. The output end of the auxiliary jack 93 is fixedly connected to the front end of the push-out section 4. When the push-out section 4 is pushed out, the auxiliary jack 93 provides auxiliary pulling force for it, and the sliding connection base 94 moves synchronously with the movement of the push-out section 4. When the push-out section 4 is blocked during underwater pushing, it needs to be pulled back. At this time, it is pulled back by the push jack 5, and the auxiliary jack 93 provides auxiliary thrust.
[0093] After the push-out section 4 and the connection section 3 are connected, a combined cavity is formed between the two. A large amount of water is stored in the combined cavity. The water in the combined cavity needs to be drained. When draining, the anti-buoyancy ability of the combined cavity is reduced. Therefore, a temporary water tank 10 is set in the combined cavity. The temporary water tank 10 is used to store a large amount of water to increase the overall gravity and balance the buoyancy of the push-out section 4. The temporary water tank 10 is provided with a crossbeam 101 and a steel support 102, and the temporary water tank 10 is connected to the inner wall of the push-out section 4 as a whole through the crossbeam 101 and the steel support 102.
[0094] After the push-out section 4 is pushed out until it contacts the connecting section 3, the water in the cavity for balancing the water pressure needs to be drained. At this time, the push-out section 4 may rebound, resulting in failure of the crimping of the push-out section 4 and the connecting section 3. Therefore, a temporary pull rod 11 is used to lock the push-out section 4 and the connecting section 3 to prevent the push-out section 4 from rebounding, and the push-out section 4 is removed after the connection between the two is completed.
[0095] A hole is opened at the top of the rear end of the expansion section 2, and a manhole is provided. Workers enter the immersed tube tunnel through the manhole and work inside the tube.
[0096] Preferably, the expansion section end sealing door 22 and the push-out section end sealing door 41 are double-layer steel plate structures, with a drain outlet at the bottom, the drain outlet is connected to a drain pipe, and is provided with a glass lens and a door mirror.
[0097] To ensure the stability of the connection of the push-out section 4, after the connection between the push-out section 4 and the connecting section 3 is completed, the push-out section 4 and the enlarged section 2 need to be welded and fixed using a rear welding section steel plate 13. The rear welding section steel plate 13 is stored at the rear end of the enlarged section 2.
[0098] A locking device is also provided between the pushing section 4 and the enlarged section 2 to connect the two into one before floating.
[0099] Example 2
[0100] like Fig.10 As shown, an embodiment of the present invention provides a construction method for a top-pushing final joint device of an immersed tube tunnel, comprising the following steps:
[0101] S100, selecting a window period to float the enlarged section 2 and the pushed-out section 4 as a whole to the installation position of the immersed tube tunnel, and making the enlarged end 21 face the connecting section 3;
[0102] S200, slowly inject water into the cavity through the water injection system 7, so that the expansion section 2 and the push-out section 4 are sunk to the installation position, and the locking device between the expansion section 2 and the push-out section 4 is released;
[0103] S300, continuously injecting water into the cavity to balance the water pressure in the cavity with the water pressure outside the sealing door 41 at the end of the push-out section;
[0104] S400, start the push jack 5 to provide thrust to the push section 4, and at the same time continue to inject water into the cavity to keep the water pressure on both sides of the push section end sealing door 41 in dynamic balance, so that the push section 4 is slowly pushed out until it is initially pressed against the connecting section 3;
[0105] S500, draining the water in the combination cavity, achieving crimping between the connecting section 3 and the pushing section 4, and connecting the connecting section 3 and the pushing section 4 using a temporary tie rod 11;
[0106] S600, drain the water in the cavity, weld the rear weld section steel plate 13, perform grouting operation on the connection between the push-out section 4 and the connection section 3 and the expansion section 2, and remove the temporary tie rod 11;
[0107] S700, complete the grouting of the bottom foundation of the push-out section 4 and the backfilling of the pipe section, remove the temporary components including the expansion section end sealing door 22, the push-out section end sealing door 41 and the temporary water tank 10, and construct the road surface and ancillary facilities.
[0108] In step S100, in order to save working procedures and construction time, when floating the enlarged section 2 and the pushed-out section 4, the rear welded section steel plate 13 is placed at the rear end of the enlarged section 2 and floated simultaneously.
[0109] During the water injection process, water is replenished into the water injection tank 72 through the water storage tank on the water surface, and then the water in the water injection tank 72 is injected into the cavity through the water injection pipe 71 by a water pump. After the cavity is filled with water, it flows upward into the pressure regulating pipe 73. By adjusting the height of the water in the pressure regulating pipe 73, the water pressure in the cavity is adjusted.
[0110] In steps S200 and S300, during the process of continuously injecting water into the cavity, the pressure regulating pipe 73 is connected to the external water environment, and the water level in the pressure regulating pipe 73 is flush with the external water surface by gravity injection, so that the water pressure in the cavity is the same as the water pressure outside.
[0111] In step S200, water is injected into the cavity to overcome the upward buoyancy exerted by the water, so that the expansion section 2 and the push-out section 4 continue to sink to the preset position of the base cushion layer 1 at a slow speed. Therefore, in this process, the amount of water injected is sufficient to make it sink, that is, the water level in the pressure regulating pipe 73 is maintained below the external liquid level.
[0112] In step S300, water is injected until the water level in the pressure regulating pipe 73 is flush with the external liquid surface, and at this time, the water pressure on both sides of the push-out section end sealing door 41 reaches equilibrium.
[0113] In step S400, the initial pushing of the pushing section 4 can be achieved by controlling the pushing jack 5 to overcome the initial resistance, wherein the initial resistance includes the water resistance at the front end of the pushing section sealing door when the pushing section is pushed out at a uniform speed, the viscous resistance at the rear end of the pushing section sealing door when the pushing section is pushed out at a uniform speed, and the friction between the pushing section and the slide rail.
[0114] When the push-out section is pushed out at a uniform speed, the water resistance at the front end of the push-out section sealing door is:
[0115]
[0116] Among them, F w The water resistance at the front end of the push-out section sealing door.
[0117] C w is the water flow resistance coefficient,
[0118] ρ is the density of water,
[0119] V is the flow rate of water,
[0120] A is the projection area of the push-out section in the push-out direction.
[0121] When the push-out section is pushed out at a uniform speed, the viscous resistance at the rear end of the push-out section sealing door is:
[0122]
[0123] Among them, D is the viscous resistance at the rear end of the sealing door in the push-out section,
[0124] C d is the resistance coefficient.
[0125] The friction force between the push-out section and the slide rail is:
[0126]
[0127] Among them, D f is the friction between the push-out section and the slide rail,
[0128] C f is the friction coefficient,
[0129] L is the length of the push-out section.
[0130] Wherein, the friction resistance coefficient C f for:
[0131]
[0132] where Re is the Reynolds number, and
[0133] μ is the dynamic viscosity of water.
[0134] The initial resistance Fc for:
[0135] F c =F w +D+D f .
[0136] As the space in the cavity gradually increases during the process of the push-out section 4 being pushed out, the water level in the pressure regulating pipe 73 decreases, causing the water pressure on both sides of the push-out section end sealing door 41 to be unbalanced, increasing the load on the push jack 5, and even causing the push-out section 4 to retreat. Therefore, during this process, the water in the water injection tank 72 is continuously injected into the cavity through the water injection pipe 71, so that the water level in the pressure regulating pipe 73 is always kept at the same height as the external liquid surface, so as to achieve a dynamic balance of the water pressure on both sides of the push-out section end sealing door 41.
[0137] In step S400, the pushing process of the pushing section 4 further includes:
[0138] S410, during the pushing process, the posture of the pushing section 4 is monitored by the monitoring system to determine whether the pushing direction thereof is offset;
[0139] S420, providing a lateral force to the push-out section 4 through the deviation-correcting jack 6, and adjusting the push-out direction of the push-out section 4 through the lateral force to ensure that the push-out path of the push-out section 4 always remains within the design range;
[0140] S430, the auxiliary jack 93 slides on the temporary slide rail 9 according to the speed of the push-out section 4, and at the same time provides a pulling force for the push-out section 4, and the auxiliary push-out jack 5 pushes the push-out section 4 out of the enlarged end 21;
[0141] S440, when the push-out section 4 is pushed to the point where the nose of the GINA waterstop 83 is 3-5 cm away from the end face of the connecting section 3, both sets of pushing jacks 5 are started, and the two sets of pushing jacks 5 are used to push synchronously to compress the GINA waterstop 83, thereby achieving preliminary pressing between the connecting section 3 and the push-out section 4.
[0142] In step S410, the monitoring system is arranged on the end face of the pushing section 4, and is used to monitor the information of the pushing section 4 including the pushing speed, direction and angle, so as to adjust the pushing action. When it is detected that the angle deviation of the pushing section 4 is too large and it cannot continue to push, a retraction operation is required, which is specifically:
[0143] S411, stop the output of the push jack 5 and the auxiliary jack 93, adjust the force output by the push jack 5 to a pulling force, so that the push section 4 is loosened at the original stuck position, so as to facilitate the subsequent retreat;
[0144] S412, after the ejection section 4 is stuck and loosened, the deviation correction jack 6 is started to adjust the angle of the ejection section 4 so that it returns to the set ejection angle;
[0145] S413, adjusting the force output by the auxiliary jack 93 to thrust, and the auxiliary jack 93 moves on the temporary slide rail 9 as the push-out section 4 retreats, to assist the push-out section 4 in retreating;
[0146] S414, drain the water in the cavity into the water injection tank 72 through the water outlet pipe 74, control the increase of the water level in the pressure regulating pipe 73 when the push-out section 4 retreats, and keep the water level in the pressure regulating pipe 73 flush with the external water surface.
[0147] In step S440, before both sets of jacking jacks 5 are started, the following steps are also included:
[0148] S441. The operator dives to check the end face data, cleans the end face, and ensures that the docking angle is correct and there are no foreign objects between the docking end faces, thus meeting the conditions required for crimping.
[0149] Step S500 is specifically as follows:
[0150] S510, during the compression of the GINA waterstop 83, the excess water in the combined cavity is pressed out at the same time, and the connection between the combined cavity and the external water is disconnected, that is, the water pressure in the combined cavity is reduced, and the pressure difference on both sides of the push-out section end sealing door 41 is formed, and the GINA waterstop 83 is hydraulically pressed for the first time through the pressure difference;
[0151] S520, drain the water between the connection section 3 and the push-out section 4 by using the drainage pipe, so that the pressure difference on both sides of the push-out section end sealing door 41 is further increased, and the GINA waterstop 83 is hydraulically pressed for the second time by the increased pressure difference;
[0152] S530, check the connection of the combined cavity, and make a through measurement of the connection between the connecting section 3 and the pushing section 4. After no problem is found in the inspection and measurement, use a temporary pull rod 11 to temporarily connect the two.
[0153] Step S600 is specifically as follows:
[0154] S610, using a water pump to discharge the water in the cavity to the external water environment through the water outlet pipe 74, moving the rear welding section steel plate 13 to the enlarged end 21, and welding it between the push-out section 4 and the enlarged end 21, completing the overall connection between the push-out section 4 and the enlarged section 2;
[0155] S620, grouting is performed on the connection between the enlarged section 2 and the ejection section 4, and grouting is performed on the connection between the connection section 3 and the ejection section 4, so that the enlarged section 2, the connection section 3 and the ejection section 4 are connected as a whole.
[0156] In step S700, the temporary components are removed as follows:
[0157] S710, remove the end sealing doors in each section and make the combined cavity watertight;
[0158] S720, drain the water in the water injection tank 72 and the temporary water tank 10, and dismantle them.
[0159] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A top-pushing final joint device for an immersed tube tunnel, characterized in that: include: A base cushion layer (1), an expansion section (2) arranged on the base cushion layer (1), a connection section (3) and a push-out section (4); The front end of the enlarged section (2) is provided with an enlarged end (21), the push-out section (4) is arranged inside the enlarged end (21), and a push jack (5) is arranged between the two; The rear end of the enlarged section (2) is provided with an enlarged section end sealing door (22), and the push-out section (4) is provided with a push-out section end sealing door (41). A cavity is formed between the enlarged section (2) and the push-out section (4) through the two end sealing doors, and a water injection system (7) is connected to the cavity; The water injection system (7) comprises a water injection pipe (71), a water injection tank (72), a pressure regulating pipe (73) and a water outlet pipe (74); the water injection pipe (71) connects the water injection tank (72) and the cavity; one end of the pressure regulating pipe (73) is connected to the cavity and the other end passes through the expansion section (2) to above the water surface; the water outlet pipe (74) connects the cavity and external water; the water injection tank (72) is arranged at the rear end of the expansion section (2); The pushing jacks (5) are divided into two groups, one for normal use and the other for standby use. The two groups are equal in number and are arranged in a staggered manner. Water is injected into the cavity through a water injection system (7) to balance the water pressure on both sides of the sealing door (41) at the end of the pushing section. The pushing jacks (5) are used to push the pushing section (4) out until it is connected to the connecting section (3).
2. The immersed tube tunnel top-pushing final joint device according to claim 1 is characterized in that: The enlarged section (2) is also provided with a stiffening rib plate (23) and a first slideway (24); The stiffening rib plate (23) is a trapezoidal plate, and is arranged between the enlarged end (21) and the rear end of the enlarged section (2); The first slideway (24) is embedded in the bottom plate inside the enlarged end (21), and a second slideway (42) is provided at a corresponding position of the pushing section (4), and the first slideway (24) and the second slideway (42) cooperate with each other.
3. The immersed tube tunnel top-pushing final joint device according to claim 1 is characterized in that: At least two deviation-correcting jacks (6) are provided on the side plates on both sides of the enlarged end (21), and the deviation-correcting jacks (6) are used to apply a lateral force to the ejection section (4) to adjust its ejection direction in real time.
4. The immersed tube tunnel top-pushing final joint device according to claim 1, characterized in that: A water-stop structure (8) is provided between the pushing section (4), the enlarged section (2) and the connecting section (3); The water-stop structure (8) comprises an M water-stop strip (81) provided at the end of the enlarged end (21) and the push-out section (4), an inflatable water-stop strip (82) provided in the connection gap between the enlarged end (21) and the push-out section (4), and a GINA water-stop strip (83) provided at the end of the connection section (3) and the push-out section (4).
5. The immersed tube tunnel top-pushing final joint device according to claim 1, characterized in that: A temporary slide rail (9) is also provided on the foundation cushion layer (1) between the enlarged section (2) and the connecting section (3); the bottom of the temporary slide rail (9) is supported by a buttress, and a leveling base is provided between the temporary slide rail (9) and the buttress; The temporary slide rail (9) is also provided with an auxiliary jack (93), and the auxiliary jack (93) is connected to the temporary slide rail (9) via a sliding connection base (94), and the sliding connection base (94) slides on the temporary slide rail (9).
6. A top-pushing final joint device for an immersed tube tunnel according to any one of claims 1 to 5, characterized in that: A combination cavity is formed between the pushing section (4) and the connecting section (3), and a temporary water tank (10) is provided in the combination cavity; The temporary water tank (10) is provided with a crossbeam (101) and a steel support (102), and the temporary water tank (10) is connected to the inner wall of the push-out section (4) into a whole through the crossbeam (101) and the steel support (102).
7. A construction method for an immersed tube tunnel top-pushing final joint device according to any one of claims 1 to 6, characterized in that: The following steps are involved: S100, selecting a window period to float the enlarged section (2) and the pushed-out section (4) as a whole to the installation position of the immersed tube tunnel, and making the enlarged end (21) face the connecting section (3); S200, slowly injecting water into the cavity through the water injection system (7), so that the expansion section (2) and the push-out section (4) are sunk to the installation position, and the locking device between the expansion section (2) and the push-out section (4) is released; S300, continuously injecting water into the cavity to balance the water pressure in the cavity with the water pressure outside the sealing door (41) at the end of the push-out section; S400, starting the push jack (5) to provide thrust to the push-out section (4), and at the same time continuously injecting water into the cavity, so that the water pressure on both sides of the push-out section end sealing door (41) maintains a dynamic balance, so that the push-out section (4) is slowly pushed out until it is initially pressed together with the connecting section (3); S500, draining the water in the connection cavity, achieving compression connection between the connection section (3) and the push-out section (4), and connecting the connection section (3) and the push-out section (4) using a temporary tie rod (11); S600, drain the water in the cavity, weld the rear weld section steel plate (13), perform grouting operation on the connection between the push-out section (4) and the connection section (3) and the expansion section (2), and remove the temporary tie rod (11); S700, complete the grouting of the bottom foundation of the push-out section (4) and the backfilling of the pipe section, remove the temporary components including the expansion section end sealing door (22), the push-out section end sealing door (41) and the temporary water tank (10), and construct the road surface and ancillary facilities.
8. The construction method according to claim 7, characterized in that: During the water injection process, water in the water injection tank (72) is injected into the cavity through the water injection pipe (71) by a water pump. After the cavity is filled with water, the water flows upward into the pressure regulating pipe (73). By adjusting the height of the water in the pressure regulating pipe (73), the water pressure in the cavity is adjusted. In steps S200 and S300, during the process of continuously injecting water into the cavity, the pressure regulating pipe (73) is connected to the external water environment, and the water level in the pressure regulating pipe (73) is flush with the external water surface by gravity injection, so that the water pressure in the cavity is the same as the water pressure outside; In step S200, water is injected into the cavity to overcome the upward buoyancy exerted by the water, so that the expansion section (2) and the push-out section (4) continue to sink to a preset position of the base cushion layer (1) at a slow speed, and the water level in the pressure regulating pipe (73) is maintained below the external liquid surface; In step S300, water is injected until the water level in the pressure regulating pipe (73) is flush with the external liquid surface, and at this time, the water pressure on both sides of the push-out section end sealing door (41) reaches equilibrium.
9. The construction method according to claim 7, characterized in that: In step S400, the push jack (5) is controlled to overcome the initial resistance to realize the initial pushing of the pushing section (4), wherein the initial resistance includes the water resistance at the front end of the pushing section sealing door when the pushing section is pushed out at a uniform speed, the viscous resistance at the rear end of the pushing section sealing door when the pushing section is pushed out at a uniform speed, and the friction between the pushing section and the slide rail; When the push-out section is pushed out at a uniform speed, the water resistance at the front end of the push-out section sealing door is: Among them, F w The water resistance at the front end of the push-out section sealing door. C w is the water flow resistance coefficient, ρ is the density of water, V is the flow rate of water, A is the projection area of the push-out section in the push-out direction; When the push-out section is pushed out at a uniform speed, the viscous resistance at the rear end of the push-out section sealing door is: Among them, D is the viscous resistance at the rear end of the sealing door in the push-out section, C d is the drag coefficient; The friction force between the push-out section and the slide rail is: Among them, D f is the friction between the push-out section and the slide rail, C f is the friction coefficient, L is the length of the push-out section; Wherein, the friction resistance coefficient C f for: where Re is the Reynolds number, and μ is the dynamic viscosity of water; The initial resistance F c for: F c =F w +D+D f ; During this process, water in the water injection tank (72) is continuously injected into the cavity through the water injection pipe (71), so that the water level in the pressure regulating pipe (73) is always kept at the same height as the external liquid level, so as to achieve a dynamic balance of water pressure on both sides of the push-out section end sealing door (41).
10. The construction method according to claim 9, characterized in that: The pushing process of the pushing section (4) also includes: S410, during the pushing process, the posture of the pushing section (4) is monitored by a monitoring system to determine whether the pushing direction thereof is offset; S420, providing a lateral force to the push-out section (4) by means of the deviation-correcting jack (6), and adjusting the push-out direction of the push-out section (4) by means of the lateral force, so as to ensure that the push-out path of the push-out section (4) always remains within the design range; S430, the auxiliary jack (93) slides on the temporary slide rail (9) according to the speed of the push-out section (4), and at the same time provides a pulling force for the push-out section (4), and the auxiliary push jack (5) pushes the push-out section (4) out of the enlarged end (21); S440, when the push-out section (4) is pushed to the point where the nose of the GINA water stop (83) is 3-5 cm away from the end face of the connecting section (3), both sets of push-out jacks (5) are started, and the two sets of push-out jacks (5) are used to push synchronously to compress the GINA water stop (83) to achieve preliminary pressing between the connecting section (3) and the push-out section (4); In step S410, the monitoring system is arranged at the end face of the pushing section (4) to monitor information of the pushing section (4) including the pushing speed, direction and angle, so as to adjust the pushing action. When it is detected that the angle deviation of the pushing section (4) is too large and it cannot continue to push, a retraction operation needs to be performed, specifically: S411, stopping the output of the push jack (5) and the auxiliary jack (93), adjusting the force output by the push jack (5) to a pulling force, so that the push section (4) is loosened at the original stuck position, so as to facilitate subsequent retreat; S412, after the ejection section (4) is stuck and loosened, the deviation correction jack (6) is started to adjust the angle of the ejection section (4) so that it returns to the set ejection angle; S413, adjusting the force output by the auxiliary jack (93) to thrust, and the auxiliary jack (93) moves on the temporary slide rail (9) as the push-out section (4) retreats, thereby assisting the push-out section (4) in retreating; S414, draining the water in the cavity into the water injection tank (72) through the water outlet pipe (74), controlling the increase of the water level in the pressure regulating pipe (73) when the push-out section (4) retreats, and keeping the water level in the pressure regulating pipe (73) flush with the external water surface.
Citation Information
Patent Citations
Immersed tunnel final joint and butt-joint construction method thereof
CN107938709A
Immersed tube tunnel push-out type final joint crimping method
CN112012242A
Final joint water stop device and installation method
CN113309146A
Retaining system of jacking section and pushing type final joint construction method
CN115653003A
Temporary limiting device applied to final butt joint of immersed tunnel
CN219808404U
Cited By
Butt joint method and device for immersed tunnel pipe section joints
CN120006758A
Immersed tube joint construction method for final butt joint, immersed tube joint and grouting structure
CN120625649A