A prefabricated sluice gate structure capable of joint load-bearing and its construction method
By integrating the prefabricated components of the assembled sluice gate structure with the molded gate pier, the problems of gate slot installation accuracy and concrete pouring in sluice gate projects were solved, achieving efficient stress distribution and improved safety of the structure.
Patent Information
- Application Number
- CN202611391894.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-09
- Publication Date
- 2026-11-17
AI Technical Summary
In existing sluice gate projects, the installation accuracy of the gate slot guide rail is difficult to control, the second-phase concrete pouring is difficult, the leakage problem of construction joints is prominent, and the construction procedures are complex and the safety risks are high, which affects the safe passage of the sluice gate through the flood season.
The prefabricated sluice gate structure, which can be jointly stressed, is formed by the integrated connection of prefabricated components and molded gate piers, combined with shear keyways, water-stop grouting grooves and gate guide rails, to ensure installation accuracy and concrete quality.
It improved the load-bearing capacity of the gate slot structure, simplified the procedures, reduced construction risks, shortened the construction period, and ensured the safety and quality of the water conservancy project.
Smart Images

Figure CN123109115A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of water conservancy engineering sluice gate structure design, and relates to a prefabricated sluice gate structure that can withstand combined forces and its construction method. Background Technology
[0002] Sluice gate projects, especially large-scale river-blocking sluice gate projects, require the pre-reserved dimensions for gate slots on the gate piers for subsequent installation of gate slot guide rails and pouring of secondary concrete. The gate slot depth is generally no less than 50 cm. Secondary concrete pouring in sluice gate projects typically refers to subsequent concrete construction after the main structure (primary concrete) is completed, for equipment installation, backfilling of reserved holes, or special locations. The installation accuracy of gate slot guide rails in sluice gate projects is generally at the millimeter level, and the requirements for installation accuracy and the quality of secondary concrete pouring are high. In practical engineering applications, the conventional gate slot structures involved in existing sluice gate projects have the following problems:
[0003] 1) Door slot guide rails need to be welded and installed on site at height or in deep slots, with limited operating space and difficulty in controlling installation accuracy;
[0004] 2) The space for pouring concrete in the second phase is narrow, making vibration difficult and prone to honeycomb, pitting, hollow areas, loose embedded parts, and leakage problems at construction joints.
[0005] 3) The thickness of the gate pier is generally 1.5-2.0 meters. The gate slot is only used as an embedded part and does not participate in the main load-bearing, making it the weakest link in terms of load-bearing capacity.
[0006] 4) The construction of the gate slot involves dangerous and large-scale projects such as high formwork and high scaffolding. The procedures are complex, the safety risks are high, and the safety management is difficult.
[0007] 5) Sluice gate projects often face flood control pressure and have tight construction schedules. However, the installation of gate slot guide rails and concrete pouring have long cycles, which is not conducive to the safe passage of floodwaters through the sluice gate.
[0008] Therefore, there is an urgent need to develop a gate slot structure that can improve the structural stress conditions, ensure the installation accuracy of the guide rail and the quality of the concrete, simplify the process, shorten the construction period and reduce the construction risk, and has significant technological advancement significance in water conservancy projects, especially in large-scale dam projects. Summary of the Invention
[0009] In view of this, it is necessary to address the shortcomings and deficiencies in the existing technology by proposing a prefabricated sluice gate structure capable of joint load-bearing and its construction method. The aim is to improve the load-bearing capacity of the gate slot structure of the prefabricated sluice gate and realize the joint load-bearing capability of the sluice gate, thereby ensuring the safety and quality of water conservancy projects.
[0010] To achieve the above objectives, the present invention adopts the following technical solution:
[0011] This invention proposes a prefabricated sluice gate structure capable of joint force bearing, comprising a first sluice gate joint pier, a second sluice gate joint pier, and a central sluice gate pier located between the first and second sluice gate joint piers. Each sluice gate joint pier and the central sluice gate pier is mounted on a sluice gate base plate. The prefabricated sluice gate structure includes at least one set of water-retaining gate components. The water-retaining gate components are used to form a solid water-retaining gate plate surface at a virtual cross-section of the prefabricated sluice gate structure. The water-retaining gate components include a left water-retaining gate plate and a right water-retaining gate plate. The left water-retaining gate plate is used to close / block the left gate flow channel between the first sluice gate joint pier and the central sluice gate pier; the right water-retaining gate plate is used to close / block the right gate flow channel between the central sluice gate pier and the second sluice gate joint pier.
[0012] The bottom plate of the sluice gate is provided with a first groove and a second groove. The first groove is used to be embedded in the bottom edge of the left water-blocking gate when the left gate channel is closed, and the second groove is used to be embedded in the bottom edge of the right water-blocking gate when the right gate channel is closed.
[0013] The first sluice gate pier is vertically provided with at least one first door slot, which is used to embed the left edge of the left water-blocking gate plate when the left gate flow channel is closed / blocked; the first sluice gate pier is longitudinally divided into multiple first segments, wherein the first segment with the first door slot is a strip-shaped first vertical prefabricated component, and the first segment without the first door slot is a first molded gate pier body; the first segment as the first vertical prefabricated component is provided with one first door slot;
[0014] The second sluice gate pier is vertically provided with at least one second door slot, which is used to embed the right edge of the right water-blocking gate plate when the right gate flow channel is closed / blocked; the second sluice gate pier is longitudinally divided into multiple second segments, wherein the second segment with the second door slot is a strip-shaped second vertical prefabricated component, and the second segment without the second door slot is a second molded gate pier body; the second segment as the second vertical prefabricated component is provided with one second door slot;
[0015] The sluice gate pier has a third gate slot and a fourth gate slot vertically opened on both sides. The third gate slot is used to embed the right edge of the left water-blocking gate plate when the left gate flow channel is closed / blocked, and the fourth gate slot is used to embed the left edge of the right water-blocking gate plate when the right gate flow channel is closed / blocked. The sluice gate pier is longitudinally divided into multiple third segments. The third segments with third and fourth gate slots are strip-shaped third vertical prefabricated components, and the third segments without third and fourth gate slots are third molded gate pier bodies. The third segment, as a third vertical prefabricated component, has one third gate slot and one fourth gate slot.
[0016] Furthermore, the first segment corresponds to a first door slot; the second segment corresponds to a second door slot; and the third segment corresponds to a third door slot and a fourth door slot.
[0017] The number of water-blocking gate components is not less than three; each water-blocking gate component is arranged longitudinally at intervals within the water gate; wherein the three water-blocking gate components are the first water-blocking gate component, the second water-blocking gate component, and the third water-blocking gate component.
[0018] Furthermore, each vertical precast component is integrated and anchored to the adjacent cast-in-place gate pier through multiple transverse connecting steel bars, thereby forming an overall joint load-bearing structure.
[0019] Furthermore, each of the vertical precast components is provided with a vertical shear keyway in the center when viewed from above; the shear keyway, together with the inserted reinforcing bars and poured concrete, is used to enhance the shear resistance of the precast component.
[0020] Furthermore, the reinforcing bars inserted into the shear keyway are reinforcement bars whose dimensions and configuration are determined through stress calculations.
[0021] Furthermore, each of the backwater sides of the sluice gate joint piers is provided with a water-stopping grouting groove, which is used to perform water-stopping treatment between two adjacent sluice gate joint piers.
[0022] Furthermore, each groove and each gate slot is equipped with a gate guide rail, which is used to reduce the frictional resistance generated when the corresponding water-blocking gate is raised or lowered.
[0023] This invention further proposes a method for constructing a prefabricated sluice gate structure capable of joint stress, comprising the following steps performed in sequence:
[0024] S1, prefabricate the prefabricated components of the assembled sluice gate structure as described in claim 7, and install gate guide rails on each groove and gate slot;
[0025] S2, the installation of each vertical precast component is completed by aligning the shear keyway and then casting the reinforcing bars by aligning the shear keyway;
[0026] S3. After each precast component is hoisted, the space between the two precast components used to form the cast-in-place gate pier is cast in place, thereby forming an integrated structure through the transverse connecting steel bars.
[0027] S4, the water-stopping grouting trench is filled with water-stopping cementitious material to form a seepage-proof structure;
[0028] S5, the cast-in-place first sluice gate joint pier, second sluice gate joint pier and sluice gate central pier are not precast components of the cast-in-place gate pier body. A section of the transverse connecting steel bar is embedded in the cast-in-place gate pier body, so that the precast component and the cast-in-place gate pier body form an integral joint load-bearing structure.
[0029] Furthermore, after S4, when the sluice gate needs to be inspected and reinforced after many years of operation, the old water-stop cementitious material can be removed by drilling along the water-stop grouting groove, and new water-stop cementitious material can be re-injected.
[0030] The beneficial effects of this invention are as follows:
[0031] This invention improves the load-bearing capacity of the gate slot structure of the prefabricated sluice gate structure by using a first sluice gate slot pier with a first gate slot, a second sluice gate slot pier with a second gate slot, a sluice gate middle pier with a third and fourth gate slot, and a sluice gate bottom plate with a groove, thereby enabling the sluice gate to bear joint forces and ensuring the safety and quality of water conservancy projects.
[0032] Other advantages, objectives and features of the present invention will become apparent in part from the following description, and in part from those skilled in the art through study and practice of the invention. Attached Figure Description
[0033] Figure 1 This is the overall assembly plan layout of a prefabricated sluice gate structure capable of joint force bearing according to the present invention;
[0034] Figure 2 The planar arrangement of the second sluice gate joint pier involved in this invention;
[0035] Figure 3 The planar arrangement of the first sluice gate joint pier involved in this invention;
[0036] Figure 4 The present invention relates to the planar arrangement of the piers in the sluice gate;
[0037] Explanation of reference numerals in the attached figures:
[0038] 1. First sluice gate joint pier; 2. Second sluice gate joint pier; 3. Middle sluice gate pier; 5. Bottom sluice gate plate; 41. Left water-retaining gate plate; 42. Right water-retaining gate plate; 11. First vertical precast component; 12. First molded gate pier body; 21. Second vertical precast component; 22. Second molded gate pier body; 31. Third vertical precast component; 32. Third molded gate pier body; 6. Shear keyway; 7. Water-stop grouting groove; 8. Gate guide rail; 9. Transverse connecting steel bars. Detailed Implementation
[0039] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be further described clearly and completely below in conjunction with the embodiments of this invention. It should be noted that the described embodiments are merely some embodiments of this invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0040] It should be understood that the terms "upper", "lower", "front", "rear", "left", "right", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present invention.
[0041] As used in this specification and the following claims, the words “a,” “an,” and “the” have the meaning of plural reference unless the context clearly indicates otherwise. Furthermore, as used in the description herein, unless the context clearly indicates otherwise, “in” has the meaning of both “in…” and “on…”.
[0042] Terms such as “first,” “second,” “third,” and “fourth” are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated.
[0043] Example 1
[0044] like Figures 1-4 As shown:
[0045] This embodiment proposes a prefabricated sluice gate structure capable of joint force bearing, including a first sluice gate joint pier 1, a second sluice gate joint pier 2, and a sluice gate central pier 3 located between the first sluice gate joint pier 1 and the second sluice gate joint pier 2. Each sluice gate joint pier and the sluice gate central pier 3 is disposed on a sluice gate base plate 5. The prefabricated sluice gate structure includes at least one set of water-blocking gate components. The water-blocking gate components are used to form a solid water-blocking gate plate surface at a virtual cross-section of the prefabricated sluice gate structure. The water-blocking gate components include a left water-blocking gate plate 41 and a right water-blocking gate plate 42. The left water-blocking gate plate 41 is used to close / block the left gate flow channel between the first sluice gate joint pier 1 and the sluice gate central pier 3. The right water-blocking gate plate 42 is used to close / block the right gate flow channel between the sluice gate central pier 3 and the second sluice gate joint pier 2.
[0046] The bottom plate 5 of the sluice gate is provided with a first groove and a second groove. The first groove is used to be embedded in the bottom edge of the left water-blocking gate plate 41 when the left gate channel is closed, and the second groove is used to be embedded in the bottom edge of the right water-blocking gate plate 42 when the right gate channel is closed.
[0047] The first sluice gate pier 1 is vertically provided with at least one first door slot, which is used to embed the left edge of the left water-blocking gate plate 41 when the left gate flow channel is closed / blocked; the first sluice gate pier 1 is longitudinally divided into multiple first segments, wherein the first segment with the first door slot is a strip-shaped first vertical prefabricated component 11, and the first segment without the first door slot is a first molded gate pier body 12; the first segment of the first vertical prefabricated component 11 is provided with one first door slot;
[0048] The second sluice gate pier 2 is vertically provided with at least one second door slot, which is used to embed the right edge of the right water-blocking gate plate 42 when the right gate flow channel is closed / blocked; the second sluice gate pier 2 is longitudinally divided into multiple second segments, wherein the second segment with the second door slot is a strip-shaped second vertical prefabricated component 21, and the second segment without the second door slot is a second molded gate pier body 22; the second segment of the second vertical prefabricated component 21 is provided with one second door slot;
[0049] The sluice gate pier 3 has a third gate slot and a fourth gate slot vertically opened on both sides. The third gate slot is used to embed the right edge of the left water-blocking gate plate 41 when it is blocking / blocking the flow channel of the left gate, and the fourth gate slot is used to embed the left edge of the right water-blocking gate plate 42 when it is blocking / blocking the flow channel of the right gate. The sluice gate pier 3 is longitudinally divided into multiple third segments. The third segment with the third gate slot and the fourth gate slot is a strip-shaped third vertical prefabricated component 31, and the third segment without the third gate slot and the fourth gate slot is a third molded gate pier body 32. The third segment of the third vertical prefabricated component 31 is provided with a third gate slot and a fourth gate slot.
[0050] Furthermore, the first segment corresponds to a first door slot; the second segment corresponds to a second door slot; and the third segment corresponds to a third door slot and a fourth door slot.
[0051] The number of water-blocking gate components is not less than three; each water-blocking gate component is arranged longitudinally at intervals within the water gate; wherein the three water-blocking gate components are the first water-blocking gate component, the second water-blocking gate component, and the third water-blocking gate component.
[0052] In some embodiments, each vertical precast component is integrated and anchored to the adjacent precast gate pier body through multiple transverse connecting steel bars 9, thereby forming an overall joint load-bearing structure.
[0053] In some embodiments, each vertical precast component is provided with a vertical shear keyway 6 in the center of its top view; the shear keyway 6, together with the inserted reinforcing bars and poured concrete, is used to enhance the shear resistance of the precast component.
[0054] In some embodiments, the reinforcing bars inserted into the shear keyway 6 are reinforcement bars whose size and configuration are determined by stress calculation.
[0055] In some embodiments, the backwater side of each sluice gate joint pier is provided with a water-stopping grouting groove 7, which is used to perform water-stopping treatment between two adjacent sluice gate joint piers.
[0056] In some embodiments, each groove and each gate slot is provided with a gate guide rail 8, which is used to reduce the frictional resistance generated when the corresponding water-blocking gate is raised or lowered.
[0057] Example 2
[0058] This embodiment proposes a method for constructing a prefabricated sluice gate structure capable of joint stress, including the following steps performed in sequence:
[0059] S1, prefabricate the prefabricated components of the assembled sluice gate structure as described in Example 1, and install gate guide rails 8 on each groove and gate slot;
[0060] S2, the installation of each vertical precast component is completed by aligning the anti-shear keyway 6 and casting the reinforcing bars by aligning the anti-shear keyway 6;
[0061] S3, after each precast component is hoisted, the space between the two precast components used to form the cast-in-place gate pier is cast in place, thereby forming an integrated structure through the transverse connecting steel bars 9;
[0062] S4, the water-stopping grouting groove 7 is filled with water-stopping cementitious material to form a seepage-proof structure;
[0063] S5, the cast-in-place first sluice gate joint pier 1, second sluice gate joint pier 2 and sluice gate middle pier 3 are not precast components of the cast-in-place gate pier body. A section of the transverse connecting steel bar 9 is embedded in the cast-in-place gate pier body, so that the precast component and the cast-in-place gate pier body form an integral joint load-bearing structure.
[0064] Furthermore, after S4, when the sluice gate needs to be inspected and reinforced after many years of operation, the old water-stop cementitious material can be removed by drilling along the water-stop grouting groove 7, and new water-stop cementitious material can be re-injected.
[0065] In some embodiments, specifically, the cross section of the third vertical precast component 31 in the XY direction (in a spatial rectangular coordinate system) is I-shaped, and the third vertical precast component 31 is a third precast reinforced concrete gate slot component; the third vertical precast component 31 can be used as a gate slot for maintenance or working gates, and the gate slot plane is I-shaped with a vertical block height of 1.5~3.0m.
[0066] In some embodiments, specifically, the cross section of the first vertical precast component 11 in the XY direction of the spatial rectangular coordinate system is U-shaped, and the first vertical precast component 11 is a first precast reinforced concrete gate slot component; the first vertical precast component 11 can be used as a gate slot for maintenance or working gates, the gate slot plane is "U"-shaped, and the vertical block height is 1.5~3.0m.
[0067] In some embodiments, specifically, the anti-shear keyway 6 is a vertical positioning anti-shear concave-convex keyway for the door groove.
[0068] In some embodiments, specifically, the water-stop grouting groove 7 is a vertical water-stop grouting groove 7 for the gate groove.
[0069] In some embodiments, the various mechanisms above the sluice gate base plate 5 of this embodiment are rigidly connected to the sluice gate base plate 5 to form an integral load-bearing structure.
[0070] In some embodiments, a prefabricated sluice gate structure capable of joint stress bearing participates in structural stress bearing, and its structural dimensions and reinforcement configuration should be determined through stress analysis.
[0071] In some embodiments, specifically, two water-swellable waterstop strips are provided between the top and bottom surfaces of the corresponding precast component (i.e., precast reinforced concrete gate slot blocks) as seepage prevention measures between precast blocks; furthermore, two water-swellable waterstop strips are provided on the upstream and downstream sides of the precast reinforced concrete gate slot blocks as seepage prevention measures for the construction joint between the precast blocks and the cast-in-place gate piers.
[0072] In some embodiments, specifically, the gate guide rail 8 is a supporting component of the gate, which needs to be pre-embedded in the reinforced concrete gate groove of the corresponding prefabricated component and prefabricated together; after the gate groove is assembled, the joints on the guide rail surface are welded and ground to meet the requirements of smooth gate operation and improve the overall integrity of the gate groove.
[0073] In some embodiments, specifically, the top and bottom surfaces of the third vertical precast component 31 are provided with shear keyways 6, and the keyway height is 200mm~500mm; during the door slot assembly process, when the shear keyway 6 (top surface concave / convex keyway) on the top surface of the third vertical precast component 31, which serves as the front block, is aligned with the shear keyway 6 (bottom surface convex / concave keyway) on the bottom surface of the third vertical precast component 31, which serves as the lifting block, the lifting block is then vertically inserted and the assembly is completed; the shear keyway 6, which is in the shape of concave and convex keyways, plays a shear-resistant role in the structure, and its size and reinforcement configuration should be determined through stress calculation.
[0074] In some embodiments, specifically, the transverse connecting steel bars 9 are arranged on the upstream and downstream sides of the gate slot of the corresponding precast component, with a steel bar diameter of 20mm~25mm, arranged in rows with a spacing of 1.0m×1.0m; during the assembly process of the precast component of the gate slot, the transverse connecting steel bars 9 can be used as lifting points; after the corresponding precast component of the gate slot is assembled, the transverse connecting steel bars 9 are embedded in the cast-in-place molded gate pier body, and the gate slot and the gate pier form an integral whole and share the load.
[0075] In some embodiments, specifically, the water-stop grouting groove 7 is arranged on the backwater side of the sluice gate joint pier, with a groove width of 200mm~400mm and a groove depth of 100mm~150mm.
[0076] In some embodiments, specifically, after the prefabricated components of the gate slot are assembled, water-stopping cementitious material is injected into the vertical water-stopping grouting groove 7 as a seepage prevention measure between the gate piers or between the side gate piers and the bank retaining wall.
[0077] Example 3
[0078] The relevant technical solution in Example 3 is an optimized design or specific setting of the technical solution corresponding to Example 1 or Example 2;
[0079] like Figures 1-4 As shown:
[0080] In some embodiments, specifically, the first sluice gate joint pier 1, the second sluice gate joint pier 2, the sluice gate central pier 3, and the first groove; the second groove are arranged on the bottom plate 5 of the sluice gate, and are integral reinforced concrete structures cast on site.
[0081] In some embodiments, specifically, the first vertical prefabricated component 11 is arranged in the middle of the first sluice gate joint pier 1 (the second vertical prefabricated component 21 is arranged in the middle of the second sluice gate joint pier 2). Depending on the number of maintenance and working gates, there are generally 1 to 3 first vertical prefabricated components 11. In this embodiment, 3 first vertical prefabricated components 11 are preferred. The first vertical prefabricated component 11 is a reinforced concrete structure that is prefabricated in the factory and assembled on site. The height of a single piece of the first vertical prefabricated component 11 is 3m. The bottom of the left water-blocking gate plate 41 can be lifted and embedded into the first groove, which serves as the bottom sill groove of the sluice gate bottom plate 5, and the whole is subjected to force.
[0082] In some embodiments, specifically, the third vertical precast component 31 is arranged in the middle position of the pier 3 of the sluice gate. Depending on the number of maintenance and working gates, there are generally 1 to 3 third vertical precast components 31. In this embodiment, 3 third vertical precast components 31 are preferred. The third vertical precast component 31 is a reinforced concrete structure prefabricated in the factory and assembled on site. The height of a single third vertical precast component 31 is 3m.
[0083] For example, such as Figure 2, Figure 3 As shown, the first sluice gate joint pier 1 and the second sluice gate joint pier 2 are both divided into the upstream section, the middle section, and the downstream section of the joint pier; the gate guide rail 8 is a supporting component of the gate, which is pre-embedded in the gate slot concrete and prefabricated in the factory in sections; after each prefabricated component with a gate slot is assembled and accepted, it meets the requirements for stable operation of the gate, and at the same time connects the gate slot blocks into a whole.
[0084] In some embodiments, specifically, the shear-resistant keyway 6, which serves as the vertical positioning shear-resistant concave-convex keyway for the gate slot, is located in the middle of the third vertical precast component 31 and has a height of 300mm. That is, the top surface of each third vertical precast component 31 is a convex keyway and the bottom surface is a concave keyway, and shear-resistant steel bars are arranged in the keyway. During the assembly of each gate slot precast component, the shear-resistant keyway 6 can be used for positioning.
[0085] In some embodiments, specifically, the transverse connecting steel bars 9 are located on the upstream and downstream sides of the corresponding sluice gate pier, with a steel bar diameter of 22mm, arranged in rows with a spacing of 1.0m×1.0m; during the assembly of the gate slot prefabricated components, the transverse connecting steel bars 9 can be used as lifting points; after the gate slot is assembled, the transverse connecting steel bars 9, which serve as the transverse connecting steel bars of the gate slot pier, are embedded in the upstream section, the middle section, and the downstream section of the cast-in-place sluice gate pier, so that the gate slot and the pier form an integral whole and share the load.
[0086] In some embodiments, specifically, the water-stopping grouting groove 7 is located on the backwater side of the corresponding sluice gate joint pier. The grouting groove is 200mm~400mm wide and 100mm deep, and is trapezoidal in shape. After the gate slot prefabrication is assembled, water-stopping cementitious material is injected into the water-stopping grouting groove 7 as a seepage prevention measure between the joint piers or between the side pier and the bank retaining wall. When the water-stopping cementitious material needs to be inspected and replaced, the old water-stopping cementitious material can be removed by drilling along the water-stopping grouting groove 7, and new water-stopping cementitious material can be injected.
[0087] It should be noted that two water-swellable sealing strips are installed between the top and bottom surfaces of each precast component of the sluice gate joint pier as a seepage prevention measure between the precast blocks; two water-swellable sealing strips are installed on the upstream and downstream sides of each precast component of the sluice gate joint pier as a seepage prevention measure for the construction joint between the precast block and the cast-in-place gate pier.
[0088] For example, such as Figure 4 As shown, the sluice gate pier 3 is divided into the upstream section, the middle section, and the downstream section of the sluice gate pier; the gate guide rail 8 in the sluice gate pier 3 is a supporting component of the gate. It is pre-embedded in the gate slot concrete and prefabricated in the factory in sections. The height of a single gate guide rail 8 can be selected as 3m; after each gate slot prefabricated component is assembled and accepted, it meets the requirements for stable gate operation and connects the gate slot blocks into a whole.
[0089] In some embodiments, specifically, the shear keyway 6 is located in the middle of the sluice gate pier 3, the height of the shear keyway 6 is 300mm, the top surface of each third vertical precast component 31 is a convex key and the bottom surface is a concave key, and shear reinforcement is arranged in the keyway; during the assembly process of each third vertical precast component 31, the shear keyway 6 can be used for positioning.
[0090] In some embodiments, specifically, the transverse connecting steel bar 9 is located on the upstream and downstream sides of the sluice gate pier 3; during the assembly of the third vertical precast component 31, the corresponding transverse connecting steel bar 9 can be used as a lifting point; after the gate slot precast component is assembled, the transverse connecting steel bar 9 is embedded in the upstream section, the middle section, and the downstream section of the sluice gate pier in the cast-in-place mold, and the gate slot precast component and the sluice gate pier form an integral whole and share the load;
[0091] It should be noted that two water-swellable sealing strips are installed between the top and bottom surfaces of each precast component of the sluice gate pier 3 as a seepage prevention measure between the precast blocks; two water-swellable sealing strips are installed on the upstream and downstream sides of each precast component of the sluice gate pier 3 as a seepage prevention measure for the construction joint between the precast block and the cast-in-place pier.
[0092] In some embodiments, specifically, after the prefabricated gate slot components are assembled, the joints on the surface of the gate slot guide rail are welded and ground to meet the requirements for smooth gate operation and improve the overall integrity of the gate slot.
[0093] In some embodiments, the shear-resistant keyway 6 specifically serves as an anti-shear element in the structure, and also as a positioning element during the door slot assembly process.
[0094] The present invention also has the following advantages:
[0095] This invention ensures the quality of concrete and the installation accuracy of guide rails by prefabricating concrete gate slots and gate guide rails in the factory.
[0096] This invention adopts an innovative structure of prefabricated gate slots, on-site assembly, and overall stress bearing, realizing an integrated prefabricated gate slot structure for large sluice gates. The structure has good stress bearing conditions, which can reduce the flood risk of sluice gate projects, simplify procedures, shorten construction period, and reduce construction risks, and has good application prospects.
[0097] This invention improves engineering quality and simplifies procedures by assembling the gate slot. At the same time, the assembled gate slot and gate pier form an integrated load-bearing structure, effectively enhancing the structural bearing capacity.
[0098] This invention also avoids dangerous and large-scale projects such as high formwork and high scaffolding on site, and solves the problem of difficulty in controlling the welding and installation accuracy in narrow and deep trenches. It not only effectively improves the quality of the project and reduces the project risk, but also shortens the construction period and ensures the project's safety during the flood season.
[0099] This invention uses measures such as shear-resistant keyway 6 and transverse connecting steel bars 9 to make the precast gate slot, the sluice gate bottom plate 5, and the gate pier form an integrated load-bearing structure. Compared with the conventional structure that does not participate in the load-bearing and weakens the rigidity of the gate pier, the integrated load-bearing structure can greatly improve the structural bearing capacity and ensure the safety of the project.
[0100] This invention ensures the quality of concrete and the installation accuracy of guide rails by prefabricating concrete gate slots and gate guide rails in the factory.
[0101] This invention features vertical positioning and shear-resistant keyways between precast reinforced concrete gate slots to ensure sufficient shear resistance between precast blocks. The precast reinforced concrete gate slots are rigidly connected to the sluice gate base slab 5, and transverse connecting steel bars 9 are installed between the precast gate slots and the cast-in-place gate piers, forming an integrated structure of gate slots, sluice gate base slab 5, and gate piers, which share the load. Vertical water-stopping grouting grooves 7 are installed between the gate piers to serve as a seepage prevention and water-stopping measure, and the materials can be repeatedly replaced for maintenance.
[0102] The embodiments described above are merely illustrative of several implementations of the present invention, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of the present invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these modifications and improvements all fall within the scope of protection of the present invention. Therefore, the scope of protection of this patent should be determined by the appended claims.
Claims
1. A prefabricated sluice gate structure capable of joint load-bearing, comprising a first sluice gate joint pier (1), a second sluice gate joint pier (2), and a central sluice gate pier (3) located between the first sluice gate joint pier (1) and the second sluice gate joint pier (2), wherein each sluice gate joint pier and the central sluice gate pier (3) are disposed on a sluice gate base plate (5), characterized in that, The prefabricated sluice gate structure includes at least one set of sluice gate components; the sluice gate components are used to form a solid sluice gate plate surface at a virtual cross-section of the prefabricated sluice gate structure; the sluice gate components include a left sluice gate plate (41) and a right sluice gate plate (42); the left sluice gate plate (41) is used to close / block the left gate flow channel between the first sluice gate pier (1) and the sluice gate middle pier (3); the right sluice gate plate (42) is used to close / block the right gate flow channel between the sluice gate middle pier (3) and the second sluice gate pier (2); The bottom plate (5) of the sluice gate is provided with a first groove and a second groove respectively. The first groove is used to be embedded in the bottom edge of the left water-blocking gate plate (41) when the left gate channel is closed, and the second groove is used to be embedded in the bottom edge of the right water-blocking gate plate (42) when the right gate channel is closed. The first sluice gate pier (1) is vertically provided with at least one first door slot, which is used to embed the left side edge of the left water-blocking gate plate (41) when the left gate flow channel is closed / blocked; the first sluice gate pier (1) is longitudinally divided into multiple first segments, wherein the first segment with the first door slot is a strip-shaped first vertical prefabricated part (11), and the first segment without the first door slot is a first molded gate pier body (12); the first segment of the first vertical prefabricated part (11) is provided with a first door slot; The second sluice gate pier (2) is vertically provided with at least one second door slot, which is used to embed the right edge of the right water-blocking gate plate (42) when the right gate flow channel is closed / blocked; the second sluice gate pier (2) is longitudinally divided into multiple second segments, wherein the second segment with the second door slot is a strip-shaped second vertical prefabricated part (21), and the second segment without the second door slot is a second molded gate pier body (22); the second segment of the second vertical prefabricated part (21) is provided with a second door slot; The sluice gate pier (3) has a third gate slot and a fourth gate slot vertically opened on both sides. The third gate slot is used to embed the right edge of the left water-blocking gate plate (41) when the left gate flow channel is closed / blocked, and the fourth gate slot is used to embed the left edge of the right water-blocking gate plate (42) when the right gate flow channel is closed / blocked. The sluice gate pier (3) is longitudinally divided into multiple third segments. The third segment with the third gate slot and the fourth gate slot is a strip-shaped third vertical prefabricated component (31), and the third segment without the third gate slot and the fourth gate slot is a third molded gate pier body (32). The third segment of the third vertical prefabricated component (31) is provided with a third gate slot and a fourth gate slot.
2. The prefabricated sluice gate structure according to claim 1, characterized in that, The first segment corresponds to a first door slot; the second segment corresponds to a second door slot; the third segment corresponds to a third door slot and a fourth door slot. The number of water-blocking gate components is not less than three; each water-blocking gate component is arranged longitudinally at intervals within the water gate; wherein the three water-blocking gate components are the first water-blocking gate component, the second water-blocking gate component, and the third water-blocking gate component.
3. The prefabricated sluice gate structure according to claim 2, characterized in that, Each vertical precast component is integrated and anchored to the adjacent molded gate pier through multiple transverse connecting steel bars (9), thus forming an overall joint load-bearing structure.
4. The prefabricated sluice gate structure according to claim 3, characterized in that, Each vertical precast component has a vertical shear keyway (6) in the center when viewed from above; the shear keyway (6) is used in conjunction with the inserted steel bars and poured concrete to enhance the shear resistance of the precast component.
5. The prefabricated sluice gate structure according to claim 4, characterized in that, The reinforcing bars inserted into the shear keyway (6) are reinforcement bars whose size and configuration are determined by stress calculation.
6. The prefabricated sluice gate structure according to any one of claims 1-5, characterized in that, The back side of each sluice gate joint pier is provided with a water-stopping grouting groove (7), which is used to perform water-stopping treatment between two adjacent sluice gate joint piers.
7. The prefabricated sluice gate structure according to claim 6, characterized in that, Each groove and each gate slot is provided with a gate guide rail (8), which is used to reduce the frictional resistance generated when the corresponding water-blocking gate is raised and lowered.
8. A method for constructing a prefabricated sluice gate structure capable of joint load-bearing, characterized in that, The steps are executed in the following order: S1, prefabricate the prefabricated components of the assembled sluice gate structure as described in claim 7, and prefabricate the gate guide rail (8) together with the gate slot; S2, aligned by the shear keyway (6), and hoisted to complete the installation of each vertical prefabricated component; S3, after each precast component is hoisted, the space between the two precast components used to form the cast-in-place gate pier is cast in place, thereby forming an integrated structure through the transverse connecting steel bars (9); S4, the water-stopping grouting trench (7) is filled with water-stopping cementitious material to form a seepage-proof structure; S5, the cast-in-place first sluice gate joint pier (1), second sluice gate joint pier (2) and sluice gate middle pier (3) are not precast components of the cast-in-place gate pier body. A section of the transverse connecting steel bar (9) is embedded in the cast-in-place gate pier body, so that the precast component and the cast-in-place gate pier body form an integral joint force-bearing structure.
9. The construction method according to claim 8, characterized in that, After S4, when the sluice gate needs to be inspected and reinforced after many years of operation, the old water-stop cementitious material can be removed by drilling along the water-stop grouting groove (7), and new water-stop cementitious material can be re-injected.
