A prefabricated submersible offshore booster station and its hoisting method
By using modular construction of prefabricated offshore substations and wave-adaptive transmission and unloading structures, the problems of high hoisting costs, long construction periods, and system complexity of integral offshore substations have been solved, achieving efficient and safe construction and operation of offshore substations.
Patent Information
- Application Number
- CN202611506885.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-28
- Publication Date
- 2026-11-17
AI Technical Summary
Existing integrated offshore substations have high hoisting costs and risks, long construction periods, and complex internal systems that result in poor reliability and maintainability. Centralized ventilation systems have high initial investment and poor energy efficiency, and failures in a single compartment can easily affect overall operation.
The prefabricated offshore substation adopts a modular construction mode, with each compartment independently equipped with fire protection and positive pressure ventilation systems. Combined with a wave-adaptive transmission and unloading structure, it automatically extends baffles when impacted by waves to convert the kinetic energy of water flow into diverted kinetic energy, reducing offshore construction procedures and improving operational safety and stability.
It shortened the construction cycle of offshore substations, improved construction efficiency and assembly precision, reduced the damage to equipment caused by long-term wave impact, and achieved independent and precise control and self-adaptation capabilities for each compartment, significantly improving operational stability and service life.
Smart Images

Figure CN123109125A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of offshore wind power equipment technology, and in particular to a prefabricated pod-type offshore booster station and its hoisting method. Background Technology
[0002] As offshore wind power develops towards deeper and larger scales, offshore substations, as key power transmission hubs, are becoming increasingly larger and heavier. This leads to severe challenges for installation operations, including high costs and increased risks. At the same time, the internal systems of substations are becoming increasingly complex, and their reliability, maintainability, and intelligence level are directly related to the total life cycle cost and operational safety.
[0003] Currently, integrated offshore substations still dominate the market. Most of them are constructed as a whole at an onshore construction base and then transported to the sea for installation. Although this model is technically mature, it has problems such as long construction period, high cost, difficult construction organization, and difficult hoisting. In addition, the auxiliary systems such as power distribution, fire protection, and ventilation in the substation are mostly designed in a centralized manner. The centralized ventilation room and through-duct make the initial investment of the system high, the energy efficiency poor, and the failure of a single compartment can easily affect the overall operation. Summary of the Invention
[0004] To solve the above-mentioned technical problems, the present invention provides a prefabricated submersible offshore booster station and its hoisting method.
[0005] This invention employs the following technical solution: a prefabricated submersible-type offshore booster station and its hoisting method, comprising a supporting frame, a bearing platform fixed to the upper surface of the supporting frame, several pre-set compartment slots formed on the surface of the bearing platform, transmission boxes fixed to both sides of the lower surface of the bearing platform, a wave-filled pressure-accumulating water tank fixed to the lower surface of the transmission boxes, a pressure-bearing push plate slidably connected inside the wave-filled pressure-accumulating water tank, several sealing plugs fixed to one side of the pressure-bearing push plate, and a sliding shaft fixed to the other side of the pressure-bearing push plate, with a fixed outer side of the sliding shaft. The device has a transmission arm, a telescopic spring fixed to one end of the sliding shaft, a guide sleeve slidably sleeved on the surface of the sliding shaft, a movable toothed plate fixed on the upper surface of the transmission arm, a transmission gear meshing with the movable toothed plate, a rotating rod fixed inside the transmission gear, an eccentric wheel fixed at the top of the rotating rod, a connecting rod rotatably connected to the outer side of the eccentric wheel, a connecting rod rotatably connected to one side of the connecting rod rotatably, a vertical frame rotatably connected to one side of the connecting rod rotatably, a baffle plate fixed on the surface of the vertical frame, and guide pulleys on both sides of the bottom of the vertical frame.
[0006] The above technical solutions, employing a modular construction model of factory prefabrication and on-site assembly, significantly reduce on-site construction procedures at sea, shorten the construction cycle of offshore booster stations, and improve construction efficiency and assembly precision. Each compartment is independently equipped with a fire protection and positive pressure ventilation system, avoiding the traditional centralized ventilation room and through-ventilation duct structure. This allows for independent and precise control of ventilation, temperature, humidity, and security in each compartment, effectively improving the operational safety and environmental adaptability of each prefabricated compartment. Through a wave-adaptive transmission and unloading structure, baffles automatically extend during wave impacts, diverting and unloading the oncoming high-pressure water flow downwards and laterally, dispersing the concentrated impact jet, and converting the forward impact kinetic energy of the water flow into diverted kinetic energy. This significantly reduces the instantaneous impact pressure on the booster station's compartments, equipment, and overall steel structure, effectively mitigating structural fatigue damage caused by alternating wave impacts. It avoids problems such as equipment loosening, structural deformation, and shell damage caused by long-term wave impacts. After the waves subside, it automatically resets without manual operation, demonstrating strong self-adaptability and significantly improving the operational stability and service life of offshore booster stations under complex marine conditions.
[0007] As a further improvement to the above solution, the surface of the wave accumulator tank is provided with several water inlet grooves that are compatible with the sealing plugs. The guide sleeve is fixedly connected to the inner wall of the wave accumulator tank, the telescopic spring is fixedly connected to the inner wall of the guide sleeve, and a sealing gasket is provided at the opening of the guide sleeve.
[0008] Through the above technical solution, by adapting the water inlet trough and the sealing plug, combined with the sealing protection of the end gasket of the guide sleeve, the wave-driven pressurized water tank can achieve adaptive switching between normal sealing and precise conduction when encountering waves. This results in excellent sealing performance, effectively preventing marine moisture, salt spray, and seawater from intruding into the transmission structure and avoiding corrosion and jamming of precision transmission components such as springs, shafts, and gears. Simultaneously, the fixed arrangement of the guide sleeve and the telescopic spring constrains the movement trajectory of the sliding shaft and the spring's extension and contraction, ensuring the stability and consistency of the reciprocating motion of the transmission structure.
[0009] As a further improvement to the above solution, both sides of the upper surface of the wave accumulator tank are fixedly connected to limit frames, and a sliding cavity is opened inside the limit frame, with the guide pulley slidably connected inside the sliding cavity.
[0010] Through the above technical solution, the movement posture of the vertical frame can be precisely constrained by the limiting frame and the internal sliding cavity, avoiding problems such as offset, tilting and shaking during the sliding process of the vertical frame. This ensures that the extension and retraction of the baffle is smooth and the alignment is accurate, avoiding problems such as reduced flow guidance effect and structural jamming and wear caused by the offset of the baffle. It effectively improves the working accuracy and operational stability of the water-blocking and unloading structure, and is suitable for long-term high-frequency wave regulation conditions.
[0011] As a further improvement to the above solution, pulley mounting brackets are fixedly connected to both sides of the bottom of the vertical frame, and the guide pulleys are rotatably connected inside the pulley mounting brackets.
[0012] As a further improvement to the above solution, a through groove is provided on the upper surface of the wave accumulator tank, and the transmission arm is slidably connected to the inside of the through groove.
[0013] As a further improvement to the above solution, the surface of the transmission box is provided with a clearance groove, and the second connecting rod is disposed inside the clearance groove.
[0014] As a further improvement to the above scheme, the first connecting rod and the second connecting rod are horizontally hinged together, and the eccentric position of the eccentric wheel is rotatably hinged to the end of the first connecting rod.
[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention utilizes the pressure of ocean waves to compress the pressure-bearing push plate inside the wave-filled pressurized water tank, causing it to retract and displace. This retraction disengages the sealing plug from the inlet trough, allowing water to enter and fill the tank. Simultaneously, the sliding shaft compresses the telescopic spring, accumulating elastic potential energy. The entire transmission system is completed through the linkage of the sliding shaft with the transmission arm, movable gear plate, transmission gear, rotating rod, and eccentric wheel. Then, via connecting rod one and connecting rod two, the vertical frame is pushed and pulled, causing the guide pulley to slide horizontally along the sliding cavity of the limiting frame. Finally, the baffle plate automatically extends and tilts downwards. By forcing the concentrated impact of ocean waves downwards and diverting the water flow laterally, the kinetic energy of the high-pressure positive impact is converted into lateral and downward diverted kinetic energy. This effectively disperses the concentrated jet of ocean waves, relieves the instantaneous impact pressure, and significantly improves the overall wave impact resistance and structural stability of the booster station cabin, support frame, and load-bearing platform. It effectively avoids problems such as equipment shell deformation, cabin loosening, structural fatigue damage, and component failure caused by long-term alternating wave impacts. It is significantly adapted to complex and harsh marine working conditions and extends the overall service life of the equipment.
[0016] This invention enables modular assembly and hoisting of prefabricated modules by pre-setting compartment grooves on the surface of the support platform. Each prefabricated module is independently equipped with a fire-fighting linkage device and a positive pressure ventilation regulation device. Through independent monitoring and alarm, fire-fighting linkage, and fresh air, temperature and humidity control structure for each module, it avoids the centralized ventilation room and through-duct structure of traditional booster stations. By using a prefabrication and debugging and rapid on-site assembly method, the construction period at sea is significantly shortened, and the risks of high-altitude and open-air operations at sea are reduced. Through independent security and environmental control modes for each module, it can adapt to the operating environment and fire protection requirements of different equipment in each module. It effectively avoids the problems of water accumulation, salt mist accumulation, leakage and cross-ventilation caused by through-ducts in traditional centralized ventilation systems, and avoids the defects of centralized machine room failure leading to the paralysis of ventilation of the entire station and loss of control of multi-module environment. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a cross-sectional structural schematic diagram of the pressure-bearing push plate of the present invention; Figure 3 This is a schematic diagram of the limiting frame of the present invention; Figure 4 This is a schematic diagram of the baffle plate of the present invention; Figure 5 This is a cross-sectional view of the telescopic spring of the present invention; Figure 6 This is a schematic diagram of the guide pulley of the present invention; Figure 7 This is a schematic diagram of the structure of the connecting rod of the present invention; Figure 8 For the present invention Figure 7 A magnified structural diagram of point A in the middle.
[0018] Explanation of key symbols: 1. Support frame; 2. Bearing platform; 3. Pre-set chamber slot; 4. Transmission box; 5. Wave accumulator tank; 6. Pressure-bearing push plate; 7. Sliding shaft; 8. Transmission arm; 9. Telescopic spring; 10. Guide sleeve; 11. Movable toothed plate; 12. Transmission gear; 13. Rotating rod; 14. Eccentric wheel; 15. Connecting rod one; 16. Connecting rod two; 17. Vertical frame; 18. Baffle plate; 19. Limiting frame; 20. Pulley mounting bracket; 21. Guide pulley; 22. Sealing plug; 23. Through slot; 24. Clearance slot; 25. Sliding cavity; 26. Pressure-bearing lifting ring. Detailed Implementation
[0019] The present invention will now be further described in conjunction with the accompanying drawings and specific embodiments. It should be noted that, without conflict, the various embodiments or technical features described below can be arbitrarily combined to form new embodiments. Example
[0020] Please combine Figure 1-8This embodiment of a prefabricated submersible offshore booster station and its hoisting method includes a support frame 1, with a bearing platform 2 fixed on the upper surface of the support frame 1. The bearing platform 2 has several pre-set cabin slots 3 on its surface. Transmission boxes 4 are fixed on both sides of the lower surface of the bearing platform 2. A wave-filled pressure tank 5 is fixed on the lower surface of the transmission box 4. A pressure-bearing push plate 6 is slidably connected inside the wave-filled pressure tank 5. Several sealing plugs 22 are fixed on one side of the pressure-bearing push plate 6, and a sliding shaft 7 is fixed on the other side. A transmission arm 8 is fixed on the outer side of the sliding shaft 7. A telescopic spring 9 is fixed at one end of the sliding shaft 7. A guide sleeve 10 is slidably fitted on the surface of the sliding shaft 7. A movable toothed plate 11 is fixed on the upper surface of the transmission arm 8, and the movable toothed plate 11 is engaged with a transmission... Gear 12, with a rotating rod 13 fixed inside the transmission gear 12. An eccentric wheel 14 is fixed to the top of the rotating rod 13. A connecting rod 15 is rotatably connected to the outer side of the eccentric wheel 14. A connecting rod 2 16 is rotatably connected to one side of the connecting rod 15. A vertical frame 17 is rotatably connected to one side of the connecting rod 2 16. A baffle plate 18 is fixed to the surface of the vertical frame 17. Guide pulleys 21 are provided on both sides of the bottom of the vertical frame 17. First, multiple prefabricated cabins are constructed, electrical equipment is assembled, and the whole machine is debugged in a professional equipment manufacturer. After all processes are accepted, they are transported to the marine engineering base. Then, each prefabricated cabin is placed in the pre-set cabin slot 3 on the surface of the bearing platform 2 to complete the assembly and overall hoisting of multiple prefabricated cabins, realizing the overall modular rapid positioning of the booster station. After being hoisted into place at sea, the wave pressure accumulator tank 5 is positioned above sea level. Under normal circumstances, when there are no waves, the equipment remains stationary. When waves are generated and impact the equipment, the pressure of the wave water flow directly acts on the surface of the pressure-bearing push plate 6 inside the wave pressure accumulator tank 5, pushing the pressure-bearing push plate 6 to retract into the wave pressure accumulator tank 5. Simultaneously, the pressure-bearing push plate 6 drives several sealing plugs 22 fixed on the side to move accordingly, completely disengaging the sealing plugs 22 from the water inlet channel of the wave pressure accumulator tank 5, releasing the sealing state of the water inlet channel. The wave water flow can then smoothly enter the wave pressure accumulator tank 5 through the water inlet channel to complete water storage. At the same time as the pressure-bearing push plate 6 retracts inward, it simultaneously drives the sliding shaft 7 fixed on the other side to slide and feed along the inside of the guide sleeve 10. During the movement of the sliding shaft 7, the telescopic spring 9 inside the guide sleeve 10 is continuously compressed, causing the telescopic spring 9 to undergo compressive elastic deformation. At the same time, the transmission arm 8 fixed on the outside of the sliding shaft 7 moves synchronously in a linear motion with the sliding shaft 7. The transmission arm 8 drives the movable toothed plate 11 fixed on the upper surface to move synchronously, and drives the transmission gear 12 to rotate through the meshing relationship of the teeth. During the rotation of the transmission gear 12, the internally fixed rotating rod 13 rotates synchronously. The eccentric wheel 14 fixed at the top of the rotating rod 13 follows and rotates coaxially. The eccentric wheel 14 uses the eccentric rotation trajectory to drive the outer hinged connecting rod 15 to swing and move. The connecting rod 15 further drives the one-side hinged connecting rod 16 to move synchronously. The connecting rod 16 pushes and pulls the vertical frame 17 to move as a whole.The vertical frame 17 achieves smooth linear movement through guide pulleys 21 on both sides of its bottom, thereby pushing the vertical frame 17 and the surface-fixed baffle 18 as a whole to a position above the wave accumulator tank 5. After the baffle 18 extends, it forms a downward tilted posture. When the incoming wave comes into contact with the tilted baffle 18, the water flow is forced downward and deflected to both sides, converting the forward impact kinetic energy of the wave into downward and lateral diversion kinetic energy, completing the unloading and redirection of the high-pressure water flow, and dispersing the concentrated jet. When the wave completely disappears and the external impact pressure is removed, the compressed extension spring 9 releases its elastic potential energy and reverses to reset, pushing the sliding shaft 7 and the pressure-bearing push plate 6 to move back in the opposite direction. 6. During the reset process, the seawater stored inside the wave accumulator tank 5 is discharged outwards, simultaneously driving the entire transmission structure to reset in reverse, ultimately achieving automatic retraction of the baffle plate 18 to its initial position. Furthermore, each prefabricated cabin is independently equipped with its own dedicated fire-fighting system and positive pressure ventilation system. The fire-fighting system includes fire detectors, fire extinguishing equipment, and alarm devices, and features an independent linkage alarm mechanism, enabling independent monitoring of fire situations in each cabin, and coordinated alarm and fire-fighting operations. The positive pressure ventilation system can independently control the fresh air intake, internal temperature, and humidity parameters of each cabin, eliminating the need for a centralized ventilation room and a through-duct structure, thus achieving independent ventilation, independent security, and independent environmental control for each prefabricated cabin.
[0021] The surface of the wave-driven pressurized water tank 5 has several inlet grooves that are compatible with the sealing plugs 22. The guide sleeve 10 is fixedly connected to the inner wall of the wave-driven pressurized water tank 5, and the telescopic spring 9 is fixedly connected to the inner wall of the guide sleeve 10. A sealing gasket is provided at the opening of the guide sleeve 10. When the wave-driven pressurized push plate 6 is displaced, the sealing plug 22 is simultaneously disengaged from the inlet groove along with the pressurized push plate 6, accurately releasing the sealing limit and ensuring that seawater can quickly enter the interior of the wave-driven pressurized water tank 5 through the inlet groove. The guide sleeve 10 is fixed to the inner wall of the wave-driven pressurized water tank 5, and the telescopic spring 9 is fixed inside the guide sleeve 10. It can accurately limit and guide the sliding trajectory of the sliding shaft 7 and the extension stroke of the spring, ensuring the stability and sealing of the reciprocating motion of the transmission structure.
[0022] Both sides of the upper surface of the wave accumulator tank 5 are fixedly connected to limit frames 19. The limit frames 19 have sliding cavities 25 inside. The guide pulleys 21 are slidably connected inside the sliding cavities 25. Through the cavity limiting effect of the sliding cavities 25, the movement range and trajectory of the guide pulleys 21 are constrained, limiting the vertical frame 17 to only make horizontal linear reciprocating movements, eliminating vertical offset, left and right sway and other displacement deviations, matching the motion logic of the entire linkage transmission structure, and ensuring the precise alignment of the extension and retraction of the baffle 18.
[0023] Both sides of the bottom of the vertical frame 17 are fixedly connected to pulley mounting brackets 20, and guide pulleys 21 are rotatably connected inside the pulley mounting brackets 20.
[0024] The upper surface of the wave accumulator tank 5 is provided with a through groove 23, and the transmission arm 8 is slidably connected to the inside of the through groove 23.
[0025] The surface of the transmission box 4 is provided with a clearance groove 24, and the connecting rod 2 16 is disposed inside the clearance groove 24.
[0026] Link 15 and Link 2 are horizontally hinged together. The eccentric position of the eccentric wheel 14 is rotatably hinged to the end of Link 15. During the rotation of the eccentric wheel 14 driven by the transmission gear 12, the rotational motion is converted into horizontal linear reciprocating push-pull power by utilizing the positional deviation between the center of the eccentric wheel 14 and the hinge point. Through the horizontal hinge transmission of the two-stage link, the power is transmitted to the vertical frame 17, realizing the stable conversion of rotational power into linear telescopic power, which is adapted to the telescopic adjustment requirements of the baffle 18.
[0027] The implementation principle of the prefabricated submersible offshore booster station and its hoisting method in this application embodiment is as follows: First, the overall equipment adopts a modular prefabrication construction process. All prefabricated cabins are first completed in the factory for overall construction, electrical equipment assembly and whole machine debugging. After all processes are accepted, they are transported to the offshore engineering base. Then, each prefabricated cabin is assembled one by one to complete the assembly and docking of the prefabricated cabin with the pre-set cabin groove 3 on the surface of the bearing platform 2. The hoisting and positioning of the booster station is completed as a whole. After the equipment is in place, the wave accumulator tank 5 is kept in a position above the sea level, and the equipment is in a normal static standby condition.
[0028] Secondly, when waves are generated on the sea surface and generate frontal impact pressure, the wave flow pressure acts directly on the surface of the pressure-bearing push plate 6 inside the wave accumulator tank 5, pushing the pressure-bearing push plate 6 to retract inward. Simultaneously, it causes several sealing plugs 22 fixed on the side of the pressure-bearing push plate 6 to disengage from the water inlet slot of the wave accumulator tank 5, completely releasing the sealing state of the water inlet slot, allowing external waves to smoothly flow into the wave accumulator tank 5 through the water inlet slot, completing the automatic water storage operation. While the pressure-bearing push plate 6 retracts inward, it simultaneously drives the sliding shaft 7 fixed on the other side to slide smoothly along the inside of the guide sleeve 10, continuously squeezing the telescopic spring 9 inside the guide sleeve 10 to compress and deform, thereby accumulating elastic restoring potential energy.
[0029] Then, during the displacement of the sliding shaft 7, the outer fixed transmission arm 8 is synchronously driven to make linear motion, which drives the movable tooth plate 11 fixed on the upper surface of the transmission arm 8 to move synchronously. Through the tooth meshing transmission relationship, the transmission gear 12 is driven to rotate, which further drives the rotating rod 13 fixed inside the transmission gear 12 and the eccentric wheel 14 at the top of the rotating rod 13 to rotate coaxially. Using the eccentric rotation trajectory of the eccentric wheel 14, the connecting rod 15 hinged to the outside of the eccentric wheel 14 is continuously driven to complete the swing displacement. The connecting rod 15 is linked with the connecting rod 2 16 hinged on one side to reciprocate synchronously. Through the horizontal hinge transmission cooperation between the connecting rod 15 and the connecting rod 2 16, the vertical frame 17 is continuously pushed and pulled to move as a whole.
[0030] Next, the vertical frame 17 slides precisely horizontally and linearly inside the sliding cavity 25 of the limiting frame 19 on both sides of the wave accumulator tank 5 via the guide pulleys 21 set on both sides of the bottom. It eliminates deviation, tilting and swaying deviations throughout the process, ensuring that the movement is stable and regular. At the same time, the baffle plate 18 fixed on the surface of the vertical frame 17 is pushed out as a whole, and the baffle plate 18 is made to form a stable downward tilting posture. After the oncoming wave water comes into contact with the tilted baffle plate 18, it is forced to be guided downward and deflected to both sides, converting the forward impact kinetic energy of the wave into downward and lateral diversion kinetic energy, realizing the unloading and reversal of the high pressure water flow, dispersing the concentrated impact jet, and weakening the instantaneous impact pressure of the wave.
[0031] Subsequently, after the waves subside and the external water flow impact pressure is completely removed, the previously compressed telescopic spring 9 releases all its elastic potential energy and automatically resets, pushing the sliding shaft 7 and the pressure-bearing push plate 6 back to their original positions. During the reset process, the pressure-bearing push plate 6 continuously discharges the seawater accumulated inside the wave accumulator tank 5, while simultaneously driving the entire transmission structure—including the movable toothed plate 11, transmission gear 12, rotating rod 13, eccentric wheel 14, connecting rod 15, and connecting rod 2 16—to reset in reverse linkage. Finally, after complete reset, it drives the vertical frame 17 and the baffle plate 18 to retract to their initial static positions, completing the entire process of a single wave adaptive buffering and unloading. At the same time, the equipment is equipped with an independent compartment control process, allowing each prefabricated compartment to independently complete real-time fire monitoring, automatic alarm, and linked fire extinguishing operations. Each compartment can also independently complete the precise adjustment of fresh air introduction, temperature, and humidity, eliminating the need for a centralized machine room and through-ventilation ducts, thus achieving independent security and independent environmental control for each compartment.
[0032] The above embodiments are merely preferred embodiments of the present invention and should not be construed as limiting the scope of protection of the present invention. Any non-substantial changes and substitutions made by those skilled in the art based on the present invention shall fall within the scope of protection claimed by the present invention.
Claims
1. A prefabricated cabin type offshore booster station comprising a supporting base frame (1) on the upper surface of which a load bearing platform (2) is fixed, characterized in that, The surface of the bearing platform (2) is provided with several pre-set chamber slots (3). Both sides of the lower surface of the bearing platform (2) are fixed with transmission boxes (4). The lower surface of the transmission box (4) is fixed with a wave pressure storage tank (5). The inside of the wave pressure storage tank (5) is slidably connected with a pressure-bearing push plate (6). Several sealing plugs (22) are fixed on one side of the pressure-bearing push plate (6). A sliding shaft (7) is fixed on the other side of the pressure-bearing push plate (6). A transmission arm (8) is fixed on the outside of the sliding shaft (7). A telescopic spring (9) is fixed at one end of the sliding shaft (7). A guide sleeve is slidably sleeved on the surface of the sliding shaft (7). 10), the upper surface of the transmission arm (8) is fixed with a movable toothed plate (11), the movable toothed plate (11) is meshed with a transmission gear (12), the transmission gear (12) is fixed with a rotating rod (13), the top of the rotating rod (13) is fixed with an eccentric wheel (14), the outer side of the eccentric wheel (14) is rotatably connected with a connecting rod one (15), the side of the connecting rod one (15) is rotatably connected with a connecting rod two (16), the side of the connecting rod two (16) is rotatably connected with a vertical frame (17), the surface of the vertical frame (17) is fixed with a baffle plate (18), and the bottom sides of the vertical frame (17) are provided with guide pulleys (21).
2. A pre-fabricated cabin-type offshore booster station according to claim 1, characterized in that: The surface of the wave accumulator tank (5) is provided with several water inlet grooves that are compatible with the sealing plug (22). The guide sleeve (10) is fixedly connected to the inner wall of the wave accumulator tank (5). The telescopic spring (9) is fixedly connected to the inner wall of the guide sleeve (10). A sealing gasket is provided at the opening of the guide sleeve (10).
3. A pre-fabricated cabin-type offshore booster station according to claim 1, characterized in that: Both sides of the upper surface of the wave accumulator tank (5) are fixedly connected to limit frames (19), and the inside of the limit frame (19) is provided with a sliding cavity (25), and the guide pulley (21) is slidably connected to the inside of the sliding cavity (25).
4. A prefabricated submersible offshore booster station as described in claim 1, characterized in that: Both sides of the bottom of the vertical frame (17) are fixedly connected to pulley mounting brackets (20), and the guide pulley (21) is rotatably connected to the inside of the pulley mounting bracket (20).
5. A prefabricated submersible offshore booster station as described in claim 1, characterized in that: The upper surface of the wave accumulator tank (5) is provided with a through groove (23), and the transmission arm (8) is slidably connected to the inside of the through groove (23).
6. A pre-fabricated cabin-type offshore booster station according to claim 1, characterized in that: The surface of the transmission box (4) is provided with a clearance groove (24), and the second connecting rod (16) is disposed inside the clearance groove (24).
7. A pre-fabricated cabin-type offshore booster station according to claim 1, characterized in that: The first connecting rod (15) and the second connecting rod (16) are horizontally hinged together, and the eccentric position of the eccentric wheel (14) is rotatably hinged to the end of the first connecting rod (15).
8. A method of lifting a pre-fabricated cabin-type offshore booster station according to claim 1, characterized in that, Includes the following steps: S1. The pre-set compartment slots (3) on the surface of the support platform (2) are used to complete the precise positioning and assembly of each prefabricated compartment; S2. The lifting equipment is connected to the pressure-bearing lifting rings (26) symmetrically arranged on both sides of the bearing platform (2) to complete the overall lifting, positioning and fixing of the booster station; S3. The overall base structure consisting of the support frame (1), the bearing platform (2), the transmission box (4) and the wave accumulator tank (5) is hoisted and positioned at sea to complete the fixed installation of the base and ensure that the wave accumulator tank (5) is higher than the sea level to meet the basic working conditions for offshore wave protection operations.