Construction method of a double-limb bearing plate type anti-buoyancy anchor bolt
By deploying multiple types of sensors on the drilling rig for formation identification and parameter adjustment, combined with real-time monitoring by the dewatering well level gauge, the construction process of the anti-buoyancy anchor bolt was automated and precisely controlled. This solved the problems of reliance on experience for formation identification and inaccurate grouting control in existing technologies, thus improving the safety and quality of construction.
Patent Information
- Application Number
- CN202611549715.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-08
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, the lack of objective quantitative judgment methods during the grouting process leads to inaccurate timing of pipe pulling and control of grouting pressure, which can easily result in anchor body breakage and mud inclusion defects. Drilling strata identification relies on experience, which can lead to accidents such as stuck drill and hole collapse.
Multiple types of sensors are used to collect drilling parameters in real time. Combined with rules and fuzzy logic, the formation type is identified, and the drilling rig parameters are automatically adjusted to form a closed-loop control. Liquid level gauges are installed around the dewatering well and grouting hole to collect water level data continuously. The safe grouting window period is calculated on a rolling basis. The grouting pump is controlled in a closed loop through pressure sensors and flow meters to ensure that the grouting pressure and pipe pulling speed are matched.
It improves the objectivity and timeliness of stratum identification, reduces the risk of borehole collapse and stuck drill, ensures the uniformity and density of grouting quality, reduces anchor body defects, and realizes the automation and precise control of the grouting process.
Smart Images

Figure CN123109148A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building engineering technology, and in particular to a construction method for a double-limb pressure-bearing support plate type anti-buoyancy anchor. Background Technology
[0002] With the development and utilization of urban underground space, anti-buoyancy anchors are widely used due to their advantages such as strong adaptability to geological formations and low cost. Among existing technologies, patent publication number CN117845914A discloses a construction method for a tension-type expanded-body anti-buoyancy anchor, including steps such as obtaining anchor coordinates and elevation points, base treatment, trial anchoring, hole drilling, anchor inspection and installation, grouting, prestressed component construction and locking, curing and acceptance, and waterproofing.
[0003] However, the existing technology still has the following shortcomings: the timing of pipe pulling during grouting relies on manual visual observation of the color and concentration of grout overflow at the borehole, lacking objective quantitative judgment methods. In water-rich pebble strata, premature or delayed pipe pulling can easily cause anchorage breakage or mud inclusion defects; the grouting pressure and pipe pulling speed lack quantitative matching, resulting in large pressure fluctuations, which can easily lead to grout loss or casing seizure; the identification of borehole strata relies on the operator's experience, and parameter adjustment is lagging, which can easily cause stuck drill, borehole collapse, or asynchronous casing advance. Summary of the Invention
[0004] In order to overcome the problems mentioned in the background art, the present invention proposes a construction method for a double-limb pressure-bearing plate type anti-buoyancy anchor.
[0005] The technical solution of this invention is: a construction method for a double-limb bearing plate type anti-buoyancy anchor bolt, comprising the following steps: S1 Positioning and Laying Out: Determine the anti-buoyancy anchor bolt hole positions according to the design drawings and number them. Set fixed points outside the anti-buoyancy design range. Use a total station to locate the center of the anchor bolt hole. The hole position deviation should not exceed 50mm. S2 casing drilling: A crawler-type hydraulic drilling rig is used for casing drilling. During the drilling process, the drilling rig torque, feed rate, drill rod vibration and air lift slag removal pressure parameters are collected in real time. The type of stratum being drilled is identified online, and the drilling rig speed, feed force and impact frequency are automatically adjusted according to the identification results. The casing follow-up speed is automatically matched. The drilling speed in soft soil is 2m / min~3m / min, and the drilling speed in gravel layer is 0.5m / min~1m / min. After drilling to the design depth, the hole depth is checked with a measuring rope. The depth deviation is no more than ±50mm. S3 Hole Cleaning: First, start the drilling rig and run it idle, then blow it with high-pressure air for 3 to 5 minutes to remove rock cuttings from the bottom of the hole, so that the thickness of the sediment in the hole is no more than 50 mm. S4 Anchor Bar and Structural Support Plate Fabrication: The anchor bars are made of double-leg parallel steel bars with anti-corrosion coating on the surface. Centering supports are welded at intervals not exceeding 2m. Stepped structural support plates are welded at the bottom of the anchor bars. The structural support plates are made of 20mm thick Q345-B steel plates. The center deviation between the support plate and the center of the anchor bar is not greater than 1mm. Double-sided fillet welding is used for continuous full welding. The weld height is not less than the thickness of the support plate and the width is not less than 8mm. Anti-corrosion coating is applied to the weld. S5 Anchor Bar Placement: After the anchor bar fabrication quality and length have been inspected and approved by the supervisor, it is placed into the hole. The centering bracket is used to center the anchor bar in the anchor hole. The grouting pipe is a PE pipe and extends to the bottom of the hole. S6 Dewatering and Grouting Linkage: Level gauges are installed in observation wells within a 3m radius of the dewatering well and grouting hole to continuously collect water level data, according to the formula... The rolling calculation of the grouting safety window period is given by the formula, where, The predicted highest groundwater level during grouting and initial setting. This is the most recent measured water level before grouting. The measured average rise rate during the pump shutdown and recovery phase. The estimated grouting time for a single anti-buoyancy anchor rod. The estimated curing time for the slurry to reach its initial setting strength. The upper limit of the safe water level elevation is 500mm below the foundation bottom surface; the groundwater level in the grouting area is controlled within 500mm±50mm below the foundation bottom surface. If the water level rises or falls suddenly during the grouting process, grouting is immediately suspended and resumed after the water level stabilizes. S7 Grouting and Pipe Pulling: Before grouting, add 30% by mass of pebbles (5mm-10mm in diameter) to the anchor hole with a mud content of less than 3%; prepare cement mortar according to the design mix ratio, with a water-cement ratio not exceeding 0.50, and a mixing time of not less than 5 minutes; after filtration, send it to a grout storage tank equipped with a mixing device for later use; start the grouting pump for trial operation, with a pumping pressure not less than 2MPa; inject the grout from the bottom of the hole, and use a pressure sensor to provide real-time feedback for frequency conversion closed-loop control of the grouting pump, stabilizing the grouting pressure at 2MPa-3MPa, automatically switching to a pressure range of 3MPa-5MPa when the stratum is a water-rich pebble layer; when the grout overflows from the hole and the concentration of the overflowing grout is consistent with the concentration of the injected grout, start lifting the casing, grouting and pulling the casing simultaneously, with the pulling speed calculated according to the formula. Real-time calculation and automatic matching with grouting flow rate, where, For the tube removal speed, The grouting flow rate per unit time The diameter of the hole. To ensure a sufficient safety margin, the pipe pulling speed is controlled within the range of 0.5m / min to 1.0m / min to ensure that the grouting pipe is always filled with grout. If grout interruption, pipe blockage, or equipment failure occurs during grouting, the pipe pulling will be automatically stopped and the pipe position will be recorded. Grouting will be resumed after the fault is cleared. Grouting will stop when the pipe is pulled out of the borehole and the grout overflows fully without any air bubbles. For important projects, grouting will be supplemented through a pre-embedded secondary grouting pipe before the grout initially sets. S8 Sealing Treatment: After grouting is completed, replenish grout to the recessed or lost grout areas at the borehole opening, and seal the borehole with plain concrete or cement mortar. The sealing height should be no less than 100mm and smoothed out. S9 maintenance: After grouting is completed, cover with plastic film or straw mat to keep the anchor bolts moist and maintain their moisture. During the maintenance period, the anchor bolts must not be disturbed. S10 Anchor Bolt Inspection: A pull-out acceptance test shall be conducted on no less than 5 bolts, representing no less than 5 bolts of the same type. The ultimate bearing capacity shall be no less than 2.0 times the design value of the anchor bolt axial force. S11 Anchor Waterproofing Node Construction: When pouring the cushion layer at the anchor rod location, a PVC DN350 pipe is used to reserve holes. After the cushion layer is poured, a groove with a maximum depth of 175mm is cleaned out. M10 cement mortar is used to level the groove to a depth of 25mm. After the leveling layer dries, waterproof sealant is filled into the groove. Water-swellable tape is applied to the surface of the reinforcing steel, and waterproof sealant is filled at the junction of the anchor rod and the foundation.
[0006] Preferably, in step S2, a torque sensor and a speed sensor are installed on the drill rig's power head, and a footage encoder and a casing stroke encoder are installed on the mast. A triaxial vibration sensor, an airlift slag discharge pressure transmitter, and an inclination sensor are also installed. The torque, footage rate, vibration spectrum, and slag discharge pressure are input into the edge controller. A combination of rule-based and fuzzy logic is used to identify the formation type online. The identification results are updated and confidence levels are output every 0.5m to 1m of drilling, generating an electronic geological columnar section of the borehole. Based on the identified formation type, the rotational speed, feed force, impact frequency, and airflow are automatically adjusted according to a preset strategy table, using a step-limiting method. A closed loop is formed between the drill bit footage signal and the casing stroke signal to automatically match the casing follow-up speed. In gravel layers, the casing follows the drill bit synchronously with an allowable lag of no more than 0.1m, and in soft soil layers, the allowable lag is no more than 0.3m.
[0007] As a preferred embodiment, the rules for identifying the formation type and adjusting parameters in step S2 are as follows: When the torque is low and stable, the advance rate is high, the vibration amplitude is small, and the slag discharge air pressure is low, it is determined to be soft soil or sand layer, and high speed, small feed force, and the impact frequency is turned off or reduced; when the torque is moderately large and fluctuates, the advance rate is moderate, the high-frequency vibration is obvious, and the slag discharge air pressure increases, it is determined to be medium-dense to dense gravel layer, and medium-low speed, medium feed force, high impact frequency, and increased air volume are used; when the torque spikes, the advance rate drops sharply, the vibration is strong, and the slag discharge air pressure increases, it is determined to be cemented gravel or boulders, and low speed, small feed force, maximum impact frequency, and increased air volume are used; when the torque exceeds the preset upper limit for more than 3 seconds, the interlock reverses and slightly lifts or stops the machine and alarms; when the slag discharge air pressure suddenly rises and the slag discharge volume decreases, the air volume is automatically increased, the advance is slowed down, and the purging is intensified; when the borehole inclination deviation exceeds the allowable value, the machine stops and alarms.
[0008] Preferably, in step S6, an immersion-type pressure level gauge or radar level gauge is installed in the dewatering well to achieve continuous water level data acquisition at the second level and automatically generate a water level trend curve; according to the formula A rolling calculation is performed every 10 minutes or before grouting begins for each anchor bolt, wherein... Take the upper quartile of the rate of rise in the water level recovery phase after the pump is stopped, multiply by a safety factor of 1.1. Take the average grouting time of the last 5 anchor bolts. The initial setting time calibrated based on the slurry mix ratio and measured temperature is updated on a rolling basis; based on the safety margin... The grouting window period is divided into three levels: When the screen is green, grouting is permitted; When the temperature is yellow, an early warning is issued, precipitation is automatically replenished, and the estimated grouting time is shortened. If the measured water level is 400mm below the foundation bottom, the indicator will be red, and grouting will be interlocked and suspended, and new grouting operations will be prohibited.
[0009] Preferably, in step S6, the variable frequency dewatering pump is PID controlled with a setpoint of 500mm below the foundation bottom surface, with a dead zone of ±25mm; the constant speed dewatering pump adopts an intermittent pumping mode of 30 minutes of pumping and 60 minutes of stopping, and automatically corrects within a duty cycle range of 20% to 80%; when the water level is higher than 450mm below the foundation bottom surface, pumping is started or frequency increased; when the water level is lower than 600mm below the foundation bottom surface, pumping is reduced; when the water level is lower than 800mm below the foundation bottom surface, pumping is stopped, and automatically resumes after the water level rises back to the target range. During grouting, if the water level change rate exceeds 0.1m / 10min without pump start / stop instructions, a yellow warning will be issued and an investigation work order will be pushed. If it exceeds 0.2m / 10min, grouting will be immediately stopped by interlocking and an investigation work order will be pushed. Rainfall forecast data will be connected, and the water level will be pre-lowered to 700mm-800mm below the foundation bottom surface 1-2 hours in advance when a short-term or moderate rain warning is issued. The operation status will be shared with adjacent dewatering wells to stagger the start and stop times of dewatering wells in the same affected area, and the grouting operation of anchor bolts within 10m of the dewatering well will be arranged during the intermittent pumping period of the dewatering well.
[0010] Preferably, in step S7, pressure sensors are installed at both the grouting pump outlet and the orifice. The grouting pump frequency converter is controlled via PID closed-loop control with the grouting pressure setpoint as the target. The typical formation setpoint is 2MPa~3MPa. When the formation identification result and water level monitoring result jointly determine it to be a water-rich gravel layer, the control automatically switches to the 3MPa~5MPa range. A 5.0MPa hard upper limit pressure is set, and a 5.5MPa safety valve is configured. If the pressure drops by more than 1MPa within 10 seconds, it is determined to be a pipe burst, and grouting and pipe removal are immediately stopped. Using the measured flow rate from the pump outlet flow meter as input, the pressure is adjusted every 100ms~500ms according to the formula... The calculation of the tube pulling speed is sent to the servo winch for execution. The speed command is processed by ramp limiting, and the acceleration is not greater than 0.5m / min². When the calculated speed is lower than 0.5m / min, the tube pulling is stopped by interlock and an insufficient flow alarm is issued. When the calculated speed is higher than 1.0m / min, it is clamped at 1.0m / min and the pump speed is automatically reduced by the pressure closed loop.
[0011] As a preferred option, the formula for tube extraction speed in step S7 In The grouting flow rate measured by the pump outlet flow meter is taken as the sliding average value from 1s to 3s, and the unit is m³ / min; The diameter of the hole is taken as a conservative value based on the outer diameter of the casing, and the unit is meters. To ensure sufficient safety factor, a value of 1.15 to 1.20 is generally used for strata, and 1.25 to 1.30 is used for water-rich pebble layers or active seepage zones. The output speed is limited to 0.5m / min to 1.0m / min.
[0012] As a preferred method, the automatic determination method for the timing of pipe pulling in step S7 is as follows: an overflow receiving tank is set at the orifice, and the overflow slurry enters the measuring tank after being filtered by a screen. The overflow density is measured in real time using a tuning fork density meter, and the overflow conductivity is measured using a conductivity meter. When the overflow switch at the orifice is triggered, the overflow density reaches more than 97% of the injected slurry density and lasts for no less than 10 seconds, and the conductivity matches the conductivity of the injected slurry, it is determined that the original water and air in the orifice have been completely replaced, the pipe pulling lock is automatically released, and the protective sleeve is pulled out after double confirmation by video and instruments.
[0013] Preferably, in step S7, when the measured flow rate is lower than the lower flow rate limit and the grouting pressure is lower than the lower pressure limit, it is determined that the grouting is interrupted; when the grouting pressure exceeds the upper pressure limit and the flow rate is lower than the lower flow rate limit, it is determined that the pipe is blocked; when a power outage or network outage occurs, power outage protection is executed; when any of the above events occur, the automatic interlocking is executed as follows: immediately stop pipe pulling, record the current position of the casing and the depth of the grouting pipe, stop the grouting pump and maintain pressure; when grouting is resumed, first insert the protective casing back to 0.5m below the break point, re-grout with low flow rate to expel the air accumulated in the hole, and resume automatic linkage control after manual confirmation that the grout is continuous and the pressure is normal.
[0014] Preferably, in step S7, the ratio of cumulative grouting volume to theoretical borehole volume is used. Determining grout fullness, theoretical pore volume In the formula, This is the effective length of the anchor bolt. The diameter of the hole. This refers to the equivalent cross-sectional area of the double-leg reinforcement, grouting pipe, and structural support plate; when the retaining sleeve is completely pulled out of the borehole, the grout overflow from the borehole is full, and no air bubbles emerge, and When the grouting is deemed qualified, grouting is stopped; when If the grouting is deemed insufficient, automatic grouting is initiated through pre-embedded secondary grouting pipes before the grout initially sets, with the amount of grout added not less than [amount missing]. ;when If abnormal grout loss is detected, the system will automatically prompt you to check the operation status of the dewatering system and reduce the frequency of the dewatering pumps in that area or switch to intermittent pumping mode before continuing or supplementing grouting.
[0015] The beneficial effects of this invention are: 1. Compared to existing technologies, casing drilling mainly relies on operators' experience to judge the formation by observing the drilling rig's sound, vibration, and cuttings return, and manually adjusting parameters such as drilling speed, feed force, and impact frequency. This judgment method is highly subjective, has a slow response, and makes it difficult to match drilling parameters with formation conditions in real time, easily leading to accidents such as stuck drill, buried drill, hole collapse, or asynchronous casing advance. Furthermore, it lacks objective borehole geological records. This invention deploys multiple sensors on the drilling rig, including torque, speed, footage, casing travel, vibration, and cuttings discharge air pressure, to collect drilling parameters in real time and calculate characteristic quantities. It uses a combination of rule-based and fuzzy logic to identify the type of formation being drilled online and output confidence levels. Based on the identification results, it automatically adjusts the speed, feed force, and impact frequency according to a preset strategy, and ensures a closed-loop match between the casing advance speed and the drill bit footage. Automatic interlocking protection is provided in case of torque exceeding limits, sudden changes in cuttings discharge air pressure, or excessive inclination angle. This transforms formation identification and parameter adjustment from manual experience-based operation to automatic sensing and closed-loop control, improving the objectivity and timeliness of formation identification, reducing the risk of borehole collapse and stuck drill, and automatically generating electronic geological columnar sections to provide a basis for subsequent grouting parameter selection.
[0016] 2. Compared to existing technologies, dewatering and grouting operations are typically managed separately by different teams. Before grouting, water levels are measured manually at regular intervals. During grouting, a crude method of completely shutting down pumps is adopted. During the pump shutdown period, the rapid rise of groundwater washes away and dilutes the grout that has not yet solidified. Furthermore, the water level fluctuations and vibrations caused by pump restarts when dewatering resumes also disturb the anchor body before initial setting, ultimately leading to abnormal grouting volume, loose anchor body, or even insufficient pull-out resistance. Moreover, the frequency of water level data collection is low, and there is a lack of predictive methods. This invention installs level gauges in observation wells around dewatering wells and grouting holes for continuous water level collection. Based on the measured rise rate during the pump shutdown recovery phase, the estimated grouting time for a single anchor rod, and the initial setting and curing time of the grout, the highest groundwater elevation during grouting and initial setting is calculated using a predictive formula. Based on this, the grouting safety window is divided into graded states, achieving automatic control of permitted grouting, early warning dewatering, and interlocked grout shutdown. Simultaneously, the dewatering pump is controlled in a closed-loop or intermittent manner and connected to rainfall forecast data. This transforms the separate management of precipitation and grouting into a linked closed-loop control, enabling quantitative prediction of water level changes before grouting, preventing the grout from being diluted or washed away by groundwater, and ensuring that the anchor body is in a stable water level environment before initial setting.
[0017] 3. Compared to existing technologies, grouting pressure and pipe extraction speed during grouting construction mainly rely on manual control based on operator experience. This results in large fluctuations in grouting pressure and a lack of quantitative matching between pipe extraction speed and grouting flow rate. Excessive pipe extraction can lead to broken piles or mud / sand inclusions within the anchor body, while excessive extraction wastes grout and poses a risk of casing seizure. Grout interruptions, pipe blockages, and equipment malfunctions during grouting also rely heavily on manual judgment and handling, which can lead to anchor body defects if not addressed promptly. This invention installs pressure sensors at the grouting pump outlet and orifice, using the grouting pressure setpoint as the target for closed-loop control of the grouting pump frequency converter. It automatically switches pressure levels in water-rich gravelly strata and simultaneously calculates the pipe extraction speed in real time using the measured grouting flow rate as input, applying the filling balance formula and sending the calculations to the winch for execution. This ensures that the pipe extraction speed and grouting flow rate are automatically matched and controlled within a safe range. The invention automatically interlocks to stop pipe extraction, records the casing position, and maintains pressure in the event of abnormal events such as grout interruption, pipe blockage, pipe bursting, or power failure. Upon recovery, the casing is reinserted before grouting is replenished. This transforms the control of grouting pressure and pipe pulling speed from manual experience to quantitative closed-loop control, ensuring that the cavity is continuously filled with grout during pipe pulling, reducing anchor body breakage and mud inclusion defects, and improving the uniformity and density of grouting.
[0018] 4. Compared to existing technologies, determining the timing of pipe removal relies mainly on visual observation of the color and concentration of grout overflowing from the borehole, and judging the grout fullness depends primarily on the grout return situation at the borehole and the operator's experience. This lack of objective and quantitative methods leads to inconsistent judgments, easily resulting in premature pipe removal leading to incomplete anchor bodies or insufficient grout volume without timely detection, and making subsequent traceability difficult. This invention incorporates a grout overflow receiving and measuring device at the borehole opening. Using a densitometer and conductivity meter, the density and conductivity of the overflow grout are measured in real time. The device automatically determines that the original water and air in the borehole have been completely replaced by grout before releasing the pipe removal restriction. Simultaneously, the grout fullness is quantitatively determined by the ratio of cumulative grout volume to the theoretical borehole volume. For insufficiently grouted anchors, grout is automatically replenished through pre-embedded secondary grouting pipes before the grout initially sets. In cases of abnormally high grout volume, the device automatically checks the precipitation status and takes corresponding measures. This transforms the judgment of the timing of pipe removal and the evaluation of grout fullness from manual visual inspection to automatic quantitative judgment of objective indicators, improving the consistency and accuracy of the judgment, enabling timely detection and remediation of defective anchor bolts, and forming complete grouting quality data for easy acceptance and traceability. Attached Figure Description
[0019] Figure 1 This is an overall flowchart of the construction method for the double-limb bearing plate type anti-buoyancy anchor bolt of the present invention; Figure 2 This is a diagram of the overall system architecture of the present invention; Figure 3 This is a schematic diagram of the drilling rig and sensor arrangement of the present invention; Figure 4 This is a schematic diagram of the water level monitoring network layout according to the present invention; Figure 5 This is a grading diagram of the grouting safety window period according to the present invention; Figure 6 This is the adaptive adjustment strategy table for drilling parameters of the present invention. Detailed Implementation
[0020] The technical solution of this invention will be further described in detail below with reference to a general engineering scenario. This embodiment takes an underground parking garage project in a city as an example: A two-story basement is constructed, with a foundation bottom elevation of -9.50m. The site, from top to bottom, consists of miscellaneous fill (approximately 2m), silty clay (approximately 3m), a slightly dense to medium dense gravel layer (approximately 6m, with abundant groundwater and a permeability coefficient of 30~50m / d), and a dense gravel layer (anchoring section). The stable groundwater level is approximately 3.0m deep, and 18 wells are installed around the foundation pit for dewatering. 800 anti-buoyancy anchors are designed, with a hole diameter of 180mm, an anchor length of 12m, and the anchor body is made of double-limb Φ25 steel bars. The grouting material is M35 cement mortar mixed with 30% pebbles. The characteristic value of the pull-out bearing capacity of a single anchor is 300kN. It should be understood that this invention is not limited to the above specific values, and those skilled in the art can adjust the relevant parameters according to the actual engineering situation.
[0021] like Figure 2 and Figure 3 As shown, the control system in this embodiment consists of a perception layer, an edge control layer, and a platform layer: the drilling station PLC is installed on the crawler-type hydraulic casing drilling rig (scanning cycle 50ms), the grouting station PLC is installed next to the grouting pump group (scanning cycle 50ms), and the dewatering pump station PLC is installed in the dewatering well control cabinet; the three PLCs are connected to the edge controller (industrial PC, dual-core 2.4GHz or higher, memory not less than 8GB, solid-state drive not less than 256GB, configured with UPS uninterruptible power supply, backup time not less than 30min) via industrial Ethernet or RS485 bus; the edge controller is deployed in a temporary control room at the edge of the foundation pit, responsible for stratum identification and calculation, rolling calculation of grouting window period, and three-station linkage decision-making, and communicates with the field management platform via 4G network, and operates autonomously locally and performs data caching and retransmission when the network is down. Please refer to [link to relevant documentation]. Figure 1 The complete construction cycle of the present invention is described below in the order of steps S1 to S11. The details of the stratum identification algorithm, grouting pressure control algorithm, water level control algorithm and related data processing are given in detail in the corresponding steps and in the following special sections.
[0022] S1: Positioning and Laying Out The surveyor, based on the design drawings and construction survey control network, marks the anchor bolt positions, assigning a unique number to each anchor bolt. At least three fixed control points are installed outside the anti-buoyancy design area, clearly marked with red paint for use during construction for measurement, restoration, and inspection. A total station is used to locate the anchor bolt center, with a deviation not exceeding 50mm. Markings are made using steel bars or bamboo sticks. After the positions are verified by the quality inspector, they are handed over to the drilling team. During construction, the fixed control points and completed anchor bolt positions are re-measured before each shift to prevent position drift due to site disturbance.
[0023] S2: Drilling the casing S21: Drilling Rig Positioning and Sensing Equipment Configuration Tracked hydraulic casing drilling rigs (such as the MGJ-90 model) are used in conjunction with air compressors (such as the IR750 model) for casing drilling. A torque sensor (range 0-5000N) is installed on the drill rig's power head. A speed sensor (photoelectric encoder, 1 rpm resolution) and a feed encoder (1 mm resolution) are installed on the drill frame mast. A triaxial vibration accelerometer (range ±16g, sampling rate 1 kHz) is installed on the mast. A wind pressure transmitter (range 0-1.0 MPa) is installed at the air compressor outlet. A dual-axis inclinometer (accuracy ±0.01°) is installed on the side of the drill frame. Each sensor is connected to the drilling station PLC via a signal conditioning module. The PLC collects data every 50 ms and transmits it to the edge controller via industrial Ethernet. After the drill rig moves to the hole position, the hydraulic outriggers are deployed to level the machine body, and the power head angle is adjusted to the designed drilling angle (vertical or inclined). The inclinometer is checked in real time. The drill bit is selected according to the initial formation assessment, and the drill rod, drill bit and casing are connected. Thread grease is applied to the threads to ensure that the concentricity deviation between the casing and the drill bit is no more than 2 mm.
[0024] S22: Data Acquisition and Feature Calculation During drilling, the drilling rig's PLC synchronously collects torque, rotational speed, drilling footage, casing stroke, triaxial vibration acceleration, and slag discharge air pressure at 50ms intervals. Each 0.1m of drilling generates a raw data frame. Outlier removal and filtering are performed on each raw data frame sequentially, and the following characteristic quantities are calculated: mean torque. (N) m), torque variation coefficient (The ratio of standard deviation to mean reflects the degree of torque fluctuation), advance rate (m / min), effective value of vibration acceleration (m / s²), dominant vibration frequency (Hz, obtained from the vibration time-domain signal via fast Fourier transform), slag discharge air pressure (MPa).
[0025] S23: The process of establishing the stratigraphic identification model and its data sources The stratigraphic identification model is established using a "rule-based + fuzzy logic" approach. The establishment process is divided into four stages: calibration, modeling, online operation, and feedback correction. The data sources for each stage are clearly defined as follows: (1) Calibration Data Acquisition. Before formal construction, three calibration holes were drilled outside the designed borehole area and in a location unaffected by dewatering wells. The calibration holes were of the same diameter, using the same drilling method and tools as the anchor bolt holes, and were drilled to the designed depth. During the drilling process, a geological engineer was present throughout. Based on the "Code for Geotechnical Investigation" GB50021, the stratigraphic category was determined through core sampling and slag return identification. The stratigraphic boundary depth provided in the investigation report was used as the benchmark, and stratigraphic labels were marked for each 0.1m drilling unit. The calibration hole data constituted the original training dataset of the model in this embodiment, of which approximately 80% was used for modeling and 20% was reserved for validation.
[0026] (2) Membership function construction. For each stratigraphic category, the distribution of each characteristic is statistically analyzed, and the inflection points of the trapezoidal membership function are determined using the 10th and 90th quantiles. The form of the trapezoidal membership function is as follows: when or hour ; when hour ; when hour ; when hour .
[0027] The statistical results of the measured data of the calibration holes in this embodiment are shown in the table below:
[0028] For example, the mean torque of medium-density pebbles Inflection point of membership function The other features follow the same pattern.
[0029] (3) Establishment of fuzzy rule base. The rule form is "If the torque is ××, the fluctuation is ××, the advance is ××, the vibration is ××, and the wind pressure is ××, then the unit is the ×× stratum, and the rule weight is ××". This embodiment establishes 30 rules for the above 5 types of formations. The rule weights are determined based on the hit rate on the 20% validation set of the calibration wells (the higher the hit rate, the greater the weight). (Value range: 0.5~1.0). During online determination, the product of the membership degrees of the antecedents is calculated for each rule and multiplied by the weight. The weighted mind algorithm is used to resolve fuzziness, and the category with the highest membership degree is taken as the recognition result. The membership degree of this category is used as the confidence level for this recognition.
[0030] (4) Online operation and confidence level classification. During formal construction, the identification results are updated and the confidence level is output every 0.5m-1m of drilling. When the confidence level is not less than 0.7, the parameter strategy table is automatically executed according to the identification results, such as... Figure 6 As shown; when the confidence level is between 0.5 and 0.7, drilling continues with the current parameters and a verification prompt is sent to the operator; when the confidence level is less than 0.5, the operator is prompted to manually take over and record the data segment. After the hole is completed, it is reviewed by technicians to correct the membership function. The model's self-learning adopts a running data refeeding method. Every 100 holes completed or once a month, the model parameters are updated after verification by technicians. Automatic updates without verification are prohibited to avoid erroneous data contaminating the model. At the same time, after each hole is drilled, an electronic geological columnar section is automatically generated and synchronously pushed to the grouting station PLC (used to fill the safety factor). (and grouting pressure level selection) and precipitation scheduling system (for formation permeability assessment).
[0031] The identification process is illustrated using a single measurement unit as an example: A 0.1m advance unit measured... , , , , , Substituting the membership function and rule base, the membership degree of medium-dense pebbles is calculated to be 0.85, that of dense pebbles is 0.55, and that of slightly dense pebbles is 0.30. Therefore, the cell is determined to be medium-dense pebbles with a confidence level of 0.85, and the system automatically executes the medium-dense pebbles parameter strategy.
[0032] S24: Parameter Adaptive Adjustment Strategy Based on the identification results, the rotation speed, feed force, impact frequency, and air volume are automatically adjusted according to the following strategy table:
[0033] Parameter adjustments employ a step-limiting method: rotational speed variation does not exceed ±5%, feed rate variation does not exceed ±10%, and impact frequency variation does not exceed ±2Hz per control cycle, preventing sudden parameter changes that could cause drill jamming or hole collapse. The operator can press the manual takeover button at any time to resume manual operation; the takeover status is automatically recorded.
[0034] S25: Casing follow-up closed-loop and protection interlock A closed loop is formed using the drill bit advance encoder signal and the casing travel encoder signal: the edge controller presses... The target casing follow-up speed is calculated, and the flow rate of the follow-up mechanism's hydraulic cylinder is matched by the PLC control of the drilling rig station. When the casing lag exceeds the allowable value (0.1m in gravel layers, 0.3m in soft soil layers), the flow rate of the hydraulic cylinder is automatically increased to catch up; if it still exceeds the limit, the drill bit advance speed is automatically reduced to ensure "drilling depth equals protection depth". Simultaneously, the following protective interlocks are implemented: if the torque exceeds the preset upper limit for more than 3 seconds, the interlock reverses slightly or stops with an alarm to prevent drill bit jamming; if the slag discharge air pressure suddenly increases and the slag discharge volume significantly decreases, it is judged as a precursor to hole collapse or blockage, and the air volume is automatically increased, the advance speed is slowed, and the purging frequency is increased; if the borehole inclination deviation exceeds the design allowable value, the machine stops with an alarm to prevent hole deviation. After drilling to the design depth, drilling stops, and the hole depth is checked with a measuring rope. If the deviation is no greater than ±50mm, the hole is ready for cleaning.
[0035] S3: Cleaning the hole The "double-stage borehole cleaning method" is adopted: First, the drilling rig is started idle to agitate the sediment at the bottom of the borehole. Then, high-pressure air at 0.5-0.7 MPa is used to purge for 3-5 minutes, discharging the rock cuttings from the bottom of the borehole along the annular gap between the drill pipe and the casing, until the returned cuttings are basically clean. After cleaning, the thickness of the sediment in the borehole is checked with a measuring rope and a measuring hammer. If it is not greater than 50 mm, it is considered qualified. If it is not qualified, the purging is repeated. After the borehole is cleaned and qualified, the anchoring process should be started immediately, and the interval should not exceed 2 hours to prevent the borehole wall from becoming unstable and backfilling.
[0036] S4: Fabrication of anchor bars and structural support plates The anchor bars adopt a double-limb parallel steel bar structure (2Φ25 in this embodiment, 12.5m in length per bar). After straightening and rust removal, the steel bars are coated with two layers of epoxy resin anti-corrosion coating, each with a dry film thickness of not less than 80μm and a total thickness of not less than 160μm. They are allowed to dry naturally before proceeding to the next step. Φ8 centering supports are welded at intervals not exceeding 2m. Support points are evenly distributed around the perimeter of the steel bars to keep the double-limb steel bars parallel and ensure the anchor bars are centered in the anchor hole. The grouting pipe uses PE pipe (DN25mm), fixed with binding wire between the steel bars. The pipe end is 100mm-200mm from the bottom of the hole, and its length meets the requirement of grouting from the bottom of the hole upwards. For important projects, a DN20 secondary grouting pipe is pre-embedded. The bottom of the secondary grouting pipe is 0.5m-1.0m from the bottom of the hole, and the top is protected with a plug. Both the primary grouting pipe and the secondary grouting pipe should be temporarily sealed at the hole opening to prevent foreign objects from entering.
[0037] The support plate is constructed from 20mm thick Q345-B steel plate in a stepped structure, with an outer diameter 40mm-60mm smaller than the hole diameter (120mm-140mm in this embodiment). A through hole is provided in the center to mate with the double-legged reinforcing bars. The processing requirements are as follows: the installation positioning lines of the support plate are engraved on the reinforcing bars, with a deviation of no more than 2mm; the deviation between the center of the support plate and the center of the anchor bar is no more than 1mm; the horizontal deviation of the surface of the support plate after installation is no more than 1mm / m; the support plate and the top of the anchor bar are firmly welded together using double-sided fillet welds, with the weld seam continuously and fully welded around the anchor bar, the weld seam height is no less than the thickness of the support plate (20mm), the weld seam width is no less than 8mm, and there must be no defects such as slag inclusions, porosity, or cracks. Welding is performed by a certified welder; after welding, the weld slag is cleaned, the surface is ground smooth, and two coats of epoxy resin coating are applied to the weld seam and surrounding area. Quality inspectors meticulously check the center deviation, flatness, fixing firmness, and weld quality of each support plate. They also randomly sample 5% to 10% of the support plates for fixing strength and weld tensile strength testing. Any plates failing to meet the standards are rectified and re-checked; unqualified support plates are strictly prohibited from proceeding to the next process. The structural support plate is located at the bottom of the anchor bar. After grouting, it forms an end-bearing step with the anchor body, allowing some of the pull-out force to be transferred to the surrounding soil and rock through end bearing, thus enhancing the overall pull-out resistance of the anchor rod.
[0038] S5: Lower the anchor bar The anchor bars can only be lowered into the hole after their fabrication quality and length have been inspected and approved by the supervisor. Lowering is primarily done manually, supplemented by mechanical placement for longer sections. Lowering should be done at a uniform and slow speed to prevent collision with the hole wall or scratching of the anti-corrosion coating. A centering bracket should be used to center the anchor bar in the anchor hole. After lowering it into place, the exposed length at the hole opening should be checked (exposed length = total anchor bar length). (Drill hole depth, error not exceeding 50mm) and confirm that the rod has reached the bottom of the hole. If grouting cannot be performed immediately after lowering, the hole opening should be temporarily covered to prevent debris from falling in.
[0039] S6 precipitation and grouting linkage S61: Water Level Monitoring Deployment and Data Acquisition like Figure 4 As shown, submersible pressure level gauges (range 0~20m, accuracy ±0.1%FS) are installed in each dewatering well, and radar level gauges are installed simultaneously in some wells for comparison. In the grouting operation area, observation wells (which can also be used as dewatering observation wells) are arranged in a grid of approximately 50m×50m within a 3m radius around the grouting holes, and the same type of level gauges are installed. The level gauges collect data in 1 second, and after local preprocessing by the dewatering pump station PLC, the data is uploaded to the edge controller to achieve continuous water level data acquisition at the second level. The edge controller automatically generates a water level trend curve by taking the median value in a 1-minute window. The original manual measurement method of "once per hour, and once every 2 hours after stabilization" is retained as a rope verification system for each shift. The data is compared with the instrument data, and the instrument is calibrated when the deviation exceeds 20mm, forming a dual-track data system of "automatic acquisition + manual verification".
[0040] S62: Rolling Calculation of Grouting Safety Window Period like Figure 5 As shown, according to the formula The rolling calculation of the grouting safety window period is given by the formula: This represents the predicted highest groundwater level during the grouting and initial setting period; The most recent measured water level elevation in the observation well before formal grouting (the median value over 1 minute) is used. The method for determining the rate of rise of water level during the pump shutdown recovery phase is as follows: take a sample set of linear fitting slopes of the continuous rise of water level after pump shutdown in the area on the current day and the previous day (duration not less than 30 minutes), take the upper quartile value of the sample and multiply it by a safety factor of 1.1. The arithmetic mean of the grouting time of the five most recently completed anchor bolts in the area is used; if there is no data for the first area, 30 minutes is taken. The expected curing time for the slurry to reach its initial setting strength is determined by linear interpolation of laboratory calibration data based on the slurry mix ratio and the actual temperature measured on the day, and is updated daily (the calibration method and data are described in the algorithm establishment section below). To determine the upper limit of the safe water level, the elevation is taken as 500mm below the foundation bottom elevation. In this embodiment... .
[0041] The calculation is performed every 10 minutes during the window period, and a mandatory update is made before grouting begins for each anchor bolt. A safety margin is used. The grouting window period is divided into three levels: Green color, grouting is permitted; If the indicator is yellow, the system will issue a warning, automatically replenish rainfall, and limit the grouting time for a single section (queue grouting). If the measured water level is 400mm below the foundation bottom, the indicator will be red. This will trigger an interlock to suspend grouting and prohibit any new grouting operations. The interlock can only be lifted after the water level has been manually verified and confirmed to have recovered.
[0042] Here's an example: At 10:00 AM one morning, the measured water level in the observation well... (i.e., 0.60m below the base); the sample rise rates of the pump stoppage and recovery phase on the current day and the previous day were 0.018, 0.021, 0.019, and 0.025 m / h, respectively, with the upper quartile being 0.023 m / h. Multiplying by 1.1 gives... ; The average grouting time of the five most recent anchor bolts was 40 minutes (0.67 hours). Based on the daily temperature of 28℃, a time interval of 4.5 hours is taken. , The system was flagged as red, and automatically interlocked to suspend grouting and increase the frequency of the variable frequency dewatering wells in that area by 5 Hz. After 20 minutes, the water level in the observation well dropped to [a certain value]. (0.82m below the base), recalculate , If the result is green, the system prompts to resume grouting, which is then executed after manual confirmation. This example demonstrates that the present invention upgrades water level prediction from experience-based judgment to quantitative rolling calculation, allowing for prediction of whether the water level will exceed the limit before grouting, achieving "calculate before grouting, stop if the limit is exceeded".
[0043] S63 Rainfall Pumping Station Intelligent Pump Control For variable frequency dewatering pumps, the water level should be 500mm below the foundation bottom (i.e. PID control is applied to the setpoint, with a control dead zone of ±25mm. Conservative PI parameters are used (tuning process described below). The output frequency is limited to 25-50Hz. The minimum pump running time is 10 minutes, the minimum downtime is 20 minutes, and the number of start-stop cycles does not exceed 6 times / hour. For the constant-speed dewatering pump, intermittent pumping mode is used, with a baseline of "pumping for 30 minutes and stopping for 60 minutes," and the duty cycle is automatically adjusted according to the water level band. The duty cycle is set at the upper limit of 80%. Take 50% when the depth is between 0.45 and 0.55 m. Take 30% when the depth is between 0.55 and 0.60 m. The lower limit is set to 20%. Dual-limit control logic is implemented: when the water level is higher than the elevation 450mm below the foundation bottom (… Start or increase the frequency of pumping when the water level is 600mm below the foundation bottom surface; Reduce pumping frequency when the water level is 800mm below the foundation bottom. Pumping will stop when the water level is too deep and will automatically resume once the water level rises back to the target range, consistent with the construction method's requirement to "stop pumping immediately when the water level is too deep".
[0044] S64: Water Level Anomaly Detection The system distinguishes between "mandatory changes" and "non-mandatory changes": water level changes within 15 minutes of receiving pump start / stop or frequency converter commands are marked as mandatory changes and are not included in the anomaly criteria to avoid false alarms for normal pump control actions. During grouting, if the water level change rate exceeds 0.10 m / 10 min without pump commands, the system issues a yellow warning and pushes an investigation work order; if it exceeds 0.20 m / 10 min, a red interlock immediately stops grouting and pushes an investigation work order. The investigation includes issues such as accidental start / stop of dewatering wells, leakage in the foundation pit retaining structure, and abnormal groundwater recharge. The water level change rate is calculated using a 10-minute sliding window linear regression slope, and median filtering is used to suppress ripples and instrument vibration. During grouting pauses, only warnings are recorded, and interlocks are not triggered.
[0045] S65: Rainfall forecasting and coordination with surrounding precipitation wells The system integrates short-term (2-hour) and 24-hour meteorological forecasts: when the short-term forecast indicates moderate to heavy rain, the water level is pre-lowered to 700-800 mm below the foundation 1-2 hours in advance to allow for rainfall infiltration; the 24-hour forecast is used for scheduling the grouting window the following day; after the rain, the water level automatically resumes normal control once it falls back to the target zone. Each rainwater well's PLC shares its start / stop status and frequency via an edge controller, and rainwater wells within the same influence area stagger their start / stop times (mutually exclusive time windows not less than 20 minutes) to avoid multiple wells stopping simultaneously and causing a rapid collective rise in water level; grouting operations for anchor bolts within a 10-meter radius of the rainwater well are automatically scheduled to be performed during the well's intermittent pumping stop period, with the scheduling rule being "grouting the farthest well first, and anchor bolts closer to the well in the pumping stop period," and the scheduling results are pushed to the dashboard and work teams.
[0046] S66: Two-way linkage closed loop for precipitation and grouting The grouting station monitored the ratio of cumulative grouting volume to theoretical borehole volume. When abnormal grout loss occurs, the system automatically prompts for checking the dewatering operation status and reduces the frequency of the dewatering pumps in that area or switches them to intermittent pumping mode (this action must not exceed the safety baseline of the foundation pit, which is 450mm below the foundation bottom); if the water level is red or there is an abnormal interlock, the grouting will be stopped immediately in the opposite direction. This forms a two-way linkage closed loop of "grouting-dewatering", replacing the passive "complete pump stoppage" and "blind recovery" in the original construction method.
[0047] S7: Grouting and pipe pulling S71: Preparation of slurry with added pebbles After the anchor bars are installed and before grouting, 30% by mass of pebbles (5mm-10mm in diameter with less than 3% mud content) are added to the anchor holes. The pebbles must be rinsed, dried, and measured before addition. Grout preparation: The mix proportion is determined according to the construction drawings and test results. Cement mortar is used and pure cement slurry is not allowed. The maximum water-cement ratio is 0.50 (in this embodiment, the mix proportion is cement:medium sand:water = 1:2.0:0.50; the water-reducing agent is determined by testing). The mixing time is no less than 5 minutes. The grout is used immediately after mixing and must be used before initial setting. Expired, segregated, or lumpy grout is strictly prohibited. The mixed grout is filtered through a 5mm filter screen and then sent to a grout storage tank for later use. The storage tank is equipped with dedicated mixing equipment and maintained at a slow stirring speed to prevent grout sedimentation. The density of each batch of grout is measured using a hydrometer (1.95-2.05 g / cm³ in this embodiment) and recorded. This density value is used as the reference density input controller for determining the timing of pipe removal.
[0048] S72: Grouting pipe connection and pump test Connect the grouting pump outlet to the top of the grouting pipe, ensuring the joint is well-sealed and leak-free. Start the grouting pump for a trial run, purge air from the pipeline, and check the pump pressure and pipeline flow. The pumped mortar pressure should not be less than 2 MPa, and the pressure should be adjusted according to the pumping distance (approximately 0.2 MPa increase for every 100m horizontal distance) to ensure construction quality.
[0049] S73: Grouting pressure closed-loop control and pipe pulling speed matching Hardware configuration: Variable frequency plunger grouting pump (rated pressure 6.3MPa, maximum flow rate 60L / min, 0-50Hz frequency conversion), one pressure transmitter (range 0-10MPa) at the pump outlet and one at the orifice, wear-resistant electromagnetic flowmeter (range 0~100L / min, accuracy ±0.5%, ceramic-lined type for mortar media), servo winch (rated traction force 30kN, equipped with absolute encoder and power failure brake).
[0050] Pressure closed loop (main loop): The grouting pump frequency converter is PID controlled with the grouting pressure setpoint as the target. The typical formation setpoint is 2MPa-3MPa (2.5MPa in this embodiment). When the formation identification result (S2) and water level monitoring result (S6) jointly determine that it is a water-rich pebble layer, it automatically switches to the 3MPa-5MPa range (4.0MPa in this embodiment), with a control dead zone of ±0.2MPa. The PID output is limited and anti-integral saturation processing is adopted. A hard upper limit of 5.0MPa pressure is set, and a 5.5MPa safety valve is configured. When the pressure drops by more than 1MPa within 10 seconds, it is determined to be a pipe rupture, and grouting and pipe pulling are stopped immediately to prevent high-pressure grout from injuring people.
[0051] Tube pulling speed follower (slave loop): Based on the measured flow rate of the pump outlet flow meter as input, the speed is adjusted according to the formula every 100ms~500ms. The tube extraction speed is calculated and sent to the servo winch for execution. The speed command is then processed by ramp limiting to ensure that the acceleration does not exceed [a certain value]. In the formula: The grouting flow rate is the actual measured value from the pump outlet flow meter, taken as the sliding average value from 1s to 3s, in units of... ; The diameter of the hole is in meters (m), with the outer diameter of the casing as a conservative value. To ensure sufficient safety margin, a value of 1.15-1.20 is generally used for strata, and 1.25-1.30 is used for water-rich pebble layers or active seepage zones. The value is automatically recommended based on strata identification results and feedback from R value loss, and takes effect after manual confirmation. The output speed is limited to 0.5 m / min-1.0 m / min. When the calculation speed is below 0.5 m / min, the interlock stops the tube pulling and issues an insufficient flow alarm; when the calculation speed is above 1.0 m / min, it is clamped at 1.0 m / min and the pump speed is automatically reduced by the pressure closed loop, and the two control loops converge naturally.
[0052] Here is a calculation example: This embodiment , Actual flow meter measurement ,but Within the 0.5~1.0 m / min limit zone, the winch is lifted at 0.629 m / min. To facilitate pump selection and initial parameter setting, a flow requirement table calculated using the formula is provided:
[0053] In this embodiment, the object being lifted is the protective casing. Grout is injected from the bottom of the hole upwards through a PE grouting pipe fixed to the anchor rod. The cavity vacated on the casing is continuously filled by the grout under pressure, thereby ensuring the integrity and diameter of the anchor body and preventing secondary hole collapse during the pipe pulling process.
[0054] S74: Automatic determination of tube removal timing An overflow receiving trough (with a volume not less than) is installed at the orifice. The overflow slurry, after being filtered through a 3mm sieve, flows into a measuring tank. A tuning fork densitometer (range 0-3g / cm³, accuracy ±0.01g / cm³) and a four-electrode conductivity meter (range 0-100mS / cm) are installed in the measuring tank. The timing for pipe removal is determined by simultaneously meeting the following conditions: ① The overflow switch at the borehole opening is triggered (slurry overflow); ② The overflow slurry density reaches at least 97% of the reference density of the injected slurry and lasts for at least 10 seconds (average value within the time window is taken to prevent instantaneous pulse interference); ③ The relative deviation between the conductivity of the overflow slurry and the conductivity of the injected slurry is no greater than 20% (the conductivity of groundwater and cement slurry differs significantly; conductivity serves as a redundant auxiliary criterion to prevent misjudgment due to single-point failure of the densitometer). When all three conditions are met simultaneously, it is determined that the original water and air in the borehole have been completely replaced by the slurry. The pipe removal restriction is automatically released, and the protective casing is allowed to be lifted only after double confirmation via video and instrument readings, replacing the original method of visually judging the overflow slurry concentration.
[0055] S75: Grouting interruption, pipe blockage, fault interlocking and recovery Event determination: The measured traffic volume is lower than the lower limit of traffic volume (in this embodiment) ), and the grouting pressure is lower than the lower pressure limit (1.0 MPa), it is determined as grout break; when the grouting pressure exceeds the upper pressure limit (4.8 MPa) and the flow rate is lower than the lower flow limit, it is determined as pipe blockage; when power failure or network disconnection occurs, power failure protection is activated. When any of the above events occurs, the system automatically performs interlocking actions: immediately stop pulling out the pipe, record the current position of the wall-protecting casing and the depth of the grouting pipe (written into the power-failure holding register to ensure no data loss upon power failure), stop the grouting pump and maintain pressure, trigger audible and visual alarms and push alarm information. When resuming grouting, first insert the wall-protecting casing back to 0.5m below the break point, re-grout at a low flow rate (about 1 / 3 of the rated flow rate) to discharge the accumulated air in the hole, and restore the automatic interlocking control after manual confirmation that the grout is continuous and the pressure is normal. The recovery operation must be manually confirmed, automatic recovery is strictly prohibited to prevent pressure buildup or secondary accidents.
[0056] S76: Filling degree judgment and secondary grouting The ratio of the cumulative grouting amount to the theoretical hole volume is used to judge the grouting fullness, where the theoretical hole volume: ; In the formula, is the effective length of the anchor rod (m), is the hole-forming diameter (m), is the converted cross-sectional area of the double-leg steel bars, grouting pipe, structural support plate, etc.( ). In this embodiment: , , cross-sectional area + cross-sectional area of PEDN25 pipe + the converted cross-sectional area of the centering bracket and the support plate is approximately , then .
[0057] , where is the cumulative value of the flowmeter minus the pre-filling amount of the pipeline (in this embodiment, subtract ). The termination judgment conditions are: all the wall-protecting casings are pulled out of the hole opening, the grout at the hole opening is full and overflows, no bubbles emerge, and , when the four conditions are met at the same time, the grouting is judged to be qualified and the grouting is stopped. When , it is judged that the grouting is not full, and automatic supplementary grouting is carried out through the pre-embedded secondary grouting pipe before the initial setting of the grout, and the supplementary grouting amount is not less than ; when If abnormal grout loss is detected, the system will automatically prompt to check the dewatering operation status (linkage S6). The dewatering pump in that area will reduce its frequency or switch to intermittent pumping mode before continuing grouting or supplementing grouting. The system will also verify whether the grout overflow density at the borehole opening consistently meets the standard to prevent grout loss along the collapsed borehole channel. For critical projects, before the initial grout setting, grout will be added at a pressure of 0.5MPa~1.0MPa through a pre-embedded secondary grouting pipe until grout overflows again at the borehole opening. The amount of grout added will be recorded to improve grout density.
[0058] S8: Sealing treatment After grouting is completed, observe the borehole opening for no less than 30 minutes. If there is any depression or grout loss at the opening, replenish the grout promptly to ensure the opening is full. Seal the borehole opening with plain concrete or cement mortar to a height of no less than 100mm. After sealing, smooth and polish the opening to prevent rainwater infiltration or grout loss. When grouting at night, clean any grout-contaminated subgrade before the cement mortar initially sets.
[0059] S9: Maintenance After grouting is completed, the anchor bolts are cured for a period that meets design requirements and relevant specifications. During curing, the grout surface must be kept moist by covering it with plastic film or straw mats to maintain moisture. Disturbing the anchor bolts is strictly prohibited to avoid affecting their bond strength and pull-out resistance. Water level control during curing must be continuously implemented according to S6 standards to ensure that the water level does not rise below 500mm below the foundation bottom before the grout initially sets, preventing the undried grout from being diluted or carried away by flowing groundwater.
[0060] S10: Anchor Bolt Inspection Anchor bolt inspection shall be carried out in accordance with relevant standard documents: basic tests shall be conducted on all types of anchor bolts; the number of pull-out acceptance tests shall not be less than 5% of the total number of anchor bolts of the same type in each unit project (sub-unit project), and shall not be less than 5 bolts; the ultimate bearing capacity value of the basic test results shall not be less than 2.0 times the design value of the anchor bolt axial force; when the test range is greater than 30%, the number of tests shall be increased, and a 95% guarantee probability shall be met; when the number of anchor bolts of the same type exceeds 10 and does not meet the design requirements, the design shall be modified in a timely manner. The intelligent system automatically generates an electronic quality file for each anchor bolt (including borehole electronic geological columnar section, drilling parameter curves, grouting pressure / flow rate / cumulative grouting volume / pipe pull-out speed curves, grout density curves, water level curves, and filling ratios). Records of abnormal events and their handling serve as supplementary data for acceptance testing site selection and quality assessment.
[0061] S11: Construction of Waterproof Anchor Bolt Joints When pouring the cushion layer at the anchor bolt location, a PVC DN350 pipe is used as a pre-reserved hole and fixed at the anchor bolt location before pouring the cushion layer. After the cushion layer is poured, a groove is cleaned out at the anchor bolt location, with the deepest part of the groove being 175mm. M10 cement mortar is used for leveling, with a leveling layer thickness of 25mm. After the cement mortar leveling layer dries, waterproof sealant is filled into the groove, and water-swellable tape is applied to the surface of the reinforcing steel. The waterproof sealant is then filled at the junction of the anchor bolt body and the foundation to form a flexible waterproof joint, eliminating micro-cracks caused by the difference in thermal expansion coefficients and inconsistent stress deformation between the bolt body and the base slab concrete, and preventing water seepage.
[0062] The above S1~S11 constitute a complete construction cycle for a single anti-buoyancy anchor. When constructing multiple anchors, the platform organizes the flow operation according to the S6 window period schedule.
[0063] To enable those skilled in the art to directly reproduce the data processing steps of this invention, the processing methods for each sensor data are described in detail below: (1) Sampling and filtering. The sampling period for grouting flow rate and pressure signals is 50ms: first use Outliers are removed using a criterion (a sliding window of 100 points is used; samples deviating from the window mean by more than three times the standard deviation are removed and replaced with the window mean). A 1-3 second moving average is then performed to smooth the results for control calculations. The water level signal sampling period is 1 second: it is first filtered by median to suppress wave and instrument vibration, then the median is taken and stored within a 1-minute window for use in trend curve and window period calculations.
[0064] (2) Calculation of rate and rate of change. The rate of change of water level is calculated by linear regression slope using a 10-minute sliding window, with an output resolution of 0.01m / 10min; the sample of the rising rate during the pump stop recovery period is taken from the linear fitting slope of the "continuous rise of water level after pump stop (not less than 30min)", with one sample for each period.
[0065] (3) Dead zone and amplitude limit. Pressure control dead zone ±0.2MPa; water level control dead zone ±25mm; pipe pulling speed acceleration limit. The step limits for speed, feed force, and impact frequency are ±5%, ±10%, and ±2Hz, respectively; the inverter output limit is set according to the rated parameters of each pump. Dead zone and limit are used to prevent frequent operation of the actuator and sudden parameter changes.
[0066] (4) Sensor abnormality handling. If the encoder jumps more than 50mm between adjacent cycles, it is judged as interference and is removed; if the sensor is over-range or disconnected, the controller will issue an alarm and automatically downgrade the process to semi-automatic or manual, and execute it according to the original manual procedure. Interlocking bypass must be authorized by the technical person in charge and the record must be kept.
[0067] (5) Data storage. The edge controller stores 7 days of raw data locally in a ring, and caches and retransmits the data when the network is down; the platform permanently archives the data, packaging each hole's data with the hole number as an index to form an electronic quality archive.
[0068] In this embodiment, the process of establishing the control algorithm and the data source are as follows: (1) Stratigraphic identification model: The establishment process and data sources are shown in S2.3. The data sources are the stratigraphic boundaries in the exploration report, the core samples from 3 calibration holes and the return residue labels (0.1m unit), and the manual verification feedback during construction. The membership function uses the 10% / 90% quantile method to determine the inflection point. The rule weights are determined according to the hit rate of the validation set. The model update must be reviewed by technical personnel.
[0069] (2) PID parameter tuning for grouting pressure: During the trial pumping stage before formal construction, an open-loop step test was conducted on an anchor bolt hole that had been anchored and was ready for grouting with clean water: When the pump frequency converter was running stably at 30Hz, the orifice pressure was stable at 1.5MPa; after a step increase of 10Hz, the pressure rose according to the first-order inertia and stabilized at about 2.7MPa. The object gain was obtained by fitting. Time constant Pure lag The desired closed-loop time constant is determined according to the internal model control (IMC) rule. , thus obtaining proportional gain Integral time The differential time is 0; after fine-tuning with two test anchors, the parameters are solidified. The pressure setting value switching (2-3MPa range and 3-5MPa range) adopts a ramp transition (0.2MPa / s) to prevent switching impact.
[0070] (3) PID parameter tuning for water level: The water level in the dewatering well is a high-inertia, high-lag object, so conservative PI parameters are adopted. A step test was conducted on a single well during the trial operation: the water level drop rate was approximately 2.5 cm / h when the frequency converter was running stably at 37 Hz, and the recovery rate was approximately 3.0 cm / h after the pump was stopped. Based on this, the proportional gain was selected. Integral Time The output frequency is limited to ±15Hz, and after manual and automatic fine-tuning is performed in a 30-minute test cycle, the output frequency is solidified.
[0071] (4) Initial setting time calibration of slurry: The initial setting time was determined by the penetration resistance method at three temperature levels of 20℃, 25℃ and 30℃ according to the mix proportion of this embodiment. The actual measured times were 6.2h, 5.1h and 4.3h respectively. The time was determined by linear interpolation based on the average temperature of the day. The data is updated daily and comes from laboratory calibration results and on-site temperature records.
[0072] (5) Establishment of anomaly detection thresholds: Take the water level data of the precipitation system during the trial operation for 3 days, and calculate the 99th percentile value of the non-command 10-minute water level change as 0.06m / 10min. The yellow threshold is 0.10m / 10min (about 1.7 times) and the red threshold is 0.20m / 10min (about 3.3 times), leaving a margin between false alarms and missed alarms. The thresholds can be reviewed and adjusted quarterly based on the operation data.
[0073] (6) Safety factor for fullness Churn determination threshold: The values are taken as 1.15-1.20 for general strata and 1.25-1.30 for water-rich pebble layers. These values are derived from statistics on the grouting volume and theoretical borehole volume of completed projects. If loss is not considered in water-rich pebble strata, the actual grouting volume required is about 1.2 to 1.3 times the theoretical volume. The abnormal grouting threshold is determined based on the distribution of abnormal grouting volume in the same diameter holes.
[0074] This invention uses the construction of anti-buoyancy anchors in water-rich pebble strata as a typical application scenario. However, those skilled in the art can apply the same method to the construction of anti-buoyancy anchors or soil anchors in general strata, simply by adjusting the S2 strategy table according to the stratum conditions. The parameters such as grouting pressure level and value are sufficient. The conventional procedures involved in each step of this invention (such as positioning and layout, hole cleaning, curing, inspection, waterproofing details, etc.) are not modified and are performed in accordance with current national standards, industry standards, and design requirements. The above embodiments are merely preferred embodiments of this invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.
Claims
1. A construction method for a double-limb bearing plate type anti-buoyancy anchor bolt, characterized in that: Includes the following steps: S1 Positioning and Laying Out: Determine the anti-buoyancy anchor bolt hole positions according to the design drawings and number them. Set fixed points outside the anti-buoyancy design range. Use a total station to locate the center of the anchor bolt hole. The hole position deviation should not exceed 50mm. S2 casing drilling: A crawler-type hydraulic drilling rig is used for casing drilling. During the drilling process, the drilling rig torque, feed rate, drill rod vibration and air lift slag removal pressure parameters are collected in real time. The type of stratum being drilled is identified online, and the drilling rig speed, feed force and impact frequency are automatically adjusted according to the identification results. The casing follow-up speed is automatically matched. The drilling speed in soft soil is 2m / min~3m / min, and the drilling speed in gravel layer is 0.5m / min~1m / min. After drilling to the design depth, the hole depth is checked with a measuring rope. The depth deviation is no more than ±50mm. S3 Hole Cleaning: First, start the drilling rig and run it idle, then blow it with high-pressure air for 3 to 5 minutes to remove rock cuttings from the bottom of the hole, so that the thickness of the sediment in the hole is no more than 50 mm. S4 Anchor Bar and Structural Support Plate Fabrication: The anchor bars are made of double-leg parallel steel bars with anti-corrosion coating on the surface. Centering supports are welded at intervals not exceeding 2m. Stepped structural support plates are welded at the bottom of the anchor bars. The structural support plates are made of 20mm thick Q345-B steel plates. The center deviation between the support plate and the center of the anchor bar is not greater than 1mm. Double-sided fillet welding is used for continuous full welding. The weld height is not less than the thickness of the support plate and the width is not less than 8mm. Anti-corrosion coating is applied to the weld. S5 Anchor Bar Placement: After the anchor bar fabrication quality and length have been inspected and approved by the supervisor, it is placed into the hole. The centering bracket is used to center the anchor bar in the anchor hole. The grouting pipe is a PE pipe and extends to the bottom of the hole. S6 Dewatering and Grouting Linkage: Level gauges are installed in observation wells within a 3m radius of the dewatering well and grouting hole to continuously collect water level data, according to the formula... The rolling calculation of the grouting safety window period is given by the formula, where, The predicted highest groundwater level during grouting and initial setting. This is the most recent measured water level before grouting. The measured average rise rate during the pump shutdown and recovery phase. The estimated grouting time for a single anti-buoyancy anchor rod. The estimated curing time for the grout to reach its initial setting strength. The upper limit of the safe water level elevation is 500mm below the foundation bottom surface; the groundwater level in the grouting area is controlled within 500mm±50mm below the foundation bottom surface. If the water level rises or falls suddenly during the grouting process, grouting is immediately suspended and resumed after the water level stabilizes. S7 Grouting and Pipe Pulling: Before grouting, add 30% by mass of pebbles (5mm-10mm in diameter) to the anchor hole with a mud content of less than 3%; prepare cement mortar according to the design mix ratio, with a water-cement ratio not exceeding 0.50, and a mixing time of not less than 5 minutes; after filtration, send it to a grout storage tank equipped with a mixing device for later use; start the grouting pump for trial operation, with a pumping pressure not less than 2MPa; inject the grout from the bottom of the hole, and use a pressure sensor to provide real-time feedback for frequency conversion closed-loop control of the grouting pump, stabilizing the grouting pressure at 2MPa-3MPa, automatically switching to a pressure range of 3MPa-5MPa when the stratum is a water-rich pebble layer; when the grout overflows from the hole and the concentration of the overflowing grout is consistent with the concentration of the injected grout, start lifting the casing, grouting and pulling the casing simultaneously, with the pulling speed calculated according to the formula. Real-time calculation and automatic matching with grouting flow rate, where, For the tube removal speed, The grouting flow rate per unit time The diameter of the hole. To ensure a sufficient safety margin, the pipe pulling speed is controlled within the range of 0.5m / min to 1.0m / min to ensure that the grouting pipe is always filled with grout. If grout interruption, pipe blockage, or equipment failure occurs during grouting, the pipe pulling will be automatically stopped and the pipe position will be recorded. Grouting will be resumed after the fault is cleared. Grouting will stop when the pipe is pulled out of the borehole and the grout overflows fully without any air bubbles. For important projects, grouting will be supplemented through a pre-embedded secondary grouting pipe before the grout initially sets. S8 Sealing Treatment: After grouting is completed, replenish grout to the recessed or lost grout areas at the borehole opening, and seal the borehole with plain concrete or cement mortar. The sealing height should be no less than 100mm and smoothed out. S9 maintenance: After grouting is completed, cover with plastic film or straw mat to keep the anchor bolts moist and maintain their moisture. During the maintenance period, the anchor bolts must not be disturbed. S10 Anchor Bolt Inspection: A pull-out acceptance test shall be conducted on no less than 5 bolts, representing no less than 5 bolts of the same type. The ultimate bearing capacity shall be no less than 2.0 times the design value of the anchor bolt axial force. S11 Anchor Waterproofing Node Construction: When pouring the cushion layer at the anchor rod location, a PVC DN350 pipe is used to reserve holes. After the cushion layer is poured, a groove with a maximum depth of 175mm is cleaned out. M10 cement mortar is used to level the groove to a depth of 25mm. After the leveling layer dries, waterproof sealant is filled into the groove. Water-swellable tape is applied to the surface of the reinforcing steel, and waterproof sealant is filled at the junction of the anchor rod and the foundation.
2. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: In step S2, a torque sensor and a speed sensor are installed on the drill rig's power head, and a footage encoder and a casing stroke encoder are installed on the mast. A triaxial vibration sensor, an air-lift slag discharge pressure transmitter, and an inclination sensor are also installed. The torque, footage rate, vibration spectrum, and slag discharge pressure are input into the edge controller. A combination of rule-based and fuzzy logic is used to identify the formation type online. The identification results are updated and confidence levels are output every 0.5m to 1m of drilling, generating an electronic geological columnar section of the borehole. Based on the identified formation type, the drill speed, feed force, impact frequency, and air volume are automatically adjusted according to a preset strategy table, using a step-limiting method. A closed loop is formed between the drill bit footage signal and the casing stroke signal to automatically match the casing follow-up speed. In pebble layers, the casing follows the drill bit synchronously with an allowable lag of no more than 0.1m, and in soft soil layers, the allowable lag is no more than 0.3m.
3. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: The rules for identifying the strata type and adjusting parameters in step S2 are as follows: When the torque is low and stable, the advance rate is high, the vibration amplitude is small, and the slag discharge air pressure is low, it is determined to be soft soil or sand layer. High speed, small feed force and closing or reducing the impact frequency are adopted; when the torque is moderately large and fluctuates, the advance rate is moderate, the high frequency vibration is obvious, and the slag discharge air pressure is increased, it is determined to be medium-dense to dense gravel layer. Medium-low speed, medium feed force, high impact frequency and increased air volume are adopted. When torque spikes, feed rate drops sharply, vibration is intense, and slag discharge air pressure increases, it is determined to be cemented pebbles or isolated rocks. Low speed, small feed force, maximum impact frequency, and increased air volume are adopted. When the torque exceeds the preset upper limit for more than 3 seconds, the interlock reverses slightly or stops with an alarm. When the slag discharge air pressure rises suddenly and the slag discharge volume decreases, the air volume is automatically increased, the feed rate is slowed down, and the purging is intensified. When the borehole inclination angle deviation exceeds the allowable value, the machine stops with an alarm.
4. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: In step S6, an immersion-type pressure level gauge or radar level gauge is installed in the dewatering well to achieve continuous water level data acquisition at the second level and automatically generate a water level trend curve; according to the formula A rolling calculation is performed every 10 minutes or before grouting begins for each anchor bolt, wherein... Take the upper quartile of the rate of rise in the water level recovery phase after the pump is stopped, multiply by a safety factor of 1.
1. Take the average grouting time of the last 5 anchor bolts. The initial setting time calibrated based on the slurry mix ratio and measured temperature is updated on a rolling basis; based on the safety margin... The grouting window period is divided into three levels: When the screen is green, grouting is permitted; When the temperature is yellow, an early warning is issued, precipitation is automatically replenished, and the estimated grouting time is shortened. If the measured water level is 400mm below the foundation bottom, the indicator will be red, and grouting will be interlocked and suspended, and new grouting operations will be prohibited.
5. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: In step S6, the variable frequency dewatering pump is PID controlled with a setpoint of 500mm below the foundation bottom surface, with a dead zone of ±25mm; the constant speed dewatering pump adopts an intermittent pumping mode of 30 minutes of pumping and 60 minutes of stopping, and automatically corrects within a duty cycle range of 20%~80%; when the water level is higher than 450mm below the foundation bottom surface, pumping is started or frequency increased; when the water level is lower than 600mm below the foundation bottom surface, pumping is reduced; when the water level is lower than 800mm below the foundation bottom surface, pumping is stopped, and automatically resumes after the water level rises back to the target range; grouting. During this period, when there is no pump start / stop command and the water level change rate exceeds 0.1m / 10min, a yellow warning is issued and an investigation work order is pushed out. When it exceeds 0.2m / 10min, the grouting is immediately stopped by interlock and an investigation work order is pushed out. Rainfall forecast data is connected, and the water level is pre-dropped to 700mm-800mm below the foundation bottom surface 1-2 hours in advance when a short-term or moderate rain warning is issued. The operation status is shared with adjacent dewatering wells, so that dewatering wells in the same affected area can start and stop at different times. The grouting operation of anchor bolts within 10m around the dewatering well is arranged to be carried out during the intermittent pumping period of the dewatering well.
6. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: In step S7, pressure sensors are installed at the grouting pump outlet and orifice, respectively. The grouting pump frequency converter is controlled via PID closed-loop control with the grouting pressure setpoint as the target. The typical formation setpoint is 2MPa~3MPa. When the formation identification result and water level monitoring result jointly determine it to be a water-rich gravel layer, the control automatically switches to the 3MPa~5MPa range. A 5.0MPa hard upper limit pressure is set, and a 5.5MPa safety valve is configured. If the pressure drops by more than 1MPa within 10 seconds, it is determined to be a pipe rupture, and grouting and pipe removal are immediately stopped. Using the measured flow rate from the pump outlet flow meter as input, the pressure is adjusted every 100ms~500ms according to the formula... The calculation of the tube pulling speed is sent to the servo winch for execution. The speed command is processed by ramp limiting, and the acceleration is not greater than 0.5m / min². When the calculated speed is lower than 0.5m / min, the tube pulling is stopped by interlock and an insufficient flow alarm is issued. When the calculated speed is higher than 1.0m / min, it is clamped at 1.0m / min and the pump speed is automatically reduced by the pressure closed loop.
7. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: Formula for tube extraction speed in step S7 In The grouting flow rate measured by the pump outlet flow meter is taken as the sliding average value from 1s to 3s, and the unit is m³ / min; The diameter of the hole is taken as a conservative value based on the outer diameter of the casing, and the unit is meters. To ensure sufficient safety factor, a value of 1.15 to 1.20 is generally used for strata, and 1.25 to 1.30 is used for water-rich pebble layers or active seepage zones. The output speed is limited to 0.5m / min to 1.0m / min.
8. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: The automatic determination method for the timing of pipe pulling in step S7 is as follows: an overflow receiving tank is set at the orifice. After the overflow is filtered by a screen, it enters the measuring tank. The density of the overflow is measured in real time using a tuning fork density meter, and the conductivity of the overflow is measured using a conductivity meter. When the overflow switch at the orifice is triggered, the overflow density reaches more than 97% of the density of the injected slurry and lasts for no less than 10 seconds, and the conductivity matches the conductivity of the injected slurry, it is determined that the original water and air in the orifice have been completely replaced. The pipe pulling lock is automatically released, and the protective sleeve is pulled out after double confirmation by video and instruments.
9. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: In step S7, when the measured flow rate is lower than the lower limit of flow rate and the grouting pressure is lower than the lower limit of pressure, it is determined as grouting interruption. When the grouting pressure exceeds the upper limit of pressure and the flow rate is lower than the lower limit of flow rate, it is determined as pipe blockage. When a power outage or network outage occurs, power outage protection is executed. When any of the above events occur, the automatic interlocking is executed as follows: immediately stop pipe pulling, record the current position of the casing and the depth of the grouting pipe, stop the grouting pump and maintain pressure. When grouting is resumed, the protective casing is first inserted back to 0.5m below the break point, and grouting is carried out again at a low flow rate to expel the air accumulated in the hole. After manual confirmation that the grout is continuous and the pressure is normal, the automatic linkage control is restored.
10. The construction method of the double-limb bearing plate type anti-buoyancy anchor bolt according to claim 1, characterized in that: In step S7, the ratio of cumulative grouting volume to theoretical borehole volume is used. Determining grout fullness, theoretical pore volume In the formula, This is the effective length of the anchor bolt. The diameter of the hole. This refers to the equivalent cross-sectional area of the double-leg reinforcement, grouting pipe, and structural support plate; when the retaining sleeve is completely pulled out of the borehole, the grout overflow from the borehole is full, and no air bubbles emerge, and When the grouting is deemed qualified, grouting is stopped; when If the grouting is deemed insufficient, automatic grouting is initiated through pre-embedded secondary grouting pipes before the grout initially sets, with the amount of grout added not less than [amount missing]. ;when If abnormal grout loss is detected, the system will automatically prompt you to check the operation status of the dewatering system and reduce the frequency of the dewatering pumps in that area or switch to intermittent pumping mode before continuing or supplementing grouting.