A structure and method for preventing buoyancy in subway stations

By constructing an anti-buoyancy system consisting of anchor bars, check valves, anchor pads, and anchor rods in subway stations, the problems of large construction disturbances, uneven force transmission, and insufficient seepage prevention in the anti-buoyancy treatment of existing subway stations have been solved, achieving long-term stable operation with convenient construction and reliable anti-buoyancy effect.

CN123109191APending Publication Date: 2026-11-17BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611338287.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for anti-buoyancy treatment of existing subway stations suffer from problems such as large construction disturbance, poor anti-buoyancy effect, poor durability, complex construction process and long construction period, which cannot effectively guarantee the structural safety and long-term stable operation of subway stations.

Method used

By rationally arranging anchor bars, check valves, anchor head pads, and other structures, a stable and reliable anti-buoyancy system is constructed. A zoned and differentiated anchor bar arrangement method is adopted, combined with double-liquid grouting and micro-expansion concrete pouring, to form a vertical force transmission system of anchor bars-check valves-anchor head pads-anchor rods, so as to achieve uniform transmission of anti-buoyancy tensile force and avoid construction interference.

Benefits of technology

It effectively reduces the risk of water and sand inrush during construction, simplifies the construction process, improves the structural impermeability and stress safety, enhances the long-term stability of anti-buoyancy treatment, adapts to the construction needs during the operation period, and reduces the later maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109191A_ABST
    Figure CN123109191A_ABST
Patent Text Reader

Abstract

This invention discloses an anti-buoyancy treatment structure and method for subway stations. The method involves two downward-sloping openings in the side walls of the station structure. A check valve is fixed inside the first side wall opening, with an anchor head pad fixed at its inner end. Anchor bars are embedded in the circumferential area of ​​the first side wall opening and welded to the check valve. A water-stopping grouting reinforcement body is constructed on the soil-facing side of the second side wall opening. Anchor bolt holes coaxial with the openings are drilled inside the second side wall opening and adjacent soil. The anchor bolts sequentially pass through the anchor bolt holes, the second side wall opening, the first side wall opening, and through the anchor head pads, and are fixedly connected to the anchor head pads. A double-liquid grout is injected between the anchor bolt holes and the anchor bolts to form an anchor bolt grouting body. Concrete is poured between the openings and the anchor bolts. Through the cooperation of the anchor head pads and the check valve, a vertical force transmission system of anchor bar-check valve-anchor head pad-anchor bolt is constructed, uniformly and efficiently transmitting the anti-buoyancy tensile force of the anchor bolts to the side walls of the station structure, improving the anti-buoyancy treatment effect and safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of subway station technology, and more specifically, relates to a subway station anti-buoyancy control structure and method. Background Technology

[0002] With the formal implementation of the "Groundwater Management Regulations," my country has continuously strengthened its efforts in groundwater ecological protection and management. Coupled with the ongoing South-to-North Water Diversion Project, Beijing's groundwater recharge capacity has significantly improved, and the groundwater level has shown a steady upward trend year by year. This continuous rise in groundwater levels poses a severe challenge to the buoyancy resistance of various existing underground structures. Subway stations, as large-scale underground public infrastructure, are particularly vulnerable to groundwater buoyancy due to their massive size, deep burial depth, and long service life. They face a series of engineering safety issues such as structural uplift, wall cracking, and component damage, seriously threatening the operational safety of the subway.

[0003] Currently, the anti-buoyancy calculation work for the entire existing subway network has been gradually carried out, and research on anti-buoyancy treatment of subway stations has been officially put on the industry's agenda. However, at present, there is no effective, mature technical method for anti-buoyancy treatment of existing subway stations that has been verified by actual engineering tests and is suitable for subway operating conditions. Existing technologies either cause large construction disturbances, which can easily damage the structural integrity of existing subways; or they have poor anti-buoyancy effects and poor durability, and cannot withstand the buoyancy of groundwater for a long time; or the construction process is complex and the construction period is long, which affects the normal operation of the subway. Therefore, the industry urgently needs an anti-buoyancy treatment structure and method for existing subway stations that is easy to construct, causes minimal disturbance, has reliable anti-buoyancy effects, and has been verified by practice, in order to overcome the shortcomings of existing technologies and ensure the structural safety and long-term stable operation of existing subway stations. This has also become one of the major issues that urgently need to be addressed in the construction industry. Summary of the Invention

[0004] To address the aforementioned deficiencies or improvement needs of existing technologies, this invention provides a structure and method for anti-buoyancy treatment of subway stations. By rationally arranging anchor bars, check valves, and anchor head pads, a stable and reliable anti-buoyancy system is constructed. Appropriate openings are made in the side walls of the station structure, and check valves are installed and fixed in conjunction with these openings. The stability of the structural connection is ensured by welding the anchor bars to the check valves. Simultaneously, a zoned and differentiated anchor bar arrangement method, combined with anchor grouting formed by dual-liquid grouting and micro-expansion concrete pouring, achieves a tight structural connection, avoiding construction interference issues. A dedicated force transmission system evenly transmits the anti-buoyancy tensile force, balancing construction convenience and structural safety. This effectively solves the pain points of large construction disturbances, uneven force transmission, and insufficient seepage prevention in existing subway station anti-buoyancy treatment. It is suitable for construction needs during the operational period and can stably perform anti-buoyancy functions for a long time. This provides an implementable and highly reliable technical solution for anti-buoyancy treatment of existing subway stations, ensuring the structural safety and long-term stable operation of subway stations.

[0005] To achieve the above objectives, according to one aspect of the present invention, an anti-buoyancy treatment structure for a subway station is provided, comprising a check valve, an anchor head pad, an anchor head, an anchor rod, a station structural side wall, a water-stopping grouting reinforcement body, an anchor rod hole, an anchor rod grouting body, concrete, a first side wall opening, a second side wall opening, and anchor bars; wherein... The station structure sidewall has a first sidewall opening and a second sidewall opening that are inclined downwards. The diameter of the first sidewall opening is larger than the diameter of the second sidewall opening. The first sidewall opening is located on the inner side of the station structure sidewall. A check valve is fixedly installed in the first sidewall opening. An anchor pad is fixedly installed at the end of the check valve facing the inner side of the station. Several anchor bars are implanted in the circumferential area of ​​the first side wall opening. The anchor bars are welded to the check valve. The side of the second side wall opening facing the soil is grouted to form a water-stop grouting body. Anchor bolt holes are drilled inside the water-stop grouting body and the adjacent soil. The anchor bolt holes are coaxial with the first and second side wall openings. The anchor bolts are sequentially inserted into the anchor bolt holes, the second side wall opening, and the first side wall opening, and pass through the anchor head pad. The anchor bolts are fixedly connected to the anchor head pad through the anchor head. The circumferential gap between the anchor bolt borehole and the anchor bolt is filled with a dual-liquid grout to form an anchor bolt grouting body. Concrete is poured between the first side wall opening, the second side wall opening and the anchor bolt. By using anchor head pads and check valves for connection, a vertical force transmission system of anchor bar-check valve-anchor head pad-anchor bolt is constructed to uniformly and efficiently transmit the anti-buoyancy force of the anchor bolt to the side wall of the station structure.

[0006] Furthermore, a reinforcing cage is provided in the first side wall opening and the second side wall opening, and the reinforcing cage is embedded in the concrete poured in the first side wall opening and the second side wall opening, forming a cooperating force-bearing structure with the concrete.

[0007] Furthermore, the check valve includes a steel ring, a steel pipe, end screw holes, a pressure plate, an end rubber sheet, and a second screw. The steel pipe is obliquely fixed to the outer wall of the steel ring. The end of the steel pipe away from the steel ring has a plurality of end screw holes evenly opened along its circumference. The pressure plate has a circular ring structure, the ring width of which matches the wall thickness of the steel pipe. The pressure plate has circular holes in its circumference that correspond to the position and number of the end screw holes. The end rubber sheet has a circular ring structure, and its circumference also has circular holes corresponding to the end screw holes. The end rubber sheet is sandwiched between the steel pipe and the pressure plate. After the second screw passes through the circular holes on the pressure plate and the end rubber sheet in sequence, it is threadedly connected to the end screw hole on the steel pipe to achieve the fixed assembly of the pressure plate, the end rubber sheet, and the steel pipe.

[0008] Furthermore, the diameter of the circular hole in the middle of the end rubber sheet is smaller than the diameter of the anchor rod, and it must be made of elastic rubber that can open and wrap around objects passing through it.

[0009] Furthermore, the check valve 1 also includes a side rubber sheet, a ring, a first screw, and side screw holes. Multiple side screw holes are evenly distributed circumferentially on the outer wall of the steel pipe near its outer end. A side rubber sheet is fitted onto the outer side of the steel pipe, with its inner diameter matching the outer diameter of the steel pipe. Its outer diameter is slightly larger than the inner diameter of the opening in the first side wall. A ring is fitted onto the outer side of the side rubber sheet near its outer end. A circular hole is formed on the ring and the side rubber sheet corresponding to the side screw hole. The first screw passes through the ring and the circular hole in the side rubber sheet sequentially, and then threadedly connects to the side screw hole on the steel pipe, thus achieving a fixed connection between the inner end of the side rubber sheet and the steel pipe. The side rubber sheet is made of elastic rubber material, allowing it to fit tightly against the inner wall of the opening in the first side wall.

[0010] Furthermore, the steel ring is provided with anchor bar holes corresponding to the anchor bars. The diameter of the anchor bar holes is slightly larger than the diameter of the anchor bars. During construction, the anchor bars are passed through the corresponding anchor bar holes on the steel ring, and then the steel ring and the anchor bars are fixedly connected by welding, so that the check valve and the anchor bars form a stable integrated structure.

[0011] Furthermore, an annular waterstop strip is provided on the inner wall of the steel pipe, and the annular waterstop strip fits tightly against the inner wall of the steel pipe and the subsequently poured concrete.

[0012] Furthermore, a pre-drilled hole is provided in the middle of the anchor head pad, and the inclination direction of the pre-drilled hole is consistent with the inclination direction of the anchor rod. A tenon is provided on the side wall of the anchor head pad facing the side wall of the station structure, and the tenon is located on the left, right and below the pre-drilled hole of the pad respectively. The steel ring has a protruding tenon on the side wall facing the anchor head block that matches the concave tenon. During assembly, the protruding tenon is inserted into the concave tenon to achieve the positioning and assembly of the anchor head block and the steel ring.

[0013] According to a second aspect of the present invention, a method for preventing buoyancy in subway stations is provided, which is implemented using the aforementioned anti-buoyancy structure for subway stations, and includes the following steps: S100: Based on the design location of the first side wall opening, anchor bars are inserted into the circumferential area of ​​the station structure side wall corresponding to the location of the first side wall opening. Then, the first side wall opening is drilled, and the opening angle is consistent with the design angle of the anchor bar. The wall structure corresponding to the second side wall opening is retained for temporary water-stop protection before grouting. S200: A groove of the same size as the steel ring is chiseled out in the steel reinforcement protective layer of the inner wall of the station structure side wall. The check valve is installed in the opening of the first side wall, so that the exposed end of the anchor bar passes through the pre-set anchor bar hole on the steel ring and the steel ring is embedded in the groove. The anchor bar and the steel ring are fixedly connected by welding. S300: A grouting hole is opened in the wall structure retained by the opening in the second side wall. Grouting is carried out through the grouting hole to the soil outside the side wall of the station structure corresponding to the opening in the second side wall to form a grouting water-stopping solid. After the grouting water-stopping solid reaches the preset strength, the wall structure retained in the opening in the second side wall is broken. The drill rod of the drilling rig passes through the check valve and drills the grouting water-stopping solid and the soil behind it. After drilling to the preset depth, an anchor hole is formed. During the drilling process, the rubber sheet at the end of the check valve is squeezed by the drill rod and elastically opens, tightly wrapping the drill rod to achieve temporary water stop during drilling and prevent groundwater leakage. S400: After the drilling operation is completed, the anchor rod is passed through the check valve and placed at the preset position of the anchor rod hole. The gap between the anchor rod hole and the anchor rod is filled with double liquid grout to form the anchor rod grouting body. S500: After the anchor grout reaches the preset strength, fix the waterstop strip to the inner wall of the steel pipe of the check valve, install the steel cage in the first side wall opening and the second side wall opening, and then assemble the anchor head pad on the steel ring to ensure that the anchor rod smoothly passes through the pre-reserved hole of the anchor head pad, and that the protruding tenon on the steel ring and the concave tenon on the anchor head pad accurately engage to complete the positioning and assembly of the anchor head pad; S600: The anchor head pad is fixedly connected to the steel ring by welding. Concrete is poured into the openings in the first and second side walls through the pre-drilled holes in the anchor head pad. Before the concrete sets, the anchor rod is prestressed using tensioning equipment. After tensioning, the anchor rod is fixed through the anchor head. Finally, all exposed steel is treated with anti-corrosion measures to complete the anti-buoyancy treatment of the entire subway station.

[0014] Furthermore, when the anchor bars are inserted, they must avoid the areas of the first side wall opening and the second side wall opening. The anchor bars located above, to the left and to the right of the first side wall opening and the second side wall opening are set perpendicular to the side wall of the station structure, while the anchor bars located below the opening are arranged parallel to the extension direction of the first side wall opening and the second side wall opening.

[0015] In summary, compared with the prior art, the above-described technical solutions conceived by this invention can achieve the following beneficial effects: 1. The present invention provides a subway station anti-buoyancy treatment structure, which adopts a non-penetrating side wall opening process with openings in the first and second side walls. The wall structure corresponding to the second side wall opening is retained for temporary water stoppage before grouting, which can effectively block groundwater, significantly reduce the risk of water and sand inrush during construction, ensure the safety of operations in the subway station, and at the same time avoid excessive disturbance to the station structure side wall by the non-penetrating opening, thus ensuring the integrity of the existing side wall structure.

[0016] 2. The anti-buoyancy treatment structure for a subway station of the present invention, by embedding a check valve in the opening of the first side wall, allows multiple processes such as anchor drilling, double-liquid grouting, and anchor installation to share the same channel, eliminating the need for repeated opening and sealing, simplifying the construction process and shortening the construction period. At the same time, the side rubber sheet 105 and end rubber sheet 111 of the check valve 1 are used to achieve dynamic water stoppage during drilling and anchor installation. Combined with the water-stop strip on the inside of the steel pipe, a full-process anti-seepage system is formed, which significantly improves the anti-seepage performance of the structure.

[0017] 3. The present invention provides a subway station anti-buoyancy control structure, which uses the tenon of the anchor head pad and the tenon of the steel ring for positioning and welding fixation, combined with the welding connection of the anchor bar and the steel ring, to form a complete vertical force transmission system of anchor bar-steel ring-anchor head pad-anchor rod. This system can uniformly and efficiently transmit the anti-buoyancy tension of the anchor rod to the side wall of the station structure, avoid local stress concentration, and improve the stress safety and durability of the entire anti-buoyancy control structure.

[0018] 4. The present invention provides a subway station anti-buoyancy treatment structure, which forms an anchor grout body by injecting a dual-liquid grout between the anchor bolt borehole and the anchor bolt, and pouring concrete into the openings in the first and second side walls. With the reinforcement of the steel cage, the anchor grout body, concrete, and steel cage are tightly integrated with the existing station structure side walls into a whole. At the same time, the micro-expansion characteristics of concrete can compensate for shrinkage cracks, further improving the long-term stability of the anti-buoyancy treatment.

[0019] 5. The present invention provides a subway station anti-buoyancy treatment structure. The entire structure and construction method cause minimal damage to the existing subway station structure, do not require large-scale demolition of the station structure side walls, have strong construction controllability, can be implemented under operating or semi-operating conditions, adapt to the anti-buoyancy treatment needs of subway stations under different working conditions, and have low maintenance costs and high structural reliability. It effectively solves the problems of high construction risk, poor force transmission, and poor seepage prevention effect in the anti-buoyancy treatment of existing subway stations. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of a subway station anti-buoyancy control structure according to an embodiment of the present invention; Figure 2 This is an elevation view of an anti-buoyancy control structure for a subway station according to an embodiment of the present invention; Figure 3This is a cross-sectional view of a check valve in a subway station anti-buoyancy control structure according to an embodiment of the present invention; Figure 4 for Figure 3 Enlarged view of a portion of point A in the middle; Figure 5 This is a plan view of a steel ring in a subway station anti-buoyancy control structure according to an embodiment of the present invention; Figure 6 This is a cross-sectional view of an anchor head pad block in an anti-buoyancy treatment structure for a subway station according to an embodiment of the present invention; Figure 7 This is an elevation view of an anchor head pad block for an anti-buoyancy treatment structure in a subway station according to an embodiment of the present invention; Figure 8 This is a flowchart illustrating a method for preventing buoyancy in subway stations according to an embodiment of the present invention.

[0021] In all the accompanying drawings, the same reference numerals denote the same technical features, specifically: 1-check valve, 101-anchor bar hole, 102-steel ring, 103-tenon, 104-steel pipe, 105-side rubber sheet, 106-ring, 107-first screw, 108-side screw hole, 109-end screw hole, 110-pressure plate, 111-end rubber sheet, 112-second screw, 2-anchor head pad, 201-pad reserved hole, 202-tenon, 3-anchor head, 4-anchor rod, 5-station structure side wall, 6-water-stop grouting reinforcement, 7-water-stop strip, 8-reinforcing cage, 9-anchor rod drill hole, 10-anchor rod grouting body, 11-concrete, 12-first side wall opening, 13-second side wall opening, 14-anchor bar. Detailed Implementation

[0022] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.

[0023] It should be noted that if the embodiments of the present invention involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of the components in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicators will also change accordingly.

[0024] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. If the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

[0025] In this patent, the terms "comprising," "including," or any other variations thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes said element.

[0026] Example 1 like Figure 1-6As shown, this embodiment of the invention provides an anti-buoyancy treatment structure for a subway station, including a check valve 1, an anchor head pad 2, an anchor head 3, an anchor rod 4, a station structural side wall 5, a water-stopping grouting reinforcement body 6, an anchor rod drill hole 9, an anchor rod grouting body 10, concrete 11, a first side wall opening 12, a second side wall opening 13, and an anchor bar 14; wherein, the station structural side wall 5 has a first side wall opening 12 and a second side wall opening 13 inclined downwards, the diameter of the first side wall opening 12 is larger than the diameter of the second side wall opening 13, and the first side wall opening 12 is located inside the station structural side wall 5, and a check valve 1 is fixedly installed in the first side wall opening 12, the check valve 1 facing the station. An anchor head pad 2 is fixedly installed at the inner end; several anchor bars 14 are implanted in the circumferential area of ​​the first side wall opening 12. The anchor bars 14 are welded to the check valve 1, which can greatly improve the overall connection between the check valve 1 and the side wall structure, avoid displacement or detachment of the check valve 1 during the tensioning of the anchor rod 4 and long-term operation, ensure the installation stability of the core reinforcement component, and lay the foundation for the reliability of the overall anti-buoyancy structure; the side of the second side wall opening 13 facing the soil is grouted to form a water-stop grouting reinforcement body 6. Anchor rod holes 9 are drilled inside the water-stop grouting reinforcement body 6 and the adjacent soil. The anchor rod holes 9 are connected to the first side wall opening 12 and the second side wall opening 13. The anchor rods 4 are coaxially arranged and sequentially pass through the anchor rod drill hole 9, the second side wall opening 13, and the first side wall opening 12, and also pass through the anchor head pad 2. The anchor rods 4 are fixedly connected to the anchor head pad 2 through the anchor head 3, ensuring that the force direction of the anchor rods 4 is consistent with the axis of the reinforcement hole and the anchor rod drill hole 9, avoiding local stress concentration caused by force deviation. At the same time, the fixed connection structure between the anchor head 3 and the anchor head pad 2 can efficiently and evenly transfer the anti-buoyancy tension of the anchor rods 4 to the side wall 5 of the station structure, effectively improving the stability and effectiveness of the tension transfer, thereby enhancing the anti-buoyancy bearing capacity of the entire anti-buoyancy treatment structure and avoiding the hidden danger of anchoring failure due to poor tension transfer; the anchor rod drill hole 9 and the anchor rod 4 The circumferential gap between the anchor rods is filled with a dual-liquid grout to form the anchor rod grout body 10. Concrete 11 is poured between the first side wall opening 12, the second side wall opening 13 and the anchor rod 4. The segmented filling of the anchor rod grout body and concrete can optimize the bonding performance and water-stopping effect of different sections. The anchor rod grout body 10 can enhance the bonding reliability between the anchor rod 4 and the wall of the anchor rod borehole 9 and the soil, and form an inner sealing protection with the check valve 1. The concrete 11 can enhance the connection tightness between the anchor rod 4 and the station structure side wall 5, and form an outer water-stopping barrier with the outer water-stopping grouting reinforcement body 6, thereby achieving double water-stopping protection inside and outside, effectively solving the technical problem of groundwater leakage at the side wall opening. At the same time, the segmented filling design can avoid problems such as uneven anchoring strength and water-stopping failure caused by a single filling material, further improving the anchoring stability of the anchor rod 4 and ensuring the long-term operational stability and safety of the subway station structure.This invention, through the welding and fixing of the check valve 1 and the anchor bar 14, the segmented layout of the reinforcement holes, and the segmented filling of the anchor grout and concrete, not only achieves effective isolation of groundwater but also significantly improves the stability and anti-buoyancy bearing capacity of the anchor bar 4. The synergistic effect of each component can greatly enhance the anti-buoyancy performance and water-stopping effect of the station structure sidewall. Moreover, the construction process of this structure is clear and easy to operate, which can effectively reduce construction costs and shorten the construction period, while improving the durability and safety of the anti-buoyancy treatment structure, and can meet the engineering requirements of anti-buoyancy treatment of subway stations under complex hydrogeological conditions.

[0027] Furthermore, when the anchor bar 14 is inserted, it must avoid the areas of the first side wall opening 12 and the second side wall opening 13. Preferably, the anchor bars 14 located above, to the left and to the right of the first side wall opening 12 and the second side wall opening 13 are set perpendicular to the station structure side wall 5, while the anchor bars 14 located below the openings are arranged parallel to the extension directions of the first side wall opening 12 and the second side wall opening 13. By adopting a zoned and differentiated arrangement, the anchor bars 14 can effectively avoid the opening construction area, avoid positional interference with the first side wall opening 12 and the second side wall opening 13, and ensure sufficient construction space and smooth procedures.

[0028] Furthermore, a reinforcing cage 8 is provided in the first side wall opening 12 and the second side wall opening 13, and the reinforcing cage 8 is embedded in the concrete 11 poured in the first side wall opening 12 and the second side wall opening 13, forming a cooperative stress-bearing structure with the concrete 11. The reinforcement cage 8 effectively compensates for the structural strength loss caused by the openings 12 and 13 in the first and second side walls, enhances the overall tensile and crack resistance of the concrete 11, and prevents the concrete 11 from cracking due to shrinkage or stress after casting. This prevents the cracks from becoming channels for groundwater seepage. At the same time, it strengthens the overall connection between the concrete 11, the anchor rod 4, and the check valve 1, allowing the anti-buoyancy force transmitted by the anchor rod 4 to be more evenly distributed to the side wall 5 of the station structure, avoiding structural damage caused by local stress concentration. This further improves the stability and reliability of the anchor rod 4, providing structural support for the long-term stable operation of the entire anti-buoyancy treatment structure. Together with the anchor rod grouting body 10, the check valve 1, and the water-stopping grouting reinforcement body 6, it forms a more complete anti-buoyancy and water-stopping synergistic protection system, effectively avoiding the hidden dangers of anchor failure and groundwater seepage caused by weak structure and concrete cracking in the opening area.

[0029] Further, the check valve 1 includes a steel ring 102, a steel pipe 104, end screw holes 109, a pressure plate 110, an end rubber sheet 111, and a second screw 112. The steel pipe 104 is obliquely fixed to the outer wall of the steel ring 102. Multiple end screw holes 109 are evenly distributed circumferentially at the end of the steel pipe 104 away from the steel ring 102. The pressure plate 110 has a circular ring structure, and its ring width matches the wall thickness of the steel pipe 104. The circumferential direction of the pressure plate 110... Corresponding to the end screw holes 109 are circular holes of the same position and number. The end rubber sheet 111 is an annular structure, and its circumference is also provided with circular holes corresponding to the end screw holes 109. The end rubber sheet 111 is sandwiched between the steel pipe 104 and the pressure plate 110. After the second screw 112 passes through the circular holes on the pressure plate 110 and the end rubber sheet 111 in sequence, it is threaded to the end screw hole 109 on the steel pipe 104, thereby realizing the connection between the pressure plate 110, the end rubber sheet 111 and the end screw hole 109. The steel pipe 104 is fixedly installed at an angle inside the steel ring 102, which can be precisely matched with the angled layout direction of the reinforcement hole and the anchor rod 4, ensuring that the anchor rod 4, grouting pipe and other components can pass smoothly through the check valve 1, avoiding construction inconvenience or force displacement caused by component interference; the ring width of the pressure plate 110 matches the pipe wall of the steel pipe 104, and is tightly fixed to the steel pipe 104 and the end rubber plate 111 by the second screw 112, which can effectively improve the installation stability of the end rubber plate 111 and prevent it from shifting or falling off during grouting and anchor rod construction; the end rubber plate 111 can achieve flexible sealing at the end of the check valve 1. When the grouting pipe, anchor rod drilling rod or anchor rod 4 passes through, the end rubber plate 111 can automatically open and tightly wrap the passing component. After construction, it can automatically fit and seal, effectively preventing groundwater from seeping into the station through the gap between the steel pipe 104 and the passing component, making up for the defect of the traditional check valve not sealing properly.

[0030] Furthermore, the inner diameter of the circular hole in the middle of the steel ring 102 is the same as the inner diameter of the steel pipe 104, thereby providing a smooth construction channel for the drill rod of the drilling rig, facilitating the smooth installation of subsequent equipment, and enabling anchor drilling construction on the water-stop grouting reinforcement 6 and adjacent soil.

[0031] Furthermore, the diameter of the central hole in the end rubber sheet 111 is smaller than the diameter of the anchor rod, and it must be made of elastic rubber to open and wrap around any object passing through it. The diameter of the central hole in the end rubber sheet 111 is smaller than the diameter of the anchor rod 4, and the end rubber sheet 111 is made of an elastic rubber material with a suitable elastic modulus. When the drilling rod of the anchor drilling rig, the anchor rod 4, or other construction components pass through, the end rubber sheet 111 can be compressed and elastically opened, thereby tightly wrapping the outer circumference of the object passing through, forming an adaptive dynamic sealing contact. After the construction components are removed or the anchor rod 4 is tensioned and fixed, the end rubber sheet 111 can return to its initial shape by its own elasticity, closing the central hole, thereby effectively preventing groundwater from leaking into the station through the gap between the steel pipe 104 and the components, significantly improving the water-stopping reliability and long-term sealing performance of the check valve 1 end.

[0032] Furthermore, a groove adapted to the size of the steel ring 102 is provided on the protective layer of the steel reinforcement on the inner wall of the station structure side wall 5, so that the steel ring 102 is partially embedded in the groove, realizing the rapid positioning and assembly of the steel ring 102, avoiding the steel ring 102 from shifting during installation, and improving the overall installation accuracy of the check valve 1.

[0033] Furthermore, the check valve 1 also includes a side rubber sheet 105, a ring clamp 106, a first screw 107, and side screw holes 108. Multiple side screw holes 108 are evenly distributed circumferentially on the outer wall of the steel pipe 104 near its outer end. A side rubber sheet 105 is fitted onto the outer side of the steel pipe 104, with its inner diameter matching the outer diameter of the steel pipe 104, and its outer diameter slightly larger than the inner diameter of the first side wall opening 12. A ring clamp 106 is fitted onto the outer side of the side rubber sheet 105 near its outer end, and the ring clamp 106 corresponds to the side screw holes 108 on the side rubber sheet 105. A circular hole is provided at position 08. A first screw 107 passes through the circular hole in the ring 106 and the side rubber sheet 105, and then threadedly connects to the side screw hole 108 on the steel pipe 104, thus fixing the inner end of the side rubber sheet 105 to the steel pipe 104. The side rubber sheet 105 is made of elastic rubber material, allowing it to fit tightly against the inner wall of the first side wall opening 12. Through the structural design of the side rubber sheet 105 and the ring 106, a double sealing protection is formed with the end rubber sheet 111, further improving the overall water-stopping performance of the check valve 1. The inner diameter of the side rubber sheet 105 is the same as that of the steel pipe 104. 04. The outer diameter is precisely matched, slightly larger than the inner diameter of the first side wall opening 12. Combined with its elastic material properties, it can tightly fit the inner wall of the first side wall opening 12, effectively preventing groundwater leakage through the gap between the steel pipe 104 and the first side wall opening 12. This compensates for the inadequacy of relying solely on the end rubber sheet 111 for sealing, forming a double sealing structure of "end + side wall". The ring clamp 106 is fixed to the steel pipe 104 by the first screw 107, firmly pressing the inner end of the side rubber sheet 105 against the outer wall of the steel pipe 104, preventing the side rubber sheet 105 from shifting or falling off during construction, ensuring its sealing. The effectiveness is stable over a long period. At the same time, the elastic fit design of the side rubber sheet 105 can adapt to the slight dimensional deviation of the inner wall of the first side wall opening 12, improve the sealing adaptability, reduce the sealing gap caused by insufficient opening precision, further strengthen the connection and sealing performance between the check valve 1 and the side wall opening, and work together with the end rubber sheet 111, the water-stop grouting reinforcement 6 and other components to build a more reliable water-stop barrier, effectively avoid the hidden danger of groundwater leakage, and at the same time enhance the overall connection between the check valve 1 and the first side wall opening 12, help improve the installation firmness of the check valve 1, and provide a guarantee for the stability of the entire anti-buoyancy treatment structure.

[0034] Furthermore, the steel ring 102 is provided with anchor bar holes 101 corresponding to the anchor bar 14. The diameter of the anchor bar holes 101 is slightly larger than the diameter of the anchor bar 14. During construction, the anchor bar 14 is passed through the corresponding anchor bar holes 101 on the steel ring 102, and then the steel ring 102 and the anchor bar 14 are fixedly connected by welding, so that the check valve 1 and the anchor bar 14 form a stable integrated structure. The diameter of the anchor bar holes 101 is slightly larger than the diameter of the anchor bar 14, which can ensure that the anchor bar 14 can pass smoothly through the steel ring 102 and avoid the problem of the hole being too large. The small size of the anchor bar 14 makes installation difficult and causes damage to components due to forced insertion. It also allows for a reasonable gap for welding operations, which facilitates the filling of welding materials, ensures the fullness and connection strength of the welded joint, and effectively avoids hidden dangers such as false welding and incomplete welding. The welding and fixing of the steel ring 102 and the anchor bar 14 can firmly anchor the check valve 1 to the side wall 5 of the station structure, significantly improving the installation firmness and overall stability of the check valve 1, and preventing the check valve 1 from shifting, loosening or falling off during the tensioning of the anchor rod 4, grouting construction and long-term operation of the station.

[0035] Furthermore, an annular waterstop strip 7 is provided on the inner wall of the steel pipe 104. The annular waterstop strip 7 is tightly fitted to the inner wall of the steel pipe 104 and the subsequently poured concrete 11 to block the water flow channel between the steel pipe 104 and the concrete 11, preventing groundwater from flowing and leaking along the gap between the two. Together with the side rubber sheet 105 and the end rubber sheet 111, it forms a triple sealing structure of "side wall + end + inner connection", which greatly improves the overall water-stopping reliability of the check valve 1. The annular waterstop strip 7 is tightly fitted to the steel pipe 104 and the concrete 11, which can adapt to the slight deformation of the two. Even if there is a slight displacement due to structural stress during station operation, it can still maintain a good sealing effect and avoid sealing failure.

[0036] Furthermore, the anchor head pad 2 has a pre-drilled hole 201 in the middle, and the inclination direction of the pre-drilled hole 201 is consistent with the inclination direction of the anchor rod 4, ensuring that the anchor rod 4 can smoothly pass through the anchor head pad 2; the anchor head pad 2 has a tenon 202 on the side wall facing the station structure side wall 5, and the tenon 202 is located on the left, right and below the pre-drilled hole 201; the steel ring 102 has a matching tenon 202 on the side wall facing the anchor head pad 2. The tenon 103 is inserted into the tenon 202 during assembly to achieve the positioning and assembly of the anchor head pad 2 and the steel ring 102. The precise tenoning of the tenon 202 and the tenon 103 can quickly achieve the positioning and installation of the anchor head pad 2 and the steel ring 102, improve construction efficiency, and effectively limit the horizontal and vertical displacement of the anchor head pad 2 relative to the steel ring 102, so as to prevent the anchor head pad 2 from shifting or loosening during the tensioning of the anchor rod 4 or long-term operation, and ensure the installation stability of the anchor head pad 2.

[0037] Furthermore, the concrete 11 is made of C45 micro-expansion concrete. The use of C45 micro-expansion concrete can ensure sufficient structural strength and bearing capacity to meet the requirements of anchor tension and long-term stress. The micro-expansion characteristics of concrete can effectively compensate for hardening shrinkage, so that it can be tightly bonded with the steel pipe, reinforcing cage, side wall concrete and anchor grouting body, eliminate internal shrinkage gaps, improve overall density and impermeability, and enhance the integrity of the structure and the reliability of force transmission, so as to avoid groundwater leakage or anchor failure caused by shrinkage cracks.

[0038] Example 2 Combination Figure 1-6 ,like Figure 7 As shown, this invention provides a method for anti-buoyancy control structure of subway stations, which is implemented using the aforementioned anti-buoyancy control structure of subway stations. The specific steps are as follows: S100: According to the design position of the first side wall opening 12, anchor bars 14 are inserted into the circumferential area of ​​the station structure side wall 5 corresponding to the position of the first side wall opening 12. Then, the first side wall opening 12 is drilled, and the opening angle is consistent with the design angle of the anchor bar 4. The wall structure corresponding to the second side wall opening 13 is retained for temporary water-stop protection before grouting. S200: A groove of the same size as the steel ring 102 is chiseled out in the steel reinforcement protective layer of the inner wall of the station structure side wall 5. The check valve 1 is installed in the opening 12 of the first side wall, so that the exposed end of the anchor bar 14 passes through the pre-set anchor bar hole 101 on the steel ring 102 and the steel ring 102 is embedded in the groove. The anchor bar 14 and the steel ring 102 are fixedly connected by welding. S300: A grouting hole is opened in the wall structure retained in the second side wall opening 13. Grouting is carried out through the grouting hole to the soil outside the station structure side wall 5 corresponding to the second side wall opening 13 to form a grouting water-stopping solid body 6. After the grouting water-stopping solid body 6 reaches the preset strength, the wall structure retained in the second side wall opening 13 is broken. The drill rod of the drilling rig passes through the check valve 1 to drill the grouting water-stopping solid body 6 and the soil behind it. After drilling to the preset depth, an anchor drill hole 9 is formed. During the drilling process, the rubber sheet 111 at the end of the check valve 1 is squeezed by the drill rod and elastically opens, tightly wrapping the drill rod to achieve temporary water stop during drilling and prevent groundwater leakage. S400: After the drilling operation is completed, the anchor bolt 4 is passed through the check valve 1 and placed at the preset position of the anchor bolt hole 9. The gap between the anchor bolt hole 9 and the anchor bolt 4 is filled with double liquid grout to form the anchor bolt grouting body 10. S500: After the anchor grouting body 10 reaches the preset strength, the waterstop strip 7 is fixedly installed on the inner wall of the steel pipe 104 of the check valve 1, and the reinforcing cage 8 is installed in the first side wall opening 12 and the second side wall opening 13. Then, the anchor head pad 2 is assembled on the steel ring 102 to ensure that the anchor rod 4 smoothly passes through the pad reserved hole 201 of the anchor head pad 2, and the protruding tenon 103 on the steel ring 102 and the concave tenon 202 on the anchor head pad 2 are precisely engaged to complete the positioning and assembly of the anchor head pad 2. S600: The anchor head pad 2 is fixedly connected to the steel ring 102 by welding. Concrete 11 is poured into the first side wall opening 12 and the second side wall opening 13 through the pre-reserved hole 201 of the anchor head pad 2. Before the concrete 11 initially sets, the anchor rod 4 is prestressed by tensioning equipment. After tensioning, the anchor rod 4 is fixed by the anchor head 3. Finally, all exposed steel is treated with anti-corrosion to complete the anti-buoyancy treatment construction of the entire subway station.

[0039] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A subway station anti-floating treatment structure, characterized in that, Includes a check valve (1), anchor head pad (2), anchor head (3), anchor rod (4), station structural side wall (5), water-stop grouting reinforcement (6), anchor rod drilling (9), anchor rod grouting body (10), concrete (11), first side wall opening (12), second side wall opening (13), and anchor bar (14); among which, The station structure sidewall (5) is provided with a first sidewall opening (12) and a second sidewall opening (13) that are inclined downwards. The diameter of the first sidewall opening (12) is larger than the diameter of the second sidewall opening (13). The first sidewall opening (12) is located inside the station structure sidewall (5). A check valve (1) is fixedly installed inside the first sidewall opening (12). An anchor pad (2) is fixedly installed at the end of the check valve (1) facing the inside of the station. Several anchor bars (14) are implanted in the circumferential area of ​​the first side wall opening (12). The anchor bars (14) are welded to the check valve (1). The side of the second side wall opening (13) facing the soil is grouted to form a water-stop grouting solid (6). The water-stop grouting solid (6) and the soil adjacent to it are drilled with anchor bolt holes (9). The anchor bolt holes (9) are coaxial with the first side wall opening (12) and the second side wall opening (13). The anchor rods (4) are sequentially inserted into the anchor bolt holes (9), the second side wall opening (13) and the first side wall opening (12), and penetrate the anchor head pad (2). The anchor rods (4) are fixedly connected to the anchor head pad (2) through the anchor head (3). The circumferential gap between the anchor bolt hole (9) and the anchor bolt (4) is filled with double liquid grout to form the anchor bolt grouting body (10). Concrete (11) is poured between the first side wall opening (12), the second side wall opening (13) and the anchor bolt (4). By using the anchor head pad (2) and the check valve (1) for connection, a vertical force transmission system of anchor bar (14)-check valve (1)-anchor head pad (2)-anchor bolt (4) is constructed to uniformly and efficiently transmit the anti-buoyancy force of the anchor bolt (4) to the side wall of the station structure (5).

2. The anti-floating structure of a subway station according to claim 1, wherein, A steel cage (8) is provided in the first side wall opening (12) and the second side wall opening (13), and the steel cage (8) is embedded in the concrete (11) poured in the first side wall opening (12) and the second side wall opening (13), forming a cooperative stress-bearing structure with the concrete (11).

3. The anti-floating structure of a subway station according to claim 1, wherein, The check valve (1) includes a steel ring (102), a steel pipe (104), end screw holes (109), a pressure plate (110), an end rubber sheet (111), and a second screw (112). The steel pipe (104) is obliquely fixed to the outer wall of the steel ring (102). Multiple end screw holes (109) are evenly opened along the circumference of the end of the steel pipe (104) away from the steel ring (102). The pressure plate (110) has a circular ring structure, and its ring width matches the wall thickness of the steel pipe (104). The pressure plate (110) has corresponding end screw holes (109) on its circumference. The screw holes (109) are all circular holes with the same position and number. The end rubber sheet (111) is a circular ring structure. It also has circular holes in its circumference that correspond to the end screw holes (109). The end rubber sheet (111) is sandwiched between the steel pipe (104) and the pressure plate (110). After the second screw (112) passes through the circular holes on the pressure plate (110) and the end rubber sheet (111) in sequence, it is threaded to the end screw hole (109) on the steel pipe (104) to realize the fixed assembly of the pressure plate (110), the end rubber sheet (111) and the steel pipe (104).

4. The anti-floating structure of a subway station according to claim 3, characterized in that, The diameter of the circular hole in the middle of the end rubber sheet (111) is smaller than the diameter of the anchor rod (4), and it must be made of elastic rubber that can open and wrap around objects passing through it.

5. The anti-floating structure of a subway station according to claim 3, characterized in that, The check valve 1 further includes a side rubber sheet (105), a ring clamp (106), a first screw (107), and side screw holes (108). Multiple side screw holes (108) are evenly distributed circumferentially on the outer wall of the steel pipe (104) near its outer end. A side rubber sheet (105) is fitted onto the outer side of the steel pipe (104). The inner diameter of the side rubber sheet (105) matches the outer diameter of the steel pipe (104), and its outer diameter is slightly larger than the inner diameter of the first side wall opening (12). The outer side of the side rubber sheet (105) near its outer end is fitted with... A ring (106) is provided, and a round hole is opened on the ring (106) and the side rubber sheet (105) at the position corresponding to the side screw hole (108). After the first screw (107) passes through the round hole on the ring (106) and the side rubber sheet (105) in sequence, it is threaded to the side screw hole (108) on the steel pipe (104) to realize the fixed connection between the inner end of the side rubber sheet (105) and the steel pipe (104). The side rubber sheet (105) is made of elastic rubber material and can fit tightly against the inner wall of the first side wall opening (12).

6. The anti-floating structure of a subway station according to claim 3, wherein, The steel ring (102) has anchor holes (101) corresponding to the anchor bars (14). The diameter of the anchor holes (101) is slightly larger than the diameter of the anchor bars (14). During construction, the anchor bars (14) are passed through the corresponding anchor holes (101) on the steel ring (102), and then the steel ring (102) and the anchor bars (14) are fixedly connected by welding, so that the check valve (1) and the anchor bars (14) form a stable integrated structure.

7. The anti-floating structure of a subway station according to claim 3, characterized in that, The inner wall of the steel pipe (104) is provided with an annular waterstop strip (7), which is closely attached to the inner wall of the steel pipe (104) and the subsequently poured concrete (11).

8. The anti-floating structure of a subway station according to claim 1, wherein, The anchor head pad (2) has a pre-drilled hole (201) in the middle. The inclination direction of the pre-drilled hole (201) is consistent with the inclination direction of the anchor rod (4). The anchor head pad (2) has a tenon (202) on the side wall facing the station structure side wall (5). The tenon (202) is located on the left, right and below the pre-drilled hole (201). The steel ring (102) has a protruding tenon (103) on the side wall facing the anchor head pad (2) that matches the concave tenon (202). During assembly, the protruding tenon (103) is inserted into the concave tenon (202) to achieve the positioning and assembly of the anchor head pad (2) and the steel ring (102).

9. A subway station anti-floating treatment method, characterized in that, The application of a subway station anti-buoyancy control structure as described in any one of claims 1-8 is characterized by comprising the following steps: S100: According to the design position of the first side wall opening (12), anchor bars (14) are inserted in the circumferential area of ​​the station structure side wall (5) corresponding to the position of the first side wall opening (12). Then, the first side wall opening (12) is drilled. The opening angle is consistent with the design angle of the anchor rod (4). The wall structure corresponding to the second side wall opening (13) is retained for temporary water-stop protection before grouting. S200: A groove of the same size as the steel ring (102) is chiseled out in the steel reinforcement protective layer of the inner wall of the station structure side wall (5). The check valve (1) is installed in the opening (12) of the first side wall. The exposed end of the anchor bar (14) passes through the anchor bar hole (101) on the steel ring (102) and the steel ring (102) is embedded in the groove. The anchor bar (14) and the steel ring (102) are fixedly connected by welding. S300: A grouting hole is opened in the wall structure retained in the second side wall opening (13). Grouting is carried out through the grouting hole to the soil outside the station structure side wall (5) corresponding to the second side wall opening (13) to form a grouting water-stopping solid body (6). After the grouting water-stopping solid body (6) reaches the preset strength, the wall structure retained in the second side wall opening (13) is broken. The drill rod of the drilling machine passes through the check valve (1) to drill the grouting water-stopping solid body (6) and the soil behind it. After drilling to the preset depth, an anchor drill hole (9) is formed. During the drilling process, the end rubber sheet (111) of the check valve (1) is squeezed by the drill rod and elastically opens, tightly wrapping the drill rod to achieve temporary water stop during drilling and prevent groundwater leakage. S400: After the drilling operation is completed, the anchor rod (4) is passed through the check valve (1) and placed at the preset position of the anchor rod hole (9). The double liquid grout is injected into the gap between the anchor rod hole (9) and the anchor rod (4) to form the anchor rod grouting body (10). S500: After the anchor grouting body (10) reaches the preset strength, the waterstop strip (7) is fixedly installed on the inner side wall of the steel pipe (104) of the check valve (1), and the steel cage (8) is installed in the first side wall opening (12) and the second side wall opening (13). Then, the anchor head pad (2) is assembled on the steel ring (102) to ensure that the anchor rod (4) smoothly passes through the pad reserved hole (201) of the anchor head pad (2), and the protruding tenon (103) on the steel ring (102) and the concave tenon (202) on the anchor head pad (2) are precisely engaged to complete the positioning and assembly of the anchor head pad (2). S600: The anchor head pad (2) is fixedly connected to the steel ring (102) by welding. Concrete (11) is poured into the first side wall opening (12) and the second side wall opening (13) through the pre-reserved hole (201) of the anchor head pad (2). Before the concrete (11) is initially set, the anchor rod (4) is prestressed by tensioning equipment. After tensioning is completed, the anchor rod (4) is fixed by the anchor head (3). Finally, all exposed steel materials are treated with anti-corrosion to complete the construction of the entire subway station anti-buoyancy treatment.

10. The anti-floating treatment method for a subway station according to claim 9, characterized in that, When the anchor bar (14) is inserted, it should avoid the area of ​​the first side wall opening (12) and the second side wall opening (13). The anchor bars (14) located above, to the left and to the right of the first side wall opening (12) and the second side wall opening (13) are set perpendicular to the station structure side wall (5). The anchor bars (14) located below the opening are arranged parallel to the extension direction of the first side wall opening (12) and the second side wall opening (13).