An adaptive adjustment structure for differential settlement of integrated utility tunnels in goaf areas

By using cross-mounted telescopic adjustment units and a central coordinating valve group, the rotation coordination problem of the pipe gallery joints during differential settlement in the goaf was solved, achieving hydraulic buffering and mechanical adaptation of the joints and improving the stability and adaptability of the structure.

CN123109207APending Publication Date: 2026-11-17JINAN URBAN CONSTRUCTION GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611479652.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-22
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When existing integrated utility tunnel joints cross mining areas, it is difficult to coordinate the relative rotation caused by the sinking of one side first, resulting in problems such as skewed tension and compression, jamming, or rapid misalignment of the connectors.

Method used

The system employs cross-configured telescopic adjustment units and a central coordinating valve group. Through hydraulic medium distribution and mechanical differential motion, it coordinates the differential settlement of pipe gallery segments, converting it into axial telescopic motion of the adjustment unit, and reduces joint misalignment through hydraulic buffering.

Benefits of technology

It effectively reduces the sudden misalignment and speed of pipe gallery joints, lowers the risk of off-center loading and jamming of connectors, and improves the adaptability and operational stability to differential settlement in goaf areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109207A_ABST
    Figure CN123109207A_ABST
Patent Text Reader

Abstract

This invention discloses an adaptive adjustment structure for differential settlement of integrated utility tunnels in goaf areas, comprising two opposing connecting frames, two adjustment units, and a central coordinating valve group. The two adjustment units are located at the lower part of the connecting frames and obliquely span between them. One end of each adjustment unit is rotatably connected to one connecting frame, and the other end is hinged to an ear plate on the other connecting frame via a connector. The two adjustment units are connected to the central coordinating valve group via a coordinating pipeline. When settlement occurs on one side of the utility tunnel segment, the two adjustment units extend and shorten respectively according to the change in the distance between the connection points. The hydraulic medium discharged from the shortened side is throttled by the central coordinating valve group and then transported to the extended side. The connector and rotating connector adjust the tilt angle of the adjustment units as the connecting frames rotate. This invention can convert the vertical misalignment and relative rotation of the utility tunnel segments into controlled differential expansion and contraction motion, reducing the risks of uneven loading, jamming, and rapid misalignment of the joints in the adjustment units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underground utility tunnel settlement adjustment technology, and in particular to an adaptive adjustment structure for differential settlement of underground utility tunnels in mining subsidence areas. Background Technology

[0002] When a utility tunnel crosses the boundary of a goaf at an angle, the foundation support conditions on both sides of the tunnel joint differ. The lower part of the tunnel segment located on the side affected by the goaf may settle first, causing vertical misalignment and relative rotation between adjacent tunnel segments. Since this type of settlement usually manifests as one side sinking while the other side remains relatively stable, the displacement and rotation direction on both sides of the joint are not consistent.

[0003] Existing integrated utility tunnel joints mostly use ordinary expansion joints, flexible waterstops, or single expansion joints for adaptation. These structures mainly rely on their own deformation to passively release displacement, making it difficult to coordinate and buffer relative rotation caused by settlement on one side first. When a segment of the utility tunnel tilts, ordinary rigid or unidirectional expansion joints are easily subjected to skewed tension and compression, leading to problems such as jamming, uneven loading, or rapid misalignment of the joint. Therefore, a differential settlement adaptive adjustment structure is needed that can differentially expand and contract with the relative settlement on both sides of the utility tunnel and coordinate and limit the rotation process of the joint. Summary of the Invention

[0004] The purpose of this invention is to provide an adaptive adjustment structure for differential settlement of integrated utility tunnels in goaf areas, which is used to solve the problem of coordinating and buffering the relative rotation caused by the initial settlement of one side of the integrated utility tunnel in a goaf area. When the tunnel segment tilts, ordinary rigid or unidirectional expansion joints are easily subjected to skewed tension and compression, which can lead to problems such as jamming, uneven loading, or rapid misalignment of joints.

[0005] An adaptive adjustment structure for differential settlement of integrated utility tunnel in a goaf area includes two connecting frames arranged opposite each other, two adjustment units disposed between the two connecting frames, and a central coordinating valve group; the two adjustment units are each disposed at the lower part of the connecting frames and obliquely span between the two connecting frames respectively, one end of each adjustment unit is rotatably connected to one of the connecting frames, and the other end is hinged to an ear plate disposed on the other connecting frame through a connector; the two adjustment units are respectively connected to the central coordinating valve group through coordinating pipelines.

[0006] The aforementioned components achieve the following effect: two connecting frames are installed on both sides of the joint between adjacent pipe rack segments. The two adjustment units are not connected parallel to each other in the same direction, but are connected diagonally from the lower part of one connecting frame to the other, forming a cross-connection relationship.

[0007] When one of the connecting frames sinks downwards along with the corresponding pipe gallery segment, the distances between the two sets of inclined connecting points change in opposite directions. The distance between one set of connecting points increases, causing the corresponding adjusting unit to extend; the distance between the other set of connecting points decreases, causing the corresponding adjusting unit to shorten. This transforms the vertical misalignment and relative rotation between the two pipe gallery segments into the extension and contraction motion of the two adjusting units.

[0008] The two regulating units are connected to the central coordinating valve group through a coordinating pipeline, so that the hydraulic medium discharged from the shortening side regulating unit can be controlled and distributed to the extension side regulating unit through the central coordinating valve group, thereby coordinating the mechanical differential motion with the hydraulic medium distribution.

[0009] Furthermore, both adjustment units are telescopic adjustment units capable of extending and retracting along their respective axes. The connector head can rotate relative to the corresponding ear plate, and the adjustment unit can rotate relative to the corresponding connecting frame. When the two connecting frames settle or rotate relative to each other, the two adjustment units extend or shorten along their respective axes as the connection position between the two connecting frames changes, and change their tilt angle relative to the connecting frame.

[0010] The effect achieved by the above components is that when differential settlement occurs in the pipe gallery, not only will there be changes in the height of the two connecting frames, but there will also be a certain degree of relative tilt. The adjustment unit adapts to the changes in distance between the two connection points by axial extension and contraction, and adapts to the changes in angle between the two connection points by the rotation of the connector relative to the ear plate and the rotation of the adjustment unit relative to the connecting frame.

[0011] Furthermore, the adjustment unit includes a cylinder, a piston disposed inside the cylinder, and a piston rod connected to the piston. The piston rod extends out of the cylinder and is connected to the connector. The cylinder is connected to an arc-shaped adjustment seat via a rotating connector. The arc-shaped adjustment seat is mounted on the corresponding connecting frame. The connector is connected to the corresponding ear plate via a pin.

[0012] The effect achieved by the above components is that when differential settlement occurs in the pipe gallery, not only will there be changes in the height of the two connecting frames, but there will also be a certain degree of relative tilt. The adjustment unit adapts to the changes in distance between the two connection points by axial extension and contraction, and adapts to the changes in angle between the two connection points by the rotation of the connector relative to the ear plate and the rotation of the adjustment unit relative to the connecting frame.

[0013] Furthermore, a guide sleeve is provided between the cylinder and the piston rod; the arc-shaped adjusting seat is provided with positioning holes arranged along the arc direction and elastic locking pins that cooperate with the positioning holes; the arc-shaped adjusting seat is also provided with a limiting block located on the swing path of the rotating connector.

[0014] The effect achieved by the above components is that the guide sleeve is used to limit the radial swing of the piston rod relative to the cylinder, so that the piston rod can stably extend and retract along the axial direction of the cylinder, and reduce the uneven wear between the piston and the cylinder.

[0015] The arc-shaped adjustment seat is mainly used to adjust the initial tilt angle of the adjustment unit during the installation stage. Based on the distance between the two connecting frames and the position of the ear plate, the rotating connector is adjusted to the corresponding angle along the arc-shaped adjustment seat, and then the elastic locking pin is inserted into the corresponding positioning hole to lock the initial installation position of the adjustment unit.

[0016] During operation, the small-amplitude rotation of the adjustment unit is mainly borne by the rotating connector. When the swing angle of the rotating connector reaches the set range, the limit block forms a mechanical block to prevent the adjustment unit from excessively deflecting and exceeding the allowable working range of the piston rod, connector, or coordinating pipeline.

[0017] Furthermore, the two adjustment units are arranged at an angle relative to each other, with one adjustment unit extending at an angle from the lower part of one connecting frame to one side of the other connecting frame, and the other adjustment unit extending at an angle from the lower part of the other connecting frame to one side of the aforementioned connecting frame, and the axes of the two adjustment units are arranged intersecting.

[0018] The effect achieved by the above components is as follows: the two adjustment units are arranged in a cross pattern, so that they respectively connect to two sets of diagonal connection points in opposite directions. When the left connecting frame settles, the distance between the two connection points of one adjustment unit increases and it lengthens, while the distance between the two connection points of the other adjustment unit decreases and it shortens; when the right connecting frame settles, the extension and retraction states of the two adjustment units are opposite.

[0019] Therefore, this cross structure can adapt to settlement in either the left or right side of the pipe gallery segment in both directions, and allows the two adjustment units to form complementary strokes. Compared with the parallel arrangement of the two adjustment units, the cross arrangement can more directly convert the relative rotation of the connecting frame into reverse axial stroke, while forming vertical and lateral components through the axial force of the two oblique adjustment units to limit sudden misalignment and excessive opening of the joint.

[0020] Furthermore, each cylinder is provided with a coordination pipeline interface that communicates with its internal hydraulic chamber. One end of the coordination pipeline is connected to the coordination pipeline interface, and the other end is connected to the central coordination valve group. The central coordination valve group is provided with a connection channel that communicates with two of the coordination pipelines respectively, and a throttling structure provided on the connection channel.

[0021] The effect achieved by the above components is as follows: when an adjustment unit shortens, its piston moves in the cylinder and compresses the corresponding hydraulic chamber. The hydraulic medium enters the coordination pipeline through the coordination pipeline interface and then enters the central coordination valve group.

[0022] After passing through the connecting channel and throttling structure, the hydraulic medium is delivered to another extending regulating unit to compensate for the increase in its hydraulic chamber volume. This results in: Furthermore, a telescopic cover plate is provided between the connecting frames, the telescopic cover plate including a first cover plate and a second cover plate that are respectively connected to the two connecting frames and slide and overlap each other.

[0023] The aforementioned components achieve the following effect: when the two connecting frames experience relative settlement, rotation, or changes in joint width, relative sliding occurs between the first and second cover plates, thereby altering the coverage length of the telescopic cover. The telescopic cover maintains coverage of the gap between the two connecting frames as the joint changes, reducing the entry of debris into the adjustment area and providing continuous coverage for personnel or maintenance equipment passing through the joint area inside the utility tunnel.

[0024] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention utilizes two retractable adjustment units intersecting at the lower part of the connecting frame between two adjacent pipe gallery segments. When settlement occurs on one side of the pipe gallery segment, the two adjustment units can extend and shorten respectively according to the distance between the two sets of inclined connection points, converting the vertical misalignment and relative rotation between the pipe gallery segments into axial differential motion of the adjustment units. Simultaneously, the hydraulic medium discharged from the shortening side adjustment unit is throttled by the central coordinating valve group and distributed to the extending side adjustment unit, coordinating the movements of the two adjustment units and forming a hydraulic buffer during the settlement process, reducing the amplitude and speed of sudden misalignment of the pipe gallery joints. The two ends of the adjustment units are rotatably connected, allowing them to adjust their tilt angle according to changes in the orientation of the connecting frame, reducing the risk of eccentric loading, bending, and jamming on the piston rod and cylinder. The arc-shaped adjustment seat, elastic locking pin, and limit block can also complete initial angle adjustment and over-angle limit, thereby improving the adaptability and operational stability of the structure to unilateral differential settlement in the goaf. Attached Figure Description

[0025] Appendix Figure 1 This is a three-dimensional structural schematic diagram of the present invention; Appendix Figure 2 This is a schematic diagram of the adjustment unit structure of the present invention; Appendix Figure 3 This is a schematic diagram of the adaptive adjustment of the left-side settlement structure of the present invention; Appendix Figure 4 This is a schematic diagram of the adaptive adjustment of the right-side settlement structure of the present invention; Icon labels: 1. Connecting frame; 2. Adjusting unit; 3. Central coordinating valve assembly; 4. Coordinating pipeline; 5. Telescopic cover plate; 6. Connector; 7. Piston rod; 8. Guide sleeve; 9. Cylinder; 10. Piston; 11. Rotary connecting piece; 12. Arc-shaped adjusting seat; 13. Elastic locking pin; 14. Limit block; 15. Coordinating pipeline interface; 16. Ear plate. Detailed Implementation

[0026] The present invention will be further illustrated below with reference to specific embodiments. It should be understood that these embodiments are for illustrative purposes only and are not intended to limit the scope of the invention. Furthermore, it should be understood that after reading the teachings of this invention, those skilled in the art can make various alterations or modifications to the invention, and these equivalent forms also fall within the scope defined by the appended claims.

[0027] This invention provides an adaptive adjustment structure for differential settlement of integrated utility tunnels in goaf areas, comprising two oppositely arranged connecting frames 1, two adjustment units 2, a central coordinating valve group 3, a coordinating pipeline 4, and a telescopic cover plate 5. The two connecting frames 1 are respectively installed at the ends of two adjacent tunnel segments and are arranged opposite each other along the tunnel's extension direction, forming a joint between the two connecting frames 1 to allow for the release of relative displacement between adjacent tunnel segments. Thus, the local differential settlement caused by goaf areas can be concentrated as relative displacement and relative rotation between the two connecting frames 1, facilitating coordinated buffering through the adjustment units 2.

[0028] To address the difficulty of converting the relative rotation caused by the initial settlement of one side of the pipe gallery into complementary adjustment motion in ordinary parallel connection structures, two adjustment units 2 are both located at the lower part of the connecting frame 1, and are diagonally spanned between the two connecting frames 1. One end of one adjustment unit 2 is installed at the lower part of the left connecting frame 1, and the other end extends diagonally to the ear plate 16 on the right connecting frame 1; one end of the other adjustment unit 2 is installed at the lower part of the right connecting frame 1, and the other end extends diagonally to the ear plate 16 on the left connecting frame 1, thus the axes of the two adjustment units 2 are intersecting. Therefore, when either the left or right connecting frame 1 settles independently, the distance between the two sets of diagonal connection points can change in opposite directions, causing the two adjustment units 2 to lengthen and shorten respectively.

[0029] To address the issue of uneven loading or jamming of the expansion joint when differential settlement occurs in the pipe gallery, where both connection distance and connection angle change, ordinary rigid connections are prone to this problem. Each adjustment unit 2 includes a cylinder 9, a piston 10, a piston rod 7, and a connector 6. The piston 10 is slidably disposed within the cylinder 9. One end of the piston rod 7 is connected to the piston 10, and the other end extends out of the cylinder 9 and connects to the connector 6. The connector 6 is hinged to the ear plate 16 on the corresponding connection frame 1 via a pin. The other end of the cylinder 9 is connected to an arc-shaped adjustment seat 12 via a rotating connector 11, which is installed at the lower part of the corresponding connection frame 1. Thus, the adjustment unit 2 can adapt to changes in the distance between the two connection points through the axial extension and retraction of the piston rod 7, and adapt to changes in the angle between the two connection points through the rotation of the connector 6 and the rotating connector 11, allowing the piston rod 7 and cylinder 9 to primarily bear axial tensile and compressive forces.

[0030] To address the issues of radial sway and uneven wear that can easily occur in the piston rod 7 during inclined arrangement and under load expansion and contraction, a guide sleeve 8 is provided between the cylinder 9 and the piston rod 7, allowing the piston rod 7 to slide axially along the guide sleeve 8. This limits the radial displacement of the piston rod 7, maintains a stable fit between the piston 10 and the cylinder 9, and reduces the possibility of jamming in the adjusting unit 2 during differential settlement.

[0031] To address the issue of initial axis misalignment of the adjusting unit 2 caused by the actual spacing between the two connecting frames 1, the installation height of the ear plate 16, and construction assembly errors, the arc-shaped adjusting seat 12 is equipped with positioning holes arranged along the arc direction and elastic locking pins 13 that cooperate with the positioning holes. During installation, the initial angle of the rotating connecting piece 11 is adjusted according to the actual positions of the two connecting frames 1 and the ear plate 16, and the corresponding position is locked by the elastic locking pins 13. This allows the adjusting unit 2 to maintain a reasonable tilt angle in its initial state and positions the piston 10 in the middle stroke region of the cylinder 9, thus simultaneously preserving both the extension and shortening strokes.

[0032] To address the issue of excessive oscillation of the adjusting unit 2 when the differential settlement of the pipe gallery is too large, a limiting block 14 located on the oscillation path of the rotating connector 11 is also provided on the arc-shaped adjusting seat 12. Within the normal adjustment range, the rotating connector 11 can rotate with the relative posture change of the connecting frame 1; when the rotation angle reaches the allowable range, the limiting block 14 forms a mechanical block on the rotating connector 11. This prevents the connector 6, piston rod 7, and coordinating pipeline 4 from exceeding their allowable operating range.

[0033] To address the issue that when the two regulating units 2 extend and retract simultaneously, if the hydraulic chambers are independent, the pressure on the shortening side may increase while the fluid supply to the extending side may be insufficient. Therefore, each cylinder 9 is equipped with a coordination pipe interface 15 that communicates with the internal hydraulic chamber. The two coordination pipe interfaces 15 are connected to the central coordination valve assembly 3 via coordination pipes 4. The central coordination valve assembly 3 contains a connection channel and a throttling structure, allowing for controlled transfer of the hydraulic medium between the two regulating units 2. Thus, the hydraulic medium discharged from the shortening-side regulating unit 2 can be transported to the extending-side regulating unit 2 via the central coordination valve assembly 3, and the throttling structure limits the movement speed of the two regulating units 2.

[0034] To address the issue of exposed gaps easily forming at the joint after relative settlement and rotation of the two connecting frames 1, a telescopic cover plate 5 is installed between the two connecting frames 1. The telescopic cover plate 5 includes a first cover plate and a second cover plate, which are respectively connected to the two connecting frames 1 and slide against each other. When the two connecting frames 1 move closer to each other, further apart, or are misaligned, the first cover plate and the second cover plate slide relative to each other. This allows the gap between the two connecting frames 1 to be continuously covered as the joint width and position change, reducing the entry of debris into the adjustment area and maintaining the continuity of passage at the joint position. Example 1

[0035] When settlement occurs in the left-side pipe gallery segment: For example Figure 3 As shown, this embodiment illustrates the adaptive adjustment process of the structure of the present invention when the left-side pipe gallery segment settles first. For ease of explanation, the adjustment unit 2 with its cylinder end installed at the lower part of the left connecting frame 1 and the connecting head 6 connected to the ear plate 16 on the right connecting frame 1 is called the left adjustment unit; the adjustment unit 2 with its cylinder end installed at the lower part of the right connecting frame 1 and the connecting head 6 connected to the ear plate 16 on the left connecting frame 1 is called the right adjustment unit. This designation is only used to distinguish the installation positions of the two adjustment units 2.

[0036] To address the issue of continued compaction of the soil and rock in the left-side goaf causing the left-side pipe gallery segment to settle downwards before the right-side segment, the left-side pipe gallery segment moves the left-side connecting frame 1 downwards as a whole, causing the left-side connecting frame 1 to rotate at a certain angle relative to the right-side connecting frame 1. At this time, the cylinder end of the left-side adjusting unit, installed at the lower part of the left-side connecting frame 1, moves downwards with the left-side connecting frame 1, while the right-side ear plate 16 connected to the other end of the left-side adjusting unit remains relatively stable. This increases the distance between the connection points at both ends of the left-side adjusting unit, causing its piston rod 7 to extend relative to the cylinder 9. Thus, the left-side adjusting unit can actively increase its connection length as the left-side connecting frame 1 settles, avoiding rigid restraint on the left-side pipe gallery segment.

[0037] Meanwhile, the cylinder end of the right adjustment unit is mounted on the lower part of the relatively stable right connecting frame 1, and its connector 6 is connected to the ear plate 16 that moves down with the left connecting frame 1, reducing the distance between the connection points at both ends of the right adjustment unit, and causing the piston rod 7 of the right adjustment unit to retract relative to the cylinder 9. Thus, the two cross-arranged adjustment units 2 form a complementary motion of the left adjustment unit extending and the right adjustment unit shortening, converting the vertical settlement and relative rotation of the left connecting frame 1 into the opposite axial stroke of the two adjustment units 2.

[0038] To address the issue that the axial direction of the adjusting unit 2 changes during the sinking of the left connecting frame 1, potentially causing the piston rod 7 to bear additional bending moment, the connecting heads 6 of the left and right adjusting units rotate around the pins on the corresponding ear plates 16. Simultaneously, the cylinder 9 rotates adaptively relative to the arc-shaped adjusting seat 12 via the rotating connecting piece 11. Thus, the two adjusting units 2 can adjust their tilt direction according to the posture changes of the left connecting frame 1, ensuring the piston rod 7 maintains axial extension and contraction along the guide sleeve 8, reducing off-center loading and jamming.

[0039] To address the issue of increased internal hydraulic pressure when the right-side regulating unit shortens, and increased hydraulic chamber volume when the left-side regulating unit extends, the piston 10 in the right-side regulating unit moves as the piston rod 7 retracts, discharging the hydraulic medium from the corresponding hydraulic chamber into the coordinating pipeline 4 via the coordinating pipeline interface 15. After entering the central coordinating valve group 3, the hydraulic medium is controlled and transported to the corresponding hydraulic chamber of the left-side regulating unit through the connecting channel and throttling structure. This creates a hydraulic medium distribution state of "right-side regulating unit discharging fluid—central coordinating valve group throttling—left-side regulating unit receiving fluid," coordinating the reverse movements of the two regulating units 2.

[0040] To address the issue of the left-side pipe gallery segment potentially sinking rapidly due to sudden compaction of local voids, the hydraulic medium, when passing through the central coordinating valve group 3 for a short period, is subject to flow restriction by the throttling structure. This prevents the right-side regulating unit from retracting quickly and freely, and the left-side regulating unit from extending quickly and freely. Consequently, hydraulic damping is provided for the sinking and rotation of the left-side connecting frame 1, transforming the sudden misalignment of the joint into a relative motion with limited speed.

[0041] To address the issue of changes in the width and height of the joint between the two connecting frames 1 after the left connecting frame 1 sinks, the first and second cover plates slide and overlap with the relative displacement of the two connecting frames 1, and the telescopic cover plate 5 continuously covers the joint. This reduces the exposure of the adjustment area and the entry of debris, while maintaining the continuity of coverage at the joint.

[0042] As the compaction process of the soil and rock mass in the left goaf gradually stabilizes, the left regulating unit remains in a relatively elongated state, while the right regulating unit remains in a relatively shortened state. The central coordinating valve group 3 maintains the hydraulic pressure relationship between the two regulating units 2. Thus, the device can maintain its regulating state in the new relative position and prevent uncontrolled swaying of adjacent pipe gallery segments after settlement has stabilized. Example 2

[0043] When settlement occurs in the right-side pipe gallery segment: For example Figure 4 As shown, this embodiment illustrates the adaptive adjustment process of the structure of the present invention when the right-side pipe gallery segment settles first. The installation structure of the two adjustment units 2 in this embodiment is the same as in Embodiment 1, except that the settled pipe gallery segment is located on the right side. Therefore, the movement direction of the two adjustment units 2 and the flow direction of the hydraulic medium are opposite to those in Embodiment 1.

[0044] To address the issue of continued compaction of the soil and rock mass in the right-side goaf causing the right-side utility tunnel segment to settle downwards before the left-side segment, the right-side utility tunnel segment moves the right-side connecting frame 1 downwards and rotates at a certain angle relative to the left-side connecting frame 1. At this time, the cylinder end of the right-side adjusting unit moves downwards with the right-side connecting frame 1, while its connector 6 connects to the ear plate 16 on the relatively stable left-side connecting frame 1, increasing the distance between the connection points at both ends of the right-side adjusting unit. The piston rod 7 of the right-side adjusting unit extends relative to the cylinder 9. Therefore, the right-side adjusting unit can increase its connection length as the right-side connecting frame 1 settles, releasing the downward displacement of the right-side utility tunnel segment.

[0045] Meanwhile, the cylinder end of the left adjustment unit is mounted on the lower part of the relatively stable left connecting frame 1, and its connector 6 is connected to the ear plate 16 that moves down with the right connecting frame 1, reducing the distance between the connection points at both ends of the left adjustment unit, and causing the piston rod 7 of the left adjustment unit to retract relative to the cylinder 9. Thus, the two adjustment units 2 form a complementary motion of the right adjustment unit extending and the left adjustment unit shortening, converting the sinking and rotation of the right connecting frame 1 into a differential telescopic stroke opposite to that in Embodiment 1.

[0046] To address the issue of the changing connection angle between the two adjustment units 2 when the right connecting frame 1 rotates, the connector 6 rotates relative to the corresponding ear plate 16, and the cylinder 9 rotates relative to the arc-shaped adjustment seat 12 via the rotating connector 11. Simultaneously, the piston rod 7 extends and retracts along the guide sleeve 8. This allows the two adjustment units 2 to realign with their respective connection points as the right connecting frame 1 changes posture, reducing lateral bending of the cylinder 9 and piston rod 7.

[0047] To address the hydraulic medium supply issue when the left regulating unit shortens while the right regulating unit extends, the piston 10 in the left regulating unit discharges the hydraulic medium from the corresponding hydraulic chamber to the central coordinating valve group 3 via the coordinating pipeline interface 15 and the coordinating pipeline 4. After passing through the throttling structure in the central coordinating valve group 3, the hydraulic medium is then controlled and delivered to the corresponding hydraulic chamber of the right regulating unit.

[0048] To address the potential for rapid misalignment of the joints when the right-side pipe gallery segment suddenly sinks, the central coordinating valve group 3 uses a throttling structure to limit the instantaneous flow of hydraulic medium from the left-side regulating unit to the right-side regulating unit. This restricts the retraction speed of the left-side regulating unit and the extension speed of the right-side regulating unit. Consequently, it provides hydraulic buffering for the downward movement and rotation of the right-side connecting frame 1, reducing the impact of the sudden sinking of the right-side pipe gallery segment on the joints and regulating structure.

[0049] To address the issue of the joint shape changing in the opposite direction after the settlement of the right connecting frame 1, the first and second covers of the telescopic cover 5 slide relative to each other in the opposite direction to that in Embodiment 1, and continue to cover the gap between the two connecting frames 1. Thus, the same telescopic cover 5 can adapt to different joint changes caused by settlement on the left or right side without altering its installation structure.

[0050] As the settlement process of the soil and rock mass in the right-side goaf gradually stabilizes, the right-side regulating unit remains in a relatively extended state, the left-side regulating unit remains in a relatively shortened state, and the central coordinating valve group 3 maintains the corresponding hydraulic state. Thus, this invention can adapt to special working conditions where settlement occurs first in either the left or right side of the pipe gallery segment without changing the installation method of the regulating unit 2.

[0051] The installation and usage steps of this invention are as follows: Step S1, Connecting Frame Installation: Fix the two connecting frames 1 to the ends of two adjacent integrated utility tunnel segments, so that the two connecting frames 1 are positioned opposite each other along the extension direction of the utility tunnel, and leave a clearance between the two connecting frames 1 to allow for relative settlement, rotation, and changes in joint width of the utility tunnel segments. During installation, ensure that the lower installation areas of the two connecting frames 1 correspond to each other to facilitate the subsequent installation of the two adjustment units 2.

[0052] Step S2, Installation of Adjustment Units and Hydraulic Pipelines: Install the cylinder end of one adjustment unit 2 onto the lower part of the left connecting frame 1 via the rotating connector 11 and the arc-shaped adjustment seat 12, and hinge the piston rod end connector 6 to the ear plate 16 on the right connecting frame 1 via a pin; install the cylinder end of the other adjustment unit 2 onto the lower part of the right connecting frame 1, and hinge the connector 6 to the ear plate 16 on the left connecting frame 1, so that the two adjustment units 2 are diagonally straddling the two connecting frames 1 and forming a cross arrangement.

[0053] The coordination pipe interfaces 15 on the two cylinders 9 are connected to the central coordination valve assembly 3 through the coordination pipe 4, and the central coordination valve assembly 3 is fixed to the connecting frame 1 or the mounting bracket connected to the connecting frame 1. Then, a telescopic cover plate 5 is installed between the two connecting frames 1, so that the first cover plate and the second cover plate are in a sliding overlapping state.

[0054] Step S3, Adaptive adjustment when the left pipe gallery segment settles: When the left pipe gallery segment settles downward due to the compaction of the soil and rock in the goaf, the left connecting frame 1 moves downward with the pipe gallery segment and rotates relative to the right connecting frame 1.

[0055] At this time, the distance between the two connection points of the adjusting unit 2, which is mounted on the left connecting frame 1 and hinged to the right connecting frame 1 at the cylinder end, increases, and the piston rod 7 extends out relative to the cylinder 9; the distance between the two connection points of the adjusting unit 2, which is mounted on the right connecting frame 1 and hinged to the left connecting frame 1 at the cylinder end, decreases, and the piston rod 7 retracts relative to the cylinder 9.

[0056] The piston 10 in the shortening-side regulating unit 2 presses against the corresponding hydraulic chamber, causing the hydraulic medium to enter the central regulating valve group 3 sequentially through the coordinating pipeline interface 15 and the coordinating pipeline 4. After passing through the connecting channel and throttling structure in the central regulating valve group 3, the hydraulic medium is delivered to the hydraulic chamber of the extension-side regulating unit 2. This creates a coordinated state where the right-side regulating unit shortens and discharges fluid, and the left-side regulating unit extends and receives fluid.

[0057] During this process, the connector 6 rotates relative to the ear plate 16, and the cylinder 9 rotates relative to the arc-shaped adjusting seat 12 by rotating the connector 11, so that the two adjusting units 2 adjust their tilt angles with the settlement of the left connecting frame 1, thereby converting the vertical settlement and relative rotation of the left pipe gallery segment into the extension and retraction movement of the two adjusting units 2, and buffering the settlement speed through the throttling effect of the central coordination valve group 3.

[0058] Step S4, Adaptive adjustment when the right-side pipe gallery segment settles: When the right-side pipe gallery segment settles downward due to the compaction of the soil and rock in the goaf, the right-side connecting frame 1 moves downward with the pipe gallery segment and rotates relative to the left-side connecting frame 1.

[0059] At this time, the distance between the two connection points of the adjusting unit 2, which is mounted on the right connecting frame 1 and hinged to the left connecting frame 1 at the cylinder end, increases, and the piston rod 7 extends out relative to the cylinder 9; the distance between the two connection points of the adjusting unit 2, which is mounted on the left connecting frame 1 and hinged to the right connecting frame 1 at the cylinder end, decreases, and the piston rod 7 retracts relative to the cylinder 9.

[0060] The hydraulic medium discharged from the shortening-side regulating unit 2 enters the central regulating valve group 3 through the coordinating pipeline 4, and is then throttled before being delivered to the elongation-side regulating unit 2. This creates a reverse coordinating state where the left-side regulating unit shortens and discharges liquid, while the right-side regulating unit elongates and receives liquid, enabling the same regulating structure to adapt to the condition where the right-side pipe gallery segment settles first.

Claims

1. A gob utility tunnel differential settlement self-adaptive adjusting structure, characterized in that: It includes two connecting frames (1) arranged opposite to each other, two adjusting units (2) disposed between the two connecting frames (1) and a central coordinating valve group (3); Both adjustment units (2) are located at the lower part of the connecting frame (1) and are diagonally spanned between the two connecting frames (1). One end of each adjustment unit (2) is rotatably connected to one of the connecting frames (1), and the other end is hinged to the ear plate (16) on the other connecting frame (1) via the connector (6). The two regulating units (2) are respectively connected to the central regulating valve group (3) through the regulating pipeline (4).

2. The gob utility tunnel differential settlement self-adaptive adjusting structure according to claim 1, characterized in that: Both adjustment units (2) are telescopic adjustment units that can extend and retract along their respective axes. The connector (6) can rotate relative to the corresponding ear plate (16). The adjustment unit (2) and the corresponding connecting frame (1) can rotate relative to each other. When the two connecting frames (1) settle or rotate relative to each other, the two adjusting units (2) extend or shorten along their respective axes as the connection position between the two connecting frames (1) changes, and change their tilt angle relative to the connecting frames (1).

3. The gob utility tunnel differential settlement self-adaptive adjusting structure according to claim 2, characterized in that: The adjustment unit (2) includes a cylinder (9), a piston (10) disposed in the cylinder (9), and a piston rod (7) connected to the piston (10). The piston rod (7) extends out of the cylinder (9) and is connected to the connector (6). The cylinder (9) is connected to the arc-shaped adjusting seat (12) via a rotating connector (11). The arc-shaped adjusting seat (12) is installed on the corresponding connecting frame (1). The connector (6) is connected to the corresponding ear plate (16) via a pin.

4. The gob utility tunnel differential settlement self-adaptive adjusting structure according to claim 3, characterized in that: A guide sleeve (8) is provided between the cylinder (9) and the piston rod (7). The arc-shaped adjustment seat (12) is provided with positioning holes arranged along the arc direction and elastic locking pins (13) that cooperate with the positioning holes. The arc-shaped adjustment seat (12) is also provided with a limiting block (14) located on the swing path of the rotating connector (11).

5. The gob utility tunnel differential settlement self-adaptive adjusting structure according to claim 1, characterized in that: The two adjustment units (2) are arranged at an angle relative to each other. One of the adjustment units (2) extends at an angle from the lower part of one of the connecting frames (1) to one side of the other connecting frame (1), and the other adjustment unit (2) extends at an angle from the lower part of the other connecting frame (1) to one side of the aforementioned connecting frame (1). The axes of the two adjustment units (2) are arranged to intersect.

6. The gob utility tunnel differential settlement self-adaptive adjusting structure according to claim 4, characterized in that: Each cylinder (9) is provided with a coordination pipeline interface (15) that communicates with its internal hydraulic chamber. One end of the coordination pipeline (4) is connected to the coordination pipeline interface (15), and the other end is connected to the central coordination valve group (3). The central coordinating valve group (3) is provided with a connecting channel that is connected to the two coordinating pipelines (4) respectively, and a throttling structure provided on the connecting channel.

7. The gob utility tunnel differential settlement self-adaptive adjusting structure according to claim 1, characterized in that: A telescopic cover plate (5) is provided between the connecting frames (1). The telescopic cover plate (5) includes a first cover plate and a second cover plate that are respectively connected to the two connecting frames (1) and slide and overlap each other.