A permeable brick evaporative cooling system for roofs

By setting a permeable brick layer and supporting components on the roof, combined with a water supply drive component and controller, the real-time moisture content and evaporation rate of the permeable bricks can be controlled, solving the problems of large roof load, low ventilation efficiency and water waste, and realizing lightweight, efficient evaporative cooling and rainwater recycling.

CN123109348APending Publication Date: 2026-11-17SOUTH CHINA UNIV OF TECH
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202611583212.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing roof cooling technologies suffer from problems such as high load, low ventilation efficiency, and water waste, making it difficult to achieve lightweight, efficient evaporative cooling and rainwater recycling.

Method used

It employs a permeable brick layer, supporting components, water supply drive components, bottom water supply components, moisture content sensors, and controllers to achieve precise water replenishment, suppress dripping, improve evaporative cooling efficiency, and recycle rainwater by real-time monitoring and control of the moisture content and evaporation rate of the permeable bricks.

Benefits of technology

It achieves a lightweight roof structure, improves evaporative cooling efficiency, reduces water waste, lowers the risk of moss growth, and reduces maintenance costs. It is suitable for the renovation of existing buildings and lightweight roofs, and meets the requirements of green building and sponge city.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109348A_ABST
    Figure CN123109348A_ABST
Patent Text Reader

Abstract

This invention relates to the field of building roof temperature control technology, solving the problems of low cooling efficiency or water waste in existing technologies for cooling building roofs. It provides a permeable brick evaporative cooling system for roofs, comprising: a permeable brick layer, supporting components, a water supply drive assembly, a bottom water supply assembly, a moisture content sensor, and a controller. The supporting components support the permeable brick layer to form an elevated layer. The water supply drive assembly pressurizes water and distributes it to the bottom water supply assembly, which then supplies water to the permeable bricks. The moisture content sensor detects the real-time moisture content of the permeable bricks. The controller determines the real-time water storage capacity and evaporation rate of the permeable bricks based on the real-time moisture content and its change. Based on the real-time evaporation rate, the controller determines the allowable water replenishment rate, controlling the real-time water replenishment rate to be lower than or equal to the allowable rate. This matches the water supply flow rate with the evaporative water consumption capacity of the permeable bricks, reducing ineffective water replenishment and thus achieving water conservation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building roof temperature control technology, and in particular to a permeable brick evaporative cooling system for roofs. Background Technology

[0002] With the advancement of building energy conservation and sponge city construction, roofs, as the main heat-receiving surface of buildings, are receiving increasing attention for their heat insulation and cooling technologies. Currently, common roof cooling methods mainly include raised roofs, permeable brick paving, and green roofs.

[0003] Elevated roofs typically rely on air gaps in the roof structure for natural ventilation and heat dissipation. However, in actual engineering, due to limitations in roof height and the arrangement of supporting components, these air gaps are often narrow and have poor circulation paths, limiting natural ventilation efficiency. Permeable brick paving is widely used for outdoor ground surfaces due to its excellent permeability and evaporative cooling capacity. Traditional permeable brick paving requires a thick base layer of sand or concrete, resulting in a significant overall weight. This significantly increases the roof load and poses safety hazards to the building structure. Green roofs have complex structures, typically including multiple waterproofing layers, root-penetration-resistant layers, and thick planting soil layers. Construction and maintenance costs are high, and the significant weight places high demands on the roof's load-bearing capacity, limiting their application in existing building renovations or lightweight roofs.

[0004] For example, existing Chinese patent CN203201033U discloses a water-retaining roof insulation module with an elevated layer, including permeable bricks, a filter layer, a support layer, a waterproof membrane, an insulation layer, module panels, and an elevated layer. This solution uses the hollow cavities within the module panels to collect rainwater, utilizes the support layer to support the permeable bricks, and sets up an elevated layer below the module panels to achieve roof insulation, accessibility, and rainwater filtration and collection. However, this solution mainly relies on the permeable bricks to block solar radiation and uses the water storage layer and elevated layer to reduce heat transfer. It lacks a bottom water supply mechanism that adjusts according to the water content and evaporation of the permeable bricks, making it difficult to actively regulate the wettability of the permeable bricks and the intensity of evaporative cooling on their lower surface.

[0005] Chinese patent CN108316569A discloses a uniformly replenished thermochromic high-reflectivity evaporative roof. It achieves roof cooling by combining a porous water-retaining material layer with a thermochromic high-reflectivity coating layer. A water supply pipe with outlet holes is installed in a seepage groove on the lower surface of the porous water-retaining material layer to achieve uniform water replenishment. A rainwater collection, purification, storage, and recycling system is also included. This solution proposes real-time water replenishment based on evaporation rate. However, its specific implementation mainly relies on controlling the opening and closing of the water supply valve based on the roof temperature and controlling the water pump and related valves based on the water level in the storage tank and collection tank. It does not specifically explain how to determine the actual evaporation rate based on changes in the brick's moisture content and the volume of replenished and returned water, and how to constrain the water replenishment rate and the water storage capacity of the brick accordingly. In actual operation, the roof temperature and evaporation water consumption do not always maintain a fixed correlation. Controlling water replenishment solely based on temperature and water tank level is insufficient to fully adapt to changes in the brick's evaporation water consumption capacity under different environmental conditions.

[0006] Existing Chinese patent CN113237796A discloses a system and method for testing the heat and moisture transfer characteristics based on the wettability of the evaporating medium. By adjusting air temperature, humidity, flow rate, and simulating solar radiation intensity, it employs a bottom-water replenishment method to wet the evaporating medium. The evaporation rate is obtained by combining water film thickness measurement and weighing of the replenishment container, establishing a quantitative relationship between surface wettability, water supply, and evaporation rate. This scheme can be used to study water supply requirements under different operating conditions, but it primarily focuses on testing the heat and moisture transfer characteristics under controlled experimental conditions. It adjusts the replenishment amount through water film thickness feedback to keep the evaporating medium in a saturated state, but it does not directly form an operational control scheme applicable to actual permeable brick roofs. For permeable bricks with their lower surfaces exposed to the air gap, if they are in a near-saturated or excessive water supply state for a long period, downward dripping may occur, increasing the load on residual water collection and ineffective water use. Therefore, it is still necessary to consider both the evaporative cooling requirements and the water storage state of the bricks, and adjust the water replenishment process accordingly.

[0007] Existing Chinese patent CN205403013U discloses a roof cleaning and cooling system and a building. It uses a water pump to deliver water from a tank to roof sprinkler pipes, using spray water to cool the roof and clean the surface. Excess water and rainwater are collected through a water collection unit and return pipe, achieving water resource recycling. The system can also control operation based on manual operation, time, temperature, or light intensity. However, this solution mainly focuses on spray cleaning and cooling of the roof surface, without adjusting the water supply according to the internal water content and evaporation capacity of the permeable bricks. Furthermore, it lacks feedback on the cleaning effect regarding the recovery of permeability after long-term use, such as clogging of the surface, brick joints, or pore inlets. This makes it difficult to determine whether to continue flushing based on the actual condition after rinsing, potentially leading to insufficient cleaning or repeated flushing.

[0008] In summary, existing roof cooling technologies suffer from problems such as high load, low ventilation efficiency, and water waste. There is an urgent need to develop a lightweight, highly efficient evaporative cooling roof cooling system that can also recycle rainwater. Summary of the Invention

[0009] In view of this, embodiments of the present invention provide a permeable brick evaporative cooling system for roofs. While ensuring the lightweight nature of the roof system, it improves the synergistic evaporative cooling capacity of the upper and lower surfaces of the permeable bricks. Through the linkage control between real-time moisture content, real-time evaporation rate, and real-time water replenishment rate, it suppresses continuous dripping of water from the permeable brick layer, thereby saving water, reducing the drip collection load, reducing the risk of moss growth, and facilitating later maintenance. It can solve the problems of large load, low cooling efficiency, or water waste in existing technologies for cooling building roofs.

[0010] This invention provides a permeable brick evaporative cooling system for roofs, comprising: The permeable brick layer is formed by laying multiple permeable bricks, and the permeable bricks have a capillary water absorption structure inside; A supporting component is installed on the building roof structure layer and supports the permeable brick layer, so that an open space is formed between the permeable brick layer and the building roof structure layer; A water supply drive assembly, which is used to pressurize and distribute water supplied by a water storage device and / or an external water supply interface to a bottom water supply assembly; A bottom water supply component is disposed within the elevated layer and communicates with the water supply drive component. The bottom water supply component is used to supply water to the lower surface of the permeable brick, so that the water enters the permeable brick from the lower surface of the permeable brick and evaporates and cools down within the elevated layer. A moisture content sensor is used to detect the real-time moisture content of the permeable bricks; The controller is connected to the water supply drive assembly, the bottom water supply assembly, and the water content sensor, respectively. The controller is used to determine the real-time water storage capacity and real-time evaporation rate of the permeable brick based on the real-time moisture content and the change in the real-time moisture content, and to determine the allowable water replenishment rate based on the real-time evaporation rate. The controller controls the real-time water replenishment rate of the bottom water supply component to be lower than or equal to the allowable water replenishment rate, so that the real-time water storage capacity is lower than the preset saturated water storage capacity, thereby suppressing the continuous dripping of water from the permeable brick layer.

[0011] As an optional implementation, the controller is used to determine the rate of change of the water content of the permeable brick and the water balance parameters based on the water content of the permeable brick at a first time, the water content of the permeable brick at a second time, the time interval between the first time and the second time, and the amount of water replenishment and / or return water within the statistical period, and to determine the real-time evaporation rate of the permeable brick based on the rate of change of the water content and the water balance parameters.

[0012] As an optional implementation, the system also includes a backflow water detection device; The backflow detection device is used to detect the state of residual water dripping or flowing back from the permeable brick layer; the controller is also used to adjust the real-time water replenishment rate according to the residual water state. When the residual water state indicates that there is dripping water or a continuous increase in backflow water in the permeable brick, the real-time water replenishment rate is reduced or the water supply of the bottom water supply component is suspended.

[0013] As an optional implementation, the controller is preset with an upper limit value and a lower limit value for water content; when the real-time water content is higher than the upper limit value, the controller shuts off or reduces the water supply flow rate of the bottom water supply component; when the real-time water content is lower than the lower limit value and the evaporation cooling conditions are met, the controller turns on or increases the water supply flow rate of the bottom water supply component.

[0014] As an optional implementation, the bottom water supply assembly includes a main water supply pipe, a node diversion structure, branch water supply pipes, and a moisture-wicking component; The main water supply pipe is connected to the water circulation module. The node diversion structure is set at the node position between adjacent permeable bricks. The branch water supply pipe extends from the node diversion structure to the inner corner area of ​​the surrounding permeable bricks. The moisture guiding element is set on the lower surface of the permeable brick and is used to diffuse the water output from the branch water supply pipe to the lower surface of the permeable brick.

[0015] As an optional implementation, the branch water pipe is a microporous water pipe, and the outlet of the microporous water pipe is oriented towards the moisture-guiding element; the controller is used for: Based on the allowable water replenishment rate and the duration of the current control cycle, determine the allowable water replenishment amount corresponding to the current control cycle; Based on the preset correspondence between water supply parameters and water output, and the allowable water replenishment, the water supply pressure, water supply duration, and water supply pulse cycle corresponding to the microporous water supply pipe are determined. Based on the water supply pressure, the water supply duration, and the water supply pulse cycle, the microporous water supply pipe is controlled to pulse water supply to the moisture-conducting component; Obtain the updated moisture content after the end of the current control cycle, and determine the actual water storage increment of the permeable brick based on the updated moisture content; Based on the difference between the actual water storage increment and the allowable water replenishment, adjust the water supply pressure, water supply duration, and / or water supply pulse cycle for the next control cycle.

[0016] As an optional implementation, the moisture-wicking component is a moisture-wicking geotextile. The moisture-wicking geotextile is fixed to the non-primary pressure-bearing area on the lower surface of the permeable brick by a clamping frame. The clamping frame includes a lower support frame, an upper pressure frame, and connecting fasteners. The edge of the moisture-wicking geotextile is clamped between the upper pressure frame and the lower support frame, and the middle moisture-wicking area of ​​the moisture-wicking geotextile is exposed and in contact with the lower surface of the permeable brick.

[0017] As an optional implementation, the system further includes an upper surface spray assembly and a personnel status detection device; The person-on-roof status detection device is used to generate a person-on-roof status signal. When the person-on-roof status signal indicates that the roof is in a person-on-roof state, the controller is used to: Acquire the rainfall status signal generated by the rainfall detection device; When the rainfall status signal indicates that the roof is in a rainfall state, the upper surface spray assembly and the bottom water supply assembly are turned off or restricted; when the rainfall status signal indicates that the roof is not in a rainfall state, the roof person status signal generated by the person status detection device is acquired; when the roof person status signal indicates that the roof is in a person status state, the thermal environment status corresponding to the person activity area on the roof is acquired, and the upper surface spray assembly is controlled to spray and cool the upper surface of the permeable bricks according to the thermal environment status. The air temperature of the elevated floor detected by the elevated floor air temperature sensor and the indoor temperature of the building detected by the building indoor temperature sensor are obtained, and the building heat gain state is determined based on the temperature difference between the elevated floor air temperature and the indoor temperature of the building. Based on the building's heat gain state, the real-time moisture content, and the real-time evaporation rate, the bottom water supply component is controlled to supply water to the lower surface of the permeable brick. When the roof status signal indicates that the roof is not in a human-free state, the upper surface spray assembly is turned off or restricted, and the bottom water supply assembly is controlled to supply water to the lower surface of the permeable bricks according to the building's heat gain state, the real-time moisture content, and the real-time evaporation rate.

[0018] As an optional implementation, the controller is further configured to: Obtain self-cleaning determination parameters, which include at least one of the permeability performance parameters and return water parameters of the permeable brick, and the spray pressure parameters and spray flow rate parameters of the upper surface spray assembly; compare the self-cleaning determination parameters with the corresponding preset normal range to determine whether the permeable brick layer and the upper surface spray assembly meet the preset self-cleaning conditions; When the preset self-cleaning conditions are met or a manual maintenance command is received, the upper surface spray assembly is switched from evaporative cooling mode to self-cleaning mode; The current target flushing zone is determined from the multiple flushing zones according to the preset flushing sequence, and a set of nozzles corresponding to the current target flushing zone is determined as the target nozzles; Based on the degree of deviation of the self-cleaning judgment parameter from the preset normal range, the target spray pressure, target spray angle, and target flushing duration corresponding to the target nozzle are determined; the target nozzle is controlled according to the target spray pressure, the target spray angle, and the target flushing duration to flush at least one of the permeable brick surface, brick joints, and pore inlets within the current target flushing zone; After completing the rinsing of the current target rinsing zone, the updated self-cleaning judgment parameters are obtained, and the updated self-cleaning judgment parameters are compared with the corresponding preset normal range. When the updated self-cleaning determination parameters return to the preset normal range, the rinsing of the current target rinsing zone ends, and the next target rinsing zone is determined according to the preset rinsing order, or the self-cleaning mode is exited after rinsing all rinsing zones is completed. If the updated self-cleaning judgment parameters do not return to the preset normal range, continue rinsing the current target rinsing zone.

[0019] As an optional implementation, the system further includes a water collection and diversion assembly and a water storage device; The water collection and diversion assembly includes a water collection plate and a water collection trough. The water collection plate is disposed below the permeable brick layer and located within the suspended layer. The water collection trough is connected to the end of the water collection plate. The water collection and diversion assembly is used to collect rainwater that passes through the permeable brick layer, water sprayed back from the upper surface, and residual water from the bottom water supply, and diverts the collected water to the water storage device; the water storage device is connected to the water collection and diversion assembly and the water supply drive assembly to reuse the collected water for the upper surface spray assembly and / or the bottom water supply assembly; wherein, the controller controls the amount of residual water entering the rainwater collection and diversion layer by controlling the real-time water replenishment rate.

[0020] In summary, the beneficial effects of the embodiments of the present invention are as follows: First, by using supporting components to form an elevated layer, the permeable brick layer can form a lightweight elevated paving structure on the roof, reducing the impact of traditional sand and gravel pads or heavy base layers on the roof load. This is suitable for the renovation of existing buildings and lightweight roofs.

[0021] Secondly, by setting up a water supply component located in the air gap, water is introduced from the lower surface of the permeable brick into the interior of the brick. The air flow in the air gap promotes the evaporation of water on the lower surface and inside the brick, achieving continuous evaporation and cooling of the lower surface, thus making up for the problem of insufficient continuous cooling by relying solely on spraying or misting the upper surface.

[0022] Third, by linking the moisture content sensor, the real-time evaporation rate and the real-time water replenishment rate, the water replenishment rate is matched with the water consumption capacity of the permeable bricks, and the real-time moisture content of the permeable brick layer is kept below the preset saturated water storage capacity. This ensures the evaporative cooling effect while suppressing continuous dripping and reducing ineffective water supply and return collection load.

[0023] Fourth, by controlling the real-time water replenishment rate, the risk of moss growth caused by long-term excessive moisture in permeable bricks can be reduced. The self-cleaning mode washes the surface of the permeable bricks, the brick joints and the pore entrances, reducing the impact of dust, moss and deposited impurities on permeability, evaporation performance and cooling effect, and reducing the frequency and cost of manual maintenance.

[0024] Fifth, by collecting rainwater, water returning from the upper surface spray, and residual water from the bottom water supply through the rainwater collection and diversion layer and water storage device, and reusing the collected water for spraying and bottom water replenishment, it is beneficial to improve the efficiency of recycled water utilization, reduce tap water consumption, and meet the application requirements of green building and sponge city.

[0025] Sixth, when people are on the roof, the upper surface spraying prioritizes improving the thermal comfort of the roof's activity area, and the bottom water supply continuously reduces the building's heat gain; when people are not on the roof, the upper surface spraying is turned off or restricted, and the bottom water supply reduces the air temperature in the elevated layer and the tendency of the roof to transfer heat to the interior, thus making the same roof system more adaptable to different usage scenarios. Attached Figure Description

[0026] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the embodiments of the present invention will be briefly introduced below. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort, and these are all within the protection scope of the present invention.

[0027] Figure 1 This is a schematic diagram of the overall structure of the permeable brick evaporative cooling system for roofs in an embodiment of the present invention; Figure 2 This is a partial structural schematic diagram of a support member in one embodiment of the present invention; Figure 3 This is a schematic diagram of an array arrangement of multiple support components in one embodiment of the present invention; Figure 4 This is a schematic diagram of the arrangement of the bottom water supply component at the node of an adjacent permeable brick in one embodiment of the present invention; Figure 5 This is a schematic diagram of the water collection and diversion component and the airflow in the overhead layer in an embodiment of the present invention; The markings in the image are as follows: 100-Permeable brick layer, 110-Permeable brick, 120-Elevated layer, 130-Capillary water absorption structure, 200-Supporting component, 210-T-shaped keel, 220-Vertical rod, 230-Flange fixing seat, 240-Cross connecting plate, 250-Moisture guiding component, 300-Water supply drive assembly, 310-Water pump, 320-Water supply pipeline, 330-Valve assembly, 400-Bottom water supply assembly, 410-Main water supply pipe, 420-Node diversion structure, 430-Branch water supply pipe, 500-Water collection and diversion assembly, 510-Water collection plate, 520-Water collection trough, 600-Water storage device, 700-Upper surface spray assembly. Detailed Implementation

[0028] The features and exemplary embodiments of various aspects of the present invention will now be described in detail. To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only configured to explain the present invention and are not configured to limit the present invention. For those skilled in the art, the present invention can be practiced without some of these specific details. The following description of the embodiments is merely intended to provide a better understanding of the present invention by illustrating examples of the invention.

[0029] It should be noted that, in this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.

[0030] like Figure 1As shown, the permeable brick evaporative cooling system for roofs according to an embodiment of the present invention includes: a permeable brick layer 100, a supporting component 200, a water supply drive component 300, a bottom water supply component 400, a moisture content sensor, and a controller. These components together form a roof-mounted permeable paving structure and a bottom-precision water replenishment structure, enabling the permeable brick layer to function simultaneously as a water storage component and an evaporative heat exchange component in rooftop applications.

[0031] The supporting member 200 is fixed to the building roof structure layer to support the permeable brick layer 100, forming an air gap 120 between the permeable brick layer 100 and the building roof structure layer. The air gap 120 provides space for evaporation from the lower surface of the permeable bricks 110, evaporation from the surface of the water collection and diversion components, and air flow within the air gap 120. At the same time, it blocks direct solar radiation from hitting the roof waterproofing layer, thereby reducing the tendency for heat to transfer from the roof to the interior.

[0032] The permeable brick layer 100 is located on the top layer of the entire system and is formed by laying multiple permeable bricks with water permeability and water absorption capacity. The permeable bricks 110 are used to bear natural rainfall and artificial spraying, and also serve as the main carrier of evaporative heat exchange in the system. The permeable bricks 110 have a capillary water absorption structure, in which water can diffuse and be retained, so that both the upper and lower surfaces of the permeable bricks 110 can participate in the evaporative cooling process.

[0033] like Figure 2 and Figure 3 As shown, the support member 200 can be made of aluminum alloy, lightweight alloy, or weather-resistant plastic material. Preferably, the support member 200 may include a T-shaped keel 210, a vertical rod 220, a flange fixing seat 230, a cross connecting plate 240, a moisture-wicking component 250, and a clamping frame. The T-shaped keel 210 is used to support the edges of adjacent permeable bricks 110, the vertical rod 220 is used to provide support height, the flange fixing seat 230 is used to connect to the building roof structural layer, and the cross connecting plate 240 is used to fix the relevant components at the nodes of adjacent permeable bricks 110.

[0034] By employing slender vertical rods 220 and T-shaped keels 210, the obstruction of airflow by horizontal components below the permeable brick layer 100 can be reduced, improving the ventilation efficiency within the elevated layer 120. Thus, after the bottom water supply component 400 supplies moisture to the lower surface of the permeable brick 110, the airflow within the elevated layer 120 can continuously remove the water vapor and latent heat generated by moisture evaporation, which is beneficial for improving the evaporative heat transfer intensity of the lower surface.

[0035] After the permeable brick 110 structure is formed, the permeable brick 110 evaporative cooling system provides a controllable amount of water to the lower surface of the permeable brick 110 through the water supply drive component 300 and the bottom water supply component 400. The water supply drive component 300 is used to pressurize and distribute the water supplied by the water storage device or the external water supply interface to the bottom water supply component 400 and the upper surface spray component.

[0036] The moisture-wicking component 250 can be a moisture-wicking geotextile. After absorbing water, the moisture-wicking geotextile diffuses the moisture in the in-surface direction and transfers the moisture to the lower surface of the permeable brick 110. The clamping frame is used to fix the moisture-wicking geotextile to the non-primary pressure-bearing area of ​​the lower surface of the permeable brick 110. The clamping frame includes a lower support frame, an upper pressure frame, and connecting fasteners. The edge of the moisture-wicking geotextile is clamped between the upper pressure frame and the lower support frame, while the central moisture-wicking area of ​​the moisture-wicking geotextile remains exposed and in contact with the lower surface of the permeable brick 110.

[0037] like Figure 1 As shown, the water supply drive assembly 300 includes a water pump 310, a water supply pipeline 320, a valve assembly 330, and an automatic water replenishment interface. The water pump 310 draws and pressurizes water from the water storage device; the water supply pipeline 320 supplies water to the bottom water supply assembly 400 and the upper surface spray assembly; the valve assembly 330 controls the start / stop of different branches, zoned water supply, and flow rate; and the automatic water replenishment interface connects to an external water source. When the water collected in the water storage device is insufficient, the controller can introduce an external water source through the automatic water replenishment interface to maintain system operation.

[0038] like Figure 1 As shown, the bottom water supply component 400 is installed inside the suspended layer 120, located below the permeable brick layer 100 and above the water collection and diversion component. The bottom water supply component 400 is used to supply water at a low flow rate to the lower surface of the permeable brick 110, so that water enters the interior of the brick from the lower surface of the permeable brick 110 and continuously evaporates under the action of air flow in the suspended layer 120.

[0039] like Figure 4 As shown, the bottom water supply assembly 400 includes a main water supply pipe 410, a node diversion structure 420, branch water supply pipes 430, and a moisture-wicking component 250. The main water supply pipe 410 is connected to the water supply drive assembly 300 and can enter the node position at the junction of adjacent permeable bricks 110 from bottom to top along the vertical rods 220 of the support member 200. Thus, the water supply path can be arranged using the vertical space of the support member 200, reducing the occupation of the ventilation channel of the elevated floor 120.

[0040] A node diversion structure 420 is disposed at a cross-shaped node between adjacent permeable bricks 110 to distribute water input from the main water supply pipe 410 to multiple branch water supply pipes 430. The branch water supply pipes 430 extend from the node diversion structure 420 to the inner corner areas of the surrounding permeable bricks 110. Preferably, the branch water supply pipes 430 are fine-diameter microporous water supply pipes with their outlets facing the dehumidification guide 250, and supply water in a low-flow or pulsed manner.

[0041] With the above structure, the bottom water supply component 400 can continuously supply water to the lower surface of the permeable brick 110 when no one is on the ground or when it is necessary to reduce the building's heat gain. This enhances the evaporative heat exchange process on the lower surface and prevents the permeable brick 110 from becoming too wet and dripping continuously by controlling the real-time water replenishment rate.

[0042] To ensure that the bottom water replenishment matches the actual evaporation water consumption capacity of the permeable brick 110, a moisture content sensor is provided in this embodiment. The moisture content sensor can be located inside the permeable brick 110, near the lower surface of the permeable brick 110, or at the moisture-guiding component 250 in contact with the permeable brick 110, and is used to measure the moisture content θ of the permeable brick 110. b Moisture content sensors primarily serve for over-humidity protection, evaporation control, and drip prevention.

[0043] The controller establishes an electrical connection with the water supply drive assembly 300, the bottom water supply assembly 400, and the moisture content sensor. The controller can be a microcontroller, PLC (Programmable Logic Controller), edge controller, embedded control board, or other control device with data acquisition and valve / pump control capabilities. The controller reads the detection value from the moisture content sensor and adjusts the real-time moisture content θ accordingly. b The real-time water storage capacity, real-time evaporation rate, and allowable water replenishment rate of the permeable brick 110 are determined by the real-time change in moisture content, water supply flow rate, and / or return flow rate.

[0044] In this embodiment, real-time moisture content refers to the moisture content of the permeable brick 110 detected by the moisture content sensor within the current control cycle; real-time water storage capacity refers to the current water storage capacity calculated based on the real-time moisture content and the effective water storage volume or effective water absorption mass of the permeable brick 110; preset saturated water storage capacity refers to the upper limit of water storage capacity that the permeable brick layer 100 is allowed to maintain before continuous dripping or continuous backflow occurs. The preset saturated water storage capacity can be determined based on the porosity, water absorption rate, thickness, volume of the permeable brick 110, the water storage capacity of the moisture-wicking component 250, and the on-site calibration results.

[0045] In one example, the controller obtains the moisture content θ of the permeable brick 110 at the first time t1. b (t1) and the moisture content θ of the permeable brick at time t2. b(t2), and based on the pre-defined conversion relationship between moisture content and water storage, the moisture content W of the permeable brick at the first moment was obtained respectively. b (t1) and the water content W of the permeable brick at the second time. b (t2). The controller obtains the time interval Δt = t2 - t1 between the first time t1 and the second time t2, and according to W... b (t1), W b (t2) and Δt determine the rate of change of moisture content in the permeable brick 110. In embodiments where the moisture content detection device can directly output the moisture content, its output value can also be used directly for the above calculation. If the bottom water supply component 400 does not supply water and there is no obvious backflow during this time interval, the decrease in moisture content can be used as a basis for estimating the evaporation water consumption.

[0046] When the bottom water supply component 400 is in water supply mode, estimating the real-time evaporation rate solely based on changes in water content may be affected by the amount of replenished water and the amount of return water. Therefore, this embodiment further introduces a water balance parameter. The water balance parameter is used to characterize the relationship between the amount of water entering the permeable brick 110, remaining in the permeable brick 110, and flowing out of the permeable brick 110 within a statistical period, and may include the amount of replenished water V within the statistical period. in , return water volume V ret Frequency of dripping, duration of dripping, and change in water content ΔW b Real-time changes in water storage and / or the water volume difference calculated from the above quantities.

[0047] For example, the controller can be based on formula E. real =(V in -V ret -ΔW b The real-time evaporation rate E is determined by ) / Δt. real , where V in V represents the amount of water replenished into the bottom water supply component 400 during the statistical period. ret ΔW is the amount of return water detected or estimated by the return water detection device. b Δt represents the change in the real-time water storage capacity of the permeable brick 110 within the statistical period, and Δt represents the duration of the statistical period.

[0048] The real-time evaporation rate can be estimated based on the rate of change in moisture content, or it can be corrected based on water balance parameters. These parameters are not limited to a single parameter; they can be one or more of the following: replenishment water volume, return water volume, real-time changes in stored water volume, dripping frequency, dripping duration, and a continuous increasing trend in return water volume. Alternatively, they can be a comprehensive water balance value calculated from the above parameters. In practical applications, the controller can also determine the real-time evaporation rate by combining ambient temperature and humidity, wind speed, the rate of change in moisture content, and empirical correction coefficients.

[0049] The controller determines the allowable water replenishment rate based on the real-time evaporation rate. The allowable water replenishment rate can be a target upper limit calculated by the controller based on the real-time evaporation rate, real-time water storage capacity, preset saturated water storage capacity, and residual water status. The controller controls the real-time water replenishment rate of the bottom water supply component 400 to be lower than or equal to the allowable water replenishment rate, and keeps the real-time water storage capacity lower than the preset saturated water storage capacity, in order to suppress continuous dripping of water from the permeable brick layer 100.

[0050] Specifically, the real-time water replenishment rate can be defined as the rate at which the bottom water supply component 400 outputs water to the lower surface of the permeable brick 110 within the current control cycle. The controller can control the real-time water replenishment rate by adjusting the speed of the water pump 310, the opening degree of the valve group 330, the water supply pressure of the microporous water delivery pipe, the water supply pulse cycle, and / or the water supply duration. When the real-time water storage volume is close to the preset saturation water storage volume, the real-time moisture content is higher than the upper limit of moisture content, or the backflow detection device detects continuous dripping, the controller reduces the real-time water replenishment rate or suspends the water supply from the bottom water supply component 400; when the real-time moisture content is lower than the lower limit of moisture content and meets the evaporation cooling conditions, the controller turns on or increases the water supply flow rate of the bottom water supply component 400.

[0051] Furthermore, to ensure that the pulsed water supply volume of the microporous water pipe matches the allowable water replenishment rate, the controller performs closed-loop control of the bottom water supply component 400 with a preset control cycle. For the current control cycle k, the controller obtains the allowable water replenishment rate q corresponding to that control cycle. allow ,k and period duration Δt k And according to V allow k=q allow ,k×Δt k Determine the allowable water replenishment volume V corresponding to the current control cycle. allow In some implementations, a safety factor η not greater than 1 can also be set, and η×V allow k is the target water replenishment amount for the current control cycle, in order to reserve a margin for water fluctuations in the permeable brick 110.

[0052] The correspondence between water supply parameters and water output can be pre-calibrated during the initial system commissioning phase. Specifically, the actual water output of the microporous water delivery pipe within a unit control cycle can be measured under different combinations of water supply pressure, water supply duration, and water supply pulse cycle, and the parameters of water supply pressure P and single water supply duration T can be established. on Water supply pulse cycle T p With water output V out The lookup table, fitting relationship, or segmented correspondence between them can be used. For the same roof zone, the correspondence can also be modified according to the length of the microporous water supply pipe, the number of water outlets, and the pressure loss of the pipeline.

[0053] To obtain the allowable water replenishment V for the current control cycleallow After k, the controller selects the corresponding value for V based on the aforementioned preset correspondence. allow ,k matches the water supply pressure P k Water supply duration T on k and water supply pulse period T p The system controls the water pump 310 and valve group 330 to ensure that the microporous water supply pipe pulses water to the moisture guide 250 according to the water supply pressure, water supply duration, and water supply pulse cycle. The moisture guide 250 diffuses the local water volume output by each pulse along the lower surface of the permeable brick 110, reducing the situation where water flow is concentrated near a single water outlet and drips directly.

[0054] After the current control cycle ends, the controller reacquires the water content detection value θ. b (k+1), and obtain the updated real-time water storage W according to the conversion relationship between moisture content and water storage. b (k+1). The real-time water storage volume W at the start of the current control cycle. b (k) is the reference, and can be determined according to ΔW act ,k=W b (k+1)-W b (k) Determine the actual water storage increment of the permeable brick 110 during the control period. When further improvement in estimation accuracy is required, the actual water storage increment can be corrected by combining the return water volume and real-time evaporation rate during the control period.

[0055] The controller compares the actual water storage increment ΔW act k and allowable water replenishment V allow The difference between ,k and ,k is used as the water supply correction for the next control cycle. For example, when the actual water storage increment is too large, the real-time moisture content is close to the upper limit of the moisture content, or there is a trend of increasing backflow, the water supply pressure is reduced, the water supply duration is shortened, and / or the water supply pulse cycle is increased in the next control cycle; when the actual water storage increment is too small, the real-time evaporation rate is still high, and no dripping or backflow abnormalities are detected, the water supply pressure can be increased, the water supply duration can be extended, and / or the water supply pulse cycle can be decreased within the new allowable water replenishment range in the next control cycle. By updating the above water supply parameters cycle by cycle, the actual water replenishment process follows the changes in the water consumption state of the permeable brick 110, while avoiding the real-time water storage from reaching the preset saturation water storage.

[0056] In an optional embodiment, when the controller obtains the updated moisture content after the end of the current control cycle and determines the actual water storage increment of the permeable brick based on the updated moisture content, it is specifically used for: The initial moisture content detected by the moisture content sensor before the start of the current control cycle is obtained. Based on the pre-calibrated correspondence between moisture content and water storage, the initial water storage is determined. The reference evaporation rate determined within the water outage observation interval before the start of the current control cycle is obtained. The reference evaporation rate is not determined by back-calculation based on the water replenishment and water storage changes during the current control cycle. After the current control cycle ends, the microporous water supply pipe is controlled to stop supplying water, and the sampling moisture content of the permeable brick is continuously obtained according to the preset sampling interval. The corresponding sampling water storage volume is determined according to the sampling moisture content at each sampling time. Based on the difference between the sampled water storage volume at each sampling time and the initial water storage volume, the corresponding water storage change is determined. Based on the reference evaporation rate and the elapsed time from the start of the current control cycle to the corresponding sampling time, the expected cumulative evaporation loss is determined. Based on the sum of the water storage change and the expected cumulative evaporation loss, the corresponding evaporation correction water storage response is determined. Based on the difference between the evaporation-corrected water storage response at adjacent sampling times, the new water storage response after the water outage is determined; when the new water storage response exceeds a preset response threshold within a consecutive preset number of sampling intervals, it is determined that there is a delayed water storage response, and the water supply is suspended again and the evaporation-corrected water storage response is updated. When the absolute value of the newly added water storage response does not exceed the preset stability threshold within a consecutive preset number of sampling intervals, it is determined that the water storage response stability condition has been met. The last sampling time that meets the water storage response stability condition is determined as the update time, the sampling moisture content corresponding to the update time is determined as the update moisture content, and the actual water storage increment is determined based on the difference between the sampling water storage volume corresponding to the update moisture content and the initial water storage volume. Based on the time interval between the update time and the end time of the current control cycle, the water storage response waiting time is determined, and the actual water storage increment, the evaporation correction water storage response amount corresponding to the update time, and the water storage response waiting time are associated and stored for adjusting the water supply parameters of the next control cycle. If additional water enters during the water supply suspension period, or if the water storage response stability condition is not met within the preset longest observation period, the current water storage response will be marked as invalid. The water supply will not be increased in the next control cycle based on the current response, and the water supply will continue to be restricted based on the real-time water storage volume.

[0057] Specifically, the controller first reads the initial moisture content before the start of the current control cycle and converts the sensor readings into the initial water storage volume of the permeable bricks according to the pre-calibrated correspondence between moisture content and water storage volume. This correspondence can be obtained by weighing permeable bricks of the same specification under different moisture conditions. During calibration, the mass of the dry bricks is deducted, and the moisture mass is converted into water storage volume to form a calibration table for the controller to query or interpolate. Weighing is only used for pre-calibration and does not require adding detection devices to the operating system. At the same time, the controller calls the reference evaporation rate obtained from the effective water outage observation period before the start of the current cycle. This rate can be determined based on the amount of water storage reduction and the observation time when there is no additional water inflow, no dripping water or backflow is detected, and the moisture content is steadily decreasing. It is used under similar moisture content and evaporation conditions to avoid using the water replenishment and water storage changes of the current cycle to back-calculate the evaporation rate and form a loop calculation.

[0058] After the current control cycle ends, the controller pauses the water supply through the microporous water pipe. For example, it reads the moisture content every 10 seconds and obtains the water storage at each sampling time according to the same calibration relationship. After the water supply is paused, the water retained in the moisture-wicking component may still enter the brick body. Therefore, continuous observation is required, and the reading at the time of water stoppage cannot be taken as the final result of this water replenishment. Secondly, the controller uses the start time of the current control cycle as a unified calculation starting point, subtracts the initial water volume from each sampled water volume to obtain the water volume change that can be positive or negative, and multiplies the reference evaporation rate by the elapsed time up to the sampling time to obtain the expected cumulative evaporation loss. Then, the two are added together to obtain the evaporation correction water storage response. The cumulative result up to the current time is recalculated each time to avoid double counting of evaporation loss. For example, if the initial water volume is 500 ml, the reference evaporation rate is 2 ml per minute, the control cycle lasts for 1 minute, and the water volume at the end of the cycle is 506 ml, then the evaporation correction water storage response is 8 ml. After 30 seconds of water outage, the water volume is 508 ml, then the cumulative expected evaporation loss is 3 ml, and the correction response is 11 ml, indicating that an additional 3 ml of correction water storage response was added during the 30 seconds after the water outage.

[0059] Subsequently, the controller compares the corrected response values ​​at adjacent sampling times. When the new responses in multiple consecutive sampling intervals exceed a preset response threshold, it determines that there is a delayed water storage response and continues to shut off the water supply. This threshold is set in conjunction with sensor resolution and calibration error to reduce misjudgments caused by measurement noise. In the example above, if the corrected response value increases continuously from 8 ml to 9 ml, 10 ml, and 11 ml, and each increment exceeds the response threshold, no additional water supply will be provided. Afterward, when the absolute value of the new responses within a consecutive preset number of sampling intervals does not exceed a stability threshold, the controller determines the last sampling time that first meets this continuous stability condition as the update time. For example, if the subsequent corrected response value stabilizes around 11 ml, the update time is 2 minutes from the start of the cycle, and the actual water storage is 507 ml, then the actual water storage increment is 7 ml, while the corrected water storage response value remains approximately 11 ml. These two values ​​represent the net water storage change and the water storage response after accounting for expected evaporation, respectively, and cannot be used interchangeably. Next, the controller records the difference between the update time and the end time of the cycle as the water storage response waiting time, which is 1 minute in this example, and saves it in association with the actual water storage increment and the corrected response amount, so that the next cycle can adjust the water supply interval and water replenishment parameters based on the previous response, reducing the superposition caused by water supplying again before the previous water has been fully absorbed.

[0060] If additional water ingress occurs during the observation period, such as rainfall or surface spraying, or if the stability condition is not met even after the maximum observation period of 3 minutes, the controller marks the response as invalid and does not increase the water replenishment amount in the next cycle. At the same time, it still uses the water storage volume calculated from the real-time moisture content to implement water supply limits, avoiding erroneous water replenishment triggered by interference data. Thus, under the condition that the reference evaporation rate is applicable, this process can reduce the impact of evaporation loss and delayed water absorption on water replenishment evaluation, improve the rationality of updating the moisture content reading timing, and reduce the risk of excessive water replenishment and dripping caused by prematurely judging insufficient water replenishment. However, the corrected response is still an estimated result and is not directly equivalent to the actual water delivery amount of the moisture-wicking component.

[0061] In an optional embodiment, when the controller adjusts the water supply pressure, water supply duration, and / or water supply pulse cycle corresponding to the next control cycle based on the difference between the actual water storage increment and the allowable water replenishment amount, it is specifically used for: Based on the actual water supply pressure setting value and water supply duration of each pulse executed in the current control cycle, as well as the correspondence between the preset water supply parameters and the water output, the estimated cumulative water output is determined. The water supply execution difference is obtained by subtracting the estimated cumulative water output from the allowed replenishment amount. The water storage response difference is obtained by subtracting the evaporation correction water storage response amount corresponding to the update time from the estimated cumulative water output. Based on the differences in water supply execution, water storage response, and the estimated cumulative evaporation loss, the difference between the allowable water replenishment and the actual water storage increment is decomposed, and the positive difference in the differences in water supply execution is determined as the unexecuted water replenishment amount in the current control cycle. The unexecuted water replenishment amount is not automatically carried over to the next control cycle. When the water storage response corresponding to the current control cycle is determined to have a delayed water storage response and no dripping or backflow is detected, the minimum pause interval between adjacent pulses in the next control cycle is determined according to the waiting time of the water storage response. The additional water supply is suspended before the water storage response stability condition is reached, and after the water storage response stability condition is reached, the water supply volume for the next control cycle is re-determined according to the updated real-time water storage volume and the allowable water replenishment rate. When dripping or backflow is detected, the pulse corresponding to the first detection of dripping or backflow is recorded. The estimated water output from the start of the pulse to the first detection of dripping or backflow is recorded. The upper limit of single water replenishment is determined based on the estimated water output and a preset reduction coefficient, where the preset reduction coefficient is greater than zero and less than one. The water supply pressure of subsequent pulses is reduced, and the water supply duration is determined based on the reduced water supply pressure and the upper limit of single water replenishment. The water supply is suspended until the remaining water condition meets the preset recovery conditions. When the difference in water storage response is greater than the preset difference threshold, no dripping or backflow is detected, and the real-time water storage volume is lower than the preset water replenishment start-up water storage volume and meets the evaporation cooling conditions, a verification water replenishment volume less than the single water replenishment volume in the current control cycle is determined. The verification water replenishment volume does not exceed the remaining allowable water replenishment volume and the current remaining water storage capacity in the control cycle where the verification pulse is located. The verification pulse water supply is executed according to the verification water replenishment amount, and the updated water content corresponding to the verification pulse is obtained according to the method for determining the updated water content. The evaporation correction water storage response amount and water storage response waiting time corresponding to the verification pulse are determined. The verification response ratio is determined according to the ratio between the evaporation correction water storage response amount and the estimated water output of the verification pulse. When the verification response ratio is within the preset effective response range and no dripping or backflow is detected, the water supply pressure corresponding to the verification pulse is maintained, the water supply duration of subsequent pulses is determined according to the verification response ratio, and the minimum pause interval is updated according to the water storage response waiting time corresponding to the verification pulse; when the verification response ratio is not within the preset effective response range or dripping or backflow is detected, the single water replenishment volume is not increased, and the water supply pressure is maintained or reduced. The verification water replenishment amount is included in the cumulative water replenishment amount of the control cycle in which the verification pulse is located, and the adjusted cumulative water replenishment amount of each control cycle does not exceed the corresponding allowable water replenishment amount.

[0062] Specifically, the controller first queries the pre-calibrated correspondence between water supply parameters and water output based on the actual water supply pressure setpoint and water supply duration of each pulse in the current control cycle, estimates the water output of each pulse and sums them to obtain the estimated cumulative water output. This process is completed using existing control commands and calibration relationships, without the need to add flow detection devices.

[0063] Subsequently, the allowable replenishment volume is subtracted from the estimated cumulative outflow volume to obtain the water supply execution difference. The estimated cumulative outflow volume is subtracted from the evaporation correction storage response volume at the update time to obtain the storage response difference. Thus, the difference between the allowable replenishment volume and the actual storage increase is decomposed into three parts: unexecuted water supply, storage response deviation, and expected evaporation loss. Each part uses the same storage calculation starting point, and the expected cumulative evaporation loss is calculated up to the update time. For example, if the allowable replenishment volume is 20 ml, the estimated cumulative outflow volume is 16 ml, the actual storage increase volume is 9 ml, and the expected cumulative evaporation loss is 4 ml, then the evaporation correction storage response volume is 13 ml, the water supply execution difference is 4 ml, and the storage response difference is 3 ml. The original 11 ml difference can be decomposed into 4 ml of unexecuted amount, 3 ml of storage response difference, and 4 ml of expected evaporation loss. The controller no longer considers all 11 ml as the water supply that needs to be added, and the unexecuted 4 ml amount is not automatically accumulated to the next cycle after the end of the current cycle.

[0064] If the evaporation correction water storage response continues to increase after a water outage and no residual water appears, the controller continues to suspend water supply. After the response reaches a stable condition, the controller obtains the water storage response waiting time and determines the minimum pause interval for the next cycle accordingly. For example, if the response stabilizes after a previous wait of 40 seconds, the pause interval for subsequent pulses can be set to no less than 40 seconds, and adjusted in conjunction with the preset time margin. After the waiting period ends, the controller recalculates the water replenishment amount based on the latest water storage, the allowable water replenishment rate, and the duration of the next cycle to reduce the superposition caused by water supplying the bricks again while the moisture-conducting components are still supplying water to the bricks. When dripping or backflow is detected, the controller first suspends the water supply, records the pulse that triggered the residual water and the water supply process, estimates the water output based on the pressure setpoint and execution time from the start of the pulse to the first detection of residual water, and then multiplies it by a reduction factor greater than zero and less than one to determine the upper limit of the single water replenishment volume. For example, if the estimated water output before the first detection of residual water is 5 ml and the reduction factor is 0.8, then the upper limit of the subsequent single water replenishment volume is 4 ml. At the same time, the water supply pressure is reduced, and the water supply time not exceeding the upper limit is determined based on the calibrated water output rate corresponding to the reduced pressure. If the residual water appears after the water supply is stopped, the complete execution of the most recent pulse before the residual water was triggered is recorded as a conservative adjustment basis. It is not assumed that all the residual water must come from that pulse. The restricted water supply is only restored after the residual water has not appeared for a continuous preset time and the water storage volume is lower than the recovery threshold.

[0065] For cases where the difference in water storage response exceeds the threshold but no residual water is detected, the controller executes the verification pulse only when the previous response has stabilized, the real-time water storage volume is lower than the water storage volume required for water replenishment and the cooling conditions are still met. For example, if the previous single water replenishment volume was 6 ml, the remaining allowable water replenishment volume for the new cycle is 5 ml, and the remaining water storage capacity is 4 ml, then 2 ml can be selected as the verification water replenishment volume. Before verification, the initial water storage volume is recorded again. After verification, the water storage response volume of the verification pulse is determined according to the same water outage observation and evaporation correction method to avoid mixing the cumulative response of the previous cycle into the verification result. The verification response ratio is then obtained by dividing the response volume by the estimated water output volume of the verification pulse. For example, if the estimated output is 2 ml and the corrected storage response is 1.8 ml, the verification response ratio is 0.9. If it is within the calibrated effective response range and there is no residual water, the controller can maintain the verification pressure, select the subsequent water supply duration according to the pre-calibrated verification response ratio, the correspondence between the target storage response and the water supply duration, and update the minimum pause interval using the verification waiting time. The determined single output is still constrained by the remaining allowable replenishment and the remaining storage capacity. If the response ratio is not within the effective range or there is residual water, the difference will not be forcibly made up by extending the duration, but the single replenishment will be maintained or reduced, and the pressure will be maintained or reduced.

[0066] Finally, the controller incorporates the verification pulse into the water supply quota calculation for the current cycle. For example, if the original remaining quota for the cycle is 5 ml, after performing 2 ml of verification water replenishment, the maximum available quota is 3 ml. The controller also updates the cumulative water output based on the estimated results of the execution parameters to control the cumulative water replenishment for the entire cycle from not exceeding the allowable water replenishment. Thus, this process can handle unexecuted water supply, evaporation consumption, delayed water storage response, and residual water feedback separately, reducing excessive water replenishment caused by blindly increasing pressure or extending water supply due to insufficient net water storage increment. At the same time, it improves the selection of subsequent parameters through limited verification. However, the differences in water storage response and the verification response ratio are estimated evaluation parameters and are not directly equivalent to the actual water loss or the water absorption efficiency of the brick.

[0067] Evaporative cooling conditions can include outdoor air temperature T a Temperature higher than preset, relative humidity (RH) lower than preset, wind speed (v) within allowable range, Δ Tbuild Higher than the preset control value, E p One or more of the following conditions must be met: the lower surface evaporation potential threshold is reached, the water volume of the water storage device meets the operating requirements, and the equipment is not in an abnormal state.

[0068] The above control method makes the water supply flow no longer dependent on fixed time start and stop, but matched with the real-time moisture content, real-time water storage, real-time evaporation rate and water balance parameters of the permeable brick 110, thereby reducing the residual water at the bottom and continuous dripping while keeping the permeable brick 110 moderately moist.

[0069] To achieve wastewater recovery and water resource recycling, such as Figure 1 and Figure 5 As shown, the permeable brick 110 evaporative cooling system for roofs in this embodiment of the invention further includes: a water collection and diversion component 500, a water storage device 600, and a return water detection device.

[0070] The water collection and diversion component 500 is used to collect and divert rainwater and residual water dripping through the permeable brick layer 100; the water storage device 600 is used to store and buffer the collected water; the water collection and diversion component 500 is located below the permeable brick layer 100 and within the overhead layer 120.

[0071] The water collection and diversion assembly 500 includes a water collection plate 510, a water collection trough 520, and a filter. The water collection plate 510 is used to collect rainwater that permeates through the permeable brick layer 100, backflow water generated by the upper surface spray assembly, and residual water from the bottom water supply assembly 400 that has not been absorbed by the permeable brick 110. The water collection plate 510 can be made of lightweight plastic sheet, aluminum alloy sheet, or composite material.

[0072] Preferably, the water collection plate 510 has an A-shaped structure with a high center and low sides, featuring a central ridge and guide slopes on both sides of the central ridge. This structure helps to increase the effective opening area of ​​the overhead layer 120 and guides the airflow in the overhead layer 120 to pass along both sides, thereby improving air exchange and evaporation efficiency.

[0073] A water collection tank 520 is located at the end or low edge of the water collection plate 510 to collect the water diverted by the water collection plate 510. A filter is installed between the water collection tank 520 and the water storage device 600 to filter dust, silt, moss debris and other deposited impurities.

[0074] The water storage device 600 includes one or more of a buffer water tank and a water purification device. The buffer water tank is used to store filtered collected water, and the water purification device is used to filter, settle, or disinfect the collected water. The water storage device 600 can also be connected to an external tap water supply or other water source to automatically replenish water when the collected water is insufficient.

[0075] A backflow detection device can be installed at the water collection plate 510, water collection trough 520, or bottom backflow path to detect the residual water status of the permeable brick layer 100 dripping downwards or flowing back. The residual water status includes one or more of the following: backflow volume, dripping frequency, dripping duration, a continuous increasing trend of backflow, or backflow turbidity. The controller can adjust the real-time water replenishment rate according to the residual water status. When the residual water status indicates that there is dripping water or a continuous increase in backflow in the permeable brick 110, the controller reduces the real-time water replenishment rate or suspends the water supply from the bottom water supply component 400 to reduce the drip collection load and the risk of moss growth caused by long-term dampness.

[0076] Based on the bottom water supply component 400 for continuous evaporation of the lower surface, such as Figure 1 As shown, this embodiment also includes an upper surface spray assembly 700 to meet the thermal comfort requirements of the accessible roof during human activity. The upper surface spray assembly 700 is positioned above the permeable brick layer 100 and includes a nozzle, spray pipes, and a spray angle adjustment mechanism. The upper surface spray assembly 700 is used to spray water onto the upper surface of the permeable brick 110 and its adjacent air area under preset conditions.

[0077] When people are on the surface, the upper surface spray assembly 700 primarily serves as a thermal comfort regulation path. By atomizing water and evaporating on the upper surface of the permeable brick 110, it absorbs heat, reducing the surface temperature of the brick and the surrounding air temperature, and weakening heat accumulation on the upper surface of the permeable brick 110. The upper surface spray assembly 700 can also moderately replenish the moisture content of the upper part of the brick, providing a moisture storage basis for the subsequent evaporation of the lower surface and the stable function of continuous water supply from the bottom.

[0078] The upper surface spray assembly 700 can also be switched to a self-cleaning mode. To determine whether to enter the self-cleaning mode, the controller acquires self-cleaning determination parameters, which include at least one of the following: permeability performance parameters of the permeable brick 110, return water parameters, and spray pressure and spray flow rate parameters of the upper surface spray assembly 700. The permeability performance parameters can be characterized by the infiltration volume after a preset spray volume, the water absorption response time, or the permeable water volume per unit time; the return water parameters can be characterized by the return water volume, return water rate, return water duration, and / or return water turbidity; the spray pressure and spray flow rate parameters can be obtained by pressure sensors and flow sensors respectively installed on the spray branches.

[0079] The controller compares the acquired self-cleaning judgment parameters with the corresponding preset normal ranges. When the water permeability parameter is lower than the corresponding normal range, the return water parameter shows an abnormal increase, or the spray pressure parameter and spray flow rate parameter deviate from the corresponding normal range to a preset degree, the preset self-cleaning condition is determined to be met. In other embodiments, it may also be required that the abnormal state persists for multiple consecutive detection cycles before the preset self-cleaning condition is determined to be met, in order to reduce false triggering caused by instantaneous fluctuations. When the preset self-cleaning condition is met or a manual maintenance command is received, the controller switches the upper surface spray assembly 700 from evaporative cooling mode to self-cleaning mode.

[0080] To achieve zoned flushing, the permeable brick layer 100 can be pre-divided into multiple flushing zones, and a correspondence between each flushing zone and a set of sprinkler heads can be established. The controller determines the current target flushing zone from among the multiple flushing zones according to the preset flushing sequence, and identifies the set of sprinkler heads covering the current target flushing zone as the target sprinkler heads. The preset flushing sequence can be set according to the order of the water supply pipeline from near to far, the roof slope from high to low, or the degree of pollution from high to low.

[0081] For the current target flushing zone, the controller determines the target spray parameters based on the degree of deviation of the zone's self-cleaning judgment parameters from the corresponding preset normal range. Specifically, the degree of deviation can be divided into multiple levels, and a correspondence between the deviation level and the spray pressure, spray angle, and flushing duration can be established in advance. The greater the deviation, the higher the target spray pressure can be, the more concentrated the spray direction can be on the brick joints or pore inlets, and the target flushing duration can be appropriately extended. The controller controls the target nozzles according to the determined target spray pressure, target spray angle, and target flushing duration to flush at least one of the following locations within the current target flushing zone: the upper surface of the permeable brick 110, the brick joints, and the pore inlets.

[0082] After completing one round of rinsing for the current target rinsing zone, the controller re-acquires the updated self-cleaning judgment parameters for that zone and compares them again with the corresponding preset normal range. When the updated self-cleaning judgment parameters return to the preset normal range, rinsing of the current target rinsing zone ends, and the next target rinsing zone is determined according to the preset rinsing sequence. When the current target rinsing zone is the last rinsing zone, the self-cleaning mode exits after it returns to the preset normal range. If the updated self-cleaning judgment parameters still do not return to the preset normal range, the controller continues rinsing the current target rinsing zone and may re-determine the spray pressure, spray angle, and / or rinsing duration based on the new degree of deviation.

[0083] During the self-cleaning process, the dust, moss, and fine sediment washed off enter the water collection and diversion component 500 with the return water, and then enter the water storage device 600 or the sewage discharge path through the water collection tank 520 and the filter. To avoid interference with the return water detection results caused by bottom water replenishment, the controller can pause or limit the water supply of the bottom water supply component 400 in the corresponding area during the flushing of the target flushing zone.

[0084] After completing the rinsing of all rinsing zones, the controller re-enters the regular monitoring process and, based on real-time self-cleaning judgment parameters, the status of people on the roof, and evaporative cooling requirements, controls the upper surface spray assembly 700 to return to evaporative cooling mode, standby mode, or other preset operating modes. This forms a closed-loop self-cleaning process, reducing the frequency of manual maintenance and maintaining the permeability and evaporation performance of the permeable bricks 110.

[0085] To achieve coordinated control of the upper surface spray assembly 700 and the bottom water supply assembly 400, the controller is also connected to a return water detection device, the upper surface spray assembly 700, a person status detection device, a rainfall detection device, an air temperature sensor for the elevated floor, a building indoor temperature sensor, and other environmental sensor groups. The rainfall detection device can be implemented using a rain gauge or raindrop sensor to generate a rainfall status signal indicating whether the roof is experiencing rainfall.

[0086] The person access detection device generates a person status signal O on the roof, where O=1 indicates the roof is occupied, and O=0 indicates the roof is not occupied. The person access detection device can be implemented using a pressure sensor, infrared detector, visual detector, or access control / reservation system signal; preferably, a pressure sensor is used to detect whether anyone is standing or passing through the permeable brick layer 100 or the roof activity area. When a zone detection method is used, the roof activity area where the person is located can also be output, so that the controller can obtain the corresponding thermal environment status for the activity area and execute local spraying.

[0087] The environmental sensor suite includes an outdoor temperature and humidity sensor, an air temperature sensor for the elevated floor (120°C), an indoor building temperature sensor, a rainfall detection device, and a wind speed sensor. The outdoor temperature and humidity sensor measures the outdoor air temperature (T). a and relative humidity RH; the 120°C air temperature sensor in the overhead space is used to measure the 120°C air temperature T in the overhead space. c The indoor temperature sensor is used to measure the air temperature (T) in a representative indoor area below the roof. in The rainfall detection device outputs rainfall status signals and / or rainfall intensity R; the wind speed sensor measures the wind speed v on the roof or in a localized area. For roofs with zoned control, surface temperature sensors or localized temperature and humidity sensors can also be installed in areas where people are active.

[0088] The controller acquires the air temperature Tc in the elevated floor and the indoor temperature Tin in the building, and uses the temperature difference between the two to construct the building's heat gain control index ΔT. build =T c -T in ΔT build Used to determine the trend of heat transfer from the roof slab 120 to the building interior, when ΔT build When the temperature is higher than the preset control value, it indicates that the air temperature of the elevated floor 120 is relatively high compared to the indoor temperature, and there is a tendency for heat to be transferred into the room. It is necessary to promote the evaporation of the lower surface of the permeable brick 110 through the bottom water supply component 400 to reduce the air temperature Tc of the elevated floor 120. When ΔTbuild decreases to below the corresponding exit threshold, it can be determined that the current heat gain state of the building no longer requires increasing the bottom evaporation intensity.

[0089] In this embodiment, S mist Indicates the start / stop status of the upper surface spray assembly 700, S sub This indicates the on / off status of the bottom water supply component 400. The thermal environment status corresponding to the personnel activity area on the roof can be determined based on the air temperature, relative humidity, local wind speed, and / or the surface temperature of the permeable bricks in that area, and can form a thermal environment trigger index H for people. occ When H occWhen the temperature exceeds a preset thermal environment threshold, it indicates a need for misting cooling in the area where people are active. For ease of description, the real-time moisture content W in the following linkage control is used. b It is the real-time water storage volume calculated based on the real-time moisture content θb, which is used to characterize the remaining amount of water that the permeable brick 110 can continue to absorb.

[0090] The controller executes the linkage control in a cyclical manner according to the sequence of "rainfall priority, personnel status branch, and building heat gain control". At the beginning of each control cycle, the controller first acquires the rainfall status signal generated by the rainfall detection device. When the rainfall status signal indicates that the roof is in a rainfall state, the controller shuts down or limits the upper surface spray assembly 700 and the bottom water supply assembly 400, and rereads the rainfall status signal in the next control cycle to avoid ineffective water use and continuous dripping caused by continued artificial water replenishment during rainfall.

[0091] When the rainfall status signal indicates that the roof is not experiencing rainfall, the controller acquires the roof occupant status signal generated by the occupant status detection device. When the roof occupant status signal indicates that the roof is occupied, the controller further acquires the thermal environment status corresponding to the area of ​​occupant activity and controls the upper surface spray assembly 700 to spray and cool the upper surface of the corresponding permeable brick 110 based on this thermal environment status. The spraying can be performed in zones by starting and stopping or adjusting the flow rate in zones, so that the spraying prioritizes the actual area of ​​occupant activity.

[0092] When people are present, if the thermal environment of the area meets the spray triggering conditions, the controller will activate or increase the spray volume of the upper surface spray assembly 700 in that area. If the thermal environment returns to a comfortable range, the local wind speed exceeds the allowable spray range, or other safety conditions are not met, the controller will deactivate or limit the upper surface spray assembly 700 in the corresponding area. Simultaneously, the controller acquires the air temperature T of the elevated floor. c and building indoor temperature T in To determine the building's heat gain state, and based on the building's heat gain state and real-time moisture content W... b and real-time evaporation rate E real The bottom water supply component 400 is controlled to supply water to the lower surface of the permeable brick 110. The bottom water supply is still constrained by the allowable water replenishment rate and the preset saturated water storage capacity, so the upper surface spray and the bottom water supply can operate in parallel without causing the permeable brick 110 to be continuously over-wet.

[0093] When the roof status signal indicates that the roof is not in a human-free state, the controller shuts off or limits the upper surface spray assembly 700 and continues to acquire the air temperature T of the elevated layer. c and building indoor temperature T in To determine the building's heat gain status. At this time, the bottom water supply component 400 acts as the main evaporative cooling actuator, and the controller determines the building's heat gain status and real-time water content W.b and real-time evaporation rate E real Determine whether bottom water supply is needed and the corresponding water replenishment intensity.

[0094] Specifically, characterizing the building's heat gain requires reducing the building's heat gain and real-time moisture content (W). b Below the corresponding water storage limit and real-time evaporation rate E real When it is indicated that the permeable brick 110 has the capacity for evaporation and water consumption, the controller will adjust according to E. real The permissible water replenishment rate is determined, and the bottom water supply component 400 is turned on or maintained according to the aforementioned pulse water supply closed-loop control method. When the building's heat gain no longer requires cooling, the real-time water content is close to the preset saturated water storage capacity, the real-time evaporation rate is lower than the preset value, or an abnormal return water flow is detected, the controller reduces the water replenishment intensity or shuts down the bottom water supply component 400. The above shutdown action does not indicate the termination of the control process; the controller will reacquire each state parameter and make judgments in the next control cycle.

[0095] Therefore, in terms of coordinated control and prioritization, rainfall conditions have the highest priority; when there is no rainfall, the activation of the upper surface spray is determined based on the number of people on the roof. When people are present, the upper surface spray primarily improves the thermal environment of the activity area, while the bottom water supply is independently adjusted based on the building's heat gain, real-time moisture content, and real-time evaporation rate. When no one is present, the upper surface spray is turned off or restricted, and the bottom water supply is primarily used to reduce the air temperature in the elevated 120°C area and the roof's heat transfer tendency into the interior. When entering self-cleaning mode, the upper surface spray assembly 700 prioritizes the zoned flushing function; after flushing is complete and the self-cleaning mode is exited, the aforementioned evaporative cooling control is restored.

[0096] In an optional embodiment, when the controller acquires the updated self-cleaning determination parameters and determines whether to continue rinsing, it is specifically used for: Obtain the cleanliness evaluation area corresponding to the detection object of the moisture content sensor, as well as the upper surface verification water supply parameters and the bottom verification water supply parameters corresponding to the cleanliness evaluation area; obtain the upper surface normal response range and the bottom normal response range determined in advance when the cleanliness evaluation area is in a normal water permeability and normal bottom water supply state, wherein the normal response range includes the water storage response range and the residual water state range, respectively. Before rinsing the cleaning evaluation area, the water supply of the upper surface spray assembly and the bottom water supply assembly is suspended. When there is no rainfall, the residual water status meets the preset backflow and receding conditions, and the real-time moisture content is within the preset verification moisture content range, the initial verification moisture content is recorded, and the reference evaporation rate determined within the water outage observation range is obtained. Keep the bottom water supply component stopped supplying water, and control the upper surface spray component to perform upper surface verification water supply to the cleaning evaluation area according to the upper surface verification water supply parameters. Then, stop the water supply and obtain the real-time moisture content and the residual water status according to the preset sampling interval. Based on the change in water storage before and after water supply and the expected evaporation water loss determined by the reference evaporation rate, determine the upper surface evaporation correction water storage response and associate it with the corresponding residual water status to form the upper surface response parameters before rinsing. After the real-time moisture content re-enters the preset verification moisture content range, the difference between the real-time moisture content and the initial verification moisture content does not exceed the preset matching threshold, and the residual water state again meets the preset backflow and fading conditions, the upper surface spray assembly stops supplying water, the bottom verification water supply is performed according to the bottom verification water supply parameters, and the bottom evaporation correction water supply response is determined using the same determination method as the upper surface evaporation correction water storage response, and associated with the corresponding residual water state to form the bottom response parameters before rinsing; After rinsing is completed according to the target spray pressure, target spray angle, and target rinsing duration, the water supply to the upper surface spray assembly and the bottom water supply assembly is paused. When the real-time moisture content, the residual water state, and the reference evaporation rate meet the preset retest matching conditions, the upper surface verification water supply and the bottom verification water supply are executed according to the same verification water supply parameters, verification sequence, and sampling method as before rinsing, to obtain the upper surface response parameters and the bottom response parameters after rinsing. If additional water enters or the preset retest matching conditions are not met, the increase in rinsing intensity is temporarily suspended based on the retest results. The response parameters of the upper surface and the bottom after rinsing are compared with their corresponding normal response ranges, and the subsequent control method is determined by combining their changes relative to the corresponding response parameters before rinsing: when the response parameters of the upper surface after rinsing do not enter the normal response range of the upper surface, but the response parameters of the bottom after rinsing are within the normal response range of the bottom, rinsing continues within the limits of the preset cumulative rinsing water volume and the preset maximum number of repeated rinsing times; when the response parameters of the upper surface after rinsing are within the normal response range of the upper surface, but the response parameters of the bottom after rinsing do not enter the normal response range of the bottom, the rinsing of the cleaning evaluation area is stopped, the water supply of the bottom water supply component is limited, and a bottom water supply maintenance prompt is generated. When neither the upper surface response parameter nor the bottom response parameter after rinsing enters the corresponding normal response range, a second rinsing and retesting are performed without reaching the preset cumulative rinsing water volume and the preset maximum number of repeated rinsings. When either limit is reached and the corresponding response parameter still has not returned to normal, the self-cleaning mode is exited and a maintenance prompt is generated. When both enter the corresponding normal response range, it is determined that the cleaning evaluation area meets the cleaning recovery conditions, the rinsing of the cleaning evaluation area is ended, and the allowable water replenishment volume of the bottom water supply is re-determined based on the real-time water storage volume after retesting. The bottom verification water supply volume is included in the cumulative water replenishment volume of its control cycle.

[0097] Specifically, the controller first determines the cleanliness evaluation area based on the range of permeable bricks or brick layers detected by the existing moisture content sensor, so that the verification water supply range corresponds to the moisture content detection range, and sets parameters such as pressure, duration, and water supply for the upper surface verification water supply and the bottom verification water supply respectively; when the permeability and bottom water supply in this area are normal, a pre-test is performed according to the above parameters, and the water storage response after water supply, as well as information such as whether residual water appears and its duration, are recorded to form the normal response range of the two water supply methods. Since the upper and lower water supply paths are different, their normal response ranges are determined separately and do not need to be the same.

[0098] Before the formal flushing, the controller shuts off the water supply at both the top and bottom. It uses the existing rainfall detection device to confirm that no rainfall has occurred and the return water detection device to confirm that the residual water has receded. It waits for the moisture content of the bricks to enter the preset verification range so that the bricks have sufficient remaining water storage capacity and avoids the interference of "less increase in water storage and more return water" due to near saturation. At this time, the initial moisture content is recorded, and the initial water storage volume is determined according to the pre-calibrated correspondence between moisture content and water storage volume. The reference evaporation rate is estimated based on the rate of decrease of water storage volume in the water-stop observation range where there is no additional water inflow and no obvious return water. Subsequently, with the bottom water supply closed, only the top surface verification water supply was performed. After the spraying stopped, the moisture content and residual water status were continuously collected. Based on the change in the stored water volume at the end of the observation relative to before the water supply, and adding the expected evaporation loss during the period from the start of the verification water supply to the end of the observation, the top surface evaporation-corrected stored water response was obtained. For example, if the stored water volume before a verification water supply was 500 ml and at the end of the observation was 515 ml, with an expected evaporation loss of 3 ml, then the corrected stored water response was 18 ml. This value was recorded together with the residual water status at the same time to avoid directly judging the small increase in stored water due to evaporation as an abnormal permeability. After the top surface verification was completed, the water supply was stopped again until the moisture content re-entered the verification range and approached the previous initial moisture content, and the residual water receded again. Then, the top surface spraying was turned off and the bottom verification water supply was performed separately. The bottom response parameters were obtained using the same calculation method. Each verification used the stored water volume before the water supply as the calculation starting point, and the reference evaporation rate was updated as necessary to reduce the difference in initial humidity caused by the sequential execution of the two verifications. Afterwards, the controller performs flushing according to the predetermined pressure, spray angle, and duration. After flushing, the water supply to the upper and lower parts is suspended first, and the water content of the bricks, the state of the remaining water, and the reference evaporation rate obtained again are allowed to meet the retest matching conditions. Then, the same upper and lower verification parameters, verification order, and sampling method as before flushing are used for retesting. For example, the cleaning is not deemed invalid if the bricks are still close to saturation after flushing. If there is rainfall, intervention of other water supply, or significant change in evaporation conditions, the flushing intensity is not increased based on the results. Instead, the conditions should be restored and the verification should be carried out again. During the result determination phase, the controller compares the upper and lower responses with their respective normal ranges and compares the improvement before and after rinsing. For example, under the same verification conditions, the normal corrected water storage response of the upper surface is 16-22 ml, but after rinsing it is still only 10 ml, while the bottom response and residual water status are normal. In this case, the upper surface, brick joints, or pore inlets can continue to be cleaned within the limits of water volume and number of times. If the upper surface response has returned to normal but the bottom response is still abnormal, the upper surface rinsing will be stopped, the bottom water supply will be limited, and the bottom water supply path or moisture-conducting contact condition will be checked. This judgment is used to select the direction of subsequent treatment and does not directly determine the specific fault location.

[0099] When both the upper and lower responses are abnormal, flushing and retesting are only performed if the cumulative flushing water volume and number of repetitions have not reached the limits. If the self-cleaning mode is exited and maintenance is prompted when either limit is reached and the condition is still not restored, the self-cleaning mode is exited. When both the upper and lower responses and the residual water status return to normal, flushing of that area ends. The bottom water replenishment amount is re-determined based on the actual water storage volume and allowable water replenishment rate after retesting, and the bottom verification water supply is included in the corresponding control cycle to avoid over-replenishment due to missed verification water volume. Through the above process, the cleaning effect can be judged by the independent responses of the upper and lower water supply paths and the changes before and after flushing without adding detection devices. This reduces misjudgments caused by evaporation water loss, residual flushing water, and differences in initial moisture content. At the same time, it avoids continuous ineffective upper surface flushing due to abnormal bottom response, which helps to balance the restoration of permeability, continuous evaporative cooling, water conservation, and suppression of dripping.

[0100] The above thresholds and conditions are merely examples and should not be construed as limiting the scope of protection of this invention. Those skilled in the art can adjust the rainfall criteria, moisture content thresholds, thermal environment thresholds, and operating time according to different roofing materials, regional climates, building uses, and maintenance requirements.

[0101] In the above scheme, both the upper and lower surfaces of the permeable brick 110 participate in evaporative heat exchange during operation, but their roles differ depending on the number of people on the ground.

[0102] The evaporation on the upper surface mainly corresponds to the working conditions when people are on it. At this time, the upper surface of the permeable brick 110 is exposed to the external environment. The water film formed by the upper surface spray component 700 and the evaporation of water on the brick surface absorb heat, thereby reducing the surface temperature of the brick and the temperature of the surrounding air, and reducing the discomfort in the area where people are active.

[0103] Evaporation from the lower surface primarily addresses situations where no one is present or other conditions requiring priority reduction of building heat gain. Because the bottom water supply component 400 keeps the bottom of the permeable brick 110 moist, airflow in the raised layer 120 reduces the partial pressure of water vapor in the air near the lower surface of the permeable brick 110, thereby promoting continuous evaporation of moisture from the interior and lower surface of the permeable brick 110 into the raised layer 120. This process helps reduce the air temperature T in the raised layer 120. c and reduce T c -T in .

[0104] During coordinated operation, the upper surface spray assembly 700 and the bottom water supply assembly 400 work together to regulate the moisture content and evaporative heat transfer intensity of the brick: the former is used to quickly improve the upper thermal environment based on the thermal environment of the activity area when people are on the ground, while the latter is used to continuously serve the building's cooling target based on the building's heat gain, real-time moisture content, and real-time evaporation rate, whether people are on the ground or not. The controller also constrains the two types of water supply paths through rainfall status, allowable water replenishment rate, preset saturated water storage capacity, and return water status, thereby reducing ineffective water replenishment while taking into account both human thermal comfort and building cooling.

[0105] In some embodiments, the water collection plate 510 may not adopt an A-shaped structure, but may adopt a single-slope, double-slope, or multi-slope lightweight guide plate, as long as it can guide the water passing through the permeable brick layer 100 to the water collection tank 520.

[0106] In some embodiments, the moisture-wicking element 250 may be made of absorbent fiber felt, microporous moisture-wicking sheet, hydrophilic sponge or other moisture-wicking material with in-plane diffusion capability, in addition to moisture-wicking geotextile.

[0107] In some embodiments, the moisture content sensor may be a capacitive moisture content sensor, a resistive moisture content sensor, a time-domain reflectometry moisture content sensor, or other sensors capable of detecting the moisture content of the permeable brick 110.

[0108] In some embodiments, the reflux water detection device may employ a flow meter, a level sensor, a drip counting sensor, an image detection device, or a turbidity sensor to detect the reflux water volume, drip frequency, or contamination status.

[0109] In some embodiments, the controller can perform water replenishment control by a single permeable brick 110, a zone of permeable brick 110, or the entire roof area to adapt to different roof areas, pipe layouts, and maintenance strategies.

[0110] It should be clarified that the present invention is not limited to the specific configurations and processes described above and shown in the figures. For the sake of brevity, detailed descriptions of known methods are omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present invention is not limited to the specific steps described and shown. Those skilled in the art can make various changes, modifications, and additions, or change the order of steps, after understanding the spirit of the present invention.

[0111] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0112] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0113] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0114] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0115] It should also be noted that the exemplary embodiments mentioned in this invention describe methods or systems based on a series of steps or apparatus. However, this invention is not limited to the order of the steps described above; that is, the steps can be performed in the order mentioned in the embodiments, or in a different order, or several steps can be performed simultaneously.

[0116] The above are merely specific embodiments of the present invention. Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, modules, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here. It should be understood that the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the protection scope of the present invention.

Claims

1. A permeable brick evaporative cooling system for roofs, characterized in that, include: The permeable brick layer is formed by laying multiple permeable bricks, and the permeable bricks have a capillary water absorption structure inside; A supporting component is installed on the building roof structure layer and supports the permeable brick layer, so that an open space is formed between the permeable brick layer and the building roof structure layer; A water supply drive assembly, which is used to pressurize and distribute water supplied by a water storage device and / or an external water supply interface to a bottom water supply assembly; A bottom water supply component is disposed within the elevated layer and communicates with the water supply drive component. The bottom water supply component is used to supply water to the lower surface of the permeable brick, so that the water enters the permeable brick from the lower surface of the permeable brick and evaporates and cools down within the elevated layer. A moisture content sensor is used to detect the real-time moisture content of the permeable bricks; The controller is connected to the water supply drive assembly, the bottom water supply assembly, and the water content sensor, respectively. The controller is used to determine the real-time water storage capacity and real-time evaporation rate of the permeable brick based on the real-time moisture content and the change in the real-time moisture content, and to determine the allowable water replenishment rate based on the real-time evaporation rate. The controller controls the real-time water replenishment rate of the bottom water supply component to be lower than or equal to the allowable water replenishment rate, so that the real-time water storage capacity is lower than the preset saturated water storage capacity, thereby suppressing the continuous dripping of water from the permeable brick layer.

2. The permeable brick evaporative cooling system for roofs according to claim 1, characterized in that, The controller is used to determine the rate of change of water content and water balance parameters of the permeable bricks based on the water content of the permeable bricks at a first time, the water content of the permeable bricks at a second time, the time interval between the first time and the second time, and the amount of water replenishment and / or return water within a statistical period, and to determine the real-time evaporation rate of the permeable bricks based on the rate of change of water content and the water balance parameters.

3. The permeable brick evaporative cooling system for roofs according to claim 1, characterized in that, It also includes a reflux water detection device; The backflow detection device is used to detect the state of residual water dripping or flowing back from the permeable brick layer; the controller is also used to adjust the real-time water replenishment rate according to the residual water state. When the residual water state indicates that there is dripping water or a continuous increase in backflow water in the permeable brick, the real-time water replenishment rate is reduced or the water supply of the bottom water supply component is suspended.

4. The permeable brick evaporative cooling system for roofs according to claim 1, characterized in that, The controller is preset with an upper limit and a lower limit for water content; when the real-time water content is higher than the upper limit, the controller shuts off or reduces the water supply flow of the bottom water supply component. When the real-time moisture content is lower than the lower limit of moisture content and the evaporation cooling conditions are met, the controller turns on or increases the water supply flow rate of the bottom water supply component.

5. The permeable brick evaporative cooling system for roofs according to claim 1, characterized in that, The bottom water supply assembly includes a main water supply pipe, a node diversion structure, branch water supply pipes, and a moisture-wicking component; The main water supply pipe is connected to the water supply drive assembly. The node diversion structure is located at the node position between adjacent permeable bricks. The branch water supply pipe extends from the node diversion structure to the inner corner area of ​​the surrounding permeable bricks. The moisture-guiding element is located on the lower surface of the permeable brick and is used to diffuse the water output from the branch water supply pipe to the lower surface of the permeable brick.

6. The permeable brick evaporative cooling system for roofs according to claim 5, characterized in that, The branch water supply pipe is a microporous water supply pipe, and the outlet of the microporous water supply pipe is oriented towards the moisture-guiding component; the controller is used for: Based on the allowable water replenishment rate and the duration of the current control cycle, determine the allowable water replenishment amount corresponding to the current control cycle; Based on the preset correspondence between water supply parameters and water output, and the allowable water replenishment, the water supply pressure, water supply duration, and water supply pulse cycle corresponding to the microporous water supply pipe are determined. Based on the water supply pressure, the water supply duration, and the water supply pulse cycle, the microporous water supply pipe is controlled to pulse water supply to the moisture-conducting component; Obtain the updated moisture content after the end of the current control cycle, and determine the actual water storage increment of the permeable brick based on the updated moisture content; Based on the difference between the actual water storage increment and the allowable water replenishment, adjust the water supply pressure, water supply duration, and / or water supply pulse cycle for the next control cycle.

7. The permeable brick evaporative cooling system for roofs according to claim 5, characterized in that, The moisture-wicking component is a moisture-wicking geotextile. The moisture-wicking geotextile is fixed to the non-primary pressure-bearing area on the lower surface of the permeable brick by a clamping frame. The clamping frame includes a lower support frame, an upper pressure frame, and a connecting fastener. The edge of the moisture-wicking geotextile is clamped between the upper pressure frame and the lower support frame. The middle moisture-wicking area of ​​the moisture-wicking geotextile is exposed and in contact with the lower surface of the permeable brick.

8. The permeable brick evaporative cooling system for roofs according to claim 1, characterized in that, The system also includes an upper surface spray assembly and a personnel status detection device; The person-on-roof status detection device is used to generate a person-on-roof status signal. When the person-on-roof status signal indicates that the roof is in a person-on-roof state, the controller is used to: Acquire the rainfall status signal generated by the rainfall detection device; When the rainfall status signal indicates that the roof is in a rainfall state, the upper surface spray assembly and the bottom water supply assembly are turned off or restricted. When the rainfall status signal indicates that the roof is not in a rainfall state, the person status signal on the roof generated by the person status detection device is acquired; when the person status signal on the roof indicates that the roof is in a person status, the thermal environment status corresponding to the activity area of ​​the people on the roof is acquired, and the upper surface spray assembly is controlled to spray and cool the upper surface of the permeable brick according to the thermal environment status. The air temperature of the elevated floor detected by the elevated floor air temperature sensor and the indoor temperature of the building detected by the building indoor temperature sensor are obtained, and the building heat gain state is determined based on the temperature difference between the elevated floor air temperature and the indoor temperature of the building. Based on the building's heat gain state, the real-time moisture content, and the real-time evaporation rate, the bottom water supply component is controlled to supply water to the lower surface of the permeable brick. When the roof status signal indicates that the roof is not in a human-free state, the upper surface spray assembly is turned off or restricted, and the bottom water supply assembly is controlled to supply water to the lower surface of the permeable bricks according to the building's heat gain state, the real-time moisture content, and the real-time evaporation rate.

9. The permeable brick evaporative cooling system for roofs according to claim 8, characterized in that, The controller is also used for: Obtain self-cleaning determination parameters, which include at least one of the permeability performance parameters and return water parameters of the permeable brick, and the spray pressure parameters and spray flow rate parameters of the upper surface spray assembly; compare the self-cleaning determination parameters with the corresponding preset normal range to determine whether the permeable brick layer and the upper surface spray assembly meet the preset self-cleaning conditions; When the preset self-cleaning conditions are met or a manual maintenance command is received, the upper surface spray assembly is switched from evaporative cooling mode to self-cleaning mode; The current target flushing zone is determined from the multiple flushing zones according to the preset flushing sequence, and a set of nozzles corresponding to the current target flushing zone is determined as the target nozzles; Based on the degree of deviation of the self-cleaning judgment parameters from the preset normal range, the target spray pressure, target spray angle, and target rinsing duration corresponding to the target nozzle are determined. The target nozzle is controlled according to the target spray pressure, the target spray angle and the target flushing duration to flush at least one of the permeable brick surface, brick joints and pore inlets in the current target flushing zone; After completing the rinsing of the current target rinsing zone, the updated self-cleaning judgment parameters are obtained, and the updated self-cleaning judgment parameters are compared with the corresponding preset normal range. When the updated self-cleaning determination parameters return to the preset normal range, the rinsing of the current target rinsing zone ends, and the next target rinsing zone is determined according to the preset rinsing order, or the self-cleaning mode is exited after rinsing all rinsing zones is completed. If the updated self-cleaning judgment parameters do not return to the preset normal range, continue rinsing the current target rinsing zone.

10. The permeable brick evaporative cooling system for roofs according to any one of claims 1 to 9, characterized in that, The system also includes a water collection and diversion assembly and a water storage device; The water collection and diversion assembly includes a water collection plate and a water collection trough. The water collection plate is disposed below the permeable brick layer and located within the suspended layer. The water collection trough is connected to the end of the water collection plate. The water collection and diversion assembly is used to collect rainwater that passes through the permeable brick layer, water sprayed back from the upper surface, and residual water from the bottom water supply, and to divert the collected water to the water storage device; the water storage device is connected to the water collection and diversion assembly and the water supply drive assembly to reuse the collected water for the upper surface spray assembly and / or the bottom water supply assembly. The controller controls the amount of residual water entering the rainwater collection and diversion layer by controlling the real-time water replenishment rate.

Citation Information

Patent Citations

  • Even-water-replenishing type thermochromism high-reflection evaporation roof

    CN108316569A

  • Heat and humidity transfer characteristic testing system and method based on humidity of evaporation medium

    CN113237796A

  • Water storage roof thermal-insulation module with empty space

    CN203201033U

  • Clean cooling system in roof and building

    CN205403013U