An adaptive intelligent drilling robot and drilling method for high slopes

By using an adaptive intelligent drilling robot for high slopes, the anchor claw drilling mechanism forms a mechanical lock with the slope surface, solving the problems of stability and hole position accuracy of drilling equipment on near-vertical slopes, and achieving efficient and stable drilling and anchoring effects.

CN123109537APending Publication Date: 2026-11-17KUNMING UNIV OF SCI & TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611439843.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-16
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing drilling equipment is difficult to stably attach to near-vertical slopes, resulting in low drilling efficiency, large hole position deviations, and affecting anchoring effect and project quality.

Method used

The high slope adaptive intelligent drilling robot uses an anchor claw drilling mechanism to form an enlarged cavity at the bottom of the borehole and mechanically lock it. Combined with the anchor frame, it forms a rigid connection with the slope surface, realizing the alternating movement of the drilling execution part and the anchoring part, ensuring the stability and accuracy of the drilling process.

Benefits of technology

It improves drilling efficiency, reduces equipment backlash and lateral sway, ensures the straightness of the hole position, and enhances the distribution of anchoring force and project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109537A_ABST
    Figure CN123109537A_ABST
Patent Text Reader

Abstract

This invention discloses an adaptive intelligent drilling robot and drilling method for high slopes. The drilling robot is connected to winches at the top and bottom of the slope via steel wire ropes at both ends. The winches move the robot up and down along the slope by winding or unwinding the steel wire ropes, and adjust the robot's contact with the slope by regulating the tension of the steel wire ropes. The adaptive intelligent drilling robot for high slopes includes a drilling execution unit and an anchoring unit. The drilling execution unit is used to drill the main holes for anchor bolt holes or anchor cable holes, while the anchoring unit is used to form temporary fixed fulcrums on the slope. The drilling execution unit and the anchoring unit can slide relative to each other, allowing them to alternately serve as working fulcrums and moving parts. Compared with existing technologies, the drilling execution unit and the anchoring unit can form a "crawling" motion, ensuring the drilling robot always has a clear mechanical guiding reference when moving on the slope, reducing lateral sway during traditional steel wire rope hoisting and thus improving the straightness of holes in the same row.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of high slope treatment construction equipment, specifically relating to an adaptive intelligent drilling robot and drilling method for high slopes. Background Technology

[0002] In highway, railway, water conservancy and municipal engineering projects, anchor bolts or anchor cables are usually required for anchoring and stabilizing high slopes. For near-vertical slopes that have been mechanically cut and leveled, especially rock or compacted soil slopes with a slope of 80° to 90°, the surface is relatively smooth, making it difficult for drilling equipment to stably adhere to the slope under its own weight, thus making the construction of anchor bolt or anchor cable holes more difficult.

[0003] Currently, drilling operations on near-vertical slopes typically involve setting up anchor points at the top of the slope and suspending the drilling equipment on the slope using steel wire ropes. The tension of the steel wire ropes pulls the equipment towards the slope, giving it a certain force to adhere to the slope. At the same time, the component of the equipment's weight along the direction of the steel wire ropes forms a partial clamping force.

[0004] However, wire ropes are flexible components. During drilling, the drill rod experiences resistance at the bottom of the hole, generating a reaction force that pulls the equipment away from the slope. Under this reaction force, the wire rope elastically elongates, causing the equipment to retract. A portion of the propulsion cylinder's stroke is consumed by the elastic deformation of the wire rope, failing to be fully converted into effective drill bit advance, resulting in reduced drilling efficiency. The greater the drilling reaction force, the more pronounced the equipment retraction, and the more unstable the drilling propulsion.

[0005] Meanwhile, on near-vertical slopes, the slope-adhering force of the equipment mainly relies on the pretension of the wire rope. The wire rope is difficult to form a stable rigid support, and the equipment is prone to a dynamic state of "pushing away and rebounding". This causes fluctuations in the contact pressure between the drill bit and the bottom of the hole, which can easily lead to problems such as drill bit slippage, free spin, slow advance, or even stagnation in hard rock formations.

[0006] Furthermore, the equipment is suspended only by wire ropes, lacking rigid lateral positioning constraints. Factors such as the counter-torque generated by the rotation of the drill rod, wind disturbance, uneven slope, and uneven rock strata can all cause the equipment to sway laterally. When the equipment is moved, its landing point is also easily affected by the swing of the wire ropes and the operator's experience, resulting in left-right offsets in the same row of holes, forming a sawtooth or wavy pattern.

[0007] Excessive deviation in hole position may prevent anchor bolts or cables from passing through pre-drilled holes in lattice beams, waist beams, or anchor piers, increasing construction work such as hole enlargement and re-drilling. It can also cause uneven distribution of anchoring force, affecting slope stability. For prestressed anchor cables, hole position deviation may also cause the anchor plate to bear eccentric loads, reducing the anchoring effect. For shotcrete construction with wire mesh, it will also increase the difficulty of connecting the reinforcing mesh to the exposed ends of the anchor bolts.

[0008] Therefore, existing construction methods are insufficient to meet the requirements of equipment stability support, drilling efficiency, and hole positioning accuracy for drilling operations on near-vertical slopes. Summary of the Invention

[0009] The purpose of this invention is to provide an adaptive intelligent drilling robot and drilling method for high slopes, so as to solve the technical problems mentioned in the background above.

[0010] To achieve the above objectives, the present invention provides a high-slope adaptive intelligent drilling robot, which has steel wire ropes fixedly connected to both ends. A winch is connected to the end of the steel wire rope furthest from the high-slope adaptive intelligent drilling robot. By winding or unwinding the steel wire rope through the winch, the position and slope-adhering force of the high-slope adaptive intelligent drilling robot relative to the slope surface are adjusted. The high-slope adaptive intelligent drilling robot includes a drilling execution unit and an anchoring unit. The anchoring unit is capable of sliding relative to the drilling execution unit. The anchoring unit includes an anchoring frame, on which multiple anchor claw drilling mechanisms are installed. After drilling, the anchor claw drilling mechanisms deform, and the end of the anchor claw drilling mechanism entering the slope expands radially, forming an enlarged diameter cavity at the bottom of the borehole. The anchor claw drilling mechanism forms a mechanical lock with the side of the enlarged diameter cavity, anchoring the anchoring frame to the slope surface and providing drilling reaction force support for the drilling execution unit.

[0011] In one or more embodiments of the present invention, the anchor claw drilling mechanism includes a slide block and a slide table slidably connected to the slide block; a drive motor is fixedly connected to the slide table, a support frame is fixedly connected to the lower end of the slide table, a first connecting rod matching the drive motor is installed on the support frame, and the support frame is used to support the first connecting rod; a drill bit is detachably installed at the end of the first connecting rod away from the drive motor; the drill bit includes a connecting part and a pilot drill bit, and a reaming blade is provided on the connecting part, the reaming blade being capable of radial expansion deformation after drilling.

[0012] In one or more embodiments of the present invention, a mounting groove is provided on the connecting part, the reaming blade is rotatably connected in the mounting groove, a connecting lug is fixedly connected to the lower end of the reaming blade, and a blade control mechanism for controlling the reaming blade is installed in the connecting part, the blade control mechanism being used to drive the reaming blade to switch between a retracted state and a free state.

[0013] In one or more embodiments of the present invention, the blade control mechanism includes a pressing plate, and the connecting part has a vertical hole that matches the connecting ear. The pressing plate is slidably connected in the vertical hole, and the two ends of the pressing plate press the connecting ear during the downward movement, forcing the enlarged blade to be retracted into the mounting groove.

[0014] In one or more embodiments of the present invention, a connecting hole is provided at the top of the connecting part; a second connecting rod is fixedly connected to the middle of the pressing plate, the second connecting rod passes through the connecting part from the connecting hole to be fixedly connected to the pressing plate, a first cavity matching the second connecting rod is provided in the middle of the connecting part, a first double-sided wedge block matching the first cavity is fixedly connected to the second connecting rod, a second sliding groove is provided on the side wall of the first cavity, a second double-sided wedge block is slidably connected in the second sliding groove, and a spring is fixedly connected between the second double-sided wedge block and the bottom wall of the second sliding groove.

[0015] In one or more embodiments of the present invention, the lower end of the first connecting rod is detachably connected to the connecting hole, a first linear drive device is fixedly connected inside the first connecting rod, a magnetic block is fixedly connected to the extended end of the first linear drive device, and a first double-sided wedge block matching the magnetic block is fixedly connected to the end of the second connecting rod away from the pressing plate.

[0016] In one or more embodiments of the present invention, a set of walking wheel assemblies are fixedly connected to the opposite end faces of the drilling execution part and the anchoring part. The walking wheel assemblies are used to change the distance between the high slope adaptive intelligent drilling robot and the slope surface, so as to increase the slope adhesion force between the high slope adaptive intelligent drilling robot and the slope surface.

[0017] In one or more embodiments of the present invention, the walking wheel assembly includes a main support rod and a secondary support rod rotatably connected to the main support rod, with an included angle between the main support rod and the secondary support rod. The end of the main support rod away from the included angle is equipped with a walking wheel body, and the end of the secondary support rod away from the included angle is rotatably connected to a second linear drive device. The output end of the second linear drive device is rotatably connected to one end of the main support rod. The opening and closing angle between the main support rod and the secondary support rod is changed by raising and lowering the second linear drive device, thereby changing the gap between the high slope adaptive intelligent drilling robot and the slope surface.

[0018] In one or more embodiments of the present invention, a control housing is further included, wherein a controller is installed inside the control housing. The controller is signal-connected to the winch, the traveling wheel assembly, the anchor claw drilling mechanism, and the drilling execution unit, respectively. The controller is used to: control the winch to wind or unwind the wire rope, moving the high slope adaptive intelligent drilling robot to a predetermined working position on the slope; control the anchor claw drilling mechanism to drill into the slope, wherein after drilling, the anchor claw drilling mechanism undergoes radial expansion deformation to form a mechanical lock with the hole wall, thereby securing the... The anchoring frame is anchored to the slope; the drilling actuator is controlled to drill the main hole. After the main hole is drilled, the drill rod of the drilling actuator is kept in the hole, and the winch is controlled to tension the wire rope so that a fixed fulcrum is formed between the drilling actuator and the anchoring frame; the anchoring frame is controlled to move forward one step along the slope, and after it moves into place, the anchor claw drilling mechanism is controlled to drill again and lock; the drilling actuator is controlled to retract the drill rod and slide along the anchoring frame to a new hole position. This cycle is repeated to realize the alternating operation of drilling and relocation.

[0019] In addition, the present invention also provides a drilling method using a high slope adaptive intelligent drilling robot. The high slope adaptive intelligent drilling robot includes a drilling execution unit and an anchoring unit. The anchoring unit includes an anchoring frame and multiple anchor claw drilling mechanisms installed on the anchoring frame. The drilling execution unit is slidably connected to the anchoring frame. The drilling execution unit and the anchoring unit are respectively connected to a winch via steel wire ropes. The method includes the following steps: S1, using the winch to wind up and unwind the steel wire rope, moving the robot to a predetermined working position on the slope and tensioning the steel wire rope so that the robot is close to the slope; S2, controlling the anchor claw drilling mechanisms to drill into the slope, and after drilling to the designed depth, causing the front end of the anchor claw drilling mechanism to expand radially, forming an enlarged cavity at the bottom of the hole and mechanically locking it with the sidewall of the enlarged cavity, thus anchoring the robot. S3. Slide the drilling actuator along the anchoring frame to the main hole position and lock it, then control the drilling actuator to drill the main hole; S4. After the main hole is drilled, keep the main drill rod in the hole and tension the wire rope to form a fixed fulcrum between the drilling actuator and the anchoring frame; S5. Release the mechanical lock of the anchor claw drilling mechanism, remove the anchor claw drilling mechanism from the slope, and control the anchoring frame to move forward one step along the slope; S6. Control the anchor claw drilling mechanism to drill into the slope again after the anchoring frame has moved into place and radially expand and lock it, then re-anchor the anchoring frame to the slope; S7. Retrieve the main drill rod, slide the drilling actuator along the anchoring frame to the new main hole position and lock it; S8. Repeat steps S2 to S7 to complete the drilling operation of multiple main holes in the same row.

[0020] Compared with the prior art, the beneficial effects of the present invention are as follows: before the drilling execution unit 1 drills the main hole, the anchoring part 4 is drilled into the slope through the anchor claw drilling mechanism 6, and after the drilling is completed, it expands radially and interlocks with the expansion cavity formed at the bottom of the hole to form a mechanical lock, thus rigidly anchoring the anchoring frame 5 to the slope. As a result, the reaction force generated when the drilling execution mechanism 3 advances can be transmitted to the anchoring part 4 through the drilling frame 2, and then transmitted to the slope by the anchoring part 4, thereby reducing the proportion of reaction force borne by the wire rope, reducing the equipment backing caused by the elastic elongation of the wire rope, improving the conversion efficiency of the propulsion cylinder stroke to the effective advance of the drill bit, and significantly improving the drilling efficiency.

[0021] Meanwhile, the drilling execution unit 1 and the anchoring unit 4 can form a movement similar to "alternating crawling": the anchoring unit 4 is first locked to the slope by the anchor claw drilling mechanism 6, and the drilling execution unit 1 slides along the anchoring frame 5 to the main hole position and completes the main hole drilling; after the main hole drilling is completed, the main drill rod of the drilling execution unit 1 remains in the hole, and at the same time the winch tensions the wire rope, making the drilling execution unit 1 a fixed fulcrum; then the anchoring unit 4 is unlocked and moves forward to the next anchoring position, and re-drills and locks; finally, the drilling execution unit 1 releases the main drill rod and retracts, and then slides along the anchoring frame 5 to the new main hole position, entering the next cycle; this method ensures that the drilling robot always has a clear mechanical guiding reference when moving on the slope, reducing the lateral sway during traditional wire rope hoisting and moving, thereby improving the straightness of the holes in the same row, and thus ensuring the smooth implementation of multiple links such as subsequent component installation, anchoring force distribution, tensioning quality, netting connection and overall project acceptance. In other words, both drilling quality and efficiency can be greatly improved. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the structure of an adaptive intelligent drilling robot for high slopes according to one embodiment of the present invention. Figure 1 ;

[0023] Figure 2 This is a schematic diagram of the structure of an adaptive intelligent drilling robot for high slopes according to one embodiment of the present invention. Figure 2 ;

[0024] Figure 3 This is a schematic diagram of the drilling actuator in one embodiment of the present invention;

[0025] Figure 4 This is a schematic diagram of the anchoring part in one embodiment of the present invention;

[0026] Figure 5 This is a schematic diagram of the anchor claw drilling mechanism in one embodiment of the present invention;

[0027] Figure 6 This is a partial cross-sectional view of the anchor claw drilling mechanism in one embodiment of the present invention;

[0028] Figure 7 for Figure 6 Schematic diagram of the structure at point A in the middle;

[0029] Figure 8 This is a schematic diagram of the walking wheel assembly in one embodiment of the present invention;

[0030] Figure 9 This is a flowchart of a drilling method using an adaptive intelligent drilling robot for high slopes, as described in one embodiment of the present invention.

[0031] Explanation of key figure labels:

[0032] 1. Drilling actuator; 2. Drilling frame; 201. First sluice; 202. Strip through hole; 203. Control box; 2031. Clearance groove; 3. Drilling mechanism; 4. Anchoring part; 5. Anchoring frame; 6. Anchor claw drilling mechanism; 7. Slide; 8. Slide table; 801. Support frame; 9. Drive motor; 10. First connecting rod; 1001. First linear drive device; 1002. Magnetic block; 11. Drill bit; 12. Connecting part; 1201. Connecting hole; 1202. Mounting groove ; 1203, Vertical hole; 1204, First cavity; 1205, Second slide groove; 13, Pilot drill bit; 14, Reamer blade; 1401, Connecting lug; 15, Blade control mechanism; 16, Pressing plate; 1601, Guide rod; 17, Second connecting rod; 1701, First double-sided wedge block; 18, Second double-sided wedge block; 19, Spring; 20, Walking wheel assembly; 21, Main support rod; 22, Secondary support rod; 23, Second linear drive device; 24, Walking wheel body. Detailed Implementation

[0033] The specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings, but it should be understood that the scope of protection of the present invention is not limited to the specific embodiments.

[0034] like Figure 1 As shown, a high slope adaptive intelligent drilling robot is used in conjunction with winches (not shown) at the top and bottom of the slope via steel wire ropes (not shown in the figure). The winches move the robot up and down along the slope by winding or unwinding the steel wire ropes, and change the robot's contact state with the slope by adjusting the tension of the steel wire ropes.

[0035] Specifically, such as Figures 1-4 As shown, the high slope adaptive intelligent drilling robot includes a drilling execution unit 1 and an anchoring unit 4. The drilling execution unit 1 is used to complete the main hole drilling of anchor bolt holes or anchor cable holes, and the anchoring unit 4 is used to form a temporary fixed support point on the slope surface. The drilling execution unit 1 and the anchoring unit 4 can slide relative to each other, so that they can alternately serve as working support points and moving parts.

[0036] Specifically, the drilling execution unit 1 includes a drilling frame 2 and a drilling execution mechanism 3 mounted on the drilling frame 2. A control box 203 is also mounted on the drilling frame 2. The drilling execution mechanism 3 is located at one end of the drilling frame 2. A hydraulic cylinder is installed between the drilling execution mechanism 3 and the control box 203 for changing the drilling direction.

[0037] The anchoring part 4 includes an anchoring frame 5 and multiple anchor claw drilling mechanisms 6 mounted on the anchoring frame 5. These multiple anchor claw drilling mechanisms 6 can be arranged at intervals along the length of the anchoring frame 5, or symmetrically arranged in two or more rows to ensure balanced force distribution on the anchoring frame 5. Each anchor claw drilling mechanism 6 can first drill into the surface layer of the slope and then undergo radial expansion after drilling, causing the end entering the slope to form an expanded state near the bottom of the hole. This expanded state interlocks with the enlarged cavity formed at the bottom of the hole or the recessed portion of the hole wall, thus forming a mechanical lock.

[0038] After mechanical locking is completed, the anchor frame 5 no longer relies solely on friction or gravity to adhere to the slope surface, but instead forms a pull-out and shear-resistant connection with the slope through the anchor claw drilling mechanism 6. In this way, when the drilling execution unit 1 performs main hole drilling and is subjected to reaction force, the reaction force can be jointly borne by the anchor frame 5 and multiple anchor claw drilling mechanisms 6, significantly reducing the tendency for the robot to be pushed away from the slope surface.

[0039] Preferably, in the multiple anchor claw drilling mechanisms 6, the drill bits 11 of adjacent anchor claw drilling mechanisms 6 rotate in opposite directions. That is, the multiple anchor claw drilling mechanisms 6 can be uniformly driven by a synchronous reversing gearbox. Within the gearbox, idler gears or internal and external gear meshing cause adjacent output shafts to rotate in opposite directions, thus causing adjacent drill bits 11 to rotate clockwise and counterclockwise respectively. With this configuration, the rotational counter-torque generated by each anchor claw drilling mechanism 6 during drilling is also in opposite directions. When these counter-torques are transmitted to the anchoring frame 5 through the mounting seats of each anchor claw drilling mechanism 6, they cancel each other out within the anchoring frame 5, and the net torque on the anchoring frame 5 as a whole approaches zero. In this way, when the four anchor claw drilling mechanisms 6 drill simultaneously, the robot body will not experience a torsional tendency around the geometric center of the anchoring frame 5 due to the superposition of rotational counter-torques, further improving the stability of the anchoring process and the uniformity of force on the anchoring frame 5. Meanwhile, since the counter-torque is basically offset inside the gearbox, the anti-torque auxiliary force required by the winch is also reduced accordingly, which reduces the control difficulty and energy consumption of the winch, making the entire anchoring operation process more stable and reliable.

[0040] The drilling frame 2 has a first groove 201 that matches the anchoring frame 5. The anchoring frame 5 is slidably connected within the first groove 201. The drilling frame 2 also has a strip-shaped through hole 202 that avoids the anchor claw drilling mechanism 6. The control box 203 also has an avoidance groove 2031 that matches the anchor claw drilling mechanism 6. This avoids interference between the drilling execution part 1 and the anchoring part 4 during the sliding process.

[0041] The drilling actuator 1 and the anchoring unit 4 are generally driven by hydraulic cylinders.

[0042] Since the anchoring part 4 can be anchored to the slope before drilling, the reaction force generated when the drilling actuator 3 advances can be transmitted to the anchoring part 4 through the drilling frame 2, and then transmitted to the slope by the anchoring part 4, thereby reducing the proportion of reaction force borne by the wire rope and increasing the effective drilling depth of the drill bit.

[0043] In practical use, the drilling execution unit 1 and the anchoring unit 4 can form a movement similar to "alternating crawling": the anchoring unit 4 is first locked to the slope surface by the anchor claw drilling mechanism 6, and the drilling execution unit 1 slides along the anchoring frame 5 to the main hole position and completes the main hole drilling; after the main hole drilling is completed, the main drill rod of the drilling execution unit 1 remains in the hole, and at the same time the winch tensions the wire rope, making the drilling execution unit 1 a fixed fulcrum; then the anchoring unit 4 is unlocked and moves forward to the next anchoring position, and re-drills and locks; finally, the drilling execution unit 1 releases the main drill rod and retracts, and then slides along the anchoring frame 5 to the new main hole position, entering the next cycle. This method ensures that the drilling robot always has a clear mechanical guiding reference when moving on the slope, reducing the lateral sway during traditional wire rope hoisting and moving, thereby improving the straightness of the holes in the same row, and thus ensuring the smooth implementation of subsequent component installation, anchoring force distribution, tensioning quality, wire mesh connection, and overall project acceptance.

[0044] like Figures 1-7 As shown, the anchor claw drilling mechanism 6 includes a slide block 7 and a slide table 8 slidably connected to the slide block 7. The slide block 7 is fixedly installed on the anchor frame 5. The slide block 7 may be provided with a dovetail groove, a T-groove or a linear guide rail. The slide table 8 cooperates with the slide block 7 through a slider, roller or guide rail pair, so that the slide table 8 can reciprocate in a direction perpendicular or approximately perpendicular to the slope.

[0045] A drive motor 9 is fixedly connected to the slide table 8, and the drive motor 9 is used to output rotational power. A support frame 801 is fixedly connected to the lower end of the slide table 8, and a first connecting rod 10 is installed on the support frame 801. The first connecting rod 10 is matched with the drive motor 9, and the output shaft of the drive motor 9 can be connected to the first connecting rod 10 through a coupling, spline sleeve, or clamping joint. The support frame 801 provides radial support for the first connecting rod 10, preventing the first connecting rod 10 from swinging due to lateral forces during drilling, and improving the entry stability of the drill bit 11 into the hole.

[0046] The drill bit 11 can be detachably installed at the end of the first connecting rod 10 away from the drive motor 9, making it easy to replace the drill bit 11 after it wears out, and also making it easy to select alloy drill bits, diamond composite drill bits or spiral drill bits according to the hardness of the rock formation.

[0047] The drill bit 11 includes a connecting part 12 and a pilot drill bit 13. The connecting part 12 is used to connect with the first connecting rod 10, and the pilot drill bit 13 is disposed at the front end of the connecting part 12 for cutting the slope and forming an initial channel. The connecting part 12 is provided with a reaming blade 14, which can expand and deform radially after drilling.

[0048] In the initial stage of drilling, the reaming blade 14 is in a retracted state, and its outer diameter is no larger than the diameter of the pilot drill bit 13 or the initial channel. Therefore, it can smoothly enter the slope with the pilot drill bit 13. When the drill bit 11 reaches the predetermined depth, the reaming blade 14 switches to a free state or an open state. When the reaming blade 14 continues to rotate, it cuts the rock and soil around the bottom of the hole to form an enlarged cavity with a diameter larger than the initial channel.

[0049] After the expansion cavity is formed, the expansion blade 14 remains open and abuts against the side wall of the expansion cavity, thereby creating a mechanical lock similar to an inverted buckle between the anchor claw drilling mechanism 6 and the slope. This locking method differs from the temporary clamping method that relies solely on hole wall friction; it has higher pull-out resistance and can maintain the stability of the anchor frame 5 even when the drilling actuator 1 is subjected to a large drilling reaction force.

[0050] Specifically, a connecting hole 1201 is provided on the connecting part 12. The connecting hole 1201 is located at the top of the connecting part 12 and is used to form a detachable connection with the lower end of the first connecting rod 10. The detachable connection method can be threaded connection, bayonet connection, pin locking connection, or conical clamping connection. A mounting groove 1202 is provided on the side wall of the connecting part 12. The reaming blade 14 is rotatably connected to the mounting groove 1202 through a hinge. In the retracted state, the outer surface of the reaming blade 14 is flush with or smaller than the outer peripheral surface of the connecting part 12, so as not to affect the normal drilling of the drill bit 11.

[0051] like Figures 6-7 As shown, a blade control mechanism 15 is installed inside the connecting part 12, and the blade control mechanism 15 includes a pressing plate 16. A vertical hole 1203 is also provided on the connecting part 12, located between two mounting slots 1202. The vertical hole 1203 extends axially along the connecting part 12. The pressing plate 16 is slidably connected within the vertical hole 1203, with both ends of the pressing plate 16 extending from the vertical hole 1203 to the corresponding mounting slots 1202. A connecting ear 1401 is fixedly connected to the lower end of the reaming blade 14, and both ends of the pressing plate 16 engage with the connecting ear 1401. When the pressing plate 16 slides downwards, it presses the connecting ear 1401, causing the reaming blade 14 to rotate towards the mounting slot 1202, thereby retracting the reaming blade 14.

[0052] Furthermore, a second connecting rod 17 is provided extending downwards from the connecting hole 1201 through the connecting part 12. The lower end of the second connecting rod 17 is fixedly connected to the pressing plate 16. Of course, a guide rod 1601 is installed in the vertical hole 1203 to match the pressing plate 16. The guide rod 1601 guides the pressing plate 16, forcing the pressing plate 16 to move along the axial direction of the connecting part 12. In other words, by pulling up or pressing down the second connecting rod 17, the position of the pressing plate 16 can be changed, which in turn changes the retracted and extended state of the reaming blade 14.

[0053] It is worth noting that the pressing plate 16 and the connecting ear 1401 are separable. When the pressing plate 16 is away from the connecting ear 1401, the reaming blade 14 is in a free state. In this state, the drill bit 11 is rotating at high speed, and under the action of centrifugal force, the reaming blade 14 flips outward and expands. The center of mass of the reaming blade 14 is off-center from the hinge axis, and the part of the reaming blade 14 away from the hinge axis has a large mass. The centrifugal torque is sufficient to overcome the gravitational torque of the reaming blade 14 itself and the frictional resistance at the hinge, so that the reaming blade 14 stably opens outward to its limit position. After the reaming blade 14 is opened, its outer edge extends beyond the outer circumferential surface of the connecting part 12, cutting out an enlarged cavity in the hole.

[0054] Preferably, the outer edge of the reaming blade 14 can be provided with a wedge-shaped cutting surface that gradually transitions from thinner at the front to thicker at the back, so that the reaming blade 14 can gradually cut into the hole wall in the initial opening stage, reducing the instantaneous impact load and reducing the jamming of the drill bit 11.

[0055] When the reaming blade 14 is retracted, the drill bit 11 is in a non-rotating state. At this time, the second connecting rod 17 moves downward, and the pressing plate 16 presses the connecting lug 1401 again to press the reaming blade 14 back into the storage position.

[0056] The first connecting rod 10 is equipped with a first linear drive device 1001 at its front end. A magnetic block 1002 is fixedly connected to the extended end of the first linear drive device 1001. The magnetic block 1002 is an electromagnetic block. A first double-sided wedge block 1701 is fixedly connected to one end of the second connecting rod 17 near the magnetic block 1002. The first double-sided wedge block 1701 can magnetically attract the electromagnetic block in the energized state, thereby enabling the first linear drive device 1001 to pull the second connecting rod 17 upward.

[0057] Of course, the magnetic block 1002 can also be a powerful permanent magnet, which requires a larger redundant space in the connecting hole 1201. That is, when the upper end face of the pressing plate 16 contacts the upper end face of the vertical hole 1203, the first linear drive device 1001 can also retract backward, forcing the first double-sided wedge block 1701 to separate from the powerful permanent magnet. This process requires the connecting hole 1201 to have sufficient axial redundant distance; otherwise, the stroke of the first linear drive device 1001 will not be sufficient to complete the disengagement action. Therefore, in this case, the electrically controllable powerful magnetic block 1002 is preferred as the preferred solution. Adsorption and separation can be easily achieved by turning the power on and off, without the need for additional reserved space for forced disengagement. The structure is more compact, and the control is simpler and more reliable.

[0058] Since the second connecting rod 17 requires upward pulling to allow the reaming blade 14 to be in a free state, the electromagnetic block needs to be energized to maintain this free state for a long time. Otherwise, under the influence of gravity, the second connecting rod 17 will move axially downwards. Therefore, to reduce the need for the electromagnetic block to be powered for a long time, a first cavity 1204 is provided in the middle of the connecting part 12. The first cavity 1204 extends axially and is on the same axis as the second connecting rod 17. The outer diameter of the first cavity 1204 is larger than the outer diameter of the second connecting rod 17.

[0059] A first double-sided wedge block 1701 is fixedly connected to the second connecting rod 17. The first double-sided wedge block 1701 is located inside the first cavity 1204. A second sliding groove 1205 is provided on the side wall of the first cavity 1204 and communicates with the first cavity 1204. A second double-sided wedge block 18 is slidably connected inside the second sliding groove 1205. A spring 19 is provided between the second double-sided wedge block 18 and the bottom wall of the second sliding groove 1205. In other words, when the reaming blade 14 needs to be kept retracted, the second connecting rod 17 drives the pressing plate 16 to move down, and the pressing plate 16 presses the connecting ear 1401, so that the reaming blade 14 is retracted into the mounting groove 1202; at the same time, the first double-sided wedge block 1701 and the second double-sided wedge block 18 contact each other through the wedge surface, and the spring 19 pushes the second double-sided wedge block 18 to press against the first double-sided wedge block 1701, so that the position of the second connecting rod 17 is restricted, thereby avoiding the vibration during drilling that causes the reaming blade 14 to open prematurely.

[0060] When the drill bit 11 reaches the predetermined depth, the first linear drive device 1001 inside the first connecting rod 10 activates, pushing the magnetic block 1002 close to or magnetically engaging with the first double-sided wedge block 1701 at the end of the second connecting rod 17, thereby causing the second connecting rod 17 to move upward against the limiting effect of the second double-sided wedge block 18. After the pressing plate 16 moves upward with the second connecting rod 17, it releases the pressure on the connecting lug 1401, and the reaming blade 14 opens outward from the mounting groove 1202.

[0061] By combining mechanical limiting with magnetic drive, the reaming blade 14 can be reliably stored during the drilling stage and actively released at a predetermined depth, avoiding failure of the reaming action due to hole wall friction or mud blockage. In addition, the electromagnetic block can stop supplying power after the action, which helps to save power consumption.

[0062] like Figure 1 , Figure 8 As shown, a set of traveling wheel assemblies 20 are fixedly connected to the opposite end faces of the drilling execution unit 1 and the anchoring unit 4. The traveling wheel assembly 20 is used to change the distance between the drilling robot and the slope, and to convert part of the tension into the clamping force of the drilling robot against the slope when the winch tensions the wire rope.

[0063] Specifically, the walking wheel assembly 20 includes a main support rod 21 and a secondary support rod 22 rotatably connected to the main support rod 21. The secondary support rod 22 is fixedly connected to the drilling robot, and a variable angle is formed between the main support rod 21 and the secondary support rod 22. The walking wheel body 24 is mounted on the end of the main support rod 21 away from the angle, and the end of the secondary support rod 22 away from the angle is rotatably connected to a second linear drive device 23. The output end of the second linear drive device 23 is rotatably connected to one end of the main support rod 21. When the second linear drive device 23 extends or retracts, the opening and closing angle between the main support rod 21 and the secondary support rod 22 changes, thereby changing the outward extension distance of the walking wheel body 24 relative to the drilling frame 2 or the anchoring frame 5.

[0064] When the walking wheel body 24 extends outward, the gap between the robot body and the slope increases, and the tensioned wire rope can generate a larger slope-adhering force in terms of geometry. Especially when the anchor claw drilling mechanism 6 is drilling, it helps to increase the normal clamping force between the anchor frame 5 and the slope, so that the anchor claw drilling mechanism 6 can resist the axial reaction force more stably during the drilling process, and avoid pushing the anchor frame 5 away from the slope due to the reaction force. This ensures that the anchor claw drilling mechanism 6 can smoothly drill into the designed depth, improve the reliability of anchoring and the quality of hole formation.

[0065] The controller is installed inside the control box 203. The controller is connected to the winch, the traveling wheel assembly 20, the anchor claw drilling mechanism 6, and the drilling actuator 1. The controller can be a PLC, an industrial controller, or an embedded control board. The sensors communicate with the controller via CAN bus or RS485 bus, or they can be directly connected via analog interfaces.

[0066] The specific control flow of the controller is as follows:

[0067] First, the controller controls the winch to wind up or unwind the wire rope, moving the high slope adaptive intelligent drilling robot to the predetermined working position on the slope.

[0068] Next, the controller controls the anchor claw drilling mechanism 6 to drill into the slope. At this time, the controller sends a start command to the drive motor 9, and the drive motor 9 drives the drill bit 11 to rotate at the first speed. The slide table 8 feeds along the slide block 7 towards the slope, and the pilot drill bit 13 drills normally in the retracted state. After the anchor claw drilling mechanism 6 drills to the designed depth, the controller controls the anchor claw drilling mechanism 6 to undergo radial expansion deformation. The reaming blade 14 opens outward, forming an enlarged cavity at the bottom of the hole, which mechanically locks with the hole wall, anchoring the anchor frame 5 to the slope.

[0069] Next, the controller controls the drilling actuator 1 to drill the main hole. After the main hole is drilled, the controller controls the main drill rod of the drilling actuator 1 to remain in the hole, and at the same time controls the winch to tension the wire rope, so that a fixed support point is formed between the drilling actuator 1 and the anchor frame 5.

[0070] Then, the controller controls the anchor frame 5 to move forward one step along the slope. This step is controlled by the winch encoder signal or the stroke of the push cylinder. After the anchor frame 5 moves into place, the controller controls the anchor claw drilling mechanism 6 to drill again and lock, so that the anchor frame 5 is re-anchored to the slope.

[0071] Finally, the controller controls the drilling actuator 1 to retrieve the drill rod and slides it along the anchoring frame 5 to the new main hole position. This cycle repeats, alternating between drilling and relocation. Through the above control process, the winch, the traveling wheel assembly 20, the anchor claw drilling mechanism 6, and the drilling actuator 1 form an automatic coordinated operation, enabling the robot to autonomously complete the cycle of positioning, anchoring, drilling, relocation, and re-anchoring on a near-vertical slope.

[0072] The working process of this embodiment can be carried out as follows. Before construction, winches and wire rope anchor points are set at the top and bottom of the slope. The wire ropes are connected to both ends of the robot, and the robot is brought close to the slope surface to be constructed. The controller controls the winch to wind up or unwind the wire rope, moving the robot to the predetermined working position on the slope. During the movement, the walking wheel body 24 of the walking wheel assembly 20 contacts the slope surface. The second linear drive device 23 adjusts the included angle between the main support rod 21 and the auxiliary support rod 22 according to the slope undulations, so that the robot body maintains a suitable distance from the slope surface, avoiding direct scraping of the drilling frame 2 or anchor frame 5 against the slope surface. After reaching the position, the winch tensions the wire rope, so that the robot obtains initial slope contact force.

[0073] Subsequently, the controller controls the drilling mechanisms 6 of multiple anchor claws on the anchoring part 4 to operate. The drive motor 9 drives the first connecting rod 10 and the drill bit 11 to rotate, and the slide table 8 feeds along the slide block 7 towards the slope. The pilot drill bit 13 forms a temporary anchoring hole on the slope. In the initial stage of drilling, the reaming blade 14 is pressed into the mounting groove 1202 by the pressing plate 16. The outer diameter of the drill bit 11 is small, so the resistance to entering the hole is low and the disturbance of the hole wall is small. When the drill bit 11 reaches the preset depth, the first linear drive device 1001 drives the strong magnetic block 1002 to move, which drives the second connecting rod 17 to move, so that the pressing plate 16 releases the pressure on the connecting lug 1401, and the reaming blade 14 opens outward. The drive motor 9 continues to drive the drill bit 11 to rotate, and the reaming blade 14 cuts the circumferential area of ​​the bottom of the hole and forms an enlarged cavity. After the enlargement is completed, the reaming blade 14 remains open and forms a mechanical lock with the side of the enlarged cavity, and the anchoring frame 5 is thus anchored to the slope. This process transforms the anchor frame 5 from a "suspended load-bearing component" into a "slope-fixed support point," providing a reliable reaction force path for subsequent main hole drilling.

[0074] After the anchoring part 4 is locked, the controller controls the drilling execution part 1 to drill the main hole. The rotary power head of the drilling execution mechanism 3 drives the main drill rod to rotate, and the propulsion cylinder pushes the main drill rod forward along the hole axis. During drilling, the reaction force at the bottom of the hole is transmitted to the drilling frame 2 through the drilling execution mechanism 3, and then transmitted to the anchoring frame 5 through the sliding or locking connection between the drilling frame 2 and the anchoring frame 5. Finally, it is transmitted to the slope through the mechanical locking between the anchor claw drilling mechanism 6 and the expansion cavity. Because this reaction force path has obvious rigid constraints, the wire rope no longer serves as the main reaction force bearing component, and the stroke of the propulsion cylinder can be more converted into drill bit advance, thereby reducing the efficiency loss caused by the flexible yielding of the traditional wire rope. At the same time, multiple anchor claw drilling mechanisms 6 are distributed on the anchoring frame 5, which can constrain the counter-torque and lateral disturbance generated by the drilling execution part 1, reduce the lateral swing of the drilling execution part 1, and improve the hole position arrangement accuracy.

[0075] After the main hole drilling is completed, the controller can temporarily keep the drill rod of the drilling actuator 1 inside the hole, while simultaneously controlling the winch to tension the wire rope, thus forming a fixed fulcrum between the drilling actuator 1 and the anchor frame 5. At this time, the drill rod inside the main hole provides some guidance and support for the drilling actuator 1, while the tension of the wire rope helps maintain the robot's posture. Subsequently, the controller releases the locking state of the anchor claw drilling mechanism 6.

[0076] Upon release, the first linear drive device 1001 can drive the second connecting rod 17 to reset via the strong magnetic block 1002, causing the pressing plate 16 to move down and press against the connecting ear 1401, and the reaming blade 14 to retract into the mounting groove 1202; the slide table 8 retracts along the slide seat 7, and the drill bit 11 exits the temporary anchoring hole. After the anchoring part 4 is unlocked, the anchoring frame 5 moves forward one step along the drilling frame 2 or the corresponding guide structure. This step can be set according to the design spacing of the anchor bolt hole or anchor cable hole, for example, 0.5m to 3m; for the construction of anchor holes for lattice beams, the step can be consistent with the center distance of the reserved holes of the lattice beam. After moving into position, the controller controls the anchor claw drilling mechanism 6 to drill and lock again, forming a new slope fixing support point.

[0077] After the new anchoring point is formed, the controller controls the drilling actuator 1 to retract the main drill rod and slide the drilling actuator 1 along the anchoring frame 5 to the new main hole position. Because the sliding between the drilling actuator 1 and the anchoring part 4 is restricted by the anchoring frame 5, the movement direction of the drilling actuator 1 is constrained by the anchoring frame 5, significantly reducing the lateral deviation of the hole position. Subsequently, the drilling actuator 3 drills the main hole again, and this cycle repeats, achieving alternating drilling and relocation operations.

[0078] This alternating operation method allows the robot to use the locked anchor part 4 as the reference for the next movement and drilling after completing each hole, avoiding the random landing point deviation caused by the swing of the wire rope during each movement of traditional equipment.

[0079] This embodiment has at least the following beneficial effects:

[0080] First, through the anchor frame 5 and multiple anchor claw drilling mechanisms 6, a mechanical anchoring support is formed on the slope before the main hole of the drilling execution unit 1 is drilled. After the anchor claw drilling mechanism 6 drills into the slope, the reaming blade 14 opens radially and forms an enlarged cavity at the bottom of the hole, which forms a mechanical lock with the hole wall to resist pull-out and shear. This allows the drilling reaction force to be transmitted to the slope through the anchor frame 5, rather than relying mainly on the wire rope, thereby reducing the equipment backlash caused by the elastic elongation of the wire rope and improving the conversion efficiency of the propulsion cylinder stroke into the effective drilling depth.

[0081] Second, the anchor claw drilling mechanism 6 employs a pilot drill bit 13 in conjunction with a retractable and expandable reaming blade 14. During drilling, the reaming blade 14 is retracted into the mounting groove 1202, resulting in a small outer diameter of the drill bit and low entry resistance. After reaching the predetermined depth, the pressure plate 16 releases the restriction on the connecting lug 1401, and the reaming blade 14 expands under centrifugal force, completing the diameter expansion. This structure facilitates drilling into the slope and forms a reliable inverted anchorage after drilling, balancing smooth drilling with reliable anchorage.

[0082] Third, the drill bits 11 of adjacent anchor claw drilling mechanisms 6 rotate in opposite directions. The rotational counter-torque generated during drilling cancels out or partially cancels out each other within the anchor frame 5, reducing the tendency of the robot to twist around the geometric center of the anchor frame 5, making the anchor frame 5 more evenly stressed, improving the stability of the anchoring process, and reducing the requirement for the winch to provide anti-torsional auxiliary force.

[0083] Fourth, the walking wheel assembly 20 can adjust the opening and closing angles of the main support rod 21 and the auxiliary support rod 22 through the second linear drive device 23, thereby changing the outward extension distance of the walking wheel body 24 relative to the robot body. During relocation, the walking wheel body 24 supports the robot, reducing the scraping and collision between the drilling frame 2, the anchoring frame 5 and the slope; during operation, the outward extension of the walking wheel body 24, in conjunction with the tension of the wire rope, increases the robot's contact force with the slope, making the anchor claw drilling mechanism 6 and the drilling execution mechanism 3 more stable in posture during drilling.

[0084] Fifth, the drilling execution unit 1 and the anchoring unit 4 can alternately serve as fixed fulcrums and moving parts, forming an alternating crawling operation mode of "anchoring-drilling-shifting-re-anchoring". After the anchoring unit 4 is locked, the drilling execution unit 1 moves along the anchoring frame 5 and completes the main hole drilling; after the main hole drilling is completed, the drill rod is temporarily left in the hole and, together with the tensioning of the wire rope, forms a temporary fulcrum. After the anchoring unit 4 is unlocked, it moves forward to the next anchoring position. This operation mode ensures that the robot has a clear mechanical guiding reference for each shift, reducing the lateral sway during shifting of traditional wire rope suspension equipment, improving the straightness and hole spacing consistency of holes in the same row, which is conducive to the accurate alignment of the reserved holes of subsequent lattice beams, waist beams, and anchor piers, making the anchoring force distribution more uniform, and also facilitating the connection between the steel mesh and the exposed end of the anchor rod in the construction of shotcrete with wire mesh.

[0085] Sixth, by coordinating and controlling the winch, the traveling wheel assembly 20, the anchor claw drilling mechanism 6, and the drilling execution unit 1 through the controller, the robot can automatically complete continuous operations such as positioning, slope contact, anchoring, main hole drilling, anchor release, relocation, and re-anchoring, reducing reliance on human experience and the risks of high-altitude operations, and improving construction safety and operational continuity.

[0086] Finally, it is worth noting that multiple anchoring holes with enlarged diameter cavities are left on the slope. These holes are not unusable during construction but can be reused in subsequent slope support procedures. Specifically, high slope anchoring treatment usually requires installing steel mesh on the slope and spraying concrete. Installing the mesh requires a large number of short anchors to fix the steel mesh to the slope.

[0087] In traditional construction, these wire mesh anchor holes require separate drilling, which is numerous and time-consuming. In this embodiment, the holes left after the anchor claw drilling mechanism 6 withdraws can be directly used as wire mesh anchor holes. The enlarged cavity at the bottom of the hole can also form a mechanically enlarged head with the grouting body, improving the pull-out resistance of the wire mesh anchor. During construction, only short steel bars need to be inserted into the holes and grouted or bonded together with the shotcrete layer, without the need for additional drilling. This saves a lot of auxiliary drilling time, transforms temporary anchor holes into part of the permanent support structure, improves the comprehensive utilization rate of the holes, and reduces the overall construction cost.

[0088] In addition, the present invention also provides a drilling method using a high slope adaptive intelligent drilling robot, the core of which is to realize step-by-step continuous drilling of the robot on a near-vertical slope by alternately fixing the anchoring part 4 and the drilling execution part 1.

[0089] Before construction, winches are set up at the top and bottom of the slope, and steel wire ropes are connected to both ends of the robot. By winding and unwinding the steel wire ropes with the winches, the robot is moved to the predetermined working position on the slope, and the steel wire ropes are tensioned to make the robot initially fit against the slope.

[0090] Subsequently, the anchoring part 4 operates. Multiple anchor claw drilling mechanisms 6 drill into the slope simultaneously or sequentially. At this time, the reaming blade 14 is retracted into the mounting groove 1202, and the pilot drill bit 13 drills with a smaller outer diameter to reduce the entry resistance. After reaching the design depth, the reaming blade 14 is controlled to open outward, and the drill bit 11 continues to rotate to cut out the enlarged diameter cavity at the bottom of the hole. The reaming blade 14 remains open and forms a mechanical lock with the sidewall of the enlarged diameter cavity, and the anchoring frame 5 is rigidly anchored to the slope.

[0091] After anchoring, the drilling actuator 1 slides along the anchoring frame 5 to the target main hole position and locks in place. The drilling actuator 3 drives the main drill rod to rotate and advance, completing the main hole drilling. Since the anchoring frame 5 is rigidly anchored, the drilling reaction force of the main hole is transmitted to the slope through the anchoring frame 5, and the impact of wire rope setback is significantly reduced.

[0092] After the main hole is drilled, the main drill rod remains temporarily inside the hole. The drilling actuator 1 clamps the main drill rod, and the winch tensions the wire rope, making the drilling actuator 1 a fixed fulcrum. Then, the anchor claw drilling mechanism 6 is released from lock. First, the reaming blade 14 is retracted, and then the drill bit 11 is withdrawn. The anchoring frame 5 moves forward one step along the slope under the drive of the winch or the pushing cylinder. This step can be equal to the designed main hole spacing, for example, 0.5m to 3m, specifically determined according to the center distance of the reserved holes in the lattice beam.

[0093] After the anchor frame 5 moves into place, the anchor claw drilling mechanism 6 drills again and expands and locks, re-establishing the anchor support point. Then, the drilling actuator 1 releases the main drill rod and withdraws it from the hole, slides along the anchor frame 5 to the new main hole position and locks it, starting the drilling of the next main hole. This cycle repeats to complete the drilling of multiple main holes in the same row.

[0094] In the above method, the anchoring part 4 and the drilling execution part 1 alternately serve as fixed fulcrums and moving parts, so that the robot uses the anchored anchor frame 5 or the main drill rod as the mechanical guidance reference during each movement, reducing lateral sway and improving the straightness of the holes in the same row. At the same time, the anchoring holes left after the anchor claw drilling mechanism 6 retracts can be used as anchor holes for subsequent wire mesh and shotcrete installation, eliminating the need for separate drilling and improving the utilization rate of hole positions.

[0095] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from its spirit or essential characteristics. Therefore, the embodiments should be considered in all respects as exemplary and non-limiting, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the present invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0096] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims

1. A high slope adaptive intelligent drilling robot, wherein steel wire ropes are fixedly connected to both ends of the high slope adaptive intelligent drilling robot, and a winch is connected to the end of the steel wire rope away from the high slope adaptive intelligent drilling robot. The position of the high slope adaptive intelligent drilling robot relative to the slope surface and the slope adhesion force are adjusted by the winch winding or unwinding the steel wire rope, characterized in that... The high slope adaptive intelligent drilling robot includes: Drilling actuator, An anchoring part, which can slide relative to the drilling execution part, includes an anchoring frame on which multiple anchor claw drilling mechanisms are installed. After drilling, the anchor claw drilling mechanism deforms and expands radially at one end that enters the slope, forming an enlarged cavity at the bottom of the borehole. The anchor claw drilling mechanism forms a mechanical lock with the enlarged cavity side, anchoring the anchoring frame to the slope surface and providing drilling reaction force support for the drilling execution part.

2. The adaptive intelligent drilling robot for high slopes according to claim 1, characterized in that, The anchor claw drilling mechanism includes a slide block and a slide table slidably connected on the slide block; A drive motor is fixedly connected to the slide table, and a support frame is fixedly connected to the lower end of the slide table. A first connecting rod that matches the drive motor is installed on the support frame, and the support frame is used to support the first connecting rod. A drill bit is detachably mounted on the end of the first connecting rod away from the drive motor; The drill bit includes a connecting part and a pilot drill bit. The connecting part is provided with a reaming blade, which can expand and deform radially after drilling.

3. The adaptive intelligent drilling robot for high slopes according to claim 2, characterized in that, The connecting part is provided with a mounting groove, and the reaming blade is rotatably connected in the mounting groove. The lower end of the reaming blade is fixedly connected with a connecting lug. The connecting part is equipped with a blade control mechanism for controlling the reaming blade. The blade control mechanism is used to drive the reaming blade to switch between a retracted state and a free state.

4. The adaptive intelligent drilling robot for high slopes according to claim 3, characterized in that, The blade control mechanism includes a pressing plate. The connecting part has a vertical hole that matches the connecting ear. The pressing plate is slidably connected in the vertical hole. When the two ends of the pressing plate slide down, they press the connecting ear, forcing the enlarged blade to retract into the mounting groove.

5. The adaptive intelligent drilling robot for high slopes according to claim 4, characterized in that, A connection hole is provided at the top of the connecting part; A second connecting rod is fixedly connected to the middle of the pressing plate. The second connecting rod passes through the connecting part from the connecting hole to the pressing plate. A first cavity matching the second connecting rod is opened in the middle of the connecting part. A first double-sided wedge block matching the first cavity is fixedly connected to the second connecting rod. A second sliding groove is opened on the side wall of the first cavity. A second double-sided wedge block is slidably connected in the second sliding groove. A spring is fixedly connected between the second double-sided wedge block and the bottom wall of the second sliding groove.

6. The adaptive intelligent drilling robot for high slopes according to claim 5, characterized in that, The lower end of the first connecting rod is detachably connected to the connecting hole. A first linear drive device is fixedly connected inside the first connecting rod. A magnetic block is fixedly connected to the extended end of the first linear drive device. A first double-sided wedge block that matches the magnetic block is fixedly connected to the end of the second connecting rod away from the pressing plate.

7. The adaptive intelligent drilling robot for high slopes according to claim 1, characterized in that, A set of walking wheel assemblies is fixedly connected to the opposite end faces of the drilling execution part and the anchoring part. The walking wheel assembly is used to change the distance between the high slope adaptive intelligent drilling robot and the slope surface, so as to increase the slope adhesion force between the high slope adaptive intelligent drilling robot and the slope surface.

8. The adaptive intelligent drilling robot for high slopes according to claim 7, characterized in that, The walking wheel assembly includes a main support rod and a secondary support rod rotatably connected to the main support rod. The main support rod and the secondary support rod form an angle between them. The walking wheel body is installed at the end of the main support rod away from the angle. A second linear drive device is rotatably connected to the end of the secondary support rod away from the angle. The output end of the second linear drive device is rotatably connected to one end of the main support rod. The opening and closing angle between the main support rod and the secondary support rod is changed by raising and lowering the second linear drive device, thereby changing the gap between the high slope adaptive intelligent drilling robot and the slope surface.

9. The adaptive intelligent drilling robot for high slopes according to claim 1, characterized in that, It also includes a control box, which contains a controller that is connected to the winch, the traveling wheel assembly, the anchor claw drilling mechanism and the drilling actuator. The controller is used for: Control the winch to wind up or unwind the wire rope, and move the high slope adaptive intelligent drilling robot to the predetermined working position on the slope. The anchor claw drilling mechanism is controlled to drill into the slope. After the anchor claw drilling mechanism completes drilling, it expands and deforms radially to form a mechanical lock with the hole wall, thus anchoring the anchor frame to the slope. The drilling actuator is controlled to drill the main hole. After the main hole is drilled, the drill rod of the drilling actuator is kept in the hole, and the winch is controlled to tension the wire rope so that a fixed support point is formed between the drilling actuator and the anchor frame. Control the anchor frame to move forward one step along the slope, and after it moves into place, control the anchor claw drilling mechanism to drill again and lock it; The drilling actuator is controlled to retract the drill rod and slide along the anchor frame to a new hole position, and this cycle is repeated to achieve alternating drilling and relocation operations.

10. A drilling method using a high slope adaptive intelligent drilling robot, the high slope adaptive intelligent drilling robot comprising a drilling execution unit and an anchoring unit, the anchoring unit comprising an anchoring frame and a plurality of anchor claw drilling mechanisms mounted on the anchoring frame, the drilling execution unit being slidably connected to the anchoring frame, and the drilling execution unit and the anchoring unit being respectively connected to a winch via wire ropes, characterized in that... Includes the following steps: S1. By using a winch to wind up and unwind the wire rope, the robot is moved to the predetermined working position on the slope and the wire rope is tensioned so that the robot is close to the slope. S2. Control the anchor claw drilling mechanism to drill into the slope. After drilling to the designed depth, the front end of the anchor claw drilling mechanism is radially expanded to form an enlarged cavity at the bottom of the hole and mechanically lock it to the side wall of the enlarged cavity, thus anchoring the anchor frame to the slope. S3. Slide the drilling actuator along the anchor frame to the main hole position and lock it, and control the drilling actuator to drill the main hole. S4. After the main hole is drilled, keep the main drill rod in the hole and tension the wire rope to form a fixed support point between the drilling actuator and the anchor frame. S5. Release the mechanical lock of the anchor claw drilling mechanism, remove the anchor claw drilling mechanism from the slope, and control the anchor frame to move forward one step along the slope. S6. Control the anchor claw drilling mechanism to drill into the slope again and radially expand and lock after the anchor frame moves into place, so as to re-anchor the anchor frame to the slope. S7. Retrieve the main drill rod, allowing the drilling actuator to slide along the anchor frame to the new main hole position and lock it; S8. Repeat steps S2 to S7 to complete the drilling of multiple main holes in the same row.