A modular interlocking ring beam structure for pipe jacking working shafts
By designing a modular interlocking ring beam structure in the pipe jacking working shaft, and using high-pressure water jet spraying for dust suppression and rapid assembly, the problem of dust pollution during construction was solved, the construction environment and stability were improved, and costs were saved.
Patent Information
- Application Number
- CN202611472237.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-21
- Publication Date
- 2026-11-17
AI Technical Summary
The existing ring beam structure of the pipe jacking working shaft generates a large amount of dust during construction, which is difficult to control effectively and affects the construction site environment.
A modular lock ring beam structure was designed, including columns, guardrails and a top cover. The top cover is equipped with a liquid flow channel, spray holes and dust suppression pipes. High-pressure water spray is used to suppress dust, and the components are quickly assembled and stabilized through triggering components and fixing components.
It effectively improved the downhole working environment, shortened the construction cycle, saved project costs, and improved the stability and pull-out resistance of the lock ring beam.
Smart Images

Figure CN123109672A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of working well construction technology, and in particular relates to a modular interlocking ring beam structure for pipe jacking working wells. Background Technology
[0002] Pipe jacking, a trenchless or minimally excavated pipeline laying technology, has been widely used in urban underground pipelines and other major infrastructure construction. Pipe jacking construction requires the installation of a working shaft within a working pit. Using the jacking force generated by jacking equipment, the pipeline is pushed into the soil at the designed slope. The working shaft is a crucial component of pipe jacking construction, and the reliability of its support structure directly affects construction safety and project quality. The interlocking ring beam is a key support component at the wellhead of the pipe jacking working shaft. It is installed at the top of the working shaft to enhance the stability of the well wall and form a support frame at the wellhead.
[0003] In practical applications, existing ring beam structures adopt prefabricated assembly support structures, which are erected in sections by components such as four corner columns, waist beams, and corrugated plates. However, traditional working wells generate a lot of dust during excavation and pipe jacking operations and do not have dust suppression functions, making it difficult to effectively control dust problems at construction sites. Summary of the Invention
[0004] The purpose of this invention is to address the problems mentioned in the background section by providing a modular interlocking ring beam structure for pipe jacking wells.
[0005] To achieve the above objectives, the present invention adopts the following technical solutions:
[0006] A modular lock-type ring beam structure for a pipe jacking working well includes multiple columns, with guardrails between two adjacent columns at the same height, and the multiple columns and multiple guardrails form a lock-type ring beam;
[0007] The top cover is located directly above the posts and guardrails and is used to cover the working well. A fixing member is provided between two adjacent guardrails. The top cover includes a liquid flow channel, spray holes and dust suppression pipes. The spray hole array is opened on the inner wall of the top cover. The top cover is provided with a connector that is connected to the liquid flow channel. The dust suppression pipe is connected to the liquid flow channel. A reinforcing frame is provided between two adjacent dust suppression pipes.
[0008] Preferably, a reinforcing plate is fixed inside the top cover, and at least two symmetrical hanging holes are provided at the upper end of the reinforcing plate, in which a hanging ring can be installed.
[0009] Preferably, the dust-suppressing pipe has a liquid outlet hole 1 on the lower side of its outer surface, a movable pipe is slidably connected inside the dust-suppressing pipe, and a liquid outlet hole 2 that matches the liquid outlet hole 1 is opened on the lower side of the outer surface of the movable pipe. The liquid outlet hole 1 and the liquid outlet hole 2 have the same inner diameter. A fixing ring is fixed inside the dust-suppressing pipe, and an elastic element is fixed between the movable pipe and the inner wall of the dust-suppressing pipe.
[0010] Preferably, the dust collection pipe is embedded in the reinforcing plate, and the reinforcing plate cannot block the liquid outlet hole.
[0011] Preferably, the outer surface of the column is fixed with a plurality of guide grooves, the upper end of the guide groove can be fixed with a connecting column by bolts, the lower end of the guide groove is provided with a connecting hole, a trigger component is provided in the lowermost connecting hole, and a fixing component is provided below the trigger component.
[0012] Preferably, the triggering component includes a sealing post, and a triggering post is fixed to the lower end of the sealing post. The outer diameter of the triggering post is the same as the outer diameter of the connecting post.
[0013] Preferably, the fixing component includes a pin post, the upper end of which has an arc-shaped hole, the inner wall of which has a rectangular groove, and two slidably connected in the rectangular groove, the ends of the two slidably connected to each other each having an inner groove.
[0014] Preferably, the trigger post is adapted to the inner groove.
[0015] Compared with existing technologies, the advantages of this modular interlocking ring beam structure for pipe jacking working shafts are:
[0016] 1. This invention, by setting a top cover, allows external water to enter the flow channel through the connector. Part of the water is sprayed out from the nozzle to suppress dust around the wellhead, while the other part is diverted to each dust suppression pipe. When the water supply pressure increases, the water pressure pushes the movable pipe to compress the elastic element and slide, so that the first liquid outlet and the second liquid outlet are aligned. The high-pressure water flow forms a fine water mist and is sprayed out. The spray dust suppression function can effectively improve the downhole working environment.
[0017] 2. By setting up a triggering component and a fixing component, after the pin is inserted into the ground, the triggering pin is pressed down to make the two stabilizing parts move in opposite directions and penetrate into the surrounding soil, forming symmetrically distributed barbed anchor points. Even if it encounters vibration or eccentric load, the column can still be firmly embedded in the foundation, improving the overall pull-out resistance and stability of the lock ring beam.
[0018] 3. This invention uses multiple columns and guardrail panels to form a lock ring beam. The components are quickly assembled through guide grooves, connecting columns and connecting holes. There is no need for on-site formwork, pouring and curing, which shortens the construction cycle. Moreover, each component can be disassembled and reused, which effectively saves project costs and avoids waste of resources. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the overall structure of a prefabricated interlocking ring beam structure for a pipe jacking working well provided by the present invention;
[0020] Figure 2 This is a partial structural schematic diagram of a prefabricated interlocking ring beam structure for a pipe jacking working well provided by the present invention;
[0021] Figure 3 This is a schematic diagram of the column structure of a prefabricated interlocking ring beam structure for a pipe jacking working well provided by the present invention;
[0022] Figure 4 This is a schematic diagram of the internal structure of the triggering component and the fixing component of the assembled lock ring beam structure for pipe jacking working well provided by the present invention;
[0023] Figure 5 This is a schematic diagram of the splicing structure of the top cover and fasteners of a prefabricated interlocking ring beam structure for a pipe jacking working well provided by the present invention;
[0024] Figure 6 This is a schematic diagram of the internal structure of the top cover of a prefabricated interlocking ring beam structure for a pipe jacking working well provided by the present invention;
[0025] Figure 7 This invention provides Figure 6 Enlarged schematic diagram of the structure at point A in the diagram;
[0026] Figure 8 This is a schematic diagram of the internal structure of a dust suppression pipe with a prefabricated interlocking ring beam structure for a jacking shaft provided by the present invention.
[0027] In the diagram: 1. Post; 2. Guardrail panel; 3. Top cover; 4. Fixing component; 11. Guide groove; 12. Connecting post; 13. Connecting hole; 14. Triggering component; 15. Fixing component; 141. Sealing post; 142. Triggering post; 151. Pin post; 152. Stabilizing component; 153. Inner groove; 31. Liquid flow groove; 32. Spray hole; 33. Reinforcing plate; 34. Hanging hole; 35. Dust suppression pipe; 351. Liquid outlet hole one; 352. Movable pipe; 353. Liquid outlet hole two; 354. Fixing ring; 355. Elastic component. Detailed Implementation
[0028] The following examples are for illustrative purposes only and are not intended to limit the scope of the invention.
[0029] Example: Refer to Figures 1 to 8 A modular lock ring beam structure for pipe jacking working well includes multiple columns 1, with guardrails 2 between two adjacent columns 1 at the same height, and the multiple columns 1 and multiple guardrails 2 form a lock ring beam.
[0030] To further explain, such as Figure 3 As shown, multiple guide grooves 11 are fixed in an array on the outer surface of the column 1. A connecting column 12 can be fixed to the upper end of the guide groove 11 by bolts. A connecting hole 13 is opened at the lower end of the guide groove 11. A trigger component 14 is provided in the lowermost connecting hole 13. A fixing component 15 is provided below the trigger component 14. In order to adapt to the lock ring beams of different heights, the connecting column 12 can be fixed to the upper end of the column 1 by bolts. Through the cooperation of the connecting column 12 and the connecting hole 13, multiple columns 1 can be stacked in height, so that all columns 1 and guardrail 2 are combined at the same height to form a complete lock ring beam, forming a wellhead support frame.
[0031] To elaborate further, such as Figure 4 As shown, the trigger assembly 14 includes a sealing post 141, and a trigger post 142 is fixed to the lower end of the sealing post 141. The outer diameter of the trigger post 142 is the same as the outer diameter of the connecting post 12.
[0032] To further explain, such as Figure 4 As shown, the fixing component 15 includes a pin post 151. The upper end of the pin post 151 is provided with an arc-shaped hole. The inner wall of the arc-shaped hole is provided with a rectangular groove. Two slidable fasteners 152 are connected in the rectangular groove. The ends of the two fasteners 152 that are close to each other are provided with inner grooves 153. The trigger post 142 is adapted to the inner grooves 153.
[0033] Specifically, multiple columns 1 are placed vertically along the perimeter of the working well opening at the designed spacing. A sealing column 141 is inserted into the connecting hole 13 on the lowest column 1. Then, a stabilizing pin 151 is inserted into the ground. At this time, the triggering column 142 is inserted into the arc-shaped hole by pressing down. In the initial state, the two stabilizing members 152 are in contact with each other. As the triggering column 142 is pressed down continuously, the two stabilizing members 152 located in the rectangular groove will move away from each other. When the stabilizing member 152 extends underground, the pin 151 can be fixed underground. At this time, the fixing of the column 1 can be completed. Then, a guardrail plate 2 is installed between two adjacent columns 1. The two ends of the guardrail plate 2 are respectively inserted into the guide groove 11 on the column 1.
[0034] To further explain, such as Figure 5 , Figure 6 and Figure 7As shown, the top cover 3 is located directly above the column 1 and the guardrail 2, and is used to cover the working well. A fixing member 4 is provided between two adjacent guardrails 2. The top cover 3 includes a liquid flow channel 31, a spray hole 32 and a dust suppression pipe 35. The spray hole 32 is arrayed on the inner wall of the top cover 3. The top cover 3 is provided with a connector, which is connected to the liquid flow channel 31. The dust suppression pipe 35 is connected to the liquid flow channel 31. A reinforcing frame is provided between two adjacent dust suppression pipes 35. A reinforcing plate 33 is fixed inside the top cover 3. At least two symmetrical hanging holes 34 are opened at the upper end of the reinforcing plate 33. A lifting ring can be installed in the hanging hole 34.
[0035] Specifically, in order to accommodate lock ring beams of different sizes, multiple top covers 3 can be assembled using fasteners 4. A hanging hole 34 is provided at the upper end of the reinforcing plate 33 of the top cover 3. A lifting ring is installed in the hanging hole 34. The top cover 3 is lifted as a whole to the top of the lock ring beam with the help of lifting equipment and slowly lowered so that the top cover 3 is accurately placed on the upper surface of the column 1 and the guardrail 2, which can prevent objects or workers from falling from the lock ring beam into the working well.
[0036] To elaborate further, such as Figure 8 As shown, the dust collection pipe 35 has a liquid outlet hole 351 on the lower side of its outer surface. The dust collection pipe 35 is embedded in the reinforcing plate 33. The reinforcing plate 33 cannot block the liquid outlet hole 351. A movable pipe 352 is slidably connected inside the dust collection pipe 35. A liquid outlet hole 353 that matches the liquid outlet hole 351 is opened on the lower side of the outer surface of the movable pipe 352. The inner diameters of the liquid outlet hole 351 and the liquid outlet hole 353 are the same. A fixing ring 354 is fixed inside the dust collection pipe 35. An elastic element 355 is fixed between the movable pipe 352 and the inner wall of the dust collection pipe 35.
[0037] Specifically, the external water supply pipe connects to the connector on the top cover 3. Water enters the internal flow channel 31 through the connector and then flows to each dust suppression pipe 35. In the initial state, under the elastic force of the elastic element 355, the first outlet 351 and the second outlet 353 of the movable pipe 352 are misaligned, and the liquid cannot flow out. When the water supply pressure increases, the water pressure pushes the movable pipe 352 downward, compressing the elastic element 355, so that the first outlet 351 and the second outlet 353 are aligned and have the same inner diameter. The liquid then sprays downward through the first outlet 351 to spray dust inside the working well. After the water supply is stopped, the elastic element 355 drives the movable pipe 352 to reset, automatically cutting off the water flow. The water in the flow channel 31 will also spray out from the spray hole 32 to remove dust at the edge of the working well.
[0038] The functional principle of this invention can be explained by the following operation: Multiple columns 1 are vertically placed around the working wellhead. After the sealing column 141 is inserted into the connecting hole 13 at the lower end of the column 1, the pin column 151 is aligned with the ground and a downward impact force is applied. This force is transmitted to the trigger column 142 through the arc-shaped hole wall at the upper end of the pin column 151. The trigger column 142 is squeezed and moves downward along its own axis, pushing the two stabilizing members 152 in the rectangular groove to slide laterally in opposite directions along the sliding groove until the tips of the stabilizing members 152 penetrate into the surrounding soil, forming symmetrically distributed barbed anchor points, which multiplies the pull-out resistance of the column 1. Even if it encounters ground vibration or eccentric load, the column 1 can still be firmly embedded in the foundation, ensuring the overall stability of the lock ring beam.
[0039] Guardrail plates 2 are embedded between adjacent posts 1. The two sides of the guardrail plates 2 are inserted into the guide grooves 11 inside the posts 1. The upper and lower walls of the guide grooves 11 apply vertical constraints to the guardrail plates 2 to prevent them from moving. At the same time, the side walls restrict the guardrail plates 2 from coming out horizontally. When the ring beam needs to be heightened, the connecting post 12 is placed on the upper end of the post 1, bolts are inserted and tightened. The bolt preload makes the lower end face of the connecting post 12 fit tightly with the upper end face of the post 1, forming a friction connection. The upper end of the connecting post 12 is provided with mounting holes of the same specification, so that the upper posts 1 can be stacked. The height can be increased layer by layer. The vertical load between the upper and lower layers is directly transmitted through the bearing surface of the connecting post 12, thereby ensuring that the multi-layer ring beams are stressed together and avoiding local instability. The height-adjustable assembly method allows the same batch of components to adapt to working wells of different depths. When disassembling, only the bolts need to be loosened, which is convenient for the reuse of components.
[0040] A lifting ring is installed in the lifting hole 34. After the lifting hook of the lifting equipment hooks the lifting ring, the top cover 3 is lifted steadily and moved to the top of the lock ring beam. Then it is slowly lowered. When the lower surface of the top cover 3 contacts the upper surface of the column 1 and the guardrail 2, the top cover 3 presses the contact surface with its own weight to seal the well opening and prevent ground debris, tools or operators from falling accidentally. At the same time, the top cover 3 provides a reliable fall protection barrier for construction operations inside the well. The external water supply hose is connected to the water inlet connector on the top cover 3. The water first flows into the liquid channel 31 inside the top cover 3. A portion of the water flows out through the spray holes 32 distributed in an array on the inner wall of the top cover 3 to pre-wet and suppress the dust flying around the well opening.
[0041] Another portion of the water flow is diverted along the liquid flow channel 31 into each dust settling pipe 35. A movable pipe 352 is installed inside each dust settling pipe 35. An elastic element 355 is installed between the outer wall of the movable pipe 352 and the inner wall of the dust settling pipe 35. In its free state, the elastic element 355 pushes the movable pipe 352 to its limit position. At this point, the second liquid outlet 353 on the side wall of the movable pipe 352 and the first liquid outlet 351 on the wall of the dust settling pipe 35 are staggered in height, with no connecting section between the two outlets, preventing leakage. When the water supply system is pressurized to the working pressure, the water pressure acts on the movable pipe 352. On the movable tube 352, when the pre-tightening force of the elastic element 355 is exceeded, the movable tube 352 begins to compress the elastic element 355 and slide along the tube wall. The second liquid outlet 353 gradually approaches the first liquid outlet 351 until the axes of the two holes are completely aligned. The high-pressure water flow is then rapidly ejected through the alignment channel, forming a fine water mist that diffuses into the well space to reduce dust. Once the water supply pressure decreases or stops, the compression potential energy stored in the elastic element 355 is immediately released, pushing the movable tube 352 to slide and reset. The two holes are misaligned again, and the spraying action immediately terminates.
[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A modular interlocking ring beam structure for pipe jacking working shafts, characterized in that, include: Multiple columns (1) are provided with guardrails (2) between two adjacent columns (1) at the same height, and the multiple columns (1) and multiple guardrails (2) form a lock ring beam; The top cover (3) is located directly above the column (1) and the guardrail (2) and is used to cover the working well. A fixing piece (4) is provided between two adjacent guardrails (2). The top cover (3) includes a liquid flow channel (31), a spray hole (32) and a dust suppression pipe (35). The spray hole (32) is arrayed on the inner wall of the top cover (3). A connector is provided on the top cover (3). The connector is connected to the liquid flow channel (31). The dust suppression pipe (35) is connected to the liquid flow channel (31). A reinforcing frame is provided between two adjacent dust suppression pipes (35).
2. The prefabricated interlocking ring beam structure for pipe jacking working shaft according to claim 1, characterized in that, A reinforcing plate (33) is fixed inside the top cover (3). At least two symmetrical hanging holes (34) are provided at the upper end of the reinforcing plate (33). A hanging ring can be installed in the hanging hole (34).
3. The assembled interlocking ring beam structure for a pipe jacking working well according to claim 2, characterized in that, The dust collection tube (35) has a liquid outlet hole 1 (351) on the lower side of its outer surface. A movable tube (352) is slidably connected inside the dust collection tube (35). A liquid outlet hole 2 (353) adapted to the liquid outlet hole 1 (351) is opened on the lower side of the outer surface of the movable tube (352). The inner diameters of the liquid outlet hole 1 (351) and the liquid outlet hole 2 (353) are the same. A fixing ring (354) is fixed inside the dust collection tube (35). An elastic element (355) is fixed between the movable tube (352) and the inner wall of the dust collection tube (35).
4. The assembled interlocking ring beam structure for pipe jacking working wells according to claim 3, characterized in that, The dust collection pipe (35) is embedded in the reinforcing plate (33), and the reinforcing plate (33) cannot block the liquid outlet hole (351).
5. The assembled interlocking ring beam structure for a pipe jacking working well according to claim 1, characterized in that, The outer surface of the column (1) is fixed with a plurality of guide grooves (11). The upper end of the guide groove (11) can be fixed with a connecting column (12) by bolts. The lower end of the guide groove (11) is provided with a connecting hole (13). A trigger component (14) is provided in the lowermost connecting hole (13). A fixing component (15) is provided below the trigger component (14).
6. The assembled interlocking ring beam structure for a pipe jacking working well according to claim 5, characterized in that, The trigger assembly (14) includes a sealing post (141), and a trigger post (142) is fixed at the lower end of the sealing post (141). The outer diameter of the trigger post (142) is the same as the outer diameter of the connecting post (12).
7. The assembled interlocking ring beam structure for a pipe jacking working well according to claim 6, characterized in that, The fixing component (15) includes a pin (151), the upper end of which is provided with an arc-shaped hole, and the inner wall of the arc-shaped hole is provided with a rectangular groove. Two slidable fasteners (152) are connected in the rectangular groove, and the two fasteners (152) are provided with an inner groove (153) at the ends of the two fasteners (152) that are close to each other.
8. The prefabricated interlocking ring beam structure for pipe jacking working shaft according to claim 7, characterized in that, The trigger post (142) is adapted to the inner groove (153).