Construction equipment and methods for grouting connecting passages in water-rich soft soil shallow overburden tunnels
By pre-installing grouting pipes and guide sleeves around the connecting passage of the shield tunnel, combined with compensating grouting pipes, the problems of grouting pipe fixation reliability and uneven settlement in water-rich soft soil were solved, achieving a highly efficient settlement control effect.
Patent Information
- Application Number
- CN202611525861.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-29
- Publication Date
- 2026-11-17
AI Technical Summary
Under conditions of water-rich soft soil and shallow overburden, during the construction of the connecting passage of the shield tunnel, water and sand are prone to gushing at the grouting pipe orifice, the grouting pipe has poor fixing reliability, uneven melting and settlement deformation, and it is difficult to add and control the grouting pipeline, making it difficult to effectively cover the entire melting and settlement area.
The system employs pre-installed arch, side, and bottom grouting pipes around the main body of the connecting passage, combined with compensating grouting pipes and grouting hole guide sleeves to form a full-section foundation grouting network. Sealing and water stoppage are achieved through the double-cone sealing core of the guide sleeve and the expansion sealing ring. Compensating grouting pipes are drilled later for directional compensating grouting, and a centralized grouting system is used for precise zone control.
It improved the utilization rate of grout, ensured the safety of grouting, realized timely compensation and precise treatment of the melting and settling area, significantly shortened the melting and settling response time, and controlled structural deformation and ground settlement.
Smart Images

Figure CN123109677A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of shield tunnel connecting passage construction technology, and particularly relates to a construction device and method for grouting connecting passages in water-rich soft soil shallow overburden tunnels. Background Technology
[0002] When constructing urban tunnels using the shield tunneling method in water-rich soft soil and shallow overburden conditions, a connecting passage is usually set up between two parallel shield tunnels. The freezing method is often used to freeze and reinforce the soil surrounding the main body of the connecting passage before excavation. After the main body of the connecting passage is completed, the frozen retaining structure formed by the freezing reinforcement gradually melts as the temperature rises. The surrounding soil undergoes freeze-thaw action, resulting in thaw settlement. Therefore, timely grouting is required for the top, sides, and bottom of the connecting passage to address this thaw settlement.
[0003] The water-rich soft soil strata have high water content and poor self-stability. During the drilling and installation of grouting pipes, water and sand are prone to gushing at the borehole opening, which places high demands on the sealing and water-stopping and fixing reliability of the grouting pipe opening. At the same time, the development of settlement deformation in the arch, sides and bottom of the connecting passage is not uniform. It is difficult to cover the entire settlement area with only a small number of fixed grouting pipes. Furthermore, the subsequent grouting is limited by the existing structure and construction site, and the addition, connection and zonal control of grouting pipelines are inconvenient. Summary of the Invention
[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a construction device and method for grouting connecting passages in water-rich soft soil shallow overburden tunnels.
[0005] This construction device for grouting connecting passages in water-rich soft soil shallow overburden tunnels includes: a connecting passage main body, grouting pipes, compensating grouting pipes, and grouting hole guide sleeves; the connecting passage main body is located between the left and right shield tunnel segments; the grouting pipes include an arch grouting pipe, a side grouting pipe, and a bottom grouting pipe, respectively located at the top, side, and bottom of the connecting passage main body; the compensating grouting pipes include a bottom compensating grouting pipe and a side compensating grouting pipe, with the side grouting pipes branching out and connected to the side compensating grouting pipes, and the bottom grouting pipes branching out and connected to the bottom compensating grouting pipes; the grouting hole guide sleeves are installed within the frozen retaining wall around the connecting passage main body, and the grouting pipes and compensating grouting pipes are fixed within the grouting hole guide sleeves.
[0006] Preferably, holes are drilled in the frozen enclosure around the main body of the connecting channel, and the grouting hole guide sleeve is installed in the holes. The grouting pipe and the body of the compensating grouting pipe are installed in the cavity of the grouting hole guide sleeve, and the length of the body of the pipe is greater than the length of the grouting hole guide sleeve.
[0007] Preferably, the bottom end of the grouting hole guide sleeve is provided with a double-cone sealing core, the outer wall of which is in contact with the inner wall of the cavity of the grouting hole guide sleeve; one end of the double-cone sealing core is located inside the cavity of the grouting hole guide sleeve, and the other end is located at the opening of the grouting hole guide sleeve; an expansion sealing ring is provided in the middle section of the double-cone sealing core, the bottom of which is in contact with the bottom of the cavity of the grouting hole guide sleeve, and the outer wall of which is in contact with the inner wall of the cavity of the grouting hole guide sleeve.
[0008] Preferably, the grouting hole guide sleeve is provided with an orifice flange block at the orifice; the pipe body is provided with a pipe body connecting block at the orifice, the pipe body connecting block and the orifice flange block are connected and fixed by connecting studs, and the grouting nozzle is installed and fixed on the pipe body connecting block.
[0009] Preferably, the side compensation grouting pipe and the bottom compensation grouting pipe are connected to the same grouting system. The grouting system includes a grouting distribution main pipe and a blind end cap at the end of the grouting distribution main pipe. The grouting distribution main pipe is connected to the side compensation grouting pipe and the bottom compensation grouting pipe. The side compensation grouting pipe and the bottom compensation grouting pipe extend through the bottom plate of the inverted arch around the main body of the connecting passage and into the frozen enclosure around the main body of the connecting passage. A manual shut-off valve, a union joint, and a one-way valve are sequentially provided on the grouting distribution main pipe along the grouting direction.
[0010] This construction method for using a grouting connection tunnel construction device for water-rich soft soil shallow overburden tunnels includes the following steps:
[0011] S1. Construct the main body of the connecting passage between the left and right shield tunnel segments, and reinforce the surrounding soil by freezing to form a frozen retaining structure.
[0012] S2. During the construction of the main body of the connecting channel, grouting pipes are pre-installed at its top, sides and bottom through grouting hole guide sleeves;
[0013] S3. After the main construction of the connecting passage is completed and the frozen retaining body enters the thawing stage, grouting is performed through the grouting pipe.
[0014] S4. Drill holes and install compensation grouting pipes that are diverging from the grouting pipes on the sides and bottom of the main body of the connecting channel through the grouting hole guide sleeve, and perform directional compensation grouting in the melting and settling development area.
[0015] Preferably, in step S2, the grouting pipe includes an arch grouting pipe, a side grouting pipe, and a bottom grouting pipe. Holes are drilled at the top, sides, and bottom of the frozen retaining wall of the connecting passage body, and grouting hole guide sleeves are installed. After placing a double-cone sealing core with an expansion sealing ring inside the grouting hole guide sleeve, the pipe bodies of the arch grouting pipe, side grouting pipe, and bottom grouting pipe are inserted into the grouting hole guide sleeve, passing through the double-cone sealing core and extending into the frozen retaining wall. The pipe bodies of the arch grouting pipe, side grouting pipe, and bottom grouting pipe are provided with pipe body connecting blocks. The pipe body connecting blocks and the orifice flange block of the grouting hole guide sleeve are connected and fixed by connecting studs. Grouting nozzles are installed on the pipe body connecting blocks and connected to the grouting pipeline.
[0016] Preferably, in step S4, the compensating grouting pipe includes a side compensating grouting pipe and a bottom compensating grouting pipe; the side compensating grouting pipe is radiatingly connected to the side grouting pipe, and the bottom compensating grouting pipe is radiatingly connected to the bottom grouting pipe; before installing and connecting the side compensating grouting pipe and the bottom compensating grouting pipe, holes are drilled in the frozen retaining body and grouting hole guide sleeves are installed. After placing a double-cone sealing core with an expansion sealing ring in the grouting hole guide sleeve, the pipe bodies of the side compensating grouting pipe and the bottom compensating grouting pipe are inserted into the grouting hole guide sleeve, penetrating the double-cone sealing core and extending into the frozen retaining body; the pipe bodies of the arch side compensating grouting pipe and the bottom compensating grouting pipe are provided with pipe body connecting blocks, and the pipe body connecting blocks and the orifice flange block of the grouting hole guide sleeve are connected and fixed by connecting studs. Grouting nozzles are installed on the pipe body connecting blocks and connected to the same grouting system.
[0017] The beneficial effects of this invention are:
[0018] 1) This invention combines pre-installed and post-installed methods to adapt to the uncertainty of slump settlement. The grouting pipes at the top, sides, and bottom are pre-installed during the construction of the main structure of the connecting passage, forming a full-section foundation grouting network. This allows for timely implementation of the first stage of general compensation for the foreseeable main slump settlement area. The side compensation grouting pipes and bottom compensation grouting pipes are drilled and installed in a post-installed process to achieve the second stage of directional reinforcement. This overcomes the defects of traditional one-time pre-embedded hole positions and blind grouting, and significantly improves the grout utilization rate and the effect of slump settlement control.
[0019] 2) The guide sleeve installation structure of this invention ensures the safety of operation in water-rich environments. The double conical sealing core at the bottom of the grouting hole guide sleeve cooperates with the expansion sealing ring to achieve double sealing and water stop at the bottom of the grouting hole, making the subsequent drilling and pipe installation operations safe and controllable in pressurized water-rich soft soil environments. The grouting pipe body and the grouting hole guide sleeve are detachably connected by the pipe body connecting block, the orifice flange block and the connecting stud, which facilitates installation, maintenance and replacement.
[0020] 3) The centralized grouting system of this invention achieves precise zone control. The side compensation grouting pipe and the bottom compensation grouting pipe are uniformly connected to the grouting distribution main pipe. With the help of one-way valves, union joints and manual shut-off valves, it can realize centralized grout supply, prevent backflow and cross-flow of grout, and support the independent opening and closing of grouting of each branch according to the development order of melting and settling. The pipeline is simple and the operation is efficient.
[0021] 4) The phased process of this invention shortens the subsidence response time. The foundation grouting network is pre-embedded, and the first stage of grouting can be started immediately after subsidence occurs without waiting for the installation of all pipelines. The compensation pipeline is connected later, forming a phased and precise subsidence treatment process that combines "general compensation and directional reinforcement", effectively controlling the deformation of the connecting channel structure and the settlement of the strata. Attached Figure Description
[0022] Figure 1 This is a schematic diagram of the pre-embedded grouting pipe for the fusion grouting connection channel of the present invention;
[0023] Figure 2 This is a schematic diagram of the guide sleeve structure for the grouting pipe and grouting hole;
[0024] Figure 3 This is a schematic diagram of the guide sleeve structure for the grouting hole;
[0025] Figure 4 This is a schematic diagram of the grouting pipeline connection.
[0026] Explanation of reference numerals in the attached drawings: 1. Left shield segment; 2. Right shield segment; 3. Main body of the connecting passage; 4. Portal ring beam; 5. Arch grouting pipe; 6. Side grouting pipe; 7. Bottom grouting pipe; 8. Bottom compensation grouting pipe; 9. Side compensation grouting pipe; 10. Grouting hole guide sleeve; 11. Frozen retaining structure; 12. Orifice flange block; 13. Double cone sealing core; 14. Expansion sealing ring; 15. Pipe body; 16. Pipe body connecting block; 17. Connecting stud; 18. Grouting nozzle; 19. Invert bottom plate; 20. Grouting distribution main pipe; 21. Blind end cap; 22. One-way valve; 23. Union joint; 24. Manual shut-off valve. Detailed Implementation
[0027] The present invention will be further described below with reference to embodiments. The description of the embodiments below is only for the purpose of helping to understand the present invention. It should be noted that those skilled in the art can make several modifications to the present invention without departing from the principle of the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0028] Example 1
[0029] As one example, such as Figure 1-4As shown, a construction device for a grouting connecting passage in a water-rich soft soil shallow overburden tunnel is proposed, comprising a connecting passage body 3, grouting pipes, compensating grouting pipes, and grouting hole guide sleeves 10. The connecting passage body 3 is positioned between the left shield segment 1 and the right shield segment 2. The grouting pipes include an arch grouting pipe 5, a side grouting pipe 6, and a bottom grouting pipe 7, respectively located at the top, side, and bottom of the connecting passage body 3. The compensating grouting pipes include a bottom compensating grouting pipe 8 and a side compensating grouting pipe 9, with the side grouting pipe 6 branching out and connected to the side compensating grouting pipe 9, and the bottom grouting pipe 7 branching out and connected to the bottom compensating grouting pipe 8. The grouting hole guide sleeve 10 is installed within a frozen retaining structure 11 surrounding the connecting passage body 3, and the grouting hole guide sleeve 10 is fixed with the grouting pipes. Grouting pipes and compensating grouting pipes; specifically, the main body 3 of the connecting passage is placed between the left shield segment 1 and the right shield segment 2. A portal ring beam 4 is provided at the connection between the main body 3 of the connecting passage and the left shield segment 1 and the right shield segment 2. The surrounding soil of the main body 3 of the connecting passage is reinforced by freezing to form a frozen retaining body 11. The top, sides and bottom of the main body 3 of the connecting passage are respectively reserved with an arch grouting pipe 5, a side grouting pipe 6 and a bottom grouting pipe 7. The side grouting pipe 6 is connected to a side compensating grouting pipe 9, and the bottom grouting pipe 7 is connected to a bottom compensating grouting pipe 8. The side compensating grouting pipe 9 and the bottom compensating grouting pipe 8 are reserved and installed by drilling in a later process so as to perform zoned and directional compensating grouting on the frozen retaining body 11 according to the actual development range of melting and settlement.
[0030] like Figure 1-3 As shown, holes are drilled within the frozen enclosure 11 surrounding the main body 3 of the connecting channel. A grouting hole guide sleeve 10 is installed within these holes. The grouting pipe and the body 15 of the compensating grouting pipe are installed within the cavity of the grouting hole guide sleeve 10. The length of the body 15 is greater than the length of the grouting hole guide sleeve 10. A double-cone sealing core 13 is provided at the bottom end of the grouting hole guide sleeve 10. The outer wall of the double-cone sealing core 13 fits against the inner wall of the cavity of the grouting hole guide sleeve 10. One end of the double-cone sealing core 13 is located within the cavity of the grouting hole guide sleeve 10. The other end of 13 is located at the opening of the grouting hole guide sleeve 10; an expansion sealing ring 14 is provided in the middle section of the double conical sealing core 13, the bottom of the expansion sealing ring 14 is attached to the bottom of the cavity of the grouting hole guide sleeve 10, and the outer wall of the expansion sealing ring 14 is attached to the inner wall of the cavity of the grouting hole guide sleeve 10; an orifice flange block 12 is provided at the orifice of the grouting hole guide sleeve 10; a pipe body connecting block 16 is provided at the orifice of the pipe body 15, and the pipe body connecting block 16 and the orifice flange block 12 are connected and fixed by connecting studs 17, and a grouting nozzle 18 is installed and fixed on the pipe body connecting block 16;
[0031] When the arch grouting pipe 5, side grouting pipe 6, bottom grouting pipe 7, bottom compensation grouting pipe 8, or side compensation grouting pipe 9 penetrate the double-cone sealing core 13, the double-cone sealing core 13 expands radially. The conical mating surface converts the axial force into a radial expansion force, causing the outer wall of the double-cone sealing core 13 to fit against the inner wall of the cavity of the grouting hole guide sleeve 10. At the same time, it causes the middle hole of the double-cone sealing core 13 to fit against the pipe, preventing water from flowing into the grouting hole guide sleeve 10 from the outer side and the middle hole of the double-cone sealing core 13. The bottom of the expansion sealing ring 14 fits against the bottom of the cavity of the grouting hole guide sleeve 10, and one end of the double-cone sealing core 13 is located at the opening of the grouting hole guide sleeve 10, preventing water from flowing into the grouting hole guide sleeve 10 from the outside. The double-cone sealing core 13 forms a double waterproof sealing mechanism.
[0032] like Figure 4 As shown, the side compensation grouting pipe 9 and the bottom compensation grouting pipe 8 are connected to the same grouting system. The grouting system includes a grouting distribution main pipe 20 and a blind end cap 21 at the end of the grouting distribution main pipe 20. The grouting distribution main pipe 20 is connected to the side compensation grouting pipe 9 and the bottom compensation grouting pipe 8. The side compensation grouting pipe 9 and the bottom compensation grouting pipe 8 penetrate the bottom plate 19 of the arch around the main body of the connecting channel 3 and extend into the frozen enclosure 11 around the main body of the connecting channel 3. The grouting distribution main pipe 20 is provided with a manual shut-off valve 24, a union joint 23 and a one-way valve 22 in sequence along the grouting direction.
[0033] Example 2
[0034] As another embodiment, this second embodiment, based on the first embodiment, proposes a construction method for a tunnel grouting connection passage construction device using water-rich soft soil and shallow overburden. Figure 1-4 As shown, it includes the following steps:
[0035] S1. Construct the main body of the connecting passage 3 between the left shield tunnel segment 1 and the right shield tunnel segment 2, and reinforce the surrounding soil by freezing method to form a frozen retaining body 11.
[0036] S2, during the construction of the main body 3 of the connecting passage, grouting pipes are pre-installed at its top, sides, and bottom through grouting hole guide sleeves 10; specifically, as follows Figure 1-3As shown, the grouting pipe includes an arch grouting pipe 5, a side grouting pipe 6, and a bottom grouting pipe 7. Holes are drilled at the top, sides, and bottom of the frozen retaining wall 11 of the connecting passage body 3, and grouting hole guide sleeves 10 are installed. After placing a double-cone sealing core 13 with an expansion sealing ring 14 inside the grouting hole guide sleeve 10, the pipe bodies 15 of the arch grouting pipe 5, the side grouting pipe 6, and the bottom grouting pipe 7 are inserted into the grouting hole guide sleeve 10, passing through the double-cone sealing core 13 and extending into the frozen retaining wall 11. The pipe bodies 15 of the arch grouting pipe 5, the side grouting pipe 6, and the bottom grouting pipe 7 are provided with pipe body connecting blocks 16. The pipe body connecting blocks 16 and the orifice flange block 12 of the grouting hole guide sleeve 10 are connected and fixed by connecting studs 17. Grouting nozzles 18 are installed on the pipe body connecting blocks 16 and connected to the grouting pipeline.
[0037] S3. After the main body 3 of the connecting passage is completed and the frozen retaining body 11 enters the thawing stage, grouting is performed through the grouting pipe to form the first stage of thawing grouting.
[0038] S4. Drill holes and install compensation grouting pipes that are diverging from the grouting pipes on the sides and bottom of the main body 3 of the connecting channel through the grouting hole guide sleeve 10, and perform directional compensation grouting in the subsidence development area; specifically, based on the subsidence monitoring results, drill and install the side compensation grouting pipe 9 that is diverging from the side grouting pipe 6 and the bottom compensation grouting pipe 8 that is diverging from the bottom grouting pipe 7 through a subsequent process, and perform the second stage of directional compensation grouting in the subsidence development area;
[0039] More specifically, such as Figure 1-3 As shown, the compensating grouting pipe includes a side compensating grouting pipe 9 and a bottom compensating grouting pipe 8; the side compensating grouting pipe 9 is radiatingly connected to the side grouting pipe 6, and the bottom compensating grouting pipe 8 is radiatingly connected to the bottom grouting pipe 7; before installing and connecting the side compensating grouting pipe 9 and the bottom compensating grouting pipe 8, holes are drilled in the frozen retaining body 11 and grouting hole guide sleeves 10 are installed. After placing a double-cone sealing core 13 with an expansion sealing ring 14 inside the grouting hole guide sleeve 10, the side... The pipe body 15 of the partial compensation grouting pipe 9 and the bottom compensation grouting pipe 8 is inserted into the grouting hole guide sleeve 10, passes through the double conical sealing core 13 and extends into the frozen enclosure 11; the pipe body 15 of the arch side compensation grouting pipe 9 and the bottom compensation grouting pipe 8 is provided with a pipe body connecting block 16, and the pipe body connecting block 16 and the orifice flange block 12 of the grouting hole guide sleeve 10 are connected and fixed by connecting studs 17, and the grouting nozzle 18 is installed on the pipe body connecting block 16 and connected to the same grouting system;
[0040] The installation of each grouting pipe and the compensation grouting pipe adopts the guide sleeve installation method. That is, first, the grouting hole guide sleeve 10 is installed in the drilled hole, then the pipe body 15 is installed, and the pipe body connecting block 16 is connected and fixed to the orifice flange block 12 of the grouting hole guide sleeve 10 by the connecting stud 17. Finally, the grouting nozzle 18 is installed on the pipe body connecting block 16 and connected to the grouting pipeline.
[0041] It should be noted that the parts in this embodiment that are the same as or similar to those in Embodiment 1 can be referred to each other, and will not be repeated in this application.
[0042] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
Claims
1. A construction device for grouting connecting passages in water-rich soft soil shallow overburden tunnels, characterized in that, include: The connecting passage body (3), grouting pipe, compensating grouting pipe and grouting hole guide sleeve (10); the connecting passage body (3) is placed between the left shield segment (1) and the right shield segment (2); the grouting pipe includes the arch grouting pipe (5), the side grouting pipe (6) and the bottom grouting pipe (7), which are respectively located at the top, side and bottom of the connecting passage body (3); the compensating grouting pipe includes the bottom compensating grouting pipe (8) and the side compensating grouting pipe (9), the side grouting pipe (6) is radiating and connected to the side compensating grouting pipe (9), and the bottom grouting pipe (7) is radiating and connected to the bottom compensating grouting pipe (8); the grouting hole guide sleeve (10) is installed in the frozen enclosure (11) around the connecting passage body (3), and the grouting hole guide sleeve (10) is fixed with the grouting pipe and the compensating grouting pipe.
2. The construction device for grouting connecting passages in water-rich soft soil shallow overburden tunnels according to claim 1, characterized in that, Holes are drilled in the frozen enclosure (11) around the main body (3) of the communication channel. The grouting hole guide sleeve (10) is installed in the hole. The grouting pipe and the body (15) of the compensating grouting pipe are installed in the cavity of the grouting hole guide sleeve (10). The length of the body (15) is greater than the length of the grouting hole guide sleeve (10).
3. The construction device for grouting connecting passages in water-rich soft soil shallow overburden tunnels according to claim 2, characterized in that, The bottom end of the grouting hole guide sleeve (10) is provided with a double conical sealing core (13), the outer wall of the double conical sealing core (13) is attached to the inner wall of the cavity of the grouting hole guide sleeve (10); one end of the double conical sealing core (13) is located inside the cavity of the grouting hole guide sleeve (10), and the other end of the double conical sealing core (13) is located at the opening of the grouting hole guide sleeve (10); an expansion sealing ring (14) is provided in the middle section of the double conical sealing core (13), the bottom of the expansion sealing ring (14) is attached to the bottom of the cavity of the grouting hole guide sleeve (10), and the outer wall of the expansion sealing ring (14) is attached to the inner wall of the cavity of the grouting hole guide sleeve (10).
4. The construction device for grouting connecting passages in water-rich soft soil shallow overburden tunnels according to claim 2, characterized in that, The grouting hole guide sleeve (10) is provided with a hole flange block (12) at the hole opening; the pipe body (15) is provided with a pipe body connecting block (16) at the hole opening, the pipe body connecting block (16) and the hole flange block (12) are connected and fixed by connecting studs (17), and a grouting nozzle (18) is installed and fixed on the pipe body connecting block (16).
5. The construction device for grouting connecting passages in water-rich soft soil shallow overburden tunnels according to claim 1, characterized in that, The side compensation grouting pipe (9) and the bottom compensation grouting pipe (8) are connected to the same grouting system. The grouting system includes a grouting distribution main pipe (20) and a blind end cap (21) at the end of the grouting distribution main pipe (20). The grouting distribution main pipe (20) is connected to the side compensation grouting pipe (9) and the bottom compensation grouting pipe (8). The side compensation grouting pipe (9) and the bottom compensation grouting pipe (8) penetrate the bottom plate (19) of the inverted arch around the main body of the connecting channel (3) and extend into the frozen enclosure (11) around the main body of the connecting channel (3). The grouting distribution main pipe (20) is provided with a manual shut-off valve (24), a union joint (23) and a one-way valve (22) in sequence along the grouting direction.
6. A construction method for a grouting connection tunnel construction device for water-rich soft soil shallow overburden tunnels as described in any one of claims 1 to 5, characterized in that, Includes the following steps: S1. Construct the main body (3) of the connecting passage between the left shield tunnel segment (1) and the right shield tunnel segment (2), and reinforce the surrounding soil by freezing method to form a frozen retaining body (11). S2. When constructing the main body (3) of the connecting channel, grouting pipes are pre-installed at its top, sides and bottom through grouting hole guide sleeves (10); S3. After the main body (3) of the connecting channel is completed and the frozen retaining body (11) enters the thawing stage, grouting is performed through the grouting pipe. S4. Drill holes and install compensation grouting pipes that are divergently connected to the grouting pipes on the side and bottom of the main body of the connecting channel (3) through the grouting hole guide sleeve (10), and perform directional compensation grouting in the melting and settling development area.
7. The construction method according to claim 6, characterized in that, In step S2, the grouting pipes include an arch grouting pipe (5), a side grouting pipe (6), and a bottom grouting pipe (7). Holes are drilled at the top, sides, and bottom of the frozen retaining wall (11) of the connecting passage body (3), and grouting hole guide sleeves (10) are installed. After placing a double-cone sealing core (13) with an expansion sealing ring (14) inside the grouting hole guide sleeve (10), the pipe bodies (15) of the arch grouting pipe (5), the side grouting pipe (6), and the bottom grouting pipe (7) are inserted. The double-cone sealing core (13) passes through the grouting hole guide sleeve (10) and extends into the frozen enclosure (11); the pipe body (15) of the arch grouting pipe (5), the side grouting pipe (6) and the bottom grouting pipe (7) are provided with pipe body connecting blocks (16), and the pipe body connecting blocks (16) and the orifice flange block (12) of the grouting hole guide sleeve (10) are connected and fixed by connecting studs (17), and grouting nozzles (18) are installed on the pipe body connecting blocks (16) and connected to the grouting pipeline.
8. The construction method according to claim 7, characterized in that, In step S4, the compensation grouting pipe includes a side compensation grouting pipe (9) and a bottom compensation grouting pipe (8); the side compensation grouting pipe (9) is radiatingly connected to the side grouting pipe (6), and the bottom compensation grouting pipe (8) is radiatingly connected to the bottom grouting pipe (7); before installing and connecting the side compensation grouting pipe (9) and the bottom compensation grouting pipe (8), holes are drilled in the frozen retaining body (11) and grouting hole guide sleeves (10) are installed. After placing a double-cone sealing core (13) with an expansion sealing ring (14) in the grouting hole guide sleeve (10), the side compensation grouting pipe (9) is installed in the bottom compensation grouting pipe (8). The pipe body (15) of the compensation grouting pipe (9) and the bottom compensation grouting pipe (8) is inserted into the grouting hole guide sleeve (10), passes through the double conical sealing core (13) and extends into the frozen enclosure (11); the pipe body (15) of the arch side compensation grouting pipe (9) and the bottom compensation grouting pipe (8) is provided with a pipe body connecting block (16), and the pipe body connecting block (16) and the orifice flange block (12) of the grouting hole guide sleeve (10) are connected and fixed by connecting studs (17), and the grouting nozzle (18) is installed on the pipe body connecting block (16) and connected to the same grouting system.