A slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations.
By introducing structures such as a cutterhead assembly with adjustable and pluggable openings, a wear-resistant protective ring for the outer shell, and a pre-stressed anti-buoyancy adapter interface for pipe sections into the slurry balance jacking machine, the problems of sand loss, head wear, and pipe section floating and displacement in high-permeability strata construction have been solved, thereby improving construction stability and pipeline forming quality.
Patent Information
- Application Number
- CN202611593758.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-15
- Publication Date
- 2026-11-17
AI Technical Summary
Existing slurry balance jacking machines suffer from problems such as sand and soil loss, poor slag discharge, severe wear of the jacking head, and pipe section floating and displacement during construction in high-permeability strata, which affect the quality of pipeline formation.
The system employs a cutterhead assembly with adjustable and sealable openings, a wear-resistant protective ring for the outer shell, a mud pipeline mounting support, and a pipe section pre-compression anti-buoyancy adapter interface. Combined with a posture monitoring module, it achieves adjustable cutterhead openings, optimized mud circulation, cutter head protection, and pipe section anti-buoyancy, ensuring construction stability.
It solved the problems of sand and soil loss, machine head wear, and pipe section floating and displacement in high-permeability strata, and improved the stability of construction and the quality of pipeline formation.
Smart Images

Figure CN123109692A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pipeline construction technology, specifically to a slurry-water balance jacking machine for trenchless pipe jacking construction in high-permeability strata. Background Technology
[0002] Slurry balance jacking machines are widely used in trenchless construction of urban municipal heating, water supply and drainage pipe networks. They are especially often used in jacking operations in high-permeability, water-rich sandy strata. They rely on the cutterhead to cut the soil and the slurry to circulate and remove slag to complete the laying of underground pipelines. They are the core construction equipment for trenchless construction of underground pipe networks.
[0003] Existing slurry balance jacking machines have cutterheads with fixed-size openings. While these can cut and remove slag from the soil, the opening parameters cannot be flexibly adjusted according to geological conditions, easily leading to significant sand loss or obstructed slag removal. The injection medium at the tunnel face is often water, which disturbs the sand layer and hinders the stability of the tunnel face. The jack head casing directly contacts and rubs against the flowing sand on the borehole wall, resulting in severe wear and tear during long-term tunneling. The slurry circulation pipeline is generally laid flat at the bottom, occupying internal working space and making pipeline assembly and disassembly inconvenient. Faced with the buoyancy of water-rich sand layers, pipe sections are prone to floating and shifting, ultimately resulting in poor pipeline formation quality. Therefore, a slurry balance jacking machine for trenchless pipe jacking construction in high-permeability strata is proposed. Summary of the Invention
[0004] To address the shortcomings of existing technologies, this invention provides a slurry-balanced jacking machine for trenchless pipe jacking construction in high-permeability formations, thereby solving the problems mentioned in the background section.
[0005] To achieve the above objectives, the present invention provides the following technical solution: a slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations, comprising: The machine head body, drive mechanism, cutter head assembly, mud circulation system, and main top docking part for docking with the main top cylinder; The cutterhead assembly is mounted on the front end of the machine head body. The cutterhead assembly includes a cutterhead base, an adjustable sealing opening, a sealing steel plate, and transverse baffles. The adjustable sealing opening is located on the surface of the cutterhead base. The sealing steel plate is detachably welded to the opening to change the coverage area. The transverse baffles are fixed between adjacent cutter teeth. The cutterhead base scraper and the outer surface of the base are provided with a wear-resistant weld overlay layer. The thickness of the transverse baffles is the same as the thickness of the plate at the front end of the cutterhead and is lower than the height of the cutter teeth. A transverse baffle is reinforced every 1-2 teeth in the opening direction of each cutterhead. The specific number can be adjusted according to the size of the cutterhead and the strength of the rock strata. The actual number and position are adjusted according to the actual site conditions and calculation results to ensure uniform excavation.
[0006] It also includes a grouting and injection component, a wear-resistant protective ring for the outer shell, a mud pipeline mounting support, and a pipe section pre-compression anti-buoyancy adapter interface; the grouting and injection component is located on the cutterhead base, and the grouting and injection component includes grouting and injection holes, slurry delivery pipeline and slurry switching valve, the slurry switching valve is connected to the bentonite slurry supply pipeline and the clean water pipeline respectively, and can selectively supply wall protection slurry or clean water to the working face; The wear-resistant protective ring of the outer shell is fixed around the outer edge of the front end of the machine head body shell and protrudes from the surface of the outer shell; the mud pipeline mounting bracket is used to be installed on the inner wall of the pipe section behind the machine head, with a central angle of 30°-45°; the mud circulation system inlet and outlet pipes are hung on both sides of the inner wall of the pipe section through the bracket. The pre-compression anti-buoyancy adapter interface for the pipe section is located inside the pipe section near the machine head. The pre-compression anti-buoyancy adapter interface for the pipe section includes a limiting stop and a detachable counterweight loading chamber. The limiting stop is fixed to the inner wall of the pipe section to limit the counterweight loading chamber. The counterweight loading chamber can be filled with counterweight material to counteract the buoyancy of the pipe section.
[0007] Preferably, the sealing steel plate is fixed by symmetrical single-sided full welding, and the opening rate of the cutter head after adjustment by the sealing steel plate is 30%-40%.
[0008] Preferably, the wear-resistant protective ring of the outer shell is made of wear-resistant alloy steel, with a ring diameter of 16-20mm, and the ring is fully welded to the outer shell of the machine head body on one side.
[0009] Preferably, the grout delivery pipeline is equipped with a one-way valve to prevent backflow of mud and water, and the grouting and injection assembly is configured with a working grouting pressure of 0.2-0.6MPa and a working grouting flow rate of 15-20L / min.
[0010] Preferably, the mud pipeline mounting support includes expansion bolts, support ribs, and clamping assemblies. The mud pipeline mounting supports are arranged at 1m intervals along the axial direction of the pipe section, and a rubber buffer pad is provided on the inner side of the clamping assembly.
[0011] Preferably, it also includes a prefabricated back reinforcement docking assembly, which includes a force transmission pad and a prefabricated reinforcement frame; the force transmission pad is attached to the back wall of the working well, and the prefabricated reinforcement frame is detachably assembled between the force transmission pad and the main jacking cylinder, so that the jacking force of the main jacking cylinder coincides with the central axis of the pipe section.
[0012] Preferably, it also includes an attitude monitoring module, which is integrated and installed inside the head body; the attitude monitoring module includes a laser guidance sensor, a horizontal tilt sensor and a displacement sensor, and the attitude monitoring module is electrically connected to an alarm unit.
[0013] Preferably, the tail end of the machine head body is provided with a hole for mounting a water-stop ring. The hole for mounting a water-stop ring can be fitted with a single or double rubber water-stop ring, and the rubber water-stop ring has a tensile strength of ≥300%.
[0014] Preferably, the clamp assembly is an openable clamp structure, with the inlet and outlet slurry pipes independently fixed on the left and right sides of the inner wall of the pipe section, forming a through-passage space for personnel maintenance at the bottom of the pipe section.
[0015] A trenchless pipe jacking method for high-permeability formation mud, using the aforementioned slurry balance jacking machine, includes the following steps: S1. Construction of the working well, completion of the pouring of the integrated back wall, and assembly of the prefabricated back reinforcement docking components. S2. Debug the mud-water balance jacking machine. Adjust the cutterhead opening ratio by sealing steel plates according to the stratum conditions. The mud circulation pipeline is installed on both sides of the inner wall of the pipe section by means of the mud pipeline hanging support. S3. Fill the counterweight loading bin inside the pipe section adjacent to the machine head with counterweight material to complete the pre-compression anti-buoyancy configuration; S4. During the jacking operation, the slurry switching valve is used to switch to bentonite slurry to inject grout into the working face to maintain the mud-water balance at the working face. The attitude monitoring module collects the attitude data of the machine head in real time, and performs a correction operation when the deviation exceeds the threshold. S5. Continue jacking until the tunneling machine reaches the receiving shaft, and complete the equipment reception and pipe section interface processing.
[0016] Compared with the prior art, the present invention provides a slurry-balanced jacking machine for trenchless pipe jacking construction in high-permeability formations, which has the following beneficial effects: 1. This invention utilizes a cutterhead base, adjustable and sealable openings, sealing steel plates, and transverse baffles to achieve adjustable slag discharge area on the cutterhead. The sealing steel plates alter the opening coverage area, while the transverse baffles prevent sand from being carried out by the slurry. This invention offers advantages such as adapting to slag discharge requirements in high-permeability formations and balancing the rotational force on the cutterhead. It solves the problems of fixed cutterhead openings in traditional jacking machines, where excessively large openings in high-permeability formations lead to sand loss and face instability, while excessively small openings hinder slag discharge. Through the combined action of the grouting and injection components and the cutterhead components, bentonite wall-protecting slurry or clean water is selectively supplied to the face. This provides the advantage of constructing a protective mud film at the face and reducing soil disturbance, solving the problem of traditional jacking machines only supplying clean water to the face, which washes away sand layers, exacerbates sand loss, and makes it difficult to maintain the mud-water balance at the face.
[0017] 2. This invention utilizes a wear-resistant protective ring on the outer shell to ensure preferential contact and friction between the borehole wall soil and the ring. This effectively isolates the direct wear of the jacking head shell by flowing sand, solving the problem of continuous wear of the jacking head shell and rapid equipment wear caused by flowing sand in high-permeability formations. The mud pipe is side-mounted on both sides of the inner wall of the pipe section using a mud pipe mounting bracket, allowing the mud pipe to detach from the bottom space of the pipe section. This frees up the passage space at the bottom of the pipe section, facilitating internal maintenance and pipe disassembly, solving the problem of traditional mud pipes being laid flat at the bottom, encroaching on the internal working space, and being cumbersome to disassemble and assemble. The pipe section pre-compression anti-buoyancy adapter interface applies counterweight pre-compression to the pipe section to counteract the buoyancy of the formation. This effectively restrains the upward trend of the pipe section and ensures stable jacking posture, solving the problem of pipe sections easily floating and shifting under buoyancy in water-rich, high-permeability formations, resulting in poor pipeline forming accuracy. Attached Figure Description
[0018] Figure 1 This is a perspective view of the overall structure of the present invention; Figure 2 This is a perspective view of the cutter head substrate structure of the present invention; Figure 3 This is a perspective view of the cutter head substrate and the head body of the present invention in a separated state; Figure 4 This is a perspective view of the rear of the nose section of the present invention.
[0019] In the diagram: 1. Cutterhead base; 2. Adjustable sealing opening; 3. Sealing steel plate; 4. Horizontal baffle; 5. Grouting injection hole; 6. Grout delivery pipeline; 7. Grout switching valve; 8. Wear-resistant protective ring for outer shell; 9. Slurry pipeline mounting support; 10. Pipe section pre-compression anti-buoyancy adapter interface; 11. Check valve. Detailed Implementation
[0020] This invention provides a technical solution: a slurry-balanced jacking machine for trenchless pipe jacking construction in high-permeability formations. Please refer to [link to relevant documentation]. Figure 1 , Figure 2 , Figure 3 and Figure 4 ,include: The machine head body, drive mechanism, cutterhead assembly, mud circulation system, and main top docking section for docking with the main top hydraulic cylinder. The cutterhead assembly is mounted on the front end of the cutter head body. The cutterhead assembly includes a cutterhead base 1, an adjustable sealing opening 2, a sealing steel plate 3, and transverse baffles 4. The adjustable sealing opening 2 is located on the surface of the cutterhead base 1. The sealing steel plate 3 is detachably welded to the opening to change the coverage area. The transverse baffles 4 are fixed between adjacent cutter teeth. The cutterhead base 1 has a wear-resistant weld overlay layer on the scraper and outer surface. The thickness of the transverse baffles 4 is the same as the thickness of the cutterhead front plate and is lower than the height of the cutter teeth. One transverse baffle 4 is added every 1-2 teeth along the opening direction of each cutterhead. The specific number can be adjusted according to the size of the cutterhead and the strength of the rock strata. The actual number and position are adjusted based on the actual site conditions and calculation results to ensure uniform excavation.
[0021] It also includes a grouting and injection assembly, a wear-resistant protective ring 8 for the outer shell, a mud pipeline mounting support 9, and a pre-loading anti-buoyancy adapter interface 10 for the pipe section. The grouting and injection assembly is located on the cutterhead base 1. The grouting and injection assembly includes a grouting and injection hole 5, a grout delivery pipeline 6, and a grout switching valve 7. The grout switching valve 7 is connected to the bentonite grout supply pipeline and the clean water pipeline, respectively, and can selectively supply wall-protecting grout or clean water to the working face.
[0022] The wear-resistant protective ring 8 is fixed around the outer edge of the front end of the machine head body shell and protrudes from the shell surface. The mud pipeline mounting bracket 9 is used to install on the inner wall of the pipe section behind the machine head, with a central angle of 30°-45°. The mud circulation system inlet and outlet pipes are hung on both sides of the inner wall of the pipe section through this bracket.
[0023] The pre-loading anti-buoyancy adapter interface 10 is installed inside the pipe section near the machine head. The interface includes a limiting stop and a detachable counterweight loading chamber. The limiting stop secures the inner wall of the pipe section to limit the counterweight loading chamber, which can be filled with counterweight material to counteract the buoyancy of the pipe section. The cutterhead base 1 and the adjustable, sealable opening 2 serve as a slag discharge channel. The sealing steel plate 3 is welded on-site to adjust the opening. The grouting injection hole 5 faces outwards towards the working face soil. The counterweight loading chamber is limited by the limiting stop, and counterweight material is loaded on-site to achieve anti-buoyancy. The integrated cutterhead base 1, sealing steel plate 3, grouting and liquid injection components, wear-resistant protective ring 8, mud pipeline mounting support 9, and pipe section pre-compression anti-buoyancy adapter interface 10 are designed for high-permeability, water-rich sandy layer conditions. They simultaneously solve multiple problems such as sand loss, cutter head wear, and pipe section floating, improve the overall stability of jacking operations, and are suitable for trenchless buried pipe construction for thermal and water supply and drainage.
[0024] The sealing steel plate 3 is symmetrically fixed with full welding on one side. After adjustment by the sealing steel plate 3, the opening rate of the cutterhead is 30%-40%. The sealing steel plate 3 is symmetrically fixed with full welding on one side around the cutterhead base 1. By increasing or decreasing the coverage of the sealing steel plate 3, the area of the adjustable opening 2 can be sealed, controlling the actual opening rate of the cutterhead within the range of 30%-40%, adapting to different permeability sand layers. The symmetrical full welding of the sealing steel plate 3 controls the opening rate of the cutterhead base 1 at 30%-40%, avoiding excessive sand loss due to overly large openings and obstruction of slag discharge due to overly small openings. Symmetrical welding ensures balanced rotational force on the cutterhead base 1, reduces eccentric vibration of the cutterhead, and improves the stability of tunneling operations.
[0025] The wear-resistant protective ring 8 is made of wear-resistant alloy steel, with a diameter of 16-20mm. The ring is fully welded to the outer shell of the machine head body on one side. The wear-resistant protective ring 8, made of wear-resistant alloy steel, has a diameter of 16-20mm and is fully welded to the outer edge of the front end of the machine head body shell on one side. The ring protrudes from the shell and preferentially contacts the soil on the borehole wall to withstand friction. During excavation, the ring preferentially contacts and rubs against the sand layer on the borehole wall, protecting the machine head body shell from direct wear by flowing sand. It also helps to prevent mud slurry backflow, extending the service life of the machine head body and reducing the frequency of equipment maintenance and replacement.
[0026] The grout delivery pipeline 6 is equipped with a one-way valve 11 to prevent backflow of mud and water. The grouting and injection assembly is configured with a working grouting pressure of 0.2-0.6 MPa and a working grouting flow rate of 15-20 L / min. The one-way valve 11 is installed in the middle section of the grout delivery pipeline 6 to prevent backflow of mud and water. The grouting and injection assembly equipment is factory-preset with a grouting pressure of 0.2-0.6 MPa and a grouting flow rate of 15-20 L / min, which can be finely adjusted on site as needed. The one-way valve 11 in the grout delivery pipeline 6 prevents backflow of mud and water from the working face from damaging components such as the grout switching valve 7. The grouting and injection assembly limits the grouting pressure to 0.2-0.6 MPa and the flow rate to 15-20 L / min to ensure a stable supply of bentonite grout, which is conducive to the formation of a complete mud film at the working face and suppresses the risk of sand inrush and collapse in high-permeability strata.
[0027] The mud pipe mounting bracket 9 includes expansion bolts, supporting stiffeners, and clamping assemblies. The mud pipe mounting brackets 9 are arranged at 1m intervals along the axial direction of the pipe section. A rubber buffer pad is installed inside the clamping assembly. The mud pipe mounting bracket 9 is fixed to the inner wall of the pipe section by expansion bolts, the supporting stiffeners bear the load, and the clamping assembly holds the mud pipe. One set is installed every 1m along the axial direction of the pipe section, and the rubber buffer pad reduces vibration and noise. The mud pipe mounting bracket 9 consists of expansion bolts, supporting stiffeners, and clamping assemblies, arranged at 1m axial intervals. The rubber buffer pad inside the clamping assembly can reduce the vibration and impact of the mud pipe. This achieves reliable side-mounted fixation of the mud pipe, reduces the probability of pipe loosening and falling off, and is suitable for long-distance continuous pipe jacking operations.
[0028] Please see Figure 1 and Figure 3 The system also includes a prefabricated backrest reinforcement and docking assembly, which consists of a force transmission pad and a prefabricated reinforcement frame. The force transmission pad is fitted against the back wall of the working shaft, and the prefabricated reinforcement frame is detachably mounted between the force transmission pad and the main jacking cylinder, ensuring that the combined jacking force of the main jacking cylinder coincides with the central axis of the pipe section. Alternatively, the force transmission pad can be fitted against the back wall of the working shaft, and the prefabricated reinforcement frame can be detachably mounted between the force transmission pad and the main jacking cylinder, allowing for on-site assembly and adjustment to ensure that the combined force of the main jacking cylinder is aligned with the central axis of the pipe section. The prefabricated backrest reinforcement and docking assembly, composed of a force transmission pad and a prefabricated reinforcement frame, is detachably mounted between the force transmission pad and the main jacking cylinder, correcting the force transmission direction of the main jacking cylinder, ensuring that the combined jacking force coincides with the central axis of the pipe section, avoiding jacking eccentricity, and reducing the construction risks of head offset and localized pressure damage to the back wall.
[0029] It also includes an attitude monitoring module, which is integrated inside the jacking head body. The attitude monitoring module contains a laser guide sensor, a horizontal tilt sensor, and a displacement sensor, and is electrically connected to an alarm unit. The attitude monitoring module, with its built-in laser guide sensor, horizontal tilt sensor, and displacement sensor integrated inside the jacking head body, transmits the collected attitude signals to an external alarm unit. Exceeding a threshold triggers an alarm. Integrated inside the jacking head body, the attitude monitoring module relies on the laser guide sensor, horizontal tilt sensor, and displacement sensor to collect tunneling attitude data in real time. When deviations exceed limits, the alarm unit is triggered for timely warnings, facilitating immediate corrective actions by operators, effectively controlling deviations in the jacking axis and elevation, and improving pipe forming accuracy.
[0030] A flange for mounting a water-stop ring at the tail of the machine head body is installed. This flange can accommodate single or double rubber water-stop rings, with a tensile strength ≥300%. Located at the tail of the machine head body, the flange allows for the installation of single or double rubber water-stop rings, depending on the depth of the overburden. The ≥300% tensile strength of the rubber water-stop rings ensures a tight seal at the exit point of the machine head. This flange also accommodates the radial deformation of the machine head body as it exits the overburden, preventing mud, water, and sand from flowing into the working well through the opening gap, thus improving the sealing performance of the opening and particularly meeting the water-stopping protection requirements for deep overburden conditions.
[0031] The clamp assembly features an openable clamp structure, with the inlet and outlet slurry pipes independently fixed to the left and right sides of the inner wall of the pipe section. This creates a continuous, unobstructed passageway for personnel during maintenance. The clamp assembly's openable clamp structure separates the inlet and outlet slurry pipes to the left and right sides of the inner wall of the pipe section, allowing the slurry pipe to avoid obstructing the bottom of the pipe section, thus creating a continuous, unobstructed passageway for personnel during maintenance. This design facilitates personnel access, equipment maintenance, and pipe disassembly / reassembly, reducing the time required for pipe disassembly and reassembly, and is suitable for frequent long-distance pipe jacking operations in high-permeability formations.
[0032] A trenchless pipe jacking method for high-permeability formation mud, using the aforementioned slurry balance jacking machine, includes the following steps: S1. Construction of the working well, completion of the pouring of the integrated back wall, and assembly of the prefabricated back reinforcement docking components.
[0033] S2. Debug the mud-water balance jacking machine. Adjust the cutterhead opening ratio by using the sealing steel plate 3 according to the stratum conditions. The mud circulation pipeline is side-mounted on both sides of the inner wall of the pipe section with the help of the mud pipeline hanging support 9.
[0034] S3. Fill the counterweight loading bin inside the pipe section adjacent to the machine head with counterweight material to complete the pre-compression anti-buoyancy configuration.
[0035] S4. During the jacking operation, the slurry switching valve 7 is used to switch to bentonite slurry to inject grout into the working face to maintain the mud-water balance at the working face. The attitude monitoring module collects the attitude data of the machine head in real time, and performs a correction operation when the deviation exceeds the threshold.
[0036] S5. Continue jacking until the tunneling machine reaches the receiving shaft, completing equipment reception and pipe section interface processing. The construction method relies on the aforementioned slurry balance jacking machine, sequentially carrying out back-end assembly, equipment debugging, counterweight anti-buoyancy configuration, grouting jacking, and receiving operations. Each process is matched with the inherent structure of the equipment to complete the pipe jacking construction. This trenchless pipe jacking construction method in high-permeability strata utilizes the slurry balance jacking machine of this invention, fully leveraging the synergistic capabilities of each structure within the equipment. Through the inherent structure of the equipment, it achieves face stability, anti-buoyancy, and attitude monitoring, reducing sand inrush, pipe section floating, and excessive settlement accidents, ensuring the safety of pipe jacking construction in high-permeability strata and the quality of pipeline formation.
[0037] This scheme utilizes a slurry-balanced jacking machine to achieve ground control at the tunneling end through the coordinated action of the cutterhead base 1, adjustable sealing openings 2, sealing steel plates 3, transverse baffles 4, and wear-resistant weld overlay. The sealing steel plates 3 alter the actual flow area of the adjustable sealing openings 2, achieving an opening ratio suitable for high-permeability sand layers. The transverse baffles 4 prevent the slurry from carrying large amounts of sand and soil outwards, while the wear-resistant weld overlay enhances the cutterhead base 1's resistance to sand abrasion. The grouting and injection assembly sprays the medium delivered by the grouting and injection holes 5 through the grouting pipeline 6 onto the tunnel face. The grout switching valve 7 switches between bentonite grout and clean water, and the one-way valve 11 prevents backflow. The bentonite grout forms a stable mud film at the tunnel face, balancing the soil and water pressure in the formation and suppressing sand inrush and tunnel face instability. The wear-resistant protective ring 8 on the outer shell bears the friction load of the borehole wall, protecting the machine head's outer shell and reducing wear and tear during tunneling.
[0038] The mud pipeline mounting bracket 9 clamps and fixes the inlet and outlet pipes of the mud circulation system. The clamp assembly with an openable clamp structure, together with the rubber buffer pad, reduces the vibration of the pipeline operation, ensuring reliable fixation of the mud circulation pipeline and ensuring unobstructed access for maintenance at the bottom of the pipe section. The pipe section pre-compression anti-buoyancy adapter interface 10 uses limit stops to limit and constrain the counterweight loading chamber. After the counterweight loading chamber is filled with counterweight material, it offsets the buoyancy of the pipe section caused by the water-rich strata, avoiding the problem of pipe section floating and deviating. The prefabricated back reinforcement docking assembly uses force transmission pads and prefabricated reinforcement frames to adjust the force transmission path, ensuring that the resultant force of the main top hydraulic cylinder output thrust does not become eccentric, and ensuring effective thrust transmission. The attitude monitoring module's laser guidance sensor, horizontal tilt sensor, and displacement sensor continuously collect the tunneling attitude. When an anomaly occurs, the alarm unit outputs a warning signal, providing data support for correction operations. The water-stop ring at the tail end of the machine head body is fitted with a flange and a rubber water-stop ring to seal the exit point of the machine head body, preventing mud, water and sand from entering the working well.
[0039] The trenchless pipe jacking method for high-permeability strata, as described in this invention, fully utilizes the functions of the entire equipment structure to complete the entire jacking operation. After the integrated back wall is poured, a prefabricated back reinforcement docking assembly is assembled to ensure thrust transmission conditions. The entire machine is debugged, and the cutterhead opening ratio is adjusted using the sealing steel plate 3. The mud circulation pipeline is laid out using the mud pipeline mounting support 9. The pre-stressing anti-buoyancy adapter interface 10 of the pipe section completes the counterweight filling, eliminating the risk of pipe section floating. During tunneling, the slurry switching valve 7 switches to the bentonite slurry mode to maintain the mud-water balance at the tunnel face. The attitude monitoring module continuously monitors the tunneling status, and corrective actions are executed if deviation exceeds the threshold. Jacking and tunneling continue until the tunneling machine reaches the receiving shaft, completing equipment reception and pipe section interface processing. This entire process relies on the equipment hardware structure to solve a series of problems associated with trenchless pipe jacking in high-permeability strata, reducing construction risks and improving pipeline construction accuracy. It is suitable for trenchless buried pipe projects for municipal heating and water supply / drainage pipelines.
Claims
1. A slurry-balanced jacking machine for trenchless pipe jacking construction in high-permeability formations, characterized in that, include: The machine head body, drive mechanism, cutter head assembly, mud circulation system, and main top docking part for docking with the main top cylinder; The cutter head assembly is mounted on the front end of the machine head body. The cutter head assembly includes a cutter head base (1), a sealable and adjustable opening (2), a sealing steel plate (3), and a transverse baffle (4). The sealable and adjustable opening (2) is located on the surface of the cutter head base (1). The sealing steel plate (3) is detachably welded to the opening to change the coverage area. The transverse baffle (4) is fixed between adjacent cutter teeth. The cutter head base (1) scraper and outer surface are provided with a wear-resistant weld overlay layer. It also includes a grouting and injection component, a wear-resistant protective ring (8) for the outer shell, a mud pipeline mounting support (9), and a pipe section pre-compression anti-buoyancy adapter interface (10); the grouting and injection component is located on the cutterhead base (1), and the grouting and injection component includes a grouting and injection hole (5), a slurry delivery pipeline (6), and a slurry switching valve (7). The slurry switching valve (7) is connected to the bentonite slurry supply pipeline and the clean water pipeline respectively, and can selectively supply wall protection slurry or clean water to the working face; The wear-resistant protective ring (8) of the outer shell is fixed around the outer edge of the front end of the machine head body shell and protrudes from the surface of the outer shell; the mud pipeline mounting bracket (9) is used to install on the inner wall of the pipe section behind the machine head, in the range of 30°-45° central angle, and the mud circulation system inlet and outlet pipes are hung on both sides of the inner wall of the pipe section through the bracket; The pre-compression anti-buoyancy adapter interface (10) of the pipe section is used to be located inside the pipe section near the machine head. The pre-compression anti-buoyancy adapter interface (10) of the pipe section includes a limiting stop and a detachable counterweight loading chamber. The limiting stop is fixed to the inner wall of the pipe section to limit the counterweight loading chamber. The counterweight loading chamber can be filled with counterweight material to counteract the buoyancy of the pipe section.
2. The slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: The sealing steel plate (3) is fixed by symmetrical single-sided full welding, and the opening rate of the cutter head after adjustment by the sealing steel plate (3) is 30%-40%.
3. The slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: The wear-resistant protective ring (8) of the outer shell is made of wear-resistant alloy steel with a diameter of 16-20mm. The ring is fully welded to the outer shell of the machine head body on one side.
4. The slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: The grout delivery pipeline (6) is equipped with a one-way valve (11) to prevent backflow of mud and water. The grouting and injection assembly is configured with a working grouting pressure of 0.2-0.6MPa and a working grouting flow rate of 15-20L / min.
5. The slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: The mud pipeline mounting support (9) includes expansion bolts, support ribs and clamp components. The mud pipeline mounting support (9) is arranged at 1m intervals along the axial direction of the pipe section. A rubber buffer pad is provided on the inner side of the clamp component.
6. The slurry-balanced jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: It also includes a prefabricated back reinforcement docking assembly, which includes a force transmission pad and a prefabricated reinforcement frame; the force transmission pad is attached to the back wall of the working well, and the prefabricated reinforcement frame is detachably assembled between the force transmission pad and the main jacking cylinder, so that the jacking force of the main jacking cylinder coincides with the central axis of the pipe section.
7. The slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: It also includes an attitude monitoring module, which is integrated and installed inside the head body; the attitude monitoring module includes a laser guidance sensor, a horizontal tilt sensor and a displacement sensor, and the attitude monitoring module is electrically connected to an alarm unit.
8. The slurry balance jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 1, characterized in that: The tail of the machine head body is provided with a hole for mounting a water-stop ring. The hole for mounting a water-stop ring can be fitted with a single or double rubber water-stop ring, and the rubber water-stop ring has a tensile strength of ≥300%.
9. A slurry-balanced jacking machine for trenchless pipe jacking construction in high-permeability formations according to claim 5, characterized in that: The clamp assembly is an openable clamp structure, with the inlet and outlet slurry pipes independently fixed on the left and right sides of the inner wall of the pipe section, forming a through-passage space for personnel maintenance at the bottom of the pipe section.
10. A method for trenchless pipe jacking construction in high-permeability formation mud, characterized in that, Using the slurry balance jacking machine according to any one of claims 1-9 includes the following steps: S1. Construction of the working well, completion of the pouring of the integrated back wall, and assembly of the prefabricated back reinforcement docking components. S2. Debug the mud-water balance jacking machine. Adjust the cutterhead opening rate by sealing steel plate (3) according to the stratum conditions. The mud circulation pipeline is installed on both sides of the inner wall of the pipe section by means of mud pipeline hanging support (9). S3. Fill the counterweight loading bin inside the pipe section adjacent to the machine head with counterweight material to complete the pre-compression anti-buoyancy configuration; S4. During the jacking operation, the bentonite slurry is switched to be injected into the face of the tunnel through the slurry switching valve (7) to maintain the mud-water balance of the face of the tunnel. The attitude monitoring module collects the attitude data of the machine head in real time. When the deviation exceeds the threshold, the correction operation is performed. S5. Continue jacking until the tunneling machine reaches the receiving shaft, and complete the equipment reception and pipe section interface processing.