Construction methods for reinforcing rock pillars in tunnels

By laying corrugated steel plates on the surface of the interlocking rock column to form a mechanical interlocking interface, and combining this with the construction method of layered pouring and prestress monitoring and compensation, the problems of weak interface bonding and prestress loss were solved, thereby improving the stability and ensuring the safety of the interlocking rock column.

CN123109708APending Publication Date: 2026-11-17中铁二十局集团第三工程有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611157463.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-31
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the interfacial bonding strength of the interbedded rock pillars is limited, and the prestress loss is difficult to control, resulting in the inability of the support system to close effectively and affecting the safety of tunnel operation.

Method used

A corrugated steel plate is used to form a mechanical interlocking interface with the surface of the rock column. Concrete supports are poured in layers and through anchor rods are inserted. Pre-tension is applied layer by layer and combined with prestress monitoring and compensation tensioning. The formwork is stacked layer by layer to the design height. The effective closure of the structure is determined by the displacement rate and prestress loss rate.

Benefits of technology

It significantly improves the stability of the interbedded rock pillars, controls long-term deformation, and ensures the safety of tunnel construction and operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109708A_ABST
    Figure CN123109708A_ABST
Patent Text Reader

Abstract

This invention discloses a construction method for reinforcing interlocking rock columns in tunnels, relating to the field of tunnel support technology. The method includes laying corrugated steel plates on both sides of the interlocking rock column to form a mechanical interlocking interface; erecting fixed steel formwork and pouring concrete in layers for support; drilling horizontal through holes after the first layer of concrete reaches drillable strength, injecting early-strength cement mortar, and inserting through anchor bolts; installing enlarged head plates after the grouting strength meets the standard, tensioning to the design prestress, and locking; monitoring prestress loss, and compensating for excessive prestress; removing the lower layer formwork and flipping it upwards, stacking layers and inserting anchor bolts to the design height; and monitoring the surface displacement of the rock column and the prestress of the anchor bolts after all construction is completed. This invention, by strengthening the interlocking interface with corrugated steel plates, applying active confining pressure in layers, and performing dynamic compensation, constructs a layer-by-layer closed bearing system, effectively solving the problem of non-convergence deformation of interlocking rock columns.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel support technology, and in particular to a construction method for reinforcing rock pillars sandwiched in tunnels. Background Technology

[0002] As tunnel engineering develops towards longer, larger, deeper, and more complex structures, tunnels with small clearances and twin-arch tunnels are widely used in highway and railway construction due to their advantages such as flexible alignment and smaller footprint. In these tunnel structures, the inter-tunnel rock column between the two tunnel sections is relatively thin. Repeated disturbances from the excavation of the two tunnel faces lead to complex stress redistribution in the surrounding rock, making the stability of this rock column a core technical challenge determining the success or failure of the project. To address this, the industry has gradually developed various methods for reinforcing inter-tunnel rock columns, ranging from single shotcrete and anchor support to composite lining, and from passive support to active restraint, striving to establish a reliable force transmission path within the narrow rock column.

[0003] Currently, the common practice for reinforcing rock columns sandwiched in the middle is to construct cast-in-place concrete support walls on both sides of the rock column and install tie rods or prestressed anchors along the transverse direction to restrain the lateral expansion and shear deformation of the rock column. Some projects use shotcrete first and then install the system of anchors, or combine it with steel arch frames to form a combined support. By applying a certain preload to the anchors, confining pressure can be actively provided to the rock column during construction, improving its stress state. This is currently recognized as a relatively effective control measure.

[0004] However, existing concrete support methods still have significant shortcomings. On the one hand, the interfacial bond strength between cast-in-place concrete and the existing rock surface is limited. Under the action of blasting vibration and stress adjustment, the interface is prone to detachment and slippage, weakening the joint bearing effect. On the other hand, transverse tie rods often experience rapid prestress decay due to incomplete grouting and inadequate isolation measures in the free section. In addition, the independent construction of each layer of support and anchor makes it difficult to form a closed and coordinated bearing system between layers, resulting in long-term non-convergence of deformation of the interbedded rock column, posing a hidden danger to the safety of tunnel operation. Summary of the Invention

[0005] The main objective of this invention is to propose a construction method for reinforcing rock pillars in tunnels, aiming to solve the problems of weak interfacial bonding, difficulty in controlling prestress loss, and ineffective closure of the support system in the prior art.

[0006] To achieve the above objectives, the present invention proposes a construction method for reinforcing rock pillars in tunnels, the method comprising: Corrugated steel plates are laid on both sides of the middle rock column as interlocking components for casting interface, and the corrugated steel plates form a mechanical interlocking interface with the surface of the rock column. A fixed steel formwork was erected on one side of the rock column, and concrete support was poured in layers, with the thickness of each layer being the preset layer height. Once the strength of the first layer of concrete reaches a preset strength threshold that allows drilling without cracking, horizontal through holes are drilled within the thickness range supported by the first layer of concrete. Early-strength cement mortar is injected into the horizontal through-hole, and through-anchor rods are inserted; the free section of the through-anchor rod is wrapped with isolation material to form a tension free section; After the grouting strength reaches the preset tension threshold, an enlarged head pad is installed at the end of the through-anchor and a pre-tension force is applied to the design pre-tension force value. After stabilizing the pressure for a preset time and the pressure drop is less than a preset percentage, the anchor is locked. Monitor the prestress loss rate of the through-anchor bolts, and perform compensatory tensioning if the prestress loss rate exceeds a preset loss threshold; Remove the lower formwork and flip it upwards. Repeat the layered pouring, drilling, grouting, insertion of through-anchor bolts, tensioning, monitoring and compensation procedures. Stack the concrete supports layer by layer and insert through-anchor bolts layer by layer until the designed support height is reached. After the concrete support and the through-anchor are completed, monitor the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor. When the displacement rate of the surface displacement is less than the preset displacement threshold and the prestress loss rate is less than the preset stability threshold within a preset number of consecutive monitoring days, it is determined that the concrete support and anchor composite structure has formed an effective closure.

[0007] In one embodiment, the step of laying corrugated steel plates on both sides of the rock column as interlocking elements for casting interface, wherein the corrugated steel plates form a mechanical interlocking interface with the rock column surface, includes: A Q235 corrugated steel plate with a wave height of 3cm, a wave pitch of 10cm, and a thickness of 3mm is selected as the corrugated steel plate. The corrugated steel plate is laid on the existing tunnel lining surface or exposed rock surface on both sides of the middle rock column, with the concave side of the corrugation facing the surface of the rock column. The corrugated steel plate is temporarily fixed with expansion bolts, and the spacing between the expansion bolts is no more than 50cm; the overlap length of the corrugated steel plate in the vertical direction is no less than 10cm, and the overlap is connected by spot welding.

[0008] In one embodiment, the preset layer height is 1.5m; the step of erecting a fixed steel formwork on one side of the interlocking rock column, and pouring concrete support in layers, with each layer having a thickness equal to the preset layer height, includes: The side formwork is erected using a 1.2m wide and 1.5m high standard steel formwork. The outside of the standard steel formwork is supported by a disc-lock scaffold with diagonal bracing. Each layer of the disc-lock scaffold is 0.6m high and fully covered with wooden planks. C20 concrete is poured using a conveyor pump into the formwork, and each layer is compacted using an immersion vibrator after pouring; the preset strength threshold is when the concrete compressive strength reaches 15MPa.

[0009] In one embodiment, the step of drilling horizontal through holes within the thickness range of the first-layer concrete support after the strength of the first-layer concrete reaches a preset strength threshold that allows drilling without breakage includes: The length of the through anchor is determined based on the thickness of the interlocking rock column. The through anchor uses Φ25 steel bars and has a length of 3.5m to 6m. The through-anchor is composed of several sections of steel bars connected by steel bar connecting sleeves, and the length of each section of steel bar is no more than 3m. Each section of reinforcing bar is machined with M30, 60° coarse thread at the end. The threaded section at the end of the anchor rod is 200mm long, and the threaded section at the end used for connecting the sleeve is 120mm long. Before threading, the end of the reinforcing bar is upset to Φ31. The diameter of the horizontal through hole is 52-55mm, and the spacing between rows is 1.5m. The grouting uses M20 early-strength cement mortar, and the grouting pressure is controlled at 0.3-0.5 MPa. The compressive strength of the early-strength cement mortar is not less than 20 MPa 12 hours after grouting.

[0010] In one embodiment, the step of wrapping the free section of the through anchor rod with insulating material to form a tensioned free section includes: Identify the mortar anchorage section on the through anchor rod, apply oil to the rod body excluding the mortar anchorage section, and wrap it with a 5cm wide plastic strip; Each through-anchor is equipped with two sets of locators, which are respectively located near the ends of both ends of the through-anchor. The locators are made of Φ6 plain round steel bars bent and welded to the through-anchor. Before installing the through-hole anchor, M20 early-strength cement mortar is injected into the borehole, and then the through-hole anchor is inserted.

[0011] In one embodiment, the enlarged head pad is Ω-shaped and made of Q235 steel, and the planar dimension of the enlarged head pad is 150mm. The grout has a diameter of 150mm, a thickness of 8mm, and a hole diameter of Φ40. After the grouting strength reaches a preset tensile strength threshold, an enlarged head pad is installed at the end of the through-anchor and a pre-tension force is applied to the designed pre-tension force value. The locking process, after stabilizing the pressure for a preset time and ensuring the pressure drop is less than a preset percentage, includes: A spherical bottom nut is used to engage with the threaded end of the through-bolt; the design preload value is 90kN; Prestress is applied using a torque wrench, and the relationship between the torque of the torque wrench and the tension of the anchor bolt is calibrated outside the tunnel before construction; the preset time is 2 minutes, and the preset percentage is 5%.

[0012] In one embodiment, after the grouting strength reaches a preset tensile strength threshold, the step of installing an enlarged head pad at the end of the through-anchor and applying a pre-tension force to the designed pre-tension force value, stabilizing the pressure for a preset time, and locking after the pressure drop is less than a preset percentage further includes: When only one side of the tunnel is exposed during the excavation of the through-bolt, an initial preload of 40 kN is applied; After the end of the through-bolt is exposed by tunnel excavation on the other side, the pre-installed threaded protective packaging is removed, and a final pre-tension of 90kN is applied to the other side. Subsequently, the prestress on the side where the initial prestress was applied was further tensioned to 90 kN, so that the prestress on both sides of the middle rock column is symmetrically balanced.

[0013] In one embodiment, the step of monitoring the prestress loss rate of the through-bolt and performing compensatory tensioning when the prestress loss rate exceeds a preset loss threshold includes: The first prestress monitoring is conducted 24 hours after the prestress of the through-bolt is locked; the preset loss threshold is 10%. If the prestress loss rate is found to exceed 10%, a torque wrench is used to re-tension the prestress to the design prestress value of 90kN and then lock it again. After the compensation tensioning is completed, monitoring is carried out again until the prestress loss rate is less than 10%.

[0014] In one embodiment, after the concrete support and the through-anchor are fully constructed, the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor are monitored. When the displacement rate of the surface displacement is less than a preset displacement threshold and the prestress loss rate is less than a preset stability threshold within a preset number of consecutive monitoring days, the step of determining that the concrete support-anchor composite structure has formed an effective closure includes: Displacement monitoring points are set up on the two side walls of the middle rock column and the surface of the concrete support, and displacement is measured using a convergence meter or measuring rod. Anchor gauges or strain gauges are installed at the pad at the end of the through anchor bolt to monitor changes in prestress; the preset monitoring period is 7 days, the preset displacement threshold is 0.5 mm / d, and the preset stability threshold is 5%.

[0015] In one embodiment, after the completion of the construction of the concrete support and the through-anchor, the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor are monitored. When the displacement rate of the surface displacement is less than a preset displacement threshold and the prestress loss rate is less than a preset stability threshold within a continuous preset monitoring period, the concrete support-anchor composite structure is determined to have formed an effective closure. Following this step, the construction method for reinforcing interlocking rock columns in tunnels includes: When excavating new sections of tunnels on both sides of the central rock pillar, the excavation advance per cycle shall not exceed the spacing of one steel frame. The blasting uses low-power, low-velocity explosives, and the detonation interval between adjacent blasting segments is not less than 100ms; After the blasting and excavation of the new tunnel, immediately check whether longitudinal cracks appear on the arch waist position on the side of the interlocking rock pillar near the existing tunnel. If so, suspend construction and reinforce the area.

[0016] The technical solution of this invention uses corrugated steel plates as interlocking components at the casting interface to form a mechanical interlocking interface on the surface of the interlocking rock column, thereby creating a reliable shear-resistant connection between the concrete support and the rock surface. By pouring the concrete support in layers and inserting through-anchor rods in each layer, prestressing is applied layer by layer, and combined with real-time monitoring and compensation of prestressing tension, the lateral deformation of the rock column is actively and continuously constrained. Then, by stacking the formwork layer by layer to the design height and using displacement rate and prestress loss rate as dual indicators to determine the effective closure of the structure, the concrete support and through-anchor rods form an integral closed load-bearing composite structure, thus significantly improving the stability of the interlocking rock column, controlling long-term deformation, and ensuring the safety of tunnel construction and operation. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.

[0018] Figure 1 This is a schematic flowchart of an embodiment of the construction method for reinforcing rock pillars in tunnels provided by the present invention.

[0019] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0021] It should be noted that if the embodiments of the present invention involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of the components in a specific posture. If the specific posture changes, the directional indicators will also change accordingly.

[0022] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the use of "and / or" or "and / or" throughout the text includes three parallel solutions. For example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

[0023] Currently, the common practice for reinforcing rock columns sandwiched in the middle is to construct cast-in-place concrete support walls on both sides of the rock column and install tie rods or prestressed anchors along the transverse direction to restrain the lateral expansion and shear deformation of the rock column. Some projects use shotcrete first and then install the system of anchors, or combine it with steel arch frames to form a combined support. By applying a certain preload to the anchors, confining pressure can be actively provided to the rock column during construction, improving its stress state. This is currently recognized as a relatively effective control measure.

[0024] However, existing concrete support methods still have significant shortcomings. On the one hand, the interfacial bond strength between cast-in-place concrete and the existing rock surface is limited. Under the action of blasting vibration and stress adjustment, the interface is prone to detachment and slippage, weakening the joint bearing effect. On the other hand, transverse tie rods often experience rapid prestress decay due to incomplete grouting and inadequate isolation measures in the free section. In addition, the independent construction of each layer of support and anchor makes it difficult to form a closed and coordinated bearing system between layers, resulting in long-term non-convergence of deformation of the interbedded rock column, posing a hidden danger to the safety of tunnel operation.

[0025] To address this technical problem, this invention proposes a construction method for reinforcing rock pillars sandwiched in tunnels.

[0026] Please see Figure 1 In one embodiment of the present invention, the construction method for reinforcing rock pillars in tunnels includes: Step S10: Corrugated steel plates are laid on both sides of the middle rock column as interlocking components for casting interface, and the corrugated steel plates form a mechanical interlocking interface with the surface of the rock column. Step S20: Erect a fixed steel formwork on one side of the middle rock column, and pour concrete support in layers, with the thickness of each layer being the preset layer height; Step S30: After the strength of the first layer of concrete reaches the preset strength threshold that allows drilling without cracking, a horizontal through hole is drilled within the thickness range of the first layer of concrete support. Step S40: Inject early-strength cement mortar into the horizontal through-hole and insert through-anchor rods; the free section of the through-anchor rod is wrapped with isolation material to form a tension free section; Step S50: After the grouting strength reaches the preset tensile strength threshold, an enlarged head pad is installed at the end of the through-hole anchor rod and a pre-tension force is applied to the design pre-tension force value. After stabilizing the pressure for a preset time and the pressure drop is less than a preset percentage, the anchor rod is locked. Step S60: Monitor the prestress loss rate of the through-hole anchor bolt; if the prestress loss rate exceeds a preset loss threshold, perform compensatory tensioning. Step S70: Remove the lower formwork and flip it upwards. Repeat the layered pouring, drilling, grouting, insertion of through-anchor rods, tensioning, monitoring and compensation procedures. Stack the concrete support layer by layer and insert the through-anchor rods layer by layer until the designed support height is reached. Step S80: After the concrete support and the through-anchor are fully constructed, monitor the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor. When the displacement rate of the surface displacement is less than the preset displacement threshold and the prestress loss rate is less than the preset stability threshold within a preset number of consecutive monitoring days, it is determined that the concrete support-anchor composite structure has formed an effective closure.

[0027] It should be noted that: "Intermediate rock column" refers to the original rock mass preserved between two tunnels in a small-clearance tunnel or a twin-arch tunnel. "Corrugated steel plate" is a thin steel plate with periodic corrugations, which interlocks with the subsequently poured concrete through its concave-convex shape. "Mechanical interlocking interface" refers to the tenon-and-mortise interlocking of the corrugated steel plate with the concrete, resisting interface shear slippage. "Preset layer height" is the pre-determined pouring height based on the stability of the formwork system and vibration requirements. "Through anchor" is a transverse tension member that penetrates the intermediate rock column and the concrete supports on both sides; the tension free section refers to the section of the anchor that does not participate in grouting bonding and can freely and elastically elongate. "Enlarged head pad" is a pad with a spherical bearing surface used to evenly transmit the anchor tension. "Design prestress value" is the final anchor tension value determined based on the support design. "Prestress loss rate" refers to the percentage decrease in prestress over time after locking. "Preset monitoring days," "displacement threshold," and "stability threshold" are the basis for determining whether the support system has formed a closed bearing capacity.

[0028] Specifically, corrugated steel plates are first laid on the surface of the rock column. After the concrete is poured, the corrugations interlock with the concrete, significantly improving the interfacial shear strength and preventing interlayer separation. Layered pouring reduces the lateral pressure on the formwork from a single pour and facilitates compaction. Through-anchor rods are inserted and tensioned within each layer of concrete support, effectively adding multiple active pressure-applying tie rods within the rock column to constrain its lateral expansion in real time. Monitoring and compensating for prestress eliminates force attenuation caused by anchor slippage and rock creep. By progressively stacking formwork upwards and repeating the above process, structural stability is ultimately confirmed using both surface displacement and prestress indicators. This ensures that each layer of support and anchor rods forms a closed load-bearing ring, placing the intercalated rock column under triaxial compression.

[0029] More specifically, in S10, first clean the slag and loose rock blocks from the sidewalls of the interlocking rock pillar. Lay corrugated steel plates flat on the existing tunnel lining surface or exposed rock surface, with the concave side of the corrugations facing the rock surface. Temporarily fix them with expansion bolts. The overlap length of adjacent steel plates in the vertical direction should not be less than 10cm, and they should be spot-welded to ensure interface continuity. In S20, erect a fixed steel formwork on one side of the rock pillar, and firmly support it with diagonal bracing and scaffolding on the outside. Then, pump concrete and pour it in layers, with a preferred layer height of 1.5m. Use an immersion vibrator to vibrate each layer. In S30, after the compressive strength of the first layer of concrete reaches the preset 15MPa, drill horizontal holes with a diameter of 52 to 55mm at intervals of 1.5m within the thickness of the concrete layer, extending to the opposite side. In S40, M20 early-strength cement mortar is first injected into the borehole, with the grouting pressure controlled between 0.3 and 0.5 MPa. Then, the through-anchor rod, with its free section wrapped with oiled plastic tape, is slowly inserted, ensuring the anchor rod is centered in the borehole. The free section wrapping isolates the grout, ensuring the rod can freely elongate during tensioning. In S50, after the mortar strength reaches at least 20 MPa, Ω-shaped enlarged head pads are fitted onto both ends of the anchor rod, and ball nuts are installed. A pre-calibrated torque wrench is used to gradually apply pre-tension to the design value, such as 90 kN, and the pressure is stabilized for 2 minutes. If the oil pressure drops by no more than 5%, it is tightened and locked. In S60, the first prestress monitoring is conducted 24 hours after locking. If the force value drops by more than 10%, the prestress is replenished to the design value using a torque wrench and re-locked. Monitoring is repeated until stability is achieved. In step S70, after all the procedures for this layer are completed and the prestress is stable, the lower layer of steel formwork is removed, and the formwork is flipped upwards to the next preset layer height. The procedures from S20 to S60 are repeated, with concrete poured layer by layer and through anchors installed until the design top elevation is reached. In step S80, after all supports and anchors are completed, convergence measuring points are set up on the rock wall and concrete surface, and force sensors are installed at the pad plate. Continuous monitoring is conducted for 7 days. When the displacement rate is continuously less than 0.5 mm / d and the prestress loss rate is less than 5%, it is determined that the concrete support and anchor system has formed an effective closure.

[0030] In an embodiment of the present invention, the step of laying corrugated steel plates on both sides of the middle rock column as interlocking members for casting interface, wherein the corrugated steel plates form a mechanical interlocking interface with the surface of the rock column, includes: Step S101: Select a Q235 corrugated steel plate with a wave height of 3cm, a wave pitch of 10cm, and a thickness of 3mm as the corrugated steel plate; Step S102: Lay the corrugated steel plate on the existing tunnel lining surface or exposed rock surface on both sides of the middle rock pillar, with the concave side of the corrugated plate facing the surface of the rock pillar. Step S103: The corrugated steel plate is temporarily fixed with expansion bolts, the spacing of the expansion bolts is not greater than 50cm; the overlap length of the corrugated steel plate in the vertical direction is not less than 10cm, and the overlap is connected by spot welding.

[0031] It should be noted that wave height refers to the vertical distance between the peaks and valleys of the ripples, while wave spacing is the horizontal distance between adjacent peaks. Q235 is a grade of ordinary carbon structural steel. Expansion bolts are used for temporary fixing of steel plates before concrete pouring.

[0032] Specifically, selecting the above waveform parameters allows the concrete and steel plate corrugations to form sufficient shear keys, the dense distribution of expansion bolts prevents the steel plate from shifting during casting, and the lap joint spot welding ensures the continuity of the steel plate in the vertical direction, forming a complete interface shear-resistant structure.

[0033] More specifically, corrugated steel plates should be procured or processed according to specifications, ensuring the corrugations are smooth and undamaged. The steel plates should be laid out with the concave side facing the rock mass, so that interlocking teeth can be formed in the concave areas after concrete is injected. Holes should be drilled in the rock surface or existing lining using an electric drill, and expansion bolts should be inserted, with spacing controlled within 50cm, and appropriately increased at the corners. After aligning the upper and lower layers of steel plates, ensure the overlap length is sufficient, and connect them by spot welding with welding rods, with weld points spaced approximately 20cm apart to prevent grout leakage and misalignment.

[0034] In an embodiment of the present invention, the preset layer height is 1.5m; the step of erecting a fixed steel formwork on one side of the interlocking rock column, and pouring concrete support in layers, with each layer having a thickness equal to the preset layer height, includes: Step S201: Use a 1.2m wide and 1.5m high standard steel formwork to erect the side formwork. The outside of the standard steel formwork is supported by a disc-lock scaffold with diagonal bracing. Each layer of the disc-lock scaffold is 0.6m high and fully covered with wooden planks. Step S202: Pour C20 concrete into the formwork using a delivery pump. After each layer is poured, compact it using an immersion vibrator. The preset strength threshold is when the concrete compressive strength reaches 15 MPa.

[0035] It should be noted that C20 indicates concrete with a standard cubic compressive strength of 20 MPa. "Pumping into formwork" refers to using a concrete pump truck to deliver concrete into the formwork via pipelines. "Disc-lock scaffolding" is a type of socket-type disc-lock steel pipe support.

[0036] Specifically, the determination of the preset layer height should comprehensively consider the lateral pressure of the formwork, the concrete pouring capacity, and the vibration effect. In this embodiment, based on the lateral pressure calculation according to the "Technical Specification for Safety of Formwork in Building Construction" JGJ 162—2008, when the layer pouring height is 1.5m, the maximum lateral pressure of the newly poured concrete on the formwork is approximately 45 kN / m. 2Using standardized steel formwork of this height in conjunction with disc-lock scaffolding can meet the load-bearing capacity and deformation requirements, and can achieve a continuous flow of pouring and vibration of a single layer within 2 hours. Drilling the hole after the concrete reaches a compressive strength of 15MPa ensures that the hole wall remains intact without collapsing or cracking, while avoiding excessively long isothermal time that could affect the progress. This 15MPa value is determined based on the empirical value of the 1-day strength of the C20 concrete used in this project at 20℃, which is approximately 75% of the design strength and is sufficient to withstand drilling disturbance.

[0037] More specifically, the prefabricated steel formwork is first assembled on the ground, then hoisted into place. A support frame is erected using disc-lock scaffolding uprights and horizontal bars, with a horizontal bar every 0.6m and wooden planks laid throughout. Steel pipe diagonal braces are used to tighten the formwork and adjust its verticality. C20 concrete is pumped into the formwork and spread in layers, each approximately 30cm thick. An immersion vibrator is used for rapid insertion and slow withdrawal to vibrate until the surface is smooth and free of air bubbles. After pouring, the concrete is covered and watered for curing for 12 to 18 hours. Drilling can begin once the compressive strength of the cured test blocks reaches 15MPa.

[0038] In an embodiment of the present invention, the step of drilling horizontal through holes within the thickness range of the first layer of concrete after the strength of the first layer of concrete reaches a preset strength threshold that allows drilling without breakage includes: Step S301: Determine the length of the through anchor rod according to the thickness of the middle rock column. The through anchor rod is made of Φ25 steel bar and has a length of 3.5m to 6m. Step S302, the through anchor rod is composed of several sections of steel bars connected by steel bar connecting sleeves, and the length of each section of steel bar is no more than 3m; In step S303, the ends of each section of reinforcing bar are machined with M30, 60° coarse threads, wherein the threaded section length of the anchor rod end is 200mm, the threaded section length of the end used for connecting sleeve is 120mm, and the end of the reinforcing bar is upset to Φ31 before threading; the diameter of the horizontal through hole is 52-55mm, and the spacing between rows is 1.5m; In step S304, M20 early-strength cement mortar is used for grouting, and the grouting pressure is controlled at 0.3-0.5 MPa. The compressive strength of the early-strength cement mortar is not less than 20 MPa 12 hours after grouting.

[0039] It should be noted that: Φ25 refers to the nominal diameter of the reinforcing bar of 25mm, and Φ31 is the diameter after upsetting. M30, 60° coarse thread indicates a coarse ordinary thread with a nominal diameter of 30mm and a thread angle of 60°. The reinforcing bar connecting sleeve is an internal thread sleeve used to extend reinforcing bars. The spacing between rows refers to the center distance in the horizontal and vertical directions between adjacent through holes.

[0040] Specifically, segmented connections are used for through-anchor bolts to adapt to operations in confined spaces. The reduction of the cross-sectional area at the anchor bolt rebar connection is a key control point. Taking a Φ25 rebar as an example, its nominal cross-sectional area is 490.9 mm². 2 This method involves end upsetting to Φ31, followed by machining an M30 thread. The resulting thread root diameter is approximately 26 mm, and its effective cross-sectional area is approximately 530 mm². 2 The cross-sectional area is larger than that of the original reinforcing bar, thus ensuring that the joint strength is not lower than that of the parent material. The hole diameter of 52-55mm is calculated based on the requirement that the maximum outer diameter of the Φ25 anchor rod with the Φ6 locator does not exceed 38mm, plus the requirement that the grouting thickness on both sides is not less than 7mm, which can ensure the grouting is dense. The early-strength mortar has a strength of not less than 20MPa after 12 hours, which is set based on the strength growth curve of M20 early-strength mortar under curing at 20℃, ensuring the rapid formation of the anchorage section and providing conditions for subsequent tensioning.

[0041] More specifically, the anchor bolt length specifications are determined based on the measured thickness of the rock column in the middle plus the thickness of the concrete supports on both sides. The required length of reinforcing steel is divided into sections no larger than 3m and transported to the tunnel. At the processing yard, the ends of each section of reinforcing steel are heated and upset to a diameter of 31mm, then machined with M30 coarse threads. The length is strictly controlled to 200mm at the anchor bolt end and 120mm at the connecting end, and a protective sleeve is fitted. Holes are drilled at 1.5m intervals on the concrete surface, using a guide rail drilling rig aligned with the marks to drill horizontal holes with a diameter of 52 to 55mm, penetrating the rock column and the supports on both sides. M20 early-strength cement mortar is injected from the bottom of the hole through the grouting pipe using a grouting pump, maintaining the grouting pressure at 0.3 to 0.5MPa. The grouting is stopped when thick grout is discharged from the hole opening, and the strength is checked after 12 hours.

[0042] In an embodiment of the present invention, the step of wrapping the free section of the through anchor rod with an insulating material to form a tensioned free section includes: Step S401: Determine the mortar anchoring section on the through anchor rod, apply oil to the rod body excluding the mortar anchoring section, and wrap it with a 5cm wide plastic strip. Step S402: Two sets of locators are installed on each through-anchor rod. The two sets of locators are respectively located at the near ends of both ends of the through-anchor rod. The locators are made of Φ6 plain round steel bars bent and welded to the through-anchor rod. Step S403: Before installing the through-hole anchor, inject M20 early-strength cement mortar into the borehole, and then insert the through-hole anchor.

[0043] It should be noted that the mortar anchoring section refers to the part of the rod body wrapped with grout and serving as a bonding and force-transferring element, while the free section is the section that is coated with oil and not bonded by grout. The locator is used to ensure that the anchor rod is centered in the borehole and to ensure that the surrounding mortar thickness is uniform.

[0044] Specifically, by applying oil and wrapping with plastic tape to effectively isolate the grout, the section of the rod can be freely extended during tensioning, establishing a clear and stable free section length. The positioner is placed near the end to ensure centering without obstructing the flow of grout in the middle.

[0045] More specifically, first, according to the design specifications for the start and end positions of the anchorage section, measure and mark from the outer end towards the inside of the hole. Apply calcium-based grease evenly to the non-anchorage section, then spirally wrap two layers of 5cm wide PVC plastic tape tightly, ensuring no exposed sections along the entire length. Use Φ6 plain round steel bars bent into circular brackets, with an outer diameter slightly smaller than the hole diameter, and weld them to the marked anchor rod locations, one set at each end, ensuring the protective layer thickness. Immediately after grouting, insert the anchor rod straight and at a uniform speed into the borehole to avoid grout segregation or displacement of the locator due to excessive speed. Temporarily fix it after insertion to the designed depth.

[0046] In an embodiment of the present invention, the enlarged head pad is Ω-shaped, made of Q235 steel, and the planar dimension of the enlarged head pad is 150mm. The grout has a diameter of 150mm, a thickness of 8mm, and a hole diameter of Φ40. After the grouting strength reaches a preset tensile strength threshold, an enlarged head pad is installed at the end of the through-anchor and a pre-tension force is applied to the designed pre-tension force value. The locking process, after stabilizing the pressure for a preset time and ensuring the pressure drop is less than a preset percentage, includes: Step S501: A spherical bottom nut is used to engage with the threaded end of the through-bolt; the designed preload value is 90kN; Step S502: Apply prestress using a torque wrench, and before construction, calibrate the relationship between the torque of the torque wrench and the anchor bolt tension outside the tunnel; the preset time is 2 minutes, and the preset percentage is 5%.

[0047] It should be noted that the Ω-shaped enlarged head pad has a hemispherical central bulge that forms a hinge with the spherical bottom nut, allowing for a certain deflection angle between the anchor rod axis and the pad's bearing surface, thus preventing bending moment. The spherical bottom nut refers to the nut's contact surface with the pad being spherical. The torque-tension calibration relationship is obtained using a tensile testing machine and is used to control construction tensioning.

[0048] Specifically, the design preload of 90kN is determined based on calculations using the minimum principal stress recovery value of the interlocking rock column and the required support resistance. In this embodiment, the rock column is approximately 5m wide, and based on an applied active confining pressure of 0.3MPa, the required axial tension of the anchor bolt is approximately 90kN. The Ω-shaped pad and spherical nut allow for automatic adjustment, ensuring the anchor bolt tension is perpendicular to the pad and improving the stress state. Stabilizing the pressure for 2 minutes and controlling the pressure drop to within 5% before locking ensures the anchor clamping and a tight joint surface. This 5% threshold is set according to the "Technical Specification for Rock and Soil Anchor Bolts" regarding pressure loss control after locking.

[0049] More specifically, place the Ω-shaped washer onto the anchor rod body with the convex spherical surface facing outwards, then screw in the spherical bottom nut, ensuring the inner spherical surface of the nut fits against the spherical surface of the washer. Confirm the design tension as 90kN. Outside the hole, use a calibration frame to pull the torque wrench and tension sensor against each other, read multiple sets of torque-to-tension values, and plot the curve. During construction, the operator applies force evenly to the stress torque value and holds the pressure for 2 minutes, observing the pressure gauge. If the pressure drop does not exceed 5%, tighten the anti-loosening nut to complete the locking.

[0050] In an embodiment of the present invention, after the grouting strength reaches a preset tensile strength threshold, the step of installing an enlarged head pad at the end of the through-anchor and applying a pre-tension force to the designed pre-tension force value, stabilizing the pressure for a preset time, and locking after the pressure drop is less than a preset percentage further includes: Step S510: When only one side of the tunnel is exposed during the excavation of the through-bolt, apply an initial pre-tension of 40kN. Step S520: After the end of the through-bolt is exposed by tunnel excavation on the other side, the pre-installed threaded protective packaging is removed, and a final pre-tension force of 90kN is applied to the other side. Step S530: After that, the prestress on the side where the prestress was first applied is further tensioned to 90kN to make the prestress on both sides of the middle rock column symmetrically balanced.

[0051] It should be noted that threaded protective packaging refers to the plastic film or tape wrapped around the threaded section at the end of the anchor bolt to prevent contamination of the threads during concrete pouring. Phased tensioning is necessary because the tunnel excavation on both sides is asynchronous, making it impossible to apply symmetrical tension from both ends simultaneously.

[0052] Specifically, applying only a portion of the prestress on the side excavated first can protect the rock column from initial deformation during single-sided excavation. After the anchor head is exposed on the other side, the full tension is applied and supplemented to achieve a balanced prestress state on both sides, thus preventing eccentric loading.

[0053] More specifically, the tunnel on the side with the rock pillar is constructed first, and the anchor bolt ends are exposed. At this point, washers and nuts are installed, and a torque wrench is used to apply 40kN of prestress and lock it, protecting the unexposed threads on the other side. As the tunnel on the other side is excavated and the anchor bolt ends are exposed, the protective layer is removed, washers and nuts are installed, and 90kN is applied and locked. Then, the work is returned to the side constructed first, and the prestress is checked with a torque wrench and tensioned again to 90kN to balance the force on both sides.

[0054] In an embodiment of the present invention, the step of monitoring the prestress loss rate of the through-bolt and performing compensatory tensioning when the prestress loss rate exceeds a preset loss threshold includes: Step S601: 24 hours after the prestressing of the through-bolt is locked, the first prestressing monitoring is performed; the preset loss threshold is 10%. Step S602: If the prestress loss rate is found to exceed 10%, use a torque wrench to re-tension to the design prestress value of 90kN and re-lock. Step S603: After the compensation tensioning is completed, monitoring is performed again until the prestress loss rate is less than 10%.

[0055] It should be noted that prestress monitoring can be performed using an anchor cable dynamometer installed behind the pad or by the torque method. The loss rate is equal to the difference between the initial locking force value and the current measured force value, divided by the initial locking force value.

[0056] Specifically, the prestress loss in the first 24 hours is mainly caused by the inward shrinkage of the anchorage and the tightness of the pad. Setting a 10% alarm line and making multiple compensations can effectively maintain effective confining pressure and prevent insufficient restraint due to relaxation.

[0057] More specifically, 24 hours after locking, measure the existing tension using a torque wrench or force gauge of the same calibration. Calculate the loss rate. If the measured tension is below 81 kN (i.e., the loss exceeds 10%), gradually tension the force to 90 kN using a torque wrench, then stabilize and lock it. Monitor again 48 hours after the additional tensioning. If the force still exceeds the limit, repeat the additional tensioning until the loss rate is below 10% in both adjacent monitoring cycles.

[0058] In an embodiment of the present invention, after the concrete support and the through-anchor are fully constructed, the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor are monitored. When the displacement rate of the surface displacement is less than a preset displacement threshold and the prestress loss rate is less than a preset stability threshold within a continuously preset number of monitoring days, the step of determining that the concrete support-anchor composite structure has formed an effective closure includes: Step S801: Displacement monitoring points are set up on the two side walls of the middle rock column and the surface of the concrete support, and displacement is measured using a convergence meter or measuring rod. Step S802: Install anchor gauges or strain gauges at the pad at the end of the through anchor bolt to monitor changes in prestress; the preset monitoring period is 7 days, the preset displacement threshold is 0.5 mm / d, and the preset stability threshold is 5%.

[0059] It should be noted that: a convergence meter is an instrument for measuring the change in distance between two points; a measuring rod combined with a dial indicator can also be used for measurement. Anchor cable gauges are vibrating wire force sensors. Displacement rate refers to the increment of displacement between two consecutive monitoring dates divided by the number of days between them.

[0060] Specifically, dual-indicator monitoring avoids the lag or false stability of a single indicator. The 7-day monitoring period is based on tunnel engineering monitoring practices and covers the main periods of initial stress and displacement adjustment. The displacement rate threshold of 0.5 mm / d is set according to the criteria for determining the basic stability of the surrounding rock in the "Technical Specification for Highway Tunnel Construction" JTG / T 3660—2020, and is calculated based on the rock column width in this project using a strain rate of 0.01%. The prestress loss rate stability threshold of 5% is to ensure that the residual anchoring force is not less than 95% of the design value. A displacement rate continuously less than 0.5 mm / d indicates that the rock column deformation tends to stop, and a prestress loss rate less than 5% indicates that the anchor bolt tension is basically constant. Both conditions being met simultaneously represent that the support-anchor bolt system has formed a closed bearing, and subsequent excavation can proceed.

[0061] More specifically, paired measuring points are set up on typical cross-sections of the supporting structure, and the daily relative displacement is measured using a convergence meter, with the data recorded. Anchor gauges are installed at the outer ends of the anchor bolts and connected to reading instruments. Measurements are taken at the same time each day for 7 consecutive days starting from the day after the structure is completed, and the daily displacement rate and total prestress loss rate are calculated. If the average daily displacement rate is less than 0.5 mm / d from day 5 to day 7 and the final loss rate is less than 5%, then the structure is considered closed.

[0062] In an embodiment of the present invention, after the completion of the construction of the concrete support and the through-anchor, the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor are monitored. When the displacement rate of the surface displacement is less than a preset displacement threshold and the prestress loss rate is less than a preset stability threshold within a continuous preset monitoring period, the concrete support-anchor composite structure is determined to have formed an effective closure. Following this step, the construction method for reinforcing interlocking rock columns in tunnels includes: Step S901: When excavating the new section of the tunnel on both sides of the middle rock pillar, control the excavation advance per cycle to not exceed the spacing of one steel frame. Step S902: The blasting uses low-power, low-detonation-velocity explosives, and the detonation interval between adjacent blasting segments is not less than 100ms. Step S903: After the blasting excavation of the new tunnel, immediately check whether longitudinal cracks appear on the arch waist position of the middle rock pillar near the existing tunnel. If so, suspend construction and reinforce it.

[0063] It should be noted that: the spacing between steel frames refers to the longitudinal distance between two adjacent steel arch frames in tunnel support, typically ranging from 0.5m to 1.0m. Low-power, low-velocity explosives refer to industrial explosives with relatively low detonation velocities and relatively gentle detonation pressures, such as emulsion explosives with added modifiers. The detonation interval is the nominal delay time between two detonators in a blasting network.

[0064] Specifically, after the closed structure is formed, the continued excavation of the tunnels on both sides will still disturb the rock pillar. Limiting the advance and using vibration-damping blasting can reduce the damage to the closed support caused by the blasting impact. After blasting, special attention should be paid to checking for cracks at the arch waist, as this is a point of unfavorable bending and tension. Once cracks are found, the excavation should be stopped in time and grouting or anchor bolts should be added for reinforcement to prevent sudden instability.

[0065] More specifically, during the excavation of adjacent sections with closed supports, the excavation length for each cycle must be strictly controlled according to the spacing of one steel frame, and over-excavation is prohibited. After the steel frames are erected, shotcrete must be sprayed in a timely manner to seal the area. The blasting design uses low-power explosives, and the delay interval between detonators in adjacent sections is no less than 100ms to stagger the superposition of vibration waves. After each blast, safety inspectors use high-intensity flashlights to check the rock wall near the arch waist of the existing tunnel's side rock pillar. If longitudinal cracks are visually detected or audibly hollow upon hammering, it must be reported immediately, excavation suspended, and reinforcement measures such as installing grouting anchors and grouting are taken.

[0066] The above description is merely an exemplary embodiment of the present invention and does not limit the scope of protection of the present invention. Any equivalent structural transformations made based on the technical concept of the present invention and the contents of the specification and drawings of the present invention, or direct / indirect applications in other related technical fields, are included within the scope of protection of the present invention.

Claims

1. A construction method for reinforcing rock pillars in tunnels, characterized in that, The construction method for reinforcing rock pillars in tunnels includes: Corrugated steel plates are laid on both sides of the middle rock column as interlocking components for casting interface, and the corrugated steel plates form a mechanical interlocking interface with the surface of the rock column. A fixed steel formwork was erected on one side of the rock column, and concrete support was poured in layers, with the thickness of each layer being the preset layer height. Once the strength of the first layer of concrete reaches a preset strength threshold that allows drilling without cracking, horizontal through holes are drilled within the thickness range supported by the first layer of concrete. Early-strength cement mortar is injected into the horizontal through-hole, and through-anchor rods are inserted; the free section of the through-anchor rod is wrapped with isolation material to form a tension free section; After the grouting strength reaches the preset tension threshold, an enlarged head pad is installed at the end of the through-anchor and a pre-tension force is applied to the design pre-tension force value. After stabilizing the pressure for a preset time and the pressure drop is less than a preset percentage, the anchor is locked. Monitor the prestress loss rate of the through-anchor bolts, and perform compensatory tensioning if the prestress loss rate exceeds a preset loss threshold; Remove the lower formwork and flip it upwards. Repeat the layered pouring, drilling, grouting, insertion of through-anchor bolts, tensioning, monitoring and compensation procedures. Stack the concrete supports layer by layer and insert through-anchor bolts layer by layer until the designed support height is reached. After the concrete support and the through-anchor are completed, monitor the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor. When the displacement rate of the surface displacement is less than the preset displacement threshold and the prestress loss rate is less than the preset stability threshold within a preset number of consecutive monitoring days, it is determined that the concrete support and anchor composite structure has formed an effective closure.

2. The construction method for reinforcing rock pillars in tunnels as described in claim 1, characterized in that, The step of laying corrugated steel plates on both sides of the middle rock column as interlocking components for casting interface, wherein the corrugated steel plates form a mechanical interlocking interface with the surface of the rock column, includes: A Q235 corrugated steel plate with a wave height of 3cm, a wave pitch of 10cm, and a thickness of 3mm is selected as the corrugated steel plate. The corrugated steel plate is laid on the existing tunnel lining surface or exposed rock surface on both sides of the middle rock column, with the concave side of the corrugation facing the surface of the rock column. The corrugated steel plate is temporarily fixed with expansion bolts, and the spacing between the expansion bolts is no more than 50cm; the overlap length of the corrugated steel plate in the vertical direction is no less than 10cm, and the overlap is connected by spot welding.

3. The construction method for reinforcing rock pillars in tunnels as described in claim 1, characterized in that, The preset layer height is 1.5m; the steps of erecting a fixed steel formwork on one side of the interlocking rock column, and pouring concrete support in layers, with each layer having a thickness equal to the preset layer height, include: The side formwork is erected using a 1.2m wide and 1.5m high standard steel formwork. The outside of the standard steel formwork is supported by a disc-lock scaffold with diagonal bracing. Each layer of the disc-lock scaffold is 0.6m high and fully covered with wooden planks. C20 concrete is poured using a conveyor pump into the formwork, and each layer is compacted using an immersion vibrator after pouring; the preset strength threshold is when the concrete compressive strength reaches 15MPa.

4. The construction method for reinforcing rock pillars in tunnels as described in claim 1, characterized in that, After the strength of the first layer of concrete reaches a preset strength threshold that allows for drilling without breakage, the step of drilling horizontal through holes within the thickness range of the first layer of concrete support includes: The length of the through anchor is determined based on the thickness of the interlocking rock column. The through anchor uses Φ25 steel bars and has a length of 3.5m to 6m. The through-anchor is composed of several sections of steel bars connected by steel bar connecting sleeves, and the length of each section of steel bar is no more than 3m. Each section of reinforcing bar is machined with M30, 60° coarse thread at the end. The threaded section at the end of the anchor rod is 200mm long, and the threaded section at the end used for connecting the sleeve is 120mm long. Before threading, the end of the reinforcing bar is upset to Φ31. The diameter of the horizontal through hole is 52-55mm, and the spacing between rows is 1.5m. The grouting uses M20 early-strength cement mortar, and the grouting pressure is controlled at 0.3-0.5 MPa. The compressive strength of the early-strength cement mortar is not less than 20 MPa 12 hours after grouting.

5. The construction method for reinforcing rock pillars in tunnels as described in claim 4, characterized in that, The steps for wrapping the free section of the through-bolt with insulating material to form the tension free section include: Identify the mortar anchorage section on the through anchor rod, apply oil to the rod body excluding the mortar anchorage section, and wrap it with a 5cm wide plastic strip; Each through-anchor is equipped with two sets of locators, which are respectively located near the ends of both ends of the through-anchor. The locators are made of Φ6 plain round steel bars bent and welded to the through-anchor. Before installing the through-hole anchor, M20 early-strength cement mortar is injected into the borehole, and then the through-hole anchor is inserted.

6. The construction method for reinforcing rock pillars in tunnels as described in claim 1, characterized in that, The enlarged head pad is Ω-shaped and made of Q235 steel. The planar dimension of the enlarged head pad is 150mm. The grout has a diameter of 150mm, a thickness of 8mm, and a hole diameter of Φ40. After the grouting strength reaches a preset tensile strength threshold, an enlarged head pad is installed at the end of the through-anchor and a pre-tension force is applied to the designed pre-tension force value. The locking process, after stabilizing the pressure for a preset time and ensuring the pressure drop is less than a preset percentage, includes: A spherical bottom nut is used to engage with the threaded end of the through-bolt; the design preload value is 90kN; Prestress is applied using a torque wrench, and the relationship between the torque of the torque wrench and the tension of the anchor bolt is calibrated outside the tunnel before construction; the preset time is 2 minutes, and the preset percentage is 5%.

7. The construction method for reinforcing rock pillars in tunnels as described in claim 6, characterized in that, After the grouting strength reaches the preset tensile strength threshold, the following steps are also included: installing an enlarged head pad at the end of the through-anchor and applying a pre-tension force to the designed pre-tension force value, stabilizing the pressure for a preset time, and locking the anchor after the pressure drop is less than a preset percentage: When only one side of the tunnel is exposed during the excavation of the through-bolt, an initial preload of 40 kN is applied; After the end of the through-bolt is exposed by tunnel excavation on the other side, the pre-installed threaded protective packaging is removed, and a final pre-tension of 90kN is applied to the other side. Subsequently, the prestress on the side where the initial prestress was applied was further tensioned to 90 kN, so that the prestress on both sides of the middle rock column is symmetrically balanced.

8. The construction method for reinforcing rock pillars in tunnels as described in claim 1, characterized in that, The step of monitoring the prestress loss rate of the through-bolt and performing compensatory tensioning when the prestress loss rate exceeds a preset loss threshold includes: The first prestress monitoring is conducted 24 hours after the prestress of the through-bolt is locked; the preset loss threshold is 10%. If the prestress loss rate is found to exceed 10%, a torque wrench is used to re-tension the prestress to the design prestress value of 90kN and then re-lock it. After the compensation tensioning is completed, monitoring is carried out again until the prestress loss rate is less than 10%.

9. The construction method for reinforcing rock pillars in tunnels as described in claim 1, characterized in that, After the concrete support and the through-anchor are fully constructed, the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor are monitored. When the displacement rate of the surface displacement is less than a preset displacement threshold and the prestress loss rate is less than a preset stability threshold within a preset number of consecutive monitoring days, the step of determining that the concrete support-anchor composite structure has formed an effective closure includes: Displacement monitoring points are set up on the two side walls of the middle rock column and the surface of the concrete support, and displacement is measured using a convergence meter or measuring rod. Anchor gauges or strain gauges are installed at the pad at the end of the through anchor bolt to monitor changes in prestress; the preset monitoring period is 7 days, the preset displacement threshold is 0.5 mm / d, and the preset stability threshold is 5%.

10. The construction method for reinforcing rock pillars in tunnels as described in any one of claims 1 to 9, characterized in that, After the concrete support and the through-anchor are fully constructed, the surface displacement of the interlocking rock column and the prestress stability value of the through-anchor are monitored. When the displacement rate of the surface displacement is less than a preset displacement threshold and the prestress loss rate is less than a preset stability threshold within a preset number of consecutive monitoring days, the concrete support-anchor composite structure is determined to have formed an effective closure. Following this step, the construction method for reinforcing interlocking rock columns in tunnels includes: When excavating new sections of tunnels on both sides of the central rock pillar, the excavation advance per cycle shall not exceed the spacing of one steel frame. The blasting uses low-power, low-velocity explosives, and the detonation interval between adjacent blasting segments is not less than 100ms; After the blasting and excavation of the new tunnel, immediately check whether longitudinal cracks appear on the arch waist position of the rock pillar in the middle, close to the existing tunnel. If so, suspend construction and reinforce it.