A method for controlling settlement by grouting and filling the overlying strata at the mining boundary
By selecting the grouting layer for overburden separation, identifying leakage risk areas, dynamically adjusting grout properties and grouting parameters, and establishing a mining-grouting coordination mechanism in conjunction with ground monitoring feedback, the problems of grout leakage and ground grouting under mining boundary conditions were solved, achieving efficient and precise grouting sealing and surface subsidence reduction.
Patent Information
- Application Number
- CN202611502993.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-24
- Publication Date
- 2026-11-17
AI Technical Summary
Under mining boundary conditions, the overburden separation grouting filling technology has the risk of grout leakage and surface grouting. Existing technologies have failed to effectively achieve precise and efficient grouting sealing and surface settlement reduction.
By selecting the grouting layer for overburden separation, identifying areas with leakage risk, dynamically adjusting grout properties and grouting parameters, and establishing a coordinated extraction and injection mechanism in conjunction with ground monitoring feedback, precise and efficient grouting sealing and surface subsidence reduction can be achieved.
It achieves efficient and precise grouting and sealing, reduces the risk of grout leakage, effectively controls surface subsidence, and improves the safety and accuracy of grouting.
Smart Images

Figure CN123109764A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of green mining in coal mines, and in particular relates to a method for controlling settlement by grouting and filling the overlying strata at the mining boundary. Background Technology
[0002] With the depletion of well-preserved coal resources, coal-bearing structures beneath existing buildings and structures have become a bottleneck restricting resource extraction and the sustainable development of enterprises. There are various methods for mining coal-bearing structures beneath these structures, and overburden separation grouting technology is widely used due to its advantages such as non-interference during mining and filling, low initial investment, efficient solid waste disposal, and strong adaptability. Overburden separation grouting technology utilizes the goaf to develop below the target critical layer, and then uses borehole pumping for large-scale grouting filling over its relatively long duration. Due to early mining planning, coal-bearing structures are often located at the end of the working face. Therefore, to improve the efficiency and cost-effectiveness of overburden separation grouting, it is generally only carried out within the area of the coal-bearing structure. This results in overburden separation grouting facing a mining boundary condition on one side. Under these conditions, overburden separation grouting faces the problem of grout leakage into the goaf rock mass and surface. Improper handling can lead to surface grouting and underground grouting collapse, seriously affecting the surface subsidence reduction effect.
[0003] The paper "Characteristics and Settlement Reduction Mechanism of Grouting for Overburden Delamination in Coal Columns Protected by Buildings" and existing technologies have preliminarily discussed the application of overburden delamination grouting technology in coal columns protected by buildings. However, it does not cover how to adjust the grout material according to the overburden zoning, or how to establish a monitoring and feedback mechanism to achieve precise and efficient grouting and sealing and ground settlement reduction.
[0004] Therefore, in order to reduce the risk of grout loss and potential safety accidents, and to achieve more precise and effective grouting for settlement reduction, a more precise and efficient method for grouting, filling, sealing, and controlling settlement of overburden delamination at mining boundaries is needed, taking into account the development characteristics of overburden delamination fissures and the differentiated requirements of surface protection levels. Summary of the Invention
[0005] For overburden separation grouting projects under mining boundary conditions on one side of the protective coal pillar, in order to achieve efficient and precise grouting sealing and surface settlement reduction, a method for controlling settlement through overburden separation grouting at the mining boundary is proposed, including: For the target mine, select the grouting layer for overburden separation; identify the risk area of grout leakage during overburden separation filling at the mining boundary; Based on the reasonable distribution range of the grout in the overburden, the required water-cement ratio of the grout material is determined, including: determining the distance from the grouting layer to the interface between the bedrock and topsoil layer and the interface between the caving zone and the water-conducting fracture zone, based on the geological columnar structure, key layers, and grouting layer location; that is, the maximum diffusion distance of the grout in the overburden; and using the established grout water-cement ratio calculation formula. Using the constraint that the slurry diffusion distance is less than the upper and lower interfaces of the reasonable distribution range, calculate the upper limit of the slurry water-cement ratio that will not trigger the risk of cross-boundary leakage. Where R is the maximum slurry diffusion distance. d Let be the fracture aperture, t be the grouting time, r0 be the borehole radius, W / C be the water-cement ratio, ΔP be the grouting pressure difference, A, B, m, and n be the grout fitting constants obtained from laboratory tests, and τ0 be the grout yield stress. m p The plastic viscosity of the slurry is given by, ; Based on the location of the core ground protection buildings and the area of the protected coal pillars, the surface subsidence reduction is divided into three areas: the primary protection control area, the secondary monitoring buffer area, and the tertiary pre-mining transition area. Based on the different surface subsidence reduction zones, the distribution location and number of overburden separation grouting boreholes are determined; As the working face advances from the transition zone to the protection and control zone, the grout properties and grouting parameters are dynamically adjusted to enhance the sealing effect of the grout on rock mass fissures and the retention effect of the grout in the delamination space and fissures.
[0006] Furthermore, this also includes establishing a ground monitoring feedback and injection coordination mechanism, including: A three-dimensional high-density resistivity array was deployed along the mining boundary on the surface to invert the grout distribution range and sealing effect in real time, and to correct the grout performance and pressure. High-precision surface subsidence monitoring was carried out in the grouting area to dynamically feed back and adjust the underground coal mining progress and the surface grouting intensity, and a mining-grouting coordinated coupling model based on surface subsidence constraints was constructed.
[0007] Among them, v s v represents the measured settlement rate of the boundary surface. m To achieve the daily advance rate of the working face, r gs The injection-to-mining ratio, calculated as the dry ash volume of grouting divided by the daily raw coal mining volume, is R. bound The wedge-shaped correction radius for the grout diffusion is given by: ξ, which is the separation space correction coefficient, obtained through physical simulation or field measurement, and generally 0 < ξ ≤ 1. The smaller ξ is, the more significant the wedge shrinkage effect. K0 is the comprehensive influence coefficient of overburden geology, ranging from 0.1 to 0.5. ψ is the grout leakage risk correction coefficient, generally between 0.6 and 1. W / C is the water-cement ratio, and ΔP is the grouting pressure difference. Based on the production-injection synergy coupling model, quantitative control factors are identified, and a production-injection synergy mechanism linking surface zoning monitoring and three-level subsidence early warning is established.
[0008] Furthermore, based on the different ground subsidence reduction zones, the distribution location and number of overburden separation grouting boreholes are set, including the ground locations of the boreholes being arranged near the ground boundary between the primary protection control zone and the secondary monitoring buffer zone, and near the ground boundary between the secondary monitoring buffer zone and the tertiary pre-mining transition zone.
[0009] Furthermore, dynamic adjustment of grout properties and grouting parameters includes: Initially, large-particle, fast-setting composite diluted grout is used in the first row of grouting directional holes adjacent to the goaf. Low-pressure intermittent grouting is carried out with a grouting pressure ≤1MPa, a grout water-cement ratio greater than 1.2, an initial setting time of no more than 2 days, and grout solid particles no more than 2mm. Intermittent 0.5-1 hour circulation grouting is used to block the flow of grout to the far-end fissures of the overlying rock in the goaf, forming a dam-sealing curtain to reduce the subsequent grout leakage and diffusion distance and amount. In the medium term, high-flow, medium-consistency, high-pressure grouting operations will be carried out in the remaining grouting holes adjacent to the goaf area and in the boreholes near the junction of the secondary monitoring buffer zone and the tertiary goaf transition zone. The water-cement ratio can be appropriately adjusted to 0.9-1.2, and the grouting pressure is 1-2 MPa. During this stage, the narrow cracks near the delamination space will be quickly filled to reduce the overburden subsidence space and reduce the impact of surface subsidence in the tertiary goaf transition zone and the secondary monitoring buffer zone on the primary protection control zone. In the later stages, high-consistency, high-pressure, uniform and continuous grouting operations were carried out in the secondary monitoring buffer zone and the primary protection control zone. The water-cement ratio was reduced to 0.6-0.9 and the grouting pressure was greater than 2MPa. During this stage, the thick delamination space cavity was quickly filled to form a dense support carrier for the overburden and effectively control surface subsidence.
[0010] Furthermore, establish a coordinated mechanism for surface zoning monitoring and a three-tiered subsidence early warning system, including: When the surface subsidence velocity within the secondary monitoring buffer zone is less than 0.5 mm / d, the working face advance speed should be appropriately increased by 10%-20% to improve mining efficiency; the water-ash ratio should be appropriately increased by 0.1-0.2 to increase fly ash consumption and reduce cement usage. Mild subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is 0.5-1 mm / d, the working face advance speed is reduced by 10%-20%, the water-cement ratio is reduced by 0.1-0.2, the grouting pressure is increased by 0.2-0.3 MPa, and the daily grouting volume is slightly increased; Moderate subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is 1-2 mm / d, the working face advance speed is reduced by 30%-50%, the water-cement ratio is reduced by 0.2-0.3, the injection-production ratio is increased to 0.6-0.7, and the filling degree of the separation space is improved; Severe subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is >2mm / d, the working face advance speed is reduced to ≤1m / d; if cracks appear in the structure, mining is temporarily suspended; high-concentration slurry is used to quickly seal the newly formed cracks and delamination spaces, and high-pressure filling is carried out in the cavities; pressure is maintained and grouting is carried out continuously throughout the day, and the grouting process is carried out in advance. Coal mining operations are carried out after the surface subsidence has stabilized.
[0011] Beneficial effects: This invention addresses the overburden separation grouting project under mining boundary conditions on one side of the protective coal pillar. It achieves efficient and precise grouting and sealing, as well as surface subsidence reduction. Based on the reasonable distribution range of the grout in the overburden layer, the required water-cement ratio of the grout material is determined, ensuring that the grouting does not trigger the risk of cross-boundary leakage.
[0012] The boreholes are located near the ground boundary between the primary protection control zone and the secondary monitoring buffer zone, and near the ground boundary between the secondary monitoring buffer zone and the tertiary pre-mining transition zone. Different grouting borehole parameters are set according to different zones, which can quickly fill the delamination space and block the transmission of overlying rock subsidence in the mined-out area to the grouting area. The grout can quickly build dams to seal the overlying rock fissures in the mined-out area, while taking into account both drilling efficiency and subsidence reduction effect.
[0013] As the working face advances from the pre-mining transition zone to the protection and control zone, dynamically adjusting the grout properties and grouting parameters increases the sealing effect of the grout on rock fissures and the retention effect of the grout in the delamination space and fissures. Adjusting the grout properties and grouting parameters according to the initial, middle and late stages can block the grout from flowing to the far-end fissures of the overlying strata in the goaf, forming a dam-sealing curtain and reducing the subsequent grout leakage and diffusion distance and amount; it can quickly fill narrow fissures near the delamination space, reduce the space for overlying strata subsidence, and reduce the impact of surface subsidence in the third-level pre-mining transition zone and the second-level monitoring buffer zone on the first-level protection and control zone; it can quickly fill the thick delamination space cavity, forming a dense support carrier for the overlying strata and effectively control surface subsidence.
[0014] Establishing a ground monitoring feedback and injection coordination mechanism can enable high-precision monitoring of surface subsidence in the grouting area, dynamically feedback and adjust the underground coal mining progress and ground injection intensity, invert the grout distribution range and sealing effect in real time, and correct the grout performance and pressure.
[0015] Meanwhile, the overburden separation grouting and sealing method proposed in this invention helps to achieve dynamic quantitative linkage control of mining and injection and efficient modular zoned mining-injection management. It scientifically and rationally guides the layout of overburden separation grouting boreholes, reduces the blindness of overburden separation grouting for settlement reduction, and improves the accuracy, pertinence, and safety and reliability of overburden separation grouting and surface control for settlement reduction. It is particularly applicable to engineering sites with high risk of surface grout leakage during overburden separation grouting under mining boundary conditions on one side of coal-bearing areas. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 Flowchart of the method for grouting and sealing the overlying strata at the mining boundary to control settlement. Figure 2 Schematic diagram for defining the boundary range of grouting for overburden. In the diagram: 1. Borehole; 2. Separation space; 3. Key injection layer; 4. Isolation layer; 5. Boundary between caving zone and water-conducting fracture zone; 6. Boundary between bedrock and topsoil; 7. Surface; 8. Coal seam; 9. Goaf. Detailed Implementation
[0018] The technical solutions in the embodiments of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are merely some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.
[0019] like Figure 1-2 As shown, this invention addresses the overburden separation grouting project under mining boundary conditions on one side of the protective coal pillar. To achieve efficient and precise grouting sealing and surface subsidence reduction, a method for controlling subsidence through grouting and filling at the mining boundary overburden separation is proposed, comprising: For the target mine, select the grouting layer for overburden separation; identify the risk area of grout leakage during overburden separation filling at the mining boundary; Based on the reasonable distribution range of the grout in the overburden, the required water-cement ratio of the grout material is determined, including: determining the distance from the grouting layer to the interface between the bedrock and topsoil layer and the interface between the caving zone and the water-conducting fracture zone, based on the geological columnar structure, key layers, and grouting layer location; that is, the maximum diffusion distance of the grout in the overburden; and using the established grout water-cement ratio calculation formula. Using the constraint that the slurry diffusion distance is less than the upper and lower interfaces of the reasonable distribution range, calculate the upper limit of the slurry water-cement ratio that will not trigger the risk of cross-boundary leakage. Where R is the maximum slurry diffusion distance. d Let be the fracture aperture, t be the grouting time, r0 be the borehole radius, W / C be the water-cement ratio, ΔP be the grouting pressure difference, A, B, m, and n be the grout fitting constants obtained from laboratory tests, and τ0 be the grout yield stress. m p The plastic viscosity of the slurry is given by, ; Based on the location of the core ground protection buildings and the area of the protected coal pillars, the surface subsidence reduction is divided into three areas: the primary protection control area, the secondary monitoring buffer area, and the tertiary pre-mining transition area. Based on the different surface subsidence reduction zones, the distribution location and number of overburden separation grouting boreholes are determined; As the working face advances from the transition zone to the protection and control zone, the grout properties and grouting parameters are dynamically adjusted to enhance the sealing effect of the grout on rock mass fissures and the retention effect of the grout in the delamination space and fissures.
[0020] In a specific implementation, for the target mine, the grouting layer for overburden separation is selected, specifically as follows: For the target mine, the grouting layer for overburden separation is selected. The location of the critical stratum can be determined based on the physical and mechanical parameters of the overburden and the critical stratum judgment formula, or it can be determined using critical stratum judgment software. The grouting layer for overburden separation is located in the strata above the water-conducting fracture zone + isolation layer and below the adjacent critical stratum. The isolation layer thickness is 5 times the mining height. The calculation formula for the water-conducting fracture zone can refer to the calculation formula for the height of the water-conducting fracture zone in overburden of different hardness in the "Specifications for the Retention of Coal Pillars and Coal Mining in Buildings, Water Bodies, Railways and Main Shafts", or it can be calculated using the measured method. The height of the water-conducting fracture zone is generally selected as the maximum value of multiple calculation results. The measured method calculation formula is H. 裂 =kH, where k The ratio of cracked to extracted material; H To extract high.
[0021] In a specific implementation, the risk area for leakage of grout filling slurry at the mining boundary overburden separation is identified, specifically as follows: By using physical or numerical simulations of similar materials, a model of the overburden separation grouting and backfilling migration of the target mine is constructed. This model is used to deduce the spatial morphology of the separation layer and the spatiotemporal evolution of mining fractures throughout the entire working face advancement process, and to predict potential high-risk areas for grout leakage in advance.
[0022] Exploration and observation boreholes were arranged before and after the coal pillar line at the engineering site to carry out full-hole core sampling, segmented borehole television observation, and in-situ measurement of delamination location, fracture aperture, continuity, and fracture zone distribution to correct the deviation of the simulation model. By integrating simulations of fracture evolution with in-situ measured data from borehole inspection, leakage areas such as the location of surrounding rock fractures in the overburden separation space, coal pillar boundary fractures, and overburden fractures in the goaf are identified, thus pinpointing high-risk areas for slurry leakage.
[0023] In a specific implementation, the required water-cement ratio of the grout material is determined based on the reasonable distribution range of the grout in the overburden layer. Specifically, The optimal distribution range of grout in the overburden is defined as extending from the interface between the bedrock and topsoil to the interface between the caving zone and the water-conducting fracture zone. Beyond these interfaces, there is a risk of surface grout leakage and downhole grout inrush. Based on geological information regarding the strata column, key layers, and the location of the grouting layer, the distances from the interface between the bedrock and topsoil to the interface between the caving zone and the water-conducting fracture zone are determined. This distance represents the maximum required diffusion distance of the grout within the overburden. A formula for calculating the water-cement ratio of the grout is then established based on this.
[0024] R is the maximum slurry diffusion distance. d denoted as fissure aperture, t as grouting time, r0 as borehole radius, W / C as water-cement ratio, and ΔP as grouting pressure difference.
[0025] A, B, m, and n are the slurry fitting constants obtained from indoor tests, and τ0 is the slurry yield stress. m p This refers to the plastic viscosity of the slurry.
[0026]
[0027] Using the constraint that the slurry diffusion distance is less than the upper and lower interfaces of the reasonable distribution range, calculate the upper limit of the water-cement ratio of the slurry that will not trigger the risk of cross-boundary leakage.
[0028] In specific implementation methods, different levels of surface protection zones are delineated based on the surface protection level and the extent of the coal pillar. Specifically, Based on the location of the core ground protection buildings and the area of the protected coal pillars, the surface subsidence reduction is divided into three zones: the primary protection control zone, the secondary monitoring buffer zone, and the tertiary pre-mining transition zone.
[0029] The primary protection control zone range is S1 = L0 + (50~100)m L0 is the outer contour line of the core protected building; the floating value is selected according to the building type: 100m for buildings, and 50m for single-story factories / pipelines; The area has a high level of protection for buildings and facilities, and therefore requires strict control over surface subsidence and deformation. Provided that the subsidence and deformation values of surface structures fall within the Class I damage range specified in the "Specifications for Coal Pillar Retention and Coal Mining under Pressure in Buildings, Water Bodies, Railways and Main Shafts," the allowable surface subsidence value for the Class I protection control area is set at 100mm.
[0030] The secondary monitoring buffer zone primarily serves to monitor, warn, and intervene in the subsidence of the primary surface protection control area. The zone's area is S2 = S1 + (150~300) m, with 150 m for densely populated areas and 300 m for open farmland. The maximum surface subsidence within the warning zone should not exceed 200 mm, and the subsidence rate warning threshold should be ≤2 mm / d.
[0031] The Level 3 transition zone S3 is mainly located in the surface area near the protective coal pillar line, adjacent to the ungrouted goaf area. It is a natural transition zone where the surface subsidence reduction effect of overburden separation grouting becomes apparent. Its range is S3 = S2 + (150~300) m. Subsidence in this area should be minimized as much as possible to prevent the transmission of goaf subsidence to the Level 1 protection control area.
[0032] In a specific implementation, the design and layout of the overburden separation grouting boreholes are as follows: The boreholes were located near the boundary between the primary protection control zone and the secondary monitoring buffer zone, and near the boundary between the secondary monitoring buffer zone and the tertiary pre-mining transition zone. Since the working face advances from the tertiary pre-mining transition zone to the primary protection control zone, the number of boreholes in the first row is crucial for achieving the "fulcrum" effect of sealing overburden delamination fractures, controlling cantilever key layers, and reducing surface subsidence.
[0033] In the area near the ground boundary between the secondary monitoring buffer zone and the tertiary near-goaf transition zone, at least two grouting boreholes and at least one directional sealing borehole can be arranged according to the actual situation. The grouting boreholes are vertical boreholes with a horizontal spacing of 15-30m. The bottom of the borehole is located below the key layer and is used to quickly fill the delamination space and block the transmission of overlying strata subsidence in the goaf to the grouting area. The directional sealing borehole is more than 15m apart from the grouting borehole, and the bottom burial depth is not less than the burial depth of the key layer plus the mining height. It is located outside the protective coal pillar and facing the goaf and is used to quickly build a dam with grout to seal the overlying strata fissures in the goaf. In the area near the ground boundary between the primary protection control zone and the secondary monitoring buffer zone, at least two grouting boreholes can be arranged with a horizontal spacing of 25-50m, taking into account both drilling efficiency and subsidence reduction effect. Dynamic observation holes are arranged at the centerline of the working face in the secondary monitoring buffer area, and channels for the installation of three-dimensional resistivity electrodes and fiber optic grating survey lines are reserved to realize dynamic monitoring and feedback of overburden fissure delamination, slurry distribution, and filling effect during the injection process.
[0034] In a specific implementation, the temporal dynamic adjustment of grout properties and grouting parameters is as follows: As the working face advances from the pre-mining transition zone to the protection and control zone, in order to increase the sealing effect of the grout on rock mass fissures and the retention effect of the grout in the delamination space and fissures, Initially, large-particle, fast-setting composite diluted grout is used in the first row of grouting directional holes adjacent to the goaf. Low-pressure intermittent grouting is carried out with a grouting pressure ≤1MPa, a grout water-cement ratio greater than 1.2, an initial setting time of no more than 2 days, and grout solid particles no more than 2mm. Intermittent 0.5-1 hour circulation grouting is used to block the flow of grout to the far-end fissures of the overlying rock in the goaf, forming a dam-sealing curtain to reduce the subsequent grout leakage and diffusion distance and amount. In the medium term, high-flow, medium-consistency, high-pressure grouting operations will be carried out in the remaining grouting holes adjacent to the goaf area and in the boreholes near the junction of the secondary monitoring buffer zone and the tertiary goaf transition zone. The water-cement ratio can be appropriately adjusted to 0.9-1.2, and the grouting pressure is 1-2 MPa. During this stage, the narrow cracks near the delamination space will be quickly filled to reduce the overburden subsidence space and reduce the impact of surface subsidence in the tertiary goaf transition zone and the secondary monitoring buffer zone on the primary protection control zone. In the later stages, high-consistency, high-pressure, uniform and continuous grouting operations were carried out in the secondary monitoring buffer zone and the primary protection control zone. The water-cement ratio was reduced to 0.6-0.9 and the grouting pressure was greater than 2MPa. During this stage, the thick delamination space cavity was quickly filled to form a dense support carrier for the overburden and effectively control surface subsidence.
[0035] In a specific implementation, the optimization of ground monitoring feedback and injection / sampling coordination includes, specifically: A three-dimensional high-density resistivity array is deployed along the mining boundary on the surface to invert the grout distribution range and sealing effect in real time, and to correct the grout performance and pressure. High-precision surface subsidence monitoring is carried out in the grouting area to dynamically feed back and adjust the underground coal mining progress and surface grouting intensity. A mining-injection coordinated coupling model based on surface subsidence constraints is constructed to identify quantitative control factors and establish a mining-injection coordinated mechanism that combines surface zoning monitoring with a three-level subsidence early warning system.
[0036] The injection-production synergistic coupling model based on surface subsidence constraints is as follows:
[0037] v s The measured settlement rate of the boundary surface. v m To achieve the daily advance rate of the working face, r gs The injection-to-mining ratio, calculated as the dry ash volume of grouting divided by the daily raw coal mining volume, is R. boundThe wedge-shaped correction radius for grout diffusion at the mining boundary is defined by ξ, which is the delamination space correction coefficient. This coefficient can be obtained through physical simulation or field measurement, and is generally set to 0 < ξ ≤ 1. The smaller the value of ξ, the more significant the wedge-shaped shrinkage effect. K0 is the comprehensive influence coefficient of overburden geology (burial depth, key layer, overburden lithology), with a value range of 0.1-0.5. Higher values are used for shallowly buried soft rock with a lack of thick, hard key layers, while lower values are used for deep burial with multiple thick, hard key layers. ψ is the grout leakage risk correction coefficient, generally between 0.6 and 1. The higher the leakage risk, the larger the value. W / C is the water-cement ratio, and ΔP is the grouting pressure difference.
[0038] In a specific implementation plan, a coordinated mechanism for surface zoning monitoring and a three-tiered subsidence early warning system linking extraction and injection is established. Specifically, this involves... When the surface subsidence velocity in the secondary monitoring buffer area is less than 0.5 mm / d, the working face advance speed should be appropriately increased by 10%-20% to improve mining efficiency; the water-ash ratio should be appropriately increased by 0.1-0.2 to increase fly ash consumption and reduce cement usage.
[0039] Mild subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is 0.5-1 mm / d, the working face advance speed is reduced by 10%-20%, the water-cement ratio is reduced by 0.1-0.2, the grouting pressure is increased by 0.2-0.3 MPa, and the daily grouting volume is slightly increased.
[0040] Moderate subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is 1-2 mm / d, the working face advance speed is reduced by 30%-50%, the water-cement ratio is reduced by 0.2-0.3, the injection-production ratio is increased to 0.6-0.7, and the filling degree of the separation space is improved.
[0041] Severe subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is >2mm / d, the working face advance speed is reduced to ≤1m / d; if cracks appear in the structure, mining is temporarily suspended; high-concentration slurry is used to quickly seal the newly formed cracks and delamination spaces, and high-pressure filling is carried out in the cavities; pressure is maintained and grouting is carried out continuously throughout the day, and the grouting process is carried out in advance. Coal mining operations are carried out after the surface subsidence has stabilized.
[0042] This invention addresses the overburden separation grouting project under mining boundary conditions on one side of the protective coal pillar. It achieves efficient and precise grouting and sealing, as well as surface subsidence reduction. Based on the reasonable distribution range of the grout in the overburden layer, the required water-cement ratio of the grout material is determined, ensuring that the grouting does not trigger the risk of cross-boundary leakage.
[0043] The boreholes are located near the ground boundary between the primary protection control zone and the secondary monitoring buffer zone, and near the ground boundary between the secondary monitoring buffer zone and the tertiary pre-mining transition zone. Different grouting borehole parameters are set according to different zones, which can quickly fill the delamination space and block the transmission of overlying rock subsidence in the mined-out area to the grouting area. The grout can quickly build dams to seal the overlying rock fissures in the mined-out area, while taking into account both drilling efficiency and subsidence reduction effect.
[0044] As the working face advances from the pre-mining transition zone to the protection and control zone, dynamically adjusting the grout properties and grouting parameters increases the sealing effect of the grout on rock fissures and the retention effect of the grout in the delamination space and fissures. Adjusting the grout properties and grouting parameters according to the initial, middle and late stages can block the grout from flowing to the far-end fissures of the overlying strata in the goaf, forming a dam-sealing curtain and reducing the subsequent grout leakage and diffusion distance and amount; it can quickly fill narrow fissures near the delamination space, reduce the space for overlying strata subsidence, and reduce the impact of surface subsidence in the third-level pre-mining transition zone and the second-level monitoring buffer zone on the first-level protection and control zone; it can quickly fill the thick delamination space cavity, forming a dense support carrier for the overlying strata and effectively control surface subsidence.
[0045] Establishing a ground monitoring feedback and injection coordination mechanism can enable high-precision monitoring of surface subsidence in the grouting area, dynamically feedback and adjust the underground coal mining progress and ground injection intensity, invert the grout distribution range and sealing effect in real time, and correct the grout performance and pressure.
[0046] Meanwhile, the overburden separation grouting and sealing method proposed in this invention helps to achieve dynamic quantitative linkage control of mining and injection and efficient modular zoned mining-injection management. It scientifically and rationally guides the layout of overburden separation grouting boreholes, reduces the blindness of overburden separation grouting for settlement reduction, and improves the accuracy, pertinence, and safety and reliability of overburden separation grouting and surface control for settlement reduction. It is particularly applicable to engineering sites with high risk of surface grout leakage during overburden separation grouting under mining boundary conditions on one side of coal-bearing areas.
Claims
1. A method for controlling settlement by grouting and filling the overlying strata at the mining boundary, characterized in that, include, For the target mine, select the grouting layer for overburden separation; identify the risk area of grout leakage during overburden separation filling at the mining boundary; Based on the reasonable distribution range of the grout in the overburden, the required water-cement ratio of the grout material is determined, including: determining the distance from the grouting layer to the interface between the bedrock and topsoil layer and the interface between the caving zone and the water-conducting fracture zone, based on the geological columnar structure, key layers, and grouting layer location; that is, the maximum diffusion distance of the grout in the overburden; and using the established grout water-cement ratio calculation formula. Using the constraint that the slurry diffusion distance is less than the upper and lower interfaces of the reasonable distribution range, calculate the upper limit of the slurry water-cement ratio that will not trigger the risk of cross-boundary leakage. Where R is the maximum slurry diffusion distance. δ Let be the fracture aperture, t be the grouting time, r0 be the borehole radius, W / C be the water-cement ratio, ΔP be the grouting pressure difference, A, B, m, and n be the grout fitting constants obtained from laboratory tests, and τ0 be the grout yield stress. μ p The plastic viscosity of the slurry is given by, ; Based on the location of the core ground protection buildings and the area of the protected coal pillars, the surface subsidence reduction is divided into three areas: the primary protection control area, the secondary monitoring buffer area, and the tertiary pre-mining transition area. Based on the different surface subsidence reduction zones, the distribution location and number of overburden separation grouting boreholes are determined; As the working face advances from the transition zone to the protection and control zone, the grout properties and grouting parameters are dynamically adjusted to enhance the sealing effect of the grout on rock mass fissures and the retention effect of the grout in the delamination space and fissures.
2. The method for controlling settlement by grouting and filling the overlying strata at the mining boundary according to claim 1, characterized in that, This also includes establishing a ground monitoring feedback and injection coordination mechanism, including: A three-dimensional high-density resistivity array was deployed along the mining boundary on the surface to invert the grout distribution range and sealing effect in real time, and to correct the grout performance and pressure. High-precision surface subsidence monitoring was carried out in the grouting area to dynamically feed back and adjust the underground coal mining progress and the surface grouting intensity, and a mining-grouting coordinated coupling model based on surface subsidence constraints was constructed. ; Among them, v s v represents the measured settlement rate of the boundary surface. m To achieve the daily advance rate of the working face, r gs The injection-to-mining ratio, calculated as the dry ash volume of grouting divided by the daily raw coal mining volume, is R. bound The wedge-shaped correction radius for the grout diffusion is given by: ξ, which is the separation space correction coefficient, obtained through physical simulation or field measurement, and generally 0 < ξ ≤ 1. The smaller ξ is, the more significant the wedge shrinkage effect. K0 is the comprehensive influence coefficient of overburden geology, ranging from 0.1 to 0.
5. ψ is the grout leakage risk correction coefficient, generally between 0.6 and 1. W / C is the water-cement ratio, and ΔP is the grouting pressure difference. Based on the production-injection synergy coupling model, quantitative control factors are identified, and a production-injection synergy mechanism linking surface zoning monitoring and three-level subsidence early warning is established.
3. A method for controlling settlement by grouting and filling overburden separation at the mining boundary according to claim 1 or 2, characterized in that, Based on the different ground subsidence reduction zones, the distribution and number of overburden separation grouting boreholes are set, including the ground locations of the boreholes being arranged near the ground boundary between the primary protection control zone and the secondary monitoring buffer zone, and near the ground boundary between the secondary monitoring buffer zone and the tertiary pre-mining transition zone.
4. A method for controlling settlement by grouting and filling the overlying strata at the mining boundary according to claim 1 or 2, characterized in that, Dynamically adjusting grout properties and grouting parameters, including: Initially, large-particle, fast-setting composite diluted grout is used in the first row of grouting directional holes adjacent to the goaf. Low-pressure intermittent grouting is carried out with a grouting pressure ≤1MPa, a grout water-cement ratio greater than 1.2, an initial setting time of no more than 2 days, and grout solid particles no more than 2mm. Intermittent 0.5-1 hour circulation grouting is used to block the flow of grout to the far-end fissures of the overlying rock in the goaf, forming a dam-sealing curtain to reduce the subsequent grout leakage and diffusion distance and amount. In the medium term, high-flow, medium-consistency, high-pressure grouting operations will be carried out in the remaining grouting holes adjacent to the goaf area and in the boreholes near the junction of the secondary monitoring buffer zone and the tertiary goaf transition zone. The water-cement ratio can be appropriately adjusted to 0.9-1.2, and the grouting pressure is 1-2 MPa. During this stage, the narrow cracks near the delamination space will be quickly filled to reduce the overburden subsidence space and reduce the impact of surface subsidence in the tertiary goaf transition zone and the secondary monitoring buffer zone on the primary protection control zone. In the later stages, high-consistency, high-pressure, uniform and continuous grouting operations were carried out in the secondary monitoring buffer zone and the primary protection control zone. The water-cement ratio was reduced to 0.6-0.9 and the grouting pressure was greater than 2MPa. During this stage, the thick delamination space cavity was quickly filled to form a dense support carrier for the overburden and effectively control surface subsidence.
5. The method for controlling settlement by grouting and filling the overlying strata at the mining boundary according to claim 2, characterized in that, Establish a surface zoning monitoring + three-level subsidence early warning linkage mechanism for coordinated extraction and injection, including: When the surface subsidence velocity within the secondary monitoring buffer zone is less than 0.5 mm / d, the working face advance speed should be appropriately increased by 10%-20% to improve mining efficiency; the water-ash ratio should be appropriately increased by 0.1-0.2 to increase fly ash consumption and reduce cement usage. Mild subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is 0.5-1 mm / d, the working face advance speed is reduced by 10%-20%, the water-cement ratio is reduced by 0.1-0.2, the grouting pressure is increased by 0.2-0.3 MPa, and the daily grouting volume is slightly increased; Moderate subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is 1-2 mm / d, the working face advance speed is reduced by 30%-50%, the water-cement ratio is reduced by 0.2-0.3, the injection-production ratio is increased to 0.6-0.7, and the filling degree of the separation space is improved; Severe subsidence warning: When the surface subsidence rate in the secondary monitoring buffer area is >2mm / d, the working face advance speed is reduced to ≤1m / d; if cracks appear in the structure, mining is temporarily suspended; high-concentration slurry is used to quickly seal the newly formed cracks and delamination spaces, and high-pressure filling is carried out in the cavities; pressure is maintained and grouting is carried out continuously throughout the day, and the grouting process is carried out in advance. Coal mining operations are carried out after the surface subsidence has stabilized.