Bypass and turbine control systems and methods for shortening the start-up time of gas turbine units
By using high-pressure cylinder exhaust temperature and valve downstream pressure modules for control in the gas-fired steam combined cycle unit, combined with bypass system coordinated control, the adaptive adjustment of turbine valves is achieved, solving the problem of poor turbine warm-up effect, shortening warm-up time and improving start-up efficiency.
Patent Information
- Application Number
- CN202611516206.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-28
- Publication Date
- 2026-11-17
AI Technical Summary
During the startup of a gas-fired combined cycle turbine unit, after the turbine is connected to the grid or engaged, the load increase rate is limited by the margin, resulting in poor warm-up performance and affecting the unit's startup efficiency.
The system employs high-pressure cylinder exhaust temperature, downstream pressure, and valve position modules for control, combined with bypass system coordinated control, to achieve adaptive adjustment of turbine valves, rapid opening and closing, and optimized steam flow transfer.
By dynamically adjusting the valve opening rate, the turbine warm-up time was shortened, improving the warm-up effect and unit start-up efficiency.
Smart Images

Figure CN123109797A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of intelligent control technology for combined cycle units, specifically relating to a bypass and turbine control system and method for shortening the start-up time of gas turbine units. Background Technology
[0002] During the startup of a gas-fired combined cycle turbine unit, after the turbine is connected to the grid (for split-shaft units) or meshed (for single-shaft units), when the turbine increases load in load mode, the load increase rate is usually kept at a fixed value and the valve opening is adjusted slowly due to the turbine's load margin limitation. In the initial startup phase, the turbine has a high load margin, but the valve opening speed is slow, resulting in poor turbine warm-up performance and increased warm-up time, which affects the overall startup efficiency of the unit. Summary of the Invention
[0003] In order to overcome the shortcomings of the prior art, the present invention aims to provide a bypass and turbine control system and method for shortening the start-up time of a gas turbine unit.
[0004] To achieve the above objectives, the present invention employs the following technical solution: In a first aspect, embodiments of the present invention provide a bypass and turbine control system for shortening the start-up time of a gas turbine unit, comprising: a high-pressure cylinder exhaust temperature module, a high-pressure valve downstream pressure module, a high-pressure bypass valve position module, a mid-pressure bypass valve position module, a high-pressure exhaust temperature module exceeding 450°C, a first control module, and a turbine shutdown and sequential control module, wherein: The output terminals of the high-pressure cylinder exhaust temperature module, the high-pressure valve downstream pressure module, the high-pressure bypass valve position module, the intermediate bypass valve position module, and the module with a high exhaust temperature higher than 450℃ are connected to the input terminal of the first control module. The output terminal of the first control module is connected to the input terminal of the turbine shutdown and sequential control module.
[0005] In one possible implementation of the first aspect, the first control module includes a first greater than module, a first less than module, a first OR module, a first less than module, a second greater than module, a first AND module, and a second OR module, wherein: The output terminal of the high-pressure cylinder exhaust temperature module is connected to the input terminal of the first module. The output terminal of the pressure module after the high-pressure valve is connected to the input terminal of the first less-than module; The outputs of the first greater than module and the first less than module are connected to the input of the first OR module; The output terminals of the high bypass valve position module and the medium bypass valve position module are connected to the input terminal of the first small selection module, and the output terminal of the first small selection module is connected to the input terminal of the second larger module. The output terminals of the first OR module and the second greater than module are connected to the input terminal of the first AND module; The output terminals of the first OR module and the high-temperature module with an exhaust temperature above 450℃ are connected to the second OR module; The output of the second OR module is connected to the input of the turbine shutdown sequence control module.
[0006] In one possible implementation of the first aspect, the system further includes a deceleration rate module under load mode, a flow command to valve module, a first lead / lag module, a first function module, a third switching module, a first constant module, a first multiplication module, and an acceleration rate module under sequential stop mode, wherein: The flow command is connected to the output of the valve module and the turbine shutdown sequence control module and the input of the first lead / lag module; The output of the first lead / lag module is connected to the input of the first function module; The output terminals of the first function module, the turbine stop sequence control module, and the first constant module are respectively connected to the N terminal, the enable trigger terminal, and the Y terminal of the third switching module; In load mode, the output terminals of the deceleration rate module and the third switching module are connected to the input terminal of the first multiplication module; The output of the first multiplication module is connected to the input of the acceleration module in sequential stop mode.
[0007] In one possible implementation of the first aspect, the system further includes a speed-up module under load mode, a temperature rise margin module, a turbine start-up sequential control module, a turbine load control mode module, a non-cold start-up module, a second control module, and a speed-up module under sequential control start-up mode, wherein: The outputs of the speed-up module, temperature rise margin module, turbine start-up sequential control module, turbine load control mode module, flow command to valve module, and non-cold start-up module under load mode are connected to the input of the second control module. The output of the second control module is connected to the input of the speed-up module under sequential control start-up mode.
[0008] In one possible implementation of the first aspect, the second control module includes a first delay module, a second less than module, a second AND module, a second lead / lag module, a second function module, a fourth switching module, a second constant module, and a second multiplication module, wherein: The output terminals of the turbine load control mode module and the flow command to valve module are respectively connected to the input terminals of the first delay module and the second less module; The output terminals of the turbine start-up sequence control module, the first delay module, the second less-than module, and the non-cold start-up module are connected to the input terminal of the second less-than module; The outputs of the second AND module and the temperature rise margin module are connected to the input of the second lead / lag module, and the output of the second lead / lag module is connected to the input of the second function module. The outputs of the second function module, the second AND module, and the second constant module are respectively connected to the Y terminal, the enable trigger terminal, and the N terminal of the fourth switching module. In load mode, the outputs of the growth rate module and the fourth switching module are connected to the input of the second multiplication module; The output of the second multiplication module is connected to the input of the speed-up module in sequential start mode.
[0009] In one possible implementation of the first aspect, the system further includes a high-pressure outer cylinder upper half-metal temperature module, a main steam temperature module, a turbine start-up sequence control module, a third control module, and an X1 criterion module, wherein: The output terminals of the high-pressure outer cylinder upper half metal temperature module, the main steam temperature module, and the turbine start-up sequence control module are connected to the input terminal of the third control module, and the output terminal of the third control module is connected to the input terminal of the X1 criterion module.
[0010] In one possible implementation of the first aspect, the third control module includes a third function module, a first addition module, a third greater than module, a fourth greater than module, a third less than module, a third AND module, a fifth switching module, and a third constant module, wherein: The output of the turbine start-up sequence control module is connected to the input of the fourth greater than module and the third less than module, respectively; The output terminals of the main steam temperature module and the high-pressure outer cylinder upper half metal temperature module are connected to the input terminal of the first addition module, and the output terminal of the first addition module is connected to the input terminal of the third greater than module. The output terminals of the third less than module, the fourth greater than module, and the third greater than module are connected to the input terminal of the third AND module; The output terminal of the upper half-metal temperature module of the high-pressure outer cylinder is also connected to the input terminal of the third function module; The outputs of the third function module, the third AND module, and the third constant module are respectively connected to the Y terminal, the enable trigger terminal, and the N terminal of the fifth switching module; The output of the fifth switching module is connected to the input of the X1 criterion module.
[0011] In one possible implementation of the first aspect, the system further includes an X1 criterion satisfaction module, a Z1 criterion satisfaction module, a Z2 criterion satisfaction module, a turbine start-up sequence control step 11 module, a fourth AND module, and an automatic steam quality verification module, wherein: The output terminals of the non-cold start-up module, the X1 criterion satisfaction module, the Z1 criterion satisfaction module, the Z2 criterion satisfaction module, and the 11th step module of the turbine start-up sequence control are connected to the input terminal of the fourth AND module, and the output terminal of the fourth AND module is connected to the input terminal of the automatic steam quality confirmation module.
[0012] In one possible implementation of the first aspect, the system further includes a release speed allowable condition satisfaction module, a turbine start-up sequence control step 23 module, a fifth AND module, and a speed release automatic confirmation module, wherein: The output terminals of the non-cold start-up module, the release speed allowable condition satisfaction module, and the turbine start-up sequence control step 23 module are connected to the input terminal of the fifth AND module, and the output terminal of the fifth AND module is connected to the input terminal of the speed release automatic confirmation module.
[0013] Secondly, embodiments of the present invention provide a bypass and turbine control method for shortening the start-up time of a gas turbine unit, comprising the following steps: The first control module performs control processing based on the output values of the high-pressure cylinder exhaust temperature module, the high-pressure valve downstream pressure module, the high-pressure bypass valve position module, the intermediate bypass valve position module, and the module with high exhaust temperature above 450℃, and obtains the output value. The turbine shutdown and sequential control module outputs values based on the output values of the first control module to achieve combined unit control.
[0014] Compared with the prior art, the present invention has the following beneficial effects: This invention provides a bypass and turbine control system and method for shortening the start-up time of a gas turbine unit. The invention achieves control through high-pressure cylinder exhaust temperature, high-pressure regulating valve pressure, and valve position. Based on dynamic changes in the turbine load margin, it accelerates the turbine valve opening speed when the margin is high and synchronously reduces the valve opening speed as the load margin gradually decreases. Simultaneously, it coordinates with the bypass system for collaborative control, maintaining positive steam pressure deviation and enhancing the bypass control loop adjustment speed under turbine load mode. This achieves a linkage effect of rapid turbine valve opening and rapid bypass valve closing, enabling rapid transfer of waste heat boiler steam flow from the bypass to the turbine, improving turbine warm-up efficiency, and shortening the overall warm-up time. Attached Figure Description
[0015] Figure 1 A schematic diagram of the bypass and turbine control system for shortening the start-up time of a gas turbine unit provided in an embodiment of the present invention; Figure 2 This is a schematic diagram of the valve deceleration rate adaptive adjustment principle in the turbine shutdown mode of the bypass and turbine control system for shortening the start-up time of gas turbine units, provided in an embodiment of the present invention. Figure 3 A schematic diagram of the valve speed increase rate adaptive adjustment principle based on temperature rise margin in the bypass and turbine control system for shortening the start-up time of gas turbine units, provided in an embodiment of the present invention. Figure 4 The schematic diagram of the X1 criterion calculation logic in the bypass and steam turbine control system for shortening the start-up time of gas turbine units provided in this embodiment of the invention; Figure 5This is a schematic diagram of the automatic steam quality confirmation logic in the bypass and steam turbine control system for shortening the start-up time of gas turbine units, provided in an embodiment of the present invention. Figure 6 This invention provides a schematic diagram of the bypass and automatic speed release confirmation logic in the turbine control system for shortening the start-up time of a gas turbine unit, as provided in an embodiment of the invention. Figure 7 This is a flowchart illustrating the bypass and turbine control method for shortening the start-up time of a gas turbine unit provided in an embodiment of the present invention. Figure 8 The diagram illustrates the effect of the bypass and turbine control system for shortening the start-up time of a gas turbine unit provided in this embodiment of the invention during practical application. Among them: 001-High-pressure cylinder exhaust temperature module; 002-First greater than module; 003-High-pressure regulating valve downstream pressure module; 004-First less than module; 005-First OR module; 006-High-pressure bypass valve position module; 007-Middle bypass valve position module; 008-First minor selection module; 009-Second greater than module; 010-First AND module; 011-High-pressure exhaust temperature above 450℃ module; 012-Second OR module; 013-Steam turbine shutdown control module; 014-Load mode deceleration rate module; 015-Flow command 016 - Valve Module; 017 - First Lead / Lag Module; 018 - First Function Module; 019 - Third Switching Module; 020 - First Constant Module; 021 - First Multiplication Module; 022 - Acceleration Rate Module in Sequential Stop Mode; 023 - Increase Rate Module in Load Mode; 024 - Temperature Rise Margin Module; 025 - Steam Turbine Start-up Sequential Control in Progress Module; 026 - Steam Turbine Load Control Module; 027 - First Delay Module; 028 - Second Less Than Module; 029 - Non-Cold Start-up Module; 020 - Second AND Module ; 030-Second Lead / Lag Module; 031-Second Function Module; 032-Fourth Switching Module; 033-Second Constant Module; 034-Second Multiplication Module; 035-Increase Rate Module under Sequential Start-up Mode; 036-High Pressure Outer Cylinder Upper Half Metal Temperature Module; 037-Third Function Module; 038-Main Steam Temperature Module; 039-First Addition Module; 040-Third Greater Than Module; 041-Steam Turbine Start-up Sequential Control Step Module; 042-Fourth Greater Than Module; 043-Third Less Than Module; 044-The Module 3; 045-Third Constant Module; 046-Fifth Switching Module; 047-X1 Criterion Module; 048-X1 Criterion Satisfaction Module; 049-Z1 Criterion Satisfaction Module; 050-Z2 Criterion Satisfaction Module; 051-Turbine Start-up Sequential Control Step 11 Module; 052-Fourth AND Module; 053-Automatic Steam Quality Confirmation Module; 054-Release Speed Allowable Condition Satisfaction Module; 055-Turbine Start-up Sequential Control Step 23 Module; 056-Fifth AND Module; 057-Automatic Speed Release Confirmation Module. Detailed Implementation
[0016] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0017] It should be noted that the terms "first," "second," etc., used in this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such terms can be used interchangeably where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0018] The present invention will now be described in further detail with reference to the accompanying drawings: See appendix Figure 1 The present invention provides a bypass and turbine control system for shortening the start-up time of a gas turbine unit, comprising: a high-pressure cylinder exhaust temperature module 001, a high-pressure valve downstream pressure module 003, a high-pressure bypass valve position module 006, a mid-pressure bypass valve position module 007, and a high-pressure exhaust temperature higher than 450°C module 011, a first control module, and a turbine shutdown control module 013, wherein the output terminals of the high-pressure cylinder exhaust temperature module 001, the high-pressure valve downstream pressure module 003, the high-pressure bypass valve position module 006, the mid-pressure bypass valve position module 007, and the high-pressure exhaust temperature higher than 450°C module 011 are connected to the input terminal of the first control module, and the output terminal of the first control module is connected to the input terminal of the turbine shutdown control module 013.
[0019] The bypass and turbine control methods for shortening the start-up time of gas turbine units using the aforementioned system are shown in the appendix. Figure 7 As shown, it includes the following steps: S10: The first control module performs control processing based on the output values of the high-pressure cylinder exhaust temperature module, the high-pressure valve downstream pressure module, the high-pressure bypass valve position module, the intermediate bypass valve position module, and the module with high exhaust temperature above 450℃, and obtains the output value.
[0020] S20: The turbine shutdown and sequential control module outputs values based on the output values of the first control module to achieve combined unit control.
[0021] In this embodiment of the invention, control is achieved through the exhaust temperature of the high-pressure cylinder, the pressure after the high-pressure regulating valve, and the valve position. Based on the dynamic changes in the turbine load margin, the opening speed of the turbine valves is accelerated when the margin is high, and the valve opening speed is reduced synchronously as the load margin gradually decreases. At the same time, in coordination with the bypass system, the steam pressure is maintained in a positive bias under the turbine load mode, and the regulation speed of the bypass control loop is enhanced. This achieves the linkage effect of rapid turbine valve opening and rapid bypass valve closing, enabling the steam flow from the waste heat boiler to be quickly transferred from the bypass to the turbine, improving the turbine warm-up effect and shortening the overall warm-up time.
[0022] In one embodiment, as shown in the appendix Figure 1 As shown, the first control module includes a first greater than module 002, a first less than module 004, a first OR module 005, a first less than module 008, a second greater than module 009, a first AND module 010, and a second OR module 012, wherein: The output terminal of the high-pressure cylinder exhaust temperature module 001 is connected to the input terminal of the first module 002; The output terminal of the high-pressure valve downstream pressure module 003 is connected to the input terminal of the first less-than module 004; The output terminals of the first greater than module 002 and the first less than module 004 are connected to the input terminal of the first OR module 005; The output terminals of the high bypass valve position module 006 and the medium bypass valve position module 007 are connected to the input terminal of the first small selection module 008, and the output terminal of the first small selection module 008 is connected to the input terminal of the second larger module 009. The output terminals of the first OR module 005 and the second OR module 009 are connected to the input terminal of the first OR module 010; The output terminals of the first OR module 010 and the high-temperature module 011 (with a high exhaust temperature above 450℃) are connected to the second OR module 012. The output of the second or module 012 is connected to the input of the turbine shutdown control module 013.
[0023] In the specific implementation process, the output value of the high-pressure cylinder exhaust temperature module 001 is processed by the first greater than module 002 and then input to the first OR module 005; the output value of the high-pressure regulating valve downstream pressure module 003 is processed by the first less than module 004 and then input to the first OR module 005; the first small selection module 008 performs a small selection based on the output values of the high-pressure bypass valve position module 006 and the middle bypass valve position module 007, and then inputs the output value to the second greater than module 009; the first AND module 010 performs calculations based on the output values of the first OR module 005 and the second greater than module 009 and obtains the output value; the second OR module 012 performs calculations based on the output values of the first AND module 010 and the module with high exhaust temperature above 450℃ and uses the obtained output value as the input value of the turbine stop-start control module 013 to achieve control.
[0024] In one embodiment, as shown in the appendix Figure 2 As shown, to achieve adaptive adjustment of valve deceleration rate under turbine shutdown mode, the system also includes a deceleration rate module 014 under load mode, a flow command to valve module 015, a first lead / lag module 016, a first function module 017, a third switching module 018, a first constant module 019, a first multiplication module 020, and an acceleration rate module 021 under sequential shutdown mode, wherein: The flow command is sent to the output of valve module 015 and turbine shutdown control module 013 and connected to the input of first lead / lag module 016; The output of the first lead / lag module 016 is connected to the input of the first function module 017; The output terminals of the first function module 017, the turbine stop sequence control module 013, and the first constant module 019 are respectively connected to the N terminal, the enable trigger terminal, and the Y terminal of the third switching module 018; In load mode, the output terminals of the deceleration rate module 014 and the third switching module 018 are connected to the input terminal of the first multiplication module 020; The output of the first multiplication module 020 is connected to the input of the acceleration module 021 in the sequential stop mode.
[0025] In the specific implementation process, the first advance / lag module 016 processes the output values of the valve module 015 and the turbine stop sequential control module 013 according to the quantity command and obtains the output value, which is then input to the first function module 017. The first function module 017 performs a function operation on the output value to obtain the output value. The third switching module 018 is triggered by the enable of the turbine stop sequential control module 013 and switches between the output value of the first function module 017 input at its N terminal and the output value of the first constant module 019 input at its Y terminal. The first multiplication module 020 performs a calculation based on the output values of the deceleration rate module 014 and the third switching module 018 under the load mode and obtains the output value as the input of the acceleration rate module 021 under the sequential control stop mode.
[0026] In one embodiment, as shown in the appendix Figure 3 As shown, to achieve adaptive adjustment of the valve speed increase rate based on temperature rise margin in turbine start-up mode, the system also includes a speed increase rate module 022 under load mode, a temperature rise margin module 023, a turbine start-up sequential control module 024, a turbine load control mode module 025, a non-cold start-up module 028, a second control module, and a speed increase rate module 035 under sequential control start-up mode, wherein: The outputs of the speed-up module 022, temperature rise margin module 023, turbine start-up sequential control module 024, turbine load control mode module 025, flow command to valve module 015, and non-cold start-up module 028 under load mode are connected to the input of the second control module. The output of the second control module is connected to the input of the speed-up module 035 under sequential start-up mode.
[0027] Furthermore, as shown in the appendix Figure 3 As shown, the second control module includes a first delay module 026, a second less than module 027, a second AND module 029, a second lead / lag module 030, a second function module 031, a fourth switching module 032, a second constant module 033, and a second multiplication module 034, wherein: The output terminals of the turbine load control mode module 025 and the flow command to valve module 015 are respectively connected to the input terminals of the first delay module 026 and the second delay module 027; The output terminals of the turbine start-up sequential control module 024, the first delay module 026, the second less than module 027, and the non-cold start module 028 are connected to the input terminal of the second and module 029. The output terminals of the second AND module 029 and the temperature rise margin module 023 are connected to the input terminal of the second lead / lag module 030, and the output terminal of the second lead / lag module 030 is connected to the input terminal of the second function module 031. The output terminals of the second function module 031, the second AND module 029, and the second constant module 033 are respectively connected to the Y terminal, the enable trigger terminal, and the N terminal of the fourth switching module 032; In load mode, the output terminals of the growth rate module 022 and the fourth switching module 032 are connected to the input terminal of the second multiplication module 034; The output of the second multiplication module 034 is connected to the input of the speed-up module 035 in the sequential start mode.
[0028] In the specific implementation process, the output values of the turbine load control mode module 024 and the flow command to valve module 015 are processed by the first delay module 026 and the second less than module 027 to obtain the output values. The second AND module 029 calculates the output value based on the output values of the turbine start-up sequential control module 024, the first delay module 026, the second less than module 027, and the non-cold start module 028. The second lead / lag module 030 processes the output values of the temperature rise margin module 023 and the second AND module 029, and the obtained output value is processed by the second function module 031 and then input to the Y terminal of the fourth switching module 032. The fourth switching module 032 switches between the output value of the second function module 031 input at its Y terminal and the output value of the second constant module 033 input at its N terminal based on the enable trigger of the second AND module 029. The second multiplication module 034 calculates the output value based on the output values of the speed-up module 022 and the fourth switching module 032 under the load mode and obtains the output value as the input value of the speed-up module 035 under the sequential control start mode.
[0029] In one embodiment, to implement the verification of the X1 criterion, as shown in the appendix... Figure 4 As shown, the system also includes a high-pressure outer cylinder upper half metal temperature module 036, a main steam temperature module 038, a turbine start-up sequence control module 041, a third control module, and an X1 criterion module 047, wherein: The output terminals of the high-pressure outer cylinder upper half metal temperature module 036, the main steam temperature module 038, and the turbine start-up sequence control module 041 are connected to the input terminal of the third control module, and the output terminal of the third control module is connected to the input terminal of the X1 criterion module 047.
[0030] Furthermore, as shown in the appendix Figure 4 As shown, the third control module includes a third function module 037, a first addition module 039, a third greater than module 040, a fourth greater than module 042, a third less than module 043, a third AND module 044, a fifth switching module 046, and a third constant module 045, wherein: The output of the turbine start-up sequence control module 041 is connected to the input of the fourth greater than module 042 and the third less than module 043, respectively. The output terminals of the main steam temperature module 038 and the high-pressure outer cylinder upper half metal temperature module 036 are connected to the input terminal of the first addition module 039, and the output terminal of the first addition module 039 is connected to the input terminal of the third greater module 040. The output terminals of the third less than module 043, the fourth greater than module 042, and the third greater than module 040 are connected to the input terminal of the third AND module 044; The output terminal of the high-pressure outer cylinder upper half-metal temperature module 036 is also connected to the input terminal of the third function module 037; The output terminals of the third function module 037, the third AND module 044, and the third constant module 045 are respectively connected to the Y terminal, the enable trigger terminal, and the N terminal of the fifth switching module 046; The output of the fifth switching module 046 is connected to the input of the X1 criterion module 047.
[0031] In the specific implementation process, the output value of the turbine start-up sequence control module 041 is processed by the fourth greater than module 042 and the third less than module 043 to obtain the output value. The first addition module 039 performs calculations based on the output values of the main steam temperature module 038 and the high-pressure outer cylinder upper half metal temperature module 036 to obtain the output value. The third AND module 044 performs calculations based on the output values of the third greater than module 040, the fourth greater than module 042 and the third less than module 043 to obtain the output value, which is then input to the enable trigger terminal of the fifth switching module 046. The third function module 037 performs function calculations based on the output value of the high-pressure outer cylinder upper half metal temperature module 036 to obtain the output value. The fifth switching module 046, based on the enable trigger of the third AND module 044, switches between the output value of the third function module 037 input at its Y terminal and the output value of the third constant module 045 input at its N terminal to obtain the output value, which is then input to the X1 criterion module 047 for verification and confirmation. The X1 criterion, also known as the high-pressure regulating valve body temperature difference matching criterion and TSE stress assessment, is defined as a prerequisite for warm-up valve operation. It ensures that the main steam temperature is higher than the metal temperature of the high-pressure regulating valve body, thus avoiding the generation of huge tensile stress and valve body cracks caused by low-temperature steam cooling the high-temperature valve body.
[0032] In one embodiment, as shown in the appendix Figure 5 As shown, to achieve automatic confirmation of steam quality, the system also includes X1 criterion satisfaction module 048, Z1 criterion satisfaction module 049, Z2 criterion satisfaction module 050, turbine start-up sequence control step 11 module 051, fourth AND module 052, and automatic steam quality confirmation module 053, wherein: The output terminals of the non-cold start-up module 028, the X1 criterion satisfaction module 048, the Z1 criterion satisfaction module 049, the Z2 criterion satisfaction module 050, and the turbine start-up sequence control step 11 module 051 are connected to the input terminal of the fourth AND module 052, and the output terminal of the fourth AND module 052 is connected to the input terminal of the steam quality automatic confirmation module 053.
[0033] In the specific implementation process, the fourth module 052 performs calculations based on the output values of the non-cold start-up module 028, the X1 criterion satisfaction module 048, the Z1 criterion satisfaction module 049, the Z2 criterion satisfaction module 050, and the 11th step module 051 of the steam turbine start-up sequence control. The resulting output value is used as the input value of the automatic steam quality confirmation module 053 to confirm the steam quality output. Z1 criterion: the superheat criterion before the high-pressure main steam valve, defined as the superheat protection limit of the main steam before the high-pressure electric main steam valve, ensuring that there is no condensate in the steam entering the high-pressure cylinder, preventing water droplets from eroding the blades and causing water erosion damage to the valves. Z2 criterion: the superheat criterion before the intermediate-pressure main steam valve, defined as the superheat boundary of the reheat steam before the intermediate-pressure electric main steam valve, preventing the reheat steam from carrying water and scouring the intermediate-pressure blades and intermediate-pressure regulating valve.
[0034] In one embodiment, as shown in the appendix Figure 6 As shown, to achieve automatic confirmation of speed release, the system also includes a release speed allowable condition satisfaction module 054, a turbine start-up sequence control step 23 module 055, a fifth AND module 056, and a speed release automatic confirmation module 057, wherein: The output terminals of the non-cold start module 028, the release speed allowable condition satisfaction module 054, and the turbine start-up sequence control step 23 module 055 are connected to the input terminal of the fifth AND module 056, and the output terminal of the fifth AND module 056 is connected to the input terminal of the speed release automatic confirmation module 057.
[0035] In the specific implementation process, the fifth module 056 performs calculations based on the output values of the non-cold start module 028, the release speed allowable condition satisfaction module 054, and the turbine start-up sequence control step 23 module 055. The output value is used as the input value of the speed release automatic confirmation module 057 to realize the confirmation output of speed release.
[0036] The applicable scenarios for this invention include: 1. After the turbine is connected to the grid (split-shaft unit) or meshed (single-shaft unit) and enters the load mode, it is necessary to dynamically adjust the valve opening rate according to the load margin. This is especially suitable for gas-fired steam combined cycle units with high load margin but poor warm-up effect in the initial stage of startup.
[0037] 2. In the scenario where the steam pressure needs to be maintained in positive deviation and the bypass regulation speed needs to be enhanced under the steam turbine load mode, it is suitable for units with high requirements for main steam pressure control of waste heat boiler and fast response speed of bypass system.
[0038] 3. It is suitable for scenarios that require coordinated control of rapid opening of the turbine valve and rapid closing of the bypass valve, so that the steam flow can be quickly transferred from the bypass to the turbine. It is especially suitable for units with strict requirements on warm-up effect and start-up time.
[0039] 4. Applicable to normal start-up and warm-up scenarios of various gas-fired steam combined cycle units, especially suitable for units with strict requirements on warm-up time, start-up economy, and equipment safety (sufficient warm-up and stable pressure), which can significantly improve the economy and safety of the unit start-up process.
[0040] Taking the first scenario as an example: After the turbine is connected to the grid or engaged, it enters the load mode. The turbine load margin data is collected in real time, the current margin value is calculated, and the margin value is converted into a turbine valve opening rate adjustment command through a preset function curve to achieve adaptive adjustment of faster valve opening when the margin is high and slower valve opening when the margin is low. After the steam turbine enters the load mode, the bypass system switches to the pressure forward control mode to increase the regulation speed of the bypass control loop and dynamically adjust the bypass opening with the steam pressure forward deviation as the target. When the turbine valves open at a faster rate, the bypass valves close simultaneously and quickly, enabling a rapid transfer of steam flow from the waste heat boiler to the turbine, thereby improving the turbine's steam inlet flow and warm-up effect. The turbine load margin is monitored in real time. When the margin drops to a preset threshold, the turbine valve opening rate decreases synchronously, and the bypass regulation speed is adjusted accordingly to maintain stable steam pressure until the warm-up process is completed.
[0041] Through the foregoing embodiments, the present invention has at least the following beneficial effects: 1. Based on the dynamic changes in the turbine load margin, a variable parameter valve opening rate regulation loop is constructed. Through linkage control that accelerates when the margin is high and slows down when the margin is low, the turbine valve opening speed is adaptively matched with the load margin, thereby improving the warm-up efficiency.
[0042] 2. Optimize the bypass system control logic to maintain the positive bias setting of steam pressure under turbine load mode, and enhance the regulation speed of the bypass control loop to achieve coordinated action of rapid bypass valve closing when the turbine valve opens rapidly.
[0043] 3. Construct a turbine-bypass coordinated transfer control loop. By linking the rapid opening of the turbine valve with the rapid closing of the bypass valve, the steam flow from the waste heat boiler can be rapidly transferred from the bypass to the turbine, thereby enhancing the turbine's warm-up effect.
[0044] 4. Design a warm-up time optimization control strategy. By dynamically matching the load margin and valve speed, the warm-up time of the steam turbine is shortened while ensuring the safety of the unit, thereby improving the economic efficiency of the unit startup.
[0045] The effect obtained through the implementation and application of the technology of this invention is shown in the attached figure. Figure 8As shown, by dynamically adjusting the turbine load margin, the valve opening speed is accelerated when the margin is high and synchronously reduced as the load margin gradually decreases, achieving adaptive regulation of faster valve opening when the margin is high and slower valve opening when the margin is low. During the same periods T0 to T1 and T0 to T3, traditional fixed-rate valve opening results in a slow increase in main steam flow and poor warm-up effect. With this invention, rapid valve opening during T0 to T1 and T0 to T3 leads to a rapid increase in main steam flow and a uniform increase in the metal temperature of the intermediate and high-pressure cylinders, significantly improving the warm-up effect and thus shortening the turbine warm-up time.
[0046] The above content is only for illustrating the technical concept of the present invention and should not be construed as limiting the scope of protection of the present invention. Any modifications made to the technical solution based on the technical concept proposed in this invention shall fall within the scope of protection of this invention.
Claims
1. A bypass and turbine control system for shortening the start-up time of a gas turbine unit, characterized in that, include: The system includes a high-pressure cylinder exhaust temperature module, a high-pressure valve downstream pressure module, a high-pressure bypass valve position module, a mid-pressure bypass valve position module, a module for high-pressure exhaust temperatures exceeding 450℃, a first control module, and a turbine shutdown / schedule control module. The output terminals of the high-pressure cylinder exhaust temperature module, the high-pressure valve downstream pressure module, the high-pressure bypass valve position module, the intermediate bypass valve position module, and the high-pressure exhaust temperature above 450°C module are connected to the input terminal of the first control module, and the output terminal of the first control module is connected to the input terminal of the turbine shutdown control module.
2. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 1, characterized in that, The first control module includes a first greater than module, a first less than module, a first OR module, a first less than module, a second greater than module, a first AND module, and a second OR module, wherein: The output terminal of the high-pressure cylinder exhaust temperature module is connected to the input terminal of the first high-pressure cylinder module; The output terminal of the high-pressure valve downstream pressure module is connected to the input terminal of the first less module; The output terminals of the first greater than module and the first less than module are connected to the input terminal of the first OR module; The output terminals of the high bypass valve position module and the middle bypass valve position module are connected to the input terminal of the first small selection module, and the output terminal of the first small selection module is connected to the input terminal of the second large selection module. The output terminals of the first OR module and the second greater module are connected to the input terminal of the first AND module; The output terminals of the first AND module and the module with a high exhaust temperature above 450°C are connected to the second OR module; The output of the second OR module is connected to the input of the turbine shutdown control module.
3. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 1, characterized in that, The system also includes a deceleration rate module in load mode, a flow command to valve module, a first lead / lag module, a first function module, a third switching module, a first constant module, a first multiplication module, and an acceleration rate module in sequential stop mode, wherein: The output terminals of the flow command to the valve module and the turbine shutdown sequence control module are connected to the input terminal of the first lead / lag module; The output of the first lead / lag module is connected to the input of the first function module; The output terminals of the first function module, the turbine stop sequence control module, and the first constant module are respectively connected to the N terminal, the enable trigger terminal, and the Y terminal of the third switching module; The output terminals of the deceleration rate module and the third switching module in the load mode are connected to the input terminal of the first multiplication module; The output of the first multiplication module is connected to the input of the acceleration module in the sequential stop mode.
4. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 3, characterized in that, The system also includes a load mode speed-up module, a temperature rise margin module, a turbine start-up sequential control module, a turbine load control mode module, a non-cold start-up module, a second control module, and a speed-up module under sequential start-up mode, wherein: The output terminals of the speed-up module under load mode, the temperature rise margin module, the turbine start-up sequential control module, the turbine load control mode module, the flow command to valve module, and the non-cold start-up module are connected to the input terminal of the second control module, and the output terminal of the second control module is connected to the input terminal of the speed-up module under sequential control start-up mode.
5. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 4, characterized in that, The second control module includes a first delay module, a second less than module, a second AND module, a second lead / lag module, a second function module, a fourth switching module, a second constant module, and a second multiplication module, wherein: The output terminals of the turbine load control mode module and the flow command to valve module are respectively connected to the input terminals of the first delay module and the second less module; The output terminals of the turbine start-up sequential control module, the first delay module, the second less module, and the non-cold start module are connected to the input terminal of the second module. The output terminals of the second AND module and the temperature rise margin module are connected to the input terminal of the second lead / lag module, and the output terminal of the second lead / lag module is connected to the input terminal of the second function module. The output terminals of the second function module, the second AND module, and the second constant module are respectively connected to the Y terminal, the enable trigger terminal, and the N terminal of the fourth switching module; The output terminals of the speed-up module and the fourth switching module under the load mode are connected to the input terminal of the second multiplication module; The output of the second multiplication module is connected to the input of the speed-up module in the sequential start mode.
6. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 1, characterized in that, The system also includes a high-pressure outer cylinder upper half metal temperature module, a main steam temperature module, a turbine start-up sequence control module, a third control module, and an X1 criterion module, wherein: The output terminals of the high-pressure outer cylinder upper half metal temperature module, the main steam temperature module, and the turbine start-up sequence control module are connected to the input terminal of the third control module, and the output terminal of the third control module is connected to the input terminal of the X1 criterion module.
7. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 6, characterized in that, The third control module includes a third function module, a first addition module, a third greater than module, a fourth greater than module, a third less than module, a third AND module, a fifth switching module, and a third constant module, wherein: The output terminal of the turbine start-up sequence control module is connected to the input terminals of the fourth greater than module and the third less than module, respectively. The output terminals of the main steam temperature module and the upper half-metal temperature module of the high-pressure outer cylinder are connected to the input terminal of the first addition module, and the output terminal of the first addition module is connected to the input terminal of the third greater module. The third less than module, the fourth greater than module, and the output terminal of the third greater than module are connected to the input terminal of the third AND module; The output terminal of the upper half-metal temperature module of the high-pressure outer cylinder is also connected to the input terminal of the third function module; The output terminals of the third function module, the third AND module, and the third constant module are respectively connected to the Y terminal, the enable trigger terminal, and the N terminal of the fifth switching module; The output of the fifth switching module is connected to the input of the X1 criterion module.
8. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 6, characterized in that, The system also includes an X1 criterion satisfaction module, a Z1 criterion satisfaction module, a Z2 criterion satisfaction module, a turbine start-up sequence control step 11 module, a fourth AND module, and an automatic steam quality confirmation module, wherein: The output terminals of the non-cold start-up module, the X1 criterion satisfaction module, the Z1 criterion satisfaction module, the Z2 criterion satisfaction module, and the turbine start-up sequence control step 11 module are connected to the input terminal of the fourth AND module, and the output terminal of the fourth AND module is connected to the input terminal of the automatic steam quality confirmation module.
9. The bypass and turbine control system for shortening the start-up time of a gas turbine unit according to claim 6, characterized in that, The system also includes a release speed allowable condition satisfaction module, a turbine start-up sequence control step 23 module, a fifth AND module, and a speed release automatic confirmation module, wherein: The output terminals of the non-cold start-up module, the release speed allowable condition satisfaction module, and the turbine start-up sequence control step 23 module are connected to the input terminal of the fifth AND module, and the output terminal of the fifth AND module is connected to the input terminal of the speed release automatic confirmation module.
10. A bypass and turbine control method for shortening the start-up time of a gas turbine unit, characterized in that, Includes the following steps: The first control module performs control processing based on the output values of the high-pressure cylinder exhaust temperature module, the high-pressure valve downstream pressure module, the high-pressure bypass valve position module, the intermediate bypass valve position module, and the module with high exhaust temperature above 450℃, and obtains the output value. The turbine shutdown and sequential control module outputs values based on the output values of the first control module to achieve combined unit control.