Unit flexible operation and optimized control system and methods

By configuring the main feedwater pump and the standby feedwater pump, combined with the steam extraction drive of the large steam turbine and the steam header, the problem of unstable operation of the dual-unit regenerative system was solved, the flexibility and reliability of the unit were improved, the redundant architecture of the feedwater system and steam utilization were optimized, and the heat consumption and coal consumption for power generation were reduced.

CN123109807APending Publication Date: 2026-11-17ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611317318.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17

Smart Images

  • Figure CN123109807A_ABST
    Figure CN123109807A_ABST
Patent Text Reader

Abstract

This invention discloses a flexible operation and optimization control system for a power plant, relating to the field of coal-fired power technology. It addresses the challenges of achieving flexible operation across all operating conditions and rapid switching and redundancy support during fault conditions. The system includes a large steam turbine system, a small steam turbine, a deaerator, and a feedwater pump. The system has: a first operating mode where the small steam turbine drives the main feedwater pump to supply feedwater to the boiler; a second operating mode where steam extraction from the large steam turbine system drives the feedwater pump turbine, which in turn drives a standby feedwater pump to supply feedwater to the boiler; and a start-up mode where the steam header supplies start-up steam to the small steam turbine to drive its startup. This invention also discloses a control method. This invention employs a sequential control approach—starting the small steam turbine via the steam header, switching the steam supply from the small boiler, gradually activating the small steam turbine and the steam extraction from each stage of the large steam turbine to heat the feedwater, and finally switching to the main boiler steam source to drive the small steam turbine—to avoid thermal shock to the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of coal-fired power technology, and in particular to a unit flexible operation and optimization control system and method. Background Technology

[0002] With the advancement of research on the efficient utilization of coal-fired power units, improving unit parameters is a major development trend. The dual-unit regenerative system is a power cycle system developed for high-parameter ultra-supercritical units. It has significant advantages under ultra-high parameters, effectively improving the power plant's cycle efficiency, reliability, and economy, while reducing construction costs.

[0003] Against this backdrop, the key to improving the overall flexibility of the unit lies in how to achieve rapid load adjustment, thermoelectric decoupling, and flexible switching under fault conditions while ensuring safe and stable operation.

[0004] In the existing dual-turbine regenerative system, high-temperature, high-pressure steam is generated by the boiler and then split into two paths: one path enters the high-pressure cylinder of the large turbine to drive its rotation, and the other path enters the small turbine. Each turbine has its own extraction steam pipeline used to heat the feedwater in the various stages of the high-pressure heaters and deaerator. The feedwater system typically uses the small turbine to drive the main feedwater pump to supply water to the boiler.

[0005] However, the existing dual-machine regenerative system still has the following shortcomings during operation: First, when the main feedwater pump has insufficient output or malfunctions, the lack of effective backup feedwater means can easily lead to boiler feedwater interruption and unplanned unit shutdown.

[0006] Second, when the small steam turbine malfunctions and needs to reduce output or shut down, the main feedwater pump loses its driving force, making it difficult for the system to maintain normal water supply, and there is a lack of effective overspeed protection measures during the shutdown process.

[0007] Third, the unit relies on an external steam source during the startup phase, and the startup process is complex. If steam extraction is initiated when steam parameters do not meet the standards, it can easily cause equipment shock.

[0008] Fourth, when a localized malfunction such as a boiler leak occurs, the system lacks a backup heat source, making it difficult to maintain the continued operation of the small steam turbine.

[0009] Fifth, when heating and start-up steam share the same header, there is still a lack of effective system architecture support for achieving thermoelectric decoupling and flexible allocation.

[0010] Therefore, there is an urgent need to provide a flexible operation and optimized control system for a unit with coupled dual-machine regeneration, in order to solve at least one or more of the shortcomings of the above-mentioned prior art. Summary of the Invention

[0011] In order to overcome the shortcomings of the prior art, one of the objectives of this invention is to provide a unit flexible operation and optimization control system, which realizes three operating modes: normal feedwater, fault standby feedwater, and start-up by configuring a main feedwater pump and a standby feedwater pump, a feedwater pump turbine driven by steam extraction from a large steam turbine, and a steam header that has both start-up steam supply and heating functions.

[0012] One of the objectives of this invention is achieved through the following technical solution: A unit flexibility operation and optimization control system, comprising a large steam turbine system, a small steam turbine, a deaerator, and a feedwater pump, characterized in that it further comprises: A steam header has its input end connected to the extraction steam pipe of the large steam turbine system, and its output end connected to the heating pipe and the steam inlet of the small steam turbine, respectively; a steam compression turbine is installed on the pipeline between the steam header and the steam inlet of the small steam turbine. The water supply pump includes a main water supply pump and a standby water supply pump, and the outlet of the deaerator is connected to the main water supply pump and the standby water supply pump respectively; The main feedwater pump is driven and connected by the small steam turbine; The system also includes a feedwater pump turbine, which is driven and connected to the standby feedwater pump, and the steam inlet of the feedwater pump turbine is connected to at least one section of the extraction steam pipeline of the large steam turbine system. The system has: In the first operating mode, the small steam turbine drives the main feedwater pump to supply feedwater to the boiler. In the second operating mode, the steam extracted from the large steam turbine system drives the feedwater pump turbine, which in turn drives the standby feedwater pump to supply feedwater to the boiler. In the start-up mode, the unit starts up, and the steam header supplies start-up steam to the small steam turbine via the steam compression turbine to drive the small steam turbine to start.

[0013] A flexible control system with dual feedwater pump redundancy and dual drive sources (small steam turbine + feedwater pump turbine) is provided to enable flexible switching between three operating modes: normal feedwater, fault standby feedwater, and start-up, significantly improving the unit's operational reliability and adaptability to all operating conditions.

[0014] Furthermore, by directing the extracted steam from each stage of the high-pressure cylinder and intermediate-pressure cylinder to the corresponding deaerator and high-pressure heater, the cascade utilization of the regenerative system is achieved, improving feedwater heating efficiency. Simultaneously, two redundant steam sources are provided to the feedwater pump turbine: a first-stage extraction steam source and a fifth-stage extraction steam source, ensuring the reliability of the backup feedwater pump's steam source. The large turbine system includes a high-pressure cylinder and an intermediate-pressure cylinder. The steam inlet of the feedwater pump turbine is connected to the first-stage extraction steam pipe of the high-pressure cylinder and the fifth-stage extraction steam pipe of the intermediate-pressure cylinder, respectively. The first-stage extraction steam pipe of the high-pressure cylinder is also connected to the first high-pressure heater, and the second-stage extraction steam pipe of the high-pressure cylinder is connected to the second high-pressure heater. The third-stage and fifth-stage extraction steam pipes of the intermediate-pressure cylinder are connected to the deaerator, and the fourth-stage extraction steam pipe of the intermediate-pressure cylinder is connected to the fourth high-pressure heater. The pipe from the intermediate-pressure cylinder to the steam header is connected to the input end of the steam header.

[0015] The water from the main and standby feedwater pumps merges and is heated step-by-step by a multi-stage high-pressure heater before entering the boiler, ensuring that the feedwater can be fully preheated during the operation of any feedwater pump, thereby improving the boiler's thermal efficiency. The four-stage high-pressure heater series configuration ensures that the feedwater temperature meets the inlet water requirements of the high-parameter boiler. The outlet pipes of the main feedwater pump and the standby feedwater pump merge and are sequentially connected to the multi-stage high-pressure heaters before being connected to the boiler's feedwater inlet. The multi-stage high-pressure heaters include a first high-pressure heater, a second high-pressure heater, a third high-pressure heater, and a fourth high-pressure heater connected in series.

[0016] Furthermore, the small steam turbine is equipped with a first-stage extraction steam pipe and a second-stage extraction steam pipe, which are respectively connected to the corresponding heaters in the multi-stage high-pressure heater; the small steam turbine is also equipped with a third-stage extraction steam pipe, which is connected to the deaerator. The first and second-stage extraction steam from the small steam turbine enters the high-pressure heater to assist in heating the feedwater, and the third-stage extraction steam enters the deaerator for deoxygenation, making full use of the extraction steam heat energy of the small steam turbine, reducing irreversible losses from regenerative extraction steam, and improving the overall cycle efficiency of the unit.

[0017] Furthermore, the small steam turbine is also equipped with a steam exhaust to condenser pipeline, which is connected to the condenser and used to exhaust steam when the small steam turbine is shut down to prevent overspeed. The steam exhaust to condenser pipeline allows for timely pressure relief and steam exhaust when the small steam turbine is shut down, preventing overspeed and ensuring equipment safety during fault shutdown conditions.

[0018] It also includes a small boiler, the steam output of which is connected to the steam inlet pipe of the small steam turbine via a pipeline, for supplying steam to the small steam turbine in the event of a leak in the main boiler. Adding a small boiler as a backup heat source allows it to replace the main boiler in supplying steam to drive the small steam turbine when the main boiler leaks, preventing unplanned shutdowns of the entire unit due to boiler failure and extending the unit's fault-tolerant operation capability.

[0019] The main feedwater pump is coaxially connected to the small steam turbine, and the main feedwater pump is coaxially connected to the generator. The generator is used to supplement power supply when the load demand increases. The small steam turbine is coaxially connected to the generator, which can be put into operation to supplement power supply when the grid load demand increases, thereby realizing thermal-electric decoupling and improving the unit's peak-shaving response capability and economic benefits.

[0020] The second objective of this invention is to provide a method for flexible operation and optimized control of a power unit. This method involves sequentially starting the small steam turbine through the steam header, switching the steam source after the small boiler produces steam, and gradually activating the large and small steam turbines to extract steam and heat the feedwater after the extraction steam parameters are qualified. Finally, the method switches to the main boiler steam source to drive the small steam turbine, thus completing the unit startup.

[0021] The second objective of this invention is achieved by the following technical solution: A method for flexible operation and optimized control of a generating unit includes a start-up phase control method, which comprises the following steps: S1. The starting steam in the steam header is compressed by a steam turbine and enters the small steam turbine to drive the small steam turbine to rotate, which in turn drives the main feedwater pump to rotate. S2. The feedwater in the deaerator is pressurized by the main feedwater pump and then enters the multi-stage high-pressure heater through the outlet pipe of the main feedwater pump for heating, and then enters the small boiler for heating into steam. S3. Steam generated by the small boiler enters the small steam turbine through the steam inlet pipe of the small steam turbine, and then the steam header stops supplying steam. S4. After the extraction parameters of the small steam turbine are qualified, the extraction steam from the first stage of the small steam turbine and the extraction steam from the second stage of the small steam turbine are put into the multi-stage high-pressure heater to heat the feedwater, and the extraction steam from the third stage of the small steam turbine is put into the deaerator to heat the feedwater. S5. After the boiler feedwater meets the requirements, start the boiler. The high-temperature and high-pressure steam generated by the boiler enters the high-pressure cylinder of the large steam turbine system. S6. After the parameters of the high-pressure cylinder are qualified, the first stage of extraction steam from the high-pressure cylinder enters the first high-pressure heater, the second stage of extraction steam from the high-pressure cylinder enters the second high-pressure heater, the third stage of extraction steam from the intermediate-pressure cylinder enters the deaerator, the fourth stage of extraction steam from the intermediate-pressure cylinder enters the fourth high-pressure heater, the fifth stage of extraction steam from the intermediate-pressure cylinder enters the deaerator, and the steam from the intermediate-pressure cylinder to the steam header enters the steam header. S7. Cut off the water supply to the small boiler and switch the boiler to supply steam to the small steam turbine through the pipeline to drive the small steam turbine to rotate.

[0022] A well-ordered and safe startup process is provided, which involves sequentially starting the small steam turbine using the steam header → switching the steam source after the small boiler produces steam → gradually introducing steam extraction at each stage after the parameters are qualified → and finally switching the main boiler steam source. This process avoids the impact on the equipment when the steam parameters do not meet the standards, ensuring the safety and stability of the startup process.

[0023] Also includes: The main feedwater pump failure handling method is as follows: when the main feedwater pump fails, the feedwater pump turbine is put into operation. Steam is supplied to the feedwater pump turbine by the first stage extraction steam of the high-pressure cylinder and / or the fifth stage extraction steam of the intermediate-pressure cylinder to drive the standby feedwater pump to run. The feedwater in the deaerator enters the outlet pipeline through the standby feedwater pump to supplement the feedwater. The method for reducing the output of a small steam turbine involves activating the first stage of extraction steam from the high-pressure cylinder and the fifth stage of extraction steam from the intermediate-pressure cylinder when the small steam turbine needs to reduce its output. The feedwater is then fed into the standby feedwater pump and the main feedwater pump in two separate paths, and finally into the multi-stage high-pressure heater and then into the boiler. The method for handling the shutdown of a small steam turbine is as follows: When the small steam turbine malfunctions and needs to be shut down, the exhaust steam to condenser pipeline is opened to allow the small steam turbine to exhaust steam to the condenser. At the same time, the first-stage extraction steam pipeline, the second-stage extraction steam pipeline, and the third-stage extraction steam pipeline of the small steam turbine are disconnected. The steam source of the feedwater pump turbine is switched to the first-stage extraction steam pipeline of the high-pressure cylinder and the fifth-stage extraction steam pipeline of the intermediate-pressure cylinder, and water is supplied by the standby feedwater pump.

[0024] Specific countermeasures are provided for three special operating conditions: main feedwater pump failure, reduced output of small turbine, and shutdown of small turbine. These measures enable rapid activation of backup feedwater pumps and seamless switching of the feedwater system under various failure scenarios, minimizing unit output loss and the risk of unplanned shutdowns.

[0025] Also includes: A boiler leakage handling method involves activating a small boiler when a leak occurs in the boiler. The steam generated by the small boiler is then piped into the small steam turbine to maintain its operation. In the heating control method, during unit operation, steam is supplied to the steam header through the high-pressure cylinder's steam header pipeline and the intermediate-pressure cylinder's steam header pipeline. Part of the steam in the steam header is used for heating, and the other part is reserved as start-up steam.

[0026] When the boiler leaks, a small boiler is started to maintain the operation of the small steam turbine, delaying the forced shutdown of the unit; at the same time, the steam header enables flexible allocation of heating and start-up steam, taking into account both heating demand and the unit's self-starting capability, and achieving thermoelectric decoupling.

[0027] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention achieves a dual-redundancy architecture for the feedwater system by setting up a main feedwater pump and a standby feedwater pump, both driven by independent drive sources. This solves the technical problem in existing dual-unit regenerative systems where a single feedwater pump failure leads to boiler feedwater interruption and unplanned unit shutdown, significantly improving the reliability and availability of unit operation. The steam inlet of the feedwater pump turbine is connected to at least one section of the extraction steam pipeline of the large turbine system, making the driving steam source of the standby feedwater pump independent of the small turbine. When the small turbine fails, has insufficient output, or needs to be shut down, the feedwater pump turbine can be quickly put into operation by the extraction steam from the large turbine without relying on an external steam source, achieving a smooth switching between the main and standby feedwater pumps. This ensures continuous operation of the unit without load reduction or with slight load reduction, significantly improving the unit's fault ride-through capability. The input end of the steam header is connected to the extraction steam from the large turbine, and the output end is simultaneously connected to the heating pipeline and the steam inlet pipeline of the small turbine, realizing the dual-function reuse of "start-up steam source + heating steam source". During the startup phase, the steam header provides startup steam for the small steam turbine, freeing the unit from dependence on an external startup boiler. During normal operation, the steam in the header can be used for heating, achieving thermoelectric decoupling and flexible allocation, providing the hardware foundation for the unit to participate in deep peak shaving. Attached Figure Description

[0028] Figure 1 This is a schematic diagram of the generator unit of the present invention; Figure 2 This is a flowchart of the unit's flexible operation and optimization control method in Example 2.

[0029] In the diagram: 0. Boiler; 0-1. Small boiler; 0-2. Steam inlet pipe for small steam turbine; 1. High-pressure cylinder; 1-1. First-stage extraction steam pipe; 1-2. Second-stage extraction steam pipe; 1-3. Pipeline from high-pressure cylinder to steam header; 1-4. Steam supply pipe from main boiler to small steam turbine; 2. Intermediate-pressure cylinder; 2-1. Third-stage extraction steam pipe; 2-2. Fourth-stage extraction steam pipe; 2-3. Fifth-stage extraction steam pipe; 2-4. Pipeline from intermediate-pressure cylinder to steam header; 3. Main feedwater pump; 3-1. Generator; 3-2. Main feedwater pump outlet pipe; 4. Small steam turbine. 4-1. Exhaust steam to condenser pipeline; 4-2. Small steam turbine first-stage extraction steam pipeline; 4-3. Small steam turbine second-stage extraction steam pipeline; 4-4. Small steam turbine third-stage extraction steam pipeline; 5. Standby feedwater pump; 5-1. Standby feedwater pump outlet pipeline; 6. Feedwater pump turbine; 6-1. Default steam source pipeline; 7. Condenser; 8. Deaerator; 9. Second high-pressure heater; 10. First high-pressure heater; 11. Third high-pressure heater; 12. Fourth high-pressure heater; 12-1. Steam compression turbine; 13. Steam header. Detailed Implementation

[0030] The present invention will now be described in more detail with reference to the accompanying drawings. It should be noted that the following description of the present invention with reference to the accompanying drawings is merely illustrative and not restrictive. Various embodiments can be combined with each other to form other embodiments not shown in the following description.

[0031] Example 1 Example 1 provides a unit flexibility operation and optimization control system, which aims to provide a unit flexibility operation and optimization control system with coupled dual-turbine regenerative heating. By constructing a dual feedwater pump redundancy architecture, setting up a feedwater pump turbine driven by steam extraction from the large turbine, and a steam header that has both start-up steam supply and heating functions, it solves the problems of existing systems lacking backup means in the event of feedwater failure, feedwater interruption in the event of small turbine failure, and the reliance on external steam source for start-up and the difficulty of thermoelectric decoupling.

[0032] Please refer to Figure 1 As shown, the system in this embodiment mainly includes a large steam turbine system, a small steam turbine system, a water supply system, and an auxiliary system.

[0033] The large steam turbine system mainly includes boiler 0 and small boilers 0-1.

[0034] The small steam turbine system mainly includes: main feedwater pump 3, generator 3-1, main feedwater pump outlet pipe 3-2, small steam turbine 4, and small steam turbine inlet pipe 0-2.

[0035] The water supply system mainly includes a main water supply pump 3, a generator 3-1, a main water supply pump outlet pipe 3-2, a standby water supply pump 5, a standby water supply pump outlet pipe 5-1, a deaerator 8, a deaerator outlet pipe 8-1, a high-pressure heater, and a steam header 13.

[0036] The auxiliary systems include: condenser 7 and steam header 13.

[0037] Specifically, it includes the large steam turbine system, the small steam turbine 4, the deaerator 8, and the feedwater pump, and also includes: Steam header 13 has its input end connected to the extraction steam pipe of the large steam turbine system, and its output end connected to the heating pipe and the steam inlet of the small steam turbine 4 respectively; a steam compression turbine 12-1 is installed on the pipeline between the steam header 13 and the steam inlet of the small steam turbine 4. The water supply pump includes a main water supply pump 3 and a standby water supply pump 5, and the outlet of the deaerator 8 is connected to the main water supply pump 3 and the standby water supply pump 5 respectively. The main feedwater pump 3 is driven and connected by the small steam turbine 4; The system also includes a feedwater pump turbine 6, which is drivenly connected to the standby feedwater pump 5, and the steam inlet of the feedwater pump turbine 6 is connected to at least one section of the extraction steam pipeline of the large steam turbine system. The system has: In the first operating mode, the small steam turbine 4 drives the main feedwater pump 3 to supply feedwater to the boiler 0. The first operating mode refers to the operating mode under normal working conditions, where the small steam turbine 4 burns steam from the boiler 0, driving the main feedwater pump 3 to supply water.

[0038] In the second operating mode, the steam extracted from the large steam turbine system drives the feedwater pump turbine 6, which in turn drives the standby feedwater pump 5 to supply feedwater to the boiler 0. The second operating mode refers to the standby / failure mode.

[0039] In the start-up mode, the unit starts up, and the steam header 13 supplies start-up steam to the small steam turbine 4 via the steam compression turbine 12-1 to drive the small steam turbine 4 to start.

[0040] Startup mode refers to the cold start scenario.

[0041] The steam header 13 needs to be pre-stored with start-up steam at a certain pressure and temperature; otherwise, it will be impossible to drive the small steam turbine 4 to rotate.

[0042] It should be noted that the high-temperature, high-pressure steam generated in boiler 0 is divided into two paths: one path enters high-pressure cylinder 1 to drive the steam turbine, and the other path enters small steam turbine 4. If a section of the extraction steam pipeline 1-1 malfunctions, or if the steam is unstable, the steam pipeline from boiler 0 to small steam turbine 4 will drive the small steam turbine 4 to rotate, preventing a shutdown.

[0043] One section of extraction steam pipe 1-1 and five sections of extraction steam pipe 2-3 enter the feedwater pump turbine 6. If the default steam source pipe 6-1 (the steam inlet of the feedwater pump turbine 6 is connected to the steam header 13 via the default steam source pipe 6-1, serving as the default steam source during normal operation) has insufficient steam or unstable steam, the two pipes drive the feedwater pump turbine 6 to rotate. The feedwater pump turbine 6 is in standby mode. If the feedwater pump 3 has insufficient output or malfunctions, the feedwater pump turbine 6 drives the standby feedwater pump 5 to supplement the water supply.

[0044] The large steam turbine system includes a high-pressure cylinder 1 and an intermediate-pressure cylinder 2. The steam inlet of the feedwater pump turbine 6 is connected to a first extraction steam pipe 1-1 of the high-pressure cylinder 1 and a fifth extraction steam pipe 2-3 of the intermediate-pressure cylinder 2. The first extraction steam pipe 1-1 of the high-pressure cylinder 1 is also connected to a first high-pressure heater 10, and the second extraction steam pipe 1-2 of the high-pressure cylinder 1 is connected to a second high-pressure heater 9. The third extraction steam pipe 2-1 and the fifth extraction steam pipe 2-3 of the intermediate-pressure cylinder 2 are connected to the deaerator 8, and the fourth extraction steam pipe 2-2 of the intermediate-pressure cylinder 2 is connected to a fourth high-pressure heater 12. The intermediate-pressure cylinder to steam header pipe 2-4 of the intermediate-pressure cylinder 2 is connected to the input end of the steam header 13.

[0045] It should be noted that the feedwater pump turbine 6 has three steam sources: the default steam source pipeline 6-1 during normal operation, the first-stage extraction steam pipeline 1-1 (backup steam source one), and the fifth-stage extraction steam pipeline 2-3 (backup steam source two). The switching logic of the three sources is as follows: the default steam source pipeline 6-1 is used during normal operation. When the parameters of the small turbine 4 are not qualified, the system switches to the first-stage extraction steam pipeline 1-1 or the fifth-stage extraction steam pipeline 2-3.

[0046] After the main feed water pump outlet pipe 3-2 of the main feed water pump 3 and the standby feed water pump outlet pipe 5-1 of the standby feed water pump 5 merge, they are connected in sequence to the multi-stage high-pressure heater, and then connected to the feed water inlet of the boiler 0; the multi-stage high-pressure heater includes a first high-pressure heater 10, a second high-pressure heater 9, a third high-pressure heater 11 and a fourth high-pressure heater 12 connected in series.

[0047] The water path is as follows: it enters the fourth high-pressure heater 12, the third high-pressure heater 11, then the second high-pressure heater 9, the first high-pressure heater 10, and finally the small boiler 0-1.

[0048] The small steam turbine 4 is equipped with a first-stage extraction steam pipe 4-2 and a second-stage extraction steam pipe 4-3, which are respectively connected to the corresponding heaters in the multi-stage high-pressure heaters. The small steam turbine 4 is also equipped with a third-stage extraction steam pipe 4-4, which is connected to the deaerator 8. The small steam turbine 4 is also equipped with a condenser exhaust pipe 4-1, which is connected to the condenser 7, and is used to exhaust steam when the small steam turbine 4 is shut down to prevent overspeed.

[0049] It should be noted that each level of high-pressure heater must complete the warm-up (parameters must be qualified) before steam extraction is put into operation; otherwise, the sudden entry of high-temperature steam into the cold pipeline will cause thermal shock.

[0050] It also includes a small boiler 0-1, whose steam output end is connected to the steam inlet pipe of the small steam turbine 4 through the steam inlet pipe 0-2 of the small steam turbine, and is used to supply steam to the small steam turbine 4 when the boiler 0 leaks.

[0051] The main feedwater pump 3 is coaxially connected to the small steam turbine 4, and the main feedwater pump 3 is coaxially connected to the generator 3-1. The generator 3-1 is used to supplement power supply when the load demand increases.

[0052] The aforementioned generator 3-1 is in standby mode. If the load demand is too high, the generator will be put into operation to ensure load supply.

[0053] It is worth noting that the method in this embodiment has been tested and found to reduce unit heat consumption by approximately 20-30 kJ / kWh, reduce power supply coal consumption by approximately 0.5-1.1 g / kWh, and improve cycle efficiency by approximately 0.3%-1.6%. This indicates that the method / system can effectively reduce extraction steam superheat, mitigate irreversible losses in the heat exchange process, improve the cycle efficiency of the regenerative system, and ultimately reduce unit heat consumption and power supply coal consumption.

[0054] Example 2 Example 2 is the control method corresponding to Example 1. It solves the problems of equipment shock caused by starting steam extraction when steam parameters do not meet the standards and the lack of standardized operation guidelines in the startup process by designing a sequential startup process that starts from the steam header, transitions through the small boiler, gradually introduces steam extraction at each stage, and finally switches to the main boiler steam source.

[0055] Please refer to Figure 2 As shown, this embodiment provides a method for flexible operation and optimized control of a generating unit, employing the flexible operation and optimized control system described in Embodiment 1. This system includes a start-up phase control method, which comprises the following steps: S1. The starting steam in the steam header 13 is used to enter the small steam turbine 4 through the steam compression turbine 12-1, which drives the small steam turbine 4 to rotate and drives the main feedwater pump 3 to rotate. S2. The feedwater in the deaerator 8 is pressurized by the main feedwater pump 3, and then enters the multi-stage high-pressure heater through the main feedwater pump outlet pipe 3-2 of the main feedwater pump 3 for heating, and then enters the small boiler 0-1 for heating into steam. S3. Steam generated by small boiler 0-1 enters small steam turbine 4 through small steam turbine inlet pipe 0-2, and then steam supply from steam header 13 is stopped. S4. After the extraction parameters of the small steam turbine 4 are qualified, for example, reaching 3MPa and 350℃, the first stage extraction steam 4-2 and the second stage extraction steam 4-3 of the small steam turbine 4 are put into the multi-stage high-pressure heater to heat the feedwater, and the third stage extraction steam 4-4 of the small steam turbine is put into the deaerator 8 to heat the feedwater. S5. After the water supply to boiler 0 meets the requirements, that is, the boiler start-up water capacity requirements are met, boiler 0 is started, and the high-temperature and high-pressure steam generated by boiler 0 enters the high-pressure cylinder 1 of the large steam turbine system. S6. After the parameters of the high-pressure cylinder 1 are qualified, for example, reaching 6.5 MPa and 350°C, the first section of the extraction steam pipe 1-1 of the high-pressure cylinder 1 is connected to the first high-pressure heater 10, the second section of the extraction steam pipe 1-2 of the high-pressure cylinder 1 is connected to the second high-pressure heater 9, the third section of the extraction steam pipe 2-1 of the intermediate-pressure cylinder 2 is connected to the deaerator 8, the fourth section of the extraction steam pipe 2-2 of the intermediate-pressure cylinder 2 is connected to the fourth high-pressure heater 12, the fifth section of the extraction steam pipe 2-3 of the intermediate-pressure cylinder 2 is connected to the deaerator 8, and the intermediate-pressure cylinder to steam header pipe 2-4 of the intermediate-pressure cylinder 2 is connected to the steam header 13. S7. Cut off the water supply to the small boiler 0-1 and switch the boiler 0 to supply steam to the small steam turbine 4 through the main boiler to the small steam turbine steam supply pipeline 1-4, so as to drive the small steam turbine 4 to rotate.

[0056] Also includes: The main feedwater pump failure handling method is as follows: When the main feedwater pump 3 fails, the feedwater pump turbine 6 is put into operation. Steam is supplied to the feedwater pump turbine 6 by the first stage extraction steam 1-1 of the high-pressure cylinder 1 and / or the fifth stage extraction steam pipeline 2-3 of the intermediate-pressure cylinder 2, driving the standby feedwater pump 5 to run. The feedwater in the deaerator 8 enters the standby feedwater pump outlet pipeline 5-1 through the standby feedwater pump 5 to supplement the feedwater. The method for reducing the output of a small steam turbine is as follows: When the output of the small steam turbine 4 needs to be reduced, the first stage of extraction steam 1-1 of the high-pressure cylinder 1 and the fifth stage extraction steam pipeline 2-3 of the intermediate-pressure cylinder 2 are activated. The feedwater is fed into the standby feedwater pump 5 and the main feedwater pump 3 respectively, and then the feedwater is collected and fed into the multi-stage high-pressure heater and then into the boiler 0. The method for handling the shutdown of a small steam turbine is as follows: When the small steam turbine 4 malfunctions and needs to be shut down, the exhaust steam to condenser pipe 4-1 is opened to allow the small steam turbine 4 to exhaust steam to the condenser 7. At the same time, the first-stage extraction steam pipe 4-2, the second-stage extraction steam pipe 4-3, and the third-stage extraction steam pipe 4-4 of the small steam turbine 4 are cut off. The steam source of the feedwater pump turbine 6 is switched to the first-stage extraction steam pipe 1-1 of the high-pressure cylinder 1 and the fifth-stage extraction steam pipe 2-3 of the intermediate-pressure cylinder 2, and water is supplied by the standby feedwater pump 5.

[0057] It should be noted that this also includes the detailed operation of bypass switching, which involves putting into operation the second-stage extraction steam pipeline 1-2 and the fifth-stage extraction steam pipeline 2-3, and then feeding water into the standby feedwater pump 5 and the main feedwater pump 3 respectively, before converging and entering the high-pressure heater, and finally into the boiler 0.

[0058] If steam extraction is cut off at this time, or if the fourth high-pressure heater 12 or the third high-pressure heater 11 leaks, the main feedwater pump outlet pipe 3-2 will directly enter the first high-pressure heater 10 and the second high-pressure heater 9. Water will no longer enter the other two high-pressure heaters, reducing heat loss.

[0059] Also includes: A boiler leakage handling method is as follows: when the boiler 0 leaks, a small boiler 0-1 is put into operation. The steam generated by the small boiler 0-1 enters the small steam turbine 4 through the small steam turbine inlet pipe 0-2 to maintain the operation of the small steam turbine 4. In the heating control method, during the operation of the unit, steam is supplied to the steam header 13 through the high-pressure cylinder to steam header pipeline 1-3 of the high-pressure cylinder 1 and the intermediate-pressure cylinder to steam header pipeline 2-4 of the intermediate-pressure cylinder 2. Part of the steam in the steam header 13 is used for heating, and the other part is reserved as start-up steam.

[0060] Specifically, during operation, if the main feedwater pump 3 malfunctions, the feedwater pump turbine 6 will be activated. Its steam source is provided by the first extraction steam pipeline 1-1, the fifth extraction steam pipeline 2-3, the default steam source pipeline 6-1, and the steam source itself.

[0061] When the unit is operating normally, steam is supplied through the default steam source pipeline 6-1 and the steam source. If the parameters of the four small steam turbines are not up to standard, steam is supplied through the first extraction steam pipeline 1-1 and the fifth extraction steam pipeline 2-3. Water in the deaerator 8 enters the standby feedwater pump 5 and then enters the standby feedwater pump outlet pipeline 5-1.

[0062] Among them, the intermediate pressure cylinder to steam header pipeline 2-4 serves as a backup steam source. One pipeline goes to the small steam turbine 4, and the other provides heat.

[0063] If the small steam turbine 4 malfunctions and its output needs to be reduced, the second-stage extraction steam pipeline 1-2 and the fifth-stage extraction steam pipeline 2-3 will be activated. The feedwater will be fed into the standby feedwater pump 5 and the main feedwater pump 3 respectively, and then the feedwater will be collected and fed into the high-pressure heater, and finally into the boiler 0.

[0064] If steam extraction is cut off at this time, or if the third high-pressure heater 11 and the fourth high-pressure heater 12 leak, the main feedwater pump outlet pipe 3-2 will directly enter the first high-pressure heater 10 and the second high-pressure heater 9. Water will no longer enter the third high-pressure heater 11 and the fourth high-pressure heater 12, thus reducing heat loss.

[0065] During unit operation, if the small steam turbine 4 malfunctions and needs to be shut down, exhaust steam will be introduced into the condenser pipeline 4-1, and the small steam turbine 4 will be shut down to prevent overspeed. Simultaneously, the first-stage extraction steam pipeline 4-2, the second-stage extraction steam pipeline 4-3, and the third-stage extraction steam pipeline 4-4 of the small steam turbine will be disconnected. The steam source for the feedwater pump turbine 6 will be switched to the second-stage extraction steam pipeline 1-2 and the fifth-stage extraction steam pipeline 2-3, and feedwater will be supplied by the standby feedwater pump 5.

[0066] If a leak occurs in boiler 0 during unit operation, small boiler 0-1 will be activated, and steam will enter the steam inlet pipe 0-2 of the small steam turbine, and then enter the small steam turbine 4.

[0067] During unit operation, steam enters steam header 13 through high-pressure cylinder to steam header pipeline 1-3 and intermediate-pressure cylinder to steam header pipeline 2-4. Part of the steam in the header is used for heating, and the other part is used as start-up steam.

[0068] For those skilled in the art, various other corresponding changes and modifications can be made based on the technical solutions and concepts described above, and all such changes and modifications should fall within the protection scope of the claims of this invention.

Claims

1. A unit flexible operation and optimization control system, characterized in that, Including the large steam turbine system, small steam turbine (4), deaerator (8) and feedwater pump, and also including: A steam header (13) is connected at its input end to the extraction steam pipe of the large steam turbine system and at its output end to the heating pipe and the steam inlet of the small steam turbine (4), respectively; a steam compression turbine (12-1) is installed on the pipeline between the steam header (13) and the steam inlet of the small steam turbine (4). The water supply pump includes a main water supply pump (3) and a standby water supply pump (5), and the outlet of the deaerator (8) is connected to the main water supply pump (3) and the standby water supply pump (5) respectively. The main feedwater pump (3) is driven and connected by the small steam turbine (4); The system also includes a feedwater pump turbine (6), which is driven to the standby feedwater pump (5), and the steam inlet of the feedwater pump turbine (6) is connected to at least one section of the extraction steam pipe of the large steam turbine system. The system has: In the first operating mode, under normal water supply conditions, the small steam turbine (4) drives the main feedwater pump (3) to supply water to the boiler (0); In the second operating mode, the backup feedwater condition, the feedwater pump turbine (6) is driven by the extraction steam of the large steam turbine system, which in turn drives the backup feedwater pump (5) to supply feedwater to the boiler (0). In the start-up mode, the unit starts up, and the steam header (13) supplies start-up steam to the small steam turbine (4) via the steam compression turbine (12-1) to drive the small steam turbine (4) to start.

2. The unit flexibility operation and optimization control system as described in claim 1, characterized in that, The large steam turbine system includes a high-pressure cylinder (1) and an intermediate-pressure cylinder (2). The steam inlet of the feedwater pump turbine (6) is connected to a section of the extraction steam pipe (1-1) of the high-pressure cylinder (1) and a section of the extraction steam pipe (2-3) of the intermediate-pressure cylinder (2). The section of the extraction steam pipe (1-1) of the high-pressure cylinder (1) is also connected to the first high-pressure heater (10). The second section of the extraction steam pipe (1-2) of the high-pressure cylinder (1) is connected to the second high-pressure heater (9). The third section of the extraction steam pipe (2-1) and the fifth section of the extraction steam pipe (2-3) of the intermediate-pressure cylinder (2) are connected to the deaerator (8). The fourth section of the extraction steam pipe (2-2) of the intermediate-pressure cylinder (2) is connected to the fourth high-pressure heater (12). The intermediate-pressure cylinder to steam header pipe (2-4) of the intermediate-pressure cylinder (2) is connected to the input end of the steam header (13).

3. The unit flexibility operation and optimization control system as described in claim 1, characterized in that, After the main feed water pump outlet pipe (3-2) of the main feed water pump (3) and the standby feed water pump outlet pipe (5-1) of the standby feed water pump (5) merge, they are connected in sequence to the multi-stage high-pressure heater and then connected to the feed water inlet of the boiler (0); the multi-stage high-pressure heater includes a first high-pressure heater (10), a second high-pressure heater (9), a third high-pressure heater (11) and a fourth high-pressure heater (12) connected in series.

4. The unit flexibility operation and optimization control system as described in claim 3, characterized in that, The small steam turbine (4) is provided with a first-stage extraction steam pipe (4-2) and a second-stage extraction steam pipe (4-3), which are respectively connected to the corresponding heaters in the multi-stage high-pressure heaters; the small steam turbine (4) is also provided with a third-stage extraction steam pipe (4-4), which is connected to the deaerator (8).

5. The unit flexibility operation and optimization control system as described in claim 1, characterized in that, The small steam turbine (4) is also provided with a steam exhaust pipe (4-1) to the condenser, which is connected to the condenser (7) and is used to exhaust steam when the small steam turbine (4) is shut down to prevent overspeed.

6. The unit flexibility operation and optimization control system as described in claim 1, characterized in that, It also includes a small boiler (0-1), the steam output end of which is connected to the steam inlet pipe of the small steam turbine (4) through the steam inlet pipe (0-2) of the small steam turbine, for supplying steam to the small steam turbine (4) when the boiler (0) leaks.

7. The unit flexibility operation and optimization control system as described in claim 1, characterized in that, The main feedwater pump (3) is coaxially connected to the small steam turbine (4), and the main feedwater pump (3) is coaxially connected to the generator (3-1). The generator (3-1) is used to supplement power supply when the load demand increases.

8. A method for flexible operation and optimized control of a generating unit, characterized in that, The unit flexibility operation and optimization control system according to claims 1 to 7 includes a start-up phase control method, which includes the following steps: S1. The starting steam in the steam header (13) is used to enter the small steam turbine (4) through the steam compression turbine (12-1), which drives the small steam turbine (4) to rotate and drives the main feedwater pump (3) to rotate. S2. The feedwater in the deaerator (8) is pressurized by the main feedwater pump (3), and then enters the multi-stage high-pressure heater through the main feedwater pump outlet pipe (3-2) of the main feedwater pump (3) for heating, and then enters the small boiler (0-1) for heating into steam. S3. Steam generated by the small boiler (0-1) enters the small steam turbine (4) through the steam inlet pipe (0-2) of the small steam turbine, and then the steam header (13) stops supplying steam. S4. After the extraction parameters of the small steam turbine (4) are qualified, the first extraction pipe (4-2) and the second extraction pipe (4-3) of the small steam turbine (4) are put into the multi-stage high-pressure heater to heat the feedwater, and the third extraction pipe (4-4) of the small steam turbine is put into the deaerator (8) to heat the feedwater. S5. After the boiler (0) feed water meets the requirements, start the boiler (0), and the high temperature and high pressure steam generated by the boiler (0) enters the high pressure cylinder (1) of the large steam turbine system. S6. After the parameters of the high-pressure cylinder (1) are qualified, the first section of the extraction steam pipe (1-1) of the high-pressure cylinder (1) is put into the first high-pressure heater (10), the second section of the extraction steam pipe (1-2) of the high-pressure cylinder (1) is put into the second high-pressure heater (9), the third section of the extraction steam pipe (2-1) of the intermediate-pressure cylinder (2) is put into the deaerator (8), the fourth section of the extraction steam pipe (2-2) of the intermediate-pressure cylinder (2) is put into the fourth high-pressure heater (12), the fifth section of the extraction steam pipe (2-3) of the intermediate-pressure cylinder (2) is put into the deaerator (8), and the intermediate-pressure cylinder to steam header pipe (2-4) of the intermediate-pressure cylinder (2) is put into the steam header (13). S7. Cut off the water supply to the small boiler (0-1) and switch the boiler (0) to supply steam to the small steam turbine (4) through the main boiler to the small steam turbine steam supply pipeline (1-4) to drive the small steam turbine (4) to rotate.

9. The unit flexibility operation and optimized control method as described in claim 8, characterized in that, Also includes: The main feedwater pump failure handling method is as follows: When the main feedwater pump (3) fails, the feedwater pump turbine (6) is put into operation. Steam is supplied to the feedwater pump turbine (6) by the first section of the high-pressure cylinder (1) extraction steam (1-1) and / or the five sections of the intermediate-pressure cylinder (2) extraction steam pipe (2-3), which drives the standby feedwater pump (5) to run. The feedwater in the deaerator (8) enters the standby feedwater pump outlet pipe (5-1) through the standby feedwater pump (5) to supplement the feedwater. The method for reducing the output of a small steam turbine is as follows: When the small steam turbine (4) needs to reduce its output, a section of the extraction steam pipe (1-1) of the high-pressure cylinder (1) and the five sections of the extraction steam pipe (2-3) of the intermediate-pressure cylinder (2) are put into operation. The water supply is fed into the standby feedwater pump (5) and the main feedwater pump (3) respectively, and then the water is collected and fed into the multi-stage high-pressure heater and then into the boiler (0). The method for handling the shutdown of a small steam turbine is as follows: When the small steam turbine (4) malfunctions and needs to be shut down, the exhaust steam to condenser pipe (4-1) is opened to allow the small steam turbine (4) to exhaust steam to the condenser (7). At the same time, the small steam turbine first-stage extraction steam pipe (4-2), the small steam turbine second-stage extraction steam pipe (4-3), and the small steam turbine third-stage extraction steam pipe (4-4) of the small steam turbine (4) are cut off. The steam source of the feedwater pump turbine (6) is switched to the first-stage extraction steam pipe (1-1) of the high-pressure cylinder (1) and the fifth-stage extraction steam pipe (2-3) of the intermediate-pressure cylinder (2), and water is supplied by the standby feedwater pump (5).

10. The unit flexibility operation and optimized control method as described in claim 8, characterized in that, Also includes: Boiler leakage handling method: When the boiler (0) leaks, a small boiler (0-1) is put into operation. The steam generated by the small boiler (0-1) enters the small steam turbine (4) through the steam inlet pipe (0-2) of the small steam turbine to maintain the operation of the small steam turbine (4); In the heating control method, during the operation of the unit, steam is supplied to the steam header (13) through the high pressure cylinder to steam header pipeline (1-3) of the high pressure cylinder (1) and the medium pressure cylinder to steam header pipeline (2-4) of the medium pressure cylinder (2). Part of the steam in the steam header (13) is used for heating, and the other part is used as start-up steam for backup.