A stacked heavy-duty fuel tank generator set
The stacked heavy-duty tank generator set, with its vertical stacking structure and dual high and low temperature cooling system, solves the problems of space utilization and energy efficiency optimization, realizes plug-and-play and unattended operation of modular power generation units, adapts to the global logistics system, and reduces cooling system energy consumption and transportation costs.
Patent Information
- Application Number
- CN202611377571.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-17
AI Technical Summary
Existing stacked heavy-duty tank generator sets have shortcomings in terms of space utilization, energy efficiency optimization, modular integration, and remote monitoring, resulting in long construction cycles, large land area, high energy consumption of cooling systems, high transportation costs, and difficulty in achieving unmanned operation.
It adopts a vertical stacking structure and a 40-foot standard container design, combined with a high and low temperature dual-path cooling system and intelligent temperature control, and an integrated electrical control system to realize modular power generation units. It also reduces the energy consumption of the cooling system through a concentric double-pipe structure and micro fans to assist in heat dissipation.
Shorten the construction cycle, improve space utilization, reduce cooling system energy consumption, achieve plug-and-play and unattended operation, adapt to the global logistics system, and support remote monitoring and on-demand expansion.
Smart Images

Figure REF-OBJ-1788760257009-000002 
Figure REF-OBJ-1788760257009-000003 
Figure REF-OBJ-1788760257009-000004
Abstract
Description
Technical Field
[0001] This invention relates to the field of generator-related technologies, and in particular to a stacked heavy-duty fuel tank generator set. Background Technology
[0002] Stacked heavy-duty tank generator sets are widely used in off-grid power supply scenarios such as mines and islands due to their significant fuel cost advantages. Currently, the mainstream implementation solutions in the industry can be divided into three categories: Traditional stationary power plants employ a "site civil engineering + component installation" model. This involves first completing the pouring of the plant and the construction of equipment foundations, and then transporting the engines, generators, cooling systems, and other equipment to the site for assembly piece by piece. This model has a construction cycle of 3 to 6 months, and the construction quality is easily affected by weather, site conditions, and personnel skills. The dispersed layout of equipment results in a large land area, and expansion requires additional civil engineering, making it impossible to relocate and reuse the entire plant.
[0003] High-speed diesel containerized generator sets integrate the core power generation unit into a single-layer container, offering flexible deployment and rapid response. However, they suffer from high fuel costs and insufficient design redundancy, making them unsuitable for long-term continuous operation and primarily used in small to medium-sized backup power scenarios. Their horizontal layout results in excessive floor space, and noise and heat dissipation issues interfere with each other.
[0004] While conventional heavy-duty tank generator sets achieve modular integration, they have significant shortcomings: they often use non-standard customized containers, exceeding the dimensions of ISO standard containers, requiring oversized permits for transportation and incurring high logistics costs; auxiliary systems still require separate cabins, resulting in a large workload for on-site connections; cooling systems have high energy consumption and insufficient temperature control accuracy, preventing the engine from continuously operating at its optimal condition; and the unit's control and auxiliary equipment are independent, making remote monitoring and unattended operation difficult. Summary of the Invention
[0005] 1. Technical problems to be solved The core of this invention lies in improving space utilization through a vertical stacking structure, using a 40-foot standard container to adapt to the global logistics system, and optimizing energy efficiency with a dual-path high and low temperature cooling and intelligent temperature control system. It also integrates integrated electrical control and remote monitoring to realize a plug-and-play modular power generation unit.
[0006] 2. Technical Solution To solve the above problems, the present invention adopts the following technical solution.
[0007] A stacked heavy-duty tank generator set includes an outer frame, a base fixedly connected to the bottom of the outer frame, and a partition fixedly connected to the middle of the outer frame. From left to right, an engine, a generator, an electrical control box, and a high-temperature water preheating unit are fixedly installed on the upper end of the base. The output end of the generator is connected to the main shaft of the engine. An air cylinder is also installed on the upper end of the engine. The air cylinder is located behind the electrical control box and is connected to the starting air inlet of the engine through a high-pressure air pipeline. The outlet and inlet of the high-temperature water preheating unit are connected to the preheating inlet and preheating outlet of the engine through a preheating water supply pipeline and a preheating water return pipeline, respectively. The upper part of the partition is equipped with a muffler, a heat exchanger, and an air-cooled radiator from left to right. The engine exhaust port is connected to the muffler intake port through an air guide pipe. The engine high-temperature water outlet is connected to the heat exchanger inlet through a high-temperature water outlet pipe. The engine low-temperature water outlet is connected to the first inlet of the air-cooled radiator through a low-temperature water outlet pipe. The engine high-temperature water return port is connected to the first outlet of the air-cooled radiator through a high-temperature water return pipe. The engine low-temperature water return port is connected to the second outlet of the air-cooled radiator through a low-temperature water return pipe. The heat exchanger outlet is connected to the second inlet of the air-cooled radiator through a series pipe. The high-temperature water outlet pipe and the series pipe are designed with concentric double pipes. Under normal conditions, the inner and outer pipes do not contact each other, and there is an auxiliary heat dissipation gap between them.
[0008] Furthermore, both the high-temperature water outlet pipe and the series pipe of the dual pipe include a multi-way end ring, a variable-diameter inner pipe and a fixed-diameter outer pipe connected between the multi-way end rings. The variable-diameter inner pipe and the fixed-diameter outer pipe are arranged concentrically, and the fixed-diameter outer pipe is located on the outside. Mounting seats are fixedly connected to the outside of both ends of the fixed-diameter outer pipe, and a connecting rod is connected between the mounting seat and the multi-way end ring.
[0009] Furthermore, a main channel is opened in the middle of the multi-way end ring, and a secondary channel is also opened inside the multi-way end ring. The secondary channel is connected to the main channel, and the two outlets of the main channel and the outlet of the secondary channel are all equipped with connecting pipes. The connecting pipe at the port of the secondary channel is connected to the sizing outer pipe, and the corresponding outer end of the connecting pipe is connected to an outer pipe. Solenoid valves are installed on the outer pipe and the connecting pipe at the end of the secondary channel.
[0010] Furthermore, the two ends of the reducing inner tube are fixedly connected to the connecting pipes at the ends of the two main channels that are close to each other. The reducing inner tube includes two fixed sections, two transition sections that are fixedly connected to the ends of the two fixed sections that are close to each other, and a reducing section that is fixedly connected between the two transition sections. The fixed sections are rigid structures, and the transition sections are elastic sealing structures.
[0011] Furthermore, the inner wall of the fixed-sizing outer tube is fixedly connected with multiple evenly distributed electromagnetic strips, and the outer wall of the variable-diameter section is fixedly attached with multiple ferromagnetic sheets, and the multiple ferromagnetic sheets are respectively radially corresponding to the multiple electromagnetic strips.
[0012] Furthermore, the variable diameter section includes overlapping sheets arranged in a ring array and a seam sheet located between the edges of two adjacent overlapping sheets. The two ends of the seam sheet are fixedly attached to the far-away end faces of the two overlapping sheets, and both ends of the overlapping sheets are arc structures.
[0013] Furthermore, the overlapping sheet has a rigid arc-shaped structure, the joint sheet has an elastic sealing structure, and the ferromagnetic sheet is set on the joint sheet.
[0014] Optionally, both the high-temperature water outlet pipe and the series pipe are double-pipe structures, and both are equipped with a micro fan on the liquid inlet side. The exhaust port of the micro fan faces the auxiliary heat dissipation gap. The connecting pipes of the two main channels on the high-temperature water outlet pipe, which are far apart from each other, are connected to the engine and the heat exchanger respectively. The connecting pipes of the two main channels on the series pipe, which are far apart from each other, are connected to the air-cooled radiator and the heat exchanger respectively.
[0015] Optionally, both the high-temperature water outlet pipe and the series pipe have a double-pipe structure in the elevated section only, and the connecting pipe at the end of the main channel is connected to the non-elevated section of the high-temperature water outlet pipe or the series pipe respectively.
[0016] 3. Beneficial Effects Compared with the prior art, the advantages of this invention are: (1) This solution improves space utilization through vertical stacking structure, adopts 40-foot standard containers to adapt to the global logistics system, and optimizes energy efficiency by combining high and low temperature dual-path cooling and intelligent temperature control system. It also integrates integrated electrical control and remote monitoring to realize plug-and-play modular power generation units.
[0017] (2) The whole section of concentric double tube structure is combined with a micro fan. Through the synergistic effect of forced convection heat dissipation and natural heat exchange between the inner and outer tubes, the temperature of the coolant before entering the radiator is significantly reduced, thereby reducing the heat load of the heat exchanger and the air-cooled radiator and reducing the energy consumption of the cooling system.
[0018] (3) Only the elevated section of the pipeline is equipped with a double pipe structure, which utilizes the chimney effect formed by the rising hot air to achieve natural auxiliary heat dissipation without additional power, making the structure simpler; at the same time, antifreeze can be introduced into the outer pipe, and the inner pipe coolant is prevented from freezing through the indirect heat exchange, thus having both heat dissipation and antifreeze functions. Attached Figure Description
[0019] Figure 1 This is a left-side perspective view of the present invention; Figure 2 This is a perspective view of the invention from the right side. Figure 3 This is a front view of the present invention; Figure 4 This is a right-side perspective three-dimensional schematic diagram of the engine, air-cooled radiator, and heat exchanger of the present invention. Figure 5 This is a left-side perspective three-dimensional schematic diagram of the engine, air-cooled radiator, and heat exchanger of the present invention. Figure 6 This is a partial schematic diagram of the high-temperature water outlet pipe or series pipe of the dual pipe of the present invention; Figure 7 This is a schematic diagram showing how the increased diameter of the variable-diameter inner tube of the present invention reduces the auxiliary heat dissipation gap. Figure 8 This is a schematic diagram of the radial cross-section of the variable diameter inner tube of the present invention; Figure 9 This is a schematic diagram of the cross-section of the variable-diameter inner tube after its diameter is enlarged according to the present invention.
[0020] Explanation of the labels in the diagram: 11 Outer frame, 12 Base, 13 Partition, 2 Engine, 3 Generator, 4 Electrical control box, 5 Air cylinder, 6 Air-cooled radiator, 7 Heat exchanger, 8 Silencer, 10 High-temperature water preheating unit, 201 High-temperature water outlet pipe, 202 Low-temperature water outlet pipe, 203 High-temperature water return pipe, 204 Low-temperature water return pipe, 205 Series pipe, 91 Multi-way end ring, 92 Variable diameter inner pipe, 93 Fixed diameter outer pipe, 901 Main channel, 902 Secondary channel, 903 Outer pipe, 904 Connecting rod, 905 Mounting seat, 921 Fixed diameter section, 922 Transition section, 923 Variable diameter section, 9231 Overlapping sheet, 9232 Joint sheet. Detailed Implementation
[0021] The technical solutions will now be clearly and completely described with reference to the accompanying drawings in the embodiments of the present invention.
[0022] First implementation method: Please see Figures 1-3A stacked heavy-duty tank generator set includes an outer frame 11, a base 12 fixedly connected to the bottom of the outer frame 11, and a partition 13 fixedly connected to the middle of the outer frame 11. From left to right, an engine 2, a generator 3, an electrical control box 4, and a high-temperature water preheating unit 10 are fixedly mounted on the upper end of the base 12. The output end of the generator 3 is connected to the main shaft of the engine 2 via a drive connection. An air cylinder 5 is also installed on the upper end of the engine 2. The air cylinder 5 is located behind the electrical control box 4 and is connected to the starting air inlet of the engine 2 via a high-pressure air pipeline. The outlet and inlet of the high-temperature water preheating unit 10 are respectively supplied with preheating water. The water pipe and the preheating return water pipe are connected to the preheating inlet and preheating outlet of engine 2. The high-temperature water preheating unit 10 is pre-operated before starting. The heated cooling water is delivered to the preheating inlet of engine 2 through the preheating water supply pipe to preheat the cylinder liner of engine 2. The preheating return water returns to the high-temperature water preheating unit 10 through the preheating return water pipe to form a preheating cycle, ensuring that engine 2 starts smoothly in low-temperature environments. When the unit starts, the compressed air stored in the air cylinder 5 is delivered to the starting air inlet of engine 2 through the high-pressure air pipe to drive the crankshaft of engine 2 to rotate. After engine 2 is successfully ignited, it enters the idle warm-up state.
[0023] The upper part of the partition 13 is equipped with a muffler 8, a heat exchanger 7 and an air-cooled radiator 6 from left to right. The exhaust port of the engine 2 is connected to the air inlet of the muffler 8 through the air guide pipe. When the engine 2 starts running, it drives the main shaft of the generator 3 to rotate. The generator 3 converts mechanical energy into electrical energy through electromagnetic induction. During the operation of the engine 2, high-temperature exhaust is generated. The exhaust enters the muffler 8 through the air guide pipe and is discharged after noise reduction treatment by the muffler 8. The engine 2, generator 3, high-temperature water preheating unit 10, heat exchanger 7, and air-cooled radiator 6 are all electrically connected to the electrical control box 4.
[0024] The high-temperature water outlet of engine 2 is connected to the water inlet of heat exchanger 7 through high-temperature water outlet pipe 201. The low-temperature water outlet of engine 2 is connected to the first inlet of air-cooled radiator 6 through low-temperature water outlet pipe 202. The high-temperature water return outlet of engine 2 is connected to the first outlet of air-cooled radiator 6 through high-temperature water return pipe 203. The low-temperature water return outlet of engine 2 is connected to the second outlet of air-cooled radiator 6 through low-temperature water return pipe 204. The water outlet of heat exchanger 7 is connected to the second inlet of air-cooled radiator 6 through series pipe 205. First, engine 2 is equipped with a high-temperature water circulation circuit and a low-temperature water circulation circuit; such as Figure 5The coolant in the high-temperature water circulation loop flows through the cylinder liner and cylinder head of engine 2 and its temperature rises. It then enters the heat exchanger 7 through the high-temperature outlet of engine 2 and the high-temperature outlet pipe 201. In the heat exchanger 7, it exchanges heat with the external cooling medium to complete the first cooling. After that, the water from the heat exchanger 7 enters the second inlet of the air-cooled radiator 6 through the series pipe 205. In the air-cooled radiator 6, it is cooled by forced air cooling by the fan. Finally, it flows back to the high-temperature return port of engine 2 through the high-temperature return pipe 203 through the first outlet of the air-cooled radiator 6 to complete the high-temperature water circulation. The coolant in the low-temperature water circulation loop flows through the intake, lubricating oil and fuel systems of engine 2, and then directly enters the first inlet of the air-cooled radiator 6 through the low-temperature outlet of engine 2 and the low-temperature outlet pipe 202. It is cooled by air cooling in the air-cooled radiator 6, and after cooling, it flows back to the low-temperature return port of engine 2 through the second outlet of air-cooled radiator 6 and the low-temperature return pipe 204, thus completing the low-temperature water circulation.
[0025] In summary, this solution transforms the traditional 3-6 month on-site civil engineering and component installation of power plants into a product-based delivery model of factory prefabrication and plug-and-play on-site, enabling commissioning within 7-15 days and shortening the construction cycle by over 60%. Regarding space utilization, it breaks through the single-layer container layout, compressing the footprint to 30% of traditional power plants through vertical stacking, significantly saving land and civil engineering costs. Simultaneously, it utilizes 40-foot standard containers as the integrated carrier, adapting to global logistics systems, eliminating the need for oversized approvals and special tooling, and completely resolving the transportation bottleneck of non-standard containers. In terms of energy efficiency… In terms of fuel cost savings, the unit effectively saves fuel costs through dual-path high and low temperature cooling, waste heat recovery from heat exchangers, and intelligent temperature control. The unit, auxiliary equipment, and environmental monitoring are integrated into an integrated electronic control system, supporting remote monitoring and fault early warning, enabling unattended operation and maintenance. The entire unit is based on a mature medium-speed heavy oil engine platform with high redundancy, a design life of 20 years, a major overhaul cycle of 36,000 hours, and 350 days of continuous and stable operation per year. It also supports modular on-demand expansion and overall migration and reuse, fully covering the core requirements of off-grid main supply scenarios for economy, reliability, and flexibility.
[0026] Second implementation method: In this embodiment, the high-temperature water outlet pipe 201 and the series pipe 205 are designed as concentric double pipes. Under natural conditions, the inner and outer pipes of the two do not contact each other, and there is an auxiliary heat dissipation gap between them. The high-temperature water outlet pipe 201 and the series pipe 205 adopt a concentric double pipe structure, and there is an auxiliary heat dissipation gap between the inner pipe variable diameter inner pipe 92 and the outer pipe fixed diameter outer pipe 93. like Figure 6Both the high-temperature water outlet pipe 201 and the series pipe 205 of the dual-pipe system include a multi-way end ring 91, a variable-diameter inner pipe 92 and a fixed-diameter outer pipe 93 connected between the multi-way end rings. The variable-diameter inner pipe 92 and the fixed-diameter outer pipe 93 are arranged concentrically, with the fixed-diameter outer pipe 93 located on the outside. Mounting seats 905 are fixedly connected to the outside of both ends of the fixed-diameter outer pipe 93. A connecting rod 904 is connected between the mounting seat 905 and the multi-way end ring 91. The connecting rod 904 and the mounting seat 905 are mainly used to fix the fixed-diameter outer pipe 93, so that its relative position with the variable-diameter inner pipe 92 is stable. During the start-up of the unit, it is not easy to shift due to vibration, thereby effectively ensuring the stability of the auxiliary heat dissipation gap.
[0027] A main channel 901 is formed in the middle of the multi-way end ring 91. A secondary channel 902 is also formed inside the multi-way end ring 91. The secondary channel 902 communicates with the main channel 901, and connecting pipes are provided at both outlets of the main channel 901 and the outlet of the secondary channel 902. The connecting pipe at the port of the secondary channel 902 is connected to the sizing outer pipe 93, and an outer connecting pipe 903 is connected to the corresponding outer end of the connecting pipe. Solenoid valves are installed on both the outer connecting pipe 903 and the connecting pipe at the end of the secondary channel 902. When the solenoid valve on the connecting pipe is open and the solenoid valve on the outer connecting pipe 903 is closed, high... Warm water can simultaneously enter the variable-diameter inner tube 92 and the fixed-diameter outer tube 93. Due to the gap between them, compared to a single-tube design with a large diameter, the thickness of the variable-diameter inner tube 92 and the fixed-diameter outer tube 93 is lower in the radial direction, allowing for more thorough heat exchange with the outside air. Furthermore, the dual-tube design significantly increases the direct heat exchange area, thereby effectively reducing the temperature of the high-temperature water when it enters the heat exchanger 7 or the air-cooled radiator 6. This effectively reduces the energy consumption and cost of the air-cooled radiator 6 and the heat exchanger 7 when cooling the high-temperature water.
[0028] The two ends of the variable diameter inner tube 92 are fixedly connected to the connecting pipes at the close ends of the two main channels 901. The variable diameter inner tube 92 includes two fixed diameter sections 921, two transition sections 922 fixedly connected to the close ends of the two fixed diameter sections 921, and a variable diameter section 923 fixedly connected between the two transition sections 922. The fixed diameter sections 921 are rigid structures, and the transition sections 922 are elastic sealing structures, which are used to provide sealing compensation when the radial dimension of the variable diameter section 923 changes, and prevent coolant leakage. The variable diameter section 923 is a radially expandable variable diameter pipe section, which can adjust the coolant flow rate and velocity by changing its inner diameter.
[0029] Multiple evenly distributed electromagnetic strips are fixedly connected to the inner wall of the fixed-sizing outer tube 93, and multiple ferromagnetic plates are fixedly attached to the outer wall of the variable-diameter section 923, with each ferromagnetic plate radially corresponding to one of the electromagnetic strips. Figure 7When the electromagnetic bar is energized, it generates electromagnetic force, attracting the ferromagnetic sheet to move radially outward, causing the variable diameter section 923 to expand radially, thus increasing the inner diameter of the variable diameter inner tube 92. When the electromagnetic bar is de-energized or the current direction is changed, the electromagnetic force weakens or disappears, and the variable diameter section 923 contracts radially due to its own elastic restoring force, thus decreasing the inner diameter of the variable diameter inner tube 92. By controlling the on / off state of the electromagnetic bar and the magnitude of the current, the inner diameter of the variable diameter inner tube 92 can be adjusted.
[0030] Both the high-temperature water outlet pipe 201 and the series pipe 205 are double-pipe structures, and both are equipped with miniature fans on their inlet sides. The exhaust ports of the miniature fans face the auxiliary heat dissipation gap. The connecting pipes of the two main channels 901 on the high-temperature water outlet pipe 201, which are far apart from each other, are connected to the engine 2 and the heat exchanger 7, respectively. The connecting pipes of the two main channels 901 on the series pipe 205, which are far apart from each other, are connected to the air-cooled radiator 6 and the heat exchanger 7, respectively. Through the design of the miniature fans, external air force can be added at the edge of the auxiliary heat dissipation gap, thereby driving the hot air in the auxiliary heat dissipation gap to be discharged. At the same time, in the raised section of both pipes, due to the principle of hot air rising, the external air force effectively ensures that the hot air in the gap between the inner and outer pipes of the high-temperature water outlet pipe 201 and the series pipe 205 can flow stably, so that heat can be discharged and the temperature of the high-temperature water entering the air-cooled radiator 6 or the heat exchanger 7 can be further reduced, thus reducing the cost of cooling.
[0031] The third implementation method: Compared to the second implementation method, this implementation method changes the setting range of the two tubes, as detailed below: Both the high-temperature outlet pipe 201 and the series pipe 205 have a double-pipe structure only in their elevated sections, and the connecting pipe at the end of the main channel 901 is connected to the non-elevated section of the high-temperature outlet pipe 201 or the series pipe 205, respectively. During unit operation, the high-temperature coolant flowing through the inner pipe transfers heat to the air in the gap through the pipe wall. The air in the gap rises along the pipe due to its reduced density after being heated, forming a chimney effect, and naturally dissipating the heat to the outside atmosphere, thus achieving auxiliary heat dissipation along the pipe. When the ambient temperature is below freezing, antifreeze can be independently introduced into the outer pipe, and indirect heat exchange can be carried out between the outer pipe and the inner pipe through the pipe wall to prevent the coolant in the inner pipe from freezing, thus achieving antifreeze insulation in winter.
[0032] Compared to the second embodiment, this embodiment does not require additional external force to drive it. It can accelerate the heat dissipation between the inner and outer pipes through the chimney effect, resulting in a lower water temperature entering the heat exchanger 7 or the air-cooled radiator 6, thereby reducing the cost of cooling.
[0033] Fourth implementation method: Compared to the second or third implementation method, this implementation method further improves the variable diameter inner tube 92, as detailed below: like Figures 8-9 The variable diameter section 923 includes stacked flaps 9231 arranged in a ring array and a joint piece 9232 located between the edges of two adjacent stacked flaps 9231. The two ends of the joint piece 9232 are fixedly attached to the far-away end faces of the two stacked flaps 9231, and both ends of the stacked flaps 9231 are arc structures. The stacked flaps 9231 are rigid arc structures. During radial movement, the arc surface serves as the fulcrum of rotation, making the relative rotation between the stacked flaps 9231 smooth and avoiding jamming or wear between the rigid structures. The elastic sealing structure of the joint piece 9232 undergoes elastic deformation when the stacked flaps 9231 move relative to each other, and always fits tightly between the edges of the adjacent stacked flaps 9231 to prevent coolant from leaking from the gap between the adjacent stacked flaps 9231. The joint piece 9232 is an elastic sealing structure, and a ferromagnetic sheet is disposed on the joint piece 9232.
[0034] It is worth noting that, in order to increase the maximum variation range of the inner diameter, the ends of two adjacent overlapping plates 9231 overlap. When the diameter needs to be expanded, the electromagnetic strip on the inner wall of the sizing outer tube 93 generates electromagnetic force after being energized, which attracts the ferromagnetic plate on the joint plate 9232 to move radially outward. Since the two ends of the joint plate 9232 are fixedly attached to the far ends of the two overlapping plates 9231, when the joint plate 9232 is pulled outward by the electromagnetic force, the overlapping plates 9231 move radially outward under the action of the joint plate 9232, thereby expanding the inner diameter. When the electromagnetic strip is de-energized or the current direction is changed, the electromagnetic force weakens or disappears, and the joint piece 9232 contracts and resets itself by relying on its own elastic restoring force, driving the overlapping piece 9231 to move radially inward, and the overall inner diameter of the variable diameter section 923 returns to its initial state. By controlling the on / off state of the electromagnetic strip and the magnitude of the current, the ferromagnetic sheet is subjected to electromagnetic forces of different magnitudes, and the joint piece 9232 produces elastic deformation of different degrees, thereby driving the overlapping piece 9231 to move radially to different positions, thereby realizing the adjustment of the inner diameter of the variable diameter section 923.
[0035] Compared to the second or third embodiment where the variable diameter section 923 is designed to be completely elastic, the overall inner diameter change of the variable diameter section 923 is determined by the elastic deformation of the joint piece 9232, rather than the uniform expansion of the entire pipe wall. The rigidity of the overlapping pieces 9231 effectively ensures that each overlapping piece 9231 maintains a consistent displacement during radial movement. The adjustment process has good linearity and high repeatability, making it easier to achieve closed-loop precise control.
[0036] The above description is merely a preferred embodiment of the present invention; it encompasses all the protection scope of the present invention. Any equivalent substitutions or modifications made by those skilled in the art within the technical scope disclosed in the present invention, based on the technical solutions and improved concepts of the present invention, should be covered within the protection scope of the present invention.
Claims
1. A stacked heavy-duty fuel tank generator set, comprising an outer frame (11), a base (12) fixedly connected to the bottom of the outer frame (11), and a partition (13) fixedly connected to the middle of the outer frame (11), characterized in that: The base (12) is fixedly installed with an engine (2), a generator (3), an electrical control box (4) and a high-temperature water preheating unit (10) from left to right on the upper end. The output end of the generator (3) is connected to the main shaft of the engine (2). An air bottle (5) is also installed on the upper end of the engine (2). The air bottle (5) is located on the rear side of the electrical control box (4), and the air bottle (5) is connected to the starting air inlet of the engine (2) through a high-pressure air pipeline. The outlet and inlet of the high-temperature water preheating unit (10) are connected to the preheating inlet and preheating outlet of the engine (2) through a preheating water supply pipeline and a preheating water return pipeline, respectively. The upper end of the partition (13) is equipped with a muffler (8), a heat exchanger (7) and an air-cooled radiator (6) from left to right. The exhaust port of the engine (2) is connected to the air inlet of the muffler (8) through a duct pipe. The high temperature water outlet of the engine (2) is connected to the water inlet of the heat exchanger (7) through a high temperature water outlet pipe (201). The low temperature water outlet of the engine (2) is connected to the first inlet of the air-cooled radiator (6) through a low temperature water outlet pipe (202). The high temperature water return port of the engine (2) is connected to the first outlet of the air-cooled radiator (6) through a high temperature water return pipe (203). The low temperature water return port of the engine (2) is connected to the second outlet of the air-cooled radiator (6) through a low temperature water return pipe (204). The water outlet of the heat exchanger (7) is connected to the second inlet of the air-cooled radiator (6) through a series pipe (205). The high-temperature water outlet pipe (201) and the series pipe (205) are designed as concentric double pipes. Under normal conditions, the inner and outer pipes of the two do not contact each other, and there is an auxiliary heat dissipation gap between them.
2. The stacked heavy-duty tank generator set according to claim 1, characterized in that: The high-temperature water outlet pipe (201) and the series pipe (205) of the dual pipe both include a multi-way end ring (91), a variable diameter inner pipe (92) and a fixed diameter outer pipe (93) connected between the multi-way end rings. The variable diameter inner pipe (92) and the fixed diameter outer pipe (93) are arranged concentrically, and the fixed diameter outer pipe (93) is located on the outside. Mounting seats (905) are fixedly connected to the outside of both ends of the fixed diameter outer pipe (93). A connecting rod (904) is connected between the mounting seat (905) and the multi-way end ring (91).
3. A stacked heavy-duty tank generator set according to claim 2, characterized in that: The multi-way end ring (91) has a main channel (901) in the middle and a secondary channel (902) is also carved inside the multi-way end ring (91). The secondary channel (902) is connected to the main channel (901), and the two outlets of the main channel (901) and the outlet of the secondary channel (902) are all provided with connecting pipes. The connecting pipe at the port of the secondary channel (902) is connected to the sizing outer pipe (93), and the corresponding outer end of the connecting pipe is connected to the outer pipe (903). Solenoid valves are installed on the outer pipe (903) and the connecting pipe at the end of the secondary channel (902).
4. A stacked heavy-duty tank generator set according to claim 3, characterized in that: The two ends of the variable diameter inner tube (92) are fixedly connected to the connecting pipes of the two main channels (901) that are close to each other. The variable diameter inner tube (92) includes two fixed diameter sections (921), two transition sections (922) that are fixedly connected to one end of the two fixed diameter sections (921) respectively, and a variable diameter section (923) that is fixedly connected between the two transition sections (922). The fixed diameter section (921) is a rigid structure, and the transition section (922) is an elastic sealing structure.
5. A stacked heavy-duty tank generator set according to claim 4, characterized in that, The inner wall of the fixed-diameter outer tube (93) is fixedly connected with a plurality of uniformly distributed electromagnetic strips, and the outer wall of the variable-diameter section (923) is fixedly attached with a plurality of ferromagnetic sheets, and the plurality of ferromagnetic sheets are respectively radially corresponding to the plurality of electromagnetic strips.
6. A stacked heavy-duty tank generator set according to claim 5, characterized in that: The variable diameter section (923) includes overlapping sheets (9231) arranged in a ring array and a seam sheet (9232) located between the edges of two adjacent overlapping sheets (9231). The two ends of the seam sheet (9232) are fixedly attached to the end faces of the two overlapping sheets (9231) that are far apart from each other, and both ends of the overlapping sheets (9231) are arc structures.
7. A stacked heavy-duty tank generator set according to claim 6, characterized in that: The overlapping sheet (9231) is a rigid arc-shaped structure, the joint sheet (9232) is an elastic sealing structure, and the ferromagnetic sheet is disposed on the joint sheet (9232).
8. A stacked heavy-duty tank generator set according to claim 3, characterized in that: The high-temperature water outlet pipe (201) and the series pipe (205) are both double pipe structures, and both are equipped with micro fans on the liquid inlet side. The exhaust port of the micro fan faces the auxiliary heat dissipation gap. The connecting pipes of the two main channels (901) on the high-temperature water outlet pipe (201) that are far from each other are connected to the engine (2) and the heat exchanger (7) respectively. The connecting pipes of the two main channels (901) on the series pipe (205) that are far from each other are connected to the air-cooled radiator (6) and the heat exchanger (7) respectively.
9. A stacked heavy-duty tank generator set according to claim 3, characterized in that: The high-temperature water outlet pipe (201) and the series pipe (205) are both double-pipe structures only in the raised section, and the connecting pipe at the end of the main channel (901) is connected to the non-raised section of the high-temperature water outlet pipe (201) or the series pipe (205).
