High-pressure gas supply device and high-pressure gas supply system

By integrating valve block design and built-in valve assembly control, the high-pressure gas supply device with integrated detection components solves the problems of loose connections and leakage risks in the prior art, and realizes a compact structure and highly safe gas supply system.

CN123109909APending Publication Date: 2026-11-17THE 711TH RES INST OF CHINA STATE SHIPBUILDING CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611371086.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-04
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing marine high-pressure gas supply devices use discrete components and are connected through external pipelines, resulting in numerous connection points and a loose layout. This makes them difficult to install compactly within the limited space of a ship and poses a risk of high-pressure leakage.

Method used

The integrated valve block design integrates the main supply channel, purge channel, and vent channel into the same valve block. The on/off state of each channel is controlled by the built-in valve assembly, reducing external connection points. The flow channel layout is carried out using the internal space of the valve block, and the detection components are integrated into the valve block.

Benefits of technology

This resulted in a compact device structure, reduced high-pressure leakage risk, simplified installation, and improved safety and reliability in space-constrained environments on ships.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109909A_ABST
    Figure CN123109909A_ABST
Patent Text Reader

Abstract

This application discloses a high-pressure gas supply device and system, belonging to the field of engine technology. The high-pressure gas supply device includes a valve block and a first valve assembly. By forming the main supply channel, purge channel, and vent channel within the same valve block, and sealing the first valve assembly for controlling the opening and closing of each channel with the valve block and at least partially embedding it within the valve block, the communication between each functional channel is achieved within the valve block. This eliminates the need for connecting pipes and joints outside the valve block, thereby reducing the risk of high-pressure gas leakage due to excessive external connection points. Simultaneously, the compact arrangement of the functional components within the valve block makes the overall structure of the device more compact and significantly reduces its size, lowering the installation difficulty within the limited space of a ship. The valve block, as the common load-bearing base for each functional channel and the valve assembly, with its integral structure and the sealed connection between the first valve assembly and the valve block, ensures the sealing reliability of the device under high-pressure conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of engine technology, and in particular to a high-pressure gas supply device and a high-pressure gas supply system. Background Technology

[0002] Marine high-pressure gas supply systems typically include multiple flow paths, each functioning through independent valves, sensors, and other discrete components. These components are sequentially connected via external pipes and connectors to complete the supply process, including gas on / off control, pressure and temperature detection, residual gas purging after shutdown, and safety venting. However, because these various flow paths use discrete components and are interconnected through external pipes, the entire system has numerous connection points, a loose overall layout, and low integration, making it difficult to achieve compact installation within the limited engine room space of a ship. Summary of the Invention

[0003] This application provides a high-pressure gas supply device and a high-pressure gas supply system to solve the technical problem of loose overall layout of the high-pressure gas supply device.

[0004] To achieve the above objectives, according to a first aspect of this application, a high-pressure gas supply device is provided, comprising: A valve block, wherein a main supply channel, a purge channel and a discharge channel are formed within the valve block; The purging channel is used to communicate with the main supply channel and to replace and discharge the residual gas in the main supply channel; the venting channel is used to communicate with the main supply channel and to vent at least a portion of the residual gas in the main supply channel. A first valve assembly is sealed to the valve block and is at least partially disposed within the valve block. The first valve assembly is used to control the opening and closing of the main supply channel, the purge channel, and the discharge channel.

[0005] In some embodiments, the main supply channel includes a first channel group, a first transition channel, a second channel group, a second transition channel, and a third channel group, wherein the first channel group, the second channel group, and the third channel group are arranged in layers sequentially along the height direction of the valve block; The first transition channel is disposed between the first channel group and the second channel group and is used to connect the first channel group and the second channel group; the second transition channel is disposed between the second channel group and the third channel group and is used to connect the second channel group and the third channel group.

[0006] In some embodiments, the high-pressure gas supply device further includes a detection component that is sealed to the valve block and is at least partially disposed within the valve block, the detection component being used to detect the pressure and temperature within the valve block.

[0007] In some embodiments, the first channel group includes a first channel, a second channel, and a third channel connected in sequence, and the two connected channels extend in different directions.

[0008] In some embodiments, the valve block has a gas inlet that is connected to one end of the first channel; The detection component includes a first sensing unit, at least a portion of which is disposed within the other end of the first channel and is sealed to the inner wall of the first channel. The first sensing unit is used to detect the temperature within the first channel.

[0009] In some embodiments, the first valve assembly further includes the first valve, at least a portion of which is disposed within the second channel and is sealed to the inner wall of the second channel, the first valve being used to control the opening and closing of the first channel and the third channel.

[0010] In some embodiments, the detection component further includes a second sensing unit, a display unit, and a third sensing unit; A filter section is provided at the end of the third channel away from the second channel. The filter section is sealed to the inner wall of the third channel. The third sensing section is connected to the filter section and sealed to the valve block. The third sensing section is used to detect the pressure difference between the air inlet and the air outlet of the filter section. The second sensing unit and the display unit are sealed to the valve block. The second sensing unit is used to detect the pressure in the third channel, and the display unit is used to display the pressure value in the third channel.

[0011] In some embodiments, the second channel group includes a fourth channel, and the third channel is connected to the fourth channel through the first transition channel, wherein the two connected channels of the third channel, the first transition channel, and the fourth channel have different extension directions; The first valve assembly further includes a second valve, at least a portion of which is disposed within the fourth channel and is sealed to the inner wall of the fourth channel. The second valve is used to control the connection and disconnection between the first transition channel and a portion of the main supply channel located within the third region.

[0012] In some embodiments, the valve block has a purge inlet, the purge channel includes a first branch, at least a portion of the first branch is located on the same layer as the second channel group, one end of the first branch is connected to the purge inlet, and the other end of the first branch is connected to the second channel, the first branch being used to input purge medium into the main supply channel.

[0013] In some embodiments, the first branch includes a first connecting slot and a second connecting slot that are connected to each other. The first connecting slot is connected to the purge inlet, and the first connecting slot is connected to the second channel through the second connecting slot. The first valve assembly further includes a sixth valve and a seventh valve. The sixth valve is disposed in the first connecting groove and is sealed to the inner wall of the first connecting groove. The sixth valve is used to control the connection between the purge inlet and the second connecting groove. The seventh valve is disposed in the second connecting groove and is sealed to the inner wall of the second connecting groove. The seventh valve is used to control the connection between the first connecting groove and the second channel.

[0014] In some embodiments, the third channel group includes a fifth channel and a sixth channel, the fourth channel is connected to the fifth channel through the second transition channel, and the two connected channels among the fourth channel, the second transition channel, the fifth channel and the sixth channel have different extension directions; The first valve assembly further includes a third valve, at least a portion of which is disposed within the fifth channel and is sealed to the inner wall of the fifth channel. The third valve is used to control the opening and closing of the second transition channel and the sixth channel. The detection assembly further includes a fourth sensing unit, which is sealed to the valve block and is used to detect the pressure within the fifth channel.

[0015] In some embodiments, the valve block has a discharge outlet, the discharge channel is disposed on the same layer as the third channel group, and the fifth channel is connected to the discharge outlet through the discharge channel; The first valve assembly further includes an eighth valve, which is disposed within the discharge channel and is sealed to the inner wall of the discharge channel. The eighth valve is used to control the on / off connection between the discharge outlet and the fifth valve.

[0016] In some embodiments, the third channel group further includes a seventh channel and an eighth channel, wherein the seventh channel is connected to the sixth channel, and the eighth channel is connected to both the sixth channel and the seventh channel; The first valve assembly further includes a fourth valve and a fifth valve. At least a portion of the fourth valve is disposed within the sixth channel and is sealed to the inner wall of the sixth channel. At least a portion of the fifth valve is disposed within the eighth channel and is sealed to the inner wall of the eighth channel. The fourth valve and the fifth valve are arranged in parallel. The fifth valve is used to limit the gas flow through the eighth channel when the high-pressure gas supply device is started, and the fourth valve is used to open when the pressure downstream of the sixth channel reaches a preset value.

[0017] In some embodiments, the third channel group further includes a ninth channel, which is connected to one end of the seventh channel, and the valve block has a gas outlet, which is connected to the ninth channel; The first valve assembly further includes a fifth sensing unit, at least partially disposed within the other end of the seventh channel and sealed to the inner wall of the seventh channel, the fifth sensing unit being used to detect the pressure within the seventh channel.

[0018] In some embodiments, the valve block has a purge outlet, and the purge channel further includes a second branch, which is disposed on the same side as the third channel group. The seventh channel is connected to the purge outlet through the second branch, and the second branch is used to discharge at least a portion of the residual gas in the main supply channel.

[0019] In some embodiments, the second branch includes a third connecting groove, a fourth connecting groove, and a fifth connecting groove, the fifth connecting groove being connected to the purge outlet, the third connecting groove being connected to the seventh channel and the fifth connecting groove respectively, and the fourth connecting groove being connected to the seventh channel and the fifth connecting groove respectively; The first valve assembly further includes a ninth valve and a tenth valve. The ninth valve is disposed in the third connecting groove and is sealed to the third connecting groove. The tenth valve is disposed in the fourth connecting groove and is sealed to the fourth connecting groove. The ninth valve and the tenth valve are connected in parallel to control the on / off state between the seventh channel and the fifth connecting groove. The detection component further includes a sixth sensing unit, which is disposed in the fifth communicating groove and is sealed to the inner wall of the fifth communicating groove. The sixth sensing unit is used to detect the temperature in the fifth communicating groove.

[0020] According to a second aspect of this application, a high-pressure gas supply system is provided, comprising: Air supply components are used to provide the driving air source; The second valve assembly is connected to the gas source assembly; The control component is electrically connected to the second valve assembly; As described above, in the high-pressure gas supply device, the first valve assembly of the high-pressure gas supply device is connected to the second valve assembly. The second valve assembly is configured to open or close under the control of the control assembly to provide or cut off the driving gas source to the first valve assembly, thereby driving the valve in the first valve assembly to open or close, so as to realize the gas supply of the main supply channel, the purging and replacement of the purging channel, and the residual gas release of the venting channel.

[0021] The high-pressure gas supply device according to an embodiment of this application includes a valve block and a first valve assembly. A main supply channel, a purge channel, and a venting channel are formed within the valve block. The purge channel communicates with the main supply channel and is used to displace and discharge residual gas within the main supply channel. The venting channel communicates with the main supply channel and is used to vent at least a portion of the residual gas within the main supply channel. The first valve assembly is sealed to the valve block and is at least partially disposed within the valve block. The first valve assembly controls the opening and closing of the main supply channel, the purge channel, and the venting channel. By forming the main supply channel, the purge channel, and the venting channel all within the same valve block, and sealingly connecting the first valve assembly for controlling the opening and closing of each channel to the valve block and at least partially embedding it within the valve block, the communication between each functional channel is achieved within the valve block. This eliminates the need for connecting pipes and joints outside the valve block, thereby reducing the risk of high-pressure gas leakage due to excessive external connection points. Meanwhile, the compact arrangement of all functional components within the valve block makes the overall structure of the device more compact and significantly reduces its size, thus lowering the installation difficulty within the limited space of a ship. As the common load-bearing base for all functional flow channels and valve assemblies, the valve block's integral structure, combined with the sealing connection between the first valve assembly and the valve block, ensures the device's sealing reliability under high-pressure conditions. Attached Figure Description

[0022] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0023] To gain a more complete understanding of this application and its beneficial effects, the following description will be provided in conjunction with the accompanying drawings, wherein the same reference numerals in the following description denote the same parts.

[0024] Figure 1 This is a schematic diagram of a high-pressure gas supply system provided in an exemplary embodiment of this disclosure; Figure 2 This is a schematic diagram of a high-pressure gas supply device provided in an exemplary embodiment of this disclosure; Figure 3 This is provided in the exemplary embodiments of this disclosure. Figure 2 A schematic diagram of the internal structure of the valve block, in which each channel is marked in the main supply flow channel section; Figure 4 This is a schematic diagram of the first branch provided in an exemplary embodiment of this disclosure, wherein each connecting slot is marked; Figure 5 This is a schematic diagram of the discharge flow path provided in an exemplary embodiment of this disclosure; Figure 6 This is a schematic diagram of the second branch provided in an exemplary embodiment of this disclosure, wherein each connecting slot is marked; Figure 7 This is a schematic diagram of the structure of the high-pressure gas supply device provided in an exemplary embodiment of this disclosure; Figure 8 This is a schematic diagram of the structure of the valve block provided in an exemplary embodiment of this disclosure; Figure 9 This is an internal perspective view of the valve block provided in an exemplary embodiment of this disclosure, showing only the main supply flow channel; Figure 10 This is a structural perspective view of the layer containing the first channel group inside the valve block provided in an exemplary embodiment of this disclosure; Figure 11 This is a structural perspective view of the layer containing the second channel group inside the valve block provided in an exemplary embodiment of this disclosure; Figure 12 This is a structural perspective view of the layer containing the third channel group inside the valve block provided in an exemplary embodiment of this disclosure.

[0025] Explanation of reference numerals in the attached figures: 10-Valve block; 11-Main supply channel; 111-First channel group; 112-First transition channel; 113-Second channel group; 114-Second transition channel; 115-Third channel group; 116-First channel; 117-Second channel; 118-Third channel; 119-Fourth channel; 120-Fifth channel; 121-Sixth channel; 122-Seventh channel; 123-Eighth channel; 124-Ninth channel; 125-Filter section; 13-Purge channel; 131-First branch; 132-First connecting groove; 133-Second connecting groove; 134-Second branch; 135-Third connecting groove; 136-Fourth connecting groove; 137-Fifth connecting groove; 14-Drainage flow 15-Gas Inlet; 16-Purge Inlet; 17-Release Outlet; 18-Gas Outlet; 19-Purge Outlet; 20-First Valve Assembly; 21-First Valve; 22-Second Valve; 23-Third Valve; 24-Fourth Valve; 25-Fifth Valve; 26-Sixth Valve; 27-Seventh Valve; 28-Eighth Valve; 29-Ninth Valve; 230-Tenth Valve; 30-Detection Assembly; 31-First Sensor Unit; 32-Second Sensor Unit; 33-Display Unit; 34-Third Sensor Unit; 35-Fourth Sensor Unit; 36-Fifth Sensor Unit; 37-Sixth Sensor Unit; 40-Gas Source Assembly; 50-Second Valve Assembly; 60-Control Assembly; 70-Temperature Regulation Module; 80-Frame; X-Height Direction. Detailed Implementation

[0026] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the protection scope of this application.

[0027] Existing marine high-pressure gas supply systems, especially those for liquefied natural gas (LNG) dual-fuel engines, typically include functional modules such as a main supply path, a purging path, and a venting path. Each module performs its function through independent valves, filters, sensors, and other discrete components. These components are connected sequentially via external pipes and connectors to complete the gas supply process, including gas filtration, on / off control, pressure and temperature detection, residual gas purging after engine shutdown, and safe venting. However, because these functional modules are all discrete components connected by external pipes, the entire system has numerous connection points, a high potential risk of leakage, and a loose overall layout, making it difficult to achieve compact installation within the limited engine room space of a ship.

[0028] Please see Figure 1 and Figure 2 This application provides a high-pressure gas supply device, including a valve block 10 and a first valve assembly 20. The valve block 10 is a single unit with multiple interconnected channels forming a main supply channel 11, a purge channel 13, and a venting channel 14. The main supply channel 11 is used to supply normal gas to the engine. The purge channel 13 communicates with the main supply channel 11 and, after the engine stops operating, introduces a purge medium, such as nitrogen, into the main supply channel 11 to replace and discharge any residual gas, thereby reducing the risk of safety accidents caused by high-pressure gas remaining in the device. The venting channel 14 communicates with the main supply channel 11 and, before emergency shutdown or maintenance, vents at least a portion of the residual gas in the main supply channel 11 to an external collection device, which may be a natural gas collection tank. The pressure of the high-pressure gas is in the range of 300 bar to 420 bar.

[0029] The first valve assembly 20 is sealed to the valve block 10 and is at least partially disposed within the valve block 10. The first valve assembly 20 includes multiple valves disposed in different positions for controlling the opening and closing of the main supply channel 11, the purge channel 13 and the discharge channel 14.

[0030] By forming the main supply channel 11, purge channel 13, and vent channel 14 within the same valve block 10, and by at least partially embedding the first valve assembly 20 for controlling the on / off state of each channel within the valve block 10, the main supply channel 11, purge channel 13, and vent channel 14 do not require external pipes or joints for connection. Communication between functional modules is achieved through the channels within the valve block 10. Compared to the prior art's use of discrete components connected via external pipes, this application eliminates external pipes and joints, fundamentally reducing potential leak points and effectively lowering the risk of high-pressure gas leakage. Simultaneously, the compact arrangement of the functional channels within the valve block 10 results in a more compact overall structure and significantly reduced volume, facilitating installation in space-constrained engine rooms such as those on ships.

[0031] The valve block 10 is an integral structure, serving as the common load-bearing base for all functional channels and valve assemblies. This structure avoids high-pressure sealing problems at the connections of discrete components. Combined with the sealing connection between the first valve assembly 20 and the valve block 10, it ensures long-term stable operation of the device under high-pressure conditions. The purging channel 13 can displace and discharge residual gas in the main supply channel 11 after the supply is stopped, and the venting channel 14 can vent at least part of the residual gas. The two work together to further improve the safety of the device in high-pressure gas environments.

[0032] Please see Figure 8 , Figure 9 , Figure 10 , Figure 11 and Figure 12 In some embodiments, the main supply channel 11 includes a first channel group 111, a first transition channel 112, a second channel group 113, a second transition channel 114, and a third channel group 115, which are arranged sequentially in layers along the height direction X of the valve block 10. The first transition channel 112 is disposed between the first channel group 111 and the second channel group 113 and serves to connect the first channel group 111 and the second channel group 113. The second transition channel 114 is disposed between the second channel group 113 and the third channel group 115 and serves to connect the second channel group 113 and the third channel group 115.

[0033] By dividing the main supply channel 11 into three levels—a first channel group 111, a second channel group 113, and a third channel group 115—and arranging these three channel groups sequentially along the height direction X of the valve block 10, the first channel group 111 connects to the gas inlet 15, and the third channel group 115 connects to the gas outlet 18. Simultaneously, a first transition channel 112 connects the first channel group 111 and the second channel group 113, and a second transition channel 114 connects the second channel group 113 and the third channel group 115, thus forming a complete path from inlet to outlet within the valve block 10. This layered arrangement allows the channels, which would otherwise need to meander within the same plane, to be positioned along the height direction X. Each channel group can independently house its corresponding functional components, such as valves, filter structures, and sensors, reducing the risk of all components being crammed into the same layer, resulting in an excessively large planar size for the valve block 10. Furthermore, the transition channels between different height levels enable more flexible and compact channel layouts between layers. Compared to the method of connecting each functional component sequentially through external pipes on the same plane, this application makes full use of the height space of the valve block 10 and arranges the main supply channel 11 in three-dimensional space, effectively reducing the size of the valve block 10 in the length and width directions, making the overall structure of the device more compact, further saving installation space, and facilitating its arrangement in engine rooms with limited space, such as ships.

[0034] The high-pressure gas supply device also includes a detection component 30, which is sealed to the valve block 10 and at least partially disposed within the valve block 10. The detection component 30 is used to detect the pressure and temperature within the valve block 10. This arrangement allows the detection component 30 to directly contact the corresponding flow channel within the valve block 10, acquiring the pressure and temperature parameters of the gas within the flow channel in real time, without the need for external pressure tapping or the installation of a temperature sensing sleeve. This application eliminates the external connection pipes and joints between the sensor and the main supply flow channel 11, reducing potential leakage points and avoiding the additional space occupation caused by external pressure tapping pipes. The detection component 30 is directly built into the valve block 10 and sealed to it, which not only shortens the distance between the detection component 30 and the detected medium, improving the detection response speed and measurement accuracy, but also makes the entire device more compact, cleaner in appearance, and adaptable to higher gas pressures.

[0035] Please see Figure 3 and Figure 10In some embodiments, the first channel group 111 includes a first channel 116, a second channel 117, and a third channel 118 connected in sequence, with the two connected channels extending in different directions. This arrangement allows the main supply channel 11 to extend in a zigzag pattern within the valve block 10, achieving turning and reversing in the length and width directions of the valve block 10. The main supply channel 11 does not need to extend in a straight line in a single direction; instead, it can be arranged in a meandering manner within the limited planar space of the valve block 10. This effectively utilizes the internal space of the valve block 10, allowing the channel to achieve a longer path length within a smaller space. This provides ample installation space for arranging multiple functional components, such as the filter unit 125 and the sensing unit, within the same layer, resulting in a more compact overall device structure.

[0036] Please see Figure 3 , Figure 7 , Figure 8 , Figure 9 and Figure 10 In some embodiments, the valve block 10 has a gas inlet 15, which is connected to one end of the first channel 116. The detection assembly 30 includes a first sensing unit 31, at least a portion of which is disposed in the other end of the first channel 116 and is sealed to the inner wall of the first channel 116. The first sensing unit 31 is used to detect the temperature inside the first channel 116.

[0037] The gas inlet 15 is used to connect to an external gas pipeline, allowing high-pressure gas to enter the valve block 10 from the gas inlet 15 and flow into the main supply channel 11 via the first channel 116 connected to the gas inlet 15. At least a portion of the first sensing unit 31 is disposed in the other end of the first channel 116, i.e., downstream of the gas inlet 15, so that the first sensing unit 31 can directly contact the gas flowing through the first channel 116 and detect the initial temperature of the gas entering the valve block 10 in real time. The first sensing unit 31 is sealed to the inner wall of the first channel 116, which can prevent high-pressure gas from leaking from the installation gap between the first sensing unit 31 and the inner wall of the first channel 116, ensuring the sealing reliability of the device under high-pressure conditions. The first sensing unit 31 is a temperature sensor.

[0038] By directly inserting at least a portion of the first sensing unit 31 into the first channel 116 and sealing it against the inner wall of the first channel 116, the first sensing unit 31 can directly contact the gas in the flow channel for temperature detection. This eliminates the need for external pipelines to draw out the gas or for installing temperature-sensing sleeves, saving the external space occupied by additional pressure-sensing pipes or temperature-sensing sleeves, and avoiding the risk of leakage at pressure-sensing pipe connections. The first sensing unit 31 can acquire the initial temperature parameters of the gas as soon as it enters the main supply flow channel 11, used to determine whether the gas temperature is within the temperature range that can be normally supplied to the engine. When the detected temperature exceeds the preset range, it can send an alarm signal to the control component 60 to alert the operator, thereby ensuring that the gas temperature supplied to the engine meets the requirements and preventing abnormal gas temperature from affecting the normal operation of the engine or causing safety hazards.

[0039] Please see Figure 3 , Figure 7 , Figure 8 , Figure 9 and Figure 10 In some embodiments, the first valve assembly 20 further includes a first valve 21, at least a portion of which is disposed within the second channel 117 and is sealed to the inner wall of the second channel 117. The first valve 21 is used to control the opening and closing of the first channel 116 and the third channel 118.

[0040] The first valve 21 is a manual shut-off valve, at least partially extending into the second channel 117, used to manually control the opening and closing of the connection between the first channel 116 and the third channel 118. When the first valve 21 is open, the high-pressure gas entering the first channel 116 from the gas inlet 15 can flow through the second channel 117 to the third channel 118, entering the subsequent supply path. When the first valve 21 is closed, the passage between the first channel 116 and the third channel 118 is cut off, and the gas cannot continue to flow downstream. The first valve 21 is sealed to the inner wall of the second channel 117, preventing high-pressure gas from leaking outward from the installation gap between the inner walls of the first valve 21 and the second channel 117, ensuring the sealing reliability of the device under high-pressure conditions. As the main switch of the entire high-pressure gas supply device, the first valve 21 needs to send its opening and closing signal back to the engine control system so that the control system can know the current status of the valve. At the same time, when the components in the system need to be repaired or replaced, the upstream gas can be isolated from the internal flow channel of the valve block 10 by closing the first valve 21, providing the prerequisite for the safe maintenance of subsequent components.

[0041] By directly integrating at least a portion of the first valve 21 into the second channel 117, i.e., within the valve block 10, there is no need to install a separate shut-off valve outside the valve block 10 and connect it to the main supply channel 11 via a pipeline. This eliminates the need for external connecting pipes and joints, reduces potential leakage points, and avoids the additional space occupied by external pipelines. The direct integration of the first valve 21 into the second channel 117 shortens the distance between the valve body and the channel, making the entire device more compact. Furthermore, the first valve 21 serves as a manually operated master switch, allowing operators to manually cut off the gas pipeline during system commissioning, maintenance, or emergencies, improving the operational flexibility and safety of the device.

[0042] Please see Figure 3 In some embodiments, the detection component 30 further includes a second sensing unit 32, a display unit 33, and a third sensing unit 34. A filter unit 125 is disposed at the end of the third channel 118 away from the second channel 117. The filter unit 125 is sealed to the inner wall of the third channel 118. The third sensing unit 34 is connected to the filter unit 125 and sealed to the valve block 10. The third sensing unit 34 is used to detect the pressure difference between the air inlet and outlet of the filter unit 125. The second sensing unit 32 and the display unit 33 are sealed to the valve block 10. The second sensing unit 32 is used to detect the pressure within the third channel 118, and the display unit 33 is used to display the pressure value within the third channel 118.

[0043] The filter section 125 is a gas filter, located within the third channel 118, downstream of the first valve 21. The filter section 125 is sealed to the inner wall of the third channel 118, ensuring that the high-pressure gas flowing from the first valve 21 must pass through the filter section 125 before continuing downstream. The filter section 125 filters impurities in the gas, with a filtration accuracy of 10 μm and a pressure drop loss of less than 1%, ensuring that no contaminants enter the engine and protecting its normal operation.

[0044] The third sensing unit 34 is a differential pressure sensor connected to the filter unit 125, used to detect the pressure difference between the air inlet and outlet of the filter unit 125. As the filter element of the filter unit 125 gradually becomes clogged with impurities, the pressure difference between its inlet and outlet gradually increases. The third sensing unit 34 monitors this pressure difference in real time. When the pressure difference exceeds the system's preset alarm value, the control component 60 automatically sends an alarm signal to remind the operator to replace the filter element in time, reducing the risk of air supply disruption due to filter blockage and ensuring the continuous and stable operation of the supply system.

[0045] The second sensing unit 32 is a pressure sensor, which is sealed to the valve block 10. It is used to detect the pressure in the third channel 118, that is, to monitor whether the pressure at the gas inlet 15 is within the pressure range that can be normally supplied to the engine, for example, the range of 300 bar to 420 bar. When the detected pressure exceeds the preset range, an alarm signal can be sent to the control component 60 to remind the operator.

[0046] The display unit 33 is a pressure gauge, which is sealed to the valve block 10. It is used to display the pressure value in the third channel 118 on site, so that the operator can directly observe the pressure of the gas inlet 15 without relying on electronic display equipment.

[0047] By placing the filter unit 125 within the third channel 118 and sealing it to the valve block 10, connecting the third sensor unit 34 to the filter unit 125 and sealing it to the valve block 10, and sealing the second sensor unit 32 and the display unit 33 to the valve block 10, the filter unit 125, the third sensor unit 34, the second sensor unit 32, and the display unit 33 are all integrated onto the valve block 10. This eliminates the need for separate filters and sensors installed outside the valve block 10 and connected to the main supply channel 11 via external pipes, thus eliminating external connecting pipes and joints, reducing potential leakage points, and avoiding the additional space occupied by external pipes and independent mounting brackets. The filter unit 125, the second sensor unit 32, and the display unit 33 are all directly connected to the third channel 118, shortening the filtration and detection paths and making the overall structure of the device more compact and the layout cleaner. The third sensor unit 34 monitors the pressure difference of the filter unit 125 in real time and can issue an alarm in time when the filter element is clogged, realizing online monitoring of the working status of the filter unit 125 and avoiding gas supply disruptions due to undetected filter element clogging. The second sensor unit 32 monitors the inlet pressure in real time, and the display unit 33 displays the pressure value on-site. The two work together to achieve automatic monitoring and alarm of the inlet pressure, and also facilitate direct observation by on-site personnel, improving the convenience and safety of the device.

[0048] Please see Figure 3 , Figure 8 , Figure 9 and Figure 11 In some embodiments, the second channel group 113 includes a fourth channel 119, and the third channel 118 is connected to the fourth channel 119 via a first transition channel 112. The two connected channels of the third channel 118, the first transition channel 112, and the fourth channel 119 have different extension directions. The first valve assembly 20 also includes a second valve 22, at least a portion of which is disposed within the fourth channel 119 and is sealed to the inner wall of the fourth channel 119. The second valve 22 is used to control the connection and disconnection between the first transition channel 112 and a portion of the main supply channel 11 located in the third region.

[0049] The first channel group 111 is located in the first region of valve block 10, the second channel group 113 is located in the second region of valve block 10, and the third channel group 115 is located in the third region of valve block 10. The third channel 118 is located in the first region, and the fourth channel 119 is located in the second region. The first transition channel 112 extends from the first region to the second region, connecting the third channel 118 and the fourth channel 119. The two connected channels of the third channel 118, the first transition channel 112, and the fourth channel 119 have different extension directions, allowing the gas to flow from the third channel 118 through the first transition channel 112 to the fourth channel 119, achieving an interlayer transition of the flow path from the first region to the second region within valve block 10, and fully utilizing the internal space of valve block 10. The second valve 22 is a pneumatic shut-off valve, at least partially disposed within the fourth channel 119 and sealed to the inner wall of the fourth channel 119, used to control the connection and disconnection between the first transition channel 112 and a portion of the main supply flow channel 11 located in the third region. The second valve 22 is pneumatically driven and can be remotely and automatically opened or closed under the control of the control component 60.

[0050] A temperature regulation module 70 is also installed inside the valve block 10. The temperature regulation module 70 is located on the same layer as the second channel group 113, i.e., the second area. The temperature regulation module 70 is used to heat the valve block 10 during the purging stage to prevent the temperature of the valve block 10 from dropping rapidly due to the purging medium entering the interior of the valve block 10. This ensures the normal operation of the temperature sensor and reduces the risk of false alarms caused by the temperature sensor due to the valve block 10 losing temperature.

[0051] Please see Figure 2 , Figure 3 , Figure 4 and Figure 7 In some embodiments, the valve block 10 has a purge inlet 16, and the purge channel 13 includes a first branch 131. At least a portion of the first branch 131 is located on the same layer as the second channel group 113. One end of the first branch 131 is connected to the purge inlet 16, and the other end of the first branch 131 is connected to the second channel 117. The first branch 131 is used to input purge medium into the main supply channel 11.

[0052] The purge inlet 16 is used to connect to an external purge gas source, such as a nitrogen cylinder group or a marine nitrogen system, so that the purge medium enters the valve block 10 from the purge inlet 16. One end of the first branch 131 is connected to the purge inlet 16, and the other end of the first branch 131 is connected to the second channel 117. At least a portion of the first branch 131 is located on the same layer as the second channel group 113, i.e., the second region, so that after the purge medium enters from the purge inlet 16, it flows into the second channel 117 through the first branch 131 and enters the main supply channel 11. After the purging medium enters the main supply channel 11 through the second channel 117, it flows through components located in the first and second regions, such as the first valve 21, filter section 125, first transition channel 112, and second valve 22. This pushes the residual gas in the pipe section between the first valve 21 and the second valve 22 downstream, where it is discharged through the subsequent purging path. Alternatively, the second valve 22 can be closed, allowing the residual gas in the pipe section between the first valve 21 and the second valve 22 to be discharged through the gas inlet 15. In this case, the gas inlet 15 can be connected to a collection device to collect the discharged gas. This structure completes the purging and replacement of at least a portion of the main supply channel 11, reducing the risk of high-pressure gas stagnation within the main supply channel 11.

[0053] By placing at least a portion of the first branch 131 on the same floor as the second channel group 113, and directly connecting the first branch 131 to the purge inlet 16 and the second channel 117, the first branch 131 of the purge channel 13 is integrated inside the valve block 10. This eliminates the need for a separate purge pipe outside the valve block 10 to introduce the purge medium into the main supply channel 11, thus eliminating the need for external purge connection pipes and joints, reducing the risk of leakage from external connections, and avoiding the additional space occupation of external pipes. The first branch 131 and the second channel group 113 are located on the same floor, making full use of the space in the second area. This eliminates the need for additional inter-floor channels or external pipelines for the first branch 131, further improving the space utilization rate inside the valve block 10 and making the overall structure of the device more compact. The first branch 131 is directly connected to the second channel 117. After the purging medium enters the main supply channel 11 from the second channel 117, it can effectively purge the pipe section from downstream of the first valve 21 to upstream of the second valve 22. This pipe section is an area where residual gas is likely to remain after the high-pressure gas supply stops. By purging this area through the first branch 131, the risk of residual gas remaining in this area is reduced, ensuring the safety of the device after the supply stops.

[0054] Please see Figure 3 and Figure 4In some embodiments, the first branch 131 includes a first connecting groove 132 and a second connecting groove 133 that are connected to each other. The first connecting groove 132 is connected to the purge inlet 16, and the first connecting groove 132 is connected to the second channel 117 through the second connecting groove 133. The first valve assembly 20 also includes a sixth valve 26 and a seventh valve 27. The sixth valve 26 is disposed in the first connecting groove 132 and is sealed to the inner wall of the first connecting groove 132. The sixth valve 26 is used to control the opening and closing of the purge inlet 16 and the second connecting groove 133. The seventh valve 27 is disposed in the second connecting groove 133 and is sealed to the inner wall of the second connecting groove 133. The seventh valve 27 is used to control the opening and closing of the first connecting groove 132 and the second channel 117.

[0055] The first connecting groove 132 and the second connecting groove 133 are both groove-shaped flow channels formed by milling inside the valve block 10. Their open sides are sealed by the cover plate of the valve block 10 or the mounting base of the valve assembly to form a closed pressure-bearing flow channel. The first connecting groove 132 communicates with the purge inlet 16, and the second connecting groove 133 communicates with the first connecting groove 132 and the second channel 117, thereby forming a complete purge passage from the purge inlet 16 to the second channel 117 inside the valve block 10. The sixth valve 26 is disposed in the first connecting groove 132. The sixth valve 26 is a shut-off valve used to control the opening and closing between the purge inlet 16 and the second connecting groove 133. The seventh valve 27 is located in the second connecting groove 133. The seventh valve 27 is a purge shut-off check valve, which is used to control the opening and closing between the first connecting groove 132 and the second channel 117. At the same time, it allows the purge medium to flow unidirectionally from the first connecting groove 132 to the second channel 117 and prevents the gas in the main supply channel 11 from flowing back to the purge inlet 16.

[0056] This configuration integrates the first branch 131 entirely within the valve block 10, eliminating the need for separate purging pipes and valves outside the valve block 10. This eliminates the need for external pipes and joints, reducing the risk of leakage from external connections and avoiding the additional space requirements of external pipes. The sixth valve 26 can be pneumatically driven, enabling remote automatic opening or closing under the control of the control component 60, eliminating the need for manual on-site operation and facilitating automated control of the purging process. The seventh valve 27 has both shut-off and check functions. On one hand, it works in conjunction with the sixth valve 26 to control the opening and closing of the purging passage. On the other hand, after purging or when the sixth valve 26 fails, it prevents high-pressure gas in the main supply channel 11 from flowing back into the purging inlet 16, reducing the risk of gas flowing back into the purging gas source and improving the safety of the device.

[0057] Please see Figure 3 , Figure 8 , Figure 9 and Figure 12In some embodiments, the third channel group 115 includes a fifth channel 120 and a sixth channel 121. A fourth channel 119 is connected to the fifth channel 120 via a second transition channel 114. The two connected channels among the fourth channel 119, the second transition channel 114, the fifth channel 120, and the sixth channel 121 have different extending directions. The first valve assembly 20 also includes a third valve 23, at least a portion of which is disposed within the fifth channel 120 and is sealed to the inner wall of the fifth channel 120. The third valve 23 is used to control the opening and closing of the connection between the second transition channel 114 and the sixth channel 121. The detection assembly 30 also includes a fourth sensing unit 35, which is sealed to the valve block 10 and used to detect the pressure within the fifth channel 120.

[0058] The fourth channel 119 is located in the second region, the fifth channel 120 is located in the third region, and the second transition channel 114 extends from the second region to the third region, connecting the fourth channel 119 and the fifth channel 120. The different extension directions of the two connected channels among the fourth channel 119, the second transition channel 114, the fifth channel 120, and the sixth channel 121 allow for a seamless transition of the flow path from the second region to the third region within the valve block 10 when the gas flows from the fourth channel 119 through the second transition channel 114 to the fifth channel 120, eliminating the need for external piping for inter-layer switching and connection. The third valve 23 is a pneumatic shut-off valve, pneumatically driven, and can be remotely and automatically opened or closed under the control of the control component 60. The fourth sensing unit 35 is a pressure sensor, sealed to the valve block 10, used to detect the pressure within the fifth channel 120.

[0059] This configuration allows the main supply channel 11 to transition between the second and third regions within the valve block 10, fully utilizing the height of the valve block 10. It eliminates the need for external cross-layer connecting pipes, reducing the risk of leakage from external pipes and joints. Simultaneously, it reduces the length and width dimensions of the valve block 10, resulting in a more compact overall structure. At least a portion of the third valve 23 is directly integrated into the fifth channel 120, eliminating the need for a separate shut-off valve connected to the main supply channel 11 via a pipe. This removes external pipes and joints, reducing potential leakage points. Furthermore, the direct integration of the third valve 23 into the fifth channel 120 shortens the distance between the valve body and the channel, improving valve response speed and reliability. The third valve 23 and the second valve 22 are connected in series, forming a double-blocking function. Together with the eighth valve 28 positioned between them, they create a double-blocking and venting module. When the second valve 22 and the third valve 23 are closed simultaneously, opening the eighth valve 28 allows residual gas between the two valves to be released to the release outlet 17, thus achieving a double-blocking and intermediate release safety function. This reduces the risk of high-pressure gas leakage in the shut-off state and meets the safety requirements for high-pressure gas systems. The fourth sensor 35 is located within the fifth channel 120, specifically between the second valve 22 and the third valve 23. Figure 3 As shown, the gas pressure in the area is detected. After the venting operation is completed, the pressure value detected by the fourth sensor 35 can determine whether the residual gas between the second valve 22 and the third valve 23 has been completely vented, thereby determining whether the dual blocking and venting module is in a safe state, providing a basis for subsequent operations and reducing the safety risks caused by incomplete venting.

[0060] Please see Figure 1 , Figure 3 and Figure 5 In some embodiments, valve block 10 has a discharge outlet 17, discharge channel 14 and third channel group 115 are disposed on the same layer, and fifth channel 120 communicates with discharge outlet 17 through discharge channel 14. The first valve assembly 20 also includes an eighth valve 28, which is disposed in discharge channel 14 and sealed to the inner wall of discharge channel 14. The eighth valve 28 is used to control the opening and closing between discharge outlet 17 and fifth valve 25.

[0061] One end of the vent channel 14 is connected to the fifth channel 120, and the other end is connected to the vent outlet 17. The vent channel 14 and the third channel group 115 are located on the same layer, i.e., the third region, so that the vent channel 14 is integrated into the third region of the valve block 10. The eighth valve 28 is a pneumatic vent valve, which is located in the vent channel 14 and is sealed to the inner wall of the vent channel 14. It is used to control the opening and closing of the vent outlet 17 and the fifth channel 120.

[0062] This configuration allows the discharge channel 14 to be integrated entirely within the valve block 10, eliminating the need for a separate discharge pipe on the outside of the valve block 10. This eliminates the need for external pipes and joints, reducing the risk of leakage from external connections and avoiding the additional space occupation of external pipes. The discharge channel 14 and the third channel group 115 are located on the same layer, fully utilizing the space in the third area. There is no need for additional inter-layer channels or external pipelines for the discharge channel 14, further improving the space utilization within the valve block 10 and making the overall structure of the device more compact. At least a portion of the eighth valve 28 is directly disposed within the discharge channel 14, i.e., integrated within the valve block 10. There is no need for a separate discharge valve installed outside the valve block 10 and connected to the discharge channel 14 via a pipe. Furthermore, the direct integration of the eighth valve 28 into the discharge channel 14 shortens the distance between the valve body and the channel, improving the valve's response speed and reliability. The eighth valve 28 is pneumatically driven and can be remotely operated automatically under the control of the control component 60, eliminating the need for manual on-site operation and facilitating automated system control. Figure 2 and Figure 3 As shown, when the second valve 22 and the third valve 23 are closed simultaneously, the eighth valve 28 opens, allowing residual gas between the second valve 22 and the third valve 23 to be released through the vent channel 14 from the vent outlet 17 to an external collection device, such as a natural gas collection tank, thus realizing the intermediate venting function of the dual-blocking venting module. The eighth valve 28 is located between the fifth channel 120 and the vent outlet 17. When the eighth valve 28 is open, the high-pressure gas between the second valve 22 and the third valve 23 is discharged from the vent outlet 17 through the vent channel 14 under its own pressure, resulting in fast and efficient venting. When the eighth valve 28 is closed, the vent channel 14 is cut off, ensuring that gas will not leak from the vent outlet 17 under normal supply conditions.

[0063] Please see Figure 3 , Figure 8 , Figure 9 and Figure 12 In some embodiments, the third channel group 115 further includes a seventh channel 122 and an eighth channel 123. The seventh channel 122 communicates with the sixth channel 121, and the eighth channel 123 communicates with both the sixth channel 121 and the seventh channel 122. The first valve assembly 20 further includes a fourth valve 24 and a fifth valve 25. At least a portion of the fourth valve 24 is disposed within the sixth channel 121 and is sealed to the inner wall of the sixth channel 121. At least a portion of the fifth valve 25 is disposed within the eighth channel 123 and is sealed to the inner wall of the eighth channel 123. The fourth valve 24 and the fifth valve 25 are arranged in parallel. The fifth valve 25 is used to limit the gas flow through the eighth channel 123 when the high-pressure gas supply device is started, and the fourth valve 24 is used to open when the pressure downstream of the sixth channel 121 reaches a preset value.

[0064] The sixth channel 121, the seventh channel 122, and the eighth channel 123 are all located on the same floor as the third channel group 115, i.e., within the third area. The seventh channel 122 is connected to the sixth channel 121, and the eighth channel 123 is connected to both the sixth channel 121 and the seventh channel 122, forming two parallel gas passages between the sixth channel 121 and the seventh channel 122: one is the sixth channel 121 itself, and the other is the eighth channel 123. The fourth valve 24 is a pneumatic shut-off valve, at least partially located within the sixth channel 121. The fifth valve 25 is a slow-start valve, at least partially located within the eighth channel 123. The fourth valve 24 and the fifth valve 25 are pneumatically driven and can be remotely and automatically opened or closed under the control of the control component 60, and they are connected in parallel.

[0065] With this configuration, both the fourth valve 24 and the fifth valve 25 are at least partially located inside the valve block 10, shortening the distance between the valve body and the flow channel and improving the valve's response speed and reliability. The fourth valve 24 and the fifth valve 25 are connected in parallel. When the high-pressure gas supply device is started, the fifth valve 25 opens first, using its throttling effect to limit the gas flow through the eighth channel 123, allowing the gas to flow slowly through the eighth channel 123 to the seventh channel 122, gradually building pressure in the downstream pipeline (i.e., the seventh channel 122 and its connected ninth channel 124 and gas outlet 18). When the pressure downstream of the sixth channel 121 (i.e., the pressure within the seventh channel 122) reaches a preset value, for example, 380 bar, the fourth valve 24 opens, and the gas simultaneously flows through both the sixth channel 121 (where the fourth valve 24 is located) and the eighth channel 123 (where the fifth valve 25 is located), achieving full flow supply. This pressure-building method allows the downstream pipeline to slowly increase pressure during startup, switching to full flow only after the pressure reaches near the engine's supply pressure. This reduces the risk of high-pressure gas directly impacting the engine's downstream pipelines at startup, and also avoids excessive pressure surges in the downstream pipelines, thus ensuring safe engine startup and long-term stable operation. Valve 24 only opens after the pressure reaches the preset value, allowing for a high-flow-rate gas supply after pressure buildup, ensuring the engine's gas flow requirements under normal operating conditions. Valve 25 remains open after valve 24 opens, supplying gas to both branches simultaneously, further increasing the flow area of ​​the supply channel and guaranteeing the gas flow rate during full-flow supply.

[0066] Meanwhile, during normal supply, if downstream pressure fluctuations necessitate repressurization, control component 60 can close the fourth valve 24, maintaining gas supply only to the branch containing the fifth valve 25, thus re-entering the flow-limited pressurization state. Once the downstream pressure stabilizes, the fourth valve 24 can be reopened, thereby providing self-regulation capabilities in case of pressure anomalies. By controlling the timing of the fourth valve 24 and the fifth valve 25 through control component 60, the pressurization process is automated, requiring no manual intervention and improving the system's intelligence and ease of operation.

[0067] Please see Figure 3 , Figure 8 , Figure 9 and Figure 12 In some embodiments, the third channel group 115 further includes a ninth channel 124, which is connected to one end of the seventh channel 122. The valve block 10 has a gas outlet 18, which is connected to the ninth channel 124. The first valve assembly 20 also includes a fifth sensing unit 36, at least a portion of which is disposed within the other end of the seventh channel 122 and is sealed to the inner wall of the seventh channel 122. The fifth sensing unit 36 ​​is used to detect the pressure within the seventh channel 122.

[0068] Specifically, the ninth channel 124 is located on the same layer as the third channel group 115, i.e., the third region. It is connected to the seventh channel 122 and the gas outlet 18, respectively. The gas outlet 18 is used to connect to an external gas pipeline to supply high-pressure gas to the engine. One end of the seventh channel 122 is connected to the eighth channel 123, and the other end of the seventh channel 122 is connected to the ninth channel 124. Gas flows into the seventh channel 122 from at least one of the sixth channel 121 and the eighth channel 123, and then flows out of the valve block 10 through the gas outlet 18 via the ninth channel 124. The fifth sensing unit 36 ​​is a pressure sensor, at least partially disposed inside the other end of the seventh channel 122, so that the fifth sensing unit 36 ​​can directly contact the gas flowing through the seventh channel 122 and detect the pressure of the gas in real time before it enters the ninth channel 124. The fifth sensing unit 36 ​​is sealed to the inner wall of the seventh channel 122, which can prevent high-pressure gas from leaking from the installation gap between the fifth sensing unit 36 ​​and the inner wall of the seventh channel 122, ensuring the sealing reliability of the device under high-pressure conditions.

[0069] This structure allows the fifth sensor unit 36 ​​to directly contact the gas within the flow channel for pressure detection, eliminating the need for external pipelines to draw out the gas and saving the external space occupied by the pressure tapping pipe. It also reduces the risk of leakage at the pressure tapping pipe connection. The fifth sensor unit 36 ​​can acquire the final supply pressure parameter before the gas is supplied to the engine from the gas outlet 18. This parameter is used to determine whether the gas pressure supplied to the engine meets the engine's operating requirements, such as reaching 380 bar. When the detected pressure meets the preset value, the control component 60 controls the fourth valve 24 to open, switching to full-flow supply mode. When the detected pressure exceeds the preset range, an alarm signal can be sent to the control component 60 to alert the operator, thus ensuring that the gas pressure supplied to the engine meets the requirements and reducing the risk of abnormal gas pressure affecting normal engine operation or causing safety hazards. The fifth sensor unit 36 ​​is directly integrated into the seventh channel 122 and sealed to the valve block 10, shortening the distance between the sensor and the gas being measured, improving the response speed and measurement accuracy of pressure detection. Gas outlet 18 is connected to the ninth channel 124 and is located in the same area as the fifth sensor unit 36. These structures are integrated on the same layer, with a compact and reasonable layout, which facilitates the connection and installation of external gas pipelines. This avoids the additional pipeline layout and leakage risks caused by cross-layer outlet pipelines between different layers, while also making the overall appearance of the device cleaner.

[0070] Please see Figure 1 , Figure 3 and Figure 6 In some embodiments, the valve block 10 has a purge outlet 19, and the purge channel 13 further includes a second branch 134, which is disposed on the same side as the third channel group 115. The seventh channel 122 is connected to the purge outlet 19 through the second branch 134. The second branch 134 is used to discharge at least part of the residual gas in the main supply channel 11.

[0071] Specifically, the purge outlet 19 is used to connect to an external exhaust pipe, such as a pipe leading to a natural gas collection tank, so that the purge medium carrying residual gas can be discharged from the purge outlet 19 to the valve block 10. The second branch 134 is connected to the seventh channel 122 and the purge outlet 19 respectively, and the second branch 134 and the third channel group 115 are located on the same floor, i.e., the third area, so that at least part of the residual gas in the main supply channel 11 can be discharged from the purge outlet 19 through the second branch 134. During the purge process, the fourth valve 24 and the fifth valve 25 are closed, and the purge medium can enter the main supply channel 11 from the gas outlet 18 and flow through the ninth channel 124 and the seventh channel 122 in sequence, discharging part of the residual gas in the main supply channel 11 through the second branch 134 from the purge outlet 19, thereby completing the purging of this part of the residual gas in the main supply channel 11.

[0072] Please see Figure 3 and Figure 6 In some embodiments, the second branch 134 includes a third connecting groove 135, a fourth connecting groove 136, and a fifth connecting groove 137. The fifth connecting groove 137 communicates with the purge outlet 19. The third connecting groove 135 communicates with both the seventh channel 122 and the fifth connecting groove 137. The fourth connecting groove 136 communicates with both the seventh channel 122 and the fifth connecting groove 137. The first valve assembly 20 also includes a ninth valve 29 and a tenth valve 230. The ninth valve 29 is disposed within the third connecting groove 135 and is sealed to the third connecting groove 135. The tenth valve 230 is disposed within the fourth connecting groove 136 and is sealed to the fourth connecting groove 136. The ninth valve 29 and the tenth valve 230 are connected in parallel. The detection assembly 30 also includes a sixth sensing unit 37, which is disposed within the fifth connecting groove 137 and is sealed to the inner wall of the fifth connecting groove 137.

[0073] Specifically, the third connecting groove 135, the fourth connecting groove 136, and the fifth connecting groove 137 are all groove-shaped flow channels formed by milling inside the valve block 10. Their opening sides are sealed by the cover plate of the valve block 10 or the mounting base of the valve assembly and sensor to form a closed pressure-bearing flow channel. The third connecting groove 135 and the fourth connecting groove 136 are both connected to the seventh channel 122, and their other ends are connected to the fifth connecting groove 137. The fifth connecting groove 137 is connected to the purge outlet 19, thereby forming two parallel exhaust passages from the seventh channel 122 to the purge outlet 19 inside the valve block 10. The ninth valve 29 is a purge relief valve, which is located in the third connecting groove 135 and is sealed to the inner wall of the third connecting groove 135, and is used to control the opening and closing of the third connecting groove 135. The tenth valve 230 is a purge relief valve, which is located in the fourth connecting groove 136 and is sealed to the inner wall of the fourth connecting groove 136, and is used to control the opening and closing of the fourth connecting groove 136. The ninth valve 29 and the tenth valve 230 are connected in parallel and are both pneumatically driven. They can be remotely and automatically opened or closed under the control of the control component 60. When the ninth valve 29 and / or the tenth valve 230 are open, the residual gas in the seventh channel 122 and the ninth channel 124 can flow into the fifth channel 137 through the third connecting groove 135 and / or the fourth connecting groove 136, and then be discharged from the purge outlet 19. The sixth sensing unit 37 is a temperature sensor, which is disposed in the fifth connecting groove 137 and sealed to the inner wall of the fifth connecting groove 137, and is used to detect the temperature of the gas discharged in the fifth connecting groove 137.

[0074] This structure allows the ninth valve 29 and the tenth valve 230 to be connected in parallel, providing redundancy. If one valve fails to open, the other can still open normally to perform the purging and exhaust function, reducing the risk of purging failure due to a single valve malfunction and ensuring reliable execution of the purging process. The sixth sensor unit 37, located within the fifth connecting groove 137, can detect the exhaust temperature in real time before the mixture of purging medium and residual gas is discharged from the purging outlet 19. When an abnormal exhaust temperature is detected, an alarm signal can be sent to the control component 60 to alert the operator, thus determining whether the purging process is proceeding normally and reducing safety risks caused by purging abnormalities. The ninth valve 29 and the tenth valve 230 are connected in parallel between the seventh channel 122 and the fifth connecting groove 137. The two parallel branches open simultaneously during purging, increasing the flow area of ​​the exhaust passage, facilitating the rapid discharge of residual gas and purging medium, and improving purging efficiency.

[0075] Please see Figure 1 This application also provides a high-pressure gas supply system, including a gas source assembly 40, a second valve assembly 50, a control assembly 60, and the high-pressure gas supply device described above. The gas source assembly 40 provides a driving gas source. The second valve assembly 50 is connected to the gas source assembly 40. The control assembly 60 is electrically connected to the second valve assembly 50. The first valve assembly 20 of the high-pressure gas supply device is connected to the second valve assembly 50. The second valve assembly 50 is configured to open or close under the control of the control assembly 60 to provide or cut off the driving gas source to the first valve assembly 20, thereby driving the valve in the first valve assembly 20 to open or close, thereby realizing the gas supply to the main supply channel 11, the purging and replacement of the purging channel 13, and the residual gas release of the venting channel 14. The second valve assembly 50, the control assembly 60, and the high-pressure gas supply device can all be mounted on the frame 80.

[0076] The air supply assembly 40 includes a compressed air source, such as a ship's own compressed air system, to provide the high-pressure gas required to drive the pneumatic valves in the first valve assembly 20. The second valve assembly 50 includes multiple solenoid valves, each with its inlet connected to the air supply assembly 40 and its outlet connected to the drive port of the corresponding pneumatic valve in the first valve assembly 20. The control assembly 60 includes a controller, an intrinsically safe junction box, and an increased safety junction box, used to control the energization or de-energization of the solenoid valves in the second valve assembly 50 according to preset logic or external commands. The drive ports of the pneumatic valves in the first valve assembly 20 are connected to the outlets of the corresponding solenoid valves in the second valve assembly 50 via pipelines.

[0077] By integrating the high-pressure gas supply device with the gas source assembly 40, the second valve assembly 50, and the control assembly 60 into a high-pressure gas supply system, the control assembly 60 controls the opening and closing of each solenoid valve in the second valve assembly 50 via electrical signals. The second valve assembly 50 then automatically controls the high-pressure gas supply device by supplying or cutting off the driving gas source to each pneumatic valve in the first valve assembly 20. Under the control of the control assembly 60, each solenoid valve is energized or de-energized according to a preset logic sequence, causing each pneumatic valve in the first valve assembly 20 to operate according to a preset timing sequence. For example, first opening the second valve 22 and the third valve 23, then opening the fifth valve 25 to limit flow and build pressure, and finally opening the fourth valve 24 to supply full flow. This achieves precise control of the gas pipeline's on / off state and flow rate, eliminating the need for manual on-site operation of each valve, reducing the risk of human error, and ensuring the safe and reliable operation of the system. The control assembly 60 controls the valves in the first valve assembly 20 through the second valve assembly 50, enabling automatic switching between multiple operating modes such as gas supply, supply stop, emergency stop, and purging, improving the system's intelligence level and ease of operation. All pneumatic valves are pneumatically driven, with the pneumatic power supply provided by the pneumatic power source assembly 40. Compared to electric drive, pneumatic drive offers higher explosion-proof safety in high-pressure gas environments, reducing the risk of accidents caused by electrical sparks in flammable and explosive environments. The solenoid valves in the second valve assembly 50 and the junction boxes in the control assembly 60 are all mounted on the frame 80 outside the valve block 10, connected to the pneumatic valves inside the valve block 10 via pipelines. This achieves a high degree of system integration and facilitates the inspection and maintenance of each solenoid valve and junction box.

[0078] In the description of this application, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more features. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.

[0079] In the above embodiments, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.

[0080] The embodiments, implementation methods, and related technical features of this application can be combined and substituted for each other without conflict.

[0081] The above are merely preferred embodiments of this application and are not intended to limit this application in any way. Any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of this application without departing from the scope of the technical solution of this application shall still fall within the scope of the technical solution of this application.

Claims

1. A high-pressure gas supply device, characterized in that, include: Valve block (10), wherein a main supply channel (11), a purge channel (13) and a discharge channel (14) are formed therein; The purging channel (13) is used to communicate with the main supply channel (11) and to replace and discharge the residual gas in the main supply channel (11); the venting channel (14) is used to communicate with the main supply channel (11) and to vent at least a portion of the residual gas in the main supply channel (11). The first valve assembly (20) is sealed to the valve block (10) and is at least partially disposed within the valve block (10). The first valve assembly (20) is used to control the opening and closing of the main supply channel (11), the purge channel (13) and the discharge channel (14).

2. The high-pressure gas supply device according to claim 1, characterized in that, The main supply channel (11) includes a first channel group (111), a first transition channel (112), a second channel group (113), a second transition channel (114), and a third channel group (115). The first channel group (111), the second channel group (113), and the third channel group (115) are arranged in layers along the height direction (X) of the valve block (10). The first transition channel (112) is disposed between the first channel group (111) and the second channel group (113) and is used to connect the first channel group (111) and the second channel group (113); the second transition channel (114) is disposed between the second channel group (113) and the third channel group (115) and is used to connect the second channel group (113) and the third channel group (115).

3. The high-pressure gas supply device according to claim 2, characterized in that, The high-pressure gas supply device also includes a detection component (30), which is sealed to the valve block (10) and is at least partially disposed within the valve block (10). The detection component (30) is used to detect the pressure and temperature within the valve block (10).

4. The high-pressure gas supply device according to claim 3, characterized in that, The first channel group (111) includes a first channel (116), a second channel (117) and a third channel (118) connected in sequence, and the two connected channels have different extension directions.

5. The high-pressure gas supply device according to claim 4, characterized in that, The valve block (10) has a gas inlet (15), which is connected to one end of the first channel (116); The detection component (30) includes a first sensing part (31), at least a portion of which is disposed in the other end of the first channel (116) and is sealed to the inner wall of the first channel (116). The first sensing part (31) is used to detect the temperature in the first channel (116).

6. The high-pressure gas supply device according to claim 4, characterized in that, The first valve assembly (20) further includes the first valve (21), at least a portion of which is disposed within the second channel (117) and is sealed to the inner wall of the second channel (117). The first valve (21) is used to control the opening and closing of the first channel (116) and the third channel (118).

7. The high-pressure gas supply device according to claim 4, characterized in that, The detection component (30) further includes a second sensing unit (32), a display unit (33), and a third sensing unit (34). A filter section (125) is provided at one end of the third channel (118) away from the second channel (117). The filter section (125) is sealed to the inner wall of the third channel (118). The third sensing section (34) is connected to the filter section (125) and sealed to the valve block (10). The third sensing section (34) is used to detect the pressure difference between the air inlet and the air outlet of the filter section (125). The second sensing unit (32) and the display unit (33) are sealed to the valve block (10). The second sensing unit (32) is used to detect the pressure in the third channel (118), and the display unit (33) is used to display the pressure value in the third channel (118).

8. The high-pressure gas supply device according to claim 4, characterized in that, The second channel group (113) includes a fourth channel (119), and the third channel (118) is connected to the fourth channel (119) through the first transition channel (112). The two channels connected in the third channel (118), the first transition channel (112) and the fourth channel (119) have different extension directions. The first valve assembly (20) further includes a second valve (22), at least a portion of which is disposed within the fourth channel (119) and is sealed to the inner wall of the fourth channel (119). The second valve (22) is used to control the opening and closing of the first transition channel (112) and a portion of the main supply channel (11) located in the third region.

9. The high-pressure gas supply device according to claim 8, characterized in that, The valve block (10) has a purge inlet (16), and the purge channel (13) includes a first branch (131), at least a portion of which is located on the same layer as the second channel group (113). One end of the first branch (131) is connected to the purge inlet (16), and the other end of the first branch (131) is connected to the second channel (117). The first branch (131) is used to input purge medium into the main supply channel (11).

10. The high-pressure gas supply device according to claim 9, characterized in that, The first branch (131) includes a first connecting groove (132) and a second connecting groove (133) that are connected together. The first connecting groove (132) is connected to the purge inlet (16), and the first connecting groove (132) is connected to the second channel (117) through the second connecting groove (133). The first valve assembly (20) further includes a sixth valve (26) and a seventh valve (27). The sixth valve (26) is disposed in the first connecting groove (132) and is sealed to the inner wall of the first connecting groove (132). The sixth valve (26) is used to control the opening and closing between the purge inlet (16) and the second connecting groove (133). The seventh valve (27) is disposed in the second connecting groove (133) and is sealed to the inner wall of the second connecting groove (133). The seventh valve (27) is used to control the opening and closing between the first connecting groove (132) and the second channel (117).

11. The high-pressure gas supply device according to claim 9, characterized in that, The third channel group (115) includes a fifth channel (120) and a sixth channel (121). The fourth channel (119) is connected to the fifth channel (120) through the second transition channel (114). The two channels connected in the fourth channel (119), the second transition channel (114), the fifth channel (120) and the sixth channel (121) have different extension directions. The first valve assembly (20) further includes a third valve (23), at least a portion of which is disposed within the fifth channel (120) and is sealed to the inner wall of the fifth channel (120). The third valve (23) is used to control the opening and closing between the second transition channel (114) and the sixth channel (121). The detection assembly (30) further includes a fourth sensing unit (35), which is sealed to the valve block (10) and is used to detect the pressure within the fifth channel (120).

12. The high-pressure gas supply device according to claim 11, characterized in that, The valve block (10) has a discharge outlet (17), the discharge channel (14) and the third channel group (115) are arranged on the same layer, and the fifth channel (120) is connected to the discharge outlet (17) through the discharge channel (14); The first valve assembly (20) further includes an eighth valve (28), which is disposed in the discharge channel (14) and is sealed to the inner wall of the discharge channel (14). The eighth valve (28) is used to control the opening and closing between the discharge outlet (17) and the fifth channel (120).

13. The high-pressure gas supply device according to claim 11, characterized in that, The third channel group (115) further includes a seventh channel (122) and an eighth channel (123). The seventh channel (122) is connected to the sixth channel (121), and the eighth channel (123) is connected to the sixth channel (121) and the seventh channel (122) respectively. The first valve assembly (20) further includes a fourth valve (24) and a fifth valve (25). At least a portion of the fourth valve (24) is disposed in the sixth channel (121) and is sealed to the inner wall of the sixth channel (121). At least a portion of the fifth valve (25) is disposed in the eighth channel (123) and is sealed to the inner wall of the eighth channel (123). The fourth valve (24) and the fifth valve (25) are arranged in parallel. The fifth valve (25) is used to limit the gas flow through the eighth channel (123) when the high-pressure gas supply device is started. The fourth valve (24) is used to open when the pressure downstream of the sixth channel (121) reaches a preset value.

14. The high-pressure gas supply device according to claim 13, characterized in that, The third channel group (115) also includes a ninth channel (124), which is connected to one end of the seventh channel (122), and the valve block (10) has a gas outlet (18), which is connected to the ninth channel (124); The first valve assembly (20) further includes a fifth sensing unit (36), at least a portion of which is disposed in the other end of the seventh channel (122) and is sealed to the inner wall of the seventh channel (122). The fifth sensing unit (36) is used to detect the pressure in the seventh channel (122).

15. The high-pressure gas supply device according to claim 14, characterized in that, The valve block (10) has a purge outlet (19), and the purge channel (13) further includes a second branch (134). The second branch (134) is located on the same side as the third channel group (115). The seventh channel (122) is connected to the purge outlet (19) through the second branch (134). The second branch (134) is used to discharge at least part of the residual gas in the main supply channel (11).

16. The high-pressure gas supply device according to claim 15, characterized in that, The second branch (134) includes a third connecting groove (135), a fourth connecting groove (136) and a fifth connecting groove (137). The fifth connecting groove (137) is connected to the purge outlet (19). The third connecting groove (135) is connected to the seventh channel (122) and the fifth connecting groove (137) respectively. The fourth connecting groove (136) is connected to the seventh channel (122) and the fifth connecting groove (137) respectively. The first valve assembly (20) further includes a ninth valve (29) and a tenth valve (230). The ninth valve (29) is disposed in the third connecting groove (135) and is sealed to the third connecting groove (135). The tenth valve (230) is disposed in the fourth connecting groove (136) and is sealed to the fourth connecting groove (136). The ninth valve (29) and the tenth valve (230) are connected in parallel to control the opening and closing of the seventh channel (122) and the fifth connecting groove (137). The detection component (30) further includes a sixth sensing unit (37), which is disposed in the fifth connecting groove (137) and sealed to the inner wall of the fifth connecting groove (137). The sixth sensing unit (37) is used to detect the temperature in the fifth connecting groove (137).

17. A high-pressure gas supply system, characterized in that, include: Air source assembly (40) for providing a driving air source; The second valve assembly (50) is connected to the gas source assembly (40); The control assembly (60) is electrically connected to the second valve assembly (50); According to any one of claims 1 to 16, the first valve assembly (20) of the high-pressure gas supply device is connected to the second valve assembly (50), and the second valve assembly (50) is configured to open or close under the control of the control assembly (60) to provide or cut off the driving gas source to the first valve assembly (20), thereby driving the valve in the first valve assembly (20) to open or close, so as to realize the gas supply of the main supply channel (11), the purging and replacement of the purging channel (13), and the residual gas discharge of the discharge channel (14).