A method for assembling oil mist collection for hydro-generators

By adopting standardized assembly methods and an airtight air intake system, the problems of assembly accuracy and sealing performance of the oil mist collection system of the hydro-generator were solved, realizing reliable sealing and collection of oil mist and improving the safety and environmental performance of the unit.

CN123109928APending Publication Date: 2026-11-17CHONGQING WATER TURBINE WORKS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611496995.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the existing technology, the assembly precision of the oil mist collection system of the hydro generator is low and the sealing performance is poor, which leads to frequent oil mist leakage, affecting the reliability of the unit and making it difficult to meet environmental protection requirements.

Method used

The standardized assembly method includes pretreatment of the work space, installation of air intake seals, installation of exhaust collection system and terminal testing. By pairing and assembling the air-tight air intake system with the oil mist discharge system, a stable air pressure is formed to prevent the lubricating oil mist from escaping and to collect it into the collection box for treatment.

Benefits of technology

It improves assembly precision and construction efficiency, ensures effective oil mist sealing and collection, prevents oil mist from contaminating stator coils and carbon brushes, ensures unit safety, and avoids environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109928A_ABST
    Figure CN123109928A_ABST
Patent Text Reader

Abstract

This invention relates to the field of auxiliary system assembly technology for hydro-generator sets, and discloses a method for assembling oil mist collection systems for hydro-generators. To address the problems of non-standard assembly processes, low sealing accuracy, and easy leakage in existing oil mist collection systems, this method is implemented in stages: pre-treatment of the work space, layout of the air-tight inlet interfaces of the upper and lower guide bearings, assembly of the inlet pipeline, assembly of the oil mist discharge pipeline interface, assembly of the main discharge pipeline, and assembly of the oil mist collection terminal. Quantitative control standards are set for hole positioning, circumferential angle of the sealing cover, pipeline fixing, and sealing performance testing. This invention can achieve integrated assembly of airtight sealing and centralized oil mist collection, effectively suppressing oil mist leakage, improving assembly efficiency and system operational reliability, and is applicable to the installation and construction of oil mist collection systems for various types of vertical hydro-generators.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of auxiliary system assembly technology for hydro-generator sets, and specifically to an assembly method for collecting oil mist from a hydro-generator. Background Technology

[0002] Driven by clean energy policies, the installed capacity of hydropower stations in China has continued to grow, while environmental protection and occupational health requirements for power station operation have been continuously increasing. The upper and lower guide bearings of vertical turbine generators are lubricated with lubricating oil. During unit operation, the lubricating oil in the bearing oil grooves is agitated by the rotating shaft, generating oil mist. If this oil mist escapes outward, it will adhere to the stator coils, slip rings, and carbon brush surfaces, causing a decrease in insulation resistance and poor carbon brush contact. In severe cases, it can lead to electrical faults such as short circuits and sparking, threatening the safe operation of the unit. Furthermore, oil mist spreading into the power plant will pollute the working environment, and if it leaks into rivers, it will cause water pollution, failing to meet environmental control requirements.

[0003] In existing technologies, simple labyrinth seals or felt seals are typically installed only at the guide bearing to block oil mist, resulting in limited sealing effectiveness and a lack of standardized assembly processes for oil mist collection systems. In actual construction, common problems include large deviations in the positioning of the air inlet opening, arbitrary installation angles of the sealing cap, poor sealing of pipeline connections, and non-standard fixing methods. These issues lead to high rework rates in the assembly of oil mist collection systems and frequent oil mist leaks after commissioning, affecting unit reliability and making it difficult to meet increasingly stringent environmental emission standards. Summary of the Invention

[0004] To address the technical problems of low assembly accuracy and poor sealing performance in oil mist collection systems, this invention provides an assembly method for oil mist collection in hydro-generators, comprising the following steps: Step 1: Pre-processing of the workspace; Step 2: Install the air-tight air inlet interface of the upper guide bearing; Step 3: Assemble the upper guide bearing intake pipe; Step 4: Install the air inlet port of the lower guide bearing air seal; Step 5: Assemble the lower guide bearing gas seal cover and air intake pipe; Step 6: Assemble the oil mist discharge pipe interface; Step 7: Assemble the main oil mist exhaust pipeline; Step 8: Assemble the oil mist collection terminal.

[0005] Furthermore, in step 1, all obstructing components at the generator bracket are removed to expose the installation positions of the upper and lower guide bearings, providing operating space for the installation of the oil mist sealing cover and pipelines.

[0006] Furthermore, in step 2, upper air inlet holes are opened at corresponding positions on the generator floor and stator base wall, and the air source inlet interface of the upper guide bearing oil mist sealing cover is aligned and installed with the upper air inlet holes.

[0007] Furthermore, in step 3, the piping is prepared, and the upper guide bearing oil mist inlet pipe, valves, joints, etc. are installed and connected.

[0008] Furthermore, in step 4, an air inlet hole is opened on the stator base wall to install the air source inlet interface of the lower guide bearing oil mist sealing cover.

[0009] Further, in step 5, the angle of the sealing cover is adjusted, the lower guide bearing oil mist sealing cover and gas sealing inlet pipe are installed, the pipeline is prepared, and the lower guide bearing oil mist inlet pipe, valves, joints, etc. are installed and connected.

[0010] Further, in step 6, under the operating space of the pre-processed work space, the oil mist discharge pipe interface of the upper guide bearing oil mist sealing cover is aligned and installed; the circumferential angle of the lower guide bearing oil mist sealing cover is adjusted to complete the alignment and installation of the oil mist discharge pipe interface of the lower guide bearing oil mist sealing cover.

[0011] Furthermore, in step 7, the piping is prepared, and the piping, joints, fixing brackets, pipe clamps, etc. for venting oil mist from the upper and lower guide bearings are installed and connected.

[0012] The present invention has the following beneficial effects: 1. The assembly process is highly standardized, effectively improving assembly accuracy and construction efficiency. This method proceeds step by step according to the logic of pre-treatment of the work space, installation of air intake seals, installation of exhaust collection, and terminal testing and acceptance. It completes the dismantling of support components and opening of the work surface in one go, avoiding repeated disassembly and assembly operations, improving assembly accuracy, and avoiding unit problems such as excessive oil pollution of the generator itself, contamination of stator coils and motor carbon brushes, and short circuits. It also prevents environmental problems such as oil mist entering rivers and polluting water sources.

[0013] 2. Reliable oil mist sealing and collection, balancing unit safety and environmental protection requirements. Through the paired assembly of the air-tight air intake system and the oil mist exhaust system, a stable air pressure is formed within the guide bearing sealing cavity, preventing lubricating oil mist from escaping at its source. The escaped oil mist is then collected in a collection box via the exhaust pipeline for centralized treatment. This prevents oil mist from adhering to the stator windings, slip rings, and carbon brush surfaces, causing electrical faults such as reduced insulation and poor contact, ensuring safe unit operation. It also avoids oil mist diffusion that pollutes the plant's working environment and surrounding water bodies. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of an embodiment of the oil mist collection assembly method for a hydro-generator according to the present invention. Detailed Implementation

[0015] The following detailed description illustrates the specific implementation method: The reference numerals in the accompanying drawings include: shielding component 1, generator floor 2, stator base wall 3, upper air intake pipe 4, connector 5, valve 6, pipe clamp 7, fixing bracket 8, upper guide bearing oil mist sealing cover 9, lower air intake hole 901, lower guide bearing oil mist sealing cover 10, lower air intake hole 101, oil mist collection box and its auxiliary components 11, and air intake pipe 12.

[0016] Example 1 like Figure 1 As shown, an assembly method for a hydro-generator oil mist collection system includes the following steps: S1 Pre-treatment of working space: Remove all obstructing parts 1 at the generator bracket to expose the installation positions of the upper and lower guide bearings, providing operating space for the installation of oil mist sealing cover and pipeline; S2 Upper guide bearing air seal air inlet interface layout: upper guide air inlet hole 901 is opened at the corresponding position of generator floor 2 and stator frame wall 3, and the air source air inlet interface of upper guide bearing oil mist sealing cover 9 is aligned and installed with the upper guide air inlet hole 901. S3 Upper guide bearing air inlet pipe assembly: prefabricate upper guide air inlet pipe 4 assembly, seal the upper guide air inlet pipe 4 assembly to the air source air inlet interface of the upper guide bearing oil mist sealing cover 9 through connector 5, and install control valve 6 on the pipe; S4 Lower guide bearing air seal air inlet interface layout: A lower guide air inlet hole 101 is opened at the corresponding position on the stator base wall 3, and the air source air inlet interface of the lower guide bearing oil mist sealing cover 10 is aligned and installed with the lower guide air inlet hole 101. S5 Lower guide bearing gas seal cover and air inlet pipe assembly: Adjust the circumferential angle of the lower guide bearing oil mist seal cover 10 to the set installation position, and complete the connection of the gas seal air inlet pipe of the lower guide bearing oil mist seal cover 10; prefabricate the lower guide air inlet pipe 12 assembly, seal the lower guide air inlet pipe 12 assembly to the air source air inlet interface of the lower guide bearing oil mist seal cover 10 through the connector 5, and install the control valve 6 on the pipe; S6 Oil mist discharge pipe interface assembly: Under the pre-processed operating space of the work space, align and install the oil mist discharge pipe interface of the upper guide bearing oil mist sealing cover 9; adjust the circumferential angle of the lower guide bearing oil mist sealing cover 10 to complete the alignment and installation of the oil mist discharge pipe interface of the lower guide bearing oil mist sealing cover 10. S7 Oil mist discharge main pipeline assembly: prefabricate the oil mist discharge main pipeline and branch pipelines, and seal the oil mist discharge pipeline interfaces of the upper guide bearing and lower guide bearing to the corresponding branch pipelines through the joint 5. The main pipeline is laid along the stator base wall 3, and the pipeline is fixed to the base wall through the fixing bracket 8 and the pipe clamp 7. S8 Oil mist collection terminal assembly: Install the oil mist collection box and its auxiliary components 11, connect the outlet of the main oil mist discharge pipeline to the oil mist collection box, and perform a sealing test after the system is connected to ensure that the oil mist collection function is normal when the hydro generator is running.

[0017] The above descriptions are merely embodiments of the present invention. Commonly known structures and characteristics are not described in detail here. Those skilled in the art are aware of all common technical knowledge in the field prior to the application date or priority date, are aware of all existing technologies in that field, and have the ability to apply conventional experimental methods prior to that date. Those skilled in the art can, under the guidance of this application, improve and implement this solution in combination with their own capabilities. Some typical known structures or methods should not be obstacles for those skilled in the art to implement this application. It should be noted that those skilled in the art can make several modifications and improvements without departing from the structure of the present invention. These should also be considered within the scope of protection of the present invention, and will not affect the effectiveness of the implementation of the present invention or the practicality of the patent. The scope of protection claimed in this application should be determined by the content of its claims, and the specific embodiments described in the specification can be used to interpret the content of the claims.

Claims

1. A method of assembling an oil mist collecting arrangement for a hydroelectric generator, characterized by: Includes the following steps: Step 1: Pre-processing of the workspace; Step 2: Install the air-tight air inlet interface of the upper guide bearing; Step 3: Assemble the upper guide bearing intake pipe; Step 4: Install the air inlet port of the lower guide bearing air seal; Step 5: Assemble the lower guide bearing gas seal cover and air intake pipe; Step 6: Assemble the oil mist discharge pipe interface; Step 7: Assemble the main oil mist exhaust pipeline; Step 8: Assemble the oil mist collection terminal.

2. The method for assembling an oil mist collection device for a hydro-generator according to claim 1, characterized in that: In step 1, all obstructing parts at the generator bracket are removed to expose the installation positions of the upper and lower guide bearings, providing operating space for the installation of the oil mist sealing cover and pipelines.

3. The method for assembling an oil mist collection device for a hydro-generator according to claim 2, characterized in that: In step 2, upper air inlet holes are opened at corresponding positions on the generator floor and stator base wall, and the air source inlet interface of the upper guide bearing oil mist sealing cover is aligned and installed with the upper air inlet holes.

4. The method for collecting oil mist from a hydro-generator according to claim 3, characterized in that: In step 3, the piping is prepared, and the upper guide bearing oil mist inlet pipe, valves, joints, etc. are installed and connected.

5. The method for assembling an oil mist collection device for a hydro-generator according to claim 4, characterized in that: In step 4, an air inlet hole is opened on the stator base wall to install the air source inlet interface of the lower guide bearing oil mist sealing cover.

6. The method for assembling an oil mist collection device for a hydro-generator according to claim 5, characterized in that: In step 5, adjust the angle of the sealing cover, install the lower guide bearing oil mist sealing cover and gas sealing inlet pipe, configure the pipeline, and install and connect the lower guide bearing oil mist inlet pipe, valves, joints, etc.

7. The method for assembling an oil mist collection device for a hydro-generator according to claim 6, characterized in that: In step 6, under the pre-processed operating space of the work space, the oil mist discharge pipe interface of the upper guide bearing oil mist sealing cover is aligned and installed; the circumferential angle of the lower guide bearing oil mist sealing cover is adjusted to complete the alignment and installation of the oil mist discharge pipe interface of the lower guide bearing oil mist sealing cover.

8. The method for assembling an oil mist collection device for a hydro-generator according to claim 7, characterized in that: In step 7, the piping is prepared, and the piping, joints, fixing brackets, pipe clamps, etc. for venting oil mist from the upper and lower guide bearings are installed and connected.