Methods for generating flood information, storage media and electronic devices

By analyzing the terrain information and water flow convergence attributes around the substation, adjustment parameters are generated to correct flood information, solving the problem of low prediction efficiency in the area surrounding the substation and achieving more efficient and accurate flood event prediction.

CN123115751APending Publication Date: 2026-11-17STATE GRID BEIJING ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611247079.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-17
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing flood prediction models have low prediction efficiency in areas surrounding substations, leading to resource waste and increased computational burden, and are unable to effectively delineate prediction areas that require accuracy adjustments.

Method used

By analyzing the terrain information around the target substation, flood risk areas are detected, and adjustment parameters are generated based on the water flow convergence attributes of the sub-regions to correct the initial flood information and improve the prediction accuracy. The flood prediction accuracy of each sub-region is dynamically allocated.

Benefits of technology

This improved the efficiency of flood event prediction in the area surrounding the substation, reduced resource waste and computational burden, and enhanced the accuracy and efficiency of prediction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123115751A_ABST
    Figure CN123115751A_ABST
Patent Text Reader

Abstract

This application discloses a method, storage medium, and electronic device for generating flood information. The method includes: detecting a target area around a target substation based on target terrain information; acquiring target area information for each target sub-area among multiple sub-areas included in the target area; generating target adjustment parameters for the target sub-area based on the target area information; and correcting the initial flood information of the target sub-area based on the target adjustment parameters to obtain target flood information. By adopting the above technical solution, the problems of low prediction efficiency for flood events around substations in related technologies are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of flood event analysis and prediction, and more specifically, to a method for generating flood information, a storage medium, and an electronic device. Background Technology

[0002] In recent years, affected by global climate change, extreme rainstorms and floods have occurred frequently. As a key hub facility in the power system, substations face severe challenges in their flood risk prevention and control capabilities. Compared with the empirical rainfall threshold criteria commonly used in current power operations, flood models based on hydrological and hydrodynamic principles can comprehensively depict the rainfall-runoff-confluence process, dynamically analyze the distribution of water inundation in substation areas, and possess a more robust and reliable scientific foundation. Therefore, they are expected to achieve more accurate flood risk early warning.

[0003] However, current flood prediction models often rely on experience to define prediction areas around substations and set prediction accuracy for these areas based on that experience. This results in a uniform prediction accuracy being used to analyze and predict flood events at different locations within different prediction areas. Setting the prediction accuracy too high within these areas places a significant computational burden on the flood prediction model. Furthermore, some areas within the empirically defined prediction areas may not experience flooding, leading to a waste of the model's computational resources.

[0004] There is still no effective solution to the problem of low efficiency in predicting flood events in the area surrounding substations in related technologies. Summary of the Invention

[0005] This application provides a method for generating flood information, a storage medium, and an electronic device to at least solve the problem of low prediction efficiency for flood events in areas surrounding substations in related technologies.

[0006] According to one embodiment of this application, a method for generating flood information is provided, comprising: detecting a target area surrounding a target substation based on target terrain information of the target substation, wherein the target terrain information is used to indicate the terrain features surrounding the target substation, and the target area is an area around the target substation that is at risk of flooding due to the terrain features; for each target sub-area included in the target area, obtaining target area information of the target sub-area, wherein the target area information is used to indicate the water flow convergence attribute of the target sub-area; and generating a target area information of the target sub-area based on the target area information. The target adjustment parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region; the initial flooding information of the target sub-region is corrected according to the target adjustment parameter to obtain target flooding information, wherein the initial flooding information is used to indicate the initial prediction accuracy of flooding prediction for the target sub-region, and the target flooding information is used to indicate the flooding event prediction accuracy of the target sub-region during the flooding event prediction process of the target region in the reference time period after the current time, and the target flooding information is used to realize the flooding event prediction of the target region in the reference time period.

[0007] Optionally, generating the target adjustment parameters for the target sub-region based on the target region information includes:

[0008] A first distance influence parameter for the target sub-region is generated based on a first distance parameter of the target sub-region, and a second distance influence parameter for the target sub-region is generated based on a second distance parameter of the target sub-region. The first distance parameter indicates the distance between the target sub-region and the river channel, and the second distance parameter indicates the distance between the target sub-region and the target substation. The target region information includes the first distance parameter and the second distance parameter. The first distance influence parameter indicates the degree of impact of the river channel distance on flooding in the target sub-region, and the second distance influence parameter indicates the degree of impact of the distance between the target sub-region and the target substation on flooding in the target sub-region.

[0009] The first distance influence parameter and the second distance influence parameter are fused together to obtain the target weight parameter of the target sub-region. The target weight parameter is used to indicate the degree of flood impact of the relative position of the target sub-region, the target substation, and the river on the target substation. The target adjustment parameter includes the target weight parameter.

[0010] Optionally, generating the first distance influence parameter of the target sub-region based on the first distance parameter of the target sub-region includes:

[0011] The first distance influence parameter is calculated using the following formula:

[0012] ;

[0013] in, The first distance-affecting parameter, The distance between the target sub-region and the river channel. The radius of influence of river flooding, The river channel distance attenuation coefficient, Used to indicate how the intensity of flood impact on a river varies with distance;

[0014] The step of generating the second distance influence parameter of the target sub-region based on the second distance parameter of the target sub-region includes:

[0015] The second distance influence parameter is calculated using the following formula:

[0016] ;

[0017] in, This is the second distance-affecting parameter. The distance between the target sub-region and the target substation. The flood impact radius of the target substation. The distance attenuation coefficient of the target substation. This is used to indicate the relationship between the intensity of flood impact on the target substation and distance.

[0018] Optionally, the step of fusing the first distance influence parameter and the second distance influence parameter to obtain the target weight parameter of the target sub-region includes:

[0019] The target weight parameters are calculated using the following formula:

[0020] ;

[0021] in, The target weight parameter, The influence weight of river distance, The influence weight of the distance to the substation. The first distance-affected parameter, This is the second distance-affected parameter.

[0022] Optionally, the step of correcting the initial flood information of the target sub-region according to the target adjustment parameters to obtain the target flood information includes:

[0023] The third grid scale of the target sub-region is calculated based on the first grid scale and the second grid scale, wherein the first grid scale is the minimum grid scale in the distribution field model of the target region, and the second grid scale is the maximum grid scale in the distribution field model. The distribution field model is used to characterize the prediction accuracy of the corresponding sub-region in the subsequent flood prediction process by indicating different grid scales of each sub-region within the target region. The initial flood information includes the first grid scale and the second grid scale.

[0024] The grid scale correction amount for the target sub-region is determined based on the target adjustment parameters and the third grid scale.

[0025] The first grid scale is corrected using the grid scale correction amount to obtain the fourth grid scale of the target sub-region, wherein the target flood information includes the fourth grid scale.

[0026] Optionally, the step of using the target adjustment parameters to correct the third grid scale to obtain the fourth grid scale of the target sub-region includes:

[0027] Detect the reference hydrological information of the target sub-region within the reference time period;

[0028] The reference weight parameter is detected based on the reference hydrological information, wherein the reference weight parameter is used to indicate the degree of impact of the hydrological state of the target sub-region on the flooding of the target sub-region during the reference time period;

[0029] The target weight parameter is compensated using the reference weight parameter to obtain candidate weight parameters, wherein the target weight parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region, and the target adjustment parameter includes the target weight parameter;

[0030] The candidate weight parameters are used to perform a weighted calculation on the third grid scale to obtain the fourth grid scale.

[0031] Optionally, the step of using the reference weight parameters to compensate the target weight parameters to obtain candidate weight parameters includes:

[0032] The candidate weight parameters are calculated using the following formula:

[0033] ;

[0034] in, The candidate weight parameters are... The reference weight parameter, The target weight parameter is denoted as .

[0035] Optionally, detecting the reference weight parameter based on the reference hydrological information includes:

[0036] The reference weight parameter is calculated using the following formula:

[0037] ,

[0038] ,

[0039] in, The reference weight parameter, Assess the risk of water accumulation depth impact on the target sub-region during the reference time period. for The corresponding attenuation coefficient, The weighting is determined by the depth of water accumulation. The weights are determined by the gradient effect of water depth. The preset scoring threshold corresponds to the risk score for the impact of water depth. To preset the water depth threshold, To preset the water depth gradient threshold, The maximum water depth in the target sub-region during the reference time period. The maximum water depth gradient of the target sub-region during the reference time period.

[0040] According to another aspect of the embodiments of this application, a computer-readable storage medium is also provided, wherein a computer program is stored in the computer-readable storage medium, and the computer program is configured to execute the above-described method for generating flood information when it is run.

[0041] According to another aspect of the embodiments of this application, an electronic device is also provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the flood information generation method through the computer program.

[0042] In this embodiment, based on the target terrain information surrounding the target substation, target areas that may be at risk of flooding due to terrain features are detected. This allows for the delineation of target areas requiring flood analysis and prediction based on the terrain features surrounding the substation. For each target sub-region within the target area, target adjustment parameters are generated based on the target area information of the sub-region. This allows for the determination of the impact of the water flow convergence attributes of each target sub-region on the flooding of that sub-region. The initial flood information of the target sub-region is then corrected based on the target adjustment parameters, thereby obtaining the flood prediction accuracy for each target sub-region. This achieves dynamic allocation of flood prediction accuracy for each sub-region within the target area based on the water flow convergence attributes of each sub-region, thus improving the efficiency of flood event prediction for the area surrounding the substation. The above technical solution solves the problem of low flood event prediction efficiency in the area surrounding substations in related technologies, achieving the technical effect of improving the prediction efficiency of flood events in the area surrounding substations. Attached Figure Description

[0043] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.

[0044] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0045] Figure 1 This is a schematic diagram of the hardware environment for a method of generating flood information according to an embodiment of this application;

[0046] Figure 2 This is a flowchart of a method for generating flood information according to an embodiment of this application;

[0047] Figure 3 This is a schematic diagram of an optional substation flood process prediction according to an embodiment of this application;

[0048] Figure 4 This is a structural block diagram of a flood information generation device according to an embodiment of this application. Detailed Implementation

[0049] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.

[0050] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0051] The methods and embodiments provided in this application can be executed on a computer terminal, device terminal, or similar computing device. Taking running on a computer terminal as an example, Figure 1 This is a schematic diagram of the hardware environment for a method of generating flood information according to an embodiment of this application. Figure 1 As shown, a computer terminal may include one or more ( Figure 1 Only one is shown in the diagram. A processor 102 (which may include, but is not limited to, a microprocessor MCU or a programmable logic device FPGA, etc.) and a memory 104 for storing data are also shown. In one exemplary embodiment, the computer terminal may further include a transmission device 106 for communication functions and an input / output device 108. Those skilled in the art will understand that... Figure 1 The structure shown is for illustrative purposes only and does not limit the structure of the computer terminal described above. For example, the computer terminal may also include components that are more complex than those described above. Figure 1 The more or fewer components shown, or having the same Figure 1 Equivalent functions or ratios shown Figure 1 The functions shown have more different configurations.

[0052] The memory 104 can be used to store computer programs, such as application software programs and modules, like the computer program corresponding to the message push sending method in this embodiment of the invention. The processor 102 executes various functional applications and data processing by running the computer programs stored in the memory 104, thereby implementing the above-described method. The memory 104 may include high-speed random access memory, and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory 104 may further include memory remotely located relative to the processor 102, and these remote memories can be connected to a computer terminal via a network. Examples of such networks include, but are not limited to, the Internet, corporate intranets, local area networks, mobile communication networks, and combinations thereof.

[0053] The transmission device 106 is used to receive or send data via a network. Specific examples of the network described above may include a wireless network provided by a communication provider for the computer terminal. In one example, the transmission device 106 includes a Network Interface Controller (NIC), which can connect to other network devices via a base station to communicate with the Internet. In another example, the transmission device 106 may be a Radio Frequency (RF) module used for wireless communication with the Internet.

[0054] This embodiment provides a method for generating flood information, applied to the aforementioned computer terminal. Figure 2 This is a flowchart of a method for generating flood information according to an embodiment of this application, the process including the following steps:

[0055] Step S202: Detect the target area around the target substation based on the target terrain information of the target substation, wherein the target terrain information is used to indicate the terrain features around the target substation, and the target area is an area around the target substation that is at risk of flooding due to the terrain features.

[0056] Step S204: For each target sub-region included in the target region, obtain target region information for the target sub-region, wherein the target region information is used to indicate the water flow convergence attribute of the target sub-region;

[0057] Step S206: Generate target adjustment parameters for the target sub-region based on the target region information, wherein the target adjustment parameters are used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region;

[0058] Step S208: Correct the initial flood information of the target sub-region according to the target adjustment parameters to obtain target flood information. The initial flood information is used to indicate the initial prediction accuracy of flood prediction for the target sub-region. The target flood information is used to indicate the flood event prediction accuracy of the target sub-region during the flood event prediction process for the target region in the reference time period after the current time. The target flood information is used to realize the flood event prediction for the target region in the reference time period.

[0059] Through the above steps, based on the target terrain information surrounding the target substation, target areas that may be at risk of flooding due to terrain features are detected. This allows for the delineation of target areas requiring flood analysis and prediction based on the terrain features around the substation. For each target sub-region within the target area, target adjustment parameters are generated based on the target area information of the sub-region. This allows for the determination of the impact of the water flow convergence attributes of each target sub-region on the flooding of that sub-region. The initial flood information of the target sub-region is then corrected based on the target adjustment parameters, thereby obtaining the flood prediction accuracy for each target sub-region. This achieves dynamic allocation of flood prediction accuracy for each sub-region within the target area based on the water flow convergence attributes of each sub-region, thus improving the efficiency of flood event prediction for the substation's surrounding area. The above technical solution solves the problem of low flood event prediction efficiency in related technologies, achieving the technical effect of improving the prediction efficiency of flood events in the substation's surrounding area.

[0060] In the technical solution provided in step S202 above, the target terrain information is used to indicate the spatial data of the topographic features of the target substation and its surrounding area. In flood modeling, it is used to identify the spatial pattern of flood convergence, flow and inundation. The target terrain information may include, but is not limited to, the distribution of river network systems around the substation, watersheds, road network data, soil properties, surface elevation data, etc. This application does not limit this.

[0061] Optionally, in this embodiment, the method for detecting the target area surrounding the target substation based on the target terrain information of the target substation may be as follows: detecting the substation type of the target substation based on the geographical location information of the target substation, wherein the geographical location information is used to characterize the geographical location of the target substation, and the geographical location information may include, but is not limited to, the distance between the substation and the river and the elevation of the substation, etc.; analyzing the river distribution information around the target substation based on the substation type to obtain the target area, wherein the target terrain information includes the geographical location information and the river distribution information, and the river distribution information is used to indicate the distribution of the river network around the target substation.

[0062] In the above embodiments, the method of detecting the substation type of the target substation based on the geographical location information of the target substation may include: matching the target river distance between the target substation and the river with a preset river distance, wherein the geographical location information includes the target river distance; if the target river distance is less than or equal to the preset river distance, determining that the substation type of the target substation is a near-river station; if the target river distance is greater than the preset river distance, determining that the substation type of the target substation is a low-lying station.

[0063] In the above embodiments, the method of analyzing the river distribution information around the target substation according to the substation type to obtain the target area may include, but is not limited to, the following: when the target substation is a river-adjacent station, starting from the river section adjacent to the target substation, a first area surrounded by the corresponding upstream river section and the catchment sub-basin is searched in reverse according to the river flow direction relationship, and the area within the first area that is outside the boundary of the target substation is determined as the target area.

[0064] In the above embodiments, the method of analyzing the river distribution information around the target substation according to the substation type to obtain the target area may include, but is not limited to: when the target substation is a low-lying substation, determining candidate intrusion points on the boundary of the target substation, wherein the candidate intrusion point is the location of water intrusion on the boundary of the substation; starting from the candidate intrusion point, tracing back the candidate catchment area of ​​the candidate intrusion point; and merging and trimming the candidate catchment area using the regional road network and river network to obtain the target area.

[0065] In the technical solution provided in step S204 above, the water flow convergence attribute of the target sub-region can be caused by topographic factors or hydrological factors. Therefore, the target region information may include, but is not limited to, the first distance of the target sub-region relative to the river channel and the second distance of the target sub-region relative to the target substation, or the target region information may also include the topographic slope of the target sub-region, or the target region information may also include the precipitation of the target sub-region. This application does not limit this.

[0066] Optionally, in this embodiment, the multiple sub-regions in the target area can be, but are not limited to, the target area being divided into the target area according to the target number of divisions. The target number of divisions can be a pre-set number, or it can be the target number of divisions corresponding to the target terrain environment determined from the terrain environment and the number of divisions that have a corresponding relationship, based on the target terrain environment around the target substation.

[0067] Optionally, in this embodiment, the multiple sub-regions in the target area may be, but are not limited to, being obtained by dividing the target area based on the target terrain environment surrounding the target substation. This application does not limit this.

[0068] In the technical solution provided in step S206 above, the target adjustment parameters of the target sub-region can be generated based on the target region information, but are not limited to, through the following formula:

[0069] ;

[0070] ;

[0071] in, The terrain slope of the target sub-region. The radius is affected by the slope. This is the slope attenuation coefficient. The slope influence function, The slope affects the weight.

[0072] Optionally, in this embodiment, the target adjustment parameters may be, but are not limited to, obtained by fusing distance weight parameters, slope weight parameters, and hydrological weight parameters corresponding to the target sub-region. The distance weight parameter indicates the degree of flood impact of the distance of the target sub-region relative to the river and substation; the slope weight parameter indicates the degree of flood impact of the terrain slope of the target sub-region; and the hydrological weight parameter indicates the degree of flood impact of the precipitation in the target sub-region. In this embodiment, the fusion of the distance weight parameters, slope weight parameters, and hydrological weight parameters may be, but is not limited to, fusion according to a preset fusion ratio; this solution does not limit this.

[0073] In the technical solution provided in step S208 above, the target flood information is used to reflect the prediction accuracy when making flood predictions for the target sub-region. Therefore, the target flood information can be the flood prediction accuracy or the grid size of the distribution field of the flood prediction model. The smaller the grid size, the denser the distribution grid lines of the target sub-region in the flood prediction model, and thus the higher the prediction accuracy of the region. Alternatively, the target flood information can also be the flood event probability of the target sub-region. The flood event probability is used to indicate the possibility of a flood event occurring in the target sub-region within the reference event segment. The higher the flood event probability, the higher the required prediction accuracy. This application does not limit this.

[0074] Optionally, in this embodiment of the application, the method of correcting the initial flood information of the target sub-region according to the target adjustment parameter may include, but is not limited to, using the target weight parameter to perform a weighted summation calculation on the initial flood information to obtain the target flood information, wherein the target weight parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flood event of the target sub-region, and the target adjustment parameter includes the target weight parameter.

[0075] Optionally, in this embodiment of the application, after obtaining the target flood information, the method further includes: converting the target flood information into a target grid scale of the initial distribution field model corresponding to the target sub-region in the target region; configuring the corresponding regional grid scale of the target sub-region on the initial distribution field model according to the target grid scale of the target sub-region to obtain the target distribution field model; configuring the hydrological information of each target sub-region on the target distribution field model to obtain the target flood prediction model, wherein the target flood prediction model records the flood event information of each sub-region in the target region within a reference event period after the current time; and using the target flood prediction model to predict the flood events in the target region within the reference time period.

[0076] As an optional embodiment, generating the target adjustment parameters for the target sub-region based on the target region information includes:

[0077] A first distance influence parameter for the target sub-region is generated based on a first distance parameter of the target sub-region, and a second distance influence parameter for the target sub-region is generated based on a second distance parameter of the target sub-region. The first distance parameter indicates the distance between the target sub-region and the river channel, and the second distance parameter indicates the distance between the target sub-region and the target substation. The target region information includes the first distance parameter and the second distance parameter. The first distance influence parameter indicates the degree of impact of the river channel distance on flooding in the target sub-region, and the second distance influence parameter indicates the degree of impact of the distance between the target sub-region and the target substation on flooding in the target sub-region.

[0078] The first distance influence parameter and the second distance influence parameter are fused together to obtain the target weight parameter of the target sub-region. The target weight parameter is used to indicate the degree of flood impact of the relative position of the target sub-region, the target substation, and the river on the target substation. The target adjustment parameter includes the target weight parameter.

[0079] Optionally, in this embodiment of the application, the method of fusing the first distance influence parameter and the second distance influence parameter can be to use the parameter weights corresponding to the first distance influence parameter and the second distance influence parameter to perform a weighted calculation on the first distance influence parameter and the second distance influence parameter, thereby obtaining the target weight parameter.

[0080] Optionally, in this embodiment of the application, the target weight parameter is used to indicate the degree of influence of the distance of the target sub-region relative to the river and the target substation on the occurrence of flooding events in the target sub-region.

[0081] Based on the above, by analyzing the first and second distance parameters of the target sub-region and fusing them, a target weight parameter is obtained. This allows for the correction of flood information in the target sub-region based on its terrain information, making the predicted flood information more accurate and reliable.

[0082] As an optional embodiment, generating the first distance influence parameter of the target sub-region based on the first distance parameter of the target sub-region includes:

[0083] The first distance influence parameter is calculated using the following formula:

[0084] ;

[0085] in, The first distance-affecting parameter, The distance between the target sub-region and the river channel. The radius of influence of river flooding, The river channel distance attenuation coefficient, Used to indicate how the intensity of flood impact on a river varies with distance;

[0086] The step of generating the second distance influence parameter of the target sub-region based on the second distance parameter of the target sub-region includes:

[0087] The second distance influence parameter is calculated using the following formula:

[0088] ;

[0089] in, This is the second distance-affecting parameter. The distance between the target sub-region and the target substation. The flood impact radius of the target substation. The distance attenuation coefficient of the target substation. This is used to indicate the relationship between the intensity of flood impact on the target substation and distance.

[0090] As an optional embodiment, the step of fusing the first distance influence parameter and the second distance influence parameter to obtain the target weight parameter of the target sub-region includes:

[0091] The target weight parameters are calculated using the following formula:

[0092] ;

[0093] in, The target weight parameter, The influence weight of river distance, The influence weight of the distance to the substation. The first distance-affected parameter, This is the second distance-affected parameter.

[0094] Optionally, in the embodiments of this application, and The weight parameters can be assigned based on, but are not limited to, the target river information surrounding the target substation. This target river information can include, but is not limited to, river width, river flow, and river network interactions. Therefore, the corresponding river information can be determined from the river information and weights that have corresponding relationships. and .

[0095] As an optional embodiment, the step of correcting the initial flood information of the target sub-region according to the target adjustment parameters to obtain the target flood information includes:

[0096] The third grid scale of the target sub-region is calculated based on the first grid scale and the second grid scale, wherein the first grid scale is the minimum grid scale in the distribution field model of the target region, and the second grid scale is the maximum grid scale in the distribution field model. The distribution field model is used to characterize the prediction accuracy of the corresponding sub-region in the subsequent flood prediction process by indicating different grid scales of each sub-region within the target region. The initial flood information includes the first grid scale and the second grid scale.

[0097] The grid scale correction amount for the target sub-region is determined based on the target adjustment parameters and the third grid scale.

[0098] The first grid scale is corrected using the grid scale correction amount to obtain the fourth grid scale of the target sub-region, wherein the target flood information includes the fourth grid scale.

[0099] Optionally, in the embodiments of this application, the first grid scale and the second grid scale may be, but are not limited to, fixed values ​​set according to the resolution of the distribution field model. For example, the maximum value of the resolution may be set as the second grid scale, and the minimum value of the resolution may be set as the first grid scale.

[0100] Optionally, in the embodiments of this application, the method for calculating the third microgrid scale based on the first grid scale and the second grid scale may include, but is not limited to, calculating the grid scale difference between the first grid scale and the second grid scale to obtain the third grid scale.

[0101] Optionally, in this embodiment of the application, the method for determining the grid scale correction amount based on the target adjustment parameter and the third grid scale can be to use the target adjustment parameter to perform a weighted calculation on the third grid scale to obtain the grid scale correction amount.

[0102] Optionally, in the embodiments of this application, the fourth grid scale can be calculated using, but is not limited to, the following formula:

[0103] ;in, , These are the first grid scale and the second grid scale, respectively. Adjust the parameters to achieve the target.

[0104] Through the embodiments of this application, by determining the grid scale correction amount for the grid scale of the target sub-region based on the target adjustment parameters and the third grid scale, and using the grid scale correction amount to correct the first grid scale, the grid scale is adjusted according to the degree of impact of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region, making the adjusted fourth grid scale of the target sub-region more accurate and reliable.

[0105] As an optional embodiment, the step of correcting the third grid scale using the target adjustment parameters to obtain the fourth grid scale of the target sub-region includes:

[0106] Detect the reference hydrological information of the target sub-region within the reference time period;

[0107] The reference weight parameter is detected based on the reference hydrological information, wherein the reference weight parameter is used to indicate the degree of impact of the hydrological state of the target sub-region on the flooding of the target sub-region during the reference time period;

[0108] The target weight parameter is compensated using the reference weight parameter to obtain candidate weight parameters, wherein the target weight parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region, and the target adjustment parameter includes the target weight parameter;

[0109] The candidate weight parameters are used to perform a weighted calculation on the third grid scale to obtain the fourth grid scale.

[0110] Optionally, in this embodiment of the application, reference hydrological information is used to indicate the hydrological status of the target sub-region within a reference time period. The reference hydrological information may include, but is not limited to, the water depth of the target sub-region within the reference time period and the water depth gradient of the target sub-region within the reference time period. The water depth gradient is used to indicate the difference between the water depth of the target sub-region and the water depth of other sub-regions within the target region.

[0111] Optionally, in this embodiment of the application, the method for detecting the reference hydrological information of the target sub-region within a reference time period may include, but is not limited to: detecting the target hydrological information of the target sub-region within a target time period prior to the current time, converting the target hydrological information into hydrological information change information of the target sub-region within the target time period based on the target hydrological information, wherein the hydrological information change information is used to indicate the change of the hydrological information of the target sub-region over time, and using the hydrological information change information to convert the reference hydrological information of the target sub-region within the reference time period.

[0112] Optionally, in this embodiment of the application, the method for detecting the reference weight parameter based on the reference hydrological information may be to determine the reference weight parameter corresponding to the reference hydrological information from the hydrological parameters and weight parameters that have a corresponding relationship.

[0113] As an optional embodiment, the step of compensating the target weight parameters using the reference weight parameters to obtain candidate weight parameters includes:

[0114] The candidate weight parameters are calculated using the following formula:

[0115] ;

[0116] in, The candidate weight parameters are... The reference weight parameter, The target weight parameter is denoted as .

[0117] As an optional embodiment, detecting the reference weight parameter based on the reference hydrological information includes:

[0118] The reference weight parameter is calculated using the following formula:

[0119] ,

[0120] ,

[0121] in, The reference weight parameter, Assess the risk of water accumulation depth impact on the target sub-region during the reference time period. for The corresponding attenuation coefficient, The weighting is determined by the depth of water accumulation. The weights are determined by the gradient effect of water depth. The preset scoring threshold corresponds to the risk score for the impact of water depth. To preset the water depth threshold, To preset the water depth gradient threshold, The maximum water depth in the target sub-region during the reference time period. The maximum water depth gradient of the target sub-region during the reference time period.

[0122] Figure 3 This is an optional substation flood process prediction schematic diagram according to an embodiment of this application, such as... Figure 3As shown, this paper presents a parametric modeling method for substation flood processes based on a large-scale intelligent model. This method addresses the problems of high interdisciplinary interaction costs and heavy reliance on manual interpretation in existing substation flood modeling techniques, promoting the efficient construction and widespread application of substation flood models and enhancing the substation's flood risk early warning capabilities. The specific steps are as follows:

[0123] Step 1: Generating the internal boundary of the substation flood model. This involves converting various descriptive files under the power grid information model engineering package into internal boundary condition information of the flood model with absolute geographic coordinates.

[0124] Commonly used power grid information model engineering packages contain descriptive files such as .cbm, .dev, .phm, and .mod, which define the cascading reference relationships and corresponding attribute parameters between substation engineering, equipment, components, and primitives in text form. Spatial organization relationships can be identified and geometric attributes can be parsed through large model intelligent agents to form a representation of the internal boundary information of the substation area suitable for flood process modeling.

[0125] In this embodiment of the application, the process of generating the inner boundary of the substation flood model mainly consists of the following three sub-steps:

[0126] Step 11: The large model agent calls the text parser to extract the project hierarchy and attribute references from the .cbm file, the device level references and spatial transformation matrix from the .dev file, the assembly references and spatial transformation matrix from the .phm file, and the entity primitive type, geometric dimensions and Boolean combination relationships from the .mod file.

[0127] Step 12: Based on the engineering-equipment-component-primitive hierarchical relationship and corresponding local spatial transformation matrix extracted by the large model intelligent agent, multiply the local transformation matrix of each level from top to bottom to calculate the three-dimensional coordinate information of each object in the global coordinate system, and perform spatial intersection analysis between each object and the ground to obtain the bottom contour of each object.

[0128] Step 13: Based on the attribute field information of each object, use the large model agent to perform flood semantic mapping, automatically convert it into appropriate type of boundary conditions and match the corresponding geometric constraint information, such as mapping the station building retaining wall, equipment support, etc. as solid wall boundaries, and automatically generating two-dimensional boundary lines according to their bottom contours; mapping holes, culverts, etc. as outflow boundaries based on orifice flow form generalization, and automatically setting orifice geometric parameters according to their bottom coordinates and width and height dimensions.

[0129] Step 2: Generate the outer boundary of the substation flood model, extract the information of the external flow generation and confluence area of ​​the substation, and integrate it with the internal boundary information of the substation to form boundary conditions suitable for integrated modeling of internal and external floods.

[0130] The flood risk in the substation area is affected by a combination of factors, including upstream river flow and local topographical confluence. Regional hydrological analysis can be automatically carried out through a large-scale model intelligent agent, thereby comprehensively identifying the sources of flood risk in the substation, determining the modeling boundary of the external flood process in the substation area, and completing the integration and connection of information inside and outside the substation area.

[0131] In this embodiment of the application, the process of generating the outer boundary of the substation flood model mainly consists of the following four sub-steps:

[0132] Step 21: Using the substation area as the control center, the large model agent calls the Python interface of remote sensing cloud databases such as Google Earth Engine (GEE) to automatically download the 30-meter resolution surface elevation model FABDEM, which has removed the influence of ground features such as buildings and vegetation canopies. It also calls the Python interface of open-source geographic analysis tools such as Whitebox to automatically generate the catchment sub-basins and corresponding river networks of the substation area through hydrological analysis based on FABDEM. This is used to help identify whether the flood risk of the substation area is affected by river floods.

[0133] Step 22: Based on the river network distribution, the large model agent calculates the distance between the substation area and the river. If the distance is less than a given threshold (e.g., 1000 meters), the current substation is a near-river station and the impact of river floods needs to be considered; otherwise, it is mainly considered according to the characteristics of low-lying stations.

[0134] Step 23: For the near-river station, starting from the river section adjacent to the substation, the large model agent automatically searches the corresponding upstream river section and catchment sub-basin range in reverse according to the river flow direction relationship, thereby constructing the external flood process calculation boundary of the near-river station.

[0135] Step 24: For low-lying stations, the large model agent calls a Python interface such as OSMnx to download the road network data of the substation area. Using points such as doorways and ditch mouths on the inner boundary of the substation as candidate intrusion points, the watershed segmentation algorithm is executed on the surface elevation model to identify the distribution of candidate catchment areas. The candidate catchment areas are merged and clipped using the regional road network and river network connectivity layers, thereby constructing the external flood process calculation boundary of the low-lying station.

[0136] Step 3: Mesh generation of the substation flood model. Based on the inner and outer boundaries of the substation flood model obtained in Steps 1 and 2, the large model agent can automatically consider the differences in flood impact characteristics of different locations and adaptively generate the unstructured mesh units required for flood process calculation. This mainly consists of the following four sub-steps:

[0137] Step 31: For stations near the river, the large model agent calls open-source geospatial analysis Python library interfaces such as GeoPandas to merge geometric feature lines such as the river boundary line, embankment boundary line, and substation perimeter wall boundary line into grid constraint lines. A grid-scale distribution field that comprehensively considers the distance of spatial points from the river and the distance from the substation is generated as follows. The grid area used to guide the flow of waterways and substations is smaller.

[0138] ,

[0139] ,

[0140] In the formula, , These are the preset maximum and minimum allowable grid areas, respectively. For distance-encrypted weight field, , The weights for the influence of distance to the river and distance to the substation are set (the default value can be 0.5 for both). , The influence functions for river channel distance and substation distance are calculated using the following exponential function form:

[0141] ,

[0142] In the formula, , Target locations Distance to river and substation , The radii of influence for the river and the substation are respectively. , These are the distance attenuation coefficients for river channels and substations, respectively. Based on the grid-scale distribution field... The specified allowable grid area is used to invoke the constrained Delaunay triangulation algorithm to form an adaptive unstructured grid that takes into account the simulation requirements of river flood propagation, floodplain diffusion, and local inundation processes in the station area.

[0143] Step 32: For low-lying stations, the large model agent calls the open-source geographic analysis Python library interface to merge geometric features such as road network boundary lines, catchment area boundary lines, and substation perimeter wall boundary lines into grid constraint lines. Then, following the method described in Step 31, a grid-scale distribution field that comprehensively considers the terrain slope and distance from the substation at the spatial location is generated. Based on this, the constrained Delaunay triangulation algorithm is invoked to form an adaptive unstructured mesh that takes into account both the main confluence paths and local micro-topography.

[0144] Step 33: Based on the aforementioned external mesh division of the substation, merge the mesh constraint lines of the bottom outline of the substation facility objects, and calculate the minimum allowable mesh area. The constrained Delaunay triangulation algorithm is invoked to form the internal mesh of the substation.

[0145] Step 34: Based on the grid division guided by the aforementioned static geographical features, and considering the sensitivity of substation facilities to water depth distribution in terms of flood risk, at each forecast operation time... The maximum predicted water depth can be obtained by using short-term rainfall forecasts to drive existing flood models. and corresponding water depth gradient Distribution, thereby constructing a depth-intensified weight field :

[0146] ,

[0147] ,

[0148] In the formula, , The risk score and corresponding attenuation coefficient for the impact of water depth distribution are calculated. , Weights are assigned to the influence of water depth distribution and water depth gradient distribution (the default value can be 0.5 for both). , , The threshold values ​​for indicator variables such as risk score, water depth, and water depth gradient can be obtained by calculating the value distribution of the corresponding indicator variables within the modeling area through random rainstorm and flooding, and then taking the corresponding 90th percentile.

[0149] Upon receiving the corresponding forecast operation time Water depth encrypted weight field Then, with the aforementioned distance-encrypted weight field By merging, a comprehensive encrypted weight field is obtained. :

[0150] ,

[0151] Therefore, the update time Grid-scale distribution field :

[0152] ,

[0153] Based on this, the constrained Delaunay triangulation algorithm is invoked to dynamically update the mesh used for model calculation.

[0154] Step 4: Substation flood model parameter mapping. Based on the substation flood model grid obtained in Step 3, a multi-source geographic dataset covering the internal and external areas of the substation can be automatically downloaded and integrated through a large model agent. Combining its semantic understanding capabilities and expert knowledge base, the original geographic data is mapped into hydrological parameters usable for flood model calculation, completing the integrated parameter modeling of the substation flood process. This mainly consists of the following two sub-steps:

[0155] Step 41: Based on the 3D coordinates of the substation's internal objects in the global coordinate system obtained in Step 12 and the external surface elevation model of the substation obtained in Step 21, the large model agent extracts the substation perimeter wall as the control line for splicing the internal and external terrain, and extracts points such as the substation gate and trench entrance as control points for splicing the internal and external terrain. The open-source geospatial analysis Python library interface is called to set up transition buffer zones on both sides of the control lines. The 3D coordinates of the substation's internal objects, the coordinates of the external surface elevation model, and the control points for splicing the internal and external terrain within the buffer zone are used to construct a triangular mesh transition surface. Overlapping areas are prioritized for coverage based on the internal high-precision elevation, and adjacent areas are interpolated and smoothed according to the principle of slope continuity. The elevation at the control points is constrained to remain unchanged, forming an integrated elevation model covering the internal and external areas of the substation, which is then input into the computational grid cell.

[0156] Step 42: Based on the substation external flood process calculation boundary obtained in Step 2, and on the basis of the existing surface elevation model, the large model agent calls the Python interface of remote sensing cloud databases such as GEE to automatically download the remaining basic datasets required for hydrological and hydrodynamic modeling, such as land use type (GEE dataset address: ESA / WorldCover / v100), soil properties (GEE dataset address: projects / sat-io / open-datasets / HiHydroSoilv2_0), leaf area index (GEE dataset address: MODIS / 061 / MCD15A3H), building area (GEE dataset address: projects / sat-io / open-datasets / GLOBAL_BUILDING_ATLAS), etc., and maps the original geographic data to hydrological and hydrodynamic parameter information according to the predefined parameter lookup table stored in the expert knowledge base, and inputs it into the computational grid cell.

[0157] As can be seen from the above embodiments, the advantages of the embodiments of this application compared with the prior art are as follows:

[0158] (A) This invention automatically parses the hierarchical references, spatial transformations and attribute semantics in GIM engineering packages through a large model intelligent agent, and streamlines the object identification, coordinate restoration and boundary condition transformation that originally required manual work. In view of the problems in the prior art that GIM is difficult to use directly for flood simulation and that manual transformation has large errors and low efficiency, it can significantly reduce modeling costs and improve the consistency of cross-disciplinary information expression.

[0159] (B) This invention distinguishes between river-near stations and low-lying stations, and automatically performs regional hydrological analysis and multi-source data integration through a large model intelligent agent. It scientifically considers the combined impact of river floods and local confluence on the flood process of substations, making the parameterized modeling of the flood process of substations more consistent with the real disaster-causing mechanism, thereby improving the reliability and pertinence of flood risk early warning.

[0160] (C) This invention comprehensively considers the integrated modeling of floods inside and outside the substation. Through the large model intelligent agent connected to the external remote sensing cloud database and expert knowledge base, it automatically completes the generation of constrained Delaunay unstructured mesh, integrated elevation stitching and hydrological and hydrodynamic parameter mapping. It solves the problems of inaccurate mesh discrete expression and high threshold for setting calculation parameters in the existing modeling process. It can be fully applied to complex scenarios and has the advantage of large-scale promotion and application.

[0161] Through the above description of the embodiments, those skilled in the art can clearly understand that the methods according to the above embodiments can be implemented by means of software and necessary general-purpose hardware platforms, and of course, they can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes several instructions to cause a terminal device (which may be a mobile phone, computer, server, or network device, etc.) to execute the methods of the various embodiments of this application.

[0162] Figure 4 This is a structural block diagram of a flood information generation device according to an embodiment of this application; as shown below. Figure 4 As shown, it includes:

[0163] The detection module is used to detect the target area around the target substation based on the target terrain information of the target substation. The target terrain information is used to indicate the terrain features around the target substation, and the target area is an area around the target substation that is at risk of flooding due to the terrain features.

[0164] The acquisition module is used to acquire target area information for each of the multiple sub-regions included in the target area, wherein the target area information is used to indicate the water flow convergence attribute of the target sub-region;

[0165] A generation module is used to generate target adjustment parameters for the target sub-region based on the target region information, wherein the target adjustment parameters are used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region;

[0166] The correction module is used to correct the initial flood information of the target sub-region according to the target adjustment parameters to obtain target flood information. The initial flood information is used to indicate the initial prediction accuracy of flood prediction for the target sub-region. The target flood information is used to indicate the flood event prediction accuracy of the target sub-region during the flood event prediction process for the target region in the reference time period after the current time. The target flood information is used to realize the flood event prediction for the target region in the reference time period.

[0167] Through the above embodiments, based on the target terrain information surrounding the target substation, target areas that may be at risk of flooding due to terrain features are detected, thereby delineating target areas requiring flood analysis and prediction based on the terrain features surrounding the substation. For each target sub-region within the target region, target adjustment parameters are generated based on the target region information of the target sub-region, thereby determining the degree of impact of the water flow convergence attributes of each target sub-region on the flooding of that sub-region. The initial flood information of the target sub-region is then corrected based on the target adjustment parameters, thus obtaining the flood prediction accuracy for each target sub-region. This achieves dynamic allocation of flood prediction accuracy for each sub-region within the target region based on the water flow convergence attributes of each sub-region, thereby improving the efficiency of flood event prediction for the substation surrounding area. The above technical solution solves the problem of low flood event prediction efficiency in the surrounding area of ​​substations in related technologies, achieving the technical effect of improving the prediction efficiency of flood events in the surrounding area of ​​substations.

[0168] Optionally, the generation module includes:

[0169] A generation unit is configured to generate a first distance influence parameter of the target sub-region based on a first distance parameter of the target sub-region, and to generate a second distance influence parameter of the target sub-region based on a second distance parameter of the target sub-region. The first distance parameter indicates the distance between the target sub-region and the river channel, and the second distance parameter indicates the distance between the target sub-region and the target substation. The target region information includes the first distance parameter and the second distance parameter. The first distance influence parameter indicates the degree of impact of the river channel distance on flooding in the target sub-region, and the second distance influence parameter indicates the degree of impact of the distance between the target sub-region and the target substation on flooding in the target sub-region.

[0170] The first calculation unit is used to fuse the first distance influence parameter and the second distance influence parameter to obtain the target weight parameter of the target sub-region. The target weight parameter is used to indicate the degree of flood impact of the relative position between the target sub-region and the target substation and the river on the target substation. The target adjustment parameter includes the target weight parameter.

[0171] Optionally, the generation unit is used for:

[0172] The first distance influence parameter is calculated using the following formula:

[0173] ;

[0174] in, The first distance-affecting parameter, The distance between the target sub-region and the river channel. The radius of influence of river flooding, The river channel distance attenuation coefficient, Used to indicate how the intensity of flood impact on a river varies with distance;

[0175] The generation unit is further configured to:

[0176] The second distance influence parameter is calculated using the following formula:

[0177] ;

[0178] in, This is the second distance-affecting parameter. The distance between the target sub-region and the target substation. The flood impact radius of the target substation. The distance attenuation coefficient of the target substation. This is used to indicate the relationship between the intensity of flood impact on the target substation and distance.

[0179] Optionally, the first computing unit is used for:

[0180] The target weight parameters are calculated using the following formula:

[0181] ;

[0182] in, The target weight parameter, The influence weight of river distance, The influence weight of the distance to the substation. The first distance-affected parameter, This is the second distance-affected parameter.

[0183] Optionally, the correction module includes:

[0184] The second calculation unit is used to calculate the third grid scale of the target sub-region based on the first grid scale and the second grid scale, wherein the first grid scale is the minimum grid scale in the distribution field model of the target region, and the second grid scale is the maximum grid scale in the distribution field model. The distribution field model is used to characterize the prediction accuracy of the corresponding sub-region in the subsequent flood prediction process by indicating different grid scales of each sub-region within the target region. The initial flood information includes the first grid scale and the second grid scale.

[0185] The determining unit is used to determine the grid scale correction amount of the grid scale of the target sub-region based on the target adjustment parameters and the third grid scale;

[0186] The correction unit is used to correct the first grid scale using the grid scale correction amount to obtain the fourth grid scale of the target sub-region, wherein the target flood information includes the fourth grid scale.

[0187] Optionally, the correction unit is used for:

[0188] Detect the reference hydrological information of the target sub-region within the reference time period;

[0189] The reference weight parameter is detected based on the reference hydrological information, wherein the reference weight parameter is used to indicate the degree of impact of the hydrological state of the target sub-region on the flooding of the target sub-region during the reference time period;

[0190] The target weight parameter is compensated using the reference weight parameter to obtain candidate weight parameters, wherein the target weight parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region, and the target adjustment parameter includes the target weight parameter;

[0191] The candidate weight parameters are used to perform a weighted calculation on the third grid scale to obtain the fourth grid scale.

[0192] Optionally, the correction unit is used for:

[0193] The candidate weight parameters are calculated using the following formula:

[0194] ;

[0195] in, The candidate weight parameters are... The reference weight parameter, The target weight parameter is denoted as .

[0196] Optionally, the correction unit is used for:

[0197] The reference weight parameter is calculated using the following formula:

[0198] ,

[0199] ,

[0200] in, The reference weight parameter, Assess the risk of water accumulation depth impact on the target sub-region during the reference time period. for The corresponding attenuation coefficient, The weighting is determined by the depth of water accumulation. The weights are determined by the gradient effect of water depth. The preset scoring threshold corresponds to the risk score for the impact of water depth. To preset the water depth threshold, To preset the water depth gradient threshold, The maximum water depth in the target sub-region during the reference time period. The maximum water depth gradient of the target sub-region during the reference time period.

[0201] Embodiments of this application also provide a storage medium including a stored program, wherein the program executes any of the above-described flood information generation methods when it is run.

[0202] Optionally, in this embodiment, the storage medium may be configured to store program code for performing the following steps:

[0203] The target area surrounding the target substation is detected based on the target terrain information of the target substation. The target terrain information indicates the terrain features surrounding the target substation, and the target area is an area where the substation is at risk of flooding due to the terrain features. For each of the multiple sub-regions included in the target area, target area information is obtained, indicating the water flow convergence attribute of the target sub-region. Target adjustment parameters are generated for the target sub-region based on the target area information, indicating the degree of impact of the water flow convergence attribute on the flooding of the target sub-region. The initial flooding information of the target sub-region is corrected based on the target adjustment parameters to obtain target flooding information. The initial flooding information indicates the initial prediction accuracy for flooding prediction of the target sub-region, and the target flooding information indicates the flooding event prediction accuracy of the target sub-region during a reference time period after the current time. The target flooding information is used to achieve flooding event prediction for the target region during the reference time period.

[0204] Embodiments of this application also provide an electronic device including a memory and a processor, wherein the memory stores a computer program and the processor is configured to run the computer program to perform the steps in any of the above embodiments of the flood information generation method.

[0205] Optionally, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor and the input / output device is connected to the processor.

[0206] Optionally, in this embodiment, the processor can be configured to perform the following steps via a computer program:

[0207] The target area surrounding the target substation is detected based on the target terrain information of the target substation. The target terrain information indicates the terrain features surrounding the target substation, and the target area is an area where the substation is at risk of flooding due to the terrain features. For each of the multiple sub-regions included in the target area, target area information is obtained, indicating the water flow convergence attribute of the target sub-region. Target adjustment parameters are generated for the target sub-region based on the target area information, indicating the degree of impact of the water flow convergence attribute on the flooding of the target sub-region. The initial flooding information of the target sub-region is corrected based on the target adjustment parameters to obtain target flooding information. The initial flooding information indicates the initial prediction accuracy for flooding prediction of the target sub-region, and the target flooding information indicates the flooding event prediction accuracy of the target sub-region during a reference time period after the current time. The target flooding information is used to achieve flooding event prediction for the target region during the reference time period.

[0208] Optionally, in this embodiment, the storage medium may include, but is not limited to, various media capable of storing program code, such as USB flash drives, read-only memory (ROM), random access memory (RAM), portable hard drives, magnetic disks, or optical disks.

[0209] Optionally, specific examples in this embodiment can refer to the examples described in the above embodiments and optional implementations, and will not be repeated here.

[0210] Obviously, those skilled in the art should understand that the modules or steps of this application described above can be implemented using general-purpose computing devices. They can be centralized on a single computing device or distributed across a network of multiple computing devices. Optionally, they can be implemented using computer-executable program code, thereby storing them in a storage device for execution by a computing device. In some cases, the steps shown or described can be performed in a different order than those presented here, or they can be fabricated as separate integrated circuit modules, or multiple modules or steps can be fabricated as a single integrated circuit module. Thus, this application is not limited to any particular combination of hardware and software.

[0211] The above description is only a preferred embodiment of this application. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of this application, and these improvements and modifications should also be considered within the scope of protection of this application.

Claims

1. A method for generating flood information, characterized by, include: The target area around the target substation is detected based on the target terrain information of the target substation. The target terrain information is used to indicate the terrain features around the target substation, and the target area is an area around the target substation that is at risk of flooding due to the terrain features. For each of the multiple sub-regions included in the target region, target region information of the target sub-region is obtained, wherein the target region information is used to indicate the water flow convergence attribute of the target sub-region; Based on the target area information, target adjustment parameters for the target sub-region are generated, wherein the target adjustment parameters are used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region; The initial flood information of the target sub-region is corrected according to the target adjustment parameters to obtain target flood information. The initial flood information is used to indicate the initial prediction accuracy of flood prediction for the target sub-region. The target flood information is used to indicate the flood event prediction accuracy of the target sub-region during the flood event prediction process for the target region in the reference time period after the current time. The target flood information is used to realize the flood event prediction for the target region in the reference time period.

2. The method of claim 1, wherein, The step of generating target adjustment parameters for the target sub-region based on the target region information includes: A first distance influence parameter for the target sub-region is generated based on a first distance parameter of the target sub-region, and a second distance influence parameter for the target sub-region is generated based on a second distance parameter of the target sub-region. The first distance parameter indicates the distance between the target sub-region and the river channel, and the second distance parameter indicates the distance between the target sub-region and the target substation. The target region information includes the first distance parameter and the second distance parameter. The first distance influence parameter indicates the degree of impact of the river channel distance on flooding in the target sub-region, and the second distance influence parameter indicates the degree of impact of the distance between the target sub-region and the target substation on flooding in the target sub-region. The first distance influence parameter and the second distance influence parameter are fused together to obtain the target weight parameter of the target sub-region. The target weight parameter is used to indicate the degree of flood impact of the relative position of the target sub-region, the target substation, and the river on the target substation. The target adjustment parameter includes the target weight parameter.

3. The method according to claim 2, characterized in that, The step of generating the first distance influence parameter of the target sub-region based on the first distance parameter of the target sub-region includes: The first distance influence parameter is calculated using the following formula: ; wherein, is the first distance impact parameter, is the distance between the target sub-region and the river, is the flood impact radius of the river, is the river distance attenuation coefficient, is used to indicate the change relationship of the flood impact intensity of the river with distance. The step of generating the second distance influence parameter of the target sub-region based on the second distance parameter of the target sub-region includes: The second distance influence parameter is calculated using the following formula: ; wherein, is the second distance impact parameter, is the distance between the target sub-region and the target transformer substation, is the flood impact radius of the target transformer substation, is the distance attenuation coefficient of the target transformer substation, is used to indicate the change relationship of the flood impact intensity of the target transformer substation with distance.

4. The method of claim 2, wherein, The step of fusing the first distance influence parameter and the second distance influence parameter to obtain the target weight parameter of the target sub-region includes: The target weight parameters are calculated using the following formula: ; wherein, is the target weight parameter, is the influence weight of river distance, is the influence weight of substation distance, is the first distance influence parameter, is the second distance influence parameter.

5. The method of claim 1, wherein, The step of correcting the initial flood information of the target sub-region according to the target adjustment parameters to obtain the target flood information includes: The third grid scale of the target sub-region is calculated based on the first grid scale and the second grid scale, wherein the first grid scale is the minimum grid scale in the distribution field model of the target region, and the second grid scale is the maximum grid scale in the distribution field model. The distribution field model is used to characterize the prediction accuracy of the corresponding sub-region in the subsequent flood prediction process by indicating different grid scales of each sub-region within the target region. The initial flood information includes the first grid scale and the second grid scale. The grid scale correction amount for the target sub-region is determined based on the target adjustment parameters and the third grid scale. The first grid scale is corrected using the grid scale correction amount to obtain the fourth grid scale of the target sub-region, wherein the target flood information includes the fourth grid scale.

6. The method of claim 5, wherein, The step of correcting the third grid scale using the target adjustment parameters to obtain the fourth grid scale of the target sub-region includes: Detect the reference hydrological information of the target sub-region within the reference time period; The reference weight parameter is detected based on the reference hydrological information, wherein the reference weight parameter is used to indicate the degree of impact of the hydrological state of the target sub-region on the flooding of the target sub-region during the reference time period; The target weight parameter is compensated using the reference weight parameter to obtain candidate weight parameters, wherein the target weight parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region, and the target adjustment parameter includes the target weight parameter; The candidate weight parameters are used to perform a weighted calculation on the third grid scale to obtain the fourth grid scale.

7. The method of claim 6, wherein, The step of compensating the target weight parameters using the reference weight parameters to obtain candidate weight parameters includes: The candidate weight parameters are calculated using the following formula: ; wherein, is the candidate weight parameter, is the reference weight parameter, is the target weight parameter.

8. The method according to claim 6, characterized in that, The step of detecting the reference weight parameter based on the reference hydrological information includes: The reference weight parameter is calculated using the following formula: , , in, The reference weight parameter, Assess the risk of water accumulation depth impact on the target sub-region during the reference time period. for The corresponding attenuation coefficient, The weighting is determined by the depth of water accumulation. The weights are determined by the gradient effect of water depth. The preset scoring threshold corresponds to the risk score for the impact of water depth. To preset the water depth threshold, To preset the water depth gradient threshold, The maximum water depth in the target sub-region during the reference time period. The maximum water depth gradient of the target sub-region during the reference time period.

9. A device for generating flood information, characterized in that, include: The detection module is used to detect the target area around the target substation based on the target terrain information of the target substation. The target terrain information is used to indicate the terrain features around the target substation, and the target area is an area around the target substation that is at risk of flooding due to the terrain features. The acquisition module is used to acquire target area information for each of the multiple sub-regions included in the target area, wherein the target area information is used to indicate the water flow convergence attribute of the target sub-region; A generation module is used to generate target adjustment parameters for the target sub-region based on the target region information, wherein the target adjustment parameters are used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region; The correction module is used to correct the initial flood information of the target sub-region according to the target adjustment parameters to obtain target flood information. The initial flood information is used to indicate the initial prediction accuracy of flood prediction for the target sub-region. The target flood information is used to indicate the flood event prediction accuracy of the target sub-region during the flood event prediction process for the target region in the reference time period after the current time. The target flood information is used to realize the flood event prediction for the target region in the reference time period.

10. The apparatus according to claim 9, characterized in that, The generation module includes: A generation unit is configured to generate a first distance influence parameter of the target sub-region based on a first distance parameter of the target sub-region, and to generate a second distance influence parameter of the target sub-region based on a second distance parameter of the target sub-region. The first distance parameter indicates the distance between the target sub-region and the river channel, and the second distance parameter indicates the distance between the target sub-region and the target substation. The target region information includes the first distance parameter and the second distance parameter. The first distance influence parameter indicates the degree of impact of the river channel distance on flooding in the target sub-region, and the second distance influence parameter indicates the degree of impact of the distance between the target sub-region and the target substation on flooding in the target sub-region. The first calculation unit is used to fuse the first distance influence parameter and the second distance influence parameter to obtain the target weight parameter of the target sub-region. The target weight parameter is used to indicate the degree of flood impact of the relative position between the target sub-region and the target substation and the river on the target substation. The target adjustment parameter includes the target weight parameter.

11. The apparatus according to claim 10, characterized in that, The generation unit is used for: The first distance influence parameter is calculated using the following formula: ; in, The first distance-affecting parameter, The distance between the target sub-region and the river channel. The radius of influence of river flooding, The river channel distance attenuation coefficient, Used to indicate how the intensity of flood impact on a river varies with distance; The generation unit is further configured to: The second distance influence parameter is calculated using the following formula: ; in, This is the second distance-affecting parameter. The distance between the target sub-region and the target substation. The flood impact radius of the target substation. The distance attenuation coefficient of the target substation. This is used to indicate the relationship between the intensity of flood impact on the target substation and distance.

12. The apparatus according to claim 10, characterized in that, The first computing unit is used for: The target weight parameters are calculated using the following formula: ; in, The target weight parameter, The influence weight of river distance, The influence weight of the distance to the substation. The first distance-affected parameter, This is the second distance-affected parameter.

13. The apparatus according to claim 9, characterized in that, The correction module includes: The second calculation unit is used to calculate the third grid scale of the target sub-region based on the first grid scale and the second grid scale, wherein the first grid scale is the minimum grid scale in the distribution field model of the target region, and the second grid scale is the maximum grid scale in the distribution field model. The distribution field model is used to characterize the prediction accuracy of the corresponding sub-region in the subsequent flood prediction process by indicating different grid scales of each sub-region within the target region. The initial flood information includes the first grid scale and the second grid scale. The determining unit is used to determine the grid scale correction amount of the grid scale of the target sub-region based on the target adjustment parameters and the third grid scale; The correction unit is used to correct the first grid scale using the grid scale correction amount to obtain the fourth grid scale of the target sub-region, wherein the target flood information includes the fourth grid scale.

14. The apparatus according to claim 13, characterized in that, The correction unit is used for: Detect the reference hydrological information of the target sub-region within the reference time period; The reference weight parameter is detected based on the reference hydrological information, wherein the reference weight parameter is used to indicate the degree of impact of the hydrological state of the target sub-region on the flooding of the target sub-region during the reference time period; The target weight parameter is compensated using the reference weight parameter to obtain candidate weight parameters, wherein the target weight parameter is used to indicate the degree of influence of the water flow convergence attribute of the target sub-region on the flooding of the target sub-region, and the target adjustment parameter includes the target weight parameter; The candidate weight parameters are used to perform a weighted calculation on the third grid scale to obtain the fourth grid scale.

15. The apparatus according to claim 14, characterized in that, The correction unit is used for: The candidate weight parameters are calculated using the following formula: ; in, The candidate weight parameters are... The reference weight parameter, The target weight parameter is denoted as .

16. The apparatus according to claim 14, characterized in that, The correction unit is used for: The reference weight parameter is calculated using the following formula: , , in, The reference weight parameter, Assess the risk of water accumulation depth impact on the target sub-region during the reference time period. for The corresponding attenuation coefficient, The weighting is determined by the depth of water accumulation. The weights are determined by the gradient effect of water depth. The preset scoring threshold corresponds to the risk score for the impact of water depth. To preset the water depth threshold, To preset the water depth gradient threshold, The maximum water depth in the target sub-region during the reference time period. The maximum water depth gradient of the target sub-region during the reference time period.

17. A computer-readable storage medium, characterized in that, The computer-readable storage medium includes a stored program, wherein the program, when executed, performs the method of any one of claims 1 to 8.

18. An electronic device comprising a memory and a processor, characterized in that, The memory stores a computer program, and the processor is configured to execute the method of any one of claims 1 to 8 through the computer program.