Multi-objective inversion method and system for structural parameters of non-transparent exterior walls of tropical buildings

By using a multi-objective inversion method for the structural parameters of non-transparent exterior walls of tropical buildings, classifying parameters into categorical and numerical types, and correcting performance objectives using prediction error limits, a joint structural parameter subdomain is formed. This solves the problems of unreasonable parameter combinations and prediction errors in existing technologies, and achieves more accurate and reliable inversion results.

CN123116509APending Publication Date: 2026-11-17SANYA SCI & EDUCATION INNOVATION PARK WUHAN UNIV OF TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611619578.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies struggle to accurately invert the structural parameters of non-transparent exterior walls in tropical buildings while meeting multiple performance requirements, and are prone to problems such as unreasonable parameter combinations or prediction errors leading to actual performance exceeding limits.

Method used

The structural parameters of the non-transparent exterior wall are classified into categorical and numerical types. The response relationship is established through dynamic performance simulation. The performance target boundary is corrected by using the prediction error limit. The connectivity is divided by combining the node adjacency relationship to form a joint structural parameter subdomain. Iterative optimization is then performed to meet multi-objective constraints.

Benefits of technology

It improves the accuracy and feasibility of the inversion results, avoids mutual compensation between performance indicators, and enhances cross-climate applicability and the reliability of the inversion results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116509A_ABST
    Figure CN123116509A_ABST
Patent Text Reader

Abstract

This invention relates to the field of building thermal and building performance simulation technology, and discloses a multi-objective inversion method and system for structural parameters of non-transparent exterior walls in tropical buildings. The method includes: classifying structural parameters into categorical and numerical structural parameters and determining the exterior wall structural type; generating candidate structural parameter nodes according to the allowable values ​​of structural parameters and the wall structural relationship, and determining the node adjacency relationship; obtaining the tropical climate boundary and performance target, determining the thermal response and establishing the performance response relationship; determining the upper and lower prediction error limits using independent calibration samples to correct the performance target boundary; screening feasible nodes; performing connectivity partitioning based on node adjacency relationship to obtain a joint structural parameter subdomain and boundary nodes; selecting representative boundary nodes based on conservative performance safety margin for dynamic building performance simulation; deleting nodes exceeding the limit and re-partitioning; iterating until the stopping condition is met; and outputting the final joint structural parameter inversion domain.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of building thermal and building performance simulation technology, specifically involving a multi-objective inversion method and system for structural parameters of non-transparent exterior walls in tropical buildings. Background Technology

[0002] Tropical regions experience prolonged periods of high temperatures and radiation, leading to significant building cooling demands. The heat transfer, heat storage, and surface radiation characteristics of non-transparent exterior walls directly impact the indoor thermal environment and cooling load. Factors such as the main wall material, insulation materials, structural layers, surface radiation performance, air gaps, and thermal bridges collectively determine the wall's thermal response, while also influencing material usage, construction costs, and the carbon footprint of the materials. Therefore, the design of non-transparent exterior walls in tropical buildings typically needs to balance energy efficiency, thermal comfort, economy, and low carbon footprint.

[0003] Existing non-transparent exterior wall designs typically begin by determining the material type, structural layers, and parameter values. Then, performance calculations and selection of different schemes are performed through building performance simulations, or optimized based on energy consumption, thermal comfort, cost, and carbon emission indicators. For exterior walls with insulation layers and thermal bridges, the wall's heat transfer performance is usually characterized by corresponding thermal parameters. When there are many candidate schemes, to reduce the computational burden of conducting dynamic building performance simulations for each one, existing simulation samples can be used to establish a rapid response relationship between structural parameters and building performance, thus assisting in the selection of candidate schemes.

[0004] However, existing methods primarily focus on performance evaluation under known structural parameters, making it difficult to directly obtain the external wall structural type and combined parameter range that meet constraints based on multiple performance requirements. External wall parameters include both categorical and numerical variables, and are constrained by structural conditions such as insulation settings, core layering, finish thickness, and total wall thickness. Determining the range of each parameter separately can easily lead to combinations where individual values ​​are reasonable but the overall structure is unreasonable. Furthermore, the material layers and heat transfer paths differ between ordinary wall sections and thermal bridge sections, making it difficult to accurately reflect actual structural differences using a single thermal parameter. The physical meanings and control boundaries of energy consumption, thermal comfort, cost, and occult carbon differ, and weighted evaluation may lead to issues of mutual compensation between different performance characteristics. In addition, rapid performance response relationships have prediction errors near the target boundary, potentially resulting in situations where predictions are met but dynamic simulations exceed limits, affecting the reliability of parameter range determination. Summary of the Invention

[0005] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a multi-objective inversion method and system for structural parameters of non-transparent exterior walls of tropical buildings. While satisfying multiple performance objective constraints, it maintains the joint relationship of structural parameters and improves the accuracy and feasibility of the inversion results through dynamic performance verification.

[0006] To achieve the above-mentioned technical objectives, this invention provides a multi-objective inversion method for structural parameters of non-transparent exterior walls in tropical buildings, comprising the following steps:

[0007] Step S1: Divide the non-transparent exterior wall construction parameters into categorical construction parameters and numerical construction parameters, and determine the exterior wall construction type according to the value combination of the categorical construction parameters; generate candidate construction parameter nodes according to the allowed values ​​of the construction parameters and the wall construction relationship, and each candidate construction parameter node represents a combination of construction parameters that satisfies the wall construction relationship; for two candidate construction parameter nodes of the same exterior wall construction type, when only one numerical construction parameter of the two candidate construction parameter nodes takes an adjacent allowed range or differs by a preset deviation step size, and the remaining numerical construction parameters have the same value, it is determined that the two candidate construction parameter nodes have a node adjacency relationship.

[0008] Step S2: Obtain the tropical climate boundary and performance targets; determine the thermal response based on candidate structural parameter nodes; establish the performance response relationship between structural parameters, thermal response, and performance indicators using dynamic building performance simulation samples under the tropical climate boundary; for performance indicators predicted by the performance response relationship, determine the upper prediction error limit and lower prediction error limit based on the upper and lower residuals of the independent calibration samples, and correct the performance target boundary according to the constraint direction of the performance target using the corresponding prediction error limit; and select feasible nodes from the candidate structural parameter nodes that simultaneously satisfy all corrected performance targets.

[0009] Step S3: Based on the node adjacency relationship, perform connectivity partitioning on feasible nodes. Feasible nodes that can be connected to each other through continuous node adjacency relationships are assigned to the same joint construction parameter subdomain. The joint construction parameter subdomain is characterized by the feasible nodes assigned to the joint construction parameter subdomain and the node adjacency relationships between the feasible nodes. Feasible nodes that have node adjacency relationships with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes.

[0010] Step S4: Determine a conservative performance safety margin based on the performance prediction values ​​of the boundary nodes, the corresponding prediction error limits, and the performance target boundaries. Based on the conservative performance safety margin, and in conjunction with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage, select representative boundary nodes and perform dynamic building performance simulation under the tropical climate boundary. Identify the representative boundary nodes whose dynamic building performance simulation results for any performance index predicted by the performance response relationship exceed the corresponding performance target as out-of-limit nodes, and delete the out-of-limit nodes from the feasible nodes. Re-divide connectivity based on the remaining feasible nodes and identify boundary nodes. Iterate the above process until all the representative boundary nodes selected in the current round meet all performance targets, and the connectivity of the feasible nodes and the joint construction parameter subdomain remains unchanged compared to the current round of review, or there are no unreviewed boundary nodes. Determine the retained joint construction parameter subdomain as the final joint construction parameter inversion domain.

[0011] Preferably, the structural parameters include the type of main material, the thickness of the main body, the type of insulation material, the thickness of insulation, the location of insulation, the type of exterior finishing material, the thickness of exterior finishing, the solar absorptivity of the exterior surface, the long-wave emissivity of the exterior surface, the thermal resistance of the air layer, the thickness of the inner gypsum board, and the ratio of thermal bridge area.

[0012] The main material category, insulation material category, insulation location, and exterior finish material category are categorical structural parameters, while structural parameters other than the categorical structural parameters are numerical structural parameters.

[0013] Numerical construction parameters with preset allowable levels take values ​​according to the corresponding allowable level, while numerical construction parameters without preset allowable levels take values ​​according to the preset discrete step size within the corresponding allowable range.

[0014] Preferably, the wall structure relationship includes:

[0015] When there is no insulation, the type of insulation material is set to none, the ratio of insulation thickness to thermal bridge area is set to zero, and the insulation location is set to none.

[0016] When using sandwich insulation, the insulation layer is located inside the main body layer, the sum of the thicknesses of the main body layers on both sides of the insulation layer is equal to the thickness of the main body layer, and the main body layers on both sides meet the preset minimum thickness requirements.

[0017] The thicknesses of the main body layer, insulation layer, exterior finish layer, and inner gypsum board layer meet the following requirements:

[0018] ;

[0019] In the formula, For the main body thickness, For insulation thickness, For the thickness of the exterior finish, The thickness of the inner gypsum board. The preset total thickness limit;

[0020] The thickness of the exterior finish should match the allowable thickness corresponding to the exterior finish material category. No air layer is set when the thermal resistance of the air layer is zero.

[0021] Combinations of construction parameters that satisfy the wall construction relationship are identified as candidate construction parameter nodes.

[0022] Preferably, the thermal response corresponding to the candidate construction parameter node is determined in the following manner:

[0023] When the insulation thickness is greater than zero and the thermal bridge area ratio is greater than zero, ordinary heat transfer path and thermal bridge heat transfer path are established respectively. The ordinary heat transfer path maintains the insulation layer and wall layer, while the thermal bridge heat transfer path uses heavy concrete of the same thickness as the insulation layer to replace the insulation material at the corresponding position.

[0024] The equivalent heat transfer coefficient of a non-transparent exterior wall satisfies:

[0025] ;

[0026] The equivalent periodic heat flux response of a non-transparent exterior wall satisfies:

[0027] ;

[0028] In the formula, This represents the proportion of thermal bridge area. and These are the heat transfer coefficients for the ordinary heat transfer path and the thermal bridge heat transfer path, respectively. The equivalent heat transfer coefficient for a non-transparent exterior wall; and These are the periodic heat flux responses of the ordinary heat transfer path and the thermal bridge heat transfer path, respectively. The equivalent periodic heat flux response of a non-transparent exterior wall; It is a time variable;

[0029] The thermal response is determined based on the equivalent heat transfer coefficient of the non-transparent exterior wall and the equivalent periodic heat flow response of the non-transparent exterior wall; when no insulation layer is provided or the thermal bridge area ratio is zero, the thermal response is determined according to the actual wall structure.

[0030] Preferably, the performance targets include annual cooling energy consumption intensity, thermal comfort exceeding the limit during the occupancy period, initial material cost per unit area of ​​non-transparent exterior wall, and carbon contained in the initial material per unit area of ​​non-transparent exterior wall, with each performance target serving as an independent constraint.

[0031] For the first predicted by the performance response relationship Performance index, number Upper residuals of individual calibration samples and lower residual They respectively satisfy:

[0032] ;

[0033] ;

[0034] In the formula, The dynamic building performance simulation values ​​for the performance indicators corresponding to the independent calibration samples. The predicted value of the performance index corresponding to the independent calibration sample obtained from the performance response relationship;

[0035] The upper prediction error limit is determined by the upper residual and the lower residual respectively according to the preset quantile level. and the lower prediction error limit ;

[0036] For upper limit performance targets The revised performance target is:

[0037] ;

[0038] For lower limit performance targets The revised performance target is:

[0039] ;

[0040] For interval-type performance targets The revised performance target is:

[0041] ;

[0042] In the formula, Construct parameter nodes for candidates; For the first Performance indicators; The candidate construction parameter node obtained from the performance response relationship is the first Predicted values ​​for various performance indicators; and The first The upper and lower bounds of the performance target;

[0043] The initial material cost per unit area of ​​non-transparent exterior wall and the carbon content of the initial material per unit area of ​​non-transparent exterior wall are calculated directly based on the actual amount of wall material used, without performance response relationship prediction, and the corresponding prediction error limit is set to zero.

[0044] Candidate structural parameter nodes that simultaneously satisfy the wall structure relationship and all modified performance objectives are determined as feasible nodes, and no weighted compensation is performed between the performance objectives.

[0045] Preferably, for the first Two candidate structural parameter nodes for the type of exterior wall structure and The node adjacency determination function satisfies:

[0046] ;

[0047] In the formula, This is a function for determining the adjacency relationship of nodes. The number of numerical construction parameters. For the external wall construction type number, and They are nodes and The Middle The possible values ​​of a numeric construction parameter. The indicator function is used; if the above conditions are not met, the node adjacency determination function is set to 0.

[0048] Let the first The candidate structural parameter node set for the various external wall structural types is as follows Joint decision function Satisfy: When node When both the wall structure relationship and all modified performance objectives are met simultaneously ;otherwise, ;

[0049] No. The feasible node set for the various external wall structural types is as follows:

[0050] ;

[0051] Based on the node adjacency relationship Divided into Then the joint construction parameter subfield, the first The combined structural parameter inversion domain for various exterior wall structural types satisfies:

[0052] ;

[0053] In the formula, For the first A joint construction parameter subdomain, For the first Joint structural parameter inversion domain for various exterior wall structural types;

[0054] The joint construction parameter subdomain is characterized by the feasible nodes included in the joint construction parameter subdomain and the node adjacency relationship between the feasible nodes. Whether the construction parameter combination belongs to the joint construction parameter subdomain is determined by whether the construction parameter combination corresponds to a feasible node in the joint construction parameter subdomain. The value range of each numerical construction parameter in the joint construction parameter subdomain is output as the projection range and is not used as the basis for determining whether it belongs to the joint construction parameter subdomain.

[0055] Preferably, the first Under the first type of exterior wall structure A joint construction parameter subdomain The set of boundary nodes satisfies:

[0056] ;

[0057] In the formula, For the set of boundary nodes; For feasible nodes in the joint construction parameter subdomain; For nodes Candidate construction parameter nodes with node adjacency relationships;

[0058] For the first predicted by the performance response relationship For each performance indicator, the conservative performance safety margin corresponding to the upper limit performance target is satisfied as follows:

[0059] ;

[0060] The conservative performance safety margin corresponding to the lower limit performance target is satisfied as follows:

[0061] ;

[0062] In the formula, and The first The upper and lower bounds of the performance target; For nodes Performance predictions; and These are the upper prediction error limit and the lower prediction error limit, respectively; and These are the conservative performance safety margins for the upper and lower constraint directions, respectively.

[0063] For interval-type performance targets, the corresponding conservative performance safety margins are determined according to the upper limit constraint direction and the lower limit constraint direction, respectively.

[0064] Within the same performance index and the same constraint direction, the priority of dynamic building performance simulation verification of boundary nodes is determined from small to large according to the conservative performance safety margin, and the representative boundary nodes are determined by combining the external wall construction type, the boundary direction of numerical construction parameters, and the parameter space coverage.

[0065] Preferably, for the same building fixed conditions and the same performance objectives, the multi-objective inversion method for the structural parameters of the non-transparent exterior wall of the tropical building is performed under at least two tropical climate boundaries;

[0066] The first The first tropical climate boundary The final joint structural parameter inversion domain corresponding to the various external wall structural types is denoted as The number of tropical climate boundaries is Then, by taking the intersection of the final joint tectonic parameter inversion domains under each tropical climate boundary according to the identical candidate tectonic parameter nodes, a cross-climate common tectonic parameter domain is obtained, which satisfies:

[0067] ;

[0068] In the formula, For the first A cross-climate common structural parameter domain for various exterior wall structural types;

[0069] The intersection is determined according to nodes with identical candidate construction parameters;

[0070] When the cross-climate common construction parameter domain contains two or more feasible node connected components that are not connected to each other, joint construction parameter subdomains are formed according to the node adjacency relationship.

[0071] Representative nodes are selected for each joint structural parameter subdomain, and dynamic building performance simulations are performed under each tropical climate boundary. The joint structural parameter subdomain that meets the performance target under all the tropical climate boundaries is determined as the structural parameter inversion domain applicable across climates.

[0072] The present invention also provides a multi-objective inversion system for structural parameters of non-transparent exterior walls of tropical buildings, the system comprising a candidate node generation module, a performance screening module, a subdomain partitioning module, and a dynamic verification module;

[0073] The candidate node generation module is used to divide the non-transparent exterior wall construction parameters into categorical construction parameters and numerical construction parameters, determine the exterior wall construction type according to the value combination of categorical construction parameters, generate candidate construction parameter nodes according to the allowed values ​​of construction parameters and the wall construction relationship, and determine the node adjacency relationship according to the condition that only one numerical construction parameter under the same exterior wall construction type takes adjacent allowed ranges or differs by a preset distance step length, and the remaining numerical construction parameters have the same value.

[0074] The performance screening module is used to obtain the tropical climate boundary and performance target, determine the thermal response based on the candidate structural parameter nodes, establish the performance response relationship between structural parameters, thermal response and performance index using dynamic building performance simulation samples under the tropical climate boundary, determine the upper prediction error limit and lower prediction error limit based on the upper and lower residuals of the independent calibration samples respectively, and correct the performance target boundary according to the constraint direction of the performance target using the corresponding prediction error limit, and screen feasible nodes that simultaneously meet all corrected performance targets from the candidate structural parameter nodes.

[0075] The subdomain partitioning module is used to partition feasible nodes based on node adjacency relationships. Feasible nodes that can be connected to each other through continuous node adjacency relationships are assigned to the same joint construction parameter subdomain. The joint construction parameter subdomain is characterized by the feasible nodes assigned to the joint construction parameter subdomain and the node adjacency relationships between the feasible nodes. Feasible nodes that have node adjacency relationships with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes.

[0076] The dynamic verification module is used to determine a conservative performance safety margin based on the performance prediction value of the boundary nodes, the corresponding prediction error limit, and the performance target boundary. Based on the conservative performance safety margin, and in combination with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage, representative boundary nodes are selected, and dynamic building performance simulation is performed under the corresponding tropical climate boundary. The boundary representative node whose dynamic building performance simulation result of any performance index predicted by the performance response relationship exceeds the corresponding performance target is identified as an over-limit node, and the over-limit node is deleted from the feasible nodes. Based on the remaining feasible nodes, connectivity is re-divided and boundary nodes are identified. The above process is iterated until all the boundary representative nodes selected in the current round meet all performance targets, and the connectivity relationship of the feasible nodes and the joint construction parameter subdomain remains unchanged compared to the current round of verification, or there are no unverified boundary nodes. The retained joint construction parameter subdomain is determined as the final joint construction parameter inversion domain and output.

[0077] Preferably, the dynamic verification module includes a margin determination unit, a node selection unit, a simulation verification unit, and a subdomain correction unit;

[0078] The margin determination unit is used to determine the boundary nodes according to the constraint direction of the performance target. The conservative performance safety margin; the conservative performance safety margin corresponding to the upper limit performance target satisfies:

[0079] ;

[0080] The conservative performance safety margin corresponding to the lower limit performance target is satisfied as follows:

[0081] ;

[0082] In the formula, and The first The upper and lower bounds of the performance target. Boundary nodes Performance predictions and These are the upper and lower prediction error limits for the corresponding performance indicators, respectively. and These are the conservative performance safety margins for the upper and lower constraint directions, respectively.

[0083] For interval-type performance targets, the corresponding conservative performance safety margins are determined according to the upper limit constraint direction and the lower limit constraint direction, respectively.

[0084] The node selection unit is used to determine the representative boundary node from the unverified boundary nodes based on the conservative performance safety margin, combined with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage.

[0085] The simulation verification unit is used to perform dynamic building performance simulation on the representative nodes of the boundary under the corresponding tropical climate boundary, and to determine the boundary representative nodes whose dynamic building performance simulation results of any performance index predicted by the performance response relationship exceed the corresponding performance target as over-limit nodes.

[0086] The subdomain correction unit is used to delete out-of-limit nodes, re-partition connectivity based on the remaining feasible nodes and identify boundary nodes in order to correct the joint construction parameter subdomain.

[0087] The dynamic verification module repeatedly calls the residual determination unit, node selection unit, simulation verification unit, and subdomain correction unit until all the boundary representative nodes selected in the current round meet all performance targets, and the connectivity of the feasible nodes and the joint construction parameter subdomain remains unchanged compared to the current round of verification, or there are no boundary nodes that have not yet been verified. The retained joint construction parameter subdomain is then determined as the final joint construction parameter inversion domain.

[0088] The advantages of this invention include at least the following:

[0089] 1. This invention uses annual cooling energy consumption intensity, thermal comfort excess ratio during the occupied period, initial material cost per unit non-transparent exterior wall area, and initial material implicit carbon as mutually independent performance constraints. The combination of exterior wall construction parameters is determined by the performance targets in reverse, and candidate construction parameter nodes are screened in combination with the wall construction relationship. This can avoid the problem of mutual compensation between different performance indicators when using weighted comprehensive evaluation, and improve the consistency between the inversion results and the actual wall construction requirements.

[0090] 2. This invention addresses non-transparent exterior walls where insulation layers and thermal bridges coexist. It establishes both ordinary heat transfer paths and thermal bridge heat transfer paths, and determines the equivalent thermal response based on the thermal bridge area ratio. Simultaneously, it divides connectivity based on the node adjacency relationship between candidate structural parameter nodes, forming a joint structural parameter subdomain. This maintains the joint value relationship between different structural parameters, reducing the number of unfeasible or unsatisfactory solutions resulting from the recombination of independent value ranges of each parameter.

[0091] 3. This invention utilizes independent calibration samples to determine the prediction error limit and corrects the performance target boundary accordingly. It performs dynamic building performance simulation verification on the boundary nodes of the joint structural parameter subdomain. When performance exceeds the limit, the corresponding exceeding node is deleted and connectivity division and boundary identification are re-performed, thereby reducing the risk of false satisfaction results in the performance response relationship near the target boundary. For multiple tropical climate boundaries, a cross-climate common structural parameter domain can also be determined based on the corrected final joint structural parameter inversion domain under each climate condition, improving the reliability and cross-climate applicability of the inversion results. Attached Figure Description

[0092] Figure 1 A flowchart of a multi-objective inversion method for structural parameters of non-transparent exterior walls in tropical buildings provided in an embodiment of the present invention;

[0093] Figure 2 This is a flowchart illustrating the heat transfer path and equivalent thermal response calculation for a non-transparent exterior wall, as provided in an embodiment of the present invention.

[0094] Figure 3 A flowchart illustrating the dynamic verification process of the joint construction parameter domain boundary provided in this embodiment of the invention. Detailed Implementation

[0095] The following combination Figures 1-3 The technical solution of the present invention will be further explained through specific embodiments.

[0096] This embodiment focuses on the non-transparent exterior walls of office buildings in tropical regions. Under the condition that the building geometry, windows, roof, personnel, lighting, equipment, air conditioning system, and operating schedule remain unchanged, only the main material and thickness of the non-transparent exterior wall, the insulation material and thickness, the insulation location, the exterior finish material and thickness, the solar absorptivity of the exterior surface, the long-wave emissivity of the exterior surface, the air layer thermal resistance, the gypsum board thickness, and the thermal bridge area ratio are changed. Based on four performance requirements—annual cooling energy consumption intensity, thermal comfort exceeding limits during occupancy periods, initial material cost per unit area of ​​non-transparent exterior wall, and initial material implicit carbon per unit area of ​​non-transparent exterior wall—one or more subdomains of joint structural parameters for non-transparent exterior walls that meet the target requirements are inverted.

[0097] The existing data includes 4,220 independent exterior wall designs that have obtained formal dynamic simulation results. Each design was calculated using four tropical meteorological conditions: Dongfang, Haikou, Qionghai, and Sanya Fenghuang, resulting in a total of 16,880 annual simulation records. Among them, 3,900 designs were used to establish performance response relationships and determine target scenarios; 128 WAVE_B_EFFECTIVE designs and 64 WAVE_C designs, totaling 192 independent designs, were used for performance response error calibration; and an additional 128 FINAL_HOLDOUT independent designs were set up, which were only used for independent verification after the performance response relationships, prediction error limits, parameter discretization rules, joint construction parameter subdomain identification rules, and boundary correction rules were all determined, and did not participate in method establishment and parameter selection.

[0098] To ensure that the subsequent inversion of structural parameters uses the same wall structure and thermal calculation methods as the existing simulation samples, this embodiment first uses a unified structural generation program to regenerate the common heat transfer paths, thermal bridge heat transfer paths, heat transfer coefficients, material usage, initial material costs, and initial material implicit carbon for 4220 independent exterior wall designs with formal dynamic simulation results. The regenerated wall layers and main derivatives are consistent with the frozen data, and the wall structure generation reproducibility rate is 100%.

[0099] like Figure 1 As shown, this embodiment of the invention provides a multi-objective inversion method for structural parameters of non-transparent exterior walls in tropical buildings, including the following steps:

[0100] Step S1: Divide the non-transparent exterior wall construction parameters into categorical construction parameters and numerical construction parameters, and determine the exterior wall construction type according to the value combination of the categorical construction parameters; generate candidate construction parameter nodes according to the allowed values ​​of the construction parameters and the wall construction relationship, and each candidate construction parameter node represents a combination of construction parameters that satisfies the wall construction relationship; for two candidate construction parameter nodes of the same exterior wall construction type, if only one of the numerical construction parameters of the two candidate construction parameter nodes takes an adjacent allowed range or differs by a preset deviation step size, and the remaining numerical construction parameters have the same value, it is determined that the two candidate construction parameter nodes have a node adjacency relationship.

[0101] Step S2: Obtain the tropical climate boundary and performance targets, determine the thermal response based on the candidate structural parameter nodes, and establish the performance response relationship between structural parameters, thermal response, and performance indicators using dynamic building performance simulation samples under the tropical climate boundary; for the performance indicators predicted by the performance response relationship, determine the upper prediction error limit and lower prediction error limit based on the upper and lower residuals of the independent calibration samples, and correct the performance target boundary according to the constraint direction of the performance target using the corresponding prediction error limit; select feasible nodes from the candidate structural parameter nodes that simultaneously meet all corrected performance targets.

[0102] Step S3: Based on the node adjacency relationship, feasible nodes are divided into connectivity subdomains. Feasible nodes that can be connected to each other through continuous node adjacency relationships are assigned to the same joint construction parameter subdomain. The joint construction parameter subdomain is characterized by the feasible nodes assigned to the joint construction parameter subdomain and the node adjacency relationship between feasible nodes. Feasible nodes that have node adjacency relationships with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes.

[0103] Step S4: Determine the conservative performance safety margin based on the performance prediction values ​​of the boundary nodes, the corresponding prediction error limits, and the performance target boundaries. Based on the conservative performance safety margin, and in conjunction with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage, select representative boundary nodes and conduct dynamic building performance simulation under tropical climate boundaries. Identify the boundary representative nodes whose dynamic building performance simulation results for any performance index predicted by the performance response relationship exceed the corresponding performance target as out-of-limit nodes, and delete them from the feasible nodes. Re-divide connectivity based on the remaining feasible nodes and identify boundary nodes. Iterate the above process until all the boundary representative nodes selected in the current round meet all performance targets, and the connectivity of feasible nodes and joint construction parameter subdomains remains unchanged compared to the current round of verification, or there are no unverified boundary nodes. Determine the retained joint construction parameter subdomains as the final joint construction parameter inversion domain.

[0104] The non-transparent exterior wall uses 12 construction parameters, and each candidate construction parameter node is denoted as . And it is uniquely characterized by the values ​​of its corresponding 12 construction parameters:

[0105] ;

[0106] In the formula, to These represent candidate construction parameter nodes. The values ​​of the first to twelfth construction parameters in the corresponding combination of construction parameters.

[0107] The main material category, insulation material category, insulation location, and exterior finish material category constitute the category-type structural parameter vector:

[0108] ;

[0109] In the formula, For the first Category-type structural parameter vectors corresponding to various exterior wall structural types; Number the exterior wall construction type; The main material category; This refers to the category of thermal insulation materials; For insulation, This refers to the category of exterior finishing materials.

[0110] The numerical structural parameter vector consists of the main body thickness, insulation thickness, exterior finish thickness, outer surface solar absorptivity, outer surface long-wave emissivity, air layer thermal resistance, inner gypsum board thickness, and thermal bridge area ratio.

[0111] ;

[0112] In the formula, Construct parameter vectors for numerical types; The thickness of the main body; For insulation thickness; For exterior finish thickness; The solar absorptivity of the outer surface; The long-wavelength emissivity of the outer surface; For air layer thermal resistance; The thickness of the inner gypsum board; This represents the proportion of thermal bridge area.

[0113] The values ​​of each construction parameter are shown in Table 1.

[0114] Table 1. Construction parameters of non-transparent exterior walls

[0115]

[0116] Among them, F06, F07, F10 and F11 correspond to the preset exterior wall insulation cladding system (EIFS) cladding, cement mortar, stone and wood cladding categories, respectively.

[0117] After forming the combination of structural parameters, the legality of the construction is screened based on the wall structure relationship. When there is no insulation, the insulation material category is set to "none".

[0118] ;

[0119] Simultaneously satisfy:

[0120] ;

[0121] In addition, the insulation layer and independent thermal bridge heat transfer paths are eliminated in the actual wall structure.

[0122] When sandwich insulation is used and the insulation location is sandwiched, the main layer is divided into an outer main layer and an inner main layer on both sides of the insulation layer, and their thickness relationship satisfies:

[0123] ;

[0124] In the formula, The thickness of the outer main body layer of the insulation layer; The thickness of the inner main body layer of the insulation layer; This refers to the total thickness of the main layer.

[0125] The outer and inner main body layer thicknesses respectively satisfy the following:

[0126] ;

[0127] Therefore, when using sandwich insulation, the total thickness of the main layer must satisfy:

[0128] ;

[0129] Let the thicknesses of the main body layer, insulation layer, exterior finish layer, and inner gypsum board layer be respectively... , , and Total thickness of solid wall layer for:

[0130] ;

[0131] And satisfy:

[0132] ;

[0133] In this embodiment, the total thickness of the solid wall layer satisfy:

[0134] ;

[0135] 0.50m is the upper limit of the total thickness of the solid wall layer used in this embodiment. In this embodiment, the preset total thickness limit is... m.

[0136] The thickness of the exterior finish corresponds to the finish category. For F06, the thickness is 0.006, 0.009, or 0.012 μm; for F07, it is 0.015, 0.020, 0.025, or 0.030 μm; for F10, it is 0.020, 0.025, 0.030, or 0.035 μm; and for F11, it is 0.010, 0.0125, 0.015, or 0.020 μm. When the thermal resistance of the air gap is 0, no air gap is required in the wall layer sequence; when the thermal resistance of the air gap is greater than 0, an air gap is provided according to the corresponding thermal resistance.

[0137] The legality conditions for wall construction are expressed as follows:

[0138] ;

[0139] Then the first The set of legal candidate structural parameter nodes for the various external wall structural types is as follows:

[0140] ;

[0141] In the formula, For the first Function for determining the legality of wall structure; Number the legality conditions for the wall structure; For the first Category-type structural parameter vectors corresponding to various exterior wall structural types; Construct parameter vectors for numerical types; For the first The set of allowed values ​​for numerical structural parameters under various exterior wall structural types; To construct the number of legality determination conditions; For the first A set of legal candidate structural parameter nodes for each type of exterior wall structure.

[0142] The existing data yielded 160 legal exterior wall construction types. The initial candidate construction parameter node generation phase generated 119,894 legal candidate construction parameter nodes; after performing parameter neighborhood closure expansion for the core inversion scenario, another 11,622 legal nodes were added, expanding the computational pool to 131,516 candidate construction parameter nodes. All nodes entering the candidate construction parameter node set passed the construction legality verification.

[0143] For two candidate structural parameter nodes under the same external wall structural type and When two nodes have only one numerical construction parameter that is either adjacent to an allowed range or differs by a preset distance, and all other numerical construction parameters are identical, they are considered to have a node adjacency relationship. Node adjacency determination function. Defined as:

[0144] ;

[0145] In the formula, This is a function for determining the adjacency relationship of nodes. and These are two candidate structural parameter nodes under the same external wall structural type; The number of parameters for numerical construction; Number the numerical construction parameters; and These are candidate construction parameter nodes. and The corresponding numerical construction parameters in the first The values ​​of the numerical construction parameters; This is an indicator function; it takes the value 1 if the condition within the parentheses is true, and 0 otherwise.

[0146] Candidate construction parameter nodes are expanded using a single-parameter, single-level adjacency method, meaning that each time only one numerical construction parameter, one allowed level, or one discrete step size is changed, while the remaining numerical parameters remain unchanged.

[0147] The building model includes 18 hot zones, 15 of which are occupied hot zones. The building occupies a floor area of ​​4982.1859 m². 2 The gross area of ​​the exterior walls is 1977.6687 m². 2 The area of ​​the door and window openings is 664.3276 m². 2 The net non-transparent exterior wall area is 1313.3412m². 2 The exterior window area is 652.6218 m². 2 The window-to-wall area ratio is 0.329996.

[0148] Building performance was simulated dynamically throughout the year using EnergyPlus 26.1, with six time steps per hour. Unsteady-state heat transfer in the building envelope was simulated using the ConductionTransferFunction method, while convective heat transfer between the inner and outer surfaces was simulated using the TARP algorithm. Windows, roof, occupants, lighting, equipment, air conditioning systems, and operating schedules were kept consistent across all exterior wall schemes, ensuring that performance differences between schemes were primarily caused by variations in non-transparent exterior wall parameters.

[0149] Simulations were conducted using typical meteorological conditions in Dongfang, Haikou, Qionghai, and Sanya Fenghuang. The same design number used the exact same 12 non-transparent exterior wall structural parameters under the four climatic conditions, with only the meteorological boundaries altered. This allows for both the generation of single-city structural parameter inversion results and the determination of common structural parameter domains under multiple tropical climate conditions.

[0150] Thermal comfort during occupancy periods is evaluated using PPD (Percentage Points Divided). In this embodiment, the proportion of occupancy periods with a PPD greater than 10% is defined as the thermal comfort excess rate.

[0151] No. Performance targets can be set as upper limit constraints:

[0152] ;

[0153] In the formula, For the first Performance indicators; Number the performance indicators; For the first The upper limit boundary of the performance target.

[0154] Lower bound constraint:

[0155] ;

[0156] In the formula, For the first Performance indicators; For the first The lower bound of the performance target.

[0157] Or interval constraints:

[0158] ;

[0159] In the formula, For the first Performance indicators; and The first The lower and upper bounds of the performance target;

[0160] Annual cooling energy consumption intensity, the proportion of thermal comfort exceeding the limit during the occupation period, the initial material cost per unit area of ​​non-transparent exterior wall, and the carbon content of the initial material per unit area of ​​non-transparent exterior wall are each used as independent constraints and are not combined into a single comprehensive evaluation index through weighting.

[0161] like Figure 2 As shown, when the insulation thickness And the proportion of thermal bridge area At the same time, ordinary heat transfer paths and thermal bridge heat transfer paths are established for the same non-transparent exterior wall. The ordinary heat transfer path retains the original main body layer, insulation layer, finishing layer and inner lining layer; the thermal bridge heat transfer path keeps other wall layers unchanged, and replaces the insulation material with heavy concrete material of the same thickness as the original insulation layer at the corresponding position of the insulation layer.

[0162] Let the net non-transparent exterior wall area be... The area of ​​a typical heat transfer path is The heat transfer path area of ​​the thermal bridge is ,but:

[0163] ;

[0164] In the formula, This represents the area of ​​a typical heat transfer path. The area of ​​the heat transfer path of the thermal bridge; This represents the total net area of ​​the non-transparent exterior walls; This represents the proportion of thermal bridge area. This represents the proportion of the area occupied by the ordinary heat transfer path.

[0165] The areas of the two heat transfer paths satisfy:

[0166] ;

[0167] In the formula, This represents the area of ​​a typical heat transfer path. The area of ​​the heat transfer path of the thermal bridge; This represents the total net area of ​​the non-transparent exterior walls.

[0168] Let the heat transfer coefficients of the ordinary heat transfer path and the thermal bridge heat transfer path be respectively... and Equivalent heat transfer coefficient of non-transparent exterior walls satisfy:

[0169] ;

[0170] For a periodic heat transfer process, let the periodic heat flux responses of the ordinary heat transfer path and the thermal bridge heat transfer path be respectively... and Equivalent periodic heat flux response of non-transparent exterior walls satisfy:

[0171] ;

[0172] In the formula, It is a time variable.

[0173] Based on the equivalent periodic heat flux response, the equivalent heat flux amplitude, surface density heat capacity, periodic decay characteristics, and time delay are further determined. Ordinary heat transfer paths, thermal bridge heat transfer paths, and equivalent thermal parameters are then used to determine the building performance of candidate structural parameter nodes. When there is no insulation layer or the thermal bridge area ratio is zero, no separate effective thermal bridge heat transfer path is generated, and the thermal response is determined according to the actual wall structure.

[0174] Taking node N011852 as an example, the main material is sintered brick with a thickness of 0.25m; it uses 0.115m of glass fiber internal insulation; the external cladding is F07 with a thickness of 0.030m; the solar absorptivity of the outer surface is 0.225, and the long-wave emissivity is 0.925; the air layer thermal resistance is 0; the gypsum board thickness is 0.0095m; and the thermal bridge area ratio is:

[0175] ;

[0176] The heat transfer coefficient of a typical heat transfer path is:

[0177] ;

[0178] The heat transfer coefficient of the thermal bridge heat transfer path is:

[0179] ;

[0180] Therefore, we can conclude that:

[0181] ;

[0182] The corresponding equivalent areal density heat capacity is 492.988 kJ / (m²). The 24-hour periodic decay coefficient is 0.153481, and the time delay is 11.832009 hours. The initial material cost per unit area of ​​the non-transparent exterior wall is 284.595558 CNY / m², and the initial material occult carbon per unit area of ​​the non-transparent exterior wall is 128.421152 kg CO₂e / m². Dynamic simulations under Haikou's climate conditions throughout the year yielded the following results:

[0183] ;

[0184] The performance metric vector is represented as follows:

[0185] ;

[0186] in, Annual cooling energy intensity The percentage of areas exceeding the limit when PPD is greater than 10% of the occupied area. The initial material cost per unit area of ​​non-transparent exterior wall. The initial material contains carbon per unit area of ​​non-transparent exterior wall, indicated by the superscript. This indicates transpose.

[0187] When thermal bridges exist, the initial material cost per unit area and the initial material implicit carbon respectively satisfy:

[0188] ;

[0189] ;

[0190] In the formula, Initial material cost per unit area of ​​non-transparent exterior wall; The initial material contains carbon per unit area of ​​non-transparent exterior wall; This represents the proportion of thermal bridge area. The initial material cost per unit area for a typical heat transfer path; The initial material cost per unit area of ​​the thermal bridge heat transfer path; and These represent the initial carbon contained per unit area of ​​the corresponding material.

[0191] Annual cooling energy consumption intensity and the proportion of thermal comfort exceeding limits were used to establish performance response relationships through a year-round dynamic simulation sample. The performance response relationship inputs included 12 non-transparent exterior wall structural parameters and 4 thermal parameters: equivalent heat transfer coefficient, equivalent surface density heat capacity, 24-hour periodic decay coefficient, and time delay, for a total of 16 inputs. For climate cities... Establish separately:

[0192] ;

[0193] ;

[0194] In the formula, For the first Annual cooling energy intensity predicted by performance response relationship under different climate city conditions; For the first Performance response function of annual cooling energy consumption intensity for each climate city; This implementation method uses climate city numbers or climate condition numbers to correspond to different tropical climate conditions such as Dongfang, Haikou, Qionghai, and Sanya Fenghuang. For candidate construction parameter nodes, the values ​​of their corresponding 12 construction parameters are used as the construction parameter inputs for the performance response relationship; This is the equivalent thermal response vector of the exterior wall; For the first Under the climatic conditions of a city, the proportion of occupancy time exceeding the thermal comfort limit obtained by the performance response relationship prediction, that is, the proportion of occupancy time with PPD greater than 10% to the total occupancy time. For the first The thermal comfort exceedance ratio performance response function for each climate city.

[0195] This embodiment uses histogram gradient boosting regression as the specific implementation method. The maximum number of leaf nodes for the annual cooling energy consumption model is set to 15, and the maximum number of leaf nodes for the PPD model is set to 31. The learning rate for both is set to 0.05, and the maximum number of iterations is set to 300. Model selection only uses 3900 development designs for 5-fold cross-validation, and 192 calibration designs are not included in the model selection. After the model is determined, the performance response accuracy is verified using 192 calibration designs. The results are shown in Table 2.

[0196] Table 2. Accuracy of performance response relationship on independent calibration data

[0197]

[0198] Performance response relationships are used for rapid initial screening of large-scale candidate structural parameter nodes. The prediction results are not directly used as the final inversion domain boundary; the prediction error is further factored in, and dynamic building performance simulation is used for boundary verification. Performance response relationships are not limited to histogram gradient boosting regression; as long as a correspondence between structural parameters, thermal response, and performance indicators can be established, other regression or surrogate calculation methods can also be used.

[0199] For the Performance metrics and independent calibration samples The dynamic building performance simulation value is denoted as The predicted value is denoted as The upper and lower residuals are as follows:

[0200] ;

[0201] ;

[0202] In the formula, For the first The first independent calibration sample is for the first The upper residual of each performance indicator; For the first The first independent calibration sample is for the first The lower-side residual of each performance indicator; For the first The first independent calibration sample Dynamic building performance simulation values ​​for each performance indicator; For the performance response relationship to the first The first independent calibration sample The predicted values ​​obtained from the performance indicators; Number the performance indicators; Number the individual calibration samples; This indicates taking the maximum value of each item within the parentheses.

[0203] This embodiment uses a preset quantile level:

[0204] ;

[0205] In the formula, In this embodiment, the preset quantile level used to determine the prediction error limit based on the residuals of independent calibration samples is 0.975.

[0206] Determine the upper prediction error limit respectively and lower side prediction error limit The prediction error limits for each city are shown in Table 3.

[0207] Table 3 Performance Prediction Error Limits for Each City

[0208]

[0209] cities The empirical coverage of the upper calibration of PPD is 0.984375, and the simultaneous coverage of both the upper and lower sides is 0.96875.

[0210] For upper limit performance targets Candidate construction parameter nodes satisfy:

[0211] ;

[0212] For lower limit performance targets ,satisfy:

[0213] ;

[0214] For interval-type performance targets ,satisfy:

[0215] ;

[0216] In the formula, and The first The lower and upper bounds of the performance target; For the first Item performance prediction value; and These are the lower prediction error limit and the upper prediction error limit, respectively.

[0217] Annual cooling energy consumption intensity, thermal comfort exceedance ratio during occupancy periods, initial material cost per unit area of ​​non-transparent exterior wall, and initial material occult carbon per unit area of ​​non-transparent exterior wall are subject to separate constraint judgments. A favorable change in one performance attribute is not allowed to compensate for an exceedance of the target boundary for another performance attribute. When cost and occult carbon are calculated deterministically based on the actual material layers of the wall, the material usage of ordinary heat transfer paths, and thermal bridge heat transfer paths, the corresponding prediction error limit is set to 0. Only candidate structural parameter nodes that simultaneously satisfy all performance objectives and wall structural conditions are determined as feasible nodes.

[0218] In practical engineering, the cooling energy consumption, thermal comfort, cost, and implicit carbon control values ​​specified in the design specification can be directly read as inversion inputs. For repeatable verification, this embodiment performs non-dominated screening on four performance parameters from 3900 development designs, selects representative designs from the non-dominated frontier as target anchors, and sets fixed performance margins based on these anchors. This target generation method is only used to establish test conditions and does not constitute a limitation on the source of performance targets in actual applications.

[0219] A total of 48 single-city target scenarios were set up for the four cities, and 4 cross-climate target scenarios were also set up. Taking Haikou (HAIKOU_S01) as an example, the anchor point was designed as LHS1743, and the number of non-dominated schemes for the four targets developed in Haikou was 107. The fixed target generation rules are as follows:

[0220] ;

[0221] ;

[0222] ;

[0223] ;

[0224] Of the original 3,900 Haikou development designs, only one existing design simultaneously meets all four requirements. Parameter nodes were generated based on the actual allowable range for main body thickness, insulation thickness, exterior finish thickness, air layer thermal resistance, gypsum board thickness, and thermal bridge area ratio. Candidate values ​​for the outer surface solar absorptivity and long-wave emissivity were generated with an offset step size of 0.025. After target-driven neighborhood expansion, 11,622 new valid parameter nodes were added, forming 131,516 calculated candidate structural parameter nodes.

[0225] For candidate constructor parameter nodes Define a joint performance and construction decision function:

[0226] ;

[0227] In the formula, Candidate construction parameter nodes The joint judgment result; when When, it means Simultaneously satisfying the wall structure relationship and all modified performance objectives; when When, it means that at least one condition is not met.

[0228] For two candidate structural parameter nodes under the same external wall structural type and When two nodes differ in only one numerical parameter by an allowable increment or a step size, and all other numerical parameters are identical, they are considered adjacent nodes, denoted as:

[0229] ;

[0230] It can also be expressed as:

[0231] ;

[0232] No. The feasible node set for each type of exterior wall structure is represented as follows:

[0233] ;

[0234] Based on the node adjacency relationship, the connectivity is partitioned, resulting in:

[0235] ;

[0236] In the formula, For the first The set of all feasible nodes for each type of exterior wall structure; For the first The first type of exterior wall structure A joint construction parameter subdomain; Number the subdomains of the joint construction parameters; For the first The number of joint structural parameter subdomains corresponding to each type of external wall structure; For the first A set of candidate structural parameter nodes for various exterior wall structural types; For the first The joint structural parameter inversion domain corresponding to the various external wall structural types.

[0237] Taking HAIKOU_S01 as an example, 67 seed nodes that meet the target criteria are initially selected from the existing candidate pool, forming 6 initial connected components. Adjacency expansion is then performed starting with these 67 nodes, continuing for 13 rounds, evaluating a total of 6975 candidate nodes. Of these, 6801 new valid nodes and 2569 new feasible nodes are added. The final number of feasible nodes is: This forms four joint construction parameter subdomains.

[0238] All first-order legal adjacency directions of feasible nodes have been classified. The number of remaining unclassified feasible frontier nodes is:

[0239] ;

[0240] In the formula, This represents the number of feasible frontier nodes that have not yet been classified; setting it to 0 indicates that there are no feasible first-order legal adjacency nodes that have not yet been classified.

[0241] The final four joint construction parameter subfields of HAIKOU_S01 are shown in Table 4.

[0242] Table 4 HAIKOU_S01 Final Joint Construction Parameter Subfield

[0243]

[0244] The parameter ranges in Table 4 are only the projection ranges of the joint construction parameter subdomains on each coordinate axis. The actual output still retains 2636 nodes and node adjacency relationships. The individual ranges cannot be arbitrarily recombined and directly identified as the external wall scheme that meets the target.

[0245] Boundary nodes are identified using the following formula. For any joint construction parameter subdomain If feasible nodes There is at least one adjacent candidate construction parameter node and ,but These are boundary nodes. The boundary set is represented as:

[0246] ;

[0247] Equivalent land, under the adjacency symbol, can be represented as:

[0248] ;

[0249] In the formula, For boundary operators, For the first Under the first type of exterior wall structure The set of boundary nodes of a joint construction parameter subdomain; For the first Under the first type of exterior wall structure A joint construction parameter subdomain; Number the exterior wall construction type; Number the subdomains of the joint construction parameters; For feasible nodes in the joint construction parameter subdomain; To and Candidate construction parameter nodes for determining node adjacency relationships; For the first A set of candidate structural parameter nodes corresponding to various external wall structural types; This is a function for determining the adjacency relationship of nodes. express and They have a node adjacency relationship; Candidate construction parameter nodes The joint judgment result, due to The legality verification has been passed. Represents candidate construction parameter nodes Not all performance targets were met simultaneously; Represents candidate construction parameter nodes With feasible nodes Having a node adjacency relationship with They have the same meaning.

[0250] like Figure 3 As shown, for the first [unit / item] determined using performance response relationships and requiring verification through dynamic building performance simulation, Each performance indicator determines its boundary nodes according to the constraint direction of the corresponding performance objective. Conservative performance safety margin.

[0251] For upper limit performance targets The conservative performance safety margin in the upper limit constraint direction is:

[0252] ;

[0253] For lower limit performance targets The conservative performance safety margin in the lower limit constraint direction is:

[0254] ;

[0255] In the formula, For the first Performance indicators For the first The upper limit boundary of the performance target. For the first The lower bound of the performance target. For performance response relationships targeting boundary nodes The obtained number Predicted values ​​of various performance indicators For the first Conservative performance safety margin for each performance index along the upper limit constraint direction. For the first The conservative performance safety margin of each performance index along the lower limit constraint direction, superscript Indicates the direction of the upper limit constraint, superscript Indicates the direction of the lower bound constraint. and The first The upper and lower prediction error limits for each performance indicator.

[0256] For interval-type targets The corresponding conservative performance safety margins are calculated according to the upper and lower constraint directions, respectively. Feasible boundary nodes determined by prediction error correction constraints satisfy a safety margin of not less than 0. The smaller the safety margin, the closer the boundary node is to the corresponding performance constraint boundary. For the same performance index, within the constraint direction of the same performance target, the dynamic simulation verification priority is determined according to the safety margin from smallest to largest. The safety margins of different performance indices maintain their respective physical dimensions and are not sorted across performance indices. Based on the selection of representative boundary nodes according to the above priority, supplementary selection is made according to the following coverage rules: at least one representative boundary node is selected for each joint structural parameter subdomain; when the same joint structural parameter subdomain contains two or more external wall structural types, at least one representative boundary node is selected for each external wall structural type; for numerical structural parameters that take the minimum or maximum value in the joint structural parameter subdomain, at least one corresponding boundary node is selected. Nodes selected according to the above rules are not counted repeatedly if they overlap with nodes selected according to the safety margin priority. The coverage rules are not limited to the above methods. They can also be adopted by dividing the range of values ​​of numerical construction parameters equally and taking at least one boundary node in each range, or by allocating the number of boundary representative nodes in proportion to the number of nodes contained in each joint construction parameter subdomain.

[0257] For HAIKOU_S01, the final four joint construction parameter subdomains selected 3, 3, 4 and 5 boundary representative nodes respectively, for a total of 15 nodes to conduct dynamic building performance simulation. All 15 nodes simultaneously met the four performance objectives, and the results are shown in Table 5.

[0258] Table 5 Verification of Boundary Dynamic Building Performance Simulation for HAIKOU_S01

[0259]

[0260] For example, the annual cooling energy consumption intensity of node N079144, representing the boundary of C1, was obtained through dynamic building performance simulation and material calculation. The thermal comfort exceedance rate was 40.513651 kWh / (m²·a), representing the proportion of the time period during which thermal comfort exceeded the limit. The initial material cost per unit area of ​​non-transparent exterior wall is 0.269697. The carbon content of the initial material per unit area of ​​non-transparent exterior wall is 70.690836 CNY / m². The result is 29.592537 kgCO2e / m², and all four of the above items meet the performance targets of HAIKOU_S01.

[0261] Taking the Dongfang_S01 inversion scenario as an example, its performance requirements are:

[0262] ;

[0263] ;

[0264] ;

[0265] ;

[0266] In early boundary simulations, node N076246 was determined to be a feasible node based on performance response relationships and prediction error corrections, but dynamic building performance simulations showed:

[0267] ;

[0268] Among them, PPD exceeded the target limit:

[0269] ;

[0270] Therefore, N076246 was identified as a falsely satisfied boundary node and removed from the corresponding joint construction parameter subdomain. Subsequently, a parameter neighborhood closure expansion was performed, using 55 conservative feasible nodes as seeds, for 15 consecutive rounds, evaluating a total of 7503 nodes. The closure phase resulted in 3260 candidate feasible nodes and 2 joint construction parameter subdomains. In the first 6 rounds, 1, 2, 3, 3, 2, and 2 actual out-of-limit nodes were found, further removing 13 nodes whose actual performance was not satisfied.

[0271] The total number of feasible nodes was revised from 3260 to 3247. In the 7th round, eight representative boundary nodes that had not yet been verified were selected for dynamic simulation based on the external wall structure, the constraint direction of performance objectives, and the parameter space coverage. All eight nodes met the four performance requirements. No new nodes exceeding the actual performance limits were found in the 7th round. The number of feasible nodes was 3247 before and after verification. After re-partitioning connectivity, each node formed two joint construction parameter subdomains. The set of feasible nodes and connectivity relationships did not change further, thus meeting the stopping condition.

[0272] In the PPD upper bound constraint direction, the conservative performance safety margin of the boundary nodes that have been verified in this round covers 0.000179517, and the minimum conservative performance safety margin of the remaining unverified PPD boundary nodes is 0.000179618, the latter being no less than the former. Ultimately, DONGFANG_S01 retains 3247 feasible nodes, forming two joint construction parameter subdomains.

[0273] The stopping conditions include: all representative boundary nodes selected in the previous round according to the external wall construction type, performance constraint boundary direction, and parameter space coverage meet all performance objectives; no actual performance exceeding the limit nodes that need to be deleted were generated in the previous round; and after re-partitioning connectivity and identifying boundary nodes, the connectivity relationship of the feasible node set and the joint construction parameter subdomain remains unchanged compared to before the previous round of review. The stopping condition is also determined to be met when there are no unreviewed boundary nodes. One or more joint construction parameter subdomains after the stopping conditions are met constitute the final joint construction parameter inversion domain.

[0274] When the dynamic building performance simulation task is not completed normally or does not meet the preset solution acceptance requirements, the corresponding node will be marked as a performance unverified node. Instead of directly determining that the performance is not met, other boundary nodes that meet the boundary coverage requirements will be selected from the corresponding joint construction parameter subdomain to supplement the dynamic building performance simulation.

[0275] With the category parameters and other numerical parameters of N011852 fixed, only the insulation thickness is changed. and thermal bridge area ratio The insulation thickness ranges from 0.025 to 0.150 μm, with a step size of 0.005, totaling 26 increments. The thermal bridge area ratio is set to 5 increments: 0, 0.05, 0.10, 0.15, and 0.20. Therefore, the complete two-dimensional combination is... A valid parameter node.

[0276] All 130 valid parameter nodes have completed calculations for ordinary heat transfer paths, thermal bridge heat transfer paths, equivalent thermal parameters, cost, and implicit carbon. The performance target for Haikou HAIKOU_S02 is:

[0277] ;

[0278] ;

[0279] ;

[0280] ;

[0281] Of the 130 two-dimensional nodes, 84 met the conservative performance constraints, forming a joint construction parameter subdomain. All two-dimensional legal meshes were enumerated, and there were no unclassified first-order legal adjacent nodes. Fifteen representative nodes with different insulation thicknesses and thermal bridge area ratios were selected for EnergyPlus year-round dynamic simulation. All 15 nodes obtained valid simulation results and met the four performance objectives. Some results are shown in Table 6.

[0282] Table 6 Examples of combined parameters for insulation thickness and thermal bridge area ratio

[0283]

[0284] Table 6 shows that when the insulation material and other structural conditions remain unchanged, changing the thermal bridge area ratio will change the equivalent heat transfer coefficient. There is no simple one-to-one monotonic correspondence between the heat transfer coefficient, cooling energy consumption and PPD. Therefore, it is necessary to retain the joint value relationship between the insulation thickness and the thermal bridge area ratio.

[0285] Within the original 6-parameter projection area of ​​HAIKOU_S01, a total of 344 different legal wall designs were identified. Among them, 324 belong to the corresponding joint construction parameter subdomain, and 20 only satisfy the projection range of each individual parameter but do not belong to the corresponding joint construction parameter subdomain.

[0286] From the nodes included in the above-mentioned joint construction parameter subdomain, 20 representative schemes with native dynamic simulation results were selected. All 20 schemes met the corresponding performance objectives, and the actual objective satisfaction rate was:

[0287] ;

[0288] Then, 20 schemes that only fall within the independent parameter projection range and not within the joint parameter domain were selected for the same native simulation verification. Of these, 19 met the objective and 1 did not, resulting in an objective satisfaction rate of:

[0289] ;

[0290] The false satisfaction rate is:

[0291] ;

[0292] The results from this limited sample are intended to illustrate that each individual parameter falls within the existing allowable range, but cannot be used to conclude that the recombination of parameters will necessarily satisfy multiple performance objectives. Therefore, the formal inversion results use actual feasible nodes and their adjacency relationships to express the jointly constructed parameter subdomain, and the minimum and maximum values ​​of each parameter are only used as projection information.

[0293] After the performance response model, error quantile level, target scenario, candidate node generation rules, adjacency rules, and boundary correction rules were all frozen, FINAL_HOLDOUT data was used for independent verification. FINAL_HOLDOUT includes 128 independent physical designs, each with annual dynamic simulation results for four cities: Dongfang, Haikou, Qionghai, and Sanya Fenghuang, totaling 512 city-design records. FINAL data is not involved in performance response model selection, model fitting, error limit determination, or target scenario generation; once the FINAL results are obtained, the method is not modified based on the performance results.

[0294] Of the 512 city-design records, the annual cooling energy consumption upper-side error limit covers 494:

[0295] ;

[0296] PPD upper side error limit covers 508 lines:

[0297] ;

[0298] Along with PPD, 492 lines of upper side coverage were achieved:

[0299] ;

[0300] In the formula, The coverage rate of the upper side error limit for annual cooling energy consumption. This represents the coverage rate of the upper error limit of the PPD. The combined upper-side coverage rate of annual cooling energy consumption and PPD.

[0301] The combined top-side coverage results for each city are shown in Table 7.

[0302] Table 7 Results of the independent test for FINAL_HOLDOUT

[0303]

[0304] Since the data from the four cities correspond to the same batch of 128 physical designs, further design-level statistics were adopted, requiring that the same physical design be included in all four cities. Both PPD and top-side coverage are achieved simultaneously. Of the 128 independent designs, 121 satisfy this condition, resulting in:

[0305] ;

[0306] In the formula, The design level is used to jointly cover the upper side of the four cities.

[0307] Costs and implied carbon are calculated using deterministic materials. The maximum absolute difference between the recalculated cost and the frozen cost in FINAL is:

[0308] ;

[0309] The maximum absolute difference of implied carbon is:

[0310] ;

[0311] The two differences are within the range of numerical calculation rounding error.

[0312] This method is applied under at least two tropical climate boundaries for the same building fixed conditions and the same performance objectives.

[0313] The joint construction parameter subdomain after the preset stopping condition is reached is determined as the final joint construction parameter inversion domain;

[0314] For the same external wall structure, the intersection of the final joint tectonic parameter inversion domains under each tropical climate boundary is obtained by taking the nodes of the same candidate tectonic parameter, and the cross-climate common tectonic parameter domain is not replaced by the intersection of the independent projection ranges of each numerical tectonic parameter.

[0315] When a cross-climate joint construction parameter domain contains two or more feasible node connected components that are not connected to each other, connectivity is partitioned based on node adjacency to form a corresponding joint construction parameter subdomain.

[0316] Representative nodes were selected for each joint tectonic parameter subdomain, and dynamic building performance simulations were performed under each tropical climate boundary. The joint tectonic parameter subdomain that met the performance targets was determined as the tectonic parameter inversion domain applicable across climates.

[0317] When the same exterior wall design needs to be applied to multiple tropical regions, the final joint structural parameter inversion domain after reaching the stopping condition is obtained in each city, and then common nodes are obtained according to the identical candidate node IDs. Generally, the first... The first tropical climate boundary The final joint structural parameter inversion domain corresponding to the various external wall structural types is denoted as The number of tropical climate boundaries is denoted as The cross-climate joint structural parameter domain is:

[0318] ;

[0319] In the formula, For the first A cross-climate common structural parameter domain for various exterior wall structural types; For the first The first tropical climate boundary The final joint structural parameter inversion domain for various exterior wall structural types; Numbering of tropical climate boundaries; This represents the number of tropical climate boundaries.

[0320] The intersection is determined by identical candidate structural parameter nodes, not by the intersection of the independent projection ranges of individual parameters. When the cross-climate common structural parameter domain consists of two or more connected components of feasible nodes that are discontinuous to each other, each joint structural parameter subdomain is retained, and it is not represented by a single parameter range containing multiple discontinuous subdomains. Representative nodes are selected for each cross-climate joint structural parameter subdomain, and dynamic building performance simulations are performed under each tropical climate boundary to verify the performance. The joint structural parameter subdomain that meets the corresponding performance objectives under each climate boundary is determined as the cross-climate applicable structural parameter inversion domain.

[0321] Taking ROBUST_S01 as an example, the unified performance target is:

[0322] ;

[0323] ;

[0324] ;

[0325] ;

[0326] Starting with the original 54 seed nodes that met the common objective, the neighborhood was expanded for 17 consecutive rounds, evaluating a total of 7143 candidate nodes and adding 7029 legal nodes, of which 3088 were newly added feasible nodes. The final number of cross-climate feasible nodes was obtained: The system forms two joint construction parameter subdomains, with zero unclassified feasible frontier nodes. The first subdomain uses a concrete block body, no insulation, and F06 exterior finish, with a total of 2563 joint nodes; the second subdomain uses a concrete block body, no insulation, and F07 exterior finish, with a total of 579 joint nodes.

[0327] The common domain of the four cities is represented as follows:

[0328] ;

[0329] In the formula, Constructing a cross-climate co-constructed parameter domain under the ROBUST_S01 scenario; , , and These represent the final joint tectonic parameter inversion domains for Haikou, Dongfang, Qionghai, and Sanya Fenghuang, respectively; HK, DF, QH, and SY represent Haikou, Dongfang, Qionghai, and Sanya Fenghuang, respectively.

[0330] The first subdomain representative node N028443 was selected, and dynamic simulation was performed in four cities using the same 12 external wall parameters. The results are shown in Table 8.

[0331] Table 8. Dynamic simulation results of N028443 across representative climate nodes

[0332]

[0333] The annual cooling energy intensity and PPD results for the four cities represented by the second joint construction parameter subdomain, node N070485, are as follows:

[0334] Haikou:

[0335] , ;

[0336] East:

[0337] , ;

[0338] Qionghai:

[0339] , ;

[0340] Sanya Phoenix:

[0341] , .

[0342] The initial material cost per unit area of ​​non-transparent exterior walls is 68.506693 CNY / m², and the carbon content lurking per unit area of ​​non-transparent exterior walls is 20.830040 kg CO2e / m². All four cities meet the targets. The original six joint subdomains across climate zones all have evidence of dynamic simulation coverage of the four cities at the same node; the two final joint subdomains formed after completing neighborhood closure also each have evidence of dynamic simulation of the four cities at the same node.

[0343] New dynamic building performance simulation results are only considered as true performance evidence of the joint parameter domain boundary when the simulation program terminates normally, without fatal errors, and meets the preset solution acceptance requirements. If there are tasks that fail to converge or otherwise fail to meet acceptance requirements, the corresponding nodes are marked as "performance unverified nodes," rather than being directly judged as performance unmet; if necessary, adjacent boundary nodes from the same joint construction parameter subdomain are selected to supplement the simulation.

[0344] The final output includes the target building and climate conditions, annual cooling energy consumption, thermal comfort exceedance ratio, material cost and implicit carbon control conditions, exterior wall construction type consisting of main building materials, insulation materials and insulation locations, and exterior finish type, one or more joint construction parameter subdomains, actual effective parameter nodes contained in each joint subdomain, node adjacency relationships, projection range of each numerical parameter in the joint parameter domain, ordinary heat transfer paths and thermal bridge heat transfer paths, equivalent heat transfer coefficient, heat capacity, periodic decay characteristics and time delay, rapid performance calculation results and prediction error limits, boundary dynamic building performance verification results, deleted falsely satisfied nodes and corresponding exceedance performance, final joint construction parameter inversion domain, and cross-climate common construction parameter domain when necessary.

[0345] Once the preset stopping condition is met, the retained joint construction parameter subdomain is determined as the final joint construction parameter inversion domain, which is represented as follows:

[0346] ;

[0347] In the formula, For the final joint construction parameter inversion domain; The number of exterior wall structural types to be retained; Number the exterior wall construction type; For the first The number of joint structural parameter subdomains corresponding to each type of external wall structure; For the first The first type of exterior wall structure A joint construction parameter subdomain.

[0348] To facilitate reading by designers, the following can also be provided: The projection range of each numerical construction parameter onto the corresponding joint construction parameter subdomain:

[0349] ;

[0350] In the formula, For numerical construction parameter numbering, For the first The possible values ​​of a numeric construction parameter. and These are the corresponding joint construction parameter subfields of the first The minimum and maximum values ​​of a numerical construction parameter.

[0351] Based on the above method, this embodiment also provides a multi-objective inversion system for structural parameters of non-transparent exterior walls of tropical buildings, including a candidate node generation module, a performance screening module, a subdomain partitioning module, and a dynamic verification module;

[0352] The candidate node generation module is used to classify non-transparent exterior wall construction parameters into categorical construction parameters and numerical construction parameters. It determines the exterior wall construction type according to the combination of values ​​of categorical construction parameters, generates candidate construction parameter nodes according to the allowed values ​​of construction parameters and the wall construction relationship, and determines the node adjacency relationship according to the condition that only one numerical construction parameter under the same exterior wall construction type takes adjacent allowed ranges or differs by a preset distance step length, and the remaining numerical construction parameters have the same value.

[0353] The performance screening module is used to obtain the tropical climate boundary and performance target, determine the thermal response based on the candidate structural parameter nodes, establish the performance response relationship between structural parameters, thermal response and performance index using dynamic building performance simulation samples under the tropical climate boundary, determine the upper prediction error limit and lower prediction error limit based on the upper and lower residuals of the independent calibration samples respectively, and correct the performance target boundary according to the constraint direction of the performance target using the corresponding prediction error limit, and screen feasible nodes that simultaneously meet all corrected performance targets from the candidate structural parameter nodes;

[0354] The subdomain partitioning module is used to partition feasible nodes based on node adjacency relationships. Feasible nodes that can be connected to each other through continuous node adjacency relationships are assigned to the same joint construction parameter subdomain. The joint construction parameter subdomain is characterized by the feasible nodes assigned to the joint construction parameter subdomain and the node adjacency relationships between feasible nodes. Feasible nodes that have node adjacency relationships with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes.

[0355] The dynamic verification module determines a conservative performance safety margin based on the performance prediction values ​​of boundary nodes, corresponding prediction error limits, and performance target boundaries. Based on this conservative performance safety margin, and considering the external wall construction type, numerical structural parameter boundary direction, and parameter space coverage, representative boundary nodes are selected. Dynamic building performance simulation is then performed under the corresponding tropical climate boundary. Boundary representative nodes whose dynamic building performance simulation results for any performance index predicted by the performance response relationship exceed the corresponding performance target are identified as exceeding-limit nodes and removed from the feasible nodes. Connectivity is re-divided and boundary nodes are identified based on the remaining feasible nodes. This process iterates until all selected boundary representative nodes in the current round satisfy all performance targets, and the connectivity relationships of feasible nodes and joint structural parameter subdomains remain unchanged compared to before the current round of verification, or there are no unverified boundary nodes. The retained joint structural parameter subdomains are then determined as the final joint structural parameter inversion domain and output.

[0356] The dynamic verification module includes a margin determination unit, a node selection unit, a simulation verification unit, and a subdomain correction unit;

[0357] The margin determination unit is used to determine the conservative performance safety margin of the boundary nodes according to the performance prediction value obtained from the performance response relationship, the corresponding prediction error limit, and the performance target boundary, according to the constraint direction of the performance target. The conservative performance safety margins corresponding to the upper limit type performance target and the lower limit type performance target are determined according to the aforementioned conservative performance safety margin calculation formulas for the upper limit constraint direction and the lower limit constraint direction, respectively. For the interval type performance target, the corresponding conservative performance safety margins are determined according to the upper limit constraint direction and the lower limit constraint direction, respectively.

[0358] The node selection unit is used to determine the representative boundary node from the unverified boundary nodes based on the conservative performance safety margin, combined with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage.

[0359] The simulation verification unit is used to perform dynamic building performance simulation on the representative nodes of the boundary under the corresponding tropical climate boundary, and to identify the representative nodes of the boundary where the dynamic building performance simulation result of any performance index predicted by the performance response relationship exceeds the corresponding performance target as the over-limit node.

[0360] The subdomain correction unit is used to delete out-of-limit nodes, re-partition connectivity based on the remaining feasible nodes and identify boundary nodes in order to correct the joint construction parameter subdomain.

[0361] The dynamic verification module repeatedly calls the margin determination unit, node selection unit, simulation verification unit, and subdomain correction unit until all the boundary representative nodes selected in the current round meet all performance targets, and the connectivity of feasible nodes and joint construction parameter subdomains remains unchanged compared to the current round of verification, or there are no boundary nodes that have not yet been verified. The retained joint construction parameter subdomain is then determined as the final joint construction parameter inversion domain.

[0362] The candidate node generation module receives the allowed values ​​of construction parameters, wall construction relationships, and discretization rules. Based on the allowed values ​​of construction parameters and wall construction relationships, it generates candidate construction parameter nodes and determines the node adjacency relationships between candidate construction parameter nodes. The data objects processed by the candidate node generation module include 12 construction parameters, categorical construction parameter vectors, numerical construction parameter vectors, construction validity judgment results, and node adjacency relationships. It outputs candidate construction parameter nodes and their adjacency relationships.

[0363] The performance screening module receives candidate structural parameter nodes, tropical climate boundaries, performance targets, and dynamic building performance simulation samples under tropical climate boundaries. First, the module generates ordinary heat transfer paths and thermal bridge heat transfer paths based on the candidate structural parameter nodes and determines the thermal response. Then, it uses the dynamic building performance simulation samples under tropical climate boundaries to establish the performance response relationship between structural parameters, thermal response, and performance indicators, obtaining performance prediction values ​​for annual cooling energy consumption intensity and the proportion of thermal comfort exceeding limits. The prediction error limit of the performance response relationship is determined using independent calibration samples, and the performance target boundary is corrected using the prediction error limit according to the constraint direction of the performance target.

[0364] The initial material cost per unit area of ​​non-transparent exterior wall and the carbon content of the initial material per unit area of ​​non-transparent exterior wall are calculated based on the actual amount of wall material used. Based on the above prediction error limits and performance targets, feasible nodes that meet all corrected performance targets are selected from the candidate structural parameter nodes.

[0365] The subdomain partitioning module receives feasible nodes and node adjacency relationships. Based on the node adjacency relationships, it partitions the feasible nodes according to connectivity. Feasible nodes that can be connected to each other through continuous node adjacency relationships are assigned to the same joint construction parameter subdomain, resulting in one or more joint construction parameter subdomains. At the same time, it checks the node adjacency relationships between feasible nodes in the joint construction parameter subdomains and candidate construction parameter nodes that do not meet the modified performance target. Feasible nodes that have node adjacency relationships with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes. The joint construction parameter subdomains and boundary nodes are then passed to the dynamic verification module.

[0366] The dynamic verification module receives the tropical climate boundary, joint tectonic parameter subdomain, boundary nodes, performance prediction values, prediction error limits, and performance targets. The margin determination unit calculates the conservative performance safety margin of the boundary nodes according to the constraint direction of the performance targets, based on the performance prediction values ​​and the corresponding prediction error limits.

[0367] The node selection unit selects representative boundary nodes from unverified boundary nodes based on conservative performance safety margins, and determines the representative boundary nodes by combining the external wall construction type, numerical construction parameter boundary direction, and parameter space coverage.

[0368] The simulation verification unit performs dynamic building performance simulation on the representative nodes of the boundary under the tropical climate boundary, and identifies the representative node of the boundary where the dynamic building performance simulation result of any performance index predicted by the performance response relationship exceeds the corresponding performance target as the over-limit node.

[0369] The subdomain correction unit deletes out-of-limit nodes, uses the remaining feasible nodes to re-divide connectivity and identify boundary nodes, and corrects the joint construction parameter subdomain based on the identification results until the preset stopping condition is reached.

[0370] The system's data transmission path is as follows: allowable values ​​of construction parameters and wall construction relationships are input into the candidate node generation module, forming candidate construction parameter nodes and node adjacency relationships;

[0371] Candidate structural parameter nodes, tropical climate boundaries, and corresponding dynamic building performance simulation samples enter the performance screening module to form thermal response, performance response relationship, performance prediction value, prediction error limit, and feasible nodes. Feasible nodes and node adjacency relationships enter the subdomain partitioning module, which forms a joint structural parameter subdomain and identifies boundary nodes through connectivity partitioning. The joint structural parameter subdomain, boundary nodes, tropical climate boundaries, performance prediction value, prediction error limit, and performance target enter the dynamic verification module, which forms a corrected joint structural parameter subdomain through conservative performance safety margin determination, boundary representative node selection, dynamic building performance simulation, and correction of over-limit nodes. The inversion result is output when the preset stopping condition is reached.

[0372] When cross-climate inversion is required, the final joint structural parameter inversion domain after reaching the preset stopping conditions can be obtained under different tropical climate boundaries. Then, it can be processed according to the aforementioned method for determining the cross-climate common structural parameter domain, and cross-climate dynamic building performance simulation verification can be performed on the corresponding representative nodes.

[0373] In summary, this embodiment generates candidate structural parameter nodes by constructing a legality screening process and determining node adjacency relationships. It then selects feasible nodes by combining performance response relationships and prediction error corrections, and forms joint structural parameter subdomains by dividing connectivity based on node adjacency relationships. Finally, through dynamic verification and over-limit correction of boundary representative nodes, it obtains the inversion results of non-transparent external wall structural parameters under single or multiple tropical climate boundaries.

[0374] In one or more implementations, the above functionality can be achieved through software, hardware, or a combination of both. When implemented in software, the computer program is stored in memory and executed by a processor; when implemented in a modular program, candidate construction parameter nodes and node adjacency relationships, performance responses and feasible nodes, joint construction parameter subdomains and boundary nodes, dynamic simulation results, and corrected joint construction parameter subdomains are passed sequentially between functional modules.

[0375] The above specific implementation process illustrates the technical solution. Without changing the technical concept, the allowable range, distance range, performance response relationship and dynamic building performance simulation program can be adjusted accordingly based on the building type, material range, performance control requirements and climate conditions.

Claims

1. A multi-objective inversion method for structural parameters of non-transparent exterior walls in tropical buildings, characterized in that, Includes the following steps: Step S1: Divide the non-transparent exterior wall construction parameters into categorical construction parameters and numerical construction parameters, and determine the exterior wall construction type according to the value combination of the categorical construction parameters; generate candidate construction parameter nodes according to the allowed values ​​of the construction parameters and the wall construction relationship, and each candidate construction parameter node represents a combination of construction parameters that satisfies the wall construction relationship; for two candidate construction parameter nodes of the same exterior wall construction type, when only one numerical construction parameter of the two candidate construction parameter nodes takes an adjacent allowed range or differs by a preset deviation step size, and the remaining numerical construction parameters have the same value, it is determined that the two candidate construction parameter nodes have a node adjacency relationship. Step S2: Obtain the tropical climate boundary and performance targets; determine the thermal response based on candidate structural parameter nodes; establish the performance response relationship between structural parameters, thermal response, and performance indicators using dynamic building performance simulation samples under the tropical climate boundary; for performance indicators predicted by the performance response relationship, determine the upper prediction error limit and lower prediction error limit based on the upper and lower residuals of the independent calibration samples, and correct the performance target boundary according to the constraint direction of the performance target using the corresponding prediction error limit; and select feasible nodes from the candidate structural parameter nodes that simultaneously satisfy all corrected performance targets. Step S3: Based on the node adjacency relationship, perform connectivity division on feasible nodes, and classify feasible nodes that can be connected to each other through continuous node adjacency relationship into the same joint construction parameter subdomain. The joint construction parameter subdomain is characterized by the feasible nodes classified into the joint construction parameter subdomain and the node adjacency relationship between the feasible nodes. Feasible nodes that have a node adjacency relationship with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes. Step S4: Determine a conservative performance safety margin based on the performance prediction values ​​of the boundary nodes, the corresponding prediction error limits, and the performance target boundaries. Based on the conservative performance safety margin, and in conjunction with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage, select representative boundary nodes and perform dynamic building performance simulation under the tropical climate boundary. Identify the representative boundary nodes whose dynamic building performance simulation results for any performance index predicted by the performance response relationship exceed the corresponding performance target as out-of-limit nodes, and delete the out-of-limit nodes from the feasible nodes. Re-divide connectivity based on the remaining feasible nodes and identify boundary nodes. Iterate the above process until all the representative boundary nodes selected in the current round meet all performance targets, and the connectivity of the feasible nodes and the joint construction parameter subdomain remains unchanged compared to the current round of review, or there are no unreviewed boundary nodes. Determine the retained joint construction parameter subdomain as the final joint construction parameter inversion domain.

2. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 1, characterized in that: The structural parameters include the type of main material, the thickness of the main body, the type of insulation material, the thickness of insulation, the location of insulation, the type of exterior finishing material, the thickness of exterior finishing, the solar absorptivity of the exterior surface, the long-wave emissivity of the exterior surface, the thermal resistance of the air layer, the thickness of the inner gypsum board, and the proportion of thermal bridge area. The main material category, insulation material category, insulation location, and exterior finish material category are categorical structural parameters, while structural parameters other than the categorical structural parameters are numerical structural parameters. Numerical construction parameters with preset allowable levels take values ​​according to the corresponding allowable level, while numerical construction parameters without preset allowable levels take values ​​according to the preset discrete step size within the corresponding allowable range.

3. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 2, characterized in that: The wall construction relationships include: When there is no insulation, the type of insulation material is set to none, the ratio of insulation thickness to thermal bridge area is set to zero, and the insulation location is set to none. When using sandwich insulation, the insulation layer is located inside the main body layer, the sum of the thicknesses of the main body layers on both sides of the insulation layer is equal to the thickness of the main body layer, and the main body layers on both sides meet the preset minimum thickness requirements. The thicknesses of the main body layer, insulation layer, exterior finish layer, and inner gypsum board layer meet the following requirements: ; In the formula, For the main body thickness, For insulation thickness, For the thickness of the exterior finish, The thickness of the inner gypsum board. The preset total thickness limit; The thickness of the exterior finish should match the allowable thickness corresponding to the exterior finish material category. No air layer is set when the thermal resistance of the air layer is zero. Combinations of construction parameters that satisfy the wall construction relationship are identified as candidate construction parameter nodes.

4. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 3, characterized in that: The thermal response corresponding to the candidate construction parameter node is determined in the following manner: When the insulation thickness is greater than zero and the thermal bridge area ratio is greater than zero, ordinary heat transfer path and thermal bridge heat transfer path are established respectively. The ordinary heat transfer path maintains the insulation layer and wall layer, while the thermal bridge heat transfer path uses heavy concrete of the same thickness as the insulation layer to replace the insulation material at the corresponding position. The equivalent heat transfer coefficient of a non-transparent exterior wall satisfies: ; The equivalent periodic heat flux response of a non-transparent exterior wall satisfies: ; In the formula, This represents the proportion of thermal bridge area. and These are the heat transfer coefficients for the ordinary heat transfer path and the thermal bridge heat transfer path, respectively. The equivalent heat transfer coefficient for a non-transparent exterior wall; and These are the periodic heat flux responses of the ordinary heat transfer path and the thermal bridge heat transfer path, respectively. The equivalent periodic heat flux response of a non-transparent exterior wall; It is a time variable; The thermal response is determined based on the equivalent heat transfer coefficient of the non-transparent exterior wall and the equivalent periodic heat flow response of the non-transparent exterior wall; when no insulation layer is provided or the thermal bridge area ratio is zero, the thermal response is determined according to the actual wall structure.

5. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 1, characterized in that: The performance targets include annual cooling energy consumption intensity, thermal comfort exceeding the limit during the occupancy period, initial material cost per unit area of ​​non-transparent exterior wall, and carbon contained in the initial material per unit area of ​​non-transparent exterior wall. Each performance target is treated as an independent constraint. For the first predicted by the performance response relationship Performance index, number Upper residuals of individual calibration samples and lower residual They respectively satisfy: ; ; In the formula, The dynamic building performance simulation values ​​for the performance indicators corresponding to the independent calibration samples. The predicted value of the performance index corresponding to the independent calibration sample obtained from the performance response relationship; The upper prediction error limit is determined by the upper residual and the lower residual respectively according to the preset quantile level. and the lower prediction error limit ; For upper limit performance targets The revised performance target is: ; For lower limit performance targets The revised performance target is: ; For interval-type performance targets The revised performance target is: ; In the formula, Construct parameter nodes for candidates; For the first Performance indicators; The candidate construction parameter node obtained from the performance response relationship is the first Predicted values ​​for various performance indicators; and The first The upper and lower bounds of the performance target; The initial material cost per unit area of ​​non-transparent exterior wall and the carbon content of the initial material per unit area of ​​non-transparent exterior wall are calculated directly based on the actual amount of wall material used, without performance response relationship prediction, and the corresponding prediction error limit is set to zero. Candidate structural parameter nodes that simultaneously satisfy the wall structure relationship and all modified performance objectives are determined as feasible nodes, and no weighted compensation is performed between the performance objectives.

6. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 2, characterized in that: For the Two candidate structural parameter nodes for the type of exterior wall structure and The node adjacency determination function satisfies: ; In the formula, This is a function for determining the adjacency relationship of nodes. The number of numerical construction parameters. For the external wall construction type number, and They are nodes and The Middle The possible values ​​of a numerical construction parameter. The indicator function is used; if the above conditions are not met, the node adjacency determination function is set to 0. Let the first The candidate structural parameter node set for the various external wall structural types is as follows Joint decision function Satisfy: When node When both the wall structure relationship and all modified performance objectives are met simultaneously ; otherwise, ; No. The feasible node set for the various external wall structural types is as follows: ; Based on the node adjacency relationship Divided into Then the joint construction parameter subfield, the first The combined structural parameter inversion domain for various exterior wall structural types satisfies: ; In the formula, For the first A joint construction parameter subdomain, For the first Joint structural parameter inversion domain for various exterior wall structural types; The joint construction parameter subdomain is characterized by the feasible nodes included in the joint construction parameter subdomain and the node adjacency relationship between the feasible nodes. Whether the construction parameter combination belongs to the joint construction parameter subdomain is determined by whether the construction parameter combination corresponds to a feasible node in the joint construction parameter subdomain. The range of values ​​for each numerical construction parameter in the joint construction parameter subdomain is output as the projection range and is not used as the basis for determining whether it belongs to the joint construction parameter subdomain.

7. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 6, characterized in that: No. Under the first type of exterior wall structure A joint construction parameter subdomain The set of boundary nodes satisfies: ; In the formula, For the set of boundary nodes; For feasible nodes in the joint construction parameter subdomain; For nodes Candidate construction parameter nodes with node adjacency relationships; For the first predicted by the performance response relationship For each performance indicator, the conservative performance safety margin corresponding to the upper limit performance target is satisfied as follows: ; The conservative performance safety margin corresponding to the lower limit performance target is satisfied as follows: ; In the formula, and The first The upper and lower bounds of the performance target; For nodes Performance predictions; and These are the upper prediction error limit and the lower prediction error limit, respectively; and These are the conservative performance safety margins for the upper and lower constraint directions, respectively. For interval-type performance targets, the corresponding conservative performance safety margins are determined according to the upper limit constraint direction and the lower limit constraint direction, respectively. Within the same performance index and the same constraint direction, the priority of dynamic building performance simulation verification of boundary nodes is determined from small to large according to the conservative performance safety margin, and the representative boundary nodes are determined by combining the external wall construction type, the boundary direction of numerical construction parameters, and the parameter space coverage.

8. The multi-objective inversion method for structural parameters of non-transparent exterior walls of tropical buildings according to claim 6, characterized in that: For the same building fixed conditions and the same performance objectives, the multi-objective inversion method for the structural parameters of the non-transparent exterior wall of tropical buildings is executed under at least two tropical climate boundaries; The first The first tropical climate boundary The final joint structural parameter inversion domain corresponding to the various external wall structural types is denoted as The number of tropical climate boundaries is Then, by taking the intersection of the final joint tectonic parameter inversion domains under each tropical climate boundary according to the identical candidate tectonic parameter nodes, a cross-climate common tectonic parameter domain is obtained, which satisfies: ; In the formula, For the first A cross-climate common structural parameter domain for various exterior wall structural types; The intersection is determined according to nodes with identical candidate construction parameters; When the cross-climate common construction parameter domain contains two or more feasible node connected components that are not connected to each other, joint construction parameter subdomains are formed according to the node adjacency relationship. Representative nodes are selected for each joint structural parameter subdomain, and dynamic building performance simulations are performed under each tropical climate boundary. The joint structural parameter subdomain that meets the performance target under all the tropical climate boundaries is determined as the structural parameter inversion domain applicable across climates.

9. A multi-objective inversion system for structural parameters of non-transparent exterior walls in tropical buildings, characterized in that: The system includes a candidate node generation module, a performance screening module, a subdomain partitioning module, and a dynamic verification module; The candidate node generation module is used to divide the non-transparent exterior wall construction parameters into categorical construction parameters and numerical construction parameters, determine the exterior wall construction type according to the value combination of categorical construction parameters, generate candidate construction parameter nodes according to the allowed values ​​of construction parameters and the wall construction relationship, and determine the node adjacency relationship according to the condition that only one numerical construction parameter under the same exterior wall construction type takes adjacent allowed ranges or differs by a preset distance step length, and the remaining numerical construction parameters have the same value. The performance screening module is used to obtain the tropical climate boundary and performance target, determine the thermal response based on the candidate structural parameter nodes, establish the performance response relationship between structural parameters, thermal response and performance index using dynamic building performance simulation samples under the tropical climate boundary, determine the upper prediction error limit and lower prediction error limit based on the upper and lower residuals of the independent calibration samples respectively, and correct the performance target boundary according to the constraint direction of the performance target using the corresponding prediction error limit, and screen feasible nodes that simultaneously meet all corrected performance targets from the candidate structural parameter nodes. The subdomain partitioning module is used to partition feasible nodes based on node adjacency relationships. Feasible nodes that can be connected to each other through continuous node adjacency relationships are assigned to the same joint construction parameter subdomain. The joint construction parameter subdomain is characterized by the feasible nodes assigned to the joint construction parameter subdomain and the node adjacency relationships between the feasible nodes. Feasible nodes that have node adjacency relationships with candidate construction parameter nodes that do not meet the modified performance target are identified as boundary nodes. The dynamic verification module is used to determine a conservative performance safety margin based on the performance prediction value of the boundary nodes, the corresponding prediction error limit, and the performance target boundary. Based on the conservative performance safety margin, and in combination with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage, representative boundary nodes are selected, and dynamic building performance simulation is performed under the corresponding tropical climate boundary. The boundary representative node whose dynamic building performance simulation result of any performance index predicted by the performance response relationship exceeds the corresponding performance target is identified as an over-limit node, and the over-limit node is deleted from the feasible nodes. Based on the remaining feasible nodes, connectivity is re-divided and boundary nodes are identified. The above process is iterated until all the boundary representative nodes selected in the current round meet all performance targets, and the connectivity relationship of the feasible nodes and the joint construction parameter subdomain remains unchanged compared to the current round of verification, or there are no unverified boundary nodes. The retained joint construction parameter subdomain is determined as the final joint construction parameter inversion domain and output.

10. The multi-objective inversion system for structural parameters of non-transparent exterior walls of tropical buildings according to claim 9, characterized in that: The dynamic verification module includes a margin determination unit, a node selection unit, a simulation verification unit, and a subdomain correction unit; The margin determination unit is used to determine the boundary nodes according to the constraint direction of the performance target. The conservative performance safety margin; the conservative performance safety margin corresponding to the upper limit type performance target satisfies: ; The conservative performance safety margin corresponding to the lower limit performance target is satisfied as follows: ; In the formula, and The first The upper and lower bounds of the performance target. Boundary nodes Performance predictions and These are the upper and lower prediction error limits for the corresponding performance indicators, respectively. and These are the conservative performance safety margins for the upper and lower constraint directions, respectively. For interval-type performance targets, the corresponding conservative performance safety margins are determined according to the upper limit constraint direction and the lower limit constraint direction, respectively. The node selection unit is used to determine the representative boundary node from the unverified boundary nodes based on the conservative performance safety margin, combined with the external wall construction type, the boundary direction of the numerical construction parameters, and the parameter space coverage. The simulation verification unit is used to perform dynamic building performance simulation on the representative nodes of the boundary under the corresponding tropical climate boundary, and to determine the boundary representative nodes whose dynamic building performance simulation results of any performance index predicted by the performance response relationship exceed the corresponding performance target as over-limit nodes. The subdomain correction unit is used to delete out-of-limit nodes, re-partition connectivity based on the remaining feasible nodes and identify boundary nodes in order to correct the joint construction parameter subdomain. The dynamic verification module repeatedly calls the residual determination unit, node selection unit, simulation verification unit, and subdomain correction unit until all the boundary representative nodes selected in the current round meet all performance targets, and the connectivity of the feasible nodes and the joint construction parameter subdomain remains unchanged compared to the current round of verification, or there are no boundary nodes that have not yet been verified. The retained joint construction parameter subdomain is then determined as the final joint construction parameter inversion domain.