A method for pre-disaster deployment of multiple types of emergency resources in power distribution networks before typhoon disasters.

By constructing a mixed-integer linear programming model, the disaster relief teams, emergency repair teams, and mobile power supplies were optimized, solving the problems of incomplete resource coverage and misaligned configuration in existing technologies. This achieved efficient post-disaster recovery and provided scientific decision support.

CN123117600APending Publication Date: 2026-11-17BEIJING JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611195733.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-07
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for pre-disaster deployment of emergency resources in power distribution networks suffer from incomplete coverage of resource types, fragmented recovery processes, insufficient information utilization, and misaligned spatial configuration, resulting in long post-disaster resource allocation times and insufficient recovery capabilities.

Method used

A mixed-integer linear programming model is constructed for three types of heterogeneous resources: disaster survey teams, emergency repair teams, and mobile power supplies. By maximizing the expected load recovery effect and combining pre-disaster deployment capacity constraints, post-disaster scheduling constraints, and distribution network operation constraints, the model achieves time-series coupling optimization of the entire chain of survey, emergency repair, and restoration, and accurately allocates emergency resources to key areas.

Benefits of technology

It enables spatial coordination and matching of three types of resources, avoids resource waste, shortens post-disaster response time, improves the load recovery capability of the distribution network, and provides a scientific and efficient decision support tool.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117600A_ABST
    Figure CN123117600A_ABST
Patent Text Reader

Abstract

This invention provides a pre-disaster deployment method for multiple types of emergency resources in a distribution network before a typhoon disaster. It relates to the field of power system emergency management technology and employs a MILP model for pre-disaster deployment of disaster relief-recovery-restoration emergency resources. This model accurately depicts the strict temporal coupling relationships of disaster relief priority constraints, repair dependence on disaster relief results, and power restoration dependence on path restoration, as well as the capacity constraints, movement time constraints, and sequential logic of various resources in pre-disaster deployment and post-disaster scheduling. Verified through an IEEE 123-node distribution network example, compared with two strategies—pre-disaster deployment without considering disaster relief resources and random deployment of multiple resources—this invention significantly improves the weighted load restoration effect, achieving efficient coordination and optimal allocation of disaster relief-recovery-restoration emergency resources within the distribution network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system emergency management technology, and in particular to a method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster. Background Technology

[0002] In recent years, predictable extreme events such as typhoons and torrential rains have occurred frequently, seriously threatening the safe operation of power distribution networks. After a disaster, the location and extent of line faults are unknown, requiring disaster survey teams to confirm faults line by line before dispatching repair teams and mobile power supplies for emergency repairs and power restoration. However, resources for surveying, repairing, and restoring power are limited after extreme disasters. Therefore, deploying disaster survey teams, repair teams, and mobile power supplies to the optimal locations within the power distribution network before a disaster can shorten post-disaster resource allocation time and improve the power distribution network's post-disaster recovery capabilities.

[0003] The main shortcomings of existing pre-disaster deployment technologies for emergency resources in power distribution networks are: incomplete coverage of resource types, fragmented recovery processes, insufficient information utilization, and misaligned spatial configuration.

[0004] Therefore, a method for pre-disaster deployment of various types of emergency resources in the power distribution network is needed to address the above issues. Summary of the Invention

[0005] The purpose of this invention is to provide a pre-disaster deployment method for multiple types of emergency resources in the power distribution network before typhoon disasters. Taking the priority ranking of disaster survey lines as the pre-input, a mixed integer linear programming model is constructed, which covers three heterogeneous resources: disaster survey teams, emergency repair teams, and mobile power supplies. By maximizing the expected weighted load recovery effect under all fault scenarios, the pre-disaster deployment capacity constraints, post-disaster sequential scheduling constraints, and power distribution network operation constraints are incorporated into a unified optimization framework. This achieves time-series coupled modeling and spatial collaborative optimization of the entire chain of survey-emergency repair-recovery, thereby enabling the precise allocation of limited resources to key areas with concentrated high-importance lines and high risk of typhoon impact before a disaster, effectively shortening the post-disaster response time and improving the load recovery capability of the power distribution network.

[0006] To achieve the above objectives, this invention provides a method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, comprising the following steps: S1: Establish an objective function with the priority ranking of disaster relief routes as input and the goal of maximizing the expected load recovery effect; S2: Add pre-disaster deployment constraints, post-disaster scheduling constraints, and power distribution network operation constraints for three types of emergency resources, including disaster survey teams, emergency repair teams, and mobile power supplies, to construct a pre-disaster deployment MILP model for disaster survey-emergency repair resources; S3: Call the solver to solve the MILP model for pre-disaster deployment of emergency resources in S2 to obtain the optimal pre-disaster deployment scheme for the three types of emergency resources; S4: Outputs the optimal deployment locations of disaster relief teams, emergency repair teams, and mobile power supplies at various deployment points within the power distribution network, serving as the basis for pre-disaster emergency resource deployment decisions.

[0007] Preferably, the expression for the objective function in S1 is defined as: ; In the formula: , S and S represent the set of distribution network nodes, the set of time periods, and the set of scenarios, respectively. For load The weight represents the importance of the load; For the scene Under load During the period The recovery state has a value range of [0,1]. =1 indicates that the load has been fully restored. =0 indicates that the load has not been restored. The value of (0,1) represents partial recovery.

[0008] Preferably, the constraints on disaster reconnaissance teams and pre-disaster deployment of emergency repair teams in S2 specifically include: The limit on the number of teams that a single deployment point can accommodate is met: ; The total number of deployable disaster relief and emergency repair teams must meet the following limits: ; The following formula states that any disaster relief team can only be deployed to one location: ; The following formula states that any emergency repair team can only reach one deployment point: ; In the formula, To assemble the disaster relief team This is a collection of pre-disaster deployment points. To allow the repair team to assemble, The maximum number of teams at a deployment point. The total number of disaster relief teams This refers to the total number of repair teams. The variable is 0-1, representing the disaster relief team. a At the deployment point Deployment status, =1 indicates that the disaster relief team has been deployed to the designated location. ; =0 indicates that the disaster relief team has not been deployed to the site. ; The variable is 0-1, representing the emergency repair team. At the deployment point Deployment status, =1 indicates that the emergency repair team has been deployed to the designated location. , =0 indicates that the repair team has not been deployed to the site. ; The specific constraints for pre-disaster deployment of portable power banks include: The limit on the number of mobile power supplies that a single deployment site can accommodate meets the following requirements: ; ; ; In the formula: , These are collections consisting of mobile generator sets and mobile energy storage systems, respectively. A 0-1 variable, representing a portable power bank. to deployment point Deployment status, =1 indicates that the power supply is deployed to point , =0 indicates that the power supply has not been deployed to the point. , The maximum number of portable power banks that can be deployed at a single location. This represents the total number of portable power banks.

[0009] Preferably, the post-disaster dispatch constraints for disaster relief teams include priority constraints: If low priority weight line Time required High-priority lines are needed to complete the disaster assessment. Must be during the time period The disaster assessment was completed either at a later time or even earlier; specifically: ; The following formula states that any disaster relief team can only be dispatched to a maximum of one route: ; The following formula expresses the idea that only one disaster relief team needs to be dispatched for any given route: ; The following formula describes the time required for disaster relief teams to move to another route during sequential dispatch: ; The following formula describes the route during the arrival and disaster relief period of the disaster relief team. Disaster assessment completed later: ; The disaster survey status of the railway line at any given time is determined by a single disaster survey team, as expressed by the following formula: ; The disaster survey status of any route changes only once throughout the entire time period, as expressed by the following formula: ; In the formula, For the disaster relief team During the period From the pre-disaster deployment point Dispatch to line state, =1 indicates that the route is assigned to this line. =0 indicates that the line was not scheduled; For the line During the period Disaster relief team The determined disaster assessment status; =1 indicates that the disaster relief team has already surveyed the affected areas. , =0 indicates that the disaster relief team did not reach the affected area. ; For the line Disaster relief priority weight; For the team from the pre-disaster deployment point Dispatch to line The shortest required travel time; For the team from the route arrive The travel time; and All of these are known quantities in each scenario; For the line Required disaster relief time; Any time period; For any line; This represents the number of time periods.

[0010] Preferably, the post-disaster dispatch constraints for emergency repair teams include: The following formula states that any emergency repair team can only be dispatched to the faulty line that has been identified and confirmed by disaster investigation: ; The following formula states that any emergency repair team can be dispatched to at most one faulty line: ; The following formula demonstrates that only one repair team is needed to repair any faulty line: ; When the repair teams are dispatched sequentially, they move to another line after a certain period of time: ; In the formula: A set of faulty lines; For 0-1 variables, =1 indicates a scenario From the deployment point The emergency repair team set off During the period Dispatch to the faulty line Place, =0 indicates the scenario From the deployment point The emergency repair team set off During the period Dispatch failed to reach the faulty line Place; For the scene Downline The initial state.

[0011] Preferably, the post-disaster dispatch constraints for mobile power banks include: The following formula states that any mobile power supply can schedule at most one access point: ; The following formula states that only one power bank is allowed to be connected to an access point: ; Scene Downstream power bank During the period Access point not reached At that time, the access point does not have the ability to restore load: ; The following formula describes how, during sequential scheduling of a mobile power source, it moves to another access point after a certain travel time: ; In the formula: For the scene Downstream power bank During the period From the pre-disaster deployment point Dispatch to distribution network node state, =1 indicates that the node will be scheduled to this node. =0 indicates that the node was not scheduled; A set of mobile power bank access points; For portable power bank From distribution network nodes To the node The travel time; Indicates pre-disaster deployment points to distribution network nodes The shortest required travel time. and All quantities are known in each scenario.

[0012] Preferably, the constraints related to distribution network operation include line status constraints, load status constraints, distribution network power balance constraints, and power supply security constraints; In line status constraints, a line that has not been surveyed for disaster relief is considered to be in a disconnected state using the following formula: ; The following formula describes the connection status of lines that have undergone disaster assessment and are initially in a normal state: ; The following formula describes the extent to which the confirmed faulty line, after the arrival of repair personnel and the elapsed repair time, is affected. Post-repair: ; The following formula describes the status of a faulty line that has been identified through disaster investigation as disconnected if it has not been repaired: ; The following formula describes how the line status changes only once during the entire time period: ; In the formula: Variables are 0-1, representing scenarios. Downline During the period The state; For 0-1 variables, =1 indicates a scenario Downline During the period Repair team Repair complete. =0 indicates the scenario Downline During the period Emergency repair team Not yet repaired; To repair the line The required repair time.

[0013] Preferably, in the load state constraints, the change in the load recovery state is expressed by the following formula: ; In the formula, This represents a set of distribution network nodes where the load recovery status changes only once during the entire time period, and after the load is restored, power supply continues throughout the entire time period without any secondary power outages.

[0014] Preferably, the power balance constraints of the distribution network are as follows: The distribution network node is described by the following formula. Power balance constraints at the location: ; The following formula expresses the condition that if the line is disconnected, the power flow is limited to 0: ; In the formula, Indicates the line The nodes on; For the scene Downline During the period The flowing tide; For nodes The active power of the connected load; For the scene Next node During the period The active power output of the power supply at that time; This is a collection of distribution network branches.

[0015] Preferably, the power output is limited to the permissible range in the power supply safety constraints using the following formula: ; ; The remaining fuel constraint within the generator is expressed by the following formula: ; The state of charge constraint for energy storage is expressed by the following formula: ; ; In the formula, and These are the lower and upper limits of the active power output of a fixed power source, respectively. For the scene Down power During the period Those who have made meritorious contributions; and These are respectively a fixed generator set and a fixed energy storage set; and These are respectively a collection of mobile generators and a collection of mobile energy storage; For the scene Downstream power bank During the period From pre-disaster deployment points to nodes Contributing to the cause at the time; For generator The initial energy; For energy storage The initial state of charge; , These are the lower and upper limits of the state of charge required for normal operation of energy storage, respectively. For energy storage Rated capacity; and For portable power bank The lower and upper limits of the effective output, Representing a scene energy storage During the period The accumulated energy.

[0016] Therefore, the present invention employs the above-mentioned method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, and the technical effects are as follows: (1) This invention breaks through the limitations of existing research that only focuses on one or two types of resources, and for the first time incorporates three heterogeneous mobile emergency resources—disaster relief teams, emergency repair teams, and mobile power supplies—into a unified pre-disaster deployment optimization framework. By constructing a mixed-integer linear programming model, the coordinated matching of the three types of resources in spatial deployment is realized—disaster relief forces prioritize covering areas with high failure probability, emergency repair forces closely follow the disaster relief deployment, and mobile power supplies are deployed in areas with power shortages for important loads as appropriate. This avoids resource waste such as "mismatch between disaster relief and emergency repair" and "disconnection between emergency repair and recovery" at the system level, and forms a complete decision-making closed loop covering the entire chain of post-disaster recovery.

[0017] (2) This invention uses the priority ranking of disaster-prone lines as a pre-input, and systematically integrates disaster information such as typhoon path and wind speed with multi-source information such as distribution network topology, line importance load weight, and distributed power source distribution. With the goal of maximizing the expected weighted load recovery effect under all fault scenarios, it can automatically identify key areas where "high-importance lines are concentrated and the risk of typhoon impact is high", and accurately deploy limited emergency resources to the most needed locations.

[0018] (3) By constructing a rigorous post-disaster scheduling constraint system, this invention accurately depicts the temporal coupling relationship of the entire process of exploration, rescue and recovery. This temporal coupling modeling method enables the pre-disaster deployment plan to fully consider the start-up conditions and connection logic of each post-disaster stage, ensuring the deployment and scheduling of resources.

[0019] (4) The model constructed in this invention is a mixed-integer linear programming model, which is solved using a mature commercial optimization solver and has good computational tractability and engineering feasibility. The decision results are output in the form of clear deployment locations, which facilitates the power grid emergency management department to quickly formulate resource deployment plans within the limited time window before the disaster, and provides a scientific, efficient and operable decision support tool for the distribution network to cope with extreme typhoon disasters. Attached Figure Description

[0020] Figure 1 This is a flowchart of a method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, according to the present invention. Figure 2 The node distribution network system and transportation network are examples of embodiments of the present invention; Figure 3 This illustrates the pre-disaster deployment scenario in an embodiment of the present invention. Figure 4 This describes the post-disaster dispatching of the power distribution network under scenario 5 in this embodiment of the invention. Detailed Implementation

[0021] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.

[0022] Unless otherwise defined, the technical or scientific terms used in this invention shall have the ordinary meaning as understood by one of ordinary skill in the art to which this invention pertains.

[0023] Example 1 like Figure 1 As shown, this invention provides a method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, including the following steps: S1: Using the priority ranking of disaster relief lines as input, an objective function is established with the goal of maximizing the expected load recovery effect; the expression of the objective function in S1 is defined as follows: ; In the formula: , S and S represent the set of distribution network nodes, the set of time periods, and the set of scenarios, respectively. For load The weight represents the importance of the load; For the scene Under load During the period The recovery state has a value range of [0,1]. =1 indicates that the load has been fully restored. =0 indicates that the load has not been restored. The value of (0,1) represents partial recovery.

[0024] S2: Add pre-disaster deployment constraints, post-disaster scheduling constraints, and power distribution network operation constraints for three types of emergency resources, including disaster survey teams, emergency repair teams, and mobile power supplies, to construct a pre-disaster deployment MILP model for disaster survey-emergency repair resources; The constraints on disaster relief teams and pre-disaster deployment of emergency repair teams in S2 specifically include: The limit on the number of teams that a single deployment point can accommodate is met: ; The total number of deployable disaster relief and emergency repair teams must meet the following limits: ; The following formula states that any disaster relief team can only be deployed to one location: ; The following formula states that any emergency repair team can only reach one deployment point: ; In the formula, To assemble the disaster relief team This is a collection of pre-disaster deployment points. To allow the repair team to assemble, The maximum number of teams at a deployment point. The total number of disaster relief teams This refers to the total number of repair teams. The variable is 0-1, representing the disaster relief team. a At the deployment point Deployment status, =1 indicates that the disaster relief team has been deployed to the designated location. ; =0 indicates that the disaster relief team has not been deployed to the site. ; The variable is 0-1, representing the emergency repair team. At the deployment point Deployment status, =1 indicates that the emergency repair team has been deployed to the designated location. , =0 indicates that the repair team has not been deployed to the site. ; The specific constraints for pre-disaster deployment of portable power banks include: The limit on the number of mobile power supplies that a single deployment site can accommodate meets the following requirements: ; ; ; In the formula: , These are collections consisting of mobile generator sets and mobile energy storage systems, respectively. A 0-1 variable, representing a portable power bank. to deployment point Deployment status, =1 indicates that the power supply is deployed to point , =0 indicates that the power supply has not been deployed to the point. , The maximum number of portable power banks that can be deployed at a single location. This represents the total number of portable power banks.

[0025] Post-disaster dispatch constraints for disaster relief teams include priority constraints: If low priority weight line Time required High-priority lines are needed to complete the disaster assessment. Must be during the time period The disaster assessment was completed either at a later time or even earlier; specifically: ; The following formula states that any disaster relief team can only be dispatched to a maximum of one route: ; The following formula expresses the idea that only one disaster relief team needs to be dispatched for any given route: ; The following formula describes the time required for disaster relief teams to move to another route during sequential dispatch: ; The following formula describes the route during the arrival and disaster relief period of the disaster relief team. Disaster assessment completed later: ; The disaster survey status of the railway line at any given time is determined by a single disaster survey team, as expressed by the following formula: ; The disaster survey status of any route changes only once throughout the entire time period, as expressed by the following formula: ; In the formula, For the disaster relief team During the period From the pre-disaster deployment point Dispatch to line state, =1 indicates that the route is assigned to this line. =0 indicates that the line was not scheduled; For the line During the period Disaster relief team The determined disaster assessment status; =1 indicates that the disaster relief team has already surveyed the affected areas. , =0 indicates that the disaster relief team did not reach the affected area. ; For the line Disaster relief priority weight; For the team from the pre-disaster deployment point Dispatch to line The shortest required travel time; For the team from the route arrive The travel time; and All of these are known quantities in each scenario; For the line Required disaster relief time; Any time period; For any line; This represents the number of time periods.

[0026] Post-disaster dispatch constraints for emergency repair teams include: The following formula states that any emergency repair team can only be dispatched to the faulty line that has been identified and confirmed by disaster investigation: ; The following formula states that any emergency repair team can be dispatched to at most one faulty line: ; The following formula demonstrates that only one repair team is needed to repair any faulty line: ; When the repair teams are dispatched sequentially, they move to another line after a certain period of time: ; In the formula: A set of faulty lines; For 0-1 variables, =1 indicates a scenario From the deployment point The emergency repair team set off During the period Dispatch to the faulty line Place, =0 indicates the scenario From the deployment point The emergency repair team set off During the period Dispatch failed to reach the faulty line Place; For the scene Downline The initial state.

[0027] Post-disaster dispatch constraints for mobile power banks include: The following formula states that any mobile power supply can schedule at most one access point: ; The following formula states that only one power bank is allowed to be connected to an access point: ; Scene Downstream power bank During the period Access point not reached At that time, the access point does not have the ability to restore load: ; The following formula describes how, during sequential scheduling of a mobile power source, it moves to another access point after a certain travel time: ; In the formula: For the scene Downstream power bank During the period From the pre-disaster deployment point Dispatch to distribution network node state, =1 indicates that the node will be scheduled to this node. =0 indicates that the node was not scheduled; A set of mobile power bank access points; For portable power bank From distribution network nodes To the node The travel time; Indicates pre-disaster deployment points to distribution network nodes The shortest required travel time. and All quantities are known in each scenario.

[0028] Constraints related to distribution network operation include line status constraints, load status constraints, distribution network power balance constraints, and power supply security constraints; In line status constraints, a line that has not been surveyed for disaster relief is considered to be in a disconnected state using the following formula: ; The following formula describes the connection status of lines that have undergone disaster assessment and are initially in a normal state: ; The following formula describes the extent to which the confirmed faulty line, after the arrival of repair personnel and the elapsed repair time, is affected. Post-repair: ; The following formula describes the status of a faulty line that has been identified through disaster investigation as disconnected if it has not been repaired: ; The following formula describes how the line status changes only once during the entire time period: ; In the formula: Variables are 0-1, representing scenarios. Downline During the period The state; For 0-1 variables, =1 indicates a scenario Downline During the period Repair team Repair complete. =0 indicates the scenario Downline During the period Emergency repair team Not yet repaired; To repair the line The required repair time.

[0029] In load state constraints, the change in load recovery state is expressed by the following formula: ; In the formula, This represents a set of distribution network nodes where the load recovery status changes only once during the entire time period, and after the load is restored, power supply continues throughout the entire time period without any secondary power outages.

[0030] The power balance constraints of the distribution network are as follows: The distribution network node is described by the following formula. Power balance constraints at the location: ; The following formula expresses the condition that if the line is disconnected, the power flow is limited to 0: ; In the formula, Indicates the line The nodes on; For the scene Downline During the period The flowing tide; For nodes The active power of the connected load; For the scene Next node During the period The active power output of the power supply at that time; This is a collection of distribution network branches.

[0031] In power supply safety constraints, the output power of the power source is limited to the permissible range using the following formula: ; ; The remaining fuel constraint within the generator is expressed by the following formula: ; The state of charge constraint for energy storage is expressed by the following formula: ; ; In the formula, and These are the lower and upper limits of the active power output of a fixed power source, respectively. For the scene Down power During the period Those who have made meritorious contributions; and These are respectively a fixed generator set and a fixed energy storage set; and These are respectively a collection of mobile generators and a collection of mobile energy storage; For the scene Downstream power bank During the period From pre-disaster deployment points to nodes Contributing to the cause at the time; For generator The initial energy; For energy storage The initial state of charge; , These are the lower and upper limits of the state of charge required for normal operation of energy storage, respectively. For energy storage Rated capacity; and For portable power bank The lower and upper limits of the effective output, Representing a scene energy storage During the period The accumulated energy.

[0032] S3: Call the solver to solve the MILP model for pre-disaster deployment of emergency resources in S2 to obtain the optimal pre-disaster deployment scheme for the three types of emergency resources; S4: Outputs the optimal deployment locations of disaster relief teams, emergency repair teams, and mobile power supplies at various deployment points within the power distribution network, serving as the basis for pre-disaster emergency resource deployment decisions.

[0033] Verification and analysis were conducted using an IEEE 123-node system. The system comprises a total of 123 loads and 7 distributed power sources. Loads are categorized into four importance levels with weighting coefficients of 100, 50, 10, and 1, respectively. The distributed power sources include 4 stationary generators, 2 mobile generators, and 1 mobile energy storage unit. Three mobile emergency power sources, 5 disaster relief teams, and 4 repair teams constitute the mobile emergency resources of the distribution network. The configuration of the transportation network is generated based on the geographical location of the distribution network. The distribution network system and transportation network are as follows: Figure 2 As shown.

[0034] This embodiment assumes that a decision on the pre-disaster deployment and optimization of mobile emergency resources is made 8 hours before the disaster. The Gurobi solver is then used to solve the problem. The computer's CPU is an Intel Core i7 with a clock speed of 2.2GHz and 32GB of memory.

[0035] Example 2 This embodiment only considers extreme typhoon disasters as extreme events. The disaster causes a major power outage in the distribution network, and the recovery time is... The decision-making period for each scenario is set to 0.5 hours, with a time limit of 5 hours. Based on 50 representative extreme disaster scenarios, the MILP model for pre-disaster deployment of exploration-rescue-recovery resources proposed in this scheme is solved to obtain the optimal pre-disaster deployment schemes for three types of emergency resources, such as... Figure 3 As shown in the figure, the spatial distribution of the typhoon path, high-importance power distribution lines, areas with high impact from typhoon disasters, and important loads are also marked to intuitively demonstrate the correspondence between deployment locations, risk distribution, and load demand.

[0036] Pre-disaster deployment point S1 is located in an area with a high concentration of critical lines on the left side of the distribution network and a high probability of typhoon failure. Therefore, disaster relief teams 2 and 4, and emergency repair teams 1 and 4 are deployed here to ensure that critical lines in this area can be prioritized for disaster relief and repair after the disaster. Deployment point S2 is close to the area with a high concentration of critical loads on the upper left side of the distribution network. Therefore, mobile power supply 2 is deployed here to facilitate rapid connection to critical loads after the disaster. Deployment point S3 is located on the right side of the distribution network. This area has both high-critical lines and a high probability of failure. Therefore, disaster relief teams 3, 4, and 5, and emergency repair teams 2 and 3 are deployed here. Deployment point S4 is located in an area with a high concentration of critical loads but lacks distributed power support. Therefore, mobile power supplies 1 and 3 are configured to provide emergency power supply.

[0037] Scenario 5, a representative scenario, is selected for detailed analysis. In this scenario, the typhoon's path cuts in from the left side of the distribution network, causing faults on 26 lines. The faults are concentrated in areas S1 and S3, which largely coincides with the high-risk areas predicted by the model. The specific allocation of the three types of resources is shown in Table 1. The post-disaster dispatching process of the distribution network in Scenario 5 is as follows: Figure 4 As shown.

[0038] Table 1

[0039] Disaster reconnaissance phase: Reconnaissance teams 2 and 4 departed from deployment point S1 and sequentially inspected the left-side lines of the system according to disaster reconnaissance priority. They completed the reconnaissance work on lines 111, 112, 3, 7, and 13 during time periods 1 to 9. These lines are all main routes from the substation to the distribution network and have a high probability of failure. After reconnaissance, lines 111, 3, 7, and 13 were confirmed to be faulty. Reconnaissance teams 3, 4, and 5 departed from deployment point S3 and completed the reconnaissance of right-side lines 115, 116, 118, 110, and 109, confirming that lines 109 and 110 were faulty. The reconnaissance coverage was consistent with the disaster reconnaissance priority guidelines, with critical lines receiving priority inspection.

[0040] During the emergency repair phase: Based on the disaster assessment results, repair teams 1 and 4 departed from deployment point S1 and sequentially repaired the faulty lines 111, 3, 7, and 13 on the left side, restoring the power supply path between the substation and critical loads 12, 3, 57, and 9. Repair teams 2 and 3 departed from deployment point S3 and repaired the faulty lines 109 and 110 on the right side, restoring the power supply path to critical load 112. All repair teams were deployed near areas prone to faults, avoiding the time loss associated with long-distance dispatch from the material center.

[0041] During the power restoration phase: Mobile power source 2 starts from deployment point S2 and connects to node 30 in time period 2 to restore the critical load at that node in a timely manner; Mobile power sources 1 and 3 start from deployment point S4 and connect to nodes 80 and 99 respectively in time period 4 to provide emergency power to critical load areas that lack distributed power support.

[0042] Comparative Example To verify the superiority of the proposed pre-disaster collaborative resource deployment model, two sets of comparative strategies were set up: Strategy 1 does not consider the pre-disaster deployment of disaster relief and emergency resources, storing disaster relief resources in a material center outside the distribution network, and dispatching them from the material center after the disaster; Strategy 2 randomly allocates the three types of resources to various deployment points before the disaster, without relying on any optimization information. The deployment of the three strategies is shown in Table 2, and the weighted load recovery numbers of the three strategies in 50 scenarios are shown in Table 3.

[0043] Table 2

[0044] Table 3

[0045] As can be seen from Table 3, the weighted load recovery number of the proposed strategy is better than that of the other two comparative strategies.

[0046] Strategy 1 places disaster relief resources in the material center. Post-disaster disaster relief teams need to be remotely dispatched from the material center to the affected area, and repair teams must depart from their deployment points after disaster relief is completed. This significantly amplifies the start-up delay of the entire disaster relief-repair-recovery chain. Compared to the strategy presented in this paper, the core disadvantage of Strategy 1 is that the initial location of disaster relief resources is not pre-optimized for potential affected areas, leading to a prolonged response time for the first round of disaster relief and repair after a disaster, thereby reducing the system's recovery effectiveness.

[0047] While Strategy 2 pre-deploys resources within the distribution network, its random deployment locations, lacking consideration of pre-disaster line importance and fault information, result in a severe mismatch between resource allocation and actual post-disaster needs. Taking the deployment scheme in Table 3 as an example, disaster relief teams are randomly assigned to critical load areas (S2, S4), while areas with high fault incidence and critical lines (S1, S3) lack sufficient disaster relief coverage. Repair teams are deployed in S1 and S3, precisely out of sync with disaster relief efforts. After the disaster, because disaster relief efforts do not cover area S1, faulty lines in that area remain undetected, rendering the repair teams deployed there idle. Simultaneously, mobile power supplies deployed in S1 and S3 cannot supply power to critical loads due to unrepaired power supply paths. This mismatch in the spatial allocation of resources across the disaster relief, repair, and restoration categories makes Strategy 2's recovery effect far inferior to the strategy in this scheme.

[0048] Therefore, the present invention adopts the above-mentioned method for pre-disaster deployment of multiple types of emergency resources in the power distribution network before a typhoon disaster. It also considers the synergy of three types of heterogeneous resources in the entire process of exploration, rescue and restoration, and uses the power distribution network topology information and typhoon disaster information that can be obtained before the disaster to generate a reasonable resource deployment plan. This allows limited emergency resources to prioritize the coverage of key areas with high importance lines and high risk of typhoon impact, thereby maximizing the post-disaster load recovery effect.

[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.

Claims

1. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, characterized in that, Includes the following steps: S1: Establish an objective function with the priority ranking of disaster relief routes as input and the goal of maximizing the expected load recovery effect; S2: Add pre-disaster deployment constraints, post-disaster scheduling constraints, and power distribution network operation constraints for three types of emergency resources, including disaster survey teams, emergency repair teams, and mobile power supplies, to construct a pre-disaster deployment MILP model for disaster survey-emergency repair resources; S3: Call the solver to solve the MILP model for pre-disaster deployment of emergency resources in S2 to obtain the optimal pre-disaster deployment scheme for the three types of emergency resources; S4: Outputs the optimal deployment locations of disaster relief teams, emergency repair teams, and mobile power supplies at various deployment points within the power distribution network, serving as the basis for pre-disaster emergency resource deployment decisions.

2. The method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 1, is characterized in that... The objective function in S1 is defined as follows: ; In the formula: , S and S represent the set of distribution network nodes, the set of time periods, and the set of scenarios, respectively. For load The weight represents the importance of the load; For the scene Under load During the period The recovery state has a value range of [0,1]. =1 indicates that the load has been fully restored. =0 indicates that the load has not been restored. The value of (0,1) represents partial recovery.

3. The method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 1, is characterized in that... The constraints on disaster relief teams and pre-disaster deployment of emergency repair teams in S2 specifically include: The limit on the number of teams that a single deployment point can accommodate is met: ; The total number of deployable disaster relief and emergency repair teams must meet the following limits: ; The following formula states that any disaster relief team can only be deployed to one location: ; The following formula states that any emergency repair team can only reach one deployment point: ; In the formula, To assemble the disaster relief team This is a collection of pre-disaster deployment points. To allow the repair team to assemble, The maximum number of teams at a deployment point. The total number of disaster relief teams This refers to the total number of repair teams. The variable is 0-1, representing the disaster relief team. a At the deployment point Deployment status, =1 indicates that the disaster relief team has been deployed to the designated location. ; =0 indicates that the disaster relief team has not been deployed to the site. ; The variable is 0-1, representing the emergency repair team. At the deployment point Deployment status, =1 indicates that the emergency repair team has been deployed to the designated location. , =0 indicates that the repair team has not been deployed to the site. ; The specific constraints for pre-disaster deployment of portable power banks include: The limit on the number of mobile power supplies that a single deployment site can accommodate meets the following requirements: ; ; ; In the formula: , These are collections consisting of mobile generator sets and mobile energy storage systems, respectively. A 0-1 variable, representing a portable power bank. to deployment point Deployment status, =1 indicates that the power supply is deployed to point , =0 indicates that the power supply has not been deployed to the point. , The maximum number of portable power banks that can be deployed at a single location. This represents the total number of portable power banks.

4. The method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 1, is characterized in that... Post-disaster dispatch constraints for disaster relief teams include priority constraints: If low priority weight line Time required High-priority lines are needed to complete the disaster assessment. Must be during the time period The disaster assessment was completed either at a later time or even earlier; specifically: ; The following formula states that any disaster relief team can only be dispatched to a maximum of one route: ; The following formula expresses the idea that only one disaster relief team needs to be dispatched for any given route: ; The following formula describes the time required for disaster relief teams to move to another route during sequential dispatch: ; The following formula describes the route during the arrival and disaster relief period of the disaster relief team. Disaster assessment completed later: ; The disaster survey status of the railway line at any given time is determined by a single disaster survey team, as expressed by the following formula: ; The disaster survey status of any route changes only once throughout the entire time period, as expressed by the following formula: ; In the formula, For the disaster relief team During the period From the pre-disaster deployment point Dispatch to line state, =1 indicates that the route is assigned to this line. =0 indicates that the line was not scheduled; For the line During the period Disaster relief team The determined disaster assessment status; =1 indicates that the disaster relief team has already surveyed the affected areas. , =0 indicates that the disaster relief team did not reach the affected area. ; For the line Disaster relief priority weight; For the team from the pre-disaster deployment point Dispatch to line The shortest required travel time; For the team from the route arrive The travel time; and All of these are known quantities in each scenario; For the line Required disaster relief time; Any time period; For any line; This represents the number of time periods.

5. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 1, is characterized in that... Post-disaster dispatch constraints for emergency repair teams include: The following formula states that any emergency repair team can only be dispatched to the faulty line that has been identified and confirmed by disaster investigation: ; The following formula states that any emergency repair team can be dispatched to at most one faulty line: ; The following formula demonstrates that only one repair team is needed to repair any faulty line: ; When the repair teams are dispatched sequentially, they move to another line after a certain period of time: ; In the formula: A set of faulty lines; For 0-1 variables, =1 indicates a scenario From the deployment point The emergency repair team set off During the period Dispatch to the faulty line Place, =0 indicates the scenario From the deployment point The emergency repair team set off During the period Dispatch failed to reach the faulty line Place; For the scene Downline The initial state.

6. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 1, is characterized in that... Post-disaster dispatch constraints for mobile power banks include: The following formula states that any mobile power supply can schedule at most one access point: ; The following formula states that only one power bank is allowed to be connected to an access point: ; Scene Downstream power bank During the period Access point not reached At that time, the access point does not have the ability to restore load: ; The following formula describes how, during sequential scheduling of a mobile power source, it moves to another access point after a certain travel time: ; In the formula: For the scene Downstream power bank During the period From the pre-disaster deployment point Dispatch to distribution network node state, =1 indicates that the node will be scheduled to this node. =0 indicates that the node was not scheduled; A set of mobile power bank access points; For portable power bank From distribution network nodes To the node The travel time; Indicates pre-disaster deployment points to distribution network nodes The shortest required travel time. and All quantities are known in each scenario.

7. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 1, is characterized in that... Constraints related to distribution network operation include line status constraints, load status constraints, distribution network power balance constraints, and power supply security constraints; In line status constraints, a line that has not been surveyed for disaster relief is considered to be in a disconnected state using the following formula: ; The following formula describes the connection status of lines that have undergone disaster assessment and are initially in a normal state: ; The following formula describes the extent to which the confirmed faulty line, after the arrival of repair personnel and the elapsed repair time, is affected. Post-repair: ; The following formula describes the status of a faulty line that has been identified through disaster investigation as disconnected if it has not been repaired: ; The following formula describes how the line status changes only once during the entire time period: ; In the formula: Variables are 0-1, representing scenarios. Downline During the period The state; For 0-1 variables, =1 indicates a scenario Downline During the period Repair team Repair complete. =0 indicates the scenario Downline During the period Emergency repair team Not yet repaired; To repair the line The required repair time.

8. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 7, is characterized in that... In load state constraints, the change in load recovery state is expressed by the following formula: ; In the formula, This represents a set of distribution network nodes where the load recovery status changes only once during the entire time period, and after the load is restored, power supply continues throughout the entire time period without any secondary power outages.

9. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 7, is characterized in that... The power balance constraints of the distribution network are as follows: The distribution network node is described by the following formula. Power balance constraints at the location: ; The following formula expresses the condition that if the line is disconnected, the power flow is limited to 0: ; In the formula, Indicates the line The nodes on; For the scene Downline During the period The flowing tide; For nodes The active power of the connected load; For the scene Next node During the period The active power output of the power supply at that time; This is a collection of distribution network branches.

10. A method for pre-disaster deployment of multiple types of emergency resources in a power distribution network before a typhoon disaster, as described in claim 7, is characterized in that... In power supply safety constraints, the output power of the power source is limited to the permissible range using the following formula: ; ; The remaining fuel constraint within the generator is expressed by the following formula: ; The state of charge constraint for energy storage is expressed by the following formula: ; ; In the formula, and These are the lower and upper limits of the active power output of a fixed power source, respectively. For the scene Down power During the period Those who have made meritorious contributions; and These are respectively a fixed generator set and a fixed energy storage set; and These are respectively a collection of mobile generators and a collection of mobile energy storage; For the scene Downstream power bank During the period From pre-disaster deployment points to nodes Contributing to the cause at the time; For generator The initial energy; For energy storage The initial state of charge; , These are the lower and upper limits of the state of charge required for normal operation of energy storage, respectively. For energy storage Rated capacity; and For portable power bank The lower and upper limits of the effective output, Representing a scene energy storage During the period The accumulated energy.