A method, apparatus, electronic device, and storage medium for generating production plans.
By automating the generation of semiconductor production plans, the problems of inventory and duplicate wafer starts have been solved, and the accuracy and consistency of production plans have been achieved.
Patent Information
- Application Number
- CN202611428562.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-15
- Publication Date
- 2026-11-17
AI Technical Summary
In the existing technology, semiconductor product production planning relies on manual planning, which leads to the reuse of inventory and repeated scheduling of wafer starts, affecting the accuracy of production planning.
By using automated generation methods, the required quantity and stage inventory quantity are obtained, inventory consumption is calculated, and wafer fabrication plans, production plans, and delivery plans are generated, thus avoiding the reuse of inventory and the duplication of wafer fabrication arrangements.
This improves the accuracy and consistency of semiconductor production planning, ensuring the continuity and accuracy of inventory and wafer start-up arrangements.
Smart Images

Figure CN123117699A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of semiconductor product manufacturing, and in particular to a production plan generation method, apparatus, electronic device, and storage medium. Background Technology
[0002] Semiconductor product manufacturing involves complex processes and long production cycles, requiring advance production planning. In related technologies, the wafer fabrication, production, and delivery schedules for semiconductor products rely on manual planning, which not only consumes significant manpower but also easily leads to problems such as duplicate inventory use and redundant wafer fabrication scheduling, affecting the accuracy of production planning. Summary of the Invention
[0003] The purpose of this invention is to provide a production plan generation method, apparatus, electronic device, and storage medium that can automatically complete the formulation of semiconductor product wafer start-up plans, production plans, and delivery plans, and can avoid the reuse of inventory and repeated wafer start-up arrangements, thereby improving the accuracy of production planning.
[0004] To solve the above-mentioned technical problems, the present invention provides a production plan generation method, comprising: Obtain the demand quantity corresponding to multiple planning periods and the stage inventory quantity of multiple production stages in the semiconductor manufacturing process; For each planned period, inventory consumption is calculated based on the demand quantity and the stage inventory quantity of each production stage to obtain the inventory consumption and demand gap of each production stage, and the stage inventory quantity of the next planned period is updated based on the inventory consumption of the previous planned period. Based on the demand gap for each planned period and the number of wafers put into production in the preceding planned period, the number of wafers to be put into production in each planned period is determined to generate a wafer put-in plan. A production plan is generated based on the inventory consumption at each production stage, and the deliverable quantity for each planned period is determined based on the inventory consumption at each production stage to generate a delivery plan.
[0005] Optionally, obtain the demand quantities corresponding to multiple planned time periods, including: Obtain sales forecast data and convert the sales forecast quantity in the sales forecast data into a sales forecast quantity in units of finished products; The sales forecast quantities for each planning period are merged according to product model to obtain the model merged demand for each planning period. Based on the correspondence between product model and wafer model, the sales forecast quantities of one or more product models corresponding to the same wafer model are combined to obtain the wafer consolidation demand for each planning period. The required quantity for each planned time period is determined based on the model merging demand or the wafer merging demand.
[0006] Optionally, multiple production stages include the finished product stage, finished product testing stage, packaging stage, wafer testing stage, and wafer manufacturing stage; inventory consumption calculations are performed for each planned period, including: Obtain the finished product conversion parameters corresponding to the wafer model, and convert the stage inventory quantity measured in wafer count into the stage inventory quantity measured in finished product quantity according to the finished product conversion parameters; The required quantity is obtained by deducting the inventory quantity at each of the finished product stage, finished product testing stage, packaging stage, wafer testing stage, and wafer manufacturing stage from the required quantity.
[0007] Optionally, the number of wafers to be wafered in each planned period is determined based on the demand gap for each planned period and the number of wafers processed in the preceding planned period, including: The initial wafer start quantity is determined based on the demand gap during the planned period; Obtain confirmation information regarding the initial wafer start-up quantity, and determine the wafer start-up quantity for the planned time period based on the confirmation information; For the next planned period, based on the demand gap of the next planned period and the number of wafers put into operation in the previous planned period, the initial number of wafers put into operation in the next planned period is updated to obtain the number of wafers put into operation to be scheduled in the next planned period.
[0008] Optionally, a production plan is generated based on inventory consumption at each production stage, including: Based on the production stage that generates inventory consumption, determine the target production steps required to process the inventory into finished products at the corresponding stage; The production demand for each target production stage is determined based on the inventory consumption at each production stage, and the production plan is generated based on the production demand for each target production stage.
[0009] Optionally, a production plan is generated based on the production demand corresponding to each target production stage, including: For each target production stage, the corresponding manufacturer is determined based on the semiconductor product model or wafer model. Obtain the daily production capacity of the manufacturer for the target production stage, and determine the production duration of the target production stage based on the production demand and the daily production capacity; When the target production stage is the testing stage, the testing time is determined based on the corresponding production demand and daily production capacity.
[0010] Optionally, the deliverable quantity for each planned period is determined based on inventory consumption at each production stage to generate a delivery schedule, including: The planned delivery quantity for each planning period is determined based on the deliverable portion of the inventory consumed at each production stage. The delivery gap is determined based on the demand quantity and the planned delivery quantity; The remaining finished goods inventory quantity is determined based on the stage inventory quantity and corresponding inventory consumption of the finished goods stage, and the delivery plan is generated based on the demand quantity, the planned delivery quantity, the delivery gap, and the remaining finished goods inventory quantity; When sales forecast data is mismatched, finished product conversion parameters are missing, daily production capacity parameters are missing, or data references are abnormal, the corresponding processing will be blocked or an error message will be generated based on the type of error.
[0011] The present invention also provides a production plan generation apparatus, comprising: The acquisition module is used to acquire the demand quantity corresponding to multiple planning periods and the stage inventory quantity of multiple production stages in the semiconductor manufacturing process. The inventory consumption calculation module is used to calculate inventory consumption for each planned period based on the demand quantity and the stage inventory quantity of each production stage, to obtain the inventory consumption and demand gap of each production stage, and to update the stage inventory quantity of the next planned period based on the inventory consumption of the previous planned period. The wafer fabrication planning module is used to determine the number of wafers to be fabricated in each planning period based on the demand gap in each planning period and the number of wafers fabricated in the preceding planning period, so as to generate a wafer fabrication plan. The production delivery planning module is used to generate a production plan based on the inventory consumption of each production stage, and to determine the deliverable quantity for each planned period based on the inventory consumption of each production stage, so as to generate a delivery plan.
[0012] The present invention also provides an electronic device, including a memory and a processor; the memory is used to store a computer program; the processor is used to implement the above-described production plan generation method when executing the computer program.
[0013] The present invention also provides a computer-readable storage medium storing computer-executable instructions, which, when loaded and executed by a processor, implement the above-described production plan generation method.
[0014] This invention provides a production plan generation method, comprising: obtaining the demand quantities corresponding to multiple planning periods and the stage inventory quantities of multiple production stages in the semiconductor manufacturing process; for each planning period, calculating inventory consumption based on the demand quantities and the stage inventory quantities of each production stage to obtain the inventory consumption and demand gap of each production stage, and updating the stage inventory quantity of the next planning period based on the inventory consumption of the previous planning period; determining the number of wafers to be wafered in each planning period based on the demand gap of each planning period and the number of wafers fed into the preceding planning period to generate a wafer feeding plan; generating a production plan based on the inventory consumption of each production stage, and determining the deliverable quantity of each planning period based on the inventory consumption of each production stage to generate a delivery plan.
[0015] The beneficial effects of this invention are as follows: For multiple planning periods, this invention calculates inventory consumption based on the demand quantity of each planning period and the stage inventory quantity of each production stage, and updates the stage inventory quantity of the next planning period based on the inventory consumption of the previous planning period, thereby avoiding the reuse of consumed inventory in subsequent planning periods. Simultaneously, this invention determines the number of wafers to be processed based on the demand gap of each planning period and the wafer input quantity of the preceding planning period, which can prevent the duplication of already scheduled wafer input demands. Furthermore, this invention generates production and delivery plans based on inventory consumption results, enabling the continuous generation of wafer input plans, production plans, and delivery plans, thereby improving the accuracy and consistency of semiconductor production planning.
[0016] The present invention also provides a production planning generation device, an electronic device, and a computer-readable storage medium, which have the above-mentioned beneficial effects. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.
[0018] Figure 1 A flowchart of a production plan generation method provided in an embodiment of the present invention; Figure 2 A schematic diagram of the functional module structure of a production plan generation device provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of a rolling production plan generation process provided in an embodiment of the present invention; Figure 4 A structural block diagram of a production planning generation device provided in an embodiment of the present invention; Figure 5 This is a structural block diagram of an electronic device provided in an embodiment of the present invention. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0020] In semiconductor manufacturing, wafer fabrication, production, and delivery plans need to be continuously developed based on product demand across multiple planning periods and inventory levels at each stage of the semiconductor manufacturing process. Related technologies allow planners to use spreadsheets to record sales forecasts, stage inventory, wafer fabrication schedules, production schedules, and delivery status. They can also perform table operations such as summation, indexing, matching, and rounding up to complete demand aggregation, quantity conversion, and calculations of corresponding planning data.
[0021] However, when formulating production plans for multiple planning periods, there are continuous data dependencies between these periods. If the inventory consumption calculation for a later planning period is not updated based on the inventory consumption of the previous planning period, the inventory already consumed in the previous planning period may be used again to offset subsequent demand. Furthermore, if the wafer arrival quantity for a later planning period is not considered in relation to the wafer arrival quantity already scheduled in the previous planning period, wafer arrival requirements may be duplicated, thus affecting the accuracy of the production plan.
[0022] In addition, sales forecast data is usually recorded according to dimensions such as customer, project, complete model, quarter or month, while production plans usually need to be organized according to product model, wafer model, planned period and production stage. The two types of data differ in statistical methods and units, requiring multiple conversions and summaries. Relying on manual processing is also prone to errors, affecting the accuracy of production plans.
[0023] In view of this, in order to address the technical problem of how to automatically complete the formulation of semiconductor product wafer fabrication plans and production plans and avoid manual operation, the present invention can provide a production plan generation method. By automatically maintaining the inventory consumption status and wafer fabrication arrangement status of each planning period, the processing results of the previous planning period can be automatically transferred to the subsequent planning period, avoiding duplicate inventory deduction and duplicate wafer fabrication calculation, and improving the accuracy of rolling production plan generation.
[0024] It should be noted that the production plan generation method provided by this invention can be executed by a production plan generation device. The production plan generation device can be a server or a terminal. This device can be equipped with a spreadsheet plugin or production planning software, and the method can be implemented by running the spreadsheet plugin or production planning software.
[0025] The production plan generation method provided in this embodiment will be described below. For easier understanding, please refer to [link / reference]. Figure 1 , Figure 1 A flowchart of a production plan generation method provided in an embodiment of the present invention, the method may include: S11. Obtain the demand quantity corresponding to multiple planning periods and the stage inventory quantity of multiple production stages in the semiconductor manufacturing process.
[0026] This embodiment can generate wafer fabrication plans, production plans, and delivery plans on a rolling basis for a preset planning window. The planning window represents the time range covered by the current production plan calculation. The planning window includes multiple consecutive planning periods, each corresponding to a demand cycle. For example, the planning window can be set by week, month, year, or other time dimensions. When the planning window is set by month, a single planning window can be set to 4 months, 10 months, 12 months, or other preset lengths, in which case one month is one planning period. During the plan generation process, the corresponding wafer fabrication plan, production plan, and delivery plan are generated based on the demand quantity and stage inventory quantity corresponding to each planning period, and the planning data is transmitted in chronological order according to the planning period.
[0027] In one implementation, the production planning generation device can determine the month identifier corresponding to each planning period based on the month corresponding to the baseline planning period. For example, if the month corresponding to the baseline planning period is denoted as M, and the offset of the planning period relative to the baseline planning period is denoted as k, then the production planning generation device can determine the month corresponding to the k-th planning period based on M and k, thereby achieving automatic scrolling of each planning period within the planning window. For example: The month corresponding to the kth planned time period = MOD(M+k, 12); When the modulo result is 0, the corresponding month is determined to be December.
[0028] During a rolling plan generation process, the production planning equipment, based on the same planning window, sequentially executes demand processing, inventory consumption calculation, and the generation of wafer fabrication plans, production plans, and delivery plans according to the time sequence of each planning period. Upon entering the next rolling plan generation process, the production planning equipment re-acquires the latest sales forecast data and the current actual stage inventory quantity, and generates a new planning window based on the re-acquired data. Notably, the stage inventory quantity calculated during the previous rolling plan generation process is not used as the actual stage inventory quantity in the next rolling plan generation process, ensuring that subsequent plans are calculated based on the latest actual stage inventory quantity.
[0029] Furthermore, to effectively plan for each planning period, this step requires obtaining the demand quantities corresponding to multiple planning periods, as well as the stage inventory quantities for multiple production stages in the semiconductor manufacturing process. The demand quantities represent the quantity of finished products required for each planning period, and the stage inventory quantities represent the available inventory quantities for each production stage.
[0030] The following section first introduces how to obtain the demand quantity. The demand quantity can be determined based on sales forecast data, which can come from spreadsheets, databases, enterprise resource management systems, customer relationship management systems, or sales forecasting APIs.
[0031] In one possible scenario, obtaining the demand quantities corresponding to multiple planned time periods may include: S111. Obtain sales forecast data and convert the sales forecast quantity in the sales forecast data into a sales forecast quantity in units of finished products.
[0032] Sales forecast data can be recorded by quarter, region, customer, project, application area, type, complete model, and monthly quantity. If the input quantity uses a non-finished product unit such as ten thousand units, the production plan generation equipment will unify it to the finished product quantity using a preset unit conversion factor. For example, when the input unit is ten thousand units, 10,000 can be used as the unit conversion factor. This allows subsequent demand aggregation to be performed under the same quantity unit.
[0033] In one particular approach, each sales forecast record may include a quarter identifier, a customer identifier, a complete model number, and the forecast quantity for three consecutive planned months.
[0034] S112. Merge the sales forecast quantities for each planned period according to product model to obtain the model merged demand for each planned period.
[0035] In this step, the production planning generation equipment can aggregate multiple sales forecast records according to the planned time period and product model to obtain a single model merged demand for the same product model within the same planned time period. Furthermore, the model merged demand can be linked to information such as customers, projects, and complete model numbers in the sales forecast records to trace the source of the model merged demand.
[0036] S113. Based on the correspondence between product model and wafer model, the sales forecast quantities of one or more product models corresponding to the same wafer model are merged to obtain the wafer merging demand corresponding to each planning period.
[0037] One wafer model can correspond to one or more product models. For multiple product models sharing the same wafer model, the production planning equipment can further merge the corresponding product requirements to obtain the wafer demand quantity. During the merging process, the production planning equipment can convert the product model demand expressed in finished product quantity into wafer model demand expressed in wafer quantity, based on the wafer model corresponding to the product model and the corresponding finished product conversion relationship. The converted demand quantities are then summarized to obtain the merged wafer demand for each planning period. At this point, the production of multiple product models can jointly consume the inventory of the same wafer model, and the production planning equipment can also summarize the common demand of multiple product models to uniformly calculate the wafer wafer start-up demand.
[0038] It should be noted that the stage inventory of different wafer models should be kept independent to avoid mixing inventory that does not have a corresponding relationship.
[0039] S114. Determine the required quantity for each planned time period based on the model merging demand or wafer merging demand.
[0040] In this step, demand data can be generated separately according to two dimensions: product model and wafer model. The production planning equipment can simultaneously retain product model demand information for customer needs and wafer model demand information for production execution. When processing inventory or delivery plans at the product level, the combined model demand can be used as the demand quantity for the corresponding planning period; when processing inventory deduction or wafer start-up plans at the wafer level, the combined wafer demand can be used as the demand quantity for the corresponding planning period. This avoids inconsistencies in data conversion between sales demand and production demand due to different statistical units, improving the flexibility and accuracy of production and delivery plan generation.
[0041] The following describes how inventory quantities are obtained. Stage inventory quantity represents the available inventory quantity corresponding to each production stage. Stage inventory data can be entered manually or obtained through manufacturing execution systems, warehouse management systems, or data interfaces provided by the manufacturer. It should be noted that the initial value of the stage inventory quantity is the actual inventory quantity at the start of the first planning period; in subsequent planning periods, the stage inventory quantity needs to deduct the inventory consumed in the previous planning period. Specifically, when generating production plans for multiple planning periods, the inventory consumption situation for each planning period is first determined based on the stage inventory quantity at the start of the planning window; for the next planning period, the corresponding stage inventory quantity is updated according to the inventory consumption generated in the previous planning period, serving as the basis for inventory consumption calculations in the next planning period.
[0042] In one possible scenario, the production stages of a semiconductor product can include the finished product stage, the finished product testing stage, the packaging stage, the wafer testing stage, and the wafer fabrication stage. Firstly, the inventory quantities for the finished product stage, the finished product testing stage, and the packaging stage are typically measured in finished product quantities, while the inventory quantities for the wafer testing stage and the wafer fabrication stage are typically measured in wafer counts. It is evident that the statistical units differ across stages; therefore, in this embodiment, unit conversion is necessary when calculating inventory consumption.
[0043] In addition, when the production planning generation equipment reads the phase inventory data, it can associate the inventory records with the corresponding product model, wafer model, package model, finished product part number, customer or classification mark, so that subsequent inventory deductions can be carried out within the matching data range.
[0044] S12. For each planned period, calculate the inventory consumption based on the demand quantity and the stage inventory quantity of each production stage to obtain the inventory consumption and demand gap of each production stage, and update the stage inventory quantity of the next planned period based on the inventory consumption of the previous planned period.
[0045] In this step, actual inventory across multiple production stages can be allocated according to planned time periods. Inventory consumption represents the amount of inventory consumed during a specific planned time period, while the demand gap represents the remaining demand that is not met by inventory after it is depleted. Since all planned time periods share the same set of actual stage inventory states, after determining the inventory consumption for the current planned time period, the production planning equipment should deduct the corresponding quantity from the remaining inventory of the corresponding stage, and use the updated stage inventory quantity as the basis for calculating inventory consumption in the next planned time period.
[0046] In one feasible implementation, inventory consumption results can form the planning basis. The planning basis is used to record information such as the demand quantity for each planning period, the inventory consumption at each production stage, the demand gap, and the corresponding product model and wafer model, and serves as the data basis for subsequently generating production and delivery plans.
[0047] The following describes the specific methods for determining inventory consumption and demand gap. In one possible scenario, for each planned period, inventory consumption is calculated based on the demand quantity and the inventory quantity at each production stage, yielding the inventory consumption and demand gap for each production stage, including: S121. Obtain the finished product conversion parameters corresponding to the wafer model, and convert the stage inventory quantity measured in wafer count to the stage inventory quantity measured in finished product quantity according to the finished product conversion parameters.
[0048] The finished product conversion parameter is used to establish the correspondence between the number of wafers and the quantity of finished products, indicating how many finished products a single wafer can be converted into. In one feasible implementation, the finished product conversion parameter can be the CP finished product count, which is the number of finished products or equivalent finished products that a single wafer can be converted into after wafer testing. For the same wafer model, the production planning generation equipment uses this parameter to convert the inventory from the wafer testing stage and the wafer manufacturing stage into a finished product quantity, and then compares it with the required quantity. The CP finished product count can be obtained from a preset yield parameter table based on the wafer model.
[0049] For example, if the finished product conversion parameter for a certain wafer model is 500 units / wafer, then the demand for 5000 finished products can be converted into the demand for 10 wafers, and the inventory of 10 wafers in the testing phase can also be converted into the equivalent finished product inventory of 5000 units. Based on this conversion relationship, the demand recorded in the quantity of finished products and the phase inventory recorded in the number of wafers can enter the same inventory consumption chain. When converting the quantity of finished products demanded into the number of wafers, the conversion method can be calculated using the following formula: Number of wafers required = Rounded up (Monthly finished product demand aggregated by wafer model ÷ Finished product conversion parameter).
[0050] In addition, the finished product conversion parameters can also be determined based on the yield rate, the total number of wafers (gross dies), the number of standard dies (standard die count), or other parameters that can characterize the conversion relationship between the number of wafers and the number of finished products.
[0051] In addition, when converting inventory already in the back-end production stage into wafer count, the inventory counts in the finished product stage, finished product testing stage, and packaging stage can also be converted into equivalent wafer counts to determine inventory coverage capacity in terms of wafer count. The following formula can be used for calculation: Inventory equivalent wafer count = (Finished product stage inventory + Finished product testing stage inventory + Packaging stage inventory) ÷ Finished product conversion parameter.
[0052] In another approach, production planning equipment can also consider potential losses during production and adjust the quantity of demand that inventory can meet. For example, corresponding stage yield rates can be set for different production stages, and the quantity of finished products that can be obtained from the current stage inventory after subsequent production can be determined based on the stage yield rate. Then, demand can be deducted based on the actual quantity of finished products that can be formed.
[0053] For example, there is currently an inventory of 100 wafers that have completed testing but have not yet been packaged. If each wafer, after testing, theoretically yields 500 finished products, then theoretically 50,000 finished products could be produced. However, due to losses during subsequent packaging and testing processes, the actual number of finished products produced may be less than 50,000. Therefore, the production planning equipment can further adjust the 50,000 finished products based on the yield of subsequent production stages, for example, obtaining 45,000 effective finished products, and determining the required quantity that the inventory can cover based on 45,000 rather than 50,000. In this way, this embodiment can effectively consider production losses, thereby improving the reliability of the planning.
[0054] S122. By successively using the inventory quantities of the finished product stage, finished product testing stage, packaging stage, wafer testing stage, and wafer manufacturing stage to offset the demand quantity, the inventory consumption and demand gap of each production stage are obtained.
[0055] In this step, the production planning equipment uses inventory from each production stage to offset the demand for the current planned period, according to a preset inventory consumption sequence. The inventory consumption sequence can be determined based on proximity to the finished product delivery stage, for example, in the order of finished product stage, finished product testing stage, packaging stage, wafer testing stage, and wafer manufacturing stage.
[0056] For any given production period, the production planning equipment first uses finished goods inventory to offset the corresponding demand. If the finished goods inventory is less than the demand, the entire finished goods inventory is used as the finished goods inventory consumption, and the remaining demand is used to continue consuming the inventory of the next production stage. If the finished goods inventory is greater than or equal to the demand, the demand is used as the finished goods inventory consumption, and there is no need to consume inventory from other stages. Following this method, the production planning equipment sequentially determines the inventory consumption for each production stage until the demand is met or all stage inventories are consumed.
[0057] For example, if the demand for a certain planned period is 10,000 finished products, and the current available inventory at each stage is as follows: 3,000 for the finished product stage, 2,000 for the finished product testing stage, 4,000 for the packaging stage, and 5,000 for the wafer testing stage. The production planning equipment first uses the finished product stage inventory to offset 3,000 units of demand. The remaining 7,000 units are then offset by 2,000 units from the finished product testing stage inventory, followed by 4,000 units from the packaging stage inventory. Finally, the remaining 1,000 units are covered by the wafer testing stage inventory. This method determines the amount of inventory consumed at each stage and the amount of unmet demand.
[0058] Furthermore, after determining the inventory consumption for each planned period, the production planning equipment can also assess the wafer start-up gap based on the number of wafers. Specifically, the production planning equipment can uniformly convert the inventory of each production stage into an equivalent number of wafers and compare the current number of available wafers with the number of wafers required to be produced corresponding to the cumulative demand within the target time range.
[0059] For example, production planning equipment can divide the required quantity corresponding to a product model or wafer model by the corresponding CP finished product quantity and round up to obtain the number of wafers to be produced; for finished product stage, finished product testing stage and packaging stage inventory, it can be converted into equivalent wafer wafer quantity according to the corresponding CP finished product quantity; for wafer testing stage and wafer manufacturing stage inventory, since it is measured in wafer wafer quantity, it can be directly used as wafer wafer quantity in the calculation.
[0060] In one implementation, the shortage after depleting inventory equals the number of wafers in inventory minus the cumulative number of wafers required from the current month to the target month. When the shortage after depleting inventory is less than 0, the wafer production gap can be determined based on its absolute value; when the shortage after depleting inventory is greater than or equal to 0, it indicates that the current inventory can cover the demand within the corresponding time frame.
[0061] Furthermore, for the next planned period, the production planning equipment updates the remaining inventory quantity for each production stage based on the initial inventory quantity and the inventory consumption generated in the previous planned period, and continues to perform inventory consumption calculations based on the updated remaining inventory quantity. By updating the inventory status in the order of planned periods, the same inventory quantity can be avoided from being repeatedly involved in demand deductions in different planned periods.
[0062] In other implementations, the order of inventory consumption at each production stage can be set according to the production process rules of the corresponding product. For example, a specific product can prioritize consuming inventory at the packaging stage, but the inventory consumption calculation for the next planned period is still based on the inventory quantity at the stage that has already deducted the inventory consumption of the previous planned period.
[0063] S13. Based on the demand gap for each planned time period and the number of wafers put into production in the preceding planned time period, determine the number of wafers to be put into production in each planned time period to generate a wafer put-in plan.
[0064] In this step, after determining the demand gap corresponding to each planned time period, the production planning generation equipment generates a wafer fabrication plan based on the demand gap. Specifically, the production planning generation equipment determines the corresponding wafer fabrication quantity based on the demand gap corresponding to each planned time period and generates a wafer fabrication plan for each planned time period.
[0065] In one implementation, if there is a demand gap in the current planning period, the production planning generation equipment can determine the number of wafers to be wafered based on the wafer model corresponding to the demand gap, and determine the wafer wafering quantity according to the rounding-up rule, so that the expected output quantity corresponding to the determined wafer wafering quantity meets the demand gap.
[0066] For the next planning period, the production planning equipment updates the number of wafers to be scheduled for production based on the number of wafers already determined in the previous planning period. The determined number of wafers to be scheduled indicates that the corresponding demand gap has already been allocated a wafer scheduling plan. This is only used to avoid generating duplicate wafer scheduling plans for the same demand gap in subsequent planning periods and is not included in the phase inventory calculation for the next planning period.
[0067] Furthermore, the wafer fabrication schedule can record basic product or wafer information, demand quantities for each planned period, inventory at multiple production stages, finished product conversion parameters, required wafer output, demand gap after inventory depletion, initial wafer fabrication quantity, confirmed wafer fabrication quantity, and remarks. For the same wafer model, the gap records can be summarized to determine the recommended wafer fabrication quantity for the corresponding planned period.
[0068] Furthermore, to improve the reliability of wafer start-up schedules, the wafer start-up schedules provided by the production planning generation equipment also need to be manually reviewed. In one possible scenario, the number of wafers to be started in each scheduled period is determined based on the demand gap for each planned period and the number of wafer starts in the preceding planned periods. This may include: S131. Determine the initial wafer feed quantity based on the demand gap during the planned period.
[0069] The initial wafer count represents the suggested value automatically calculated by the production planning equipment.
[0070] S132. Obtain confirmation information for the initial wafer feed quantity, and determine the wafer feed quantity for the planned time period based on the confirmation information.
[0071] Confirmation information can be generated by planners after reviewing the suggested values. The production plan generation equipment can save the suggested values, manually confirmed values, confirmation time, and confirming personnel for subsequent tracking of changes in the rolling plan. The confirmed wafer start-up quantity is recorded as the scheduled start-up status for this planned time period.
[0072] S133. For the next planned period, based on the demand gap of the next planned period and the number of wafers put into production in the previous planned period, update the initial number of wafers put into production in the next planned period to obtain the number of wafers to be put into production in the next planned period.
[0073] Specifically, if a portion of the wafer start-up quantity has already been determined in a previous planning period, then when generating the wafer start-up plan in a subsequent planning period based on the demand gap, the demand covered by the wafer start-up quantity already determined in the previous planning period needs to be deducted to avoid the same demand being repeatedly generated into wafer start-up plans. For multiple previous planning periods, the production planning generation equipment can cumulatively consider the wafer start-up quantity already determined in each previous planning period.
[0074] Below is a specific implementation example. If the confirmed wafer starts for the first and second planning periods are A1 and A2 respectively, then after the third planning period forms its initial wafer starts based on its own demand gap, it also needs to consider the demand gaps already covered by A1 and A2 to obtain the additional wafer starts that still need to be arranged in the third planning period. In this way, the manual confirmation results of the previous planning period can be passed on along the planning period and used to update the wafer starts calculation results of subsequent planning periods.
[0075] Furthermore, after obtaining the theoretical wafer count based on the demand gap, the theoretical wafer count can be adjusted according to the expected yield corresponding to the wafer model, so as to fully consider production losses and improve the reliability of the wafer count.
[0076] S14. Generate a production plan based on the inventory consumption of each production stage, and determine the deliverable quantity for each planned period based on the inventory consumption of each production stage to generate a delivery plan.
[0077] In this step, production plans and delivery plans can be generated based on the aforementioned inventory consumption. The production plan determines the target production steps and corresponding production requirements for processing the inventory into finished products at each production stage, based on the inventory consumption at each stage. The delivery plan determines the corresponding deliverable quantity based on the inventory consumption results for each planned period and updates the delivery information in conjunction with the actual delivery situation.
[0078] Based on the above embodiments, this invention calculates inventory consumption for multiple planning periods based on the demand quantity of each planning period and the stage inventory quantity of each production stage. It then updates the stage inventory quantity of the next planning period based on the inventory consumption of the previous planning period, thereby preventing consumed inventory from being reused in subsequent planning periods. Simultaneously, this invention determines the number of wafers to be processed based on the demand gap of each planning period and the wafer input quantity of the preceding planning period, preventing already scheduled wafer input demands from being duplicated. Furthermore, this invention generates production and delivery plans based on inventory consumption results, enabling the continuous generation of wafer input plans, production plans, and delivery plans, thereby improving the accuracy and consistency of semiconductor production planning.
[0079] Based on the above embodiments, the method for determining the production plan is described below. In one possible scenario, generating the production plan based on the inventory consumption at each production stage may include: S1411. Based on the production stage that generates inventory consumption, determine the target production process required to process the inventory into finished products at the corresponding stage.
[0080] In this step, for any planned time period, the production planning generation equipment can determine the target production steps required to process the corresponding stage inventory into finished products based on the production stage that generates inventory consumption, and determine the corresponding production requirements based on the target production steps. For example, for inventory in the wafer manufacturing stage, it is determined that it needs to go through the wafer testing stage, packaging stage, and finished product testing stage in sequence; for inventory in the packaging stage, it is determined that it only needs to go through the finished product testing stage. It can be seen that the closer the stage inventory is to the early stage of production, the more target production steps it usually needs to be associated with.
[0081] S1412. Determine the production demand quantity corresponding to each target production link based on the inventory consumption of each production stage, and generate a production plan based on the production demand quantity corresponding to each target production link.
[0082] The production demand at the target production stage is determined by the amount of inventory consumed that needs to be processed at that stage. For inventory measured in wafer count, such as in the wafer testing and wafer manufacturing stages, the demand can be determined by maintaining the wafer count caliber, or it can be linked to the demand at subsequent stages measured in finished product quantity using finished product conversion parameters. The production demand at each stage generated from the same planning basis can correspond to the aforementioned inventory allocation results.
[0083] The following section, using specific production and testing stages as examples, details the method for generating a production plan. In one possible scenario, the production plan is generated based on the production demand quantities corresponding to each target production stage, including: S14121. For each target production stage, determine the corresponding manufacturer based on the semiconductor product model or wafer model.
[0084] Specifically, the production planning equipment can query the manufacturer information corresponding to each target production stage from the basic parameter data based on the semiconductor product model or wafer model. Different target production stages can correspond to different manufacturers; for example, the wafer manufacturing stage, wafer testing stage, packaging stage, and finished product testing stage each correspond to a specific manufacturer.
[0085] After the manufacturer is determined, the production planning equipment determines the production demand for the target production stage based on the processing requirements corresponding to each production stage. Specifically, the production planning equipment can determine the required quantity for each target production stage based on the inventory consumption results of each stage in the planning foundation, combined with the production flow relationship between different production stages. For example, the CP production demand can be obtained by dividing the required quantity corresponding to the inventory consumption in the CP stage by the number of finished CP products, and then adding it to the wafer start demand corresponding to the FAB stage; the packaging production demand can be obtained by adding the required quantity corresponding to the inventory consumption in the packaging stage and the output demand in the CP stage; the FT production demand can be obtained by adding the required quantity corresponding to the inventory consumption in the FT stage and the packaging production demand.
[0086] Furthermore, the production planning generation equipment can generate production plans based on the manufacturers and production needs corresponding to each target production stage. The production plans may include wafer manufacturing manufacturers and wafer manufacturing needs, wafer testing manufacturers and wafer testing needs and testing time, packaging manufacturers and packaging needs, and finished product testing manufacturers and finished product testing needs and testing time.
[0087] S14122. Obtain the daily production capacity of the manufacturer for the target production stage, and determine the production duration of the target production stage based on the production demand and daily production capacity.
[0088] In this step, the production planning generation equipment can determine the production time of a single target production stage by dividing the production demand by the corresponding daily capacity. When the inventory in the same stage needs to go through multiple target production stages in sequence, the production times of multiple target production stages can be added together to obtain the total production time required for that part of the inventory to complete production.
[0089] S14123. When the target production stage is the testing stage, the testing time shall be determined based on the corresponding production demand and daily production capacity.
[0090] Test time is used to represent the time occupied by test resources to execute the corresponding test requirements. In one specific implementation, when daily capacity represents the quantity that can be processed in 24 hours, the number of hours required for testing can be calculated by converting the production demand quantity and daily capacity, and adding a fixed setup time. It can be expressed as: Test time = Production demand quantity × 24 ÷ Daily capacity + Fixed setup time.
[0091] If multiple test resources or test sites exist, the production plan generation equipment can calculate the test hours separately based on the corresponding daily capacity and then summarize them. The fixed preparation time can be a fixed constant or set according to product model, manufacturer, test resource, or batch quantity.
[0092] Furthermore, if there is no available stage inventory to cover the demand during the current planning period, the production planning generator can generate an alarm indicating that delivery cannot be completed based on the existing inventory. If there is available stage inventory to cover the demand, the production planning generator can determine whether there is a risk of delay based on the production stage and corresponding production cycle of the consumed inventory. The production cycle can be determined based on the daily capacity of each production stage, and the available production cycle is the time span between the current planning period and the target delivery period. If the consumed inventory is in a production stage close to the finished product and the corresponding production cycle does not exceed the available production cycle, the corresponding production plan is generated normally. If the consumed inventory is in a production stage far from the finished product and the corresponding multi-stage production cycles exceed the available production cycle, a delay risk warning is output while generating the production plan. The alarm reason, alarm content, and representation method can be set according to business needs.
[0093] Based on the above embodiments, the method for generating a delivery schedule is described below. In one possible scenario, the deliverable quantity for each planned period is determined based on the inventory consumption at each production stage to generate the delivery schedule, which may include: S1421. Determine the planned delivery quantity for each planned period based on the deliverable portion of the inventory consumption at each production stage.
[0094] Planned delivery quantity represents the quantity of deliveries that are expected to be supported by allocated stage inventory in the production planning calculations. For finished goods stage inventory, the corresponding inventory consumption can be directly included as the deliverable portion; for other production stage inventory, the inventory consumption that can complete the necessary subsequent production under the planned schedule can be included in the deliverable portion. Planned delivery quantity is a planned value and is not equivalent to the quantity that has been produced and can be delivered immediately.
[0095] In one feasible implementation, the planned delivery quantity can be obtained by summing the deliverable portion of the inventory consumption at each production stage during the current planning period. By using the same inventory consumption results as the production plan, the delivery plan can maintain the same data basis as the production needs of each production stage.
[0096] S1422. Determine the delivery gap based on the required quantity and the planned delivery quantity.
[0097] The production planning generation equipment can determine the remaining demand that has not yet been met through planned deliveries based on the required quantity and the planned delivery quantity, and then determine the delivery gap based on the remaining demand. If the production planning generation equipment can access the actual delivery quantity, it can also determine the delivery gap based on the required quantity, the planned delivery quantity, and the actual delivery quantity. For delivery demands spanning multiple planning periods, the production planning generation equipment can also accumulate the required quantity and the planned delivery quantity in the order of the planning periods and determine the delivery gap based on the accumulated result.
[0098] The delivery gap can be expressed as: Delivery gap = Demand delivery - Planned delivery.
[0099] S1423. Determine the remaining finished goods inventory quantity based on the stage inventory quantity and corresponding inventory consumption of the finished goods stage, and generate a delivery plan based on the demand quantity, planned delivery quantity, delivery gap and remaining finished goods inventory quantity.
[0100] The remaining finished goods inventory is obtained by subtracting the finished goods inventory consumption already allocated to each planned period from the original available inventory in the finished goods stage. The delivery schedule can record demanded deliveries, planned deliveries, delivery gaps, and remaining finished goods inventory, thus characterizing the delivery status from multiple dimensions.
[0101] S1424. When sales forecast data is mismatched, finished product conversion parameters are missing, daily production capacity parameters are missing, or data reference is abnormal, block the corresponding processing or generate an error message according to the type of error.
[0102] When sales forecast data cannot match the corresponding customer or model, a no-match flag can be generated for the corresponding record and the record can be blocked from entering the automatic plan, or it can be added to the exception list; when finished product conversion parameters are missing, the corresponding quantity conversion can be blocked and a prompt can be made to supplement the corresponding parameters for the wafer model; when daily capacity parameters are missing, the production plan generation equipment can still output the quantity plan, while marking data that depends on daily capacity, such as the manufacturer, production duration, or testing machine time, as to be supplemented.
[0103] When a data source field or data reference is missing, a reference exception message can be generated. This message can include the missing field name, the corresponding planned time period, and the product identifier. By identifying missing key parameters before data enters subsequent planning, missing data can be prevented from being passed on to inventory consumption, production duration, or delivery calculations.
[0104] The following diagram illustrates the production planning generation system and the overall production planning process.
[0105] Please refer to Figure 2 , Figure 2 This is a schematic diagram of the functional module structure of a production planning generation device provided in an embodiment of the present invention. The input layer may include a sales forecast acquisition module, a basic parameter acquisition module, and an inventory and work-in-process data acquisition module; the calculation layer may include a demand aggregation module, a caliber conversion module, an inventory consumption module for each time period, and a wafer start-up gap determination module; the output layer may include a wafer start-up plan generation module, a plan basis generation module, a production plan generation module, and a delivery plan generation module. These modules can be deployed in the same production planning generation device; in a distributed implementation, these modules can also be deployed in multiple production planning generation devices, each of which can be a terminal or a server.
[0106] Please refer to Figure 3 , Figure 3 This is a schematic diagram of a rolling production plan generation process provided in an embodiment of the present invention. Figure 3 As shown, the production planning generation equipment first obtains sales forecast data, which may include quarterly information, customer information, product model information, and monthly demand quantity, etc.
[0107] Subsequently, the production planning generation equipment performs demand transformation and merging processing on the sales forecast data. Specifically, the production planning generation equipment can convert the sales forecast quantity into a quantity caliber suitable for production planning calculations based on the product model information, wafer model information, and corresponding finished product conversion parameters in the sales forecast data. Then, it merges the converted demand quantities according to product model and wafer model respectively to obtain the demand data corresponding to each planning period.
[0108] After obtaining the demand data, the production planning generation equipment acquires the inventory quantity for each production stage. This inventory quantity can include the inventory quantity corresponding to the finished product stage, finished product testing stage, packaging stage, wafer testing stage, and wafer manufacturing stage. Subsequently, the production planning generation equipment performs rolling inventory consumption calculations based on the demand data and stage inventory quantities for each planning period, utilizing the inventory of each stage to meet demand according to a preset order, and determining the inventory consumption and demand gap corresponding to each planning period.
[0109] Furthermore, the production planning generation equipment generates a wafer start-up plan based on the demand gap, and generates a production plan and a delivery plan based on the phase inventory consumption results. Among them, the wafer start-up plan is used to determine the number of wafers that need to be put into production; the production plan is used to determine the production demand and corresponding production resources for each production phase; and the delivery plan is used to determine the planned delivery quantity for each planned period, and forms the delivery result by combining the actual delivery information.
[0110] The production plan generation device provided in the embodiments of the present invention will be described below. Please refer to... Figure 4 , Figure 4 This invention provides a structural block diagram of a production planning generation device, which may include: The acquisition module 401 is used to acquire the demand quantity corresponding to multiple planning time periods and the stage inventory quantity of multiple production stages in the semiconductor production process. The inventory consumption calculation module 402 is used to calculate the inventory consumption for each planned period based on the demand quantity and the stage inventory quantity of each production stage, to obtain the inventory consumption and demand gap of each production stage, and to update the stage inventory quantity of the next planned period based on the inventory consumption of the previous planned period. The wafer fabrication planning module 403 is used to determine the number of wafers to be fabricated in each planning period based on the demand gap in each planning period and the number of wafers fabricated in the preceding planning period, so as to generate a wafer fabrication plan. The production delivery planning module 404 is used to generate a production plan based on the inventory consumption of each production stage, and to determine the deliverable quantity for each planned period based on the inventory consumption of each production stage, so as to generate a delivery plan.
[0111] Optionally, the acquisition module 401 may include a sales forecasting processing unit, a product model merging unit, a wafer model merging unit, and a demand determination unit.
[0112] The sales forecast processing unit is used to acquire sales forecast data and convert the sales forecast quantity in the sales forecast data into a sales forecast quantity in units of finished products. The product model merging unit is used to merge the sales forecast quantities for each planning period according to the product model, so as to obtain the model merging requirements for each planning period. The wafer model merging unit is used to merge the sales forecast quantities of one or more product models corresponding to the same wafer model based on the correspondence between product model and wafer model, so as to obtain the wafer merging demand corresponding to each planning period. The demand determination unit is used to determine the demand quantity corresponding to each planned time period based on the model merging demand or wafer merging demand.
[0113] Optionally, the multiple production stages include the finished product stage, the finished product testing stage, the packaging stage, the wafer testing stage, and the wafer manufacturing stage; the inventory consumption calculation module 402 may include a finished product conversion processing unit and a stage inventory consumption unit.
[0114] The finished product conversion processing unit is used to obtain the finished product conversion parameters corresponding to the wafer model, and convert the stage inventory quantity measured by the number of wafers into the stage inventory quantity measured by the number of finished products according to the finished product conversion parameters. The stage inventory consumption unit is used to sequentially deduct the demand quantity from the stage inventory of the finished product stage, finished product testing stage, packaging stage, wafer testing stage and wafer manufacturing stage to obtain the inventory consumption and demand gap of each production stage.
[0115] Optionally, the wafer fabrication planning module 403 may include an initial wafer fabrication quantity determination unit, a confirmation information processing unit, and a subsequent wafer fabrication quantity update unit.
[0116] The initial wafer start quantity determination unit is used to determine the initial wafer start quantity based on the demand gap during the planned period. The confirmation information processing unit is used to obtain confirmation information for the initial wafer feed quantity and determine the wafer feed quantity for the planned time period based on the confirmation information. The subsequent wafer start quantity update unit is used to update the initial wafer start quantity for the next planned period based on the demand gap of the next planned period and the wafer start quantity of the previous planned period, so as to obtain the number of wafer start to be scheduled for the next planned period.
[0117] Optionally, the production and delivery planning module 404 may include a production planning submodule and a delivery planning submodule. The production planning submodule may include a target production stage determination unit and a production demand processing unit.
[0118] The target production stage determination unit is used to determine the target production stage required to process the inventory into finished products based on the production stage that generates inventory consumption. The production demand processing unit is used to determine the production demand quantity corresponding to each target production link based on the inventory consumption of each production stage, and to generate a production plan based on the production demand quantity corresponding to each target production link.
[0119] Optionally, the production planning submodule may also include a manufacturer determination unit, a production duration determination unit, and a test time determination unit.
[0120] The manufacturer determination unit is used to determine the corresponding manufacturer for each target production stage based on the semiconductor product model or wafer model. The production duration determination unit is used to obtain the daily production capacity of the manufacturer for the target production stage, and determine the production duration of the target production stage based on the production demand and daily production capacity. The test time determination unit is used to determine the test time based on the corresponding production demand and daily capacity when the target production stage is a test stage.
[0121] Optionally, the delivery planning submodule may include a planned delivery quantity determination unit, a delivery gap determination unit, a delivery plan generation unit, and an exception handling unit.
[0122] The planned delivery quantity determination unit is used to determine the planned delivery quantity for each planned period based on the deliverable portion of the inventory consumption at each production stage. Delivery gap determination unit, used to determine the delivery gap based on the demand quantity and the planned delivery quantity; The delivery plan generation unit is used to determine the remaining finished goods inventory quantity based on the stage inventory quantity and corresponding inventory consumption of the finished goods stage, and to generate a delivery plan based on the demand quantity, planned delivery quantity, delivery gap and remaining finished goods inventory quantity. The anomaly handling unit is used to block corresponding processing or generate anomaly prompts when sales forecast data is mismatched, finished product conversion parameters are missing, daily production capacity parameters are missing, or data reference is abnormal, based on the anomaly type.
[0123] For further processing principles and optional implementations of the above modules, sub-modules and units, please refer to the corresponding descriptions in the foregoing method embodiments, which will not be repeated here.
[0124] Please refer to Figure 5 , Figure 5 This is a structural block diagram of an electronic device provided in an embodiment of the present invention. The electronic device 50 provided in this embodiment may include a processor 51 and a memory 52, wherein the memory 52 stores a computer program, and the processor 51 executes the production plan generation method provided in the foregoing embodiment when executing the computer program.
[0125] The specific process of the above production plan generation method can be found in the corresponding content provided in the foregoing embodiments, and will not be repeated here.
[0126] The memory 52 serves as a storage medium for data and programs and can be a read-only memory, random access memory, disk, or optical disk, etc. The storage method can be short-term storage or permanent storage.
[0127] Electronic device 50 may also include a power supply 53, a communication interface 54, an input / output interface 55, and a communication bus 56. The power supply 53 provides operating voltage for the hardware in electronic device 50; the communication interface 54 establishes a data transmission channel between electronic device 50 and external devices; the input / output interface 55 acquires external input data or outputs planned data; the processor 51, memory 52, power supply 53, communication interface 54, and input / output interface 55 can interact with each other via the communication bus 56.
[0128] This invention also provides a computer program product, including a computer program or instructions, which, when executed by a processor, implement the production plan generation method described in the foregoing embodiments. The computer program product corresponds to the foregoing method embodiments, and the specific processing steps can be found in the foregoing method embodiments.
[0129] This invention also provides a computer-readable storage medium storing a computer program. When executed by a processor, the computer program implements the production plan generation method described in the foregoing embodiments. The computer-readable storage medium corresponds to the foregoing method embodiments, and the specific processing procedure can be found in the foregoing method embodiments.
[0130] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical content can be referred to interchangeably. The apparatus embodiments correspond to the method embodiments; therefore, the apparatus section can be found in the relevant descriptions in the method section.
[0131] Those skilled in the art will further understand that the example units and processing steps described in conjunction with the embodiments disclosed herein can be implemented using electronic hardware, computer software, or a combination of both. Whether to use hardware or software can be determined based on the application scenario and design constraints of the technical solution.
[0132] The method steps described in conjunction with the embodiments disclosed herein can be implemented by hardware, a software module executed by a processor, or a combination of both. The software module can be located in random access memory, memory, read-only memory, electrically programmable read-only memory, electrically erasable programmable read-only memory, registers, hard disk, removable disk, optical disk, or other storage media applicable in this technical field.
[0133] The foregoing has provided a detailed description of a production plan generation method, apparatus, electronic device, and storage medium provided by the present invention. This document has elucidated the principles and implementation methods of the present invention through specific embodiments. The above description is intended to aid in understanding the method and core ideas of the present invention. For those skilled in the art, improvements and modifications can be made to the present invention without departing from its principles, and these improvements and modifications also fall within the protection scope of the present invention.
Claims
1. A method for generating a production plan, characterized in that, include: Obtain the demand quantity corresponding to multiple planning periods and the stage inventory quantity of multiple production stages in the semiconductor manufacturing process; For each planned period, inventory consumption is calculated based on the demand quantity and the stage inventory quantity of each production stage to obtain the inventory consumption and demand gap of each production stage, and the stage inventory quantity of the next planned period is updated based on the inventory consumption of the previous planned period. Based on the demand gap for each planned period and the number of wafers put into production in the preceding planned period, the number of wafers to be put into production in each planned period is determined to generate a wafer put-in plan. A production plan is generated based on the inventory consumption at each production stage, and the deliverable quantity for each planned period is determined based on the inventory consumption at each production stage to generate a delivery plan.
2. The production plan generation method according to claim 1, characterized in that, The process of obtaining the demand quantities corresponding to multiple planned time periods includes: Obtain sales forecast data and convert the sales forecast quantity in the sales forecast data into a sales forecast quantity in units of finished products; The sales forecast quantities for each planning period are merged according to product model to obtain the model merged demand for each planning period. Based on the correspondence between product model and wafer model, the sales forecast quantities of one or more product models corresponding to the same wafer model are combined to obtain the wafer consolidation demand for each planning period. The required quantity for each planned time period is determined based on the model merging demand or the wafer merging demand.
3. The production plan generation method according to claim 1, characterized in that, The multiple production stages include the finished product stage, the finished product testing stage, the packaging stage, the wafer testing stage, and the wafer manufacturing stage; For each planned time period, inventory consumption is calculated based on the demand quantity and the inventory quantity at each production stage to obtain the inventory consumption and demand gap for each production stage, including: Obtain the finished product conversion parameters corresponding to the wafer model, and convert the stage inventory quantity measured in wafer count into the stage inventory quantity measured in finished product quantity according to the finished product conversion parameters; The required quantity is obtained by deducting the inventory quantity at each of the finished product stage, finished product testing stage, packaging stage, wafer testing stage, and wafer manufacturing stage from the required quantity.
4. The production plan generation method according to claim 1, characterized in that, The process of determining the number of wafers to be processed in each planned period based on the demand gap in each planned period and the number of wafers processed in the preceding planned period includes: The initial wafer start quantity is determined based on the demand gap during the planned period; Obtain confirmation information regarding the initial wafer start-up quantity, and determine the wafer start-up quantity for the planned time period based on the confirmation information; For the next planned period, based on the demand gap of the next planned period and the number of wafers put into operation in the previous planned period, the initial number of wafers put into operation in the next planned period is updated to obtain the number of wafers put into operation to be scheduled in the next planned period.
5. The production plan generation method according to claim 1, characterized in that, The process of generating a production plan based on inventory consumption at each production stage includes: Based on the production stage that generates inventory consumption, determine the target production steps required to process the inventory into finished products at the corresponding stage; The production demand for each target production stage is determined based on the inventory consumption at each production stage, and the production plan is generated based on the production demand for each target production stage.
6. The production plan generation method according to claim 5, characterized in that, The step of generating the production plan based on the production demand quantity corresponding to each target production stage includes: For each target production stage, the corresponding manufacturer is determined based on the semiconductor product model or wafer model. Obtain the daily production capacity of the manufacturer for the target production stage, and determine the production duration of the target production stage based on the production demand and the daily production capacity; When the target production stage is the testing stage, the testing time is determined based on the corresponding production demand and daily production capacity.
7. The production plan generation method according to claim 1, characterized in that, The process of determining the deliverable quantity for each planned period based on inventory consumption at each production stage to generate a delivery schedule includes: The planned delivery quantity for each planning period is determined based on the deliverable portion of the inventory consumed at each production stage. The delivery gap is determined based on the demand quantity and the planned delivery quantity; The remaining finished goods inventory quantity is determined based on the stage inventory quantity and corresponding inventory consumption of the finished goods stage, and the delivery plan is generated based on the demand quantity, the planned delivery quantity, the delivery gap, and the remaining finished goods inventory quantity; When sales forecast data is mismatched, finished product conversion parameters are missing, daily production capacity parameters are missing, or data references are abnormal, the corresponding processing will be blocked or an error message will be generated based on the type of error.
8. A production plan generation device, characterized in that, include: The acquisition module is used to acquire the demand quantity corresponding to multiple planning periods and the stage inventory quantity of multiple production stages in the semiconductor manufacturing process. The inventory consumption calculation module is used to calculate inventory consumption for each planned period based on the demand quantity and the stage inventory quantity of each production stage, to obtain the inventory consumption and demand gap of each production stage, and to update the stage inventory quantity of the next planned period based on the inventory consumption of the previous planned period. The wafer fabrication planning module is used to determine the number of wafers to be fabricated in each planning period based on the demand gap in each planning period and the number of wafers fabricated in the preceding planning period, so as to generate a wafer fabrication plan. The production delivery planning module is used to generate a production plan based on the inventory consumption of each production stage, and to determine the deliverable quantity for each planned period based on the inventory consumption of each production stage, so as to generate a delivery plan.
9. An electronic device, characterized in that, include: Memory, used to store computer programs; A processor for executing the computer program to implement the production plan generation method as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer-executable instructions, which, when loaded and executed by a processor, implement the production plan generation method as described in any one of claims 1 to 7.